Installation Manual Femtogrid Wind Power Optimizer A018

image

Contents

1. In this mode it is not possible to use the processing power of the optimizer It responses more or less the same as reprogrammed Solar inverter so don t use this mode in the field It will often stop overshoot restart try to grid connect and leave again This is unwanted behavior of a controller 10 3 Forced start stop function For maintenance purpose a hidden feature is available By holding the back button for 5 seconds the turbine can be switched on and off V 1 0 July 2013 25 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV 11 Specifications Type Wind Input DC from wind turbine Pmax constant Nominal DC power Voltage range Brake safety voltage Maximum DC current Dumpload Power Optimizer Output Maximal DC power Nominal output voltage Femtogrid voltage Maximum output current Cut in power sustainable Standard Compliance EMC Immunity EMC Emission Safety CE RoHS WEEE REACH Safety class Protection rating General Parallel Scalable Housing Dimensions WxHxD Ambient temperature Weight DC turbine connections Output connections Safetyline voltage neutral Femtogrid feed through current i
2. famtog rid www femtogrid com energy solutions Wind Power Optimizer ACIE ONAVENIEI Femtogrid Solar System the sunny side of shade Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer CONTENTS 1 Explanation of the symbols USEd cccecceccccccnccecccnccescenccessencenecescenceesceecees 3 Z AFO ON ae seston ote a E a eee ee sansaeu used uacGoudeeeeeees 4 2 1 GNET Iana a dled aeons deter dled Alene iow meen a iterate ty dantn led scion al ten dan de fein ten ella 4 2 2 Target group GOCUMENE ocacicdicccerenccescdscemecctccudes ess Sapanessatcedeas daoenesenteed oes dasewesasens 4 2 3 Introduction to the Femtogrid Wind SysteEm csecceeeccceecccesccceeesceessceeeceeeeescess 4 2 4 Vaudation GOCUMENTcveuyeSovesisneSengas dacotanetedevatedasereriemetevoustedorerensteneustatetaneteteters 4 Sy Saey MSU UCONN ereer tink Mendes akslema ed eons ahclmateudcemeeeakeemadsetcunceeatosmetewtaees 5 3 1 Installing the Femtogrid Wind System ccccescccccccccescceescceseccesescceessceseccesescees 5 3 2 High voltages inside the Wind Power Optimizer and the Inverter ceeeeccceeeeeees 5 3 3 Femtogrid DC bus Safety Warnings ccscccccccccecscccnesccescceneccesescceesccesescesescess 5 3 4 COMECON ARCA riera Era ee overtone E E on ale diurnal ved AE E A ATA 5 4 Schematics Femtoerid Solar SyStein e rriren anene eE E EREE ASNE EAEAN 6 2 SHOrt installation sequence eoe a e r E ON 8 6
3. e g with tie wraps When the turbine runs free it can be damaged or cause damage to the Wind Power Optimizer The installation of the Wind Power Optimizer must be carried out by authorized installers and performed in accordance to local and national regulations e g the regulations for the Netherlands are covered by the NEN1010 The installation of the Inverter 2400 must be carried out by authorized installers and performed in accordance to local and national regulations e g the regulations for the Netherlands are covered by the NEN1010 Do not connect the Inverter 2400 to the DC grid before all Power Optimizers are installed The DC grid may be charged up to 400 Vdc when connected to the Inverter 2400 Do not touch the inside of the DC connectors 3 2 High voltages inside the Wind Power Optimizer and the Inverter Do not open the housing of the Inverter or the Wind Power Optimizer This is not needed during operation Only the Wind Power Optimizer may be opened for installation purposes and it should only be done by authorized installers Warranty will be void after opening the housing of the Power Optimizer or the Inverter 3 3 Femtogrid DC bus safety warnings If the Femtogrid female DC connector is disconnected from the inverter the power of all equipment on the bus DC grid will be disconnected However if the DC cables or connectors are damaged it is possible to get electrical shocks Place a protection or end cap on the
