Home
User Manual 990
Contents
1. For dual feed devices within a redundant system attach a power cable from each PDU with System Bypass into two different Metered Rack Mount PDUs in the NetShelter VX enclosure 54 User s Manual PowerStruXure Type B Installation Power Cables Whips For single feed devices within a redundant system with an Automatic Transfer Switch connect a power cable to the Automatic Transfer Switch A and B feeds and connect the Automatic Transfer Switch power cord to a Metered Rack Mount PDU in the NetShelter VX enclsosure For dual feed devices in a redundant system with an Automatic Transfer Switch connect a power cable from each PDU with System Bypass to the Automatic Transfer Switch s A and B feeds and another power cable from one PDU with System Bypass to a Metered Rack Mount PDU and the Automatic Transfer Switch s power cord to a second Metered Rack Mount PDU in the NetShelter VX enclosure L A Q
2. enclosure Ground Studs Rear cabling channel Front door Rear doors Side panels base model only Location of cable access There are cable access holes in the roof sides and base of the holes enclosure The rear cabling channel on the back of the enclosure has ample clearance between the doors and the mounting rails for cable routing 134 User s Manual PowerStruXure Type B Skirt removal Cable management devices How to reverse the door Customization NetShelter VX Enclosures The skirt at the front of the enclosure can be detached for additional cable access by removing the screws TORTE N PEREO OORO OOP COLO OCI ce oe x y JOR SRA RONAN TRES TS T 5 Le 7 SE Fe a a 0 NY ENDEN z Optional cable management devices can be used for helping to route and dress cables e Cable Management Hoops AR8113 e Cable Containment Kit AR8116BLK e Rear Cable Management Tray AR8118BLK e Side Cable Management Tray AR8114BLK You can reverse or remove the front door to accommodate your site configuration This section shows how to remove and reverse the door on your enclosure 1 Remove both side panels See How to remove and install the side panels
3. z I if ka Like Like i rn i m hd GA N SZ ALL PE EPO PCB IOOo000000000 PMAIMIAMIF OOOOO B P 10 11 12 13 14 User s Manual PowerStruXure Type B 41 Emergency Power Off Switch Choose a connection method Choose only one connection Note Emergency power off can be achieved with any one of the following four methods e Applying 120 VAC e Applying 24 VDC e Applying 24 VAC e Contact closure APC recommends contact closure EPO User Interface AC 120V DC 24V Contact Closure ee AC 24V Hazardous voltage from the branch circuit must be isolated from the 24 Vac 24 Vac and contact closure 24 VAC and 24 VDC are considered a Class 2 circuit as defined in Article 725 of the National Electrical Code NFPA 70 and Section 16 of the Canadian Electrical Code C22 1 A class 2 circuit 1s a source having limited voltage and energy capacity as follows a If an Inherently Limited Power Source voltage and energy are limited to lt 30 VAC lt 60 VDC 8
4. Maintenance Bypass Battery Breaker Box Bus Int MIM XXXXXX XXXXXX RIM XXXXXX XXXXXX MIM lt gt RIM XXXXXX 121 3 Phase Automatic Transfer Switch Front panel Reset Link N Status wv Fs www apc com ec Si Preference Configuration 3 Automatic Arc AP9616 Network Management Card Transfer Switch Resets the Network Management Card to ts default settings This Reset switch switch does not affect the settings of the Automatic Transfer Switch O Ethernet Port Connects the Automatic Transfer Switch to the Information Controller Hub using an APC network cable provided Rx Link LED Indicates whether there is activity on the network eo Status LED Indicates whether the Network Management Card is powered on Sets which power source will be the preferred source to supply power to the load equipment In normal operation if both sources are available the Automatic Transfer Switch will use the preferred source Press the Preference Selection button to change the preferred source Preference Selection button Indicate which of the two sources if any 1s selected as the user s preferred source Both LEDs off means that neither source is preferred Preference A and B LEDs Provide information about the condition of the input voltages from both sources If a source is considered OK the corresponding indicator will light A source is OK if the RMS input voltage on all Source A
5. MA Do not exceed the maximum voltage and current ratings listed on the rear panel of the Metered Rack Mount PDU Warning 124 User s Manual PowerStruXure Type B Information Controller and Hub Controller front panel o COM 2 RS 485 port reserved for future use COM 1 RS 232 RS 232 port reserved for future use RS 232 port reserved for future use future use HDD Hard disk drive LED e amber disk is being accessed Power LED O Power e green the controller is powered on VGA Monitor Connector reserved for future use Switch that reboots the Information Controller Reset The controller is shipped with a plastic screw inserted into the reset switch PS 2 Keyboard port reserved for future use O APCLAN Ethernet port for connecting to the private APC network een LAN Ethernet port used to connect to the user s network Link LEDs Link Rx e solid amber link is valid e flashing amber activity on the port e off tink is invalid Speed LEDs e off operating at 10 Mbps na e sreen operating at 100 Mbps Because the APC LAN operates at 1 10Mbps it is normal for the APC LAN Note speed LED to be off Information Controller Hub Hub front panel Pwr 19X 20X 21X 22X 23X 24X 25X 26X 27X 28X 29X 30X 31X 32X User s Manual PowerStruXure Type B 125 Operation Information Controller and Hub Pwr Power LED e green the hub is powered on LEDs indicate statu
6. 38 Tools required 38 Position level and attach the Symmetra 3 Phase UPS 38 Ensure that all power is off 38 Connect the PDU to the UPS 40 Emergency Power Off Switch 42 Choose a connection method 42 Connect a switch to the EPO interface 43 NetShelter VX Enclosures 44 Tools required 44 Position the enclosures 44 How to level an enclosure 44 How to stabilize the enclosure 45 How to join enclosures together 45 Cable Troughs Partitions and Ladders 47 Troughs and partitions for overhead wiring along rows 47 How to install power cable troughs 48 How to install data cable partitions 49 Ladders for overhead wiring across rows 50 Installation Contents How to install ladders across rows 51 Power Cables Whips 54 Route and attach overhead wiring 54 Wiring under the floor 57 3 Phase Automatic Transfer Switch 58 Placement 58 Attach mounting brackets 58 Disassemble segments of the adjustable bracket 58 Attach rear segments to the rack 58 Attach front segments to the switch 59 Mount the Automatic Transfer Switch in the enclosure 59 Metered Rack Mount PDU 60 Mounting options 60 Toolless mounting 60 Bracket mounting 61 Information Controller and Hub 63 Attach mounting brackets to the Controller and Hub 63 Mount the Controller and Hub in the PDU with System Bypass 63 30
7. 38 Only qualified personnel trained by APC may connect the Symmetra 3 Phase UPS to the PDU with System Bypass Warning Before connecting the Symmetra 3 Phase UPS you should first position and level it and then join the Symmetra 3 Phase UPS to the PDU with System Bypass See Exchange s de panels on page 32 How to level an enclosure on page 44 and Join the Symmetra 3 Phase UPS enclosure to the PDU with System Bypass enclosure on page 33 Before electrical installation begins ensure that power is Electrical off by following the procedure below Hazard l Set utility power to the OFF or Locked Out position 2 Open the DC breaker and set the System Enable switch on the Sym metra 3 Phase UPS to the Off position User s Manual PowerStruXure Type B Installation Symmetra 3 Phase UPS 3 Open the Main input circuit breaker on the PDU with System Bypass 4 Open the Q1 Q2 and Q3 breakers on the PDU with System Bypass 1 Perform all power wiring before installing modules into the Symmetra 3 Phase UPS Note User s Manual PowerStruXure Type B 39 Installation Symmetra 3 Phase UPS Connect the PDU to the UPS AN Only qualified personnel trained by APC may connect the Symmetra 3 Phase UPS to the PDU with System Bypass Warning Attach power wiring to and from the Symmetra 3 Phase UPS The power wires are coiled
8. Metered Rack Mount PDU 89 How to configure through a serial port connection 89 User menus 90 Administrator menus 92 Metered Rack Mount PDU How to configure through a serial port connection l Connect an available serial port on your computer to the serial port on the front panel of the Metered Rack Mount PDU using the sup plied configuration cable p n 940 0144 2 Run a terminal emulation software program such as Windows HyperTerminal 3 Configure the appropriate serial port with the following settings 19 200 bps no parity 8 data bits 1 stop bit no flow control Some terminal emulation software programs require that you disconnect and reconnect in order for the new serial port Note Settings to take effect 4 Press any key on your computer to bring up the Metered Rack Mount PDU logon menu pdu HyperTerminal ol x File Edit View Call Transfer Help AP7601 Metered Rack Mount PDU Username Password Auto detect 19200 8 N 1 Connected 0 03 32 5 Type the default usename and password for the appropriate level of access Administrator e Username type apc e Password type apc lowercase User e Username type apc e Password press ESC The Main menu will appear See User menus on page 90 or Administrator menus on page 92 for more information on the menus User s Manual PowerStruXure Type B 89 Configura
9. User s Manual PowerStruXure Type B 151 Information Controller and Hub Information Controller specifications Electrical Specifications Input 100 240 VAC 50 60 Hz 0 5 A Weigh Operating temperature Operating elevation Storage temperature Storage humidity 5 95 RH non condensing Compliance Specifications UL cUL VDE FCC Class A AS NZS 3548 Approvals VCCI Class A EN 55024 EN61000 3 2 EN61000 3 3 CE Information Controller Hub specifications Electrical Specifications 100 240 VAC 50 60 Hz 0 5 A Weigh Shipping dimensions Operating temperature Operating elevation Storage temperature Storage humidity 5 95 RH non condensing Compliance Specifications K UL cUL VDE FCC Class A VCCI Class En A EN55022 EN 50082 1 AS NZS 3548 152 User s Manual PowerStruXure Type B Maintenance Symmetra 3 Phase UPS 155 Handling and transport 155 Module replacement 155 How to obtain replacement modules 155 How to replace a power module 156 How to replace a battery unit 158 How to replace an intelligence module 159 How to replace cards 159 Replacement parts 160 How to return modules to APC 160 Metered Rack Mount PDU 00008 161 How to download firmware revisions to the Metered Rack Mount PDU 161 Symmetra 3 Phase UPS Handling and transport Module replacement How to obtain replacement modules Follow these guidelines if you need to ship the Symmetra
10. current at minimum mains Maximum continuous output current 125 overload 139A 139A 139A Bypass mode only Output current nominal Input current nominal Internal static switch fuses External output breaker Output voltage AC User s Manual PowerStruXure Type B 23 Symmetra 3 Phase UPS Weight Dimensions Symmetra 3 Phase UPS Symmetra 3 Phase UPS Empty 600 Ib 265 kg Full 1700 Ib 775 kg 82 in 208 cm Q Y 24 in 61 cm 34 in 87 cm Power Module Battery Module 60 lb 26 kg 4 x 50 1b 4 x 23 kg 4 25 in 11 cm 28 in 72 cm Space considerations Study the figure below to determine your space requirements for installing the Symmetra 3 Phase UPS The clearances listed below are required to comply with Table 110 26 of the 1999 National Electric Code In accordance with section 110 26 of this code the 36 inch depth is required for all 120 208V products and the majority of 277 480V and 346 600V products If 277 480V and 346 600V products are installed adjacent to an uninsulated concrete wall you must have a working depth space of 42 inches Consult your local code for additional requirements GS Ga Floor to Ceiling Ventilation gt 91 in 230 cm GS Minimum Rear Clearance 36 in Minimum E 91 Re Clearance 34 3 in 91 cm DS ei 87 cm 60 cm 91 cm 24 User s Manual Po
11. A ST SSS VW 2 G Ve NW Tr S S AN Push the two enclosures together until the holes in the free end of the baying bracket are aligned with holes in the frame post of the base enclosure The outer holes on the baying brackets are used when installing on 24 inch raised floor tiles and the inner holes on the baying brackets are used when installing on 600 millime ter raised floor tile On the base enclosure insert a caged nut into the holes that al gn with the holes in the expansion bracket e Repeat steps a d for each expansion bracket f On the base enclosure insert a socket head screw through the holes in the bracket the frame post and caged nut Hand tighten the screw Do not fully tighten the screws at this time They will be secured after all four mounting brackets have been installed Note g Repeat for the three remaining baying brackets Align the two enclosures as closely together as possible and then tighten all socket head screws on each of the four baying brackets Reinstall any side panels as required Side panels removed from base enclosure can be used on the expansion enclosure 46 User s Manual PowerStruXure Type B Cable Troughs Troughs and partitions for overhead wiring along rows Partitions and Ladders If you ordered APC cable troughs partitions and ladders to route overhead wiring for your PowerStruXure system you must assemble the power cable troughs and the
12. Local Interface Use this option of the Config screen to access these options Contract Requires password to modify Sets the screen contrast for the LCD Select from 1 high contrast to 8 low contrast Key Click On causes an audible click whenever you press a navigation key Off disables the key click Beeper Volume Select High Medium Low or Off to adjust the loudness of the audible beeper and the key click Network Interface Use this option of the Config screen to access these options to customize system and network settings IP Requires password to modify The System IP address which the domain name server translates into a domain name Mask The subnet mask which selects some of the bits from an internet address to route it to the subnet MAC The media access control address a hardware address that uniquely identifies the PDU with System Bypass network node Time Date Use this option of the Config screen to set any component of the system time and date The date format is dd mmm yyyy for example 12 Jun 2001 To modify values on the Time Date screen you must enter the system password Manufacturer Data Use this option of the Config screen to display a scrollable list containing information about hardware products in your PowerStruXure system For each hardware product the following data is displayed Manufacturer The company that made the product Name User s Manual PowerStruXure Type B Oper
13. Network Card Measure MeasureUPS UPS Probe 1 gt Stat Setup Probe 2 Stat Setup Zones Status 7 Aug 01 23 34 64 Zone 4 OK Probe 1 Temp OK Comm Established View Log View Statistics 1 Transfers gt Bat 0 Low Bats 3 Faults OHr OMin On Bat Network Card gt Network Setup View Network Setup Configure Logging Power Events On UPS Control On UPS Faults On User Activity On Measure UPS On List Event Groups Power Events UPS Control Events User Activities UPS Fault Events Measure UPS Events Clear Event Log Confirm gt Clear Event Log NO ABORT YES Clear Log Information Display E sc gt Date Time Beeper Password Contrast Information Config gt Date Aug 7 2001 Time 15 30 Password gt Password x x x _ end Timeout Emin Invalidate NOW Model APC9999 S N A94063038681 Manuf Date 11 18 94 Revs HW C3 FW A3a Beeper gt At UPS PwrFail 30s At Disp LowBatt Vol Low Click On Contrast Contrast 2 Fuel 100 22222222 Load 100 222222222 D8Vin 230Vout 60Hz Runtime 002hr 20min User s Manual PowerStruXure Type B Fault Diagnostics Frame Status Ext Device Status Comm Bus Status Esc gt Fault amp Diagnostics Frame Status Ext Device Status Comm Bus Status An Installed UPS Module has failed More Main Frame of 5 Status 14 of 16 bats Sub Systems Raw Status Data
14. 3 Phase UPS to another location Symmetra 3 Phase UPS to avoid damage during transport U S Federal Regulation requires that batteries be disconnected during shipment Always REMOVE BATTERIES before shipping the Electrical Hazard The above requirement applies anytime the Symmetra 3 Phase UPS is moved either indoors or outdoors by itself or as part of a PowerStruXure installation Remember to reinstall the battery and power modules after the Symmetra 3 Phase UPS has arrived at its destination Battery units power modules and intelligence modules can be replaced by the user If a power or a main intelligence module fails and a redundant module is present the failed module can be replaced without interrupting power to the load equipment If a functioning intelligence module is already installed you can replace a redundant intelligence module without interrupt 1 ing the power to the load If the Symmetra 3 Phase UPS 1s not in the on battery operat Note e ing mode you can replace a battery module without interrupting power to the load To obtain a replacement module contact APC Customer Support see page 168 Prepare to provide the additional information e In the event of a module failure the display interface may display additional fault list screens Press any key to scroll through these fault lists record the information and relay 1t to the APC Customer Support technician e If possible
15. 6 System Management Select the desired item and press ENTER Changes take affect immediately For firmware downloads follow the instructions on screen or see How to download firmware revisions to the Metered Rack Mount PDU on page 161 pdu HyperTerminal 10 x File Edit View Call Transfer Help Djs sls aa AP7601 Metered Rack Mount PDU System Management Restart RMPDU 2 Restore Default Parameters amp Restart 3 Firmware Download lt ESC gt Return to Main Menu Connected 0 03 32 Auto detect 19200 8 N 1 SCROLL CAPS NUM Capture Print echo User s Manual PowerStruXure Type B 95 Operation System Operations 20s cence dew ew 2 al aux 99 How to place the UPS into maintenece bypass opera tion 99 How to return from maintenance bypass operation 100 Total power off procedure 100 PDU with System Bypass 102 Display interface 102 LEDs 102 Top level status screens 102 Top level Menu screen 103 Screen map PDU with System Bypass 105 Load Meter screen 107 Volt Meter screen 108 Contacts screen 108 Alarms amp Logging screen 109 Config screen 112 Symmetra 3 Phase UPS 116 Display interface 116 Display overview 116 Control functions 117 Status functions 117 Set up functions 118 Basic troubleshooting 118 General Status troubleshooting 118 Threshold Alarm troubleshooting 119 Bypass troubleshooting 119 General Fault tro
16. 60T211HCUOCSW3 e 480 V 60T3IHCUOCSW3 e 600 V 60T65HCUOCSW3 The BTU output is higher while batteries are charging Under normal operating conditions battery recharge periods are Note Telatively infrequent PDU with System Bypass Protected from water and conductive Operating environment contaminates Temperature class transformer Class H 220 C Storage elevation for shipping 33 000 ft 10 000 m by air Relative humidity for operating 6507 on dore and storage Operating temperature 32 104 F 0 40 C User s Manual PowerStruXure Type B Site Planning PDU with System Bypass Electrical requirements l All power wiring including connection to the branch circuit must be installed by a qualified electrician and must comply Electrical with local and country codes Hazard Service distribution breaker 200 A 100 A 0 A provided by customer Conductors to main input breaker provided by 3 0 conductors 3 conductors 4 conductors customer Electrical specifications Transformer configuration a 2 Delta to WYE Delta to WYE Voltage requirements nominal 208 120 V 208 120V 208 120V 3 phase 3 phase 3 phase Input voltage AC 3 wire plus 3 wire plus 3 wire plus ground 208V ground 480V ground 600V 3 phase 3 phase 3 phase 4 wire plus 4 wire plus 4 wire plus ground 120 ground 120 ground 120 208V 208V 208V Output rating full load 40 kW 40 kW 40 kW Maximum continuous input 155
