1. 24 24 10 Compressor Oil Level 24 24 12 Annual Maintenance 4 24 13 Annual Maintenance Checks 24 T4 Compressor asas 25 Theat 25 16 Low Ambient 0ption 26 17 Touble Shooting 26 AIR COOLED PACKAGED MODULE Introduction The Multistack ASP is a modular air cooled chiller system with a nominal capacity of 10 15 20 30 and 60 tons per module The chiller system could consist of a master module front module with controller front and rear modules free cooling module and a pump module This system utilizes a fully hermetic scroll compressor 316 stainless steel brazed plate heat exchanger four or six row copper tube or microchannel aluminum fin condenser coils and a microprocessor based control Operating capacity is based on the entering chilled liquid temperature Precise control and system reliability is best served in this fashion This manual was created for the express purpose of assisting the owner or installing contractor of the Multistack ASP Packaged Air Cooled Product Please review the material contained in t
2. Signed ___ _ Title Company Telephone Company Name Job Location Telephone Company Location 21 AIR COOLED PACKAGED MODULE Operations 1 CHILLER IDENTIFICATION More model numbers for related modules are available on page 5 of this manual The new model numbers will be effective for any new module ordered after July 1 2011 Any existing orders will not change Existing ASP 30 X 1 H 1 A 0 R410A New ASP 0 X C N 1 1 H 1 A L 1 A A 1 S 410A Refrigerant Fan Configuration Condenser Coating Condenser Evaporator Ambient L Low 5 Standard H high C low high Voltage H 460 3 60 C for 575 3 60 E for 400 3 50 Application Air Cooled D Cond Unit H Heat Recovery R Heat Pump Power Connection 1 Direct Connect 2 Multiple Module Connections Voltage Frame Designation 1 32 x 58 2 36 72 3 36 x 84 4 72 x 84 5 other3 36 x 84 4 72 x 84 5 other No of Refrigerant Circuits 1 single 2 dual 4 four AHRI Certified C certified N Not certified Compressor Type Module Nominal Capacity 10 75 tons needs 3 digits Series 1B Bristol Trane Cornerstone R Bitzer Screw 5 Trane Scroll T Danfoss Turbocor Z Copeland scroll old elec X Copeland Scroll ZP A Copeland Scroll ZR 2 A 208 3 60 230 3 60 H 460 3 60 C 575 3 60 D 200 3 50 E 400 3 50 F 380 3 60 5 220 230 1 60 V Other gt A Bra
3. stack By HFMULTISTACK Air Cooled Packaged Module Installation and Operations Manual ASP010 ASPO15 57020 5 030 152060 PMP FCP LISTED AIR COOLED PACKAGED MODULE Table of Contents Product Introduction Product MELO 4 Model Number Nomendlature 5 Module 5070 7 Installation Handling of 6 8 11 S 6 PIG eal AION 11 Installing Single and Multiple Modules 13 Configuration Information 15 Installation of Free Cool and Pump Module 16 Man po 16 60 16 ASP Start Up Data LOG u q 19 Chilled Water Mode Readings 20 instalation Cherkilt III 21 Operation nsn nn 22 22 u unus 22 A Pressure Reading LLIK WAS 23 23 6 Refrigerant Charge Evacuation 23 7 23 8 Pressure Relief Valve
4. V Other Coil Coating A None B Bronzeglow H Heresite E Electrofin V Other Coil Cu tube Al fin Cu tube Cu fin C Microchannel V Other Water Piping C Copper Stainless P PVC B Black iron V Other Voltage Frame Designation 1 32 x 58 2 36 72 3 36 x 84 4 72 x 84 5 other Series FCP FreeCool Module DCP Dry Cooler RCP Remote Condensing Unit A 208 3 60 230 3 60 H 460 3 60 C 575 3 60 D 200 3 50 E 400 3 50 F 380 3 60 5 220 230 1 60 V Other Accessory Module ACP 2 H Strainer materials of construction B Bronze Copper 5 Stainless V Other Basket Strainer S Single D Duplex L Lakos N None Air Separator Y Yes N None Glycol Shot Feeder M Mini shot feeder amp Exp tank T Exp tank N None Tank Volume Three digits Gallons Water Piping Copper 5 Stainless P PVC B Black iron V Other Voltage Frame Designation 1 32 x 58 2 36 72 3 36 x 84 4 72 x 84 5 other Series ACP Accessory Component Module A 208 3 60 230 3 60 H 460 3 60 C 575 3 60 D 200 3 50 E 400 3 50 F 380 3 60 5 220 230 1 60 V Other AIR COOLED PACKAGED MODULE Introduction Master Module The master module for each chiller is designated at the factory and is equipped with the master microprocessor display Multistack ASP The chiller will consist of modules
5. one master front or back with an optional free cooling module no compressors an optional water pump module optional water holding tank module not pictured and optional glycol feeder module not pictured Rear Module This module will be attached to the front module by vertical frame bolts and the evaporator is connected by cross over pipes to the front modules water header pipes It also has its own slave board There is no rear module on the 060 Free Cooling Modules Thismodule hasfinand tube coils forfree cooling operation and no mechanical refrigeration no compressors The module contains a three way diverting valve for either enabling free cooling or bypass for mechanical cooling Note Free cool modules can come as fronts with headers or rears without headers Front Module Front Modules contain the 4 6 or 8 water header distribution pipes and has a slave control board This module will bolt together with the rear module Note ASP 020X 030X and 060X uses 6 header Pump Package Module This module contains a centrifugal dual arm pump and water distribution headers This module is for installations where no pump is provided for the chilled water system or when additional pumping capacity is required Note Several configurations of pump modules are available Typical pump is shown AIR COOLED PACKAGED MODULE Introduction Standard ASP 010 015 020 030 Diagrams MULTI