4. item 22 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Push message When the inverter has an important message to show to the user it will use a push message In this screen the user is alerted of current events To exit the push message press the Enter or back button In case of an ongoing blocking event the user will not be able to exit the push message Value edit screen To enter or modify a value on the display screen the user is presented with an value edit interface In this screen the title of the value is displayed in the upper left corner of the screen The actual value is displayed in the centre of the screen optionally with its unit Below the value an indicator arrow is displayed the indicator arrow points to the current editable digit To change the digit s value use the up down keys To select the next digit press the enter button When the last digit is already selected and the enter button is pressed the interface will save the value and exit To select the previous digit press the back button When the first digit is already selected the interface will return V 1 0 July 2013 Installation manual Femtogrid
5. 00 Lor 0 00 0 00 20 00 40 00 60 00 80 00 100 00 120 00 DC input voltage V 13 Company information Femtogrid Energy Solutions BV Pedro de Medinalaan 11 1086 XK Amsterdam The Netherlands T 31 0 20 5672140 F 31 0 20 5672159 www femtogrid com Mail info femtogrid com V 1 0 July 2013 28 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV
6. Maintenance ks cicetecdsnesheseciea aa OESE 9 6 1 Yearly maintenance Wind Power Optimizer sssesessesesceseseecesescecesesceecsceceseeceeeee 9 6 2 Maintenance WING WFDING sereine ee a E NA ease E AN Ries 9 7 Mechanical installation of the power Optimizer s sssesssessssesssessseesseesseeesseo 10 7 1 CHOCK DALS sc cavcnswa an cha euausheneuse chanausdideneus coteraueredeveuscogenetsersers 10 7 2 Check for damage Of the Products cc ccceccccnsccceecccesccensccesescesescceesccesescees 10 7 3 Choosing the MOUNLING OCALION siatesdccndsclecceteu tects eles secasdeevetatlanssecebeesetataeasmons 10 7 4 DIMENSIONS ex eautetingucte aea ete ioe telus etetenedae seus eet Geese gett aees Geet nas 11 7 5 Mounting the Wind Power Optimizer onto the wall cccceeccceeccceeccceececeeesceeees 11 7 6 INSEFUCTIONS MOUNTING Plata enini n E E E E E N N 12 S C OnnecHona eassa a a a a a a a a a a a a S 14 8 1 Assemble the Femtogrid DC cable connector ssesssesseseseecesesoeseseecescsceceseeseeese 15 8 2 Connecting the Wind Turbine to the Safety bOX sssssessesssesceseseesesescsesesesceseseeeeo 16 8 3 Functional schematic of Safety BOX sesessecesesceceseeceoeeceoesesororeesoeoeecesoseeeoseree 18 8 4 Connection from the Safety box to the Wind Power OptimiZer cescccesccceeeecees 18 8 5 Connecting the Wind Power Optimizer to the Inverter ccccceeecceeeccceecccececees 20 O COMMISSIONING awa noe
7. OUT female DC on open connectors of Power Optimizers Normally it is not possible to directly touch the high voltage but without an end cap water can get into the connector and can cause malfunction of the system c N CAUTION DOUBLE POLE NEUTRAL FUSING A 3 4 Connection area Do not open the FG PO2500 UW001 Wind Power Optimizer Dangerous voltages can be inside this device Do not switch on the Inverter 2400 AC power before finishing the total installation The safety switches of the FG PO2500 UW001 Wind Power Optimizer are activated once the AC power is switched on The DC bus is then charged to a potentially dangerous voltage After System Power On the turbine braking functionality will be released after 3 minutes to give the Inverter time to attach to the AC grid first The Wind Power Optimizer MUST be earthed by mounting an earth wire on the bottom of the device and connect it to the installation Earthing V 1 0 July 2013 5 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer 4 Schematics Femtogrid Solar System The schematic overview presented below shows all components of the Femtogrid Wind Syste
8. Optimizer can reach temperatures of 65 degrees Therefore it is important to do the following maintenance 6 1 Yearly maintenance Wind Power Optimizer 1 Inspect vacuum clean the backside of the Wind Power Optimizer for dust papers etc Due to active braking this side can heat up to 65 C 2 Check connections for corrosion and correct mounting 3 Check the earth wire and connection 4 Test the safety stop cycle a Check the wind speed on the display of the Wind Power Optimizer this must be higher than 2m sec this is a turbine voltage of 10 30 VDC b When it is higher than 2m s hold the back button for more than 5 seconds This triggers the forced switch off of the Power Optimizer c Wait for 5 seconds for the safety box to brake the turbine d Check the turbine voltage on display of the Wind Power Optimizer This should drop below 5 Vdc e Turbine voltage gt 5Vdc Replace safety box e Turbine voltage lt 5Vdc OK e When the safety stop cycle is correct the Wind Power Optimizer can be started again by holding the back button for 5 seconds 6 2 Maintenance wind turbine The wind turbine is a device with turning parts These parts need maintenance for a long lifetime of the equipment and safe operation is very important to follow up the instructions of the manufacturer Follow the maintenance procedure of the Turbine manufacturer V 1 0 July 2013 9 28 Although the information in this document is presente