17. A b If Not Inherently Limited Power Source voltage and energy are limited to lt 30 VAC lt 60 VDC 250 VA and the current is lim ited to 1000 Vmax The fuse is limited to 5 A if lt 20 VAC or 20 VDC or 100 Vmax if lt 30 VAC or 60 VDC If choosing to use 24 VAC 24 VDC or contact closure to perform the EPO function the wires should be UL Listed type e CL2 Class 2 cable for general purpose use or e CL2P Plenum cable for use in ducts plenums and other space used for environmental air or e CL2R Riser cable for use in a vertical run shaft from floor to floor or e CL2X Limited Use cable for use in dwellings and for use in raceway 42 User s Manual PowerStruXure Type B Connect a switch to the EPO interface Installation Emergency Power Off Switch For installation in Canada the cable should be CSA Certified type ELC extra low voltage control cable If CL2 cable is not used the EPO wiring is to be routed in conduit The conduit should not contain any hazardous branch circuit wiring 1 Connect the switch to the EPO interface mounted on the bottom of the PDU with System Bypass rear panel See Choose a connection method on the previous page for guidance 1 The default setting on the EPO interface 1s for a normally open switch Note 2 If you are attaching a normally closed switch a access the monitoring unit through the back doors of the PDU with System
18. Bypass The arrow in the illustration below points to the PDU with System Bypass monitoring unit b Flip the EPO DIP switch on the PDU monitoring unit to change the default setting from a normally open to a normally closed setting 3 On the PDU monitoring unit ensure that the TEST ARM rocker switch is in the ARM position User s Manual PowerStruXure Type B 43 NetShelter VX Enclosures Tools required Position the enclosures How to level an enclosure 44 Tool Required Standard screwdriver Phillips screwdrivers various sizes Metric socket wrench or adjustable open ended wrench Metric hex drives 5mm allen wrench Level Open ended wrench 13 mm 14 mm for adjusting the leveling feet of the enclosure 1 Do not discard the open ended wrench with the packaging of the enclosure Note Position the first enclosure to the right or left of the PDU with System Bypass depending on the location of the Symmetra 3 Phase UPS and place each additional enclosure after the first to form a row After placing the enclosures in the desired position level stabilize if necessary and join enclosures before installing any equipment Leveling feet are attached under the enclosure at each corner The leveling feet can help provide a stable base if the selected floor space is uneven but they are not intended to compensate for a badly sloped surface The feet and casters can also be comple
19. CAPS num Capture Print echo 92 User s Manual PowerStruXure Type B Configuration Metered Rack Mount PDU 2 Metered Strip Configuration The administrator of the Metered Rack Mount PDU can configure warning alarm and indicator settings To select a configuration menu type the number of the desired selection and press ENTER pdu HyperTerminal B I0I x File Edit wiew Call Transfer Help AP7601 Metered Rack Mount PDU Metered Rack Mount PDU Configuration 1 Warning and Alarm Threshold Data 2 Audio Visual Indicator Settings lt ESC gt Return to Main Menu System Messages Menu Selection gt Connected 0 03 32 Auto detect 19200 8 N 1 SCROLL caps num Capture Print echo 2 1 Warning and Alarm Threshold Data The Warning and Alarm Threshold Data menu displays the present settings for output current warnings and alarms and allows configuration of those settings To change a setting a Type the appropriate number of the setting listed on the menu b Press ENTER c Type the new amount for the setting you selected d Press ENTER The change appears immediately in the top alarm and warning data list pdu HyperTerminal B lol x File Edit View Call Transfer Help AP7601 Metered Rack Mount PDU Warning and Alarm Threshold Data Warning Threshold Alarm Threshold L1 Output Current gt 12 17 L2 Output Current 12 17 L3 Output Current 12 17 Menu
20. IP Address 192 168 100 2 192 168 100 2 Subnet Mask 255 255 255 0 255 255 255 0 Default Gateway 192 168 100 1 192 168 100 1 Host Name 111 hn Domain Name xyz com xyz com Primary DNS Server 192 168 100 3 192 168 100 3 Secondary DNS Server 192 168 100 4 192 168 100 4 Done Internet 4 Log off the Information Controller by clicking the Log Off text at right on the tool bar 5 Disconnect your laptop from the APC LAN port 6 Continue with Verify the address assignment starting on page 85 84 User s Manual PowerStruXure Type B Communication Connection Information Controller and Hub Verify the address l From a computer on your user LAN open a browser Internet assignment Explorer 5 0 or higher and type n the IP address ass gned to the Information Controller in the previous procedure e g http 192 168 100 2 If you see the screen below you have configured the Information Controller properly If you do not see the screen below check the IP address verify that the link LED on the Note User LAN port is illuminated check your browser version and check all connections File Edit View Favorites Tools Help Back gt amp A Search Favorites EBristory NET 3 gt 13 Address v Links Legendary Reliability pe PowerStru gt ure Log On E Done Internet User s Manual PowerStruXure Type B 85 Configuration
21. Load Meter Monitor the load that the PDU with System Bypass is supporting by phase or in summary Volt Meter View the input and output voltage data for the PDU with System Bypass Configure settings and monitor the present status for any Contacts contacts set up on the PDU with System Bypass monitoring unit Alarms amp Logging oe alarm settings and view recent and active e Configure setup preferences for your display interface e Configure settings for the PDU with System Bypass Config and for your network e Set the characteristics of the electrical service that provides input to the PDU Obtain help about selected topics and procedures If the display interface is inactive for the time specified as the 1 Time out setting of the System Password option on the Config screen the interface reverts to the initial basic Note monitoring screens See System Password on page 112 To open any screen press the UP and DOWN W N arrow keys until the selector arrow rests next to your desired selection Press the ENTER key to view the selected screen gt Load Meter Alarms Contact In 020f04 EPO Name User Switch 2 Config Normal Open Breakers Help N Top level Menu scree Selector arrows Contacts screen When configuring settings press the UP and DOWN W MN keys until the selector arrow rests next to the setting you want to change and press the ENTER key If the setting is a list of c
22. Status Display Setup Diags Selector Accessories Help arrow Top Level Menu Press the UP and DOWN W A keys to navigate the selector arrow and view all sub menu screens Bat Voltage 128 5V Capacity 12 0kVA Bat Capacity 100 0 Fault Tolerance Total UPS Modules Runtime Olhr 30min 16 Batts 00Bad Bad UPS Mo Battery Module Status Screen Power Module Status Screen Scroll arrows indicate additional screens 116 User s Manual PowerStruXure Type B Control functions Status functions Operation Symmetra 3 Phase UPS Press the UP and DOWN W MN keys and the ENTER key to move the Input arrow to select and enter information Low Batt Dur Low Batt Dur ywfl0min Shutdwn Dly Shutdwn Dl 20sec Return Dly gt Return Sly Osec Return Bat Cap f arn Bat Cap 0 Shutdown Menu Shutdown Menu Input arrow To turn the load on off 1 Turn Load On Do Self Test CD 2 UPS LOAD IS OFF Simulate Power Fail Graceful Reboot Press any key Control Menu Load Off Screen To place the Symmetra 3 Phase UPS in out of bypass mode O Graceful Turn Off 2 Start Runtime Cal UPS IS BYPASSED UPS into Bypass CD Press any key Control Submenu Bypassed Screen Placing the Symmetra 3 Phase UPS into bypass mode stops backup protection Warning Verify general module status O Control Logging Sta
23. Symmetra 3 Phase UPS Product Manual on the Information Controller Help page or on our Web site at www apc com support General Status troubleshooting Input Freq outside configured range AC adequate for UPS but not for bypass Display Message The input frequency to the Symmetra 3 Phase UPS is outside the configured range The output frequency will not synchronize with the input frequency Normal bypass is not available The Symmetra 3 Phase UPS will function on line with the input voltage but in the event that bypass is required the input voltage is not adequate to power the load equipment 118 User s Manual PowerStruXure Type B Corrective Action Option 1 Improve the frequency of the incoming voltage Option 2 Widen the range of the acceptable incoming frequency using the display interface Startup Setup Output Freq Select Option 3 Proceed with startup normal bypass is not available Option 1 Improve the incoming voltage Option 2 Proceed with startup normal bypass is not available Threshold Alarm troubleshooting Redundancy has been lost Runtime is below alarm threshold Bypass troubleshooting Display Message Bypass is not in range either freq or voltage General Fault troubleshooting Need Bat Replacement The Redundant Intelligence Module is in control Display Message Display Message Operation Symmetra 3 Phase UPS The Symmetra 3 Phase UP
24. Type 1 and press ENTER to initiate a download The internal menu will dispay C repeatedly and the digital display dL b Select the Transfer pull down menu from the menu bar c Select Send File from the Transfer pull down menu d In the Send File window browse for and select the firmware file you copied to your hard drive e In the Send File window set the protocol to Xmodem and press the Send button When the firmware download is complete the digital dispaly will refresh and display the current reading again User s Manual PowerStruXure Type B 161 Product Information Warranty risa HER A aa Limited Warranty 165 Life Support Policy General policy 166 Examples of life support devices 166 How to Obtain Service If problems persist 167 How to Contact APC APC Worldwide Customer Support 168 Document Information Copyright 169 Revision 169 Warranty Limited Warranty American Power Conversion APC warrants its products to be free from defects in materials and workmanship for a period oftwo years from the date of purchase except in India where the period is one year for battery modules Its obligation under this warranty is limited to repairing or replacing at its own sole option any such defective products To obtain service under warranty you must obtain a returned material authorization RMA number from APC Cus
25. User s Manual PowerStruXure Type B PDU with System Bypass Tools required The following table lists all tools required for installation 1f your configuration places the PDU with System Bypass adjacent to the Symmetra 3 Phase UPS For an installation in which the PDU with System Bypass is not adjacent to the Symmetra 3 Phase UPS you will also need a selection of tools that are part of a standard electrician s tool Tool Required Supplied O set Standard screwdriver Phillips screwdrivers various sizes Metric socket wrench 13 mm or adjustable open ended wrench for connecting input and output wires between the PDU with System Bypass and the UPS Level Open ended wrench 14 mm for adjusting the leveling feet of the PDU with System Bypass 17 mm socket wrench Hex driver 3 16 in User s Manual PowerStruXure Type B 31 Installation PDU with System Bypass Exchange side panels Before installing the PDU with System Bypass and the Symmetra 3 Phase UPS you will need to exchange side panels so that the adjacent panels will have matching holes for joining the enclosures together and for routing input and output wiring between them Perform these steps before moving the enclosures to adjacent positions 1 Remove the side panel from the side of the Symmetra 3 Phase UPS that will be adjacent to the PDU with System Bypass in your planned configuration For instructions on removing side panels see How to remove
26. and B LEDs three phases and the measured frequency are within the selected tolerance ranges In a normal operating condition full source redundancy both LEDs are illuminated Indicates which source is being used for the output Only one arrow will be lit at any time The combination of Source LEDs Connector LEDs and Output LEDs provide a graphical view of the power flow though the Automatic Transfer Switch Ondes Shows that voltage 1s truly available at the output for the 2 Automatic Transfer Switch The local connection for accessing all the setup status Configuration port maintenance and diagnostic information for the Automatic Connector LEDs Transfer Switch 122 User s Manual PowerStruXure Type B Metered Rack Mount PDU Display interface www apc com o Metered Rack Mount PDU N m N Link 0090 y Status L1 L2 L3 Control button e press to change the phase of the current displayed on the digital display e press and hold for five seconds to view the orientation hold for an additional five seconds to change the orientation e press to silence an alarm Digital displayt e shows the current for the phase corresponding to the Phase Indicator LED that is illuminated e cycles through all three phases in 3 second intervals Serial port e access internal menus by connecting this port RJ 11 modular port to a serial port on your computer using the supplied serial cable p n 940 0144 P
27. and install the side panels on page 131 2 Remove the side panel from the side of the PDU with System Bypass that will not be adjacent to the Symmetra 3 Phase UPS 3 Install on the Symmetra 3 Phase UPS the side panel with the pre punched hole that you removed from the PDU with System Bypass in Step 2 4 Install on the PDU with System Bypass the solid side panel that you removed from the Symmetra 3 Phase UPS in Step 1 32 User s Manual PowerStruXure Type B Installation PDU with System Bypass Join the Symmetra l Move the Symmetra 3 Phase UPS into position next to the PDU 3 Phase UPS enclosure to with System Bypass aligning the two openings in the lower part of the PDU with System the adjacent side panels Bypass enclosure 2 Level both the PDU with System Bypass and the Symmetra 3 Phase UPS For instructions see How to level an enclosure on page 44 3 Thread the chase nipple p n 820 0071 through the opening in the adjacent side panels of the PDU with System Bypass and the Sym metra 3 Phase UPS 4 Tighten the lock nut and the bushing on the chase nipple Connection to be performed by a licensed electrician only A licensed electrician must connect the PDU with System Bypass to the main utility power Procedures requiring a licensed electric
28. call APC Customer Support from a telephone that is within reach of the Symmetra 3 Phase UPS display interface This will help to gather and report additional information to the APC Customer Support technician e Be prepared to provide a detailed description of the problem A Customer Support technician will help you solve the problem over the telephone if possible or will give you a return material authorization RMA number If a module is returned to APC this RMA number must be clearly printed on the outside of the package e Ifthe Symmetra 3 Phase UPS is within the warranty period repairs will be performed free of charge See Warranty on page 165 If it is not within the warranty period there will be a charge for repair e If the Symmetra 3 Phase UPS is covered by an APC PowerPlan service product have that information available and give it to the APC Customer Support technician User s Manual PowerStruXure Type B 155 Maintenance Symmetra 3 Phase UPS How to replace a power module MA Only qualified APC trained personnel should replace power modules Warning The display interface indicates the location of the faulty power module rows through 5 To remove the faulty power module 1 To deactivate the power module turn the knob with arrow pointing toward the module counterclockwise until it points downward D SP 2 Turn the spring activated finger screws one at either side of the module un
29. casters 3 Fit the 14 millimeter end of the open ended wrench included to the hex nut just above the round pad on the bottom of the leveling foot Turn the wrench clockwise to extend the leveling foot until it comes off 4 Repeat Step 3 for each of the remaining leveling feet How to remove and You can remove the side panels for access to the interior To remove the install the side panels side panels 1 Use the key to unlock the panel if necessary 2 Slide both panel latches down at the same time and pull the top of the panel toward you To avoid personal injury two people should lift the panel Heavy User s Manual PowerStruXure Type B 131 Customization NetShelter VX Enclosures 3 Release the latches and lift the panel up and off the narrow horizon tal lip at the bottom of the enclosure frame To reinstall Engage the bottom of the panel securely with the rail before pushing the top of the panel forward into place 132 User s Manual PowerStruXure Type B Customization NetShelter VX Enclosures How to identify one When installing equipment you will need to locate the top and bottom U space on the mounting of a U space on the mounting rails Every third mounting hole on the rail mounting rails of a NetShelter VX enclosure is notched and numbered to indicate the middle of a U space A U space takes up one of these notched holes an
30. data cable partitions along the rows of enclosures and assemble the ladders between rows Power cable troughs Each power cable trough is two feet in length and is not adjustable There are two types of power cable troughs The PDU power cable trough sits atop the PDU with System Bypass and has an opening in one end to fit around the power cables where they exit the PDU with System Bypass TheNetShelter VX power cable troughs have an opening in each side through which you can route data cables to the data cable partitions Data cable partitions There are two types of data cable partitions each of which forms a side wall of a trough for data cables You can customize the width of the trough for each row of your system wider for rows carrying many data cables narrower for rows carrying fewer A data cable trough for each row must use as its back wall a partition that contains an opening for routing data cables User s Manual PowerStruXure Type B 47 Installation Cable Troughs Partitions and Ladders How to install power cable troughs 48 Use the procedure in this section for both the PDU and NetShelter VX power cable troughs Make sure you install the PDU power cable trough on the PDU with System Bypass When installing NetShelter VX power cable troughs be sure that the opening for routing data cables s facing the front of the enclosure Note Install power cable troughs along the back edge on the
31. in the bottom of the PDU with System Bypass Five input wires are at left and four output wires are at the right Both sets are labeled with colors black for L1 red for L2 blue for L3 white for neutral and input only green for the equipment ground wire 1 Refer to the wiring diagram on page 41 as you follow this procedure Note l Remove the back lower panel of the Symmetra 3 Phase UPS Use the opening in the side panels of the PDU with System Bypass and Symmetra 3 Phase UPS to run the wires between the units Attach the equipment ground wire from the PDU with System Bypass to the ground stud below the input terminal block at right on the Symmetra 3 Phase UPS Attach the neutral wire and the input wires for the phases to the connectors with the corresponding colors and labels on the input terminal block at right on the Symmetra 3 Phase UPS 0 Attach the neutral wire and the output wires for the phases to the connectors with the corresponding colors and labels on the output terminal block at left on the Symmetra 3 Phase UPS Connect EPO control wires from the PDU with System Bypass to the EPO board on the Symmetra 3 Phase UPS 0 Connect Maintenance Bypass control wires from PDU with System Bypass to the Maintenance Bypass interface board of the Sym metra 3 Phase UPS 40 User s Manual PowerStruXure Type B Installation Symmetra 3 Phase UPS
