Home

SK3000 Assembly Guide - Steel King Industries, Inc.

image

Contents

1. Jm gn eee gm E cat 7T tet King industries ne 000 Structural Pallet Rack installation Guide Step 7 Accessories Continued Noe We recommend that the nuts nd bot fo these accessories are not uly tightened urti the ack i plas leve ad are Torque he bolts to GO Pes Please see the bo hein E Tighten ali accessory nuts and bolts row spacers and pallet supports and double check anchor connections to complete the instalation process Please see the bolt tightening specications at the end of this document onset Piane Noe instalation of capacity plates ster recommended These plates Heald ey tna characters Fr wich he rac wt designed such a lod e ld met And rack configuration These Plates are very nhl orcormumieatingafelondng oration ta Sot resent ana future ses Several signe saul be pone rated or eat way and se permanenti fed to the rac structure Appropriate gra ane obtained bra teur Ie Step 8 Clean up A Dispose of al dunnage strapping and debris Sweep the floor wth a broom f necessary 3T Stet King Industries ne i000 structural Pallet Rack installation Guide Determining Storage Rack Capacity To determine the load capacity of your storage rack Determine the maximum distances between halbe levi 3 Determine the distance from the floor to the fst shlbeam level Compare distances computed in Steps A amp B use whichever figure is greater as the Maximum Vertical Beam Spa
2. contacting Steel King Industries at Stel xing industries ine 2700 chamber st aco 226 0203 nfogsteeng o ectonic versions are avalable at wunsteeling com safetyinto aT Stet King industries ne SkGo00 Structural Pallet Rack installation Guide Step 1 Check the Material A Check to make certain that all materiis have been received Materials should be checked against the packing ts and BU af Laing B Notify the shipper immediately of any shortages or product damage Step 42 Check the Area A Clea the area where the rack system isto be located 1 Check the area for al obstructions such as lights heating duets pipes building columns ete to insure a clear area for the installation of the storage rack Step 3 Lay Out floor BRE A Establish the rack lay out by determining he ase dimensions and the raci postion B Snap a chaik ine establishing the front edge of the upright bases The chalk Ine should run the entire length of the row of rack Stet King industries ne i000 Structural Pallet Rack installation Guide Step 4 Assemble First Bay Recommended tools I Torque wrench fe arive impacts or equivalent A Bottone beam to the upright frame using the hardware provided The bolt is inserted through the frant af the frame column sa that the nut shows o the inside of the column When assembled See figure below 1B Stand the second upright frame vertically attach
3. SK3000 Structural Pallet Rack Installation and Assembly Guide tet King Industries ic 2700 Chamber st Stevens Pont Wi 54461 800 526203 wrwwstetkingcom jnfo steelking com Stet King industries ne 000 Structural Pallet Rack installation Guide ASSEMBLY INSTRUCTIONS Stel king Industries recommends that this product be assembled ony by qualified personne experienced in assembly of storage racks and knowledgeable of safety regulations and Practices These instructions are intended oly for use by qualifed individuais using al proper safely equipment BARRE 17r erene hean andit oe prope soud during instalation and assembly could fal possible causing injury or death as mellas damage to property Contact tel King Industries or your local stesi King Representative for the name and contact information ofa qualified staller Users of this information agree to indemnify and hold harmless Steel King Industries from any and all abit Installation Note Do not install racks outdoors unless special designed by Steel King er this purpose Outdoor usage requires consideration of wind loads snow loads ete Which are not normally considered in rack design Pallet Rack User s Manual tel King Industries recommends that all users of Steel King manufactured storage racks obtain read and understand steel King s Pallet Rack User s Manual Copies of Steel King s Pallet Rack Users Manual are free of charge and can be obtained by