9. Wind Power Optimizer Button function Back Exit push message Up None Down None Enter Exit push message Value name 123456 Volts N Button function Back Select previous digit exit screen Up Raise value Down Lower value Enter Select next digit save value and exit 23 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer Error codes and warning messages When the display presents an error code or warning message please check the website www femtogrid com for references 24h energy graph The Wind Power Optimizer shows a graphical presentation of the energy that is generated in the last 24 hours This is only possible if the Wind Power Optimizer is active for more than 24 hours Software versions This menu item shows the software version of the Wind Power Optimizer Our customer service can ask for this version number during a service call Settings In this menu item several settings can be changed This includes time and date Zigbee network language and device settings and information Some setting can only be changed after entering a PIN code Zigbee Network In this menu information and co
10. ade according the instructions in chapter 8 1 to connect the Femtogrid DC output the connector at the right bottom side on the Wind Power Optimizer to the Femtogrid DC input connector connector at the left bottom side on the Inverter 9 Commissioning 9 1 Start up Install start up and commission the Inverter 2400 first according to the installation instruction provided with the inverter 2400 The Wind Power Optimizer is automatically powered up together with the power up of the Inverter when the Female Female Femtogrid cable between the Inverter 2400 and the Wind Power Optimizer is connected correctly NOTE The Safety brake in the Safety Box will not be released immediately The Wind Power Optimizer will release the Brake function after 3 minutes to allow the Inverter to connect to the Mains grid first This means that the turbine will only start rotating after 3 minutes The user will follow the next steps after starting up the Wind Power Optimizer the first time e Adjust select the language e Adjust set the date and time 9 2 Monitoring When a monitoring box is installed you can join the Wind Power Optimizer to the wireless network by pressing the button shortly on the monitoring box with a pointy object like a tooth pick You have two minutes to navigate on the Wind Power Optimizer user interface to the Settings menu gt Zigbee network gt search network And press enter After entering this menu item the Win
11. d Power Optimizer will join the wireless network and when it has done so it will show on the display Joined Network V 1 0 July 2013 20 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer 10 User Menu 10 1 Menu map Main menu e 24h Energy Graph e Settings e Time Date e ZigBee Network e Network state e Nodelist e Search network e Leave network e Language e English e Nederlands e Deutsch e Espagnol e taliano e Francais e Edit PIN 1 e Service 1 e Power gain e Gust factor e Monitoring e Software versions 1 Requires installer PIN code editable by installer 10 2 Menu manual Boot screen The boot screen is displayed during the Femtogrid Wind Optimizer startup sequence of the Wind Power Optimizer When the Wind Power Optimizer finished its startup sequence the display Version 1 0 6 will show the home screen Button function Back None Up Display previous value Down Display next value Enter Open menu V 1 0 July 2013 21 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no