32. loosen the second screw c Route all the data cables through the opening under the trough and into the enclosure O gt a Ill Pew Yb Information Controller d Press each data cable into a slot in the comb leaving enough cable below the comb to allow you to plug it into the Information Controller Hub e Reinstall the comb into the PDU with System Bypass 4 Connect each APC device s network cable to any available station port in the Information Controller Hub Station ports are those with an x after the number e g 2x Note 78 User s Manual PowerStruXure Type B Install and route data cables alternative routing Connect the Information Controller and Hub Communication Connection Information Controller and Hub APC strongly recommends routing data cables overhead as described in Overhead routing on page 77 Using APC data cable troughs and ladders is the best way to ensure that data transmission for your PowerStruXure system is free from the danger of induced voltages Note If you choose to route data cables under a raised floor note the following precautions e Do not route data cables inside the PDU with System Bypass to the floor either within the power cable conduit or in any other location Induced voltages from the power cables may interfere with correct data transmission You must route data cables out t
33. step 1 Consider the orientation of the Metered Rack Mount PDU in the enclosure before attaching the brackets A recessed orientation allows the Metered Rack Mount PDU to be mounted flush with the enclosure a raised orientation allows you to route cables through the channel see the figures in step 2 1 Attach two brackets to the rear of the Metered Rack Mount PDU using six pan head screws provided in the bracket kit for each bracket Recessed Orientation Raised Orientation User s Manual PowerStruXure Type B 61 Installation Metered Rack Mount PDU 2 Insert one mounting screw provided with the bracket kit in the top and bottom positions in the channel where the brackets align with the holes Tighten to secure the Metered Rack Mount PDU to the enclosure Recessed Orientation Raised Orientation 62 User s Manual PowerStruXure Type B Information Controller and Hub Attach mounting brackets to the Controller and Hub Mount the Controller and Hub in the PDU with System Bypass The Information Controller and Hub will come pre installed in the PDU with System Bypass However if at any time you need to install either or both of the units into a rack or PDU follow the procedure in this section 1 Attach the left and right mounting brackets to the controller using two flat head 2 Phillips screws provided for each brac
34. troughs of adjacent rows The ladder runs above the data cable partition to span the rows and to carry power cables and data cables User s Manual PowerStruXure Type B 51 Installation Cable Troughs Partitions and Ladders e Use two ladders one attached between power cable troughs to carry power cables and the other between data cable partitions to carry data cables 52 User s Manual PowerStruXure Type B Installation Cable Troughs Partitions and Ladders For two rows of enclosures that face back to back attach the ladders as follows e Attach one ladder to the slotted top of the power cable trough to carry power cables across rows e Attach another ladder to the slots low on the side of the power cable trough at an opening for the data cables This ladder will carry data cables after they are routed through the opening under the power cable trough Alternatively you can mount the two ladders side by side using the slots in the top edge of the power cable trough User s Manual PowerStruXure Type B 53 Power Cables Whips Route and
35. with the front of the rack to leave room for routing cables Note Disassemble segments of The adjustable brackets are necessary only f you are using a four post the adjustable bracket enclosure or rack If you are using a two post rack the Automatic Transfer Switch is supported by the mounting brackets alone 1 Disassemble each adjustable bracket by removing the slide screw and nut 2 Set the screws nuts and the adjustable bracket segments aside Attach rear segments to 1 Insert caged nuts included on the enclosure s rear vertical mount the rack ing rails at your chosen location 2 Align the rear segments of the adjustable bracket with the caged nuts you inserted in Step 1 3 Insert mounting screws included and tighten 58 User s Manual PowerStruXure Type B Attach front segments to the switch Mount the Automatic Transfer Switch in the enclosure Installation 3 Phase Automatic Transfer Switch 1 Align the front segments of the adjustable bracket with the four holes on the sides of the switch 2 Attach both front segments to the switch using four Phillips pan head screws and washers provided for each bracket segment MA Two people should perform this step Warning 1 Position the Automatic Transfer Switch in front of the mounted rear adjustable bracket segments 2 Align the front and rear adjustable bracket segments and slide the front segments onto the rear segments 3 Align
36. 4 User s Manual PowerStruXure Type B Overview NetShelter VX Enclosures Cable routing equipment O Overhead ladders Power cable trough Data partitions NetShelter VX options Options for this enclosure include the following e Stabilizer plate Bolt down brackets e Cable management devices e Toolless mounting for some accessories Quantity AR2100BLK AR2101BLK Expansion and mounting hardware User s Manual PowerStruXure Type B 15 3 Phase Automatic Transfer Switch AP7701 Network Management Card AP9617 Two NEMA L21 20 plugs cords 36 inches NEMA L21 20R receptacle cord 36 inches Rack mount brackets Rear rail segments 0 2 6 Front rail segments 16 User s Manual PowerStruXure Type B Metered Rack Mount PDU AP7601 AP7602 NEMA 5 20R outlets Cord retension clip holes Serial cable 940 0144 Hardwire end cap 870 70803 Hardwire access cover 870 70804 Cord retention clip AP7601 42 AP7602 21 870 70945 Digital display L21 20 power cord o NEMA L6 20R outlets User s Manual PowerStruXure Type B Information Controller and Hub Information Controller Hub O Information Controller Hub 32 port hub Rack mount brackets 2 and screws 6 Information Controller O Information Controller Rack mount brackets 2 and screws 4 The Information Controller and the Information Controlle
37. 60 00Hz Batt Voltage 211 5V Batt Capacity 100 0 Runtime Ohr 30min 16 Batts 0 Bad Up Capacity 40 0 kVA Fault tolerance n 2 Total Pwr Modules 05 Bad Pwr Modules 0 Alarm Thresholds Fault Tolerance n 1 Runtime Ohr 15min Load 10 0 KVA Self Test Ok Last Xfer None On Line RIM OK Status IM OK User s Manual PowerStruXure Type B Setup Esc Settings gt Shutdown Shutdown Defaults Output Freq Alarms Bypass Copy Other Defaults Output Feq gt Low Batt Dur 2min Shutdown Dly 20sec Esc Return Dly Osec Return Batt Cap 15 Set all UPS settings to Factory Defaults Esc NO ABORT YES Set to Defaults gt Output Freq Range Esc 60Hz 0 1Hz Alarm Thresholds gt Redundancy 1 Esc Load 10 0kVA Runtime Ohr 15m If UPS fails and line freq or voltage Esc is out of normal range Go To Bypass Copy UPS Settings gt Configuration 1 Esc From UPS to Display From Display to UPS gt Self Test 14 days UPS ID UPS IDEN Esc VoutReporting AUTO Output 208V BatFrAmpHour 1000 Operation Symmetra 3 Phase UPS START Fuel 100 MIINIMUMINI IIIN TI Load 100 WIMINI IIIi 208Vin 208Vout 60Hz Runtime Ohr 30min Control Status Setup Accessories Logging Display Diag Help Logging Accessories Esc Esc Accessories gt View Log Clear Log View Statistics Configure Logging List Event Groups gt MeasureUPS
38. Access the APC LAN by following the instructions in Access the APC LAN starting on page 80 If you do not have your network set up yet you can still access the Information Controller APC LAN and configure initial Note Settings 1 Connect a laptop to one of the station ports on the Information Con troller Hub using a CAT 5 network cable Your laptop must meet the following requirements It must be configured to automatically obtain an IP address via DHCP It must have a 10 BaseT compatible ethernet card It must be running TCP IP as a network protocol The browser must be Internet Explorer 5 0 or higher Your browser should have Java Script enabled Internet Explorer security cannot be set to high 2 On the proper adaptor release and renew your laptop s IP address 1 The controller will assign your computer one of its private IP addresses Note 3 Access the Information Controller s local interface by opening your browser Internet Explorer 5 0 or higher and entering the following IP address 192 168 1 1 User s Manual PowerStruXure Type B Communication Connection Information Controller and Hub 4 Log on to the Information Controller using the APC default user name apc lowercase and password apc lowercase File Edit View Favorites Tools Help lt p Back 6 A search Favorites EBristory B 3 z El Address APC PowerStruXure Location Con
39. Audible Alarm ENABLED Display Mode ENABLED Display Orientation NORMAL Menu Selections lt ESC gt Return to Main Menu System Messages Menu Selection gt Connected 0 03 32 Auto detect 19200 8 N 1 SCROLL caps num Capture Print echo Le 3 Device Data Users can view the configured device data about the Metered Rack Mount PDU All data is configured by an administrator The device data helps to keep track of the Metered Rack Mount PDU pdu HyperTerminal B 10 x File Edit View Call Transfer Help Dis 213 AP7601 Rack Mount PDU Device Data Product Name Product Location Contact Information Log Timeout mins Admin Password Menu Selections lt ESC gt Return to Main Menu APC PDU Enclosure 12 328 223 8976 10 kkkkkkkkkkk System Messages Menu Selection gt Connected 0 03 32 Auto detect 19200 8 N 1 SCROLL CAPS num Capture Print echo L User s Manual PowerStruXure Type B 91 Configuration Metered Rack Mount PDU 4 Factory Data Users can view the Factory Information which provides detailed manufacturing data about the Metered Rack Mount ln File Edit View Call Transfer Help AP7601 Rack Mount PDU Factory Information Model AP7601 Serial 23458765 Hardware Rev 1 0 Manufacture Date 11 28 2001 Firmware Rev 1 0 Firmware Date 10 22 2001 Menu Selections lt ESC gt Return to Main Menu System Messages Me
40. DC bus in the Symmetra 3 Phase UPS is energized when battery modules are installed even when the DC Electrical Hazard Disconnect breaker is open 5 Install at least one battery module 4 battery units in the Symmetra 3 Phase UPS Install battery units four across starting in the lowest available shelf Position the battery unit to slide in between the grooves and push completely into the enclosure to ensure connec tion User s Manual PowerStruXure Type B 69 System Start Up Start Up Procedure 70 6 Install atleast one power module in the Symmetra 3 Phase UPS Install power modules in the top 5 shelves starting from the lowest available shelf Push the module completely into the enclosure and secure a Tighten the screws on each side of the power module b Turn the locking latch on the right hand side of the enclosure clockwise until the arrow faces the power module 1 The power module will not start unless the locking latch is engaged Note 7 Apply AC power to the Symmetra 3 Phase UPS input by closing the Q1 breaker on the PDU with System Bypass User s Manual PowerStruXure Type B System Start Up Start Up Procedure 8 Check phase rotation at the Symmetra 3 Phase UPS input terminal block ensuring that it is A B C clockw
41. Electromagnetic Compatibility General Immunity Standard Part 1 Residential Commercial and Light Industry Dimensions lt 10 x normal input current with isolation transformer optional equipment User s Manual PowerStruXure Type B 149 3 Phase Automatic Transfer Switch np como Two 36 inch attached L21 20P line Input connectors cords One 36 inch attached L21 20R line Output connectors cord 1 71 x 17 00 x 12 00 in USW 4 34 x 43 18 x 30 48 cm Shipping Weight 20 5 Ib 9 30 kg Elevation above MSL 0 to 10 000 ft 0 to 3000 m Operating 210 FO 400 211 F4 0 Safety Verification UL cUL UL 60950 150 User s Manual PowerStruXure Type B Metered Rack Mount PDU AP7601 AP7602 Electrical Specifications 100 120 173 208 V 36 16 A 7601 NEMA L21 20 plug 7602 NEMA L21 20 plug 7601 100 120 V 3x 16 A 42 NEMA 5 20 R receptacles 7602 100 120 173 208 V 3 x 16A 21 NEMA 5 20R 6 NEMA L6 20R receptacles Physical Specifications Dimensions 1 75 x 3 5 x 60 in 4 5 x 8 9 x 152 4 cm Weight 17 lb 7 7 kg PIRE 4 x 5 x 72 in 10 2 x 12 7 x 182 9 cm dimensions Shipping weight 19 Ib 8 6 kg Opera nus 23 113 F 5 45 C temperature Operating humidity 5 95 RH non condensing Operating elevation 10 000 ft 3000 m above MSL Storage temperature 13 149 F 25 65 C Storage humidity 5 95 RH non condensing Compliance Specifications Approvals UL CUL FCC VCCI
42. Lay the cables neatly in the trough to minimize cable build up If they are not laid neatly all the cables will not Note fit User s Manual PowerStruXure Type B 55 Installation Power Cables Whips 5 From each NetShelter VX enclosure run the power cable of the appropriate APC power management device out the roof of the enclosure through the notch in the rear side of the power cable trough to the connector of the appropriate power cable from the PDU with System Bypass Plug the two twist lock connectors together and twist them clockwise to lock 56 User s Manual PowerStruXure Type B Wiring under the floor Installation Power Cables Whips A N A licensed electrician must route and connect the power Electrical cables for under floor wiring Hazard If you plan to route the power cables whips to the enclosures under a raised floor you must provide the appropriate power cables and equipment for installation and a licensed electrician must route and connect the power cables to the circuit breakers of the PDU with System Bypass To wire each cable to an enclosure l Electrical Push out a knock out filler in
43. Load Output Rating 40 KW 40 KW 40 KW Maximum Continuous Input Current at minimum mains aD Maximum Continuous Output Current 125 Overload Bypass Mode 139 amps 139 amps 139 amps only User s Manual PowerStruXure Type B 147 Symmetra 3 Phase UPS 148 Symmetra 3 Phase UPS Specifications Input Specifications The UPS will operate from mains at full load over the following ranges 166 240 VAC line to line for North America 304 477 VAC line to line for Europe and 160 230 VAC line to line for Japan including transformer If the AC input voltage exceeds this range the UPS will AC Input Voltage operate from battery power The UPS may operate on line below this range if the load is reduced from full power thus extending the life of the batteries When operating on battery power the UPS will not retransfer to AC power until the line has returned to an acceptable level plus a hysteresis margin based on loading on the UPS The battery voltage produced by the battery system is De pub Voltage 192 VDC nominal Input Frequency 40 70 Hz Range Input Power gt 0 99 at full load and operating on line at nominal input Factor voltage Input Inrush l 2 lt normal input current without transformer Current Input Generator Generator kW rating gt 1 25 x UPS kW rating Sizing Generator kVA rating gt 1 40 x UPS kVA rating Output Specifications 3x208VAC for North America and Japan Output Voltage 3x380 400 415
44. PC PowerStruXure Location Contact Legendary Reliability Status amp PowerStrus ure HOME EVENTS MEE NETWORK HELP REFRESH ENCLOSURES INVENTORY Add Remove APC Device Serial Numbers New APC Device Serial Number rl To add an APC device enter its serial number above and click on the arrow button To delete an APC device select its serial number on the right and click the remove button when finished click Apply Remove O This information will be sent to APC s Remote Monitoring Service for inventory purposes Apply ee 82 User s Manual PowerStruXure Type B Communication Connection Information Controller and Hub 4 Click on the System button on the Information Controller menu bar and click on the Identification tab On the Identification screen click the Enable RMS check box to enable RMS and enter the RMS SMTP mail server address this address is available from APC RMS Eile Edit View Favorites Tools Help lt p Back m amp ZS A search Lg Favorites EA History E r Address E Links 4 APC PowerStruXure y E Location S Legendary Reliability ue Powe rSt ru ure HOME EVENTS 36321209 NETWORK HELP REFRESH Encuosures Inventory MBE Edit PowerStruXure Information Name apc PowerStruxure Location System ID Edit Contact Information First Name Last Name wa Address 7 EE State ity Provin
45. Pow erStru Xure User s Manual Contents Safety Information 1 Safety Warnings 3 OVEIVIEW rie sce da e ri a ie a ek 7 PDU with System Bypass 9 Symmetra 3 Phase UPS 12 NetShelter VX Enclosures 14 3 Phase Automatic Transfer Switch 16 Metered Rack Mount PDU 17 Information Controller and Hub 18 SITE PLANING aria add a es 19 PDU with System Bypass 21 Symmetra 3 Phase UPS 24 Emergency Power Off Switch 26 NetShelter VX Enclosures 27 Installatol ES su HE ad 29 PDU with System Bypass 31 Symmetra 3 Phase UPS 38 Emergency Power Off Switch 42 NetShelter VX Enclosures 44 Cable Troughs Partitions and Ladders 47 Power Cables Whips 54 3 Phase Automatic Transfer Switch 58 Metered Rack Mount PDU 60 Information Controller and Hub 63 System Start UD case ER asia Bi Bee 65 Start Up Procedure 67 Contents Communication Connection Information Controller and Hub Configuration Metered Rack Mount PDU 89 Operation eee wee seat System Operation 99 PDU with System Bypass 102 Symmetra 3 Phase UPS 116 3 Phase Automatic Transfer Switch 122 Metered Rack Mount PDU 123 Information Controller and Hub Customization NetShelter VX Enclosures 131 Metered Rack Mount PDU 142 Specifications PDU with System Bypass 147 Symmetra 3 Phase UPS 148 125 3 Phase Automatic Transfer Switch 150 Metered Rack Mount PDU 151 Informat
46. Reproduction in whole or in part without permission is prohibited APC the APC logo NetShelter and PowerStruXure are trademarks of American Power Conversion Corporation and may be registered in some jurisdictions All other trademarks product names and corporate names are the property of their respective owners and are used for informational purposes only Part number 990 7823 November 2001 User s Manual PowerStruXure Type B 169
47. S no longer detects redundant power modules Either a power module s has failed or the load has increased The predicted runtime is lower than the user specified minimum runtime alarm threshold Either the battery capacity has decreased or the load has increased The frequency and or voltage is out of acceptable range for bypass This message occurs when the Symmetra 3 Phase UPS is online and indicates that the bypass mode may not be available if required One or more battery units need to be replaced The main intelligence module has failed and the redundant intelligence module is functioning as the primary intelligence module User s Manual PowerStruXure Type B Corrective Action Option 1 If possible install additional power modules Option 2 Decrease the load Option 3 Disable the redundancy alarm by setting redundancy to zero Startup Setup Alarms Redundancy select zero Option 1 Allow the battery modules to recharge Option 2 If possible increase the number of battery modules Option 3 Decrease the load Option 4 Use the display to decrease the minimum runtime alarm threshold Startup Setup Alarms Runtime select Corrective Action Option 1 Decrease the sensitivity to input fre quency Startup Setup OutputFreq select Option 2 Correct input voltage to provide acceptable voltage and or frequency Corrective Action Refer to How to replace a batte
48. Selections 1 Next Selection 2 Enter Warning Threshold 3 Enter Alarm Threshold lt ESC gt Return to Main Menu System Messages Menu Selection gt Connected 0 03 32 Auto detect 19200 8 N 1 SCROLL CAPS NUM Capture Print echo L User s Manual PowerStruXure Type B 93 Configuration Metered Rack Mount PDU 2 2 Audio Visual Indicator Settings The Audio Visual Indicator menu displays the present settings for the audio alarm and digital display and allows configuration of those settings To change a setting a Type 1 and press ENTER until the arrow cursor reaches the desired setting b Type 2 and press ENTER to make a change to the setting c Type the number of the desired change and press ENTER The available settings and their associated numbers are listed after the System Messages item The change takes place immediately pdu HyperTerminal o x File Edit View Call Transfer Help Die sl 5 AP7601 Metered Rack Mount PDU Audio Visual Indicator Settings Audible Alarm gt ENABLED Display Mode ENABLED Display Orientation NORMAL Menu Selections 1 Next Selection 2 Enable Normal 3 Disable Flipped lt ESC gt Return to Main Menu System Messages Menu Selection gt Connected 0 03 32 Auto detect 19200 8 N 1 SCROLL Cars NUM Capture Print echo Z 3 Device Data The device data can help you keep track of the Metered Rack Mount PDU by assigning a u
