Home
Technical Writing Samples a file
Contents
1. Display Drill Holes gt Add Hole Schedule View Hole Schedule gt Read Default Hole Symbols Draw Parts Drawings View Part Drawing Windows gt Manual Parts List gt Drill Drawings gt gs CLOSE CAS Drawings Artwork Drawings APL Drawings gt Assembly Drawings Figure A 2 Create CAS Drawings The Create CAS Drawings menu option instructs FABLINK to create all drawing parts that begin with dr_ When the drawing contains artwork the following three things are checked a If the Gerber file does not exist the appropriate graphics files are converted to Gerber format b If the artwork does not exist the Gerber file is viewed into FABLINK for Signal Planes c If the artwork true part does not exist the true artwork is created from the Gerber file for Power Planes NOTE The Create CAS Drawings menu option and all sub menu options except Create APL Drawings do not affect drawings already created Page 13 of 26 Patrick M Kennedy 1 2 1 Create Manual Parts List loutput setup Status Left Key Create New Drawing Read Drawings Write Drawings Copy Drawing Part s Delete Drawing Part s Display Drill Holes Add Hole Schedule View Hole Schedule Read Default Hole Symbols Draw Parts Drawings View Part Drawing Windows gt Drawings gt Artwork Drawings APL Drawings Assembly Drawings DRAW CAS Drawings gt brill CLOSE CAS Drawings Figure
2. A 3 Create Manual Parts List Technical Writing Samples TITLE MATERIALS 1 NOTES 1 The Manual Parts List sub menu option instructs FABLINK to create all drawing parts that begin with dr_pl_ A second sub menu allows the user the option to create one parts list drawing part at a time Page 14 of 26 Patrick M Kennedy Technical Writing Samples 2 0 Overall Test Plan 2 1 Test Processes The Test Process begins with planning once the business requirements have been defined approved and committed to by the client and ends when the system is accepted by the client after acceptance test and reoccurs as changes are made during maintenance or enhancements The Test Process interfaces extensively with the Clients who are involved in planning and conducting acceptance tests and possibly other levels of test Analysts who are the users of the process Management who receives information on the quality of the products under test Requirements Process defines the business and system requirements that are verified by the test process Project Management Process that integrates the project specific Test activities methods and status with other project aspects forming an overall Project Plan and project status and Software Configuration Management Process that controls different versions undergoing test associated test products and tools This section defines the Test Process by defining four major sub processes Test Planning Test
3. DQS DQS is transmitted externally along with data for use in data capture at the receiver DQS is a strobe transmitted by the DDR2 SDRAM device during READs and by the memory controller during WRITEs DQS is edge aligned with data for READs and center aligned with data for WRITEs DDR2 SDRAM modules operate from a differential clock CK and CK the crossing of CK going HIGH and CK going LOW will be referred to as the positive edge of CK Commands are registered at every positive edge of CK Input data is registered on both edges of DOS and output data is referenced to both edges of DOS as well as to both edges of CK Register and PLL Operation DDR2 SDRAM modules operate in registered mode where the command address input signals are latched in the registers on the rising clock edge and sent to the DDR2 SDRAM devices on the following rising clock edge data access is delayed by one clock cycle A phase lock loop PLL on the module receives and re drives the differential clock signals CK CK to the DDR2 SDRAM devices The register s and PLL reduce address command control and clock signal loading by isolating DRAM from the system controller PLL clock timing is defined by JEDEC specifications and ensured by use of the JEDEC clock reference board Registered mode will add one clock cycle to CL Temperature Sensor An on board temperature sensor provides the ability to monitor the module tempera ture along with monitoring alarms
4. EMI requirements are specified in the documents listed in Section 2 Applicable Documents As an example Table 3 2 1 lists the EMC EMI requirements imposed on the 777 Cabin Management System CMS equipment These requirements are typical of the requirements levied on electronic equipment on airplanes The following code is used for the table Page 10 of 26 Patrick M Kennedy Technical Writing Samples 1 INTRODUCTION to PWB PWA Drawing Design Guide 1 1 Scope The PWB PWA Drawing Design Guide defines the standard process for creating new fabrication drawings This process makes use of a series of pop up menus and sub menus developed to save time and ensure a higher quality product It uses an Apollo Mentor Board Station 1 2 Purpose The purpose of this document is to guide the designer through the steps and functions needed in setting up FABLINK completing tasks before creating the fabrication drawings and checking and releasing the new drawings This document also describes and illustrates the numerous menu options developed to simplify the process It is the responsibility of each designer or group involved in this process to follow these guidelines This will ensure a complete and accurate board design in the shortest amount of time with the highest quality Page 11 of26 Patrick M Kennedy Technical Writing Samples Appendix A FABLINK PROCESS MENU DESCRIPTIONS This section contains detailed descriptions of the menus u