12. d fasten the strain relieve nut Strip the 3 wire ends and crimp a 6 3 mm Faston terminal on the wires Make sure to use the right type of Faston terminals for the 4mm wires When the 4 mm Femtogrid DC cable is used the following color coding scheme is to be used Red POS Blue NEG Black safety 0 V 1 0 July 2013 18 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer Connections in the Safety Box NEG POS Safety or O Wind turbine Wind Power Optimizer Connections in the Wind Power Optimizer POS NEG Safety or 0 V 1 0 July 2013 19 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer 8 5 Connecting the Wind Power Optimizer to the Inverter Use the 2 meter Female Female Femtogrid cable or the custom length cable m
13. d in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer 7 Mechanical installation of the power Optimizer 7 1 Check parts Wind Power Optimizer Mounting bracket User manual Installers manual Cable gland mounted in Wind Power Optimizer Used to connect to Wind Turbine 6 Femtogrid connector or cable supplied separately a Used to connect to DC Femtogrid 7 2 Check for damage of the products U A WN Check the DC cables for damage Cuts in DC cables or broken DC connectors can cause malfunctioning of the Femtogrid System and may cause dangerous situations Check the Inverter and the Wind Power Optimizer If damaged contact your supplier 7 3 Choosing the mounting location DANGER to life due to fire or explosion Despite careful construction electrical devices can cause fires e Do not mount the Inverter or Wind Power Optimizer on flammable construction materials e Do not mount the Inverter or Wind Power Optimizer in areas where highly flammable materials are stored e Do not mount the Inverter or Wind Power Optimizer in areas with a risk of explosion The Wind Power Optimizer is only suitable for indoor placement It is not allowed
14. e should be connected to Protective Earth and a suitable conductor should be connected to the Earth connection point on the safety box To Wind Power Optimizer mounting pole The Femtogrid Safety Box is a Connectbox between the wind turbine and the Wind Power Optimizer This safety box is delivered separate from the Wind Power Optimizer and the Inverter The Safety Box must be used for safety reasons it protects the Turbine by braking it in a controlled sequence during fault conditions V 1 0 July 2013 16 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer The Wind turbine from the 3 phase rectifier is connected with 6 3 mm Faston terminals on 3 connection points inside the safety box Use the right type of Faston terminals for the conductor size used Stranded wire conductors with a cross section area of 4 mm must be used Connect the positive voltage from the 3 phase rectifier to the terminal in the Safetybox Connect the negative voltage from the 3 phase rectifier to the terminal in the Safetybox Connect the Earth Connection wire to the PE terminal in
15. earch for network to join the network at the Inverter and the Wind Power Optimizer The devices will answer joined to network If multiple Inverters and or Wind Power Optimizers are installed repeat steps 10 to 12 for the other Inverters and Wind Power Optimizers Check if the wireless data network is installed Follow the following route in the setting menu of the Wind Power Optimizer Settings gt Zigbee network gt node list It should show the surrounding Power Optimizers Inverters and the monitoring box the Power Optimizer cannot see its self Check power conversion on the display of the Wind Power Optimizer With powerful wind press two times the up button to check the actual converted power When the turbine rotates with no powerful wind Press two times the down button to check the generator voltage V 1 0 July 2013 8 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV OOOO Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer 6 Maintenance The Wind Power Optimizer is equipped with an integrated dump load In some cases it can happen that the device uses this dump load to brake the wind turbine In these cases the heatsink of the Wind Power
16. eceee eases hictintea alana E eweeanaewash seth 20 9 1 SAAD AEE EE EA ESA IE A dled atone E AEE IEEE EE E A AEE T 20 9 2 NOU COMING ariera ereere EEEE EOE EEEE AE 20 TO User Manieren T E E NE 21 OT MEn MAD eeri E EE EE EE EEEE OEE EE EE E ORE 21 10 2 Men man Uassa ie EEE OE EAEE EEEE NEEE E EOE OEA 21 103 Eorced Start Stop FUME OM doie aene EEEE EEEIEE OEE OEEO E 25 EE SDECITICALIONS erereres tioro eS nre eaen EEEE ANRI ESEA E 26 12 Loadand Control Grane rora arar RETR E E ETOO ESRO 27 13 Company INPOFMALION ask E EEA E EEA EAE AEE eenenan 28 V 1 0 July 2013 2 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer 1 Explanation of the symbols used To ensure optimal usage of this document we start by explaining the symbols used in this installation manual for the Wind Power Optimizer LL This symbol indicates an example m This symbol indicates a note which if ignored will make the procedure or operation more difficult This symbol indicates a fact which if not observed could result in damage to components or represents danger to persons Read these passages carefully V 1 0 July 2013 3 28 Although