6. 0 10V or 4 20ma input and remote communication Supply and return CHW sensors module communication plugs and communication interface cables are all provided with the chiller The sensors and cables will be installed and tested by the Factory Authorized Start Up Technician See electrical diagrams for locations of all inputs outputs AIR COOLED PACKAGED MODULE Installation Master Controller Communication This is the computer controller that is installed on the master module and controls all connected modules Module Slave Board Communication Each front and rear module has one of these This board transfers communication from one module to the next Module Communication All modules are linked together through a communication cable The communication port is 11 on the module slave board d 1 j 10 s f i 17 AIR COOLED PACKAGED MODULE Installation Chilled Water Temperature Sensors These sensors are factory supplied and field installed on the leaving chilled water header stubs The master module also has a return water sensor top header stub On Variable Flow applications a return CHW sensor well must be supplied external and field installed as well Compressor Pressure Transducers These are factory installed on the suction and discharge lines of each refrigeration circuit to monitor the suction and discharge pressures circled Sensor Well The factory s
7. 151A Cleaning Kit to assist with this process Please see the 151A Cleaning Kit bulletin 126 for more details All of these bulletins part of the standard O amp M manual package 13 ANNUAL MAINTENANCE CHECKS a Electrical components b Check all external interlocks c Inspect compressor terminals d Check compressor crankcase heater operation 6 Tighten all electrical terminals high voltage and low f Check and calibrate all compressor safety controls g Check and record voltages and amperages for compressors h Check and record amperages for pumps and condenser fans i Check and calibrate low ambient fan cycling controls Update Your Maintenance Log Book j Inspect relay contacts for damage or pitting replace if required 13 1 Refrigeration Circuits a Analyze refrigerant with tube type moisture acid analyzer b Check and record refrigerant sub cooling and superheat c Check liquid solenoid valves d Check expansion valve and sensing bulb connections 24 AIR COOLED PACKAGED MODULE 13 2 Chilled Water System a Clean pump strainers and system strainers b Remove header caps and clean the ECHW strainers Please see the 151A Cleaning Kit bulletin F126 for more details 6 Check glycol inhibitor content in system chilled water 13 3 Cabinet and Related Hardware a Dry clean electrical panels remove debris b Apply protective coatings or wax if required 6 Remove rust and apply primer and paint if requi
8. Yes No 6 Factory Set Up variables Chiller type Standard Low Temp Low Ambient Variable Flow Enabled Disabled Min Flow Bypass 1 Enabled 1 Disabled 19 AIR COOLED PACKAGED MODULE Installation Temperatures T T T Observations 20 AIR COOLED PACKAGED MODULE Installation CUSTOMER JOB NAME JOB LOCATION CUSTOMER ORDER NUMBER The work checked below is in process and will be completed by Date The service of a Multistack Authorized Start up Engineer is requested on this date and it is understood that if the work checked below is not completed the engineer s time and expenses will be billed to us by Multistack Terms Net 30 days Multistack to be notified at least ten 10 working days in advance of the start up date Chilled Water Yes No Piping complete and connected to Multistack units Water system filled and vented Pumps installed Rotation checked Recommended strainers installed Controls 3 way valves by pass valves etc operable Water system operated and flow balanced to meet unit design recommended Strainers checked for unusual debris d Flow or differential pressure switch installed Remote Air Cooled Condenser Yes No Piping complete and connected to Multistack module All piping in accordance with good engineering practice Hot gas and liq
9. refrigerant charge in the system If a module is going out on a LP fault check the static pressure of the system while the module is in the off mode It will be necessary to wait for the system to warm up before checking the pressures by the gauge If pressures are low check the circuit for possible leaks Call the Multistack service department for leak testing procedures A further possible cause of a low suction temperature fault could be insufficient water flow The strainers filters and pump and valve settings should be checked 5 STRAINER CLEANING All ASP modules have a 30 mesh filter cartridge in the chilled water inlet header The purpose of the filter cartridge is to keep debris from entering the heat exchanger An external Y or basket type strainer should also be installed as a pre filter the factory supplied strainers There is no set time for cleaning the filter cartridges The factory recommendation is that the internal filters be removed and cleaned once per year Sometimes the filter must be removed more often if the water in the closed loop system has particulates A good indicator that the strainers need to be cleaned is low leaving water temperature fault in the module s near the discharge side of the chiller a In order to remove the in line strainers the following steps must be performed b Shut down the chiller and stop the chill water pump Close the inlet and outlet water valves the chiller d D