5. Execution Problem Report Tracking Assure Quality The Figure below illustrates the relationship among the four major sub processes Page 15 of 26 Patrick M Kennedy Technical Writing Samples Four Major Sub Processes of Test Software A Analysts Client Configuration Programmers Management tats Codes amp Fixes Test Products Test Criteria Participation Test Problem Reports Test Report Test Planning Test Execution Tracking Approach Resources Schedule Defect Data Milestones Assure Quality Requirements Quality Reports to Verify v v Project x 3 J Requirement Test Completion Management Process End of Test Process 2 1 1 Test Planning Test Planning defines all the activities for planning a project s test strategy and approach and planning those tests that will verify the system Test Planning results in the project specific application of the Test Process including the project s test approach activities summary schedule and organizational and management aspects identified in the Project Plan preparation of a test environment including necessary hardware test tools and test data verification method for each business system and software requirement and the test levels in which it will occur and Page 16 of 26 Patrick M Kennedy Technical W
6. HWDD This data is used to build initial hardware used in testing The Design Verification phase verifies design concepts by test and ensures compatibility with the airplane and its electromagnetic environment The Red Label phase further refines the previous design work to build hardware that will be used in full qualification testing Once fully qualified the Black Label production program proceeds Page 6 of 26 Patrick M Kennedy Technical Writing Samples 1 0 Introduction the Sample System 1 1 Purpose The purpose of this document is to provide the objectives of the project the scope and describe the current situation of the Sample System for historical purposes 1 2 Information Asset Protection Policy This document conforms to the Computerized Systems Validation Policy CSVP version 3 0 of the Information Asset Protection Policies LAPP manual which states the following A statement of the current situation will be written to provide a historical reference documenting the rationale for the project The current situation may be documented as a part of a project justification request for capital or as a part of a requirements document This is a historical product 1 3 Objective The objective of the Sample System is to continue to support the tracking of all events related to sample accountability for a sales representative in accordance with FDA and DEA legislation In addition it is the objective of the Sample
7. Programmable registers can be used to specify temperature events and critical boundaries The EVENT pin is used to signal when different conditions occur based on how the registers are defined Serial Presence Detect Operation DDR2 SDRAM modules incorporate serial presence detect SPD The SPD function is implemented using a 2 048 bit EEPROM This nonvolatile storage device contains 256 bytes The first 128 bytes are programmed by Micron to identify the module type and various SDRAM organizations and timing parameters The remaining 128 bytes of storage are available for use by the customer System READ WRITE operations between the master system logic and the slave EEPROM device occur via a standard I C bus using the DIMM s SCL clock and SDA data signals together with SA 1 0 which provide four unique DIMM EEPROM addresses Write protect WP is tied to Vss on the module permanently disabling hardware write protect Page 5 of 26 Patrick M Kennedy Technical Writing Samples 1 INTRODUCTION to Electronic Compatibility 1 1 Scope This document applies to the Commercial Avionics Systems CAS electromagnetic compatibility EMC or electromagnetic interference EMI design processes for the design of airplane electrical electronic hardware It provides guidelines of EMC EMI techniques to be used by the designer on CAS designed equipment 1 2 Purpose The purpose of this document is to establish for the CAS hardware designer a unifo
8. System team to complete the 1999 Sample Regulations Project The purpose of this project is to implement changes to business and information systems that will the Company to be compliant with the new regulations published in December 1999 The changes include but are not limited to changes to Business procedures Internal systems Field systems Interfaces Purchased data Packaging The complete Purpose Scope and Approach to the 1999 Sample Regulations Project are explained in detail in the 1999 Sample Regulation Charter which supports this Statement of Current Situation It is also the objective to update the Sample System s validation documentation including some retrospective validation deliverables needed to become compliant with CSVP 1 4 Scope This Statement of Current Situation applies to the validation of the Sample System developed by the US Demand IT department Technology Center in association with the New Regulations Compliance Committee Compliance Manufacturing QA Legal and Distribution 1 5 Current Situation Page 7 of 26 Patrick M Kennedy Technical Writing Samples The Sample System process has been developed to support the tracking of all events related to sample accountability for every sales representative at the Company in accordance with FDA and DEA legislation These events include the shipment of sample product the receipt of a shipment the delivery of product samples the return of product samples the