49. VAC for Europe se electrical installation ia Factor Synchronized to mains programmable frequency range Output Frequency 3Hz or 0 1 Hz around nominal frequency 50 or 60 Hz Output Voltage Regulation Steady State 1 Output Voltage Regulation 5 Transient Dynamic lt 2 When loaded to 100 of rated capacity in Watts Total Harmonic Distortion lt 5 With a computer load under all rated environmental conditions Output Specifications Overload Sustainable Overload 2 lt 150 for 30 seconds Capacity User s Manual PowerStruXure Type B Specifications Symmetra 3 Phase UPS Symmetra 3 Phase UPS Specifications Efficiency Fully gt 91 5 for North America Charged Physical Specifications Audible Noise at 70 Load lt 58 dBA Width 23 5 Depth 34 3 Height 81 4 597 x 871 x 2058 mm for Europe and North America Width 47 Depth 34 3 Height 2068 1194x871x2058 for Japan 1395 lbs 633 kg for Europe and North America Weight Fully Loaded 2055 lbs 932 kg for Japan Isolation Transformer included Heat Dissipation Fully Loaded 12 682 BTU hr North America Compliance Specifications UL Listed UL 1778 Standards EN50091 2 Uninterruptible Power Systems Part 2 EMC Requirements EN 55022 Limits and CE Verified Class methosd of measurement of radio disturbance A characteristics of information technology equipment and EN 50082 1
50. a User s Manual PowerStruXure Type B Active Alarm 01of11 Input Transformer Temperature Too High New Logged Alarms Entire Alarm Log All Possible Alarms Clear Alarm Log Loading Limits Voltage Limits Other Limits Global Alarm Config Alarm Beeper If Active Silence Alarms All Alarms Active Alarm System Password Time Date Local Interface Network Address Service Type Delta Input Voltage 480V Main Breaker 200A Transformer YES gt Panel Config Left Panel Config Rght Global Panel Config gt PDU Monitor PDU Meter Esc Esc Esc Esc EPO Monitor State Disarmed Switch Disengaged Esc gt System Network Input Configuration Panel Configuration Manufacturer Data gt Product Data Factory Defaults Firmware Update A ore Device Name Product Location Esc Product Contact Factory Defaults Set Configuration to Factory Defaults Esc NO ABORT YES Set to Default Firmware 7 Update PDU Monitor PDU Meter Esc Operation PDU with System Bypass Load Meter screen From the Load Meter screen you can select the following items Total Load by Phase The load supported by each phase in kVA in RMS current Irms and as a percentage of the breaker rating LD TotalLoad Summary For the total load supported kW The power provided in kilowatts e kVA The actual power drawn by the load in kilovolt amperes Freq Frequency e PF The power fa
51. al policy Examples of life support devices 166 American Power Conversion APC does not recommend the use of any of its products in the following situations e In life support applications where failure or malfunction of the APC product can be reasonably expected to cause failure of the life support device or to affect significantly its safety or effectiveness e In direct patient care APC will not knowingly sell its products for use in such applications unless it receives in writing assurances satisfactory to APC that a the risks of injury or damage have been minimized b the customer assumes all such risks and c the liability of American Power Conversion is adequately protected under the circumstances The term ife support device includes but 1s not limited to neonatal oxygen analyzers nerve stimulators whether used for anesthesia pain relief or other purposes autotransfusion devices blood pumps defibrillators arrhythmia detectors and alarms pacemakers hemodialysis systems peritoneal dialysis systems neonatal ventilator incubators ventilators for adults and infants anesthesia ventilators infusion pumps and any other devices designated as critical by the U S FDA Hospital grade wiring devices and leakage current protection may be ordered as options on many APC UPS systems APC does not claim that units with this modifications are certified or listed as hospital grade by APC or any other organizatio
52. and alarm data for current Type 2 and press ENTER to see the audio alarm and digital display settings pdu HyperTerminal 5I x File Edit Yiew Call Transfer Help AP7601 Rack Mount PDU Metered Rack Mount PDU Configuration 1 Warning and Alarm Threshold Data 2 Audio Visual Indicator Settings lt ESC gt Return to Main Menu System Messages Menu Selection gt Connected 0 03 32 Auto detect 19200 8 N 1 SCROLL CAPS mum Capture Print echo L User s Manual PowerStruXure Type B Configuration Metered Rack Mount PDU 2 1 Warning and Alarm Threshold Data Users can view the warning and alarm threshold settings for output current Each setting is given for all three phases pdu HyperTerminal E m E File Edit View Call Transfer Help Ole e 3 ls AP7601 Rack Mount PDU Warning and Alarm Threshold Data Warning Threshold Alarm Threshold L1 Output Current 12 17 L2 Output Current 12 17 L3 Output Current 12 17 Menu Selections lt ESC gt Return to Main Menu System Messages Menu Selection gt Connected 0 03 32 Auto detect 19200 8 N 1 SCROLL CAPS NUM Capture Print echo ZA 2 2 Audio Visual Indicator Settings Users can view the present settings for the audio alarm and digital display e pdu Hypertermina ______ ee ioii File Edit View Call Transfer Help ollel S 3 o s el AP7601 Rack Mount PDU Audio Visual Indicator Settings
53. ation PDU with System Bypass The person to notify concerning questions or problems Product Contact with regard to the product Product Location The physical location of the product in your data center Model Number Basic information about the product useful when Serial Number requesting service or product updates Product Name Hardware Revision Manufacture Date User s Manual PowerStruXure Type B 115 Symmetra 3 Phase UPS Display interface The Symmetra 3 Phase UPS display interface is a local interface used to configure functions monitor the system set alarm thresholds and provide audible and visual alarms CO LOAD ON CON BATT Fuel 100 Load 000 CDavrass 120Vin 000Vout 60Hz Runtime 00hr 30m CD FAULT E A h al crystal our s report the display LCD operational status of the Symmetra 3 Phase UPS Select and open menu items access information change system parameters and launch context sensitive help using these five navigation keys Display overview Press the ESC Esc key until you reach the top level Status screen providing you with basic system status information Fuel 10 Load 000 120Vin 000Vout 60Hz Runtime Ohr Om Top Level Status Screen factory default Press the ENTER key to open the top level Menu screen This screen is the launching pad to command configure and monitor the Symmetra 3 Phase UPS Control Logging
54. attach If you ordered overhead wiring connect the prewired power cables of overhead wiring the PDU with System Bypass as follows 1 Install the troughs partitions and ladders as described in Cable Troughs Partitions and Ladders starting on page 47 so that you can route power cables from the PDU with System Bypass to the NetShelter VX enclosures 2 Find the numbers that indicate the enclosure to which each power cable will supply power These numbers appear on the roof of the PDU with System Bypass where the power cables exit and they also appear on the ends of each power cable The enclosures are not numbered Consult your APC PowerStruXure Configuration Buildout Tool to determine nite the enclosure associated with each power cable 3 Beginning with the power cables for the enclosures farthest from the PDU with System Bypass run each power cable within the power cable trough along the row and if necessary across one or more ladders to the enclosure to which it will provide power Ensure that the L21 20 twist lock connector at the end of each power cable always lies on top of any longer power Sra cables in the trough 4 Connect the appropriate power cable to APC power management equipment in the enclosure in one of the four following ways For single feed devices without redundancy attach a power cable directly to a Metered Rack Mount PDU installed in a NetShelter VX enclosure
55. cator immedi ately following the breaker rating To indicate that the breaker is not associated with tied to the next pole position in the list choose the character as the tie indicator immediately following the breaker rating When you change the or character that follows the breaker rating in one row the or character before the breaker rating in the next row also changes to indicate the changed association between the breaker and that pole position Example A 1 pole 30 amp breaker in position 11 and a 2 pole 60 Amp breaker in positions 13 and 15 Pos Phase Breaker 111 L3 30A 13 Ll 60A 15 L2 60A User s Manual PowerStruXure Type B 113 Operation PDU with System Bypass Panel Config Pos The pole positions in the right panel which contains Right even numbered pole positions only Phase and Breaker See Panel Config Left To scroll the screen and configure values see Panel Config Left Example A 3 pole 20 Amp breaker in positions 8 10 and 12 Pos Phase Breaker 108 Lil 20A 10 12 20A 12 23 20A Global Panel Requires password to view or modify Configures the Config same number of poles and the same breaker rating for all breakers in both panels simultaneously For example if your system uses only 3 pole 20 amp breakers choose this option scroll to the value 3 for Poles and 020 for Amp Rating and then select Apply Now and YES to implement your changes
56. ce Postal Code Country United States E mail Phone Configure Remote Monitoring Service RMS SMTP A mail apce com mail server Apply a TA en Enable RMS D 5 Change the username and password from the default by clicking on the System button on the menu bar and clicking on the Users tab File Edit View Favorites Tools Help Ea 2 22 4 GM 9 6 oes 2 Back Forward Stop Refresh Home Search Favorites History Mail Print Edit Discuss Real com Links APC Intranet 4 APC Oracle Site gt address eo APC PowerStruXure Location Legendary Reliability E as amp Po wer St ru ure HOME EVENTS 26311239 NETWORK HELP REFRESH Loc Orr Configure System User User Name apc The user name that you supply here will become the Password only user name that can log Verify Password on to this system A You will be automatically logged off when you change the username password Apply FTP User Name apc The user name that you supply here will be used for FTP Password FTP access into the system Verify Password Apply E Done Fr Internet Porat A E 2 R B EA Se O 5 37 PM l http 192 168 1 PCxHelp Microsoft Control Panel Asb _prob_ EAA Not Sign On GI c WINNTISystem3 R Y SHE amp D 6 Continue with Assign an IP address to the Information Control ler starting on page 84 User s Manual PowerStruXure Ty
57. ch phase to phase output voltage e g L1 2 for phase L1 to phase L2 and each phase to neutral output voltage e g L1 for phase L1 to neutral Input Voltage Displays each phase to phase input voltage e g L1 2 for phase L1 to L2 and if your service transformer is a Wye transformer each phase to neutral input voltage e g L1 for phase L1 to neutral Contact monitoring is a future enhancement that 1s not available at this time User s Manual PowerStruXure Type B Alarms amp Logging screen Operation PDU with System Bypass Alarm Beeper Use this option of the Alarms amp Logging screen to access the following options Silence All Alarms Turn off the audible alarm for present and future alarms Silence Active Turn off the audible alarm for the present alarm condition Alarms only If the condition recurs the alarm sounds again If the alarm beeper has been deactivated by previously selecting the Silence All Alarms option the Alarm Beeper screen displays the following option Activate Alarm Turns on the audible alarm Beeper View Active Alarms Use this option of the Alarms amp Logging screen to display active alarms alarms that have not been resolved Scroll through the list to view each active alarm Alarm Log Use this option of the Alarms amp Logging screen to access the following options New Logged Display a description and the date and time of each alarm Alarms that occurred since the last time this
58. ctor which affects the power available to the load e LD The present load as a percentage of the breaker rating Power Factor For each phase e kVA The actual power drawn by the load in kilovolt amperes kVA kW The power in kilowatts provided by the phase e PF The power factor which affects the power available to the load Branch Ckt Loading You can display this status if the option to measure individual currents is installed In the Branch Ckt Loading screen scroll through the list of breakers in the panel to display the following for each pole associated with a breaker Ckt The panel position of the pole for example 03 e nnofbb The rating in amps for example 20 A for each pole associated with breaker number nn of the total number of installed breakers bb in the panel for example 010f28 Irms the measured root mean square RMS current e LD Present load as a percentage of rated load The following example shows the display for a 3 pole 20 amp breaker To configure poles so that they are tied together 1 e associated with the same breaker see Panel Config Left and Panel Config Right on page 114 Olof28 Irms LD 20A 16 0 080 20A 10 0 050 20A 20 0 100 User s Manual PowerStruXure Type B 107 Operation PDU with System Bypass Volt Meter screen Contacts screen 103 From the Volt Meter screen you can select the following items Output Voltage Displays ea
59. d Environmental Monitoring Unit are listed on the Information Controller Configure screen by checking your list of serial numbers with the list of serial numbers on the Configure screen see figure below File Edit View Favorites Tools Help lt h Back m x Al search Favorites S4History EX 7 Address APC PowerStruXure Location Legendary Reliability ns PowerStru Image Map Device List CONFIGURE Edit Device Information aoe Serial Number Name Enclosure Remove UPS ED011234567 Unassigned y m UPS ED011234567 Unassigned O ATS SNO345982 Unassigned m Env 77777 onessigned E Monitor 49844004113 Unassigned y O Env Unassigned E Monitor 40111006458 Unassigned y 1 EEE WA0111006404 Unassigned O Monitor Ei WA40111006452 Unassigned J r Monitor Env PA Unassigned E Monitor 40111006514 Unassigned O Apply E Done Internet 2 On the Configure screen assign each APC device listed to an enclo sure 3 Click on the System button on the Information Controller menu bar and click on the Inventory tab On the Inventory screen enter all APC device serial numbers that are not detected by the Information Controller 1 e NetShelter VX enclosures PDU with System Bypass Metered Rack Mount PDUs File Edit View Favorites Tools Help lt E Back D 5 A search SgjFavorites EBristory E 3 r Address Links A
60. d bushing to the conduit 7 Thread the conduit through the hole User s Manual PowerStruXure Type B 35 Installation PDU with System Bypass 8 Route the input conductors to the main input circuit breaker of the PDU with System Bypass as follows a For wiring under a raised floor run the input conductors through the wireways at the right or left side within the PDU with Sys tem Bypass to the main input circuit breaker of the PDU with System Bypass b For overhead wiring run the cable directly to the main input cir cuit breaker of the PDU with System Bypass 36 User s Manual PowerStruXure Type B Installation PDU with System Bypass A licensed electrician must connect the input wiring to the PDU with System Bypass 9 At the main input circuit breaker connect the input wiring to the PDU with System Bypass circuit breaker terminals for phase L1 L2 and L3 according to the following color coding Input MA Tighten the lugs on the circuit breaker terminals only to the torque specified on the circuit breaker s label Warning 10 Connect the equipment ground wire to the lug on the bracket next to the circuit breaker 11 Connect the GEC to the second lug on the bracket next to the breaker and connect to building steel User s Manual PowerStruXure Type B 37 Symmetra 3 Phase UPS Tools required Position level and attach the Symmetra 3 Phase UPS Ensure that all power is off
61. d one hole immediately above and below it as shown Caged nuts During installation of equipment in your enclosure you may need to install or remove caged nuts Follow the procedures in this section when installing or removing caged nuts from the enclosure Install caged nuts horizontally with the ears engaging the MA sides of the mounting hole Do NOT install caged nuts vertically with the ears engaging the top and bottom of the Warning mounting hole How to install and remove caged nuts 1 Install the caged nuts on the side of the mounting rail that is opposite the equipment to be mounted Note l Insert the caged nut into the mounting hole by hooking one ear of the caged nut assembly through the far side of the hole 2 Place the caged nut tool included on the other ear of the caged nut and pull to snap it into position 3 Detach the tool from the caged nut To remove Remove any attached screws and reverse the action in Step 2 Grasp the caged nut before releasing the tool User s Manual PowerStruXure Type B Customization NetShelter VX Enclosures Grounding studs The enclosure has thirteen grounding studs which are located on the doors the roof the side panels and the frame American Power Conversion offers an optional grounding kit AR8390 for grounding the
62. e frequency of the input mains power Run Time The run time that can be expected of the batteries The intelligence module calculates the run time based on both the amount of power required by the load equipment and the capacity of the battery modules in the enclosure Command the UPS to apply power to the load a Press the ESC key at the Monitoring screen to open the Main menu This menu allows access to eight submenus Control Logging Status Display Setup Diags Accessories Help b Move the selection arrow to the Control item and press the ENTER key c Move the selection arrow on the Contol menu to the Turn UPS On item and press the ENTER key d Confirm the selection on the next screen move the selection arrow to the Yes UPS Load ON item and press the ENTER key The LOAD ON LED will illuminate and the display will show the following two screens UPS has been commanded to turn load power on UPS load is on Press any key 72 User s Manual PowerStruXure Type B System Start Up Start Up Procedure Verify proper phasing l Place the Symmetra 3 Phase UPS into Static Bypass mode a Move the selection arrow on the Main menu to the Control item and press the ENTER key Control Logging Status Display Setup Diags Accessories Help b Move the selection arrow on the Contol menu to the UPS into Bypass item and press the ENTER key c Confirm the selection
63. e system INSTUCTIONS IMPORTANTES CONCERNANT LA S CURIT Conserver ces instructions Cette notice contient des instructions importantes concernant la s curit User s Manual PowerStruXure Type B 3 Safety Information Safety Warnings PDU with System Bypass o Note Electrical azard A Warning A Electrical Hazard Total Power Off Procedure l Set the Symmetra 3 Phase UPS System Enable switch to the Standby or Off position 2 Open the Symmetra 3 Phase UPS DC Disconnect breaker 3 Open the PDU with System Bypass Main Input breaker 4 Open the DC Disconnect breaker of each XR Battery Cabinet 5 Disconnect the batteries in the Symmetra 3 Phase UPS by pulling them out approximately one inch 25 4 mm from their normal position Hazardous live parts inside the Symmetra 3 Phase UPS are energized from the battery supply even when the AC power is disconnected Hazardous live parts may exist inside the PDU with System Bypass due to the Symmetra 3 Phase UPS inverter even when the AC power 1s disconnected Test before touching any electrical parts This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules and the Class A limits for radio noise emissions from digital apparatus set out in the Radio Interference Regulations of the Canadian Department of Communications These limits are designed to provide reasonable protect