10. Introduction Standard ASP 060 Diagrams NUMBER OF MODULES X 84 4 ASP 060X MULTIPLE MODULE NOTES 1 NO OBSTRUCTIONS ALLOWED ABOVE CONDENSER FANS 2 REQUIRED SERVICE CLEARANCE AT MODULE ENDS 42 3 REQUIRED AIR INTAKE FRONT CLEARANCE 42 4 REQUIRED CLEARANCE FROM ANY HIGH VOLTAGE PANEL 42 72 DISCHARGE DISCHARGE FRONT SIDE ECHW HEADER RIGHT SIDE LCHW HEADER NUMBER OF MODULES X 84 4 ASP 060X with single fan option MULTIPLE MODULE NOTES 1 NO OBSTRUCTIONS ALLOWED ABOVE CONDENSER FANS 2 REQUIRED SERVICE CLEARANCE AT MODULE ENDS 42 3 REQUIRED AIR INTAKE FRONT CLEARANCE 42 4 REQUIRED CLEARANCE FROM ANY HIGH VOLTAGE PANEL 42 TOP SIDE DISCHARGE DISCHARGE FRONT SIDE ECHW HEADER RIGHT SIDE All ASP 060X units come standard with four multi blade vane axial condenser fans There is also a single fan unit available with a Low Sound poly resin reinforced Blade or Ultra Low Sound fiberglass construction Blade option Testing has shown a sound reduction of 6dB with the Low Sound and an additional 4dB with the Ultra Low Sound design 9 ASP 060X with single fan option SINGLE MODULE NOTES 1 N0 0BSTRUCTIONS ALLOWED AB0VE CONDENSER FANS 2 REQUIRED SERVICE CLEARANCE AT MODULE ENDS 42 3 REQUIRED AIR INTAKE FRONT CLEARANCE 42 4 REQUIRED CLEARANCE FROM ANY HIGH VOLTAGE PANEL 42 5 REQUIRED CLEARANCE FROM A
11. NY GROUNDED WALL 42 NON GROUNDED WALL 36 DISCHARGE DISCHARGE tf INTAKE RIGHT SIDE ASP 060X SINGLE MODULE NOTES 1 NO OBSTRUCTIONS ALLOWED ABOVE CONDENSER FANS 2 REQUIRED SERVICE CLEARANCE AT MODULE ENDS 42 3 REQUIRED AIR INTAKE FRONT CLEARANCE 42 4 REQUIRED CLEARANCE FROM ANY HIGH VOLTAGE PANEL 42 5 REQUIRED CLEARANCE FROM ANY GROUNDED WALL 42 NON GROUNDED WALL 36 DISCHARGE DISCHARGE INTAKE RIGHT SIDE INTAKE INTAKE AIR COOLED PACKAGED MODULE Introduction TOP SIDE FRONT SIDE ECHW HEADER LCHW HEADER am FRONT SIDE ECHW HEADER LCHW HEADER 10 AIR COOLED PACKAGED MODULE Installation Handling of Modules the Multistack product is damaged in any way during shipping and handling by the transportation company or any of it s agents the owner or installing contractor should promptly file a claim with the transportation company and advise Multistack It is very important to note any damage on the bill of lading when signing for the delivery of the chiller Digital photos are also helpful Use of a Crane or Other Lifting Devices If lifting modules by crane ensure the slings do not use chains do not damage the modules The lift points are at the corners of the base of the chiller The modules are shipped with the panels pre fitted The use of a spreader bar will prevent damage Fork Lift
12. PLE MODULES NOTES ASP O10X 015 ASP 020X 1 NO OBSTRUCTIONS ALLOWED ABOVE CONDENSER FANS 2 REQUIRED SERVICE CLEARANCE AT MODULE ENDS 36 3 REQUIRED AIR INTAKE CLEARANCE 42 Unobstructed 4 REQUIRED CLEARANCE FROM ANY HIGH VOLTAGE PANEL 42 TOP VIEW D D DISCHARGE DISCHARGE ugr BERR EERE I TITI GS eee Bee eee Bee ee TITI III Fa EI FRONTVIEW FRONTVIEW SINGLE MODULE NOTES 1 NO OBSTRUCTIONS ALLOWED ABOVE CONDENSER FANS 2 REQUIRED SERVICE CLEARANCE AT MODULE ENDS 36 3 REQUIRED AIR INTAKE CLEARANCE 42 anin a B 59 7 8 76 e8 4 REQUIRED CLEARANCE FROM ANY HIGH VOLTAGE PANEL 42 5 REQUIRED CLEARANCE FROM ANY GROUNDED WALL 36 Dig Kan kai pe us 6 CLEARANCE REQUIRED FROM REAR F i DISCHARGE ICAL PANEL I ECHW HEADER INTAKE I 822 IR BERR ERE Ree Cee PREAH HHH TTT AERE CT ETET LCHW HEADER 1 Eee FRONTVIEW RIGHT SIDE VIEW REAR VIEW Note If insullation is in a pit or near walls that are taller than modules please contact Multistack for clearances AIR COOLED PACKAGED MODULE
13. URATION SAMPLES s s Rear modules are an invalid configuration for the ASP060X 15 IMPORTANT MODULE CONFIGURATION INFORMATION PMP ASP Pump Module 1 When present a Pump Module is only allowed in the Front position 2 Incoming water to the chiller system must enter at the Pump Module 3 Leaving water from the chiller system may be from either end of the chiller FCP Free Cool Module 1 When present incoming system water must enter through the Free Cool Modules prior to entering an ASP 010X 015X 020X 030X or 060X Chiller Module 2 You may not attach a Rear Free Cool Module to a Front ASP 010X 015 020X 030X or 060X Chiller Module ACP ASP Glycol Feeder Module 1 An ACP Glycol Feeder Module may be attached in any rear position ASP 010X 015X 020X 030X or 060X Chiller Module 1 The maximum number of ASP 010X 015X 020X 030X or 060X modules with a single Master Module is 14 i e 1 Front Master 6 Front Slaves and 7 Rear Slaves 2 You may have more than one Master Module in a single chiller bank 3 Piping sides of an ASP 010X 015X 020X 030X or 060X chiller without Free Cool or Pump Modules attached are field selectable LEGEND First Letter M Master Chiller Module ASP 010X 015X 020X 030X or 060X 5 Slave Chiller Module ASP 010X 015X 020X 030X or 060X P Pump Module PMP F Free Cool Module FCP G Glycol Feeder Module ACP Second Letter F Front Module R R