9. layout and invoke the user proj doc bds_templates def_style_s style sheet Verify the Page 21 of 26 Patrick M Kennedy Technical Writing Samples style sheet using template style other style sheet name menu The style sheet can be changed depending on the number of indenture levels required or if the document requires more than one volume See Section 3 1 4 3 which describes dividing a document into more than one volume The following shows changes that can be made to the indenture levels 1 For five levels of subsection of indenture use user proj doc bds_templates def_style_s 2 For three levels of subsection of indenture use user proj bds_templates bds_style_l4_s 3 For documents with volumes user proj doc bds_templates volume_style_s c Change listing bullets into alphanumeric lower case per BDS 2065 standards d Comply with the deviation written to allow the subsequent text of lists and items to line up under the first line of the text rather than under the lower case letters or numbers that identify the sections e Add the appropriate Generic Title page Active pages Revision page Footers and Headers using the command Add_bds_pages in the command window within a DOC session Highlight the command and press the shell cmd key select the appropriate item 3 1 5 Distribution of a First Draft for Review The originator is responsible for developing a first draft copy of the document After the data has b
10. receipt of returned product samples the theft and loss of product samples and the re allocation of product samples from one representative to another representative In addition the system also supports the tracking of shipments directly to authorized physicians In December 1999 draft regulations were changed and finalized All manufacturers must comply by December 2000 These regulations state that samples must be tracked down to the lot number Currently lot numbers are printed on the packages and tracked to the sales representative The lot numbers are not currently tracked manually or otherwise to the physician level The new regulations also state that manufacturers must validate that a medical professional is eligible to receive samples per state law Currently the Sample System team is obtaining these license numbers improving the lot number tracking and developing procedures for this validation process The new FDA regulations describe what data must be gathered on requests and receipts Most of this data is currently captured in our systems and or documentation We will be compliant with these new regulations before December 2000 Page 8 of 26 Patrick M Kennedy Technical Writing Samples Testing is the process with the primary purpose of detecting errors and demonstrating that a system meets requirements and design specifications There are six processes of testing in the e Data Management Program Development Testing Uni
11. software problems that occur during the Formal Testing levels System and Client Acceptance Although not required this procedure could be used to log test problems during the Technical Testing levels Unit and Integration Page 19 of 26 Patrick M Kennedy Technical Writing Samples 1 INTRODUCTION to Creating amp Releasing Documentation 1 1 Scope This document establishes the CAS process for creating and releasing engineering documentation which is in the form of either a document e g HWRDs HWDDs or design guidelines or a book form drawing for hardware designs and design processes It is based on existing procedures and provides the functions to be followed and completed to ensure a document or book form drawing has met all the procedural and technical requirements It defines the steps for creating the document or book form drawing from its initial identification and definition through its final release and storage This document will be concerned with two areas of documentation documents and book form drawings In most cases the procedure is the same for both and in this document they will be addressed together as documentation Where the procedures for documents and book form drawings differ they will be addressed separately 1 2 Purpose The purpose of this document is to standardize the procedure and format for creating documentation needed in the CAS engineering design process and not the content of documentation wh
12. system This is a CSV required testing level and must be conducted on a qualified platform that emulates the production environment This is formal testing conducted by the system owner or designee to determine whether or not a system satisfies its original business objectives as described by the requirements documentation and to enable the customer to determine whether or not to accept the system It also must be conducted on a qualified platform that emulates the production environment Regression testing usually is performed by rerunning test cases to detect errors because of changes or corrections made during software development and maintenance This testing is conducted to ensure system change s implemented will not have adverse effects on other related parts of the system Regression testing may also be performed by updating existing or creating new test cases Page 9 of 26 Patrick M Kennedy Technical Writing Samples 3 2 Requirements Allocated to LRUs EMC EMI requirements are usually specified or allocated to CAS equipment at the LRU level Requirements defining both EMC EMI performance and hardware configuration are normally imposed 3 2 1 EMC EMI Performance Requirements EMC EMI performance requirements are specified by BCAG FAA usually in terms of LRU limits for radiated and conducted susceptibility and for radiated and conducted emissions a Radiated susceptibility these limits are based on the emission levels o
13. when updating tables or figures If the path is incorrect the table or figure will disappear from your file d Creation of Appendices 1 style sheet num_section_style_s 2 Menu create gt section gt show as Appendix at the point in the document the appendix will be inserted e Hide section and title Select yes e Include in table of contents Select yes e Execute the menu e Type APPENDIX number within the Appendix format codes Insert a center format code e Triple space below APPENDIX number and type the appendix title see BDS 2065 for formatting the Appendix title 3 Page numbering by section template gt page gt page numbering gt by section 4 Table and Figures are numbered by section number template gt tables gt by section or template gt pictures gt by section 3 1 4 5 Determine Mentor File Name and Path The CAS directory structure for the given design determines the Mentor file name and path All project support documents will be developed in the appropriate place in the Mentor directory under the appropriate LRU SRU or CM 3 1 4 6 Changing and Updating Existing Mentor Documents The following steps define the process for updating existing online Mentor Doc documents to ensure they meet the BDS 2065 standards a Delete from the existing template the section list page and other generic format codes b Run the update_pages macro within your DOC session This will reset the page