64. en tripped Wrap Around Bypass Alarm Log Cleared The alarm log has been deleted None not applicable User s Manual PowerStruXure Type B 111 Operation PDU with System Bypass Config screen System Password options Password Time out Invalidate NOW Use this option of the Config screen to access these Change the system password required to access protected screens and fields in the display interface Enter a string of up to eight alphanumeric characters followed by the underline character _ to indicate the end of the string The default password is APC Set the time that the display interface waits for user input before it reverts to the initial scrolling of status screens Select 1 2 5 10 the default or 30 minutes or 1 2 or 4 hours or Forever Immediately prompts users to re enter the system password if they are viewing password protected screens Input Configuration Use this option of the Config screen to configure information about the electrical service that provides input to the PDU with System Bypass Service Type Input Voltage Main Breaker Transformer Requires a password to modify The type of transformer at the service entrance for the building The voltage of the service transformer The rating in amps of the main breaker for the building s electrical service Whether this PDU has a transformer YES or NO User s Manual PowerStruXure Type B Operation PDU wi
65. es between the vertical frame posts These adjustable braces provide structural support and are available for managing cables or to support the mounting rails 1 Use the 5mm Allen wrench included to remove the four socket head screws that are holding the brace to the frame posts 2 Remove the caged nuts from the frame post See How to install and remove caged nuts on page 133 3 Locate the new position for the brace and secure the brace to the frame posts a Insert a caged nut into the appropriate holes at the new position on the frame post b Place the brace at the new position and insert a socket head screw through the brace frame post and caged nut c Tighten the screw to secure the brace to the frame post How to remove the roof Remove the roof from the enclosure by removing the four socket head screws from the inside corners Use the 5 millimeter Allen wrench included 140 User s Manual PowerStruXure Type B How to move the vertical baying trim Customization NetShelter VX Enclosures The vertical baying trim is pre installed to one side of the expansion enclosure The vertical baying trim covers the gap between enclosures after they have been joined together Your s te configuration may require you to move the trim to the other side of the enclosure 1 U
66. esholds individually e Volt Limits Set the same percentage for the high and low thresholds for input and output voltage Use the Voltage Limits option to set these thresholds individually Select Apply Now and then YES to implement your changes 110 User s Manual PowerStruXure Type B Operation PDU with System Bypass List of PDU Alarms This table lists all alarms that can be generated by the PDU with System Bypass as displayed by the All Possible Alarms option with numeric variables between the lt gt characters Logged alarms will display specific numbers instead Se Message When Alarm Condition Explanation Condition Cleared Phase to phase input voltage between the Input V lt L L gt lt Value gt P P 8 4 two phases indicated has dropped below the configured lower limit Input Voltage V lt L L gt Phase to phase input voltage between the Back In Range two phases indicated exceeded the configured upper limit Output V lt L N gt lt Value gt Phase to neutral output voltage for phase Voltage Under Limit lt L N gt dropped below the configured limit Output Voltage V lt L N gt Output V lt L N gt lt Value gt Phase to neutral output voltage for phase Back In Range Voltage Over Limit lt L N gt exceeded the configured limit Output I lt N gt lt Value gt Current of output phase lt N gt exceeded the Current Over Limit configured limit Output Phase lt N gt Output Phase L lt n gt Current
67. ft the battery handle and then pull it outward until it is fully extended in the locked position 2 To release it from the lock mechanism gently push the battery upward again and pull outward supporting the battery unit with your free hand To install a new battery unit l Position the battery to slide in between the two grooves in the empty slot in the enclosure and push the unit all the way into the Symmetra 3 Phase UPS enclosure 2 Check that the Symmetra 3 Phase UPS display interface shows a message saying that it has registered the installation ready to apply power to the Symmetra 3 Phase UPS Failure to do so can result in a deep discharge of the batteries which Warning may cause permanent damage Install battery units into the enclosure only when you are Store the battery module s in a cool ambient temperature below 77 F 25 C Verify that the Symmetra 3 Phase UPS is operating in on line mode before replacing a battery module If the unit is operating in the on battery mode power to the connected Note Equipment may be interrupted while the battery is being replaced User s Manual PowerStruXure Type B Maintenance Symmetra 3 Phase UPS How to replace an intelligence module A redundant intelligence module can be replaced without interrupting power to the connected equipment provided that Note another functioning intelligence module is already installed To remove the faulty intelligence m
68. ge 9 Return the equipment by insured prepaid carrier to the address given to you by Customer Service User s Manual PowerStruXure Type B 167 How to Contact APC APC Worldwide Customer Customer support for th s or any other APC product s available at no Support charge in any of the following ways e Visit the APC Web site to find answers to frequently asked questions FAQs to access documents in the APC Knowledge Base and to submit customer support requests www apc com Corporate Headquarters Connect to localized APC Web sites for specific countries each of which provides customer support information www apc com support Global support with FAQs knowledge base and e support Contact an APC Customer Support center by telephone or e mail Regional centers APC Corporate Headquarters U S and Canada 800 800 4272 toll free Latin America 1 401 789 5735 United States Europe Middle East Africa 353 91 702020 Ireland Japan 03 5434 2021 Guidance 3 Local country specific centers go to www apc com support contact for contact information e Contact the APC representative or other distributor from whom you purchased your APC product for information on how to obtain local customer support 168 User s Manual PowerStruXure Type B Document Information Copyright Revision Entire contents copyright 2001 American Power Conversion All rights reserved
69. hase indicator LEDs e indicates the phase corresponding to the current listed in the digital display e indicates normal green warning yellow or alarm red condition Status LED e reserved for future use Ethernet port e reserved for future use Link LED e reserved for future use Each Metered Rack Mount PDU is equipped with a sensor that measures the current being used by the Metered Rack Mount PDU and devices connected to it The value displayed is the aggregate current of an individual phase This value is used to gen erate alarms that you define For information on configuring alarms see 2 1 Warning and Alarm Threshold Data on page 93 User s Manual PowerStruXure Type B 123 Operation Metered Rack Mount PDU Alarm conditions The warning and alarm limits are configurable through the internal menus through a serial port connection For instructions on accessing the internal menus see How to configure through a serial port connection on page 89 The following table describes warning and alarm conditions Behaviors During Alarm Condition Phase Indicator LED Digital Display Control Button Yellow warning Shows the current Causes the digital display to Red alarm for the phase at or show the current reading for the above the warning next phase or alarm limit e After 30 seconds of disuse the display will return to the phase or cycle among phases at or above the warning or alarm limit
70. he finishing trim Replace the trim using the socket head screws Replace the bumpers and latch plate using the counter sunk screws from the hardware bag Reinstall the hinge pin brackets 7 Reinstall the hinge pin brackets on the opposite side of the enclo sure a Remove the small plastic plugs covering the insertion holes in the plinths and the top of the enclosure frame b Reinstall the two hinge pin brackets from their original position to their new position c Secure the hinge pin brackets by threading the hex nuts onto the screws Hand tighten the screws they will be tightened firmly later in the procedure User s Manual PowerStruXure Type B 137 Customization NetShelter VX Enclosures Reinstall the latch plate and bumpers 8 Reinstall the latch plate and the two door bumpers from their origi nal position O to their new position O Be sure to maintain the original spacing between the latch plate and bumpers as well as their vertical relationship Note With the enclosure frame If you are using an expansion enclosure use the socket head screws in the hardware bag to reinstall the latch Note Plate and bumpers 9 Reinstall the small plastic plugs in the frame and the plinths in the empty holes that once held the hi
71. he output phases Voltage Limits Password required to modify Configure the following as a percentage under or over the rated voltage Input The allowed range for input voltage e Output The allowed range for output voltage Other Limits Password required to modify Configure these limits e Frequency The frequency variation in Hz that is acceptable for the output current e Gnd Current The upper limit in amps for the current on the earth ground wire Branch Ckt Limits Available only if the option to measure individual currents is installed Branch Ckt Limits accesses a scrollable list of the breakers in the panel For each breaker the screen displays in the Loading column the current on each pole as a percentage of the rated current In the Load Alarm column you can configure the high and low thresholds for the breaker as a percentage of its rated current For example if you set 80 as the high threshold for a 3 pole 20 amp breaker an alarm condition occurs if the current on any of the three poles reaches 16 amps Global Alarm Password required to view or modify Config Set all the loading limits or all the voltage limits simultaneously as a percentage of full load Load Limits Set the same percentage for the upper limit for output current the lower limit for output current and the upper limit for current on the neutral wire for the output phases Use the Loading Limits option to set these thr
72. he roof of the PDU with System Bypass and down inside the first NetShelter VX enclosure to the floor e Induced voltages can also create problems under the floor when data cables run too close to any power cables Even if data transmission 1s successful after the initial installation later additions to power cabling under the floor for other equipment in your data center can jeopardize the integrity of the data transmission for your PowerStruXure system 5 Apply power to all devices connected to the Information Controller Hub Ensure that you log the serial number of each APC PowerStruXure device and where it is installed before Note you begin configuring the information controller 6 After both the Status and Link LEDs on each connected Network Management Card have turned green proceed to Connect the Information Controller and Hub 1 Connect the Information Controller s APC LAN port to any station port on the Information Controller Hub using a CAT 5 network jumper cable provided 1 Station ports are those with an x after the number e g 2x Note User s Manual PowerStruXure Type B 79 Communication Connection Information Controller and Hub Connect the Information Controller to your LAN Access the APC LAN 80 l Connect a port on your LAN to the Information Controller s User LAN port ED EE 2
73. hoices an input arrow will appear next to the setting Press the UP and DOWN ww MN keys until your desired change is listed Press the ENTER key to and change to the setting Contact In 020f04 Name User Switch 2 O Normal Open Status Contacts scr Input arrow User s Manual PowerStruXure Type B 103 Operation PDU with System Bypass 104 On the Config screen and the Breaker screen continue arrows indicate that there are additional screens to view in the category Press the UP and or DOWN w MN keys to view the additional screens System Network Breaker t 020f05 Input Configuration Name O2 Breaker Panel Configuration Closed Manufacturer Data y y Config screen Breaker screen Continue arrows User s Manual PowerStruXure Type B Screen map PDU with System Bypass Load Meter Esc gt Total Load by Phase Total Load Summary Power Factor Total Load by Phase Total Load Summary Total Output Loading KW 000 0 PF 0 00 KVA 000 0 LD 000 Freq 60 0 Power Factor KVA KW PF 00 0 00 0 0 00 00 0 00 0 0 00 00 0 00 0 0 00 User s Manual PowerStruXure Type B START Volts In Volts Out L1 2 112 Ll 112 L2 3 114 L2 112 L3 1 116 L3 112 Load Current L1 000 Neut 000 L2 001 L3 000 Gnd 00 0 Total Output Loading KW 000 0 PF 0 00 KVA 000 0 LD 000 Freq 60 0 Active Alarm O1lof1l Input Transfo
74. ian include connection of main utility conductors Electrical e connection to the input circuit breaker of the PDU with System Bypass e connection to a branch circuit This PDU with System Bypass contains no parts that are serviceable by general users Refer all servicing to APC Field Note Service Engineers User s Manual PowerStruXure Type B 33 Installation PDU with System Bypass Connect main utility power Ensure that utility power is OFF before beginning Electrical installation Hazard A licensed electrician must connect the main utility power 1 Run three wires with an equipment ground wire and a GEC grounding electrode conductor from the main utility service of the building to the PDU with System Bypass 2 Open the back doors of the PDU with System Bypass using the provided key for the top smaller door and loosen the two screws holding the larger hinge door in place 3 Remove the rectangular gland plate by loosening the captive screws using a Phillips or standard screw driver a in the bottom of the PDU with System Bypass for wiring under a raised floor 34 User s Manual PowerStruXure Type B Installation PDU with System Bypass b or in top of the PDU with System Bypass for overhead wiring 4 Cut an appropriately sized hole in the gland plate for the conduit 5 Re attach the gland plate 6 Install a lock nut an
75. illuminate indicating that it 1s safe to operate the Q2 breaker Note Close the Q2 breaker on the PDU with System Bypass 1 The H3 LED above the Q3 breaker should illuminate indicating that 1t 1s safe to operate the Q3 breaker Note Open Q3 breaker on the PDU with System Bypass 1 As soon as you open the Q3 breaker the UPS will automatically come out of Static Bypass Note Open the DC breaker and turn off the System Enable switch on the Symmetra 3 Phase UPS User s Manual PowerStruXure Type B Operation System Operation 2 Open the Main input circuit breaker on the PDU with System Bypass NIE IN 1 3 Open the DC Disconnect breaker of each XR Battery Cabinet 4 Disconnect the batteries in the Symmetra 3 Phase UPS by pulling them out approximately one inch 25 4 mm from their normal posi tion User s Manual PowerStruXure Type B 101 PDU with System Bypass Display interface LEDs Top level status screens 102 You can use the display interface of the PDU with System Bypass to configure settings set alarm thresholds and provide audible and visual alarms LOADON CHECK LOG www apc com BYPASS ALARM Liquid crystal Four LEDs indicate the display LCD operational status of the PDU with System Bypass Select and open menu items access information change
76. ion against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his or her own expense Hazardous live parts inside the PDU with System Bypass are energized from the battery supply of the attached Symmetra 3 Phase UPS even when the AC power is disconnected Risk of Electrical Shock No user serviceable parts inside Refer all servicing to an APC Field Service Engineer A licensed electrician must perform the following e Connection to the branch circuit e Connection of PDU power cords in addition to the factory installed power cords User s Manual PowerStruXure Type B Symmetra 3 Phase UPS Other components A Warning Note A Electrical Hazard Warning Warning Safety Information Safety Warnings Changes or modifications to this unit not expressly approved by the party responsible for compliance could void the user s authority to operate the equipment The Branch Circuit conductors are secured to the Main Input Circuit Breaker Ensure that the circuit breaker terminals are tightened to the torque specified on the circui
77. ion Controller 152 Maintenance Symmetra 3 Phase UPS 155 Metered Rack Mount PDU 161 Product Information Warranty 165 Life Support Policy 166 How to Obtain Service 167 How to Contact APC 168 Document Information 169 ii User s Manual PowerStruXure Type B Safety Information Safety Warnings zu sa ee eee ac id 3 Safety symbols used in this guide 3 General safety warnings 3 PDU with System Bypass 4 Symmetra 3 Phase UPS 5 Other components 5 Safety Warnings This manual is intended for use by the following groups e Users e Licensed electricians e APC Field Service Engineers e Qualified APC trained personnel This manual indicates who must perform specific procedures Failure to follow the instructions in this manual could result in damage to property personal injury or even death s Safety symbols used in this quide a g A N Indicates a hazard which if not avoided could result in injury Electrical Of death Hazard Indicates a hazard which if not avoided could result in damage to product or other property Wa 5 a Indicates important information Note Indicates a heavy load that should not be lifted without assistance gt Heavy General safety warnings IMPORTANT SAFETY INSTRUCTIONS Save these instructions This manual contains important Note Instructions that should be followed during installation and maintenance of the PowerStruXur
78. ise rotation using a phase rotation meter 9 Close the DC breaker and turn on the System Enable switch on the Symmetra 3 Phase UPS SS 0 Start the UPS using the When the System Enable switch is placed in the ON position the Startup display interface screen appears on the display interface of the Symmetra 3 Phase UPS PowerViewRM Rev 0051 English Please wait 1 Note any alarms listed on the display interface of the UPS and ver ify that they are appropriate for start up conditions See Basic trou bleshooting on page 118 for more information 2 Referring again to the display interface verify that the Symmetra 3 Phase UPS accepts the AC Mains input After the display interface has established communication with the Symmetra 3 Phase UPS the Monitoring screen appears Fuel AAA Load In 000Vout Hz Runtime hr m User s Manual PowerStruXure Type B 71 System Start Up Start Up Procedure Default Monitoring Information The factory default Monitoring screen displays the following status information Fuel Percentage The percentage of battery capacity fuel that is available Load Percentage The percentage of system capacity that 1s being used to supply conditioned power to the load equipment Voltage and Input The input voltage from mains power the output Frequency voltage supplied to the load equipment and th