17. ection tightening torque typically 0 8 1 0 Nm 1 Push the rear part of the socket over the DC cable 2 Press wire end sleeves onto the stripped strands 3 Use the Femtogrid DC cable and connect the individual 3 wires with the insert in turn as follow e HOT conductor on screw terminal with label Red e Cold conductor on the screw terminal with label Blue e Neutral conductor on the screw terminal with label O Black 4 Ensure that the wires are connected properly 5 Snap the rear part of the socket onto the socket insert Tighten the screwed cable gland COLD HOT NEUTRAL V 1 0 July 2013 15 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer 8 2 Connecting the Wind Turbine to the Safety box The Anakata A018 wind turbine has a 3 phase AC generator The wires from the 3 phase generator should be connected to a 3 phase rectifier Not supplied with the Safety box or the Wind Power Optimizer The DC output of the 3 phase rectifier should be connected to the input of the safety box Use stranded wire conductors with a cross section area of 4 mm The metal mounting pole of the turbin
18. gerous voltage Use of the special Femtogrid cable is prescribed for this installation This cable is specified for outdoor use Materials According to T V 2 Pfg 1169 08 2007 Insulation Special XL HFFR compound Conductor Tinned copper conductor according to class 5 of IEC 60228 The Wind Power Optimizer has four electrical connection points and one screw to un lock the frontcover at the bottom of the device 2 WIND DC P PC ee eee Tee Pea E E ce cP EGUE E FP A Allen screw or Socket head cap screw for un locking Frontcover Cable gland entry point for Turbine DC cable 2 Earth Connection point 3 Female Femtogrid Connector Input from second or more Power Optimizers 4 Male Femtogrid Connector Output to the Inverter The earth connection point must be connected to system earth V 1 0 July 2013 14 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer 8 1 Assemble the Femtogrid DC cable connector Connect the Femtogrid DC cable socket with the special Femtogrid DC cables Strands with a cross section of minimal 2 5 mm to maximal 4 mm can be connected Screw conn
19. le Safety Box Earth wire PV Module backside view 400 Yde D oND UNB Ww ny V 1 0 July 2013 7 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV gt D Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer D Short installation sequence To ensure a safe quick and easy installation we advise to follow the following installation sequence 1 Z 10 11 12 13 14 15 Tie wrap the wind turbine to avoid free spinning of the turbine Make sure that it is save to work on the cables from the wind turbine Check if the safety box is installed correctly according to the mounting instructions in chapter 8 4 Connection from the Safety box Mount the Wind Power Optimizer according to the mounting instructions in chapter 7 5 Mounting the Wind Power Optimizer onto the wall Place the optimizer indoor in range of the delivered cable length to the inverter Connect the Wind Turbine to the Safety Box according to the installation instructions in chapter 8 2 Connecting the Wind Turbine to the Safety box Connect the Safety box to the Wind Power Optimizer at the Wind DC input on the bottom left side of the Wind Powe
20. m Femtogrid Wind System 1 Urban Wind Turbine 2 Power Optimizer 3 Femtogrid DC cable 3 core 2 5mm 2mtr 4 Inverter 5 Monitoring Box 6 Turbine DC Cable 3 core 4mm custom length 7 Safety Box 8 Earth wire 220 wac he ne The data communication is wireless using a Zigbee network and has no influence on the power generation Go tional edd solar modules O Pere Chg pred ee Safety Bow a ae Power Opeimizer Depending on the local wind conditions it is possible to make a system with more than one Power Optimizer on one inverter Beside Wind Power Optimizers you can add Sun Power Optimizers V 1 0 July 2013 6 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer A few solar panels improve the efficiency of system During the day they level out the consumption of the system and let the inverter feed energy to the grid Result a faster reacting system Femtosrid 230 Vac Femtogrid System Urban Wind Turbine Power Optimizer Femtognd DC cable Inverter Monitoring Box Turbine DC Cab
21. makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer 4 Check if the Wind Power Optimizer is correctly aligned on the mounting plate Minimal 12 cm 5 Use the Wind Power Optimizer to mark the drill hole on the wall 6 Lock the Wind Power Optimizer with a screw on the bottom V 1 0 July 2013 13 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer 8 Connection area Do not open the Wind Power Optimizer during operation Opening of the Wind Power Optimizer is only allowed for installation purposes and should only be done by authorized installers NOTE an allen screw or Socket head cap screw in the left bottom should be removed before opening the frontcover and placed back after closing Do not switch on the AC power on the Inverter before finishing the installation The safety switches of the Power Optimizer are activated when the AC power is switched on The DC bus can be charged to a potentially dan
22. mmands for the zigbee network can be given Edit installer PIN If you have the installer PIN code you can change it here to avoid unauthorized access to the settings Service With the installer PIN code it is possible to view details and change settings In normal use it is not necessary to enter this menu and is mainly used for trouble shooting Gust Control One of the settings that can be changed is the Gust factor This adjustable factor is set by the factory to the proper value for the specific turbine This factor changes the response to falling winds 0 means rising and falling response are the same It depends on the type of turbine mass blades type of wind ratio gust constant flow and so on Special setting 10 the test In this mode the Wind Power Optimizer reacts like a normal curve follower At each voltage a load is presented at the input and it continues doing this until the max load is presented It brakes at overload Rising and falling winds follow the same curve All other functions are disabled V 1 0 July 2013 24 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer
23. n out V 1 0 July 2013 Installation manual Femtogrid Wind Power Optimizer FG PO2500 UW001 2500 2400 0 250 120 25 Built in dynamic 250 380 7 5 Vdc Vdc Vdc A W EN61000 4 2 3 4 5 6 11 EN55022 EN60601 1 2 EN61000 3 3 Yes to a maximum of 7 5kW with 4 mm cable Indoor 325x447x197 10 65 15 Internal Fixed with 6 3mm Faston Femtogrid Wieland 48 20 EN60950 yes yes Class IP31 mm kg Type Type 26 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer 12 Load and Control Graph The diagrams below show the load and control graph of the Wind Power Optimizer and inverter for the Anakata A018 turbine It gives an indication how much this set can absorb convert and under what conditions Timing variables are not included in this graph speed responds on gusts max overshoot time G ain step timing up and down etc The turbine is electronically kept close to the edge of escaping Pwind gt Pmax generator to get keep it at maximum efficiency at gt 8 10 m sec Betz Blue is the normal load line Red is the load line if it passes 90 vdc for x sec
24. ng Box and a Monitoring Portal 2 4 Validation document This document is only valid for Wind Power Optimizers with the following nameplate Keep this guide in a convenient place for future reference Femtogrnd Energy Solutions BV famtogrid Pedro de Mediralaan 11 enerfy sole tons 1086 XK Amsterdam The Netherlands Femtogrid FG P02500 UW001 Le PD 1224 MacZigbee 00 00 6F 00 00 64 74 53 Serial Number C611AA0024 TURBING DC input power 0 2509 W DC input voltase 0 25 Vde DC Max input current 10A FEMTOGRID DC output voltage 360 V 400 Vde DC Max output power 2500 W DC Max output current 7A Operating temp renge 10 C 40 C Product Code 370210 Enclosure IP 31 Type FG P02500 UWOO1 Satety Class I Device must be earthed Ger t muss ceerdet werden Appareil doit tre mis a la terre CE amp Is Revs V 1 0 July 2013 4 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV oO Oo 9 O oOo Oo 9 OO gS Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer 3 Safety instructions 3 1 Installing the Femtogrid Wind System Make sure that the Wind Turbine cannot spin free The turbine must be braked during installation or maintenance