14. CL 3 Not recommended for new designs Por Pozssoo Ys ao Yo ES a f o o a o a S C mw o o e e l Page 3 of 26 Patrick M Kennedy Technical Writing Samples cron 2GB x72 DR 200 Pin DDR2 SDRAM VLP SORDIMM Pin Assignments and Descriptions L Table 5 Pin Descriptions ODTO Input On die termination ODT registered HIGH enables termination resistance internal to the SSTL_18 DDR2 SDRAM When enabled ODT is only applied to each of the following pins DO DOS DQS and DM The ODT input will be ignored if disabled via the LOAD MODE command CKO CKO Input Clock CK and CK are differential clock inputs All address and control input signals are SSTL_18 sampled on the crossing of the positive edge of CK and negative edge of CK Output data DQs and DQS DQS is referenced to the crossings of CK and CK CKEO Input Clock enable CKE registered HIGH activates and CKE registered LOW deactivates SSTL_18 clocking circuitry on the DDR2 SDRAM Input Chip select S enables registered LOW and disables registered HIGH the command SSTL_18 decoder All commands are masked when S is registered HIGH S provides for external rank selection on systems with multiple ranks S is considered part of the command code RAS CAS Input Command inputs RAS CAS and WE along with S define the command being WE SSTL_18 entered BAO BA2 Input Bank address inputs BAO BA2 define to which devi
15. Patrick M Kennedy Technical Writing Samples A Collection of Technical Writing Sample Pages Because of the Confidential and Proprietary nature of some the documents these pages are randomly taken from various documents Sample Pages from Micron Data Sheets cccccccscecssessecsecseceecesecnseeeeeseecseeeseseceseeeseecseeeeenaeenes 3 1 INTRODUCTION to Electronic Compatibility 2 00 cc cceecceseeseeeeceseceeeeeeeseceeeeaeeeeceaeeaeens 6 1 1 SCOPE aes chicks des cerad ith ETE Malas rete b te yen bladed enki de Dad cateeeu teu eeukd cceaai vedas cate catebasaees 6 1 2 PUrpOSe rar soe cabs use cians a e R Eea sands sos EA A A 6 1 3 EMC EMI Design Process Overview ccscsssssseseceseeseeeceaecaeeeceesecaeeeceesecaeeaeeeenaeeatees 6 1 0 Introduction the Sample System eesesesesesesssssesetssssssesestsstsesstsssseseesesssestrsessesesrestsseseeees 7 1 1 PUTPOS eenen anann in eas stecadsbastanses tests sdautn bedaeesaahs dmeacsecaezessuadacts petaeteahs RE neanstadaatn e E 7 1 2 Information Asset Protection Policy ccccecseesesseceteceseceeeceeeceeeeseeeeeneeeseeeseeeseeeeeesaees 7 1 3 ODOC Ve iyi oie BS ea E aa dana Sess aa aside ste a ea ee 7 1 4 SCOPE ertan aa a deadtck sc tslecust a oa land a a Mesa a a 7 1 5 Curent Situado ste an bel a T a a a a E a A EAE 7 3 2 Requirements Allocated to LRUS cccccccccsseesteceteceeceteeeeeeeseeeseecseecsaecaecnsecneenaeenes 10 3 2 1 EMC EMI Performance Requirements cccccce
16. ccccsseesseesseesecetecseceecneeseeees 21 3 1 4 5 Determine Mentor File Name and Path 0 cceecceseesseeeceeceseceeeeeeeseeneeeneeeees 21 3 1 4 6 Changing and Updating Existing Mentor Documents cceseeseeeeeeteeteees 21 3 1 5 Distribution of a First Draft for Review 0 cccccccccseeseesteceteceeceseceeceeeeseeesseeenseennes 22 1 0 Introduction ARIIS User s Manual 00 cc eeceeecescceceeceeeceseeaeeeecaecaeeeceeseceaeeneseeceaesaeeereeaeenee 23 1 1 IPUTPOSCs eet eta ed Shee E ee sel vcshaeebat opiaeea tates thes T E aae N 23 Page 1 of 26 Patrick M Kennedy Technical Writing Samples 1 2 COPE ave ctacncecesed E E E E she A de eas tuaccaatdadevebesvneriad dae ve E E EE 23 ZET Keyenc Laser Scantier isis ic s cecccoecdhsgeageedeodedaes abies sedeaeddahadaiesstaesaa cdavledoneidvaxeedeocs 24 2T Accessing SQC data Control Charts and Histograms cccccsscssessseeseesteeteeeeeees 25 2 8 Calibration Certafi Cat OM css csi ns cxccsseavasadevncdes eee vonehars E E R cakvaseauases ook ia Sa aa 25 2 8 1 Calibration and Certification of the Keyence LS 3100 Laser Scannet 4 26 2 8 2 Certification of NEAT 310M Mototr Stage cccccsccesseessesseecseeeseesecseceteenseeeeees 26 Page 2 of 26 Patrick M Kennedy Technical Writing Samples Sample Pages from Micron Data Sheets DDR2 SDRAM VLP SORDIMM MT18HVS25672RH 2GB For component data sheets refer to Micron s Web site http www micron com Fea
17. ce bank an ACTIVE READ WRITE or SSTL_18 PRECHARGE command is being applied BAO BA2 define which mode register including MR EMR EMR 2 and EMR 3 is loaded during the LOAD MODE command Input Address inputs Provide the row address for ACTIVE commands and the column address SSTL_18 and auto precharge bit A10 for READ WRITE commands to select one location out of the memory array in the respective bank A10 sampled during a PRECHARGE command determines whether the PRECHARGE applies to one device bank A10 LOW device bank selected by BAO BA2 or all device banks A10 HIGH The address inputs also provide the op code during a LOAD MODE command DMo DM8 Input Input data mask DM is an input mask signal for write data Input data is masked when DM SSTL_18 is sampled HIGH along with that input data during a WRITE access DM is sampled on both edges of DOS Although DM pins are input only the DM loading is designed to match that of DQ and DOS pins SCL Input Serial clock SCL is used to synchronize the presence detect and temperature sensor data aan Fe transfer to and from the module SAO SA1 Input Serial address inputs These pins are used to configure the presence detect and PSN ostttte ltonperatrosenordews RESET Input Disables the output clocks on the PLL when LOW a a laa DQo DQ63 1 0 Data input output Bidirectional data bus SSTL_18 CBO CB7 1 0 Check bits See a eae DQS0 DQS8 VO Data strobe Outp