14. al 4 four AHRI Certified C certified N Not certified Compressor Type Module Nominal Capacity 10 75 tons needs 3 digits Series Bristol C Trane Cornerstone R Bitzer Screw 5 Trane Scroll T Danfoss Turbocor Z Copeland scroll old elec X Copeland Scroll ZP A Copeland Scroll ZR A 208 3 60 L 230 3 60 H 460 3 60 C 575 3 60 D 200 3 50 E 400 3 50 F 380 3 60 S 220 230 1 60 V Other gt A Brazed 55 B Brazed SMO C S amp T copper D S amp T cu Ni Z Other A Cu tube Al fin Cu tube Cu fin C Microchannel V Other gt None Bronzeglow H Heresite E Electrofin V Other 5 5 Standard H High static L Low sound V Other Pump Module 2 015 Misc Other Comp Y Yes other comp N No other comp Glycol Shot Feeder M Mini shot feeder amp Exp tank T Exp tank N None Water Piping C Copper Stainless P PVC B Black iron V Other Voltage Configuration A 100 Redundant D Dualarm configuration 5 Single pump Pump Horsepower HP of one pump Three digits Frame Designation 1 32 x 58 2 36 72 3 36 x 84 4 72 x 84 5 other 9 Indoor Series PMP Pump Module A 208 3 60 L 230 3 60 H 460 3 60 C 575 3 60 D 200 3 50 E 400 3 50 F 380 3 60 5 220 230 1 60 V Other AIR COOLED PACKAGED MODULE Introduction Free Cool Module FCP 2 H Fan Config 5 Standard
15. al leak In such an event it would become necessary to replace the heat exchanger Following are steps for field replacement of a failed evaporator heat exchanger a If the refrigerant has not been lost on the failed circuit you should first do a standard refrigerant recovery b Begin by isolating the chiller and draining the water glycol form the loop c Remove the 4 round header pipes that attach to the evaporator if you have a front module If rear module remove the crossover pipes from the front module d Cur the refrigerant lines below the elbows and sweat off remaining pipe 6 Remove old evaporator and replace with new one f Fit in copper connections and braze using a minimum 45 silver solder Purge with Nitrogen while brazing g After brazing first perform a pressure check with Nitrogen Charge the system to 110 psig and hold for 20 minutes If the system passes the pressure test evacuate to a minimum of 500 microns and hold for 20 minutes Charge the circuit according to the name plate charge the evaporator heat exchanger has caused water to enter into the refrigerant side the compressor and condenser should also be checked for possible contamination If water has entered into the compressor it is recommended the compressor be replaced as removing all the moisture from the oil is very difficult Replacement of the condenser the expansion valve and installation of a liquid line filter drier with a water core cartridge is also
16. creases the ORD valve will open allowing hot gas into the liquid line increasing the liquid pressure To set the chiller for low ambient operation and to set the CDS valves please see the ASPX Master Controller User Manual 17 TROUBLE SHOOTING AIR COOLED PACKAGED MODULES ASP modules use the Carel 02 master control The user manual for the PCO2 controller is located the O amp M package The user manual details the different Status screen and explanations of system or module faults WARNING Most of the following repairs to the system should only be performed or attempted by a qualified service technician Failure to adhere to proper safeguards and safety rules could cause damage to the system and serious injury to personnel SOLUTION FAULT SOLUTION Check main disconnect for power Excessive Check VSP setting in system variables No Displayon Check circuit breakers in module and J Box Cycling Check entering CHW sensor location Master Module gt Check transformer in modules Check fan operation Check for 24v at J1 on board High discharge Check coil condition EX 1 interlock Check appropriate interlock component Pressure Compare analog pressure reading with digital e Check jumpers on 152 in master module Check fan settings in system variables Check for proper rotation phasing e Check refrigerant charge leaks e Check PPM device Low Suction Compare analog pressure reading to digital Ch
17. dule on the rails Align the rear module with the front module 9 By loosening the four bolts on the plate you can slide the evaporator to the correct distance If further adjustments are needed you can loosen the header pipes and front evaporator plate as well The Next Step For installation of subsequent modules follow the same procedure as discussed previously always begin with the front module Before installing further rear modules align the water header pipes lubricate and install the gaskets and couplings connecting to the previous modules header pipe When bolting the second full module to the first full module align the three outer holes on each end and install the 3 8 bolts provided AIR COOLED PACKAGED MODULE Installation arep 6 Termination of each module to the power box should be done by the electrician 8 Fit the connector pipes from the front module to the rear module lubricate the gasket and tighten both front and rear couplings at this time You may need to slide the evaporator mounting plate forward or backward to accomplish this 10 To secure the front and rear modules align the three holes on both ends and install the six 3 8 bolts provided AIR COOLED PACKAGED MODULE Installation ASP 010X 015X 020X OR 030X CONFIGURATIONS SAMPLES ee e T L bes fav ee ee 0 alee ss ASP 060X CONFIG
