Home

SL-18928 - Emerson Network Power

image

Contents

1. 17 6 1 2 Humidifier Supply Water Optional Infrared or Steam Generating Humidifier 17 6 2 Refrigerant Piping ziii n ode ke ee RAS AWG YF WN nS aes 18 7 0 PLENUM AND DUCTING CONSIDERATION OF SEISMIC lNSTALLATION 20 T1 Plenum Imnscillati n ves vete RY YD Vase idR Vd GY aw 20 T2 Duc Connections Ri cad cies eae eee aie ee EWR Ve Seas GU 21 8 0 ANCHOR AND LOAD REQUIREMENTS OF SEISMIC INSTALLATION 22 9 0 MAINTENANCE 225225504 o Sansa dt o nue Meee antes ee EA wee ele EE 23 9 1 Seismic Bracing yy un DD TIE SRI ea a Ge Ba eae uates 23 9 1 1 Temporary Service 4 23 9 2 Inspection of System 23 9 3 Post Seismic 24 Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figure 7 Figure 8 Figure 9 Figure 10 Figure 11 Table 1 Table 2 Table 3 Table 4 Table 5 Table 6 FIGURES Dimensions foot details for 18 48 457 1219mm high floor stands Liebert DSE 080 165 Dimensions foot details for 7 178mm high floor stands Liebert DSE 080 165 Seismic anchoring dimensions 7 178mm floor stands DA080 DA165 Seismic anchoring 5 0 80 085
2. Operating mass includes the operating refrigerant and water volume floor stand and plenum Liebert DSE IBC Seismic Supplement 22 Maintenance 9 0 MAINTENANCE A Risk of electric shock Can cause injury or death Open all local and remote electric power disconnect switches before working within Before proceeding with installation read all instructions verify that all the parts are included and check the nameplate to be sure the voltage matches available utility power The Liebert iCOM microprocessor does not isolate power from the unit even in the Unit Off mode Some internal components require and receive power even during the Unit Off mode of the Liebert iCOM control The factory supplied optional disconnect switch is inside the unit The line side of this switch contains live high voltage With disconnect Off check for voltage on the load side The only way to ensure that there is NO voltage inside the unit is to install and open a remote disconnect switch Refer to unit electrical schematic Follow all local codes A Risk of high speed moving parts Can cause injury or death Open all local and remote electric power disconnect switches before working in the unit 9 1 Seismic Bracing Liebert DSE units supplied with the seismic option can be easily identified once the panels are removed All seismic bracing is painted red and is factory installed Seismic bracing should not be removed except when abso
3. Seismic anchoring dimensions DA125 150 165 Electrical wiring seismic 1 Horizontal expansion loop iu Ege pev eT BEE WA ne E Vertical expansion 1000 et ET RE FF WG Gab eile quee Piping seismic considerations Plenum seismic mounting data Liebert DA080 085 Seismic duct connection considerations 0 0 0 ee eee GG uu TABLES Liebert DSE on factory built seismic floor stand and factory installed seismic option Liebert DSE on factory built seismic floor stand Dimensions 18 48 457 1219mm high floor stands Liebert DSE 080 165 Dimensions for 7 178mm high floor stands LIebert DSE 080 165 Dimensions in Figure 8 Downflow Liebert DSE models DA085 165 on floor stand with 18 457mm filter plenum IMPORTANT SAFETY INSTRUCTIONS This manual contains important safety and installation instructions not included in the Liebert DSE user manual SL 18925 The information in this manual is not a substitute for the data in the Liebert DSE user manual but provides additional information required for units equipped with the seismic option The information in this manual should be read
4. E and F are all covered under this certification limited by the Sg value stated above A seismic importance factor Ip of 1 5 applies to this certification to include essential facility requirements and life safety applications for the Liebert DSE system s functionality after a seismic event Shake table testing conducted in accordance with ICC ES AC 156 enveloped a required response spectrum RRS defined in the tables below Liebert DSE IBC Seismic Supplement 4 Introduction Table 1 Liebert DSE on factory built seismic floor stand Soil Class S 51 Sds Sa1 F zlih D 1 50 0 64 1 00 0 64 1 1 5 1 AFLEX Horizontal ARIG Horizontal AFLEX Vertical ARIG Vertical 1 60 1 20 0 67 0 27 Table 2 Liebert DSE on factory built seismic floor stand and factory installed seismic option Soil Class S Sis Sas Fa Fy 2 D 3 75 1 28 multiple 1 28 1 1 5 1 0 Sds AFLEX Horizontal ARIG Horizontal AFLEX Vertical ARIG Vertical 2 00 3 20 2 40 N A N A 2 50 N A N A 1 68 0 68 A Liebert DSE as described above is approved for seismic application as a system when properly installed in the following configurations Liebert DSE unit with factory installed seismic option attached directly to a housekeeping pad using the anchoring system defined in this document Liebert DSE unit with factory installed seismic option and with factory