25. ond Green is the load line if it passes 90 vdc for x x seconds Purple is the load line if it passes 90 vdc for x x x seconds Light purple is the maximum diversions load continuous The blue line is the conversion capacity power The orange is the max load line the converter and diversion load can generate DC input Current vs DC input Voltage Anakata AOLS 25 00 20 00 Gain 1 q i Gain 1 25 x k Gain 5 2 15 00 5 Gain 10 a Max converter current 5 Max converter max brake current Max converter continuous brake current 10 00 Max continuous brake current 5 00 0 00 0 00 20 00 40 00 60 00 80 00 100 00 120 00 DC input voltage V V 1 0 July 2013 27 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer DC input Power vs DC input Voltage Anakata ADIB 2500 00 2000 00 amp Gain 1 z Gain 1 25 v gt amp Gain 5 amp 1500 00 z gt Gain 10 a Max converter power raf Max converter max brake power Max converter continuous brake power 1000 00 Max continuous brake power 500
26. ower Optimizer onto the wall Choose a place that allows the Wind Power Optimizer to conduct its heat A range of 50 cm above the Wind Power Optimizer must be clear of obstacles N N MM Q nr min 500 mm P oo0oo0o0 min min 50 mm 50 mm min 300 mm fy Make sure the Wind Power Optimizer hangs vertically Do not place the Wind Power Optimizer horizontally V 1 0 July 2013 11 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer 7 6 Instructions mounting plate Screws and plugs are not included Each wall needs different screws and plugs to ensure a solid fixation Take the weight of the Wind Power Optimizer in account when choosing the appropriate mounting material The weight of the Wind Power Optimizer is 15kg 1 Use the mounting plate to mark the drill holes on the wall 2 Attach the mounting plate to the wall using appropriate screws and washers 3 Place the Wind Power Optimizer on the mounting plate V 1 0 July 2013 12 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV
27. r Optimizer according the installation instructions at chapter 8 4 Connection from the Safety box to the Wind Power Optimizer Connect the Wind Power Optimizer to the Inverter with a Femtogrid cable Female Female If a custom length cable is used follow instructions in chapter 8 1 Assemble the Femtogrid DC cable connector Install an earth wire between the earth of the installation and the earth mounting screw on the bottom of the Wind Power Optimizer Activate the monitoring box by pressing the button with a small pointy object e g toothpick for at least 5 seconds during power up Assemble the AC connector female and connect the inverter to the mains according to the instructions of the inverter Power up the Inverter Enter date time language and country on the display of the Inverter and the Wind Power optimizer After setting these values the question search for network appears When no monitoring box is installed answer No and go to step 15 When a monitoring box is installed do not answer the question first execute step 12 Press the button of the Monitoring Box shortly The green led will start to blink for two minutes During this time Power Optimizers and the inverters can enter the network of the Monitoring Box The Solar Power Optimizers will join automatically to this network The Inverter s and the Wind power Optimizer s need to be added manually Answer Yes on the question s
28. representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Homescreen The home screen is the default screen the inverter will always return to The home screen can display several values such as status of the inverter total energy generated energy generated today and current power To switch between values use the up down buttons To enter the menu of the Wind Power Optimizer press the Enter button in the home screen Menu screen The inverter screen is equipped with a graphical menu interface in which various settings and functions can be accessed At the top of the screen the title of the menu is displayed regardless of the scroll position in the menu Below the menu title the menu items are displayed The selected menu item is displayed with an inverted background color At the right of the screen the scrollbar indicates the position of the selected menu item in regard to all the items in the current menu V 1 0 July 2013 Installation manual Femtogrid Wind Power Optimizer Main menu 24h energy graph Settings Software versions Button function Back None Up Display previous value Down Display next value Enter Open menu Power 500W Button function Back Go to previous menu home screen Up Select the menu item above Down Select the menu item below Enter Select menu