18. e flashing even with the correct charge As fans are cycling the sight glass will also display some bubbling 7 SUPERHEAT SUB COOLING All ASP modules use a mechanical type expansion valve By turning the valve adjustment clockwise superheat is increased On each module superheat is set at the factory during the run test Superheat is set for 10 12 F during the test run No further adjustments should be necessary after the module is shipped Sub cooling is necessary in the system to prevent flash gas as the refrigerant enters the expansion valve ASP condensers are sized and charged so that sub cooling of the liquid refrigerant will take place with no separate sub cooler being needed The range of sub cooling is 7 15 F 23 AIR COOLED PACKAGED MODULE Operations 8 PRESSURE RELIEF VALVE Each module has a 650 psig pressure relief valve installed The relief valve is installed on the receiver of the module and has a 3 8 flare connection 9 FILTER DRIERS ASP modules are built with a factory installed liquid line filter drier The filter driers are a solid core sweat fitting replaceable type Some modules have a flare connection system for the filter drier In the case of a compressor failure heat exchanger failure or water contamination in the system it is always required to replace the drier 10 COMPRESSOR MOUNTING AND OIL LEVEL is very important that the compressors remain tightened on the rubber isolators and base plat
19. e in the same manner as shipped This will prevent any damage to the refrigerant piping from excess vibration If replacing a compressor make sure the isolators and mounting brackets get re installed the same manner The compressors used on ASP modules are oil charged by the compressor manufacturer Most models have an oil sight glass Correct oil level should be between 1 8 to 7 8 full on the glass To ensure no liquid is present in the oil the crankcase heaters should be on a minimum of 24 hours before starting of the compressors The factory oil charge volume for each compressor can be found in the Product Data Catalog The oil used in R 410A compressors use an esther based oil not a petroleum based oil Please do not mix oils when adding oil to a system since they are not compatible and will cause damage 11 DAILY LOG SHEET On the back page of this manual is a chiller information log sheet The log sheet can be used daily weekly or as desired to record operation characteristics of the chiller The information recorded on the log sheet can also be very helpful for diagnosing potential problems in the system 12 ANNUAL MAINTENANCE Most of the annual maintenance requirements for ASP Chillers involve proper shut down of the system and if needed cleaning of the heat exchangers Preventive Maintenance bulletin 125 and Heat Exchanger Cleaning Procedures bulletin F130 describe the recommended procedures for both processes Airstack has available the
20. ear Module Front of Chiller Bank is Facing the Bottom of he Page Master Module location determines front of chiller For other configurations contact your local Multistack Representative AIR COOLED PACKAGED MODULE Installation FREE COOL AND PUMP MODULES Top Header This header is for CHW water leaving the free cool coils If return CHW enter on the free cool module this should be capped on the CHW inlet side This header sends water from the free cool module to the mechanical modules for additional cooling Middle Header This connection is for the inlet water to the free cool module If the connection is to a mechanical module the header end closest to the mechanical module should be capped Bottom Header This header is for CHW going to the building If the LCHW exits through a mechanical module on the opposite end this header would not be used MAIN POWER Locate the power distribution box on the specified end of the chiller Wire and conduit will need to be run from the distribution box to each module of the chiller The wire and conduit may be pre sized and fabricated at the factory It is the responsibility of the installer to connect main power to modules before start up FIELD WIRING is the responsibility of the contractor to supply and install a flow switch in the LCHW piping The master module of the ASP chiller has inputs for the following options remote start stop run status system alarm
21. eck CHW pump Pressure LP Check expansion valve Waiting For Check flow switch operation Check solenoid valve Chilled Water gt Check filter strainers Basket strainers and Y Check suction sensor How strainers Check set points in system variables e Check 752 inputs 3 and 5 Low Suction e Check LCHW sensor Temperature Check set points in system variables Check for flow restrictions system and module Check entering CHW sensor Check settings in system variables rror Check expansion valve Low Chill Water Check solenoid valve Temp Check for water flow restrictions No Demand Check set points in system variables Check cables at J11 communications ports Check sensor location pLan Error 100 Demand Check entering CHW sensor Check components in control circuit all the time Check set points the system variables Check wire crimps in the control circuit 100 Demand Turn chiller on chiller won t gt Check sensors load Check load limit setting in system variables menu 26 HMULTISTACK Originators Innovators Never the Imitators 1065 Maple Avenue Sparta WI Phone 608 366 2400 Fax 608 366 2450 www multistack com F122IUM0511 Made in U S A
22. f inorganic scale is present in system Note Cleaning chemicals such as Nu Calgon Imperial Grade Scale Remover part number 4360 84 or equivalent suitable for both organic residue and scale removal may be substituted Any other detergents and acids shall not be combined unless approved by chemical manufacturers Only chemicals compatible with 316 stainless steel copper and carbon steel shall be used Any concentrations of hydrochloric or sulfuric acid or chloride containing chemicals shall not be allowed to come in contact with copper brazed 316 stainless steel evaporators During the flushing 30 mesh max Y strainers or acceptable equivalent shall be in place in the system piping and examined periodically as necessary to remove collected residue The flushing process shall take no less than 6 hours or until the strainers when examined after each flushing are clean Old systems with heavy encrustation shall be flushed for a minimum of 24 hours and may take as long as 48 hours before the filters run clean Detergent and acid concentrations shall be used in strict accordance with the respective chemical manufacturers instructions After flushing the system loop shall be purged with clean water for at least one hour to ensure that all residual cleaning chemicals have been removed Prior to supplying water to the Multistack chiller the Water Treatment Specification shall be consulted for requirements regarding the water quality during chiller operati