5. Risk of improper wiring piping moving lifting and handling Can cause equipment damage injury or death Installation and service should be done only by personnel who have been properly trained and qualified in the installation of air conditioning equipment WARNING Risk of overheated electrical connection terminals Can cause wiring and component damage smoke and fire resulting in building damage serious injury or death Use copper wiring only Make sure that all connections are tight 15 Liebert DSE IBC Seismic Supplement Electrical Considerations of Seismic Installation Figure 6 Electrical wiring seismic considerations Factory installed Unit Disconnect Switch optional Field supplied disconnect EH switch when factory x WN installed unit disconnect GG Monitoring switch is not provided Panel ap d Three phase electrical and low voltage m connections not by Emerson ue UNS See a Seismic Compensation Flexible conduit and conductors must be provided to allow the unit to move in three dimensions during a seismic event The flexible conduit must have at least one bend between the rigid connection at the unit cabinet and the connection to the rigid DPN002538 conduit or foundation Pg 8 Rev 2 Liebert DSE IBC Seismic Supplement 16 Piping Considerations of Seismic Installation 6 0 PIPING CONSIDERATIONS O
6. The only way to ensure that there is NO voltage inside the unit is to install and open a remote disconnect switch Refer to unit electrical schematic Follow all local codes WARNING Risk of high speed moving parts Can cause injury or death Open all local and remote electric power disconnect switches before working in the unit WARNING Risk of top heavy unit falling over Can cause equipment damage injury or death Read all of the following instructions before attempting to move lift remove packaging from or prepare the unit for installation WARNING Risk of seismic event Can cause equipment damage injury or death Unit must be welded to the floor stand and anchored to the floor or housekeeping pad If not mounted on a floor stand the unit must be anchored to the floor or housekeeping pad WARNING Risk of arc flash infrared exposure hazardous fumes and toxic gases during welding operations Can cause eye skin and serious respiratory system choking and breathing problems Welding may produce fumes and gases hazardous to health Avoid breathing these fumes and gases Use adequate ventilation Only properly trained and qualified personnel wearing appropriate safety headgear gloves shoes skin and eye protection should be welding 1 Liebert DSE IBC Seismic Supplement A WARNING Risk of concrete failure and or loose or unsecured mounting anchors Can cause unit to fall over or move during a seismic e
7. position the blowers will not lower into the floor stand Pg 5 Rev 2 Table 3 Dimensions 18 48 457 1219mm high floor stands Liebert DSE 080 165 Dimensions in mm Height H Model Overall Unit Length A B Nominal In mm DA080 085 100 2540 99 2515 33 838 18 457 DA125 150 165 144 3658 142 3607 45 1143 24 610 Source DPNO02538 Rev 2 30 762 36 914 42 1067 48 1219 9 Liebert DSE IBC Seismic Supplement Floor and Floor Stand Seismic Mounting Figure 2 Dimensions foot details for 7 178mm high floor stands Liebert DSE 080 165 7 178mm DPNO002538 7 178mm Foot Detail Pg 6 Rev 2 No adjustment on 7 178mm floor stands Table 4 Dimensions for 7 178mm high floor stands Llebert DSE 080 165 Dimensions in mm Model Overall Unit Length A B DAO80 085 100 2540 99 2515 33 838 DA125 150 165 144 3658 142 3607 45 1143 Source DPN002538 Rev 2 Liebert DSE IBC Seismic Supplement 10 Floor and Floor Stand Seismic Mounting 4 1 2 Floor Stand Anchoring See Figure 3 for weld and anchoring details of 05080 DA165 7 178mm floor stands Figure 4 for weld and anchoring details of DS080 085 floor stands and Figure 5 for weld and anchoring details of DS125 165 floor stands 1 2 Check the proposed finished floor height Turn the floor stand over and screw the feet on the bottom until the measurement fr
8. Clearance requirements are dependent on the system mounting Refer to 4 1 Anchoring Systems for recommendations The post installed anchors used for unit anchoring must be pre qualified for seismic applications in accordance with ACI 335 2 and documented in a report by a reputable testing agency such as the Evaluation Service Report issued by the International Code Council Anchors must be installed to the torque specifications recommended by the anchor manufacturers to ensure maximum loading Wide washers sized to match the nominal diameter of the specified anchors must be used at each anchor location For tension load distribution the washer is to be placed between the anchor head and the connected equipment The washers are to be Type A Series W plain washers per ANSI B18 22 1 1965 R1975 The floor or housekeeping pad must be rebar reinforced structural concrete that is designed and approved by the structural engineer of record to resist the added seismic loads from components being anchored to the floor see 3 0 Site Requirements of Seismic Installation When installing anchors rebar interference must be considered The installing contractor is responsible for the proper installation of all anchors and mounting hardware observing the mounting requirement details outlined by the structural engineer of record NOTE The floor stand used with EC units is not symmetrical and its orientation to the Liebert DSE is critical to lowerin