79. ket 2 Attach the left and right mounting brackets to the hub using three flat head 1 Phillips screws provided for each bracket The top 1U space in the PDU with System Bypass enclosure is reserved for the Information Controller Hub and the second 1U space is reserved for the Information Controller In the NetShelte VX use the top two U spaces for the Information Controller and the Information Controller Hub Use the following procedure for installing both components 1 Insert caged nuts provided with the enclosure above and below the notched holes on the vertical mounting rails occupying the reserved 1U space for the component you are installing in the enclosure 2 Plug the component into one of the provided power cords pre installed in the PDU with System Bypass and slide it into place If you are installing the component into a NetShelter VX or a rack use the provided power cords 3 Align the mounting holes on the brackets with the caged nuts you installed in Step 1 and insert two mounting screws provided with the enclosure to secure the brackets to the enclosure User s Manual PowerStruXure Type B 63 System Start Up Start Up Procedure 67 Important safety information 67 Ensure that power is off 67 Apply power to the system 68 Start the UPS using the display interface 71 Verify proper phasing 73 Power the PDU distribution breakers 74 Start Up Procedure Important
80. l PowerStruXure Type B Operation Information Controller and Hub How to access the This procedure is for accessing the Information Controller for Information Controller information on setting up the APC LAN and the Information Controller APC LAN on your LAN see the procedures in Connect the Information Controller and Hub on page 79 l Connect a computer to one of the ports on the Information Control ler Hub using a 10Base T network cable This computer must be configured to automatically obtain an IP address 2 Release and renew your laptop s IP address for Windows 95 98 run winipcfg exe for Windows NT 2000 run ipconfig exe 1 The controller will assign your computer one of its private IP addresses Note 3 Access the Information Controller s local interface via APC LAN by opening your browser and entering the following IP address 192 168 des L 4 Log on to the Information Controller using the APC default user name and password apc lowercase How to access the This procedure is for accessing the Information Controller from your Information Controller on LAN for information on setting up the APC LAN and the Information your LAN Controller on your LAN see the procedures in Connect the Information Controller and Hub on page 79 l From a computer on your public LAN open a browser and type in the IP address assigned to the Information Controller 2 Enter the APC default username and
81. ll an overhead Note ladder Use wide 12 inch ladders where many power cables or data cables will run between rows use narrow 6 inch ladders where few power cables or data cables will run between rows e g to rows farthest from the PDU with System Bypass You can adjust the length of the ladders in the following ways e You can cut back the ends to shorten them by using a hacksaw e You can extend their length several inches by inserting the connectors only partially into the side rails Do not change the spacing between rows and the length and physical positioning of the ladders from the basic layout you planned with your APC representative when you placed your order For overhead wiring each whip is provided at a pre determined length to reach the enclosure whose devices 1t will Note support Changes to the physical configuration of your PowerStruXure system could cause some power cables whips to be too short or too long User s Manual PowerStruXure Type B Installation Cable Troughs Partitions and Ladders How to install ladders To install the ladders for typical configurations across rows 1 On each side rail of the ladders insert the ladder brackets 2 Attach the ladders to the troughs in one of the three a c following ways Q For two rows of enclosures that face front to front do one of the following e Use the ladder brackets to attach the 12 inch ladder to the slotted top of the power cable
82. n Therefore these units do not meet the requirements for use n direct patient care User s Manual PowerStruXure Type B How to Obtain Service If problems persist If the equipment requires service do not return it to the dealer Follow the steps below l Review the appropriate sections of this manual to troubleshoot common problems Verify that no circuit breakers have been tripped A tripped circuit breaker is the most common UPS problem If the problem persists contact APC Customer Support by referring to How to Contact APC on page 168 Note the model number of the product the serial number and the date purchased A technician will ask you to describe the problem and try to solve it over the phone if possible If this is not possible the technician will issue a returned material authorization RMA number If the equipment is under warranty repairs are free If not there is a repair charge Warranty information appears on Note Page 165 5 Pack the equipment in its original packaging If the original packing is not available ask Customer Service about obtaining a new set For information on how to pack a Symmetra 3 Phase UPS refer to Handling and transport on page 155 Pack the product properly to avoid damage in transit Never use polystyrene beads for packaging Damage sustained in transit is not covered under warranty 8 Mark the RMA number on the outside of the packa
83. nate and the display will show the following two screens UPS has been commanded to go into Bypass UPS is in Bypass Press any key 1 The H3 LED above the Q3 breaker should illuminate indicating that it 1s safe to operate the Q3 breaker Note 2 Close Q3 breaker on the PDU with System Bypass 1 The H2 LED above the Q2 breaker should illuminate indicating that it 1s safe to operate the Q2 breaker Note 3 Open the Q2 breaker on the PDU with System Bypass 4 Turn the System Enable switch on the Symmetra 3 Phase UPS to the off position User s Manual PowerStruXure Type B 99 Operation System Operation How to return from maintenance bypass operation Total power off procedure 100 Note 5 Open the DC Disconnect breaker on the Symmetra 3 Phase UPS 6 Open the Q1 breaker on the PDU with System Bypass After you have finished these steps you are now in maintenance bypass operation and you can service the Symmetra 3 Phase UPS without affecting your connected equipment 1 Close the Q1 breaker on the PDU with System Bypass Close the DC Discomnect breaker on the Symmetra 3 Phase UPS 3 Turn the System Enable switch on the Symmetra 3 Phase UPS to the On position As soon as you close the DC Disconnect breaker and turn the System Enable switch to the On position the Note UPS comes up in static Bypass with the load on 1 The H2 LED above the Q2 breaker should
84. nd 346 600V products If 277 480V and 346 600V products are installed adjacent to an uninsulated concrete wall you must have a working depth space of 42 inches Consult your local code for additional requirements A G GS Floor to Ceiling Ventilation gt 101 in 236 cm Minimum Rear Clearance Minimum F ae inimum Fron E aa Orem oe Clearance 1 24 in ET 86 cm 36 in 60 mm T cm Ensure that the floor and sub floor can support the total weight of the configuration when concentrated on the leveling feet If you are placing equipment on a raised floor consult the flooring manufacturer for loading requirements prior to installing equipment PDU with System Bypass Weight 1500 Ib 680 kg See Weight considerations on page 25 and on page 27 for weight measurements for the Symmetra 3 Phase UPS and NetShelter VX enclosures User s Manual PowerStruXure Type B 21 Site Planning PDU with System Bypass BTU Considerations Operating conditions 22 Consider the BTU ratings of equipment to determine cooling requirements Additional cooling equipment may be required Refer to the table below for BTU output of the PDU with System Bypass Product Voltage BTU Output 208 V 4645 480 V 4617 600 V 3425 BTU was calculated with the following formula Load x 2 x Mfg specified load loss Mfg specified core loss x 3 414 This calculation is based on the following Square D transformers e 208 V
85. nel of the base enclosure and attaching it to the open side of the expansion enclosure The expansion enclosure consists of expansion hardware and vertical baying trim that covers the gap between the joined enclosures for a finished appearance Before joining enclosures Sometimes you must change enclosure configurations before joining enclosures together Often this means reversing the front door on one of the enclosures or moving the trim from one side of an enclosure to the other Preliminary steps for joining enclosures 1 Reverse the door if necessary See How to reverse the door on page 135 2 Remove the side panel from the existing enclosure or bay if neces sary See How to remove and install the side panels on page 131 3 If necessary move the vertical baying trim from one side of the expansion enclosure to the other side See How to move the verti cal baying trim on page 141 How to join enclosures 1 Connect the four baying brackets pre installed on the expansion enclosure to the base enclosure a Using the 5 mm Allen wrench included loosen the socket head screw that is holding the baying bracket to the expansion enclosure User s Manual PowerStruXure Type B 45 Installation NetShelter VX Enclosures b Rotate the bracket from its original position to its new position O RSR EE N A K
86. nformation Controller 84 Verify the address assignment 85 Information Controller and Hub Connect network cables l Connect aCAT 5 network cable provided to the Network ports on to PowerStruXure devices the Network Management Cards The following devices have Net work Management Cards 3 Phase Automatic Transfer Switch Symmetra 3 Phase UPS Environmental Monitoring Unit 2 Connect network cables provided to the 10Base T ports on the Metered Rack Mount PDU and on the PDU with System Bypass Route network cables to Overhead routing the Information 1 Install troughs and ladders as described in Cable Troughs Parti Controller Hub tions and Ladders on page 47 2 Run the CAT 5 network cables from each APC device to the Infor mation Controller Hub in the top of the PDU with System Bypass a Run the connected network cable into the data cable trough and along the row toward the PDU with System Bypass b If necessary to reach the PDU with System Bypass run the APC network cables for the entire row bundled together with cable ties across one or more ladders between rows For the cables to reach a ladder you may have to route them through the opening under the power cable trough for the row User s Manual PowerStruXure Type B 77 Communication Connection Information Controller and Hub 3 Atthe PDU with System Bypass a Remove one of the two screws in the comb inside the PDU with System Bypass and
87. ng in maximum 40 kW configuration _ Output freauenc Synchronized to mains in normal i S operation 60 Hz in battery operation Maximum output current 125 139 A load Bypass mode only Output current per phase nominal 111 A Output per neutral nominal APC recommends the neutral to be 192 2 x phase Input current nominal 123 A Input current limit 162 A User s Manual PowerStruXure Type B 25 Emergency Power Off Switch Overview of EPO 26 A remote switch not included is attached at the EPO interface in the PDU with System Bypass The EPO interface O is connected to the PDU with System Bypass Main breaker and to the Symmetra 3 Phase UPS internal EPO switch connection to the Symmetra 3 Phase UPS is made during installation of PowerStruXure When the remote EPO Switch is enabled power will be terminated at the PDU with System Bypass and the Symmetra 3 Phase UPS providing a single point for emergency shutdown of the PowerStruXure system User s Manual PowerStruXure Type B NetShelter VX Enclosures Weight Dimensions Space considerations Weight considerations The American Power Conversion APC NetShelter VX is a high quality enclosure for storage of industry standard EIA 310 19 inch equipment which includes servers voice data networking internetworking and APC power protection equipment Both the base enclosure AR2100BLK and the expansion enclosure AR2101BLK provide 42U of mo
88. nge pin brackets and hinge pins before the door was reversed Reinstall the door assembly 10 Reinstall the door assembly To avoid personal injury or damage to the enclosure one person should support the door while another secures the Warning 00r to its frame a Reverse the steps for removing the door See Remove the door on page 136 b Make sure that the door opens and closes properly and then firmly tighten the countersunk screws to secure the hinge pin brackets to the enclosure frame 11 Reinstall the side panels for AR2100 series See How to remove and install the side panels on page 131 138 User s Manual PowerStruXure Type B Mounting rails Location of screws for adjusting the mounting rail How to adjust the mounting rails on the frame posts How to move the rails to a new position using the side braces Customization NetShelter VX Enclosures The vertical mounting rails are factory installed in the proper position for use with Compaq rack mountable equipment that has a depth of 29 13 inches 739 mm You can adjust the rails to the front or rear a total of 2 35 inches 60 mm to accommodate different rails or equipment with various depths You can also move the rails by attaching them to the horizontal braces The following sections describe the procedures for adjusting the position of the mounting rails and for moving them within the enclosure The location of the screws that govern
89. nique name for the device a contact number or name and the enclosure in which it is housed To change a device data item a Type 1 and press ENTER until the arrow cursor reaches the desired item b Type 2 and press ENTER to make a change to the item c Type the new value numbers or letters and press ENTER The change takes place immediately pdu HyperTerminal oj x File Edit View Call Transfer Help Ole e 3 lS AP7601 Metered Rack Mount PDU Device Data Product Name gt Product Location Contact Information Log Timeout mins Admin Password Menu Selections 1 Next Selection 2 Enter Data lt ESC gt Return to Main Menu 10 kkkkkkkkkkk System Messages Menu Selection gt Connected 0 03 32 Auto detect 19200 8 N 1 SCROLL CAPS num Capture Print echo 4 94 User s Manual PowerStruXure Type B Configuration Metered Rack Mount PDU 4 Factory Data View detailed manufacturing data about the Metered Rack Mount PDU 2 pdu HyperTerminal 5 Ioj x File Edit View Call Transfer Help Die els Es AP7601 Metered Rack Mount PDU Factory Information Model AP7601 Serial 2332567 Hardware Rev 1 0 Manufacture Date 11 28 2001 Firmware Rev 0 0 7 Firmware Date 10 22 2001 Menu Selections lt ESC gt Return to Main Menu System Messages Menu Selection gt Connected 0 03 32 Auto detect 19200 8 N 1 SCROLL CAPS mum Capture Print echo
90. nu Selection gt Connected 0 03 32 Auto detect 19200 8 N 1 SCROLL CAPS num Capture Print echo Administrator menus Main menu When accessed by an administrator the Main menu lists all Metered Rack Mount PDU menus Administrators can access all data and configure all items Users cannot configure any items on the menus To access a menu type the associated number and press ENTER pdu HyperTerminal 10l x File Edit View Call Transfer Help Djs sls m s AP7601 Metered Rack Mount PDU Menu Selections 1 Status Information 2 Metered Rack Mount PDU Configuration Device Data Factory Data Logout System Management Oo Ul amp W System Messages Menu Selection gt Connected 0 03 32 Auto detect 19200 8 N 1 SCROLL CAPS num Capture Print echo 1 Status Information The administrator Status Information menu displays the present current readings for each phase from the Metered Rack Mount PDU and whether the Metered Rack Mount PDU has reached or exceeded the configured limits for output current pdu HyperTerminal l0I x File Edit View Cal Transfer Help Djs sls aa AP7601 Metered Rack Mount PDU Status Information Current Amps Status Output Current Ll 0 0 Output Current L2 0 0 OK Output Current L3 0 0 Menu Selections lt ESC gt Return to Main Menu System Messages Menu Selection gt Connected 0 03 32 Auto detect 19200 8 N 1 SCROLL
91. o that the terminal block is exposed Set the screws as de for later use 2 Loosen the four screws that hold the power cord s wires to the ter minal block and loosen the screw that holds the ground wire to the standoff on the metal chass s 3 Pull the power cord and the inspection cover from the Metered Rack Mount PDU 142 User s Manual PowerStruXure Type B Customization Metered Rack Mount PDU Attach wiring to terminal block 4 Attach a 1 inch conduit termination to the hardwiring end cap p n 870 70803 5 Attach the hardwiring end cap assembly to the power inlet end of the Metered Rack Mount PDU using two of the screws removed in step 1 6 Attach wires to the terminal block as labeled on the board Tighten the terminal block screws to secure the wires Metered Rack Mount PDU Terminal Block A amp ALIHM 39NV40 033 yovid AVALON g 1 vn O A NEUTRAL L3 L2 L1 WHITE ORANGE RED BLACK GROUND 7 Attach a ground wire to the standoff on the metal chassis and tighten the screw to secure the ground to the chassis 8 Place the hardwiring access cover p n 870 70804 on the strip and secure with one screw in the hole on the top of the cover 9 Apply power to the strip observing the status LED on the display interface If the unit is connected pr
92. odule 1 Loosen the two Phillips screws at either side at the top of intelli gence module Push the small tab in the left side of the module downward to deactivate the intelligence module 2 Carefully remove the intelligence module from the enclosure by pulling outward on the handle To install the new intelligence module 1 Carefully position the intelligence module between the grooves in the empty slot at the top of the Symmetra 3 Phase UPS enclosure and slide the module inward 2 Tighten the two Phillips screws to secure the intelligence module to the enclosure 3 Push the small tab upward to re activate the intelligence module 4 Verify that the Symmetra 3 Phase UPS display interface shows a message reporting that it has registered the installation How to replace cards 1 Loosen the two Phillips screws at both sides of card 2 Carefully pull the card out ward 3 Verify that the UPS display interface shows a message reporting that it has regis tered the installation Reverse the above procedures to install a new card User s Manual PowerStruXure Type B 159 Maintenance Symmetra 3 Phase UPS Replacement parts How to return modules to APC 160 Replacement Parts and Numbers Replacement Parts and Numbers Call APC Customer Support see APC Worldwide Customer Support on page 168 to obtain an RMA number To return a failed module to APC pack the module in the original
93. of output phase lt N gt dropped below Current Within Limit Current Under Limit the configured limit Output Neutral Current on the neutral wire for the output Output Neutral Current Over Limit phases exceeded the configured limit Current Within Limit Frequency of the output current is above or below the range that is configured as acceptable Earth Ground lt Value gt Current on the earth ground wire exceeded Earth Ground Current Over Limit the configured limit Current Within Limit BranchBrkr lt nn gt lt Value gt Current on one of the poles of branch circuit Current Over Limit breaker nn exceeded the configured limit BranchBrkr lt nn gt Current on one of the poles of branch circuit Current Within Limit breaker nn dropped below the configured limit Voltage Under Limit Input V lt L L gt lt Value gt Voltage Over Limit Output FDev lt Value gt Freq Out of Range Output Frequency Back In Range BranchBrkr lt nn gt lt Value gt Current Under Limit The temperature of the PDU with System Bypass transformer exceeded the normal limit Input Transformer Temperature Too High Input Transformer Temp Back to Normal Main Circuit Breaker ESRR Main Circuit Breaker The Main circuit breaker has been tripped Has Been Closed Output Phase L lt n gt Output Phase L lt n gt The fuse for output phase Ln has blown Fuse Was Replaced System Wrap Around System Returned From Bypass Closed The bypass breaker has be