23. face with steel rails This will ensure proper alignment of all fittings Rails should run parallel with module water flow headers For maximum stability three rails should be used one rail for each outside edge and one rail to be shared in the center The outside rails should be placed flush with outside frame Internal rail shares half the distance 2 with Rear and Front modules To ensure all warranties and a successful installation a Factory Authorized Technician is required to perform start up of the Multistack Chiller If start up is to be performed directly by Multistack a minimum of two weeks notice is required Please call the Multistack Service Department at 608 366 2400 to schedule 1 Starting with the master front modules 2 Lubricate rails with solid vegetable shortening position on rails 27 center to center for Crisco or other non petroleum lubricant 010X and 015X 32 5 for 020X 030X and 060 Note Consult a qualified seismic expert for seismic restraint information on M 4 Lubricate gaskets with vegetable based lubricant 5 Note If the chiller has a single point power and hand tighten only Make sure the bottom box the coiled wire and conduit should be run connector pipe and the sensor pocket is positioned to to the power box as the modules are installed accept the sensor for the rear module The conduit is marked 13 7 Position the rear mo
24. his document carefully before installing and operating this equipment Additional inquires regarding installation and operation should be directed to Multistack or its authorized agents Failure to handle install and operate this equipment in accordance with this manual may result in damage to the equipment and or personal injury Failure to comply may void some or all of the Multistack warranty options Any questions regarding the content of this Installation Manual the handling or installation of the Multistack Chiller components should be directed immediately to your authorized representative or to the Service Department at 608 366 2400 or FAX 608 366 2450 AIR COOLED PACKAGED MODULE Introduction MODEL NUMBER NOMENCLATURE The new model numbers will be effective for any new module ordered after July 1 2011 Any existing orders will not change Air Cooled Packaged Module Existing ASP 30 X 1 1 New ASP 030 410A Refrigerant Fan Configuration Condenser Coating Condenser Evaporator Ambient Low S Standard H high C low high Voltage H 460 3 60 C for 575 3 60 E for 400 3 50 Application A Air Cooled D Cond Unit H Heat Recovery R Heat Pump Power Connection 1 Direct Connect 2 Multiple Module Connections Voltage Frame Designation 1 32 58 2 36 x 72 3 36 x 84 4 72 x 84 5 other3 36 x 84 4 72 x 84 5 other No of Refrigerant Circuits 1 single 2 du
25. on The Multistack service literature shall be available to the operator and or service contractor and consulted for guidelines concerning preventative maintenance Clearances Required Service Clearance at Module 36 Required Air Intake learance 4 Required Clearance From High Voltage 42 Water Treatment Specifications Supply water for the evaporator water circuits shall be analyzed and treated by a professional water treatment specialist who is familiar with the operating conditions and materials of construction specified for the heat exchangers headers and associated piping Cycles of concentration shall be controlled such that recirculated water quality for modular chillers using 316 stainless steel brazed plate heat exchangers and carbon steel headers is maintained within the following parameters Modular Chiller Water Quality ph gt 7 and lt 9 Total Dissolved Solids TDS Less than 1000 ppm Hardness as 3 30 to 500 ppm Alkalinity as CaCO 30 to 500 ppm Chlorides Less than 200 ppm Sulfates Less than 200 ppm AIR COOLED PACKAGED MODULE Installation 3 For rear modules install the evaporator heat exchanger connecting pipes Also install the provided CHW sensor into the leaving pipe The 60 ton module consists of a front and rear portion for one module Installing Single and Multiple Modules The modules should be mounted on a level sur
26. or Pallet Jack The modules can safely be lifted and maneuvered with a forklift or pallet jack Forks can be positioned under the evaporator and between the tandem compressors Site Preparation Below components are required to ensure proper performance of the AIRSTACK ASP chiller All piping must be properly supported at coupling connections and suitable intervals It is the responsibility of the installing contractor to ensure all water connections conform to local and national codes The drawing shows piping exiting on right end Depending on location of master module exit can be on either end Pressure Taps Chilled Pee pee Water Pump anew rainer option supplied by Multistack CHW IN lt Ps lt gt CHW OUT gt lt Flow DP Swite System Piping D gt supplied Multistack installed by others Supplied by Multistack Supplied and installed by others Install system ECHW sensor external to Master module if doing variable flow 11 AIR COOLED PACKAGED MODULE Installation Pipe System Flushing Procedure Prior to connecting the Multistack chiller to the water glycol piping loop the system piping should be flushed with a detergent and hot water 110 130 F to remove previously accumulated dirt and or other organic residue After removal of organic residue flushing should continue with a diluted phosphoric sulfamic or citric acid mixture i