4. cing in the chart below E Tg Frame espe Scrat CH Post Wath sihes a incher Waximum Vert eam Spacing Capaciy pounds La umor sis E Sr sis La Suns s stor La rp ar seor m zs sas 3 1528 35870 Seer Cena Sa Kine 1 Capes ated upon interior usage 2 Capacities are for selective rack ony 3 The above canacies Sa not consider simi losing 3 tach cium aost of each frame MUST be anchored toan desunt concrete Nose 5 Capacities based upon instalation in a plumb conditor Capac mre ttd pe oi tinge oe i bo at Inti te td ihe he maniura weight ot ry be stored whin one nual rack ay DO NOT double the capacity stench ight ms when eating sgl bys pay 7 Capes are tobe reduced o acount fr the wept of the rack pto deduct he weight of beam 3 Yast loca lig pectore ee wren ec coda wich may redice the ted Stet King industries ne i000 Structural Pallet Rack installation Guide Many of these condition do not appl to your pplication of you oe unsure they apply DO NOT USE CHART in those coses consul tel ng Engineering department for design information Changing the configuration such as adjusting storage levee can PRES erene he contguration t justin storage leve A adversely affect the load carrying capacity and reduce the structural integrity of the rack system Before adjusting the rack configuration contact steel King or your Steel king Di
5. ing the load beam as above instali second beam on the opposite side of upright frames at the identical height of frst D Move and align bay so that front edge af upright bases is on chalk Ine Note Iis recommended that a Nft truek be used to stand and postion frames Stet King industries ne k000 structural Pallet Rack installation Guide Step 4 Assemble First Bay Continued pote downward toward E instal subsequent beam levels from the lowest level to the highest evel F Torque the bolts to 60 eis ees toe ghtening Src Rach The contin for ow structural rack re benign atgue deta vibration orlosd actuation are ot design conadeations need ony be bend te thr snug lit m impact wreme or the fuer ofa woe ith a ordary qud wrench hat rings te connected plies irto rm contact Manual of See Condrutan Lon amp Resistance Fator design Volume 1 Second ection 1994 pages 6 79 Therefore I bolted connections in Stei ting Rack are to be ihtened ta the sug tight condition defined above Step 5 Shim Plumb and Anchor A Make sure that the bay ls square and plumb before anchoring fam ote ttis very importane that the rack structure be installed ina hh vel and sure ton Since few loors are perfec at min theres requ require for af average proportione A vertical tolerance of in fert or other at spected on Steet Xing talasan drawing t genera accentate Stet King industries ne i000 Str
6. stributor to ver the safety and structural adequacy of the new configuration Have questions about pallet racks Answers to Frequently Asked Questions may be found at the following website ww mhia org industrygroups rmi fa I you have any further questions contact your local Steel King Representative for customer assistance or contact Steel King Industries directly at 800 826 0203 WARNING INSTRUCTIONS FOR ASSEMBLY ARE SET FORTH ON THESE PAGES PROPER ASSEMBLY 1S WITH RESPECT TO ANY SUBSTITUTION OF PARTS OR HARDWARE NOT APPROVED IN WRITING BY AND OR A REQUIREMENT FOR SPECIAL INSTALLATION TECHNIQUES ADOITIONAL INFORMATION ToT
7. uctural Pallet Rack installation Guide Step 5 Shim Plumb and Anchor Continued B Use shims as required Shims are available in 1 8 and 2 26 thicknesses C The iest bay of each row must be anchored to the floor to insure proper placement ofthe raek ta the floor layout D tach upright frame has 2 footplates each with 2 anchor holes for floor anchoring Under normal circumstances only 1 anchor is required for each footplate 4 wide Upright Column eth tes Eery car of eh rick te anche o m dette conte fot Tera anchor comcton ene K dama 3 concrete prom che per Anchor bts ae tinned with Stel King rack systems unless spell detailed on the il of Since anchor bls vary in strength you are parchaning you aum anchor ts ct Steel King yur Ste King Otter for iim hor pico for yau utn ata rtr conte abs adequate t support a parla ackinatation The charac he slab should sine or the ling archer before track are Speci 3o that the rack upper can desig the rack to sul th ib ET Stet King industries ne SiGo00 structural Pallet Rack installation Guide Step 6 Install Remaining Bays A Fallow the same procedure as Step M using common upright frames for each bay Step 7 Accessories A When row spacers are required ach component must have 2 diameter x bolts and nuts per connection Hro e SO ERER ese E 1 The angie pallet supports are Installed with 2 nuts and carriage bolts one on each end

Download Pdf Manuals

image

Related Search

Related Contents

téléchargeable ici - IUT Le Mans  Konzept, Umsetzung und Erprobung - Physikalisch  Organisation: panorama d`une méthode de diagnostic  Wintools    GPS-Geräte der Serie nüvi® 800  取り付け及び作業説明書    Nokia 6015i User Guide  

Copyright © All rights reserved.
Failed to retrieve file