18. csseeseesseeseeeseceecseeseeeseeeeeeeeeeeeenes 10 1 INTRODUCTION to PWB PWA Drawing Design Guide cccccceesesteeeteeeteeeteeeeeees 11 1 1 SCODE i oii ati e E EA davies sake canis E EO A A O O E ii 11 1 2 PUPP OSC ai e E eee esebeauce e a a E eE E EEE EE 11 Appendix A FABLINK PROCESS MENU DESCRIPTIONS c scssessessessessessessessesseeseeseees 12 1 1 Reload Design Information cccccccesseesseceseceteceseeeeceeeeseeeeeseeeseecseecsaecsaecnaeenseenaeenes 12 1 2 Create CAS Drawing ccccscccssecsseesseceseceeceseceeceeeeeseecseecssecsaecsaeceaecnseenseeeeeeseneeeneenges 13 1 2 1 Create Manual Parts List 0 eee ceceeseesececeeseeececeeseeeceaecaeeeeeeaecaaeeaeesecaeeaeseeeeaeeatees 14 2 00 Overall rest Plan ioris nt eosti a a e as edad act extatn est a a e taioeks incre cases 15 2 1 Test ProCeSS S nni eiaei EEE a E EE a E A E SEE AA R e a E Ea 15 2 1 Fest Planning a eera cist e EOE E Dotan eke R E EE 16 ZEZ Test EXECU ON aie a a cote oe E E E A EET 17 2 1 3 Problem Report Tracking cccecccescesscessceseeseeceeeeeseeesaeeeseeeseecsaecsaecnaecnsecnseenaeenes 19 1 INTRODUCTION to Creating amp Releasing Documentation ccccccesseeeteeeteceteeeteeees 20 1 1 SCOPE EET E E A E E EAE 20 1 2 IPUTP OSC aie aan a E ata tele E E A E ENS 20 1 3 Overview of the Process FIOW eccescsssseseeseceseeeeseeseceaeeseeseceaecaeeeeeeaecaaeeeeeaecnaeeneeeees 20 3 1 4 4 Notes Concerning Document Creations cc
19. een input and the graphics completed and inserted the originator develops a first draft copy of the document The first draft should follow the original outline as close as possible The first draft copy of the document is distributed by the originator to the key personnel and to the SMEs for review They are responsible to ensure the accuracy of the content and furnish the originator with concise notes critique added information or corrections Following are several optional methods for distribution and response of the document to the key personnel Page 22 of 26 Patrick M Kennedy Technical Writing Samples 1 0 Introduction ARIIS User s Manual 1 1 Purpose The purpose of this User s Manual is to provide basic operation guidelines that focus on the Automated Rivet Interference Inspection System ARIS processes that affect rivet inspection 1 2 Scope The ARIIS was developed to replace the time consuming inaccurate methods of measuring rivet interference for machine installed fluid tight applications ARIIS uses four main components that work collectively as an automated measurement system The four components are a single axis stepper motor a bench center a laser micrometer and a PC computer The ARIIS system runs on built software built and written in C programming language which instructs the stepper motor to move the rivet to precise locations and take laser measurements at those locations The ARIIS rivet inspection i
20. ents in modes three and four from the measurement in mode two The ARIIS software automatically configures the laser scanner to average 32 scans for each measurement This is a speed accuracy trade off The MANUAL EXE program uses the maximum 1024 scan averaging Page 24 of 26 Patrick M Kennedy Technical Writing Samples MAIN MENU item 4 gt Profile Plots allows the user to recall the latest profile plot for any coupon This profile can be sent to the printer or saved to a floppy disk if the ASK TO SAVE option is set The INTERFERENCE PLOTS utility allows the user to display up to five interference plots simultaneously This is useful for comparison purposes When this is selected from the HOST MENU the user is asked for the number of profiles to plot The next query is for a plot title The program will then request whether the profiles are in disk drive A or B When this is complete the filenames for the profiles will be requested one at a time The profiles will then be plotted with the title at the top and a legend on the right identifying the profiles by file name The plot can be sent to the printer with the lt Print Screen gt key 2 7 Accessing SQC data Control Charts and Histograms MAIN MENU items 5 gt Production SQC files and 6 gt Qualification SQC files allow the user to access data from the 50 most recent runs of any production or qualification coupon respectively When these are executed the user mus
21. est to ensure all preparations has been accomplished executing the specific tests in accordance with the Test Plan and Scripts and documenting the status of the Test Effort Test Execution is the activity which conducts analyzes and summarizes the results of software testing to verify that the system s internal logic and Page 17 of 26 Patrick M Kennedy Technical Writing Samples design satisfies the system requirements Its purpose is to identify and fix defects during development BEFORE the system is delivered to the customer Page 18 of 26 Patrick M Kennedy Technical Writing Samples Test Execution Process Flow Test Plan prepare Test Scripts Results Analyze and gt gt Conduct Test gt Summarize Test Scripts Results A Final Test Ready for Plans Test gt Test Readiness Se p 2 1 3 Problem Report Tracking Problem Report Tracking defines the activities for reporting assigning and closing problems that occur during System and Acceptance Test This includes establishing a Problem Reporting System to collect and track Problem Reports initiating Problem Report when problems are identified during test correcting the problem and closing the Problem Report and problem root cause analysis to improve both the test and development processes Test Problem Report Tracking is the activity for reporting assigning fixing and closing