94. on page 131 Reverse the door handle 2 Remove the two Phillips screws from the rear of the door handle assembly and remove the handle assembly from the door 3 Rotate the door handle assembly 180 and reinstall it using the hardware removed in Step 2 4 Continue with Remove the door on page 136 User s Manual PowerStruXure Type B 135 Customization NetShelter VX Enclosures Remove the door To avoid personal injury or damage to the enclosure one person should support the door while another releases the door Warning from its frame 5 Open the door and pull down on the spring loaded hinge pin attached to the top of the door Lift the door from its frame and set safely aside Remove the hinge pin brackets bumpers and latch plates Remember the location and distance between all items being removed You will need to duplicate this positioning when reinstalling 136 User s Manual PowerStruXure Type B Customization NetShelter VX Enclosures 6 Use a Phillips head screwdriver to remove the hinge pin brackets bumpers and latch plate from the enclosure frame O I ot a 0 8 i O GI 3 ao 0 o y Ool la ELE 6 a c H 8 01 z 99 E On the expansion enclosure the bumpers and latch plate screws also attach t
95. on the next screen move the selection arrow to the Yes UPS into Bypass item and press the ENTER key The BYPASS LED will illuminate and the display will show the following two screens UPS has been commanded to go into Bypass UPS is in Bypass Press any key 2 Check between the Q1 and Q2 breakers that there is no difference in potential between L1 in and L1 out L2 in and L2 out and L3 in and L3 using a True RMS voltmeter User s Manual PowerStruXure Type B 73 System Start Up Start Up Procedure Power the PDU 1 Make sure all breakers are open on the PDU with System Bypass distribution breakers distribution panels 2 Close the Q2 breaker on the PDU After Q2 has been closed both distribution panels on the PDU with System Bypass will be ener gized 3 Apply power to the PDU with System Bypass power cords whips by closing the distribution breakers on the PDU with System Bypass 74 User s Manual PowerStruXure Type B Communication Connection Information Controller and Hub 77 Connect network cables to PowerStruXure devices 77 Route network cables to the Information Controller Hub 77 Install and route data cables alternative routing 79 Connect the Information Controller and Hub 79 Connect the Information Controller to your LAN 80 Access the APC LAN 80 Configure initial settings on the Information Controller 82 Assign an IP address to the I
96. operly the LED will illuminate User s Manual PowerStruXure Type B 143 Specifications PDU with System Bypass Operating specifications 147 Electrical specifications 147 Symmetra 3 Phase UPS 3 Phase Automatic Transfer Switch Metered Rack Mount PDU AP7601 AP7602 151 Information Controller and Hub Information Controller specifications 152 Information Controller Hub specifications 152 PDU with System Bypass Operating specifications Power Distribution Unit Protected from water and conductive Operating Environment l contaminates Temperature Class Class H 220 C Storage Elevation for aircraft 10 000 m transportation Relative Humidity for operating ee ie and storage Operating Temperature 0 40 C 32 104 F Service Distribution Breaker provided by customer rau FANS ey aD Conductors to Main Input HA Breaker provided by 3 0 conductors 3 conductors conductors customer Transformer Configuration Delta to WYE Delta to WYE eis 10 Electrical specifications Nominal Voltage 208V 208 480V 208 600V 208 Requirements 120V 120V 120V 3 phase 3 wire plus ground 600V 3 phase 3 wire 3 phase 3 wire Input Voltage AC plus ground plus ground 208V 480V 3 phase 4 3 phase 4 wire 3 phase 4 wire wire plus Output Voltage AC plus ground plus ground 208V 208V she Full
97. option was used The most recent alarm is displayed initially To move to the previous alarm press the DOWN arrow key To move to the next more recent alarm press the UP arrow key e If the log contains no alarms the screen displays Alarm Log Empty and the system date and time The date time format is mmm dd yyyy hh mm ss Entire Alarm Log Display a description and the date and time of each alarm in the alarm log e The most recent alarm is displayed initially press the DOWN arrow key To move to the next more recent alarm press the UP arrow key e If the log contains no alarms the screen displays Alarm Log Empty and the system date and time The date time format 1s mmm dd yyyy hh mm ss All Possible Alarms Display a description of each alarm that can occur To move through the list press the UP or DOWN arrow key For more information on each alarm see List of PDU Alarms on page 111 Clear Alarm Log Delete the contents of the alarm log This action requires a password User s Manual PowerStruXure Type B 109 Operation PDU with System Bypass Alarm Setup Use this option of the Alarms amp Logging screen to access the following options Loading Limits Password required to modify Configure the following in amps and as a percentage of full load e Out High The upper limit for output current e Out Low The lower limit for output current e Out Neut The upper limit for current on the neutral wire for t
98. password apc lowercase on the logon screen Eile Edit View Favorites Tools Help Ei a Back my A search Leg Favorites ES History E 3 El Address y Links PowerStru ure Done i Internet User s Manual PowerStruXure Type B 127 Customization NetShelter VX Enclosures 131 How to remove the leveling feet and casters 131 How to remove and install the side panels 131 How to identify one U space on the mounting rail 133 Caged nuts 133 How to install and remove caged nuts 133 Grounding studs 134 Location of cable access holes 134 Skirt removal 135 Cable management devices 135 How to reverse the door 135 Mounting rails 139 Location of screws for adjusting the mounting rail 139 How to adjust the mounting rails on the frame posts 139 How to move the rails to a new position using the side braces 139 How to move a brace 140 How to remove the roof 140 How to move the vertical baying trim 141 Metered Rack Mount PDU nun 142 Hardwiring procedure optional 142 NetShelter VX Enclosures How to remove the 1 Gently place the enclosure on its side This should be done with all leveling feet and casters equipment removed from the enclosure To avoid personal injury or damage to the enclosure two people should support the enclosure Heavy 2 Remove the four hex nuts from each caster using a 10 millimeter wrench and remove the
99. pe B 83 Communication Connection Information Controller and Hub Assign an IP address tothe Assign an IP address to the Information Controller by following the Information Controller applicable procedure If you are using DHCP on your user LAN Your IT department should create a permanent DHCP lease for the IP address assigned to the Information Controller You ll need this IP address to access the Information Controller from your User LAN 1 Log off the Information Controller by clicking the Log Off text at right on the tool bar 2 Disconnect your laptop from the APC LAN port 3 Continue with Verify the address assignment starting on page 85 If you are not using DHCP on your user LAN How to set a static IP address for the Information Controller l If you are not already connected to the APC LAN follow the instructions in Access the APC LAN starting on page 80 2 Select the Network tab and disable DHCP on the TCP tab See the figure below 3 Provide a User LAN IP Address Subnet Mask Default Gateway Host Name Domain Name Primary DNS Server and Secondary DNS Server See the figure below 1 All the above items should be provided to you by your IT department Note File Edit View Favorites Tools Help Back gt amp 2 A search 3gFavorites EBristory Edy S r E Address PowerStru ure Legendary Reliability DHCP C Enable Disable MAC Address 00 C0 B7 12 34 56
100. r Hub connect to powercords pre installed in the PDU These Note Cords are a 5 15 to IEC C13 and an IEC C13 to an IEC C14 18 User s Manual PowerStruXure Type B Site Planning PDU with System Bypass 21 Weight Dimensions 21 Space considerations 21 Weight considerations 21 BTU Considerations 22 Operating conditions 22 Electrical requirements 23 Electrical specifications 23 Symmetra 3 Phase UPS Weight Dimensions 24 Space considerations 24 Weight considerations 25 BTU Considerations 25 Operating conditions 25 Electrical Requirements 25 Emergency Power Off Switch 26 Overview of EPO 26 NetShelter VX Enclosures 27 Weight Dimensions 27 Space considerations 27 Weight considerations 27 PDU with System Bypass Weight Dimensions Space considerations Weight considerations PDU with System Bypass 1500 Ib 680 kg Data Cable Troughs y So 23in 4 8 in 58 cm 12 cm 85 in 215 cm including power cable trough 89 in 226 cm Power Cable Trough 34 in 87 cm A 24 in 60 cm Study the figure below to determine your space requirements for installing the PDU with System Bypass The clearances listed below are required to comply with Table 110 26 of the 1999 National Electric Code In accordance with section 110 26 of this code the 36 inch depth is required for all 120 208V products and the majority of 277 480V a
101. re Type B 11 Symmetra 3 Phase UPS Main intellegence module MIM Access for data cables Redundant intelligence module RIM Static switch module Power module O Documentation tray Battery module four battery units 12 User s Manual PowerStruXure Type B Overview Symmetra 3 Phase UPS External switch gear monitoring card DC disconnect breaker System enable switch Display computer interface card Reserved for future use O System power supply cards Battery monitoring card Available card slots 6 Network Management Card Extended Run Frame card User s Manual PowerStruXure Type B 13 NetShelter VX Enclosures The APC Netshelter VX enclosure allows 42U 73 50 n of storage height for EIA 310 19 inch rack mount equipment It comes in two models e AR2100BLK the base enclosure e AR2101BLK an expansion enclosure O Frame posts O Ventilated split rear door for added access in narrow aisles Adjustable horizontal Quick release side panels with braces locks base model only Vertical mounting rails Ventilated roof O Skirt Access on roof sides and base Quick release ventilated reversible front door 1
102. rmer Temperature Too High gt Load Meter Alarms Volt Meter EPO Contacts Config Breakers Help Volt Meter Esc gt Output Voltage Input Voltage Output Voltage L1 2 001 L1 L2 3 001 L2 L3 1 001 L3 Input Voltage L1 2 001 L2 3 001 L3 1 001 001 001 001 The Main Menu is continued on the next page Down l Future Enhancement Operation PDU with System Bypass Contacts Esc Contact In 0lof04 User Switch 1 Normal Open Status Open Contact In 020f04 Name User Switch 2 Normal Open Status Open Contact In 030f04 Name User Switch 3 Normal Open Status Open Contact In 040f04 Name User Switch 4 Normal Open Status Open 105 Operation PDU with System Bypass Breakers Esc 106 Breaker O10f05 Name Q1 Breaker Normal Closed Status Open Breaker 020f05 Name Q2 Breaker Normal Closed Status Open Breaker 030f05 Name Q3 Breaker Normal Closed Status Open Breaker 040 05 Name Q4 Breaker Normal Closed Status Open Breaker 050 05 Name Q5 Breaker Normal Closed Status Open Continuation of Main Menu Load Meter Alarms Volt Meter EPO Contacts Config Breakers Help Alarms View Active Alarms Alarm Log Alarm Setup Alarm Beeper View Active Alarms Alarm Log Alarm Setup Alarm Beeper System Networks Input Configuration Panel Configuration Manufacturer Dat
103. roof of each row of enclosures To install l Insert the rear set of fastening tabs into the square holes along the top back of the unit 2 Squeeze the s des of the section towards each other at the bottom to insert the front fastening tabs NetShelter VX When installing the PDU power cable troughs drape the power cables whips over the UPS as shown After you have finished installating the troughs in the row route the power Note cables using the troughs User s Manual PowerStruXure Type B Installation Cable Troughs Partitions and Ladders How to install data cable Use the procedure in this section to install all data cable partitions You partitions can install data cable partitions on any enclosure l Squeeze the two sides of a partition to insert the fastening tabs into the set of square holes toward the back of the roof of the enclosure next to the power cable trough sections already installed 2 At the width you need for the data cable trough install the other partition in the same manner at the front of the roof of the enclsoure User s Manual PowerStruXure Type B 49 Installation Cable Troughs Partitions and Ladders Ladders for overhead wiring across rows 50 After installing the power cable troughs and data cable partitions install the ladders between rows of enclosures If you are installing more than one row of enclosures within the PowerStruXure system you must insta
104. ry unit on page 158 for more information Replace the main intelligence module See How to replace an intelligence module on page 159 for more information Operation Symmetra 3 Phase UPS Symmetra 3 Phase UPS display interface menus Control Esc gt Turn Load ON Off Do Self Test Simulate Power Fail Graceful Reboot Graceful Turn Off Start Runtime Cal UPS Into Bypass Confirm Turn Load ON gt NO ABORT YES Turn Load ON Turn Load ON OFF Do Self Test Confirm Do Self Test gt NO ABORT Simulate YES Do Self Test Power Fail Confirm Simulate Power Fail gt NO ABORT YES Simul Pwr Fail Graceful Reboot Confirm Graceful Reboot gt NO ABORT YES Graceful Reboot Graceful Turn Off Confirm Graceful Off gt NO ABORT Start Stop YES Graceful Off Runtime Cal Confirm Start Runtime Cal gt NO ABORT YES Do Runtime Cal UPS Into Out of Bypass Confirm UPS Into Bypass ABORT gt NO YES UPS Into Bypass 120 The following two figures show the display interface menus and the navigation path to each menu Down START Fuel 100 Load 100 DLL I AAN fria 208Vin 208Vout 60Hz Runtime Ohr 30min Any Key Esc Control Status Setup Accessories Logging Display Diag Help Status Vin 1 209 0 Esc 2 208 0 3 209 0 load assuming no redundancy 50 load allowing for n x redundancy 50 Frequencies Input 60 01Hz Output
105. s for each port Link Rx e solid green link is on e flashes green activity on the port Collision LED e flashes amber collision on network Col Collisions are normal unless this LED is on continuously your APC LAN 1s Note Operating normally Station ports for connecting PowerStruXure equipment to the Information Controller The x in the numbering 1s short for MDI X zen Only port 32 or 32x can be in use at N any time Do not connect covers to Note both parts simultaneously Uplink Port 10Base T port for interconnecting hubs How to shut down the You can shutdown the Information Controller through the software Information Controller interface at the System screen go to the Tools menu and select software Shutdown Information Controller 126 File Edit View Favorites Tools Help lt Back 6 fat A search Favorites E history E 3 Y Bl Address APC PowerStruXure Location Contact Legendary Reliability Status x Powe rSt ru ure 5 HOME EVENTS MEJIA NETWORK HELP Reboot Shutdown Information Controller Reboot Information Controller Shutdown Information Controller T Reset Information Controller To Factory Defaults Apply Update the Information Controller Software Select the Check for Updates button in order to check for update files for the APC Information Controller Check for Updates El Done Internet User s Manua
106. safety information Ensure that power is off Only qualified APC trained personnel may perform a system start up Warning Only those trained in the construction and operation of the equipment and the electrical and mechanical hazards Electrical involved may install and remove system components Before beginning the start up procedure ensure that Electrica Power is off by following the procedure below Hazard l Open the DC breaker and turn off the System Enable switch on the Symmetra 3 Phase UPS Bypass User s Manual PowerStruXure Type B 67 System Start Up Start Up Procedure 3 Open the Q1 Q2 and Q3 breakers on the PDU with System Bypass Apply power to the 1 Apply utility power to the PDU with System Bypass system 2 Check the phase rotation at the top of input breaker on the PDU with System Bypass to ensure that it is A B C clockwise rotation using a phase rotation meter 3 Close the main input circuit breaker on the PDU with System Bypass 68 User s Manual PowerStruXure Type B System Start Up Start Up Procedure 4 Verify that the proper voltage is present at the transformer 208 V metered phase to phase using a True RMS voltmeter Verify the correct phase rotation at the top of the transformer to ensure that it is an A B C clockwise rotation using a phase rotation meter The
107. shipping materials and return it by insured prepaid carrier The APC Customer Support technician will provide the address If you no longer have the original shipping materials ask the technician about obtaining a new set It is very important that you pack the module properly to avoid damage in transit Never use stryrofoam beads or other loose packaging materials when shipping a module The module may settle in transit and become damaged Enclose a letter in the package with your name RMA number address a copy of the sales receipt description of the problem a phone number and a check 1f necessary 1 Damages sustained in transit are not covered under warranty Note User s Manual PowerStruXure Type B Metered Rack Mount PDU How to download firmware revisions to the 1 During firmware downloads power will not be interrupted to Metered Rack Mount PDU the Metered Rack Mount PDU outlets Note l Goto the APC Web site and download the latest firmware version for the Metered Rack Mount PDU 2 Access the Metered Rack Mount PDU internal menus follow the instructions in How to configure through a serial port connection on page 89 3 Log on to the Metered Rack Mount PDU as an Administrator 4 From the Main menu type 6 and press ENTER to choose the System Management item 5 From the System Management menu type 3 and press ENTER to choose the Firmware Download item From the Firmware Down load menu a
108. sing the 5 millimeter Allen wrench included remove the four socket head screws securing the vertical trim the door latch and the door bumpers to the frame of the enclosure Tg E 1 _ 2 Replace the door latch and bumpers using the countersunk socket head screws from the hardware bag 3 Reinstall the trim to the opposite side of the enclosure a Insert the capped socket head screw removed from the other side of the enclosure through the upper hole n the vertical trim and the original hole in the frame of the enclosure b Repeat the step above for the lower hole in the vertical trim c Tighten the screws securing the vertical trim to the enclosure assembly 4 Reinstall any side panels required See How to remove and install the side panels on page 131 5 Reinstall the roof of the enclosure Replace the four socket head screws with the 5 millimeter Allen wrench included User s Manual PowerStruXure Type B 141 Metered Rack Mount PDU Hardwiring procedure Remove the power Cord optional Make sure that power to the Metered Rack Mount PDU has been turned off and unplug any attached equipment to prevent Note damage if a mistake occurs during wiring l Detach the inspection cover on the power inlet end ofthe Metered Rack Mount PDU by removing the four screws on the s des of the cover and tilt the cover upward s
109. syste parameters and launch context sensitive help using the five navigation keys CI Status LOAD ON The PDU with System Bypass is supplying conditioned power to the load equipment CHECK LOG At least one new alarm condition has been detected Power to the load is being supplied directly by the mains power source The UPS has been removed from the circuit for maintenance or replacement BD AEON Bypass breakers on the PDU with System Bypass function as input breakers to protect the load equipment After displaying a brief start up screen after system start up the display interface scrolls automatically and continuously through four screen of basic status information In Volts Out 112 L1 112 114 L2 112 116 L3 112 Load Current L1 000 Neut 000 L2 001 L3 000 Gnd 00 0 Status Screen 1 Status Screen 2 Total Output Loading KW 000 0 PF 0 00 Active Alarm Olofll Input Transformer KVA 000 0 LD 000 Freq 60 0 Temperature Too High Status Screen 3 Status Screen 4 Press the UP and DOWN W N keys to interrupt the automatic scrolling to view a specific status screen User s Manual PowerStruXure Type B Top level Menu screen Operation PDU with System Bypass On any top level status screen press the ENTER key to open the top level Menu screen gt Load Meter Alarms Volt Meter EPO Contacts Config Breakers Help