27. rain the water glycol from the system and dispose properly When the water glycol level is below the top header the system can be safely opened e Remove the 4 Victaulic end cap on the last module on the discharge side On systems with 2 banks of modules the upper crossover pipe will also have to be removed to access the strainer the second bank of modules Care should be taken to close the isolation valve for that header f Remove the strainers and clean immediately A hooked tool may be required to remove the strainers further in the system This tool be manufactured on site g Slowly open the bottom water isolation valve and fill the unit from the bottom up to prevent air from being trapped in the headers Care should be taken to check for leaks h Restart the chill water pump and again check for possible leaks bleed any trapped air from the system and start the chiller 6 REFRIGERANT CHARGE EVACUATION All ASP modules come from the factory charged with the recommended refrigerant volume Prior to charging each unit is evacuated to a maximum of 150 microns and held 15 minutes The proper refrigerant charge for each module can be found on the module data plate On air cooled machines the proper charging procedure is by a calculated weigh in method Charging to a full sight glass on air cooled machines will likely result in over charging as the elbows in the liquid line as well as the liquid line solenoid valve still produce som
28. recommended Evacuate the circuit to a maximum of 500 microns and let stand for 20 minutes Charge the circuit and run 2 3 weeks with the high water core cartridge and the replace with a standard core Standard condensers on the ASP module are copper coil with aluminum fin type however other construction materials may be used Periodic cleaning of the fins should be done to keep air born debris from plugging up the fins and causing high pressure conditions Confirm the specific material used in construction of the condenser before cleaning to avoid any possible damage A coil cleaner suitable for copper and aluminum can be used for the standard condensers 25 AIR COOLED PACKAGED MODULE Operations 16 LOW AMBIENT OPTION For applications requiring operation below 20 F modules should be ordered with the Low Ambient option Low Ambient modules can be operated down to 20 F These modules will be equipped with additional refrigerant charge a larger liquid receiver and head pressure control valves The valves used to control head pressure are the adjustable electronic CDS Stepper Valve along with the fixed setting ORD valve The CDS Valve holds refrigerant in the condenser to flood the coils by reducing surface area and therefore building the condenser head pressure The ORD valve will open based on a differential between the compressor discharge pressure and the receiver liquid pressure As the differential between pressures in
29. red 14 COMPRESSOR FAILURE With any chiller system there is always the chance of a compressor failure In the event of a failure proper steps should be taken to determine the cause of the failure a A motor burn out due to a fault in the motor insulation is quite rare Most burnouts are actually caused by a mechanical condition or lubrication problems In the event of a burnout proper clean up procedures should be followed b Check all electrical components of the circuit contactors fuses wires etc c If necessary perform a system clean up Nu Calgon RX 11 Flush or Sporlan System Cleaner work well Follow the cleaning solutions manufacturers direction d Replace the liquid line filter drier with a burnout core 6 Evacuate the system to a minimum of 500 microns and hold for 20 minutes f Charge the circuit with virgin refrigerant Charge with liquid into the discharge side of the compressor See refrigerant charge on nameplate data of unit for proper amount g Run the system 2 3 weeks with the burnout filter core With the King Valve on the receiver closed replace with standard core drier Consideration should be given that the pipe loop will have refrigerant under pressure and consideration must be given to safety 15 HEAT EXCHANGERS Airstack uses brazed plate stainless steel heat exchangers for all evaporators Without proper water treatment or due to abuse heat exchangers can corrode over time and eventually develop an intern