22. f all nearby radio and radar transmitters including those installed on the airplane They specify the component s required radiated susceptibility threshold level below which it shall not be susceptible to radiated emissions b Conducted susceptibility these limits are based on the interference present on airplane power and signal systems and interference that can be coupled from nearby airplane cabling They specify the component s required conducted susceptibility threshold level below which it shall not be susceptible to conducted emissions They are usually specified in voltage current as a function frequency c Radiated emissions these limits are based on the threshold levels of intentional airplane receivers They specify the component s required radiated emissions limit above which radiated emissions shall not be allowed They are usually specified in dBu V M for narrowband and dBuV M MHz for broadband emissions d Conducted emissions these limits are based on the threshold levels of equipment that can be coupled to through interfacing cabling They specify the component s required conducted emissions limit above which conducted emissions shall not be allowed They are usually specified in voltage peak to peak as a function of frequency If the requirements are correctly applied and if the LRU complies with the limits then the LRU should be compatible with the airplane operational interference environment System EMC
23. he on line procedure that is available from the CAL CERT MENU in the ARIIS software Procedure l Exit the ARIIS program to DOS The Cal Cert password will work Initially it is cec Ensure the prompt is C ARITS gt 2 Execute attrib h r cal_fact dat to unprotect the calibration file for updating If cal_fact dat does not exist startup proceed to step 4 3 Verify the contents of the CAL_FACT DAT and the RLEXE or EV EXE files Insert the cal cert diskette that contains controlled copies of these files and execute comp a cal_fact dat cal_fact dat and comp a ri exe ri exe Renton or comp a ev exe ev exe Everett File comparisons should check out OK If not contact the responsible Facilities personnel 4 Type menu to enter the ARIIS HOST MENU select ARIIS and type the Cal Cert password to enter the ARIS MAIN MENU Select Calibration Certification Page 25 of 26 Patrick M Kennedy Technical Writing Samples and enter the cal cert password to reach the CERTIFICATION MENU Execute Keyence scanner calibration and motor stage certification as described in the details below 5 Return to DOS insert diskette type copy cal_fact dat a Remove and retain the diskette when complete 6 Type attrib h r cal_fact dat to protect it Type menu to return to MAIN MENU Calibration is complete 2 8 1 Calibration and Certification of the Keyence LS 3100 Laser Scanner Four diameter standards of at least 0 000025 in qualit
24. ich is defined in other documents When a new or revised document or book form drawing is released it is essential that it be complete accurate and controlled In this document when the text refers to a drawing it means a book form drawing This document does not replace the already existing documents that define standards but supplies an outline to assist the originator of documentation It helps to ensure that all procedures and standards are complied with while developing H W design process documentation 1 3 Overview of the Process Flow Figure 1 3 1 H W Design Documentation and Release Process illustrates the overview of the process This includes a Determining the need of documentation document or drawing b Identification of the documentation Creation of the documentation on the selected platform d Review and approval e Release and storage Page 20 of 26 Patrick M Kennedy Technical Writing Samples 3 1 4 4 Notes Concerning Document Creations The following are notes and hints of which the user should be aware when creating a document in Mentor Doc and using the BDS 2065 standards template a Do not substitute spaces for tabs Spaces are text dependent and they will not be constant from paginate to paginate b If the line spacing is inconsistent from line to line with stretched format codes verify the nominal font size and execute the associated menu layout gt set nominal font c Verify the path is correct
25. riting Samples development of test plans for each Test including the identification of Test Items Test Categories and the identification of Test Cases that will specify what types of tests will be conducted Test Planning is an activity that is a necessary preparation for the actual testing of the system or process In general testing is planned in a top down fashion starting with an overall plan Planning next occurs for the entire system through the lower levels of integrated units to the individual software units themselves Test Planning Process Flow Test Strategy Resources and Schedule i gt cise Generate Overall P g Project Test Plan rocess a Overall Project Test Pl Requirements Document as Design Documents Overall Project Program Specifications Y Test Plan Determine Client 3 3 Inventory of Test Acceptance Test System Tes saat haat Test ec so st Items Planning g g ing AA Determine Test Item Validation Methods Validation Approach 2 1 2 Test Execution Test Execution defines all the activities for conducting and reporting test results for each test level unit integration system client acceptance Test Execution includes preparing Test Scripts that identify the steps and expected results of each Test Case conducting a Test Readiness Review prior to System and Client Acceptance T
26. rm set of EMC EMI design practices for the design of CM PWB PWA SRU and LRU hardware Use of these design guidelines early in the design process will help to ensure the airplane EMC EMI design requirements are met in a consistent manner at minimum cost 1 3 EMC EMI Design Process Overview Figure 1 3 1 identifies the overall CAS H W design process phases and the major EMC EMI design tasks associated with each design phase During the Conceptual Design Phase the H W and EMC EMI designers develop the overall EMC EMI design approach Communications parameters are identified such as type of data data buses and the speed of signal The interfaces to airplane functions are specified and operating modes are identified The preliminary EMC EMI requirements are analyzed and allocated to the functional elements of the conceptual design These activities are accomplished in concert with System Engineering EMC EMI design approaches are defined for grounding bonding cable design enclosure design and circuit design During Preliminary Design the H W designer uses the conceptual design approach and requirements data to further define allocate the EMC EMI requirements for incorporation in the HWRD and development of the preliminary design The Detail Design phase then takes the preliminary design data and develops detailed circuit schematics and hardware design data The EMC EMI design is reviewed for compliance with requirements and documented in the
27. s currently being used in Everett as well as the East and West Factories in Renton in production for 737 747 757 767 and 777 wing riveting operations Spin off applications are forming with the inspection of cold work mandrels for wear receiving and inspection of new mandrels generic inspection of multiple fastener types inspection of fluid tight Low Voltage Electromagnetic Riveting LVEMR install rivets and as a tool to be used in conjunction with laboratory research Page 23 of 26 Patrick M Kennedy Technical Writing Samples MOTOR STAGE wai LASER SCANNER NEAT 310M CONTROLLER KEYENCE LS 3100 LASER SCANNER CONTROLLER COMPUTER OR DATA COLLECTOR OPTIONAL IBM PC COMPATIBLE LASER PRINTER 1 4 M FLOPPY DISK Figure 2 1 Hardware Configuration 2 1 1 Keyence Laser Scanner The Keyence laser scanner is a commercially available product that is capable of very precise diameter measurements It consists of a laser source that scans to produce a collimated plane of laser light that is roughly 2 5 in wide A receiver collects this laser light and detects breaks in the beam There are four modes of measurement provided Refer to figure 2 2 The ARIS software uses all four modes Direct diameter measurements are made using mode one for measurement of D1 D4 and button diameter Indirect diameter measurement is used for countersink diameter measurement and is made by subtracting measurem
28. sed in the FABLINK drawing process The shaded areas indicate the menu options selected for the step being described 1 1 Reload Design Information Drawing lJoutput S status Left Key Cursor Snap Display Grid Page Size Component Labels Text Style Draw Style Draw Path Width Dimension Style Dimension Pointer Size Net Highlight Icons Display Environment Security Warning View Sheet Property Config Create Group Figure A 1 Reload Design Information Before FABLINK can create the manufacturing drawings information specific to the design must be provided This information includes the number of layers the existence of a paste mask board assembly and model numbers etc FABLINK receives this information from two files under the design directory a default_artwork_stackup b data_file FABLINK draws this design information from these two files at startup If the information in either file is changed during a FABLINK session the latest design specific information must be reloaded into FABLINK The Reload Design Information menu option has been provided for this reason NOTE The Reload Design Information menu option is functional only if these two files exist in your system Page 12 of 26 Patrick M Kennedy Technical Writing Samples 1 2 Create CAS Drawings output setup status Left Key Create New Drawing Read Drawings Write Drawings Copy Drawing Part s Delete Drawing Part s
29. t Testing Integration Testing System Testing Acceptance Testing Regression Testing This is informal testing conducted during the development of a system or component usually in the development environment by the developer This is formal testing and debugging of the smallest functional part of a program It focuses on the early examination of the functionality of units of code ensures that functionality not visible at the system or acceptance level is examined by testing and pinpoints discrepancies between what an application software component does and what it is expected to do Paths conditions ranges limits and algorithms as written in the source code are tested A person other than the one who coded it must conduct this Unit testing This is an orderly progression of testing in which software elements hardware elements or both are combined and tested to evaluate their interactions until the entire system has been integrated It ensures that relationships between units and external interfaces properly function and perform according to the design specifications This is the process of testing an integrated hardware and software system to verify that the system meets its specified requirements and demonstrates the application s ability to meet the business objectives and system requirements This includes testing of security ER ES and performance requirements and functional testing that challenges the intended use of the
30. t select a coupon from the menus in the same manner as when inspecting a coupon The data file for the selected coupon is opened and nine SQC files are generated automatically The SQC program is then automatically loaded By selecting File and then Open from the SQC menu the following files will be available BTHEIGHT BTNDIA CSK CSKDIA D1 D2 D3 D4 and HOLEDIA When one of these files is selected the data can be viewed directly by selecting Edit from the SQC menu To enter or edit specification limits or title information select Options then Data File from the SQC menu By choosing Chart a menu of available plots is listed When a plot is selected and displayed several display options are available by typing the letter o while the plot is displayed To print a plot press lt Alt P gt while the plot is displayed Before printing a plot ensure the printer selection is correct and that fast print is turned off To do this select Options then Printer from the SQC MENU and verify the printer is HP Laser Jet and that Fast Print says NO To make changes of these entries press the Down Arrow to the one to change then press the Right Arrow key to change the selection until it is correct Press lt Esc gt to exit SQC MENU 2 8 Calibration Certification This section describes the actions required to calibrate and certify both the Keyence laser scanner and the NEAT 310M motor controller This is essentially a duplication of t