9. Corporation All names referred to are trademarks or registered trademarks of their respective owners SL 18928 _REV1_03 14 Emerson Network Power Liebert www emerson com Technical Support Service Web Site www liebert com Monitoring liebert monitoring emerson com 800 222 5877 Outside North America 00800 1155 4499 Single Phase UPS amp Server Cabinets liebert upstech emerson com 800 222 5877 Outside North America 00800 1155 4499 Three Phase UPS amp Power Systems 800 543 2378 Outside North America 614 841 6598 Environmental Systems 800 543 2778 Outside the United States 614 888 0246 Locations United States 1050 Dearborn Drive P O Box 29186 Columbus OH 43229 Europe Via Leonardo Da Vinci 8 Zona Industriale Tognana 35028 Piove Di Sacco PD Italy 39 0499719111 Fax 39 049 5841 257 Asia 29 F The Orient Square Building F Ortigas r Road Ortigas Center Pasig City 1605 Philippines 63 26876615 Fax 63 2 730 9572 www EmersonNetworkPower com
10. and 2012 compliance requirements All anchors listed and any housekeeping pad must be installed to meet compliance Anchors must be installed per ICC ESR instructions Special inspection per IBC Section 1704 is required on all installations Refer to Figure 5 for dimensions and anchoring locations Liebert DSE AII Models 24 concrete expansion anchors 24 Type A Series W plain washers NOTICE Risk of structural damage Drilling holes all the way through the floor or housekeeping pad may cause damage to the structure and can result in damage to lower floors Drilling holes that penetrate either the floor or the housekeeping pad must be properly filled and sealed NOTE The seismic floor stand is not symmetrical and its orientation to the Liebert DSE unit is critical Unless the floor stand is installed in the correct position features such as turning vane and EC plug fans may not function properly Liebert DSE IBC Seismic Supplement 8 Floor and Floor Stand Seismic Mounting Figure 1 Dimensions foot details for 18 48 457 1219mm high floor stands Liebert DSE 080 165 4 6 117mm i Foot Detail Foot provides 1 4 6mm adjustment from nominal height The floor stand is not symmetrical and its orientation to the Liebert DSE is critical to lowering the EC fans Unless the floor stand is installed in the correct E DPNO002538
11. carefully and used to ensure compliance with the International Building Code Special inspection per IBC Section 1704 is required during all installations Read this document and the Liebert DSE user manual SL 18925 thoroughly before attempting to install or operate this unit Only properly trained and qualified personnel should move install or service this equipment Adhere to all warnings cautions and installation operating and safety instructions on the unit in the Liebert DSE user manual SL 18925 and in this manual Follow all operating and user instructions SAVE THESE INSTRUCTIONS A gt gt WARNING Arc flash and electric shock hazard Open all local and remote electric power disconnect switches and wear protective equipment per NFPA 70E before working within the electric control enclosure Failure to comply can cause serious injury or death Before proceeding with installation read all instructions verify that all the parts are included and check the nameplate to be sure the voltage matches available utility power The Liebert iCOM microprocessor does not isolate power from the unit even in the Unit Off mode Some internal components require and receive power even during the Unit Off mode of the Liebert 1COM control The factory supplied optional disconnect switch is inside the unit The line side of this switch contains live high voltage With disconnect Off check for voltage on the load side
12. eye skin and serious respiratory system choking and breathing problems Welding may produce fumes and gases hazardous to health Avoid breathing these fumes and gases Use adequate ventilation Only properly trained and qualified personnel wearing appropriate safety headgear gloves shoes skin and eye protection should be welding 11 Liebert DSE IBC Seismic Supplement Floor and Floor Stand Seismic Mounting Figure 3 Seismic anchoring dimensions 7 178mm floor stands DA080 DA165 Anchor Detail 2 Typical 8 Places 51mm I Anchor Places ANSