Home
LinkLine
Contents
1. Building Systems Design Inc This article is one of a series intended to keep you informed as we develop SpecLink E successor to the long lived BSD SpecLink system The primary goals for this new product include expanding the word processing functionality to come closer to that of Microsoft Word improving the underlying database components to bolster performance over local and wide area networks including VPNs and modernizing the product installation and updating features to reduce the manual intervention and oversight presently required This article discusses the new spell checking functionality and more importantly master database updating that takes place almost transparently letting day to day operations continue without interruption Spelling Checker In SpecLink the spell check feature only SUMMER 2007 e P r FR can spell check all or part of the whole ill ial inr project The Project Spell Check dialog see figure lets you specify the documents you want to check The software actually checks the documents on the server and checks out and loads the document for review if it finds misspellings If a document is already checked out SLE moves on to the next document but tries the document again after it completes everything else Cedng 252416 Paneboards EE SLE Spell Check works on the document you have open In SpecLink E you have three different spell checker modes There is now a
2. properties State tolerances here only as materials The product descriptions PART 2 PRODUCTS they apply to the performance requirements are now arranged in reading order from OWNER FURNISHED OR SUPPLIED of the complete system Fabrication and the largest to the smallest from top PRODUCTS erection tolerances should be included in down rather than proceeding from the New Products their respective articles smallest parts to the largest as in the Existing Products T l l l current edition The top down organiza SYSTEMS ASSEMBLIES In addition to reinforcing the idea that the tion is more logical from a reader s point M ACTURED UNITS system should be described in PART 1 E a a E read a EO oip o ENT COMPONENTS these headings have had the truly unfortu nate effect of suggesting to specifiers that performance type properties are somehow different from other properties of products assemblies and systems The idea that performance type properties should be in system if you start from the big picture PRODUCT TYPES MATERIALS rather than from the parts PART 2 is USER DEFINED HEADING also now intentionally very flexible allowing much more logical organization for different types of sections Manufacturers Manufacturer List Substitution Limitations PART 1 is apparently very difficult for some The new outline of PART 2 is shown in Product Options specifiers to overcome The revision to Fig A There
3. the latest specification text But we know the process can be onerous and detracts from SpecLink s many time saving features That s why we think you ll be glad to hear that with this new generation we re separating the software installation and update from the database update and for those with a high speed Internet connection we re eliminating altogether the quarterly install ritual BSD LinkLine Summer 2007 project I do will be a high quality product ih BSD presently uses web services to collect information from you about how the SpecLink master data is being used in the field Essentially each customer site reports statistical information about section usage back to BSD approximately once a month If you permit it with the checkbox on the Project Info dialog we also collect certain project data SpecLink E will make this a two way process by using the same channel to pass master database updates to your site In the new updating scheme BSD specifications editors will make two types of changes to the master database on BSD s server The See SpecLink E on page 3 SpecLink Statistics e e 528 sections total 132 updated 25 e 524 non proprietary sections e 4 proprietary sections e 54 sections with built in checklists e 91 063 paragraphs e 100 917 internal links targets and consequences e 25 901 notes to specifier e 14 830 notes with live hyperlinks to Internet web
4. 1s Building Systems Design Inc Two Piedmont Center Suite 300 3565 Piedmont Road NE Atlanta GA 30305 One and Two Piedmont Center BSD LinkLine Summer 2007 2 BSD Software All Products e I copied a project by choosing Copy or Copy Database from the File menu Now when I click the Open button the new file is not listed Why isn t it there and how do I open it When you click the Open button the m Recently Used dialog box opens Since you have never actually opened the newly copied project before it has not been used on this computer To open the project click the Browse button The standard Windows Open dialog box will open allowing you to navigate to the new project select it and open it from wherever you have it saved When you copy a project remember to open the Project Summary Info dialog box in order to change the project name An easier method might be to use your project as the template when you start a new project this opens the Project Summary Info dialog box automatically and you will remember to change the project name there I want to move the software from one computer to another but the access key won t work Why is that The access key you received when m you installed the software is specific to the computer or server on which it was installed To move the software to another computer call Tech Support at 800 266 7732 for an Unpermit code before you re