31. tures Figure 1 200 Pin VLP SORDIMM MO 224 e 200 pin very low profile small outline registered dual in line memory module VLP SORDIMM PCB height 17 9mm 0 70in Fast data transfer rates PC2 3200 PC2 4200 or PC2 5300 2GB 256 Meg x 72 Supports ECC error detection and correction VDD VDDQ 1 8V VDDSPD 3 0V to 3 6V e JEDEC standard 1 8V 1 0 SSTL_18 compatible Differential data strobe DOS DQS option J Fl I e 4n bit prefetch architecture prs ae Marang Multiple internal device banks for concurrent Operating temperature Sat operation Commercial 0 C lt Ta lt abe None e Programmable CAS latency CL si nial ictal S8C l Posted CAS additive latency AL a af kage 3 WRITE latency READ latency 1 CK 200 pin DIMM FD TEE Programmable burst lengths 4 or 8 Freguency GASMitency BER 2 e Adjustable data output drive strength seine C L 9 DDRZ 667 z097 64ms 8 192 cycle refresh a ie oct 5 De a On die termination ODT ae CL 3 DDR2 300 ee Serial presence detect SPD with EEPROM i PCB height nee e PLL to reduce system clock line loading Gold edge contacts Notes 1 Contact Micron for industrial temperature e Dual rank module offerings Table 1 Key Timing Parameters eee T Data Rate MT s Grade Nomenclature cL 6 ct s cr a cr s IC temperature sensor th CL CAS READ latency registered mode will add one clock cycle to
32. ughly intersects the rightmost portion of the measuring envelope This is where the rivet contacts the right or fixed chuck member Starting with the 0 1000 in increment zero the accumulator lt F10 gt then step ten steps to the left and ten steps to the right Verify the accuracy of each motion Repeat this procedure for jog increments of 0 0100 0 0010 and 0 0005 in All movements must be within 0 001 in of predicted Note The motor certification utility is useful for spot checks on laser scanner accuracy Press lt Enter gt and direct and indirect measurements are made that use the appropriate calibration factors All measurements taken with this utility should comply to within 0001 in of actual Page 26 of 26
33. ut with read data input with write data for source synchronous DQSO DOQS8 SSTL_18 operation Edge aligned with read data center aligned with write data DOS is only used when differential data strobe mode is enabled via the LOAD MODE command VO Serial data SDA is a bidirectional pin used to transfer addresses and data into and out of SSTL_18 the presence detect and temperature sensor devices EVENT Output Temperature sensor alarm output SSTL_18 me f _ _ Noconnect These pins shouldbeleftunconnected OO OOU Page 4 of 26 Patrick M Kennedy Technical Writing Samples cron 2GB x72 DR 200 Pin DDR2 SDRAM VLP SORDIMM General Description o General Description The MT18HVS25672RH I DDR2 SDRAM module is a high speed CMOS dynamic random access 2GB memory module organized in a x72 configuration This DDR2 SDRAM module uses internally configured 8 bank 2Gb TwinDie DDR2 SDRAM devices DDR2 SDRAM modules use double data rate architecture to achieve high speed opera tion The double data rate architecture is essentially a 4n prefetch architecture with an interface designed to transfer two data words per clock cycle at the I O pins A single read or write access for the DDR2 SDRAM module effectively consists of a single 4n bit wide one clock cycle data transfer at the internal DRAM core and four corre sponding n bit wide one half clock cycle data transfers at the I O pins A bidirectional data strobe
34. y cyclindricity are required Nominal diameter standards required are 0 1875 0 2500 0 3125 and 0 3750 in When 1 gt Calibrate Keyence Laser Scanner is selected from the CAL CERT MENU the computer will ask for the actual diameter of the first standard When this value is entered it will prompt for the clean standard to be placed in the chuck When this is done press lt Enter gt and the ARIIS will make 50 direct and indirect measurements of the standard The program will then execute a t statistic test If it finds a significant difference 95 confidence between the mean of the direct or indirect measurements and the actual for the standard a calibration factor s will be stored for that nominal diameter The program will then make another 50 measurements of the standard using the calibration factors and report the minimum and maximum values If any of the measurements exceed the nominal plus or minus 0 0001 in clean the standard and start over This procedure will be repeated until all four standards have been calibrated and 50 calibrated measurements direct and indirect are within acceptable range 2 8 2 Certification of NEAT 310M Motor Stage Stage displacement must be measurable within 0 0005 in Select 2 gt Motor Stage Certification from the CAL CERT MENU The system will enter the certification utility mode Follow the instructions to adjust the jog increment and move the stage left and right Position the motor stage so the laser ro
Download Pdf Manuals
Related Search
Related Contents
MANUAL DE INSTALACIÓN GLP "取扱説明書" Manual de Instruções, Instruction Manual, Manuel d`Instructions Conair BE151SNK makeup mirror MM - Van`s Aircraft, Inc. 調査票 - IPA 独立行政法人 情報処理推進機構 Quinta - Beyerdynamic 2 in. Triple Gauge Set XOTclIDE User Guide Copyright © All rights reserved.
Failed to retrieve file