110. t breaker s label This product is intended for installation in a temperature controlled 0 C 40 C indoor area free of conductive contaminants The Symmetra 3 Phase UPS contains an internal energy source Hazardous voltage can be present even when disconnected from the utility power source All power wiring from the Symmetra 3 Phase UPS to the PDU with System Bypass must be completed by an APC Field Service Engineer A battery can present a risk of electrical shock and high short circuit current The following precautions should be observed when working on batteries e Remove all conductive jewelry such as chains watches and rings e Use tools with insulated handles e Wear rubber gloves and boots e Do not lay tools or metal parts on top of the batteries When replacing batteries replace with same number and type as installed For customer supplied external batteries see manufacturer s installation and safety instructions Automatic Transfer Switch Metered Rack Mount PDU Information Controller and Information Controller Hub This equipment contains potentially hazardous voltages Do not attempt to disassemble the unit This equipment contains no user serviceable parts Repairs are performed only by factory trained service personnel User s Manual PowerStruXure Type B 5 Overview PDU with System Bypass Front veiw 9 Front view interior 10 Rear view interior 11 Symme
111. tact Legendary Reliability Status amp PowerStru ure Log On to PowerStruXure Username Password Log On E Done Internet When you first log on to the Information Controller you will see an initial logon screen See the figure below To proceed from this screen you will need the following The System ID request from the APC Remote Monitoring Service Number of enclosures the total number of enclosures n your PowerStruXure system XR Frames Symmetra 3 Phase UPS PDU with System Bypass and NetShelter VX device enclosures File Edit View Favorites Tools Help lt p Back mb A search Favorites EBristory B 3 7 El Address APC PowerStruXure SE Location lt B gt Contact Legendary Reliability status PowerStrus ure Initial Configuration System ID Number of Enclosures Apply E Done Internet 5 Continue with Configure initial settings on the Information Con troller starting on page 82 User s Manual PowerStruXure Type B 81 Communication Connection Information Controller and Hub Configure initial settings on the Information In order to configure the initial settings of the Information Controller Controller you will need a list of serial numbers for all APC Note devices installed in your PowerStruXure system l Ensure that each installed Automatic Transfer Switch Symmetra 3 Phase UPS an
112. tely removed to allow the enclosure base to rest directly on the floor Leveling procedure 1 Fit the 14 millimeter end of the open ended wrench included to the hex nut just above the round pad of the leveling foot Turn the wrench clockwise to extend the leveling foot until it makes firm contact with the floor 2 Repeat step 2 for each of the remaining leveling feet User s Manual PowerStruXure Type B Installation NetShelter VX Enclosures 3 Use a level to determine which feet need further adjustment to level the enclosure Adjust as necessary Do not move the enclosure after the leveling feet are lowered the leveling feet may bend Warning How to stabilize the American Power Conversion offers two additional products for enclosure stabilizing enclosures e Stabilizer Plate Kit AR8115ABLK one plate and mounting hardware for attaching to the enclosure frame One plate can be installed in front and two plates can be used on each side Stabilizer plates may also be bolted to the floor to add stability Bolt Down Bracket Kit AR8112BLK four brackets and mounting hardware for attaching to the enclosure frame on the sides exterior or interior These brackets must be anchored to the floor to provide stabilization How to join enclosures You can expand your installation by joining an expansion enclosure to a together base enclosure or two expansion enclosures together The procedure involves removing one side pa
113. th System Bypass Panel Configuration Use this option of the Config screen to access these options Panel Config Left Pos The pole positions in the left panel which contains odd numbered pole positions only Phase The phase associated with this position Breaker Requires password to modify Two configurable items e The breaker rating in amps 20A 30A 45A SOA or 60A e The breaker tie indicator To be able to monitor breakers correctly you define the number of poles tied to 1 e associated with each breaker Associating poles with specific breakers here enables you to use the screen option Branch Ckt Loading on page 107 to scroll by breaker number to information about each breaker Also the alarms BranchBrkr lt nn gt lt Value gt Current Over Limit and BranchBrkr lt nn gt lt Value gt Current Under Limit on page 111 occur for a multi pole breaker when any of its poles are above or below the limit To configure the values on this screen 1 From the first column use the arrow keys to scroll up or down to the breaker and pole position you want to configure 2 Press the ENTER key to move to the item you want to configure in the third column the breaker rating or the breaker tie indicator 3 Scroll again to select the value you want for the breaker rating or the breaker tie indicator To associ ate the breaker with the next pole position in the list choose the character as the tie indi
114. the floor of the PDU with System Bypass to create an opening for the cable Install Liquidtite waterproof conduit under the floor from the enclosure to the PDU with System Bypass From the Metered Rack Mount PDU or Automatic Transfer Switch in the enclosure thread a four wire cable with ground from the enclosure through the Liquidtite conduit to the PDU with System Bypass At the PDU with System Bypass route the four wire cable with ground through the opening you created in step 1 and then up through the wireways at the left or right side within the PDU with System Bypass This will allow you to connect the four wire cable to the breaker panel At the breaker panel cut the wires to the proper length connecting the three hot wires to a properly sized three phase circuit breaker on the PDU with System Bypass Connect the neutral wire to the neutral bar and the ground wire to the ground bar Make sure all wire connections and circuit breaker connections are properly torqued Hazard User s Manual PowerStruXure Type B 57 3 Phase Automatic Transfer Switch Placement Reserve the top 1U space for overhead wiring or bottom 1U space for under floor wiring in the NetShelter VX enclosures for the Automatic Transfer Switch Attach mounting brackets 1 Attach the left and right mounting brackets to the unit using two flat head Phillips screws provided for each bracket 1 Place the brackets flush
115. the mounting brackets of the Automatic Transfer Switch with the front vertical mounting rails and insert caged nuts included in the appropriate holes on the front vertical mounting rails 4 Insert mounting screws included and tighten 5 Insert slide screws and nuts into each adjustable bracket and tighten to secure the positions of the adjustable brackets User s Manual PowerStruXure Type B 59 Metered Rack Mount PDU Mounting options Toolless mounting 60 You can install Metered Rack Mount PDUs in one of two ways using toolless mounting pegs or the mounting brackets The Metered Rack Mount PDUs are mounted in the rear of the enclosure in the channel directly behind the rear vertical mounting rails Before you begin to install the Metered Rack Mount PDUs choose a location for them in the enclosure and decide on the mounting method 1 Slide the mounting pegs into the holes provided in the channel in the rear panel of the enclosure Make sure the bottom pegs slide into the bottom holes in the enclosure 2 Snap the Metered Rack Mount PDU into place by pushing it down ward until it locks into position User s Manual PowerStruXure Type B Bracket mounting Installation Metered Rack Mount PDU You can attach a pair of brackets to the Metered Rack Mount PDU in two different directions shown in the figures in
116. the position of the mounting rails is shown below 60 mm 1 Use the 5 millimeter Allen wrench included to loosen but not remove the socket head screws in the slot of the mounting rail 2 Slide the mounting rail forward or rearward as desired staying par allel with the frame posts Tighten each screw 1 Remove the side panels from the enclosure See How to remove and install the side panels on page 131 2 Use the 5 millimeter Allen wrench included to remove the socket head screws in the slots of the mounting rail 3 Locate the new position for the mounting rail 4 Secure the vertical mounting rail to each horizontal brace You may have to adjust the position of the brace up or down to align it with the mounting channel in the rear Note Mounting rail See How to move a brace on page 140 a Insert a caged nut into the appropriate holes at the new position on the upper and lower horizontal brace b Place the mounting rail at the new position and insert a socket head screw through the rail brace and caged nut c Tighten the screw to secure the mounting rail to the brace User s Manual PowerStruXure Type B 139 Customization NetShelter VX Enclosures How to move a brace Each side of the enclosure has two horizontal brac
117. til they pop out 3 Standing on either side of the Symmetra 3 Phase UPS enclosure two people should pull the power module outward until it is fully extended in the locked position 4 With the power module resting in the UPS enclosure release the lock by depressing the catch on each side of the power module 5 Pull the power module away from the UPS enclosure User s Manual PowerStruXure Type B Maintenance Symmetra 3 Phase UPS To install the new power module 1 With one person on each side of the power module push the power module all the way into the Symmetra 3 Phase UPS enclosure The power module is self guiding 3 Turn the knob clockwise until the arrow points toward the power module to re activate the power module 4 Verify that the Symmetra 3 Phase UPS display interface shows a message saying that it has registered the installation If your Symmetra 3 Phase UPS includes a redundant power module the failed module can be replaced without Note interrupting power to the connected equipment User s Manual PowerStruXure Type B 157 Maintenance Symmetra 3 Phase UPS How to replace a battery unit AN Only qualified APC trained personnel should replace battery units Warning The Symmetra 3 Phase UPS display interface will indicate the location of the faulty battery unit rows 1 through 4 To remove the faulty battery unit 1 Holding the handle gently li
118. tion Metered Rack Mount PDU User menus 90 Main menu When accessed by a user the Main menu lists the Status Information Configuration Device Data and Factory menus Users can access but not configure data on these menus To view a menu type the associated number and press ENTER pdu HyperTerminal E 10l x File Edit View Call Transfer Help AP7601 Metered Rack Mount PDU Menu Selections 1 Status Information Metered Rack Mount PDU Configuration Device Data Factory Data Logout 2 3 4 5 System Messages Menu Selection gt Conmected 0 03 32 Auto detect 19200 8 N 1 SCROLL CAPS num Capture Print echo A 1 Status Information The user Status Information menu displays the present current readings for each phase from the Metered Rack Mount PDU and whether the Metered Rack Mount PDU load has reached or exceeded the configured limits for output current a iojx File Edit View Call Transfer Help AP7601 Metered Rack Mount PDU Status Information Current Amps Status Output Current Ll 0 0 Output Current L2 0 0 OK Output Current L3 0 0 Menu Selections lt ESC gt Return to Main Menu System Messages Menu Selection gt Connected 0 03 32 Auto detect 19200 8 N 1 SCROLL CAPS num Capture Print echo 2 Metered Rack Mount PDU Configuration Users can view the configuration settings for the Metered Rack Mount PDU Type 1 and press ENTER to see the warning
119. tomer Support See How to Obtain Service on page 167 Products must be returned with transportation charges prepaid and must be accompanied by a brief description of the problem encountered and proof of date and place of purchase This warranty does not apply to equipment which has been damaged by accident negligence or misapplication or has been altered or modified in any way This warranty applies only to the original purchaser who must have properly registered the product within 10 days of purchase EXCEPT AS PROVIDED HEREIN AMERICAN POWER CONVERSION MAKES NO WARRANTIES EXPRESSED OR IMPLIED INCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE Some states do not permit limitation or exclusion of implied warranties therefore the aforesaid limitation s or exclusion s may not apply to the purchaser EXCEPT AS PROVIDED ABOVE IN NO EVENT WILL APC BE LIABLE FOR DIRECT INDIRECT SPECIAL INCIDENTAL OR CONSEQUENTIAL DAMAGES ARISING OUT OF THE USE OF THIS PRODUCT EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE Specifically APC is not liable for any costs such as lost profits or revenue loss of equipment loss of use of equipment loss of software loss of data costs of substitutes claims by third parties or otherwise This warranty gives you specific legal rights and you may also have other rights which vary from state to state User s Manual PowerStruXure Type B 165 Life Support Policy Gener
120. tra 3 Phase UPS NetShelter VX Enclosures Cable routing equipment 15 NetShelter VX options 15 Expansion and mounting hardware 15 3 Phase Automatic Transfer Switch AP7701 16 Metered Rack Mount PDU Information Controller and Hub Information Controller Hub 18 Information Controller 18 PDU with System Bypass Front veiw fs 3 O Power cable whip O Cable access holes Display interface Power cable trough 121 20 outlet Data cable trough User s Manual PowerStruXure Type B Overview PDU with System Bypass Front view interior O Information Controller Hub Wraparound maintenence bypass panel Information Controller O 42 position circuit breaker panels 10 User s Manual PowerStruXure Type B Overview PDU with System Bypass Rear view interior NN co doc _ VIN a 220020 7 dl Al AN En IR TL A T N iy O Main input circuit breaker PDU transformer Load test bank connector O EPO switch interface PDU monitoring unit O UPS input and output connector cables O Fuses for external static switch User s Manual PowerStruXu
121. tus Display CD Setup Diags Accessories Help Top Level Menu Status Screen 6 Verify voltage on all phases O Control Logging Status Display CD Setup Diags Accessories Help Top Level Menu Status Screen 1 Verify battery voltage capacity O Control Logging Status Display CD Setup Diags Accessories Help Top Level Menu Status Screen 5 User s Manual PowerStruXure Type B 117 Operation Symmetra 3 Phase UPS Set up functions Basic troubleshooting The display interface settings are set to factory defaults For more information on the settings that you can change refer to the Symmetra 3 Phase UPS product manual in PDF available on the Information Controller Help page or on our Web site at www apc com support Changing factory default settings Logging O Control 2 Status Display CD Setup Diags Accessories Help Settings Alarms Shutdown Bypass E Defaults Copy Ly Output Freq Other y Settings Menu Top Level Menu This Troubleshooting section will help you solve most problems using the Symmetra 3 Phase UPS display interface component in question is correctly installed in the Symmetra A If the display interface reports a problem verify that the 3 Phase UPS If the problem persists follow the instructions Note in How to Obtain Service on page 167 For advanced configuration refer to the
122. ubleshooting 119 Symmetra 3 Phase UPS display interface menus 120 Operation Contents 3 Phase Automatic Transfer Switch 122 Front panel 122 Metered Rack Mount PDU 123 Display interface 123 Alarm conditions 124 Information Controller and Hub 125 Controller front panel 125 Hub front panel 125 How to shut down the Information Controller soft ware 126 How to access the Information Controller APC LAN 127 How to access the Information Controller on your LAN 127 98 User s Manual PowerStruXure Type B System Operation How to place the UPS into Place the system into maintenance bypass operation when servicing the maintenece bypass UPS When n maintenance bypass operation power flows directly from operation the utility to the PDU and out to the load equipment l Command the Symmetra 3 Phase UPS into static bypass through the Symmetra 3 Phase UPS display interface a Press the ESC key at the Monitoring screen to open the Main menu This menu allows access to eight submenus Control Logging Status Display Setup Diags Accessories Help b Move the selection arrow to the Control item and press the ENTER key c Move the selection arrow on the Contol menu to the UPS into Bypass item and press the ENTER key d Confirm the selection on the next screen move the selection arrow to the Yes UPS into Bypass item and press the ENTER key The BYPASS LED will illumi
123. unting space NetShelter VX base enclosure VW 23 5 in 59 60 cm A Data Cable Troughs A SS Sy 23 in AQU in 81 5 in 58 cm 12 cm 206 92 cm Power Cable Trough Y UY 42 2 in 107 19 cm Study the figure below to determine your space requirements for installing NetShelter VX enclosures GS Floor to Ceiling Ventilation gt 91 in 231 cm L E 4 Minimum Rear Clearance Minimum Front pee Clearance a 23 6 42 2 in 6 in A 59 94 cm 59 60 cm u Cue 76 20 cm Ensure that the floor and sub floor can support the total weight of your system configuration when concentrated on the leveling feet If you are placing equipment on a raised floor consult the flooring manufacturer for loading requirements prior to installing equipment Enclosure weight empty 359 Ib 162 8 kg The rack is rated at 2000 Ib for a static load and 1400 Ib for a dynamic load See Weight considerations on page 21 and on page 25 for weight measurements for the PDU with System Bypass and the Symmetra 3 Phase UPS User s Manual PowerStruXure Type B 27 Installation PDU with System Bypass 31 Tools required 31 Exchange side panels 32 Join the Symmetra 3 Phase UPS enclosure to the PDU with System Bypass enclosure 33 Connection to be performed by a licensed electrician only 33 Connect main utility power 34 Symmetra 3 Phase UPS
124. werStruXure Type B Weight considerations BTU Considerations Operating conditions Electrical Requirements Site Planning Symmetra 3 Phase UPS Ensure that the floor and sub floor can support the total weight of the configuration when concentrated on the leveling feet If you are placing equipment on a raised floor consult the flooring manufacturer for loading requirements prior to installing equipment Symmetra 3 Phase UPS Weisht 1700 Ib 775 kg See Weight considerations on page 21 and on page 27 for weight measurements for the Power Distribution Unit and NetShelter VX enclosures Consider the BTU ratings of equipment to determine cooling requirements Additional cooling equipment may be required BTU output of the Symmetra 3 Phase UPS is 12 682 BTU hr North America The BTU output is higher while batteries are charging Under normal operating conditions battery recharge periods are Note relatively infrequent Symmetra 3 Phase UPS Temperature range 32 104 F 0 40 C Relative humidity lt 95 Maximum elevation 0 10 000 ft 0 3048 m Nominal full load 12 682 BTU h Full load loss at nominal mains 3716 W Keep ventilated keep dust and Operating environment corrosive fumes away from the Symmetra 3 Phase UPS Power wiring must be installed by an APC Field Service Electrical Engineer Hazard Input voltage AC nominal 3 phase 208 V Output voltage AC nominal 3 phase 208 V Full load output rati
Download Pdf Manuals
Related Search
Related Contents
Manual del usuario Manual de utilização - SMA Solar Technology AG Cooper Lighting POINT 510 User's Manual Trekstor SurfTab xiron 98321 4GB 3G Black tablet AEM31 MANUAL - Electrocomponents BEDIENUNGSANLEITUNG / USER MANUAL Deutsch - SC KMUTT WiFi User Manual for Ubuntu 取 付 説 明 書 Um toque pessoal em cada imagem Sumário Atos do Poder Judiciário Atos do Poder Copyright © All rights reserved.
Failed to retrieve file