5. day is devoted to learning the basics of SpecLink including how to navigate within the software start a new project edit sections understand how the links and choices work and how to format print and export the final document It is designed for new users The second day is designed for those who want to learn how to create and maintain their own office master This day covers the concepts of an office mas ter how to customize your master by add ing choices links and tags as well as cre ating your own checklists Users must al ready be familiar with the basics of SpecLink to attend the second day BSD SpecLink Either Day 495 Both Days 895 June 12 13 Atlanta June 28 29 San Francisco July 17th amp 18th Atlanta September 11th amp 12th Atlanta October 16th amp 17th Atlanta December 4th amp 5th Atlanta AIA Members We will report your course completion for 7 or 14 Continuing Education Units CSI Members Submit Course Completion Certificate for 7 or 14 Education Contact Hours ECHs toward your CCS CCCA or CCPR Certification renewal Class starts at 9 00 AM and ends at 5 PM Scheduled on a demand basis Call 888 273 7638 AIA Members Submit Course Completion Certificate for 7 Continuing Education Units for CostLink AE training or 24 Continuing Education Units for CostLink CM training CSI Members Submit Course Completion Certificate for Education Contact Hours ECHs toward your CCS CCCA
6. each of the four rating systems All four rating systems are addressed by the LEED Credit Summary section that walks you through identification of the credits to be achieved and the LEED Certification Procedures section explains it all to the Contractor T CSI Award Building Systems Design Inc will receive the CSI Construction Technology Award on Wednesday June 20 2007 during the Opening General Session of The CSI Show in Baltimore BSD is being recognized for creation of its innovative product BSD SpecLink a guide specification system that offers up to date content as well as the ability to switch the specifications for any project between the 1995 and 2004 editions of CSI CSC MasterFormat with a single mouse click E EE i ee Ue BSD SpecLink Takes Novice Spec Writer tothe Next Level at F amp S Partners The Dallas Texas company that would items should be added to the various created in SpecLink the user doesn t need become F amp S Partners Incorporated was sections This made the old system difficult to try to remember what sections should or founded in 1962 by consolidating the to learn It was also time consuming for should not be used In contrast to word existing practices of J Herschel Fisher and both Tims and his boss Tims suggested processing based systems SpecLink users Pat Y Spillman under the name of Fisherand they look at BSD SpecLink also don t need to worry about losing data S
7. is one main heading with Description SectionFormat includes Performance options in brackets each bracketed Regulatory Requirements Design Criteria as a heading in PART 2 term can be used as a heading along with Sustainability Characteristics The revised commentary will state that the the relevant subheadings For instance Performance Design Criteria term Design Criteria can be used when a section describing an entire system Canacit describing the intended characteristics of a would include the SYSTEM heading product for which the Contractor is as with a Description and probably Perfor roan signed design responsibility mance and Operation Following that Operators might be an EQUIPMENT or COMPO Controls PART 2 ORGANIZATION Part 2 will now NENTS heading with appropriate Operation Sequences ae p a ee E E Aysien properties Concluding might be a Materials evel down including headings for assem ee blies E A BE E a Ne P E SE sear ca a made out of If none of the terms Shop ree ent a areal sels E pega Assembly OR Fabrication SPEC WRITER JOB OPENING BSD is NENTS Baan TYPES orM ARU Tolerances looking for an architect or engineer to ALS is Do e sper fieris Mixes pin H i maintaining and expanding entitled to define su able heading and Finishes Speci Po PTE iritatii ete insert appropriate subheadings from the Primer Materials www bsdsoftlink com bsdjobs htm or call fee Finish Materials 888 BSD SOFT a l o Shop Finishing Methods T
8. or CCPR Certification renewal 7 for CostLink AE training 24 for CostLink CM training Class starts at 9 00 AM and ends at 5 PM View BSD class schedules on our website Go to www bsdsoftlink com and click the Training link Get directions amp information on travel hotels amp Atlanta BSD Building Systems Design Inc LinkLine Two Piedmont Center Suite 300 3565 Piedmont Road NE Atlanta GA 30305 PRESORTED STANDARD U S POSTAGE PATD ATLANTA GA PERMIT NO 6613
9. real time spell checker that presents a squiggly red underline beneath misspelled word as you work You can use the context menu with the right mouse button to select alternatives or add the word to your dictionary if that is appropriate You can also spell check the current text selection or the entire document using a dialog that offers a number of options and spelling alternatives And you Transparent Updating In a previous issue of LinkLine Fall 2006 we reviewed the new SpecLink E software configuration as a loosely connected client and continuously running server and about its installation and how it gets updated This quarter we describe how we plan to update the SpecLink E master database and the projects that are using that master As you For the Summer 2007 update LEED EB for existing buildings and LEED CI for commercial interiors tenant fit up have been added to SpecLink Prior to this LEED NC since Winter 2001 and LEED CS since last quarter were the only LEED rating systems that SpecLink addressed To address any of the four rating systems the specifier simply selects the desired rating system and the automated checklist sections automatically exclude inapplicable require ments Where credit numbers differ between systems SpecLink changes the credit numbers in each LEED related section and form where the numbers are referenced See related articles in this newsletter for more details on how SpecLink supports
10. For CI many of the site and water efficiency considerations are combined into a single multi point credit related to Commercial Ir selection of the building in which to take tenant space ii We re very excited to report that Building Systems Design has moved to new offices Our new space is located about a block away and across the street from our original location in Atlanta s Buckhead neighborhood Visitors to our new office will find it as conveniently situated as our old location with many hotels restau rants and entertainment venues within walking distance Itis four blocks from the Buckhead MARTA station so visitors will still be able to take the train from Atlanta s Hartsfield Jackson airport and avoid car rentals and expensive taxi rides The local business association also sponsors the free bus the Buckhead Uptown Connection BUC which stops right in front of the entrance to our building just a 10 minute ride from the station Our new space has been custom designed for us and we are enjoying a less cramped more efficient layout and an invigorating environment The new dedicated training room accommodates 12 students without crowding and features a ceiling mounted projection system for better viewing We also have a more centrally located library three conference rooms and a cafe and shaded courtyard right in the complex Our telephone numbers will remain the same and our address as of May 14
11. a Program in the subject line if youll would like to participate BSD LinkLine Summer 2007 Revised SpecLink Sections Section titlesthat have changed MF95 01363 LEED Prohibited Content Installer Certification 07152 Lead Sheet Waterproofing MF04 00 43 27 Separate Prices Form 00 43 28 Tax Rebate Form 01 31 14 Facility Services Coordination 07 15 13 Lead Sheet Waterproofing t for coordination with ongoing MasterFormat 2004 updates Note Some additional corrections have been made to the TOC sections T BSD at the Trade Shows Building Systems Design used its largest booth to display BSD SpecLink and BSD CostLink AE at the AIA 2007 National Convention and Design Exposition in San Antonio May 3 5 We had a great show with almost 1 000 visitors to our booth We were one of seven sponsors in the 2007 Honda Civic Hybrid Sweepstakes and the winner of the drawing for the brand new fuel efficient car was Oudeshram Rampershad project manager with Gerald Caliendo Architects in Briarwood New York We will also have a large booth at the upcoming CSI Show June 20 22 held in conjunc tion with CSI s 51 annual conven tion in Baltimore In addition to offering 20 minute education sessions we will be giving away a new Segway i2 Personal Trans porter on Friday June 22 One entry card will be drawn from among completed cards left by visitors to the BSD booth We encourage
12. dition of SectionFormat Describe performance or design requirements and functional requirements of a complete system Limit descriptions to composite and operational properties to the extent necessary to link multiple components of a system together and to interface with other systems About as clear as mud in the first sentence it says to describe the complete system In the second sentence it seems to suggest that there is something you shouldn t specify here perhaps the components that are specified in other sections The task team received and reviewed many communications on this subject and struggled with the issue almost up to the final draft Ironically the most vocal opponents of the SPUTT proposal to remove System Descrip tion from PART 1 have been experienced specifiers whose most prevalent interpretation hinged on the second sentence of the commentary that it was a location for descriptions of systems that span more than one section Although the task team members recognized that there is sometimes a need for such a description they felt that there was a more compelling need to be able to describe the system specified in the current section in the most logical location Specifiers who have been following the advice of the first sentence of the commentary readily accept the logic that systems should be described in PART 2 compliance with the current edition requires making an exception to the concept that all product informati
13. e Your subscription expires once a year and the software master expires each quarter The two dates are not related To see both dates close any open projects and click on File and then Registration and Settings If you have not installed your update by the time that the master expires then you will no longer have access to the software Install ing the update will allow you to use the software If your subscription has expired and you have already renewed it you need to enter the access key that you were emailed when you renewed your subscrip tion e report but it doesn t include the manufacturers I have added Can I get them on this report I printed my manufacturer listing Paragraphs have to be tagged to m appear on the various reports You can add Tags to any paragraph If the Tag T status column is not visible on the View menu click on Display Layout and then on Tags Click in the paragraph that needs the tag and from the Tags dropdown list on the formatting toolbar above the Document Panel choose the appropriate tag ML for Manufacturer Listing When the paragraph with the tag is active and you print the report for the tag the section will be listed in the report For a list of Tags and their functions search Help for Tags e I want to email my project to some one who does not have the software How can I do that N You can email an individual section m a division or the entire project To do tha
14. e update package placing them on the list of available updates and making them available to the updates manager Meanwhile the SpecLink E server component which runs continuously on your server periodically sends a request to the BSD server to get a list of available updates It can do this at night or on the weekend to minimize interference with daily activities On receipt of the list from the BSD server your server determines which updates have not yet been downloaded and sends requests back to the BSD server to download each new update As your server component s update manager downloads updates it applies them to your master database again working in off hours It also begins the process of marking projects Project Administrators can then choose what updates if any to apply to each project If security has not been enabled any user may do the same see the Spring 2007 article Managing Users in SpecLink E This process operates much like the Mark and Apply Updates process in SpecLink We think this approach will greatly reduce burdens on administrators and users alike while still keeping your data up to date and allowing you the freedom of choice We expect to release a beta version of SpecLink E including critical editing features in the fall and would welcome your participation if you can take the time away from production to provide feedback to us Send an email to support bsdsoftlink com mentioning Bet
15. he The Need In 2001 Jerry Tims associate redlining my sections said Tims That s writes he just gets better With each job I principal with F amp Partners was just one of the reasons he agreed to give not only learn more about effective and learning to write speci eo ortet SpecLink a try With our old word process efficient ways to use SpecLink but also how He was using their word processing base d ing system masters were created on the fly to do a better job of writing specifications et bye That meant they didn t always include SpecLink has taught me something on each specification writing system and found the l process slow and arduous He recalls The information that was applicable to a project and every job I have worked on And the masters weren t really p see A raliet type especially if that information was great thing about SpecLink is that due to its different in the master you opened ease of use and reliability I know that every edited sections that were simply saved to a central location It was not easy to tell which With a true master file such as the type SpecLink E continued from page I are probably aware we currently create and ship a quarterly CD that contains both new software and a new master database Installation of the CD is mandatory as part of the subscription It is very important to us as well as to you to keep you updated with the latest data
16. he past two years e Now Playing e SpecLink Webinars Building Systems Design is pleased to e announce that we are providing twice x weekly guided tours of the BSD SpecLink application These one hour Webinars e cover the basics of getting started develop j ing your first project Subjects covered in the SpecLink Webinar e include Starting a new project Navigation of the Menu Bar and Tree Panel Discussion of the Status Columns in the Document Panel Explanation of choices options and fill in the blanks Creating and modifying headers and footers Printing options s We offer free SpecLink Webinars twice a e week Tuesdays at 11 AM and Thursdays at4 PM Eastern Time Please call 1 800 266 7732 to schedule the most convenient time for you and we will send you the informa e tion needed to register SpecLink E continued from page 2 first type will be edits to a specific document specification section When the edits are complete the BSD editor will publish the document updates as a package essentially placing the update package on an available updates list and making it available to an updates manager on BSD s server The second type of update is one that affects many documents spanning a large segment of the master database These are com monly changes to references or changes to manufacturer listings These changes will also be periodically published as a singl
17. his flexible organization actually reflects QA continued from previous page the way most experienced specifiers work A EORI report that you would like to email In the and results in better specs for complex SOURCE QUALITY CONTROL Print Preview window click the export products than the current more rigid and Tests and Inspections report button on the toolbar Choose limited arrangement Non Conforming Work Acrobat Format PDF Follow the onscreen Manufacturer Services These three changes in SectionFormat represent the most significant changes proposed both in terms of degree of relocation of material and potential benefit to readers BSD has begun to implement these changes and will continue to do so over the next few Contact BSD Technical Support quarters We ll do our best to make all changes of a given type within a single quarter and try to minimize the effect on existing projects 4 directions including entering a file name and location Once the export is complete you can email the exported file as an attachment A Coordination of Other Tests and Inspections More questions Figure A New Part 2 Organization Toll Free 800 266 7732 In Atlanta 404 365 9226 Email support bsdsoftlink com BSD LinkLine Summer 2007 Training Schedule BSD CostLink AE 1 day 595 BSD CostLink CM 3 days 1295 The BSD SpecLink Workshop The BSD SpecLink Workshop consists of two one day workshops The first