30. that the compressors will not run If the Heat Exchanger does not chill the return water glycol enough the 3 heat exchanger valves close and the compressors will start and chill the discharge water to the set point 3 FAIL TO RUN Airstack ASP systems designed for critical needs have a design that will allow individual modules to run in the event that the master module fails or goes offline or if certain System Faults occur that would otherwise disable the entire chiller Each module must be in the Auto mode of operation in order for this OVERRIDE condition to occur If the Master Control comes back online and all System Faults are cleared then the control of the compressors will automatically shift back to the master control AIR COOLED PACKAGED MODULE Operations 4 PRESSURE READINGS The operating suction and discharge pressures in the modules are directly related to the temperature of the water flow condenser temperatures the ambient temperature and the cleanliness of the system If a module is faulting on a High Pressure HP fault you should first check to see that the fans are operating If both fans are working check the cleanliness of the condenser coil All ASP modules have both a high pressure and low pressure LP cut out setting Each module will cut out on HP or LP when the programmed limit in the master control is met In addition a back up manual HP cut out switch is installed on each module A LP fault is an indication of low
31. uid lines installed correctly Low ambient refrigerant head pressure controls installed Condenser fans controlled on head pressure Condenser wired and operational correct rotation Control wires ran from Multistack module to remote condenser Electrical Ye No N A Power wiring complete and in accordance with nameplate rating on Multistack unit and prepared for connection in accordance with installation manual qd Note No power is to be applied to unit prior to inspection by Multistack engineer All interlock wiring complete between control panel and complies with Multistack specifications and with applicable codes Miscellaneous Ye No N A Thermometer wells thermometer gauges control etc are installed A minimum system load of 50 of total building load is available for testing and adjusting controls We understood that authorized representatives of the installing electrical and piping contractor must be available during the start up period and that coordination is our responsibility We further understand that the services of Multistack Authorized Start Up Engineer will be furnished for a period of not more than sixteen 16 consecutive normal working hours and we agree that a charge for time and expenses will be made by Multistack if services are required for longer than sixteen 16 consecutive normal working hours or if repeat calls are required through no fault of Multistack
32. upplied and field installed LCHW system sensor well should be installed near the master module Sensor well is 1 2 pipe thread The master modules LCHW System sensor will should be installed in this well On Variable Flow applications a system ECHW sensor well is also provided AIR COOLED PACKAGED MODULE Installation START UP DATE SHIP DATE JOB NAME JOB NUMBER ADDRESS MULTISTACK REPRESENTATIVE MODEL NUMBER MODULE SERIAL NUMBERS Indicate Master Controller with an X Indicate if Free Cool Indicate if Pump Module 1 7 2 8 3 9 4 10 5 11 6 12 Master Controller Program INSTALLATION CHECKLIST CIRCLE CORRECT RESPONSE 1 Chiller mounted on rails and isolators YES NO 2 Any visible damage YES NO If yes detail 3 Any obvious oil and or refrigerant leaks YES NO If yes detail 4 Sensor pockets installed YES NO 5 Chilled water flow or DP switch installed Type YES NO 6 Chilled water system strainer installed Type YES NO 7 Chilled water isolation valves installed YES NO ELECTRICAL AND CONTROLS CHECKLIST CIRCLE CORRECT RESPONSE 1 All electrical connections tight and correct YES NO 2 Power wiring sufficient to carry RLA YES NO 3 Voltage levels PHASES 1 2 2 3 1 G 2 G 3 G 4 Set system variables to site conditions Yes No Upset Manual Range_ Sequence _ Loset Manual Offset Indexing VSP Fan Setpoint_ TDiff_ Fan Offset Load Limit HP Cutout 5 Set time and date
33. zed 55 B Brazed SMO C S amp T copper D S amp T cu Ni Z Other A Cu tube Al fin B Cu tube Cu fin C Microchannel V Other gt None Bronzeglow H Heresite E Electrofin V Other 6 5 Standard H High static L Low sound V Other 2 THEORY OF OPERATION The Airstack ASP chiller provides chilled water to an external load based on the return water temperature as measured by the ASP master control When the temperature of the returning water rises above the set point as calculated by the upper set point the lower set point and the VSP the master controller starts compressors one at a time to produce chilled water The number of compressors that will start is determined by the program in the master controller based on the temperature being returned When the return chill water approaches the correct set point the master controller starts to turn off compressors as needed When the return chilled water reaches the set point or a little below the master controller will have turned off all the compressors During operation of the compressors the controller will cycle on one or both of the condenser fans in a module according to the refrigerant high pressure Some systems have a large heat exchanger which uses a main chiller to chill the return water glycol When the chilled water from the main system is cold enough the heat exchanger valves open and chill the return water glycol through the smaller chiller enough

Download Pdf Manuals

image

Related Search

Related Contents

Mr. Heater #MH500PT User's Manual  conoscenza della vettura    Welch Allyn Medical Diagnostic Equipment Tablet Accessory V 1.3 User's Manual  350 - CHARGEUSE SUR PNEUS (Kramer)  manuale Utente C232&485plus  取扱説明書  sound management integration  

Copyright © All rights reserved.
Failed to retrieve file