29. the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer 2 Introduction 2 1 General Thank you for buying this product and helping the world to become greener by adding a sustainable energy system on this planet Your renewable energy system produces grid ready renewable energy that contributes to the global reduction of CO2 emission and stimulates the transition from conventional fossil energy sources to renewable energy sources 2 2 Target group document Authorized installers must install this product In addition the installer must follow the regulations of the local grid operator The installer must read this installation guide carefully and must ensure compliance with all prescribed safety regulations the technical connection requirements of the local grid operator and any other applicable provisions 2 3 Introduction to the Femtogrid Wind System The Femtogrid Wind System consists of 4 components e Femtogrid Wind Power Optimizer one for each Urban Wind Turbine installed e Femtogrid Inverter 2400 or multiple Inverters 2400 e Femtogrid DC Cable s e Femtogrid Monitoring wireless monitoring system consisting of a Monitori
30. the safetybox These 3 connection points are indicated with arrows in the picture below The name of the Signal is printed on the PCB board near the Faston connection point PE a i P i Mlle Wind turbine Wind Power Optimizer V 1 0 July 2013 17 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer 8 3 Functional schematic of Safety Box s i O yp higy K2 J AT dev Wind Power Turbine Optimizer j MOV j MOV _ 500v 500v PE G fo PE 8 4 Connection from the Safety box to the Wind Power Optimizer The connection between the safety box and the Wind Power Optimizer is made with a 3 wire cable The cable must have stranded wire conductors with a cross section area of 4 mm We recommend the use of the 4 mm Femtogrid DC cable with Red Blue and Black wires The outer insulation on both ends of the cable should be removed over a sufficient length so the individual wires can be connected inside the Safety box and the Wind Power Optimizer as shown below However try to keep the internal wires as short as possible Insert the cable through the Cable gland an
31. to place the Wind Power Optimizer outside where it is exposed to rain and other weather conditions If more Wind Power Optimizers are installed be sure that the Wind Power Optimizers are not placed above each other This has a bad influence on the heat dissipation of the Wind Power Optimizer To ensure good wireless communication for the web monitoring portal it is important to place the inverter in range of the wireless network of the Power Optimizers For example in the loft right under the roof If this is not possible there are two ways to enlarge the range of the wireless network First mount the Monitoring Box on a strategic place between the Power Optimizers and the inverter If this doesn t work additional repeaters are necessary to enlarge the range of the wireless network For more information on the monitoring system see the manual of the Monitoring Box The inverter and Power Optimizers do not need the wireless network to convert the energy properly V 1 0 July 2013 10 28 Although the information in this document is presented in good faith and believed to be correct Femtogrid Energy Solutions BV makes no representation or warranties as to the completeness or accuracy of the information Femtogrid is a registered trademark of Femtogrid Energy Solutions BV Femtogrid Energy Solutions BV Installation manual Femtogrid Wind Power Optimizer 7 4 Dimensions 325 mm 197 mm SS Es 7 o0o00 447 mm 7 5 Mounting the Wind P

Download Pdf Manuals

image

Related Search

Related Contents

takeMS 64in1 Cardreader  How to setup and secure Snort, MySQL and Acid on  Canada - Buyandsell.gc.ca    Manual de instruções do Assistente do Certificado  DeVillbiss Air Power Company PWH3635 Pressure Washer User Manual  R6D−BS  USER'S MANUAL  

Copyright © All rights reserved.
Failed to retrieve file