18. move the software from the first computer Before you call you can have the software already installed on the new computer and once we get the Unpermit code we can generate a new key for the new computer SpecLink and PerSpective Q I have recently purchased the software and would like to learn how to use it What options are available BSD LinkLine Summer 2007 Several useful hyperlinks are available on our Website at the following location http www bsdsoftlink com speclink sl_subscribers htm The Getting Started hyperlink has basic information that will assist you in becoming acquainted with the application It provides a good starting point for learning to use the software We offer free SpecLink Webinars twice a week on Tuesdays at 11 AM and Thursdays at 4 PM Eastern Time Please call 1 800 266 7732 to schedule the most convenient time and a technician will send you the information needed to register We also provide on site training or training at our office in Atlanta Georgia Please contact your salesperson to coordinate a time and location that is best for you ra I am getting a message that it is time to install my update and that I must install it to gain access to the software I just renewed my subscription so why am I getting this message There are two different effective dates for the software One is your subscription effective date and the other is the master database effective dat
19. on belongs in PART 2 Rather than simply relocating the heading as is to PART 2 the team chose to meld the relocation of the subject matter into the new organizational scheme for PART 2 which is described below DESIGN REQUIREMENTS PERFORMANCE REQUIREMENTS Two subheadings under System Description in the 1997 edition of SectionFormat are Design Requirements and Performance Requirements These subheadings have traditionally been interpreted both independently of System Description and in conjunction with it The existing commentary says Include design and performance parameters Use this article in conjunction with quality control articles covering tests for verification Performance requirements may include criteria for structural thermal and acoustical See 3 part on page 7 Specifying LEED EB for Existing Buildings Although at first glance LEED EB might seem to be unrelated to construction the goal of certifying an existing building under LEED EB might lead to the need for some construction related upgrades This is likely to be a good market for A Es since the concepts of greening and sustainability are gaining in popularity As might be expected LEED EB includes prerequisites and credits that are different from those for NC CS and CI but there is considerable overlap Some credits have the same intent but are implemented differently For instance the credit dealing with isolation of all rooms where hazard
20. our subscribers and prospective subscribers to come see us in Booth 221 learn about specifications or cost estimating and fill out an entry card to enter the drawing for the Segway k BSD LinkLine Summer 2007 CSIThree Part Section Format Slatedto Change This article is the first in an expected series describing some of the changes that will appear in the revised CSI SectionFormat which will be published later this year BSD is already implementing some of these changes because they are sensible and make the sections easier to understand and enforce SYSTEM DESCRIPTION The heading System Description which currently appears in PART 1 GENERAL has been removed In its place a new heading has been added to PART 2 to house descriptions of systems specified in the section System Description in PART 1 is the only heading in the current SectionFormat located outside of PART 2 where characteristics of products might be specified this is a significant inconsistency Some contributors have noted that the location in PART 1 was counterintuitive especially to novice specifiers and readers of specifications why aren t all the product character istics specified in PART 2 The original logic for placing this heading in PART 1 has been lost in time The members of the CSI Section and Page Format Update Task Team SPUTT could not find any definitive rationale or docu mentation for that location except for the brief commentary in the 1997 e
21. ous gases or chemicals might be present referred to as Indoor Chemical amp Pollutant Source Control in NC CS and CT is limited to high volume copy print fax rooms and janitor closets in EB The EB credits for alternative materials recycled rapidly renewable etc and AQ compliant materials apply to all acquisi tions of such materials over the certification period which is usually one year meaning that the owner must document all purchasing regardless of whether a construction project is involved Other credits are unique to EB such as those that can be obtained simply by documenting operating and maintenance procedures for instance low environmental impact cleaning materials and equipment and pest control On the other hand the minimum number of credits for EB certification at all levels Certified Silver Gold and Platinum is the highest of all the rating systems with a larger number of prerequisites In general a recently constructed relatively energy efficient building could probably be certified at the minimum level under EB without any upgrades although some work by the owner s facility personnel would probably be needed Anyone investigating the possibility of EB certification of a building should first look at the prerequisites which include the age of the building over 2 years minimum water efficiency retrocommissioning which can be phased over 5 years a solid waste stream audit a plan for reduction of me
