Home

Cambridge NanoTech Savannah 100 Atomic Layer Deposition System

image

Contents

1. system first and follow the out gassing procedure completely as described in the system manual If you are not sure contact Helena Joe or one of the superusers to restart the system In case that either of the precursors is running out indicated by the disappearance of pulses during the running cycles contact Helena Joe or one of the superusers for replacement Do not attempt to change precursors by yourself The largest wafer size supported is 4 circular Always set the center heater to 150 C and the outer heater to 150 C after you finish the growth Software user interface Buttons Program Stop Valve All Heaters oC PEM e Program Stop the Labview program Stop Valve Open and close the stop valve to the pump All heaters Turns all the heaters ON OFF Run cycle area Flow sccm Delay min valve Pulse s Expots Pump s 20 0 0 1 E 5 i 0 4 W Save Run Runtime Abort Run CHALD datal4al0 run Jun 11 2005 0546PMO6sec 00 16 59 F Cycle matrix Programming of the cycle recipe Valve indicates the source valve to be opened Valve 0 connects to the DI water precursor and to the TMA precursor Pulse sets the time for which the source valve is opened Valves only respond to pulsing for t gt 0 007 sec Expo gives the time for which the stop valve is closed after pulsing the source and before pumping the chamber See exposure mode below Pump sets the time between the pulses of each sour
2. Cambridge NanoTech ALD System User Instructions This is a shortened version that focuses mainly on the operation For more detailed instructions please refer to the user manual Cambridge NanoTech Savannah 100 Atomic Layer Deposition System available both on line and near the ALD setup System description Atomic layer deposition ALD is a technique that allows growth of thin films with atomic layer precision The ALD system in PRISM clean room is designated for growth of Al20 film which uses water and trimethylaluminum TMA as precursors ALD is a self limiting process so each cycle produces exactly a monolayer with a maximum of 1 1 of ALO depending on the temperature Before starting Important notes TMA is pyrophoric and ignites when in contact with the air Never remove TMA source The chamber lid and the walls are HOT Use care when opening the chamber Do not place any flammable materials on or near the ALD machine The chamber lid cannot be lifted if the chamber is cold The temperature of the chamber outer heater should be set to at least 80 C Do not put in materials that will outgas Do not use a substrate having carbon tape Do not use vacuum grease on your substrate or in the chamber System is intended to have the pump running nitrogen flowing and heaters on at all times even when idle If restarting the system after it has been cold e g following a power outage or maintenance shutdown warm up the
3. ce in which the chamber is pumped and vapor removed This should be long enough so that the chamber reaches base pressure before next pulse Cycles Programmed number of cycles The current cycle number is displayed underneath Flow Sets the flow rate of carrier gas here nitrogen with ultra low water content as controlled by MFC Delay Time delay before the start of a run Usually set for temperature stabilization Save Run Check the box to save the run data in the file described below Run Time Calculated total time for the current run Start Abort Run Start or abort the current run The arrow turns bright green as run starts and gray green as it stops Reactor Pressure Plot Area 1E 0 1E 1 Time s ri i l i i i i i i l I i i I S61 564 566 568 S70 M2 374 S76 D70 560 Soe 564 586 598 590 592 This plot tracks the reactor pressure read by the gauge installed in the pumping line assembly Pulses can be seen on the plot Time scale can be reset by Reset Time Heaters control Area i ie I E Prt al s a ies E OR ee e i a f hH a fa i i i j EPH rere a Sree 5 vr nh ii ii i i Z HINIMIUA NIH git AL Pidi A Meer ental i ete i7 iJ ie jil i i Sarge erat aot ha n i Control the temperature of the heaters Temperatures can be set by typing values into the light blue areas The current temperature readings are in
4. dicated in the red area of each heater under the set point Heater settings Maximum Recommended C Solenoid valve 115 80 Center heater 400 250 300 Outer heater 200 150 80 minimum Tee and elbow 180 150 Pumping line 180 150 Operating Instructions Load Unload 1 Close the stop valve and set the flow rate to 100 sccm to vent the chamber Only vent when system hot chamber gt 60 C Leave system vented for as short a time as possible 2 Wait for the lid to rise slightly from the chamber Please be patient it is important to wait for the chamber to reach atmospheric pressure to preserve the integrity of the O ring 3 Lift the lid and place your sample in the center of the chamber Close the lid 4 Open the stop valve to pump down the chamber The base pressure should be less than 1 Torr depending on the flow rate Growth run Continuous flow mode recommended 1 Pump down the reactor chamber by opening the stop valve after loading sample 2 Make sure all heaters are set to the desired temperatures 3 Enter the desired values for cycle parameters A typical recipe is below This recipe below will give you 300 monolayers approx 33 nm of Al203 o qoo 04800 20 io 007 Jo _ J4 4 Click Start run in the run cycle area You can see the pulses in the pressure plot area 5 After the run is over vent the system and remove your sample Close the lid and pump down with flow rate set t
5. o 20 sccm Let the system idle Growth run Exposure mode Exposure mode can be used for the ultra high aspect ratio structures A typical recipe is listed below For both valves Pulse sets to 0 2 sec Expo sets to 4 sec to allow fully reaction of the current precursor with the sample surface Pump sets to 10 sec to provide sufficient time to remove any un reacted precursor and or by products Carrier gas is recommended and Flow can use 5sccm Degassing only after installation of precursors or system checked for leaks Water cylinder Valve 0 Pulse 1 3 Expo 0 Pump 3 Cycle 5 Flow 5 TMA cylinder Valve 1 Pulse 1 3 Expo 0 Pump 3 Cycle 5 Flow 5 Keep the manual valve of TMA source still closed while degassing Degassing is essential every time the space between manual and solenoid valves is open to air

Download Pdf Manuals

image

Related Search

Related Contents

NP View Administrator`s Guide  Rubbermaid MB225B Instructions / Assembly  2007 Quick Reference Guide  Daewoo DRVT-43 DVD VCR Combo User Manual  FS-i-K シリーズ  Craftsman 119.214 Saw User Manual  1 - Brother  MT-020-user-manual  取扱説明書ダウンロード  仕 様 書 1/4  

Copyright © All rights reserved.
Failed to retrieve file