22. pages e 2 123 external documents referenced with live hyperlinks to order information e 958 ASTMs referenced 100 verified within last 9 months i e 1 165 other documents referenced 77 verified this quarter e 183 standards organizations referenced 2 410 manufacturer listings with live hyperlinks to their web sites 940 unique manufacturers listed in 371 non proprietary sections Short Form Specs Statistics 16 sections corresponding to MasterFormat 1995 divisions 1 sections updated 6 8 307 paragraphs 1 563 notes to specifier 1 022 with live hyperlinks 9 096 internal links targets and consequences 365 external documents referenced 224 ASTMS referenced 100 verified within last 9 months 141 other documents referenced 74 verified this quarter e 43 standards organizations referenced PerSpective Performance Specs Statistics e 161 sections 5 updated 3 e 17 392 paragraphs e 21 992 internal links targets and consequences e 4 024 notes to specifier 926 with live hyperlinks e 191 external documents referenced with live hyperlinks to order information e 50ASTMsS referenced 100 verified within last 9 months e 143 other documents referenced 76 verified this quarter e 39 standards organizations referenced ih Documents issued more than two years ago are verified quarterly as are annual or semiannual publications The documents not verified this quarter were updated within t
23. pillman Architects Since that time the firm has grown to an average size of forty and has continued to attract design commissions succes sively larger in scope and technical complexity In 1984 the name of the firm was changed to F amp S Partners Incorporated in order to reflect the nature of the firm as a corporation headed by several principals Architectural services include feasibility studies facilities program ming project budgeting scheduling conceptual design detailed design construction documents technical specifications construction cost estimating construction contracts bid consultation and evaluation lender inspection construction that may have been deleted from previous office masters In SpecLink all of the information is always available nothing is ever deleted You select rather than delete data to create specifications This has been a major time saver we ve easily reduced our spec writing time by at least 40 percent And it has reduced the stress of meeting tight project deadlines says Tims The Outcome Tims was a novice spec writer when he began using SpecLink He was able to learn the administration computer aided The Spa at Mohonk Mountain House New Paltz New York program by reading through design and drafting CADD and the user s manual And he facilities database management The Solution I think my boss got tired of believes that with each specification
24. rcury in light bulbs environ mental tobacco smoke control and asbestos and PCB abatement plans as well as the prerequi sites required for NC The LEED Credit Summary in SpecLink walks the specifier through identifying the credits to be addressed and offers some design solutions It also helps document whether the existing building can achieve the credit without modifications or whether the owner s operation and maintenance O amp M program must address the credit Ei SDECCII YIN g for Core amp Shell Development and l Interiors LEED CS is intended for developer driven projects where the Core amp Shell CS includes base building MEP FP but not tenant fit out Along with commercial ee ee office buildings CS is expected to cover retail fe eee evga a ee warehouses and labs that are developed this way Two Piedmont Center Suite 300 LEED Clis specifically for office building interiors ee area where the basic building the core and shell have either already been built or are not under the control of oe ee the tenant or owner of the office space LEED CI is is notifies designed to interface with LEED CS for the core and oe shell but can also be used for fit out projects for which MEN the base building has not been LEED certified The a aE prerequisites and credits for LEED CS and LEED CI are O practically identical to those for LEED NC except for omission of those that exclusively apply to the portions of the building not covered
25. t click on the File menu and select Print From the Reports dialog box select Document as your Report to Print and select Section Branch or Project as the Scope of Report Click on the Export button on the right side of the dialog box Select the folder where the files should be created You will have an RTF rich text format file for each section These can be emailed and or opened in most word processors If you are a meter customer this option will not be available If you have Adobe Acrobat Writer or Distiller installed you can also create pdf files From the Reports dialog box change your default printer to Acrobat PDF Writer or Acrobat Distiller and print as normal Select the folder where the files should be created Cost Link CM and Cost Link AE el A To change the placement of a folder inthe Tree with your right mouse button drag the misplaced folder to the folder that you want it to be above When you release the mouse button choose Move Above from the right mouse button menu I added a folder in the wrong place How can I move it e How can I email my CostLink CM or CostLink AE reports to someone who does not have CM or AE Export the report s to a PDF file m PDF files can be opened on any computer using Acrobat Reader and cannot be edited easily To export your reports Print Preview a See QA on next page 3 part continued from page 4 components product types and
Download Pdf Manuals
Related Search
Related Contents
User Guide for Website Managers - Support Home VoIP Telephony with Asterisk (Paul Mahler) Belkin Sport Armband for iPod classic Ficha Técnica Ermidrá champú Wireless Indoor/Outdoor Speakers Copyright © All rights reserved.
Failed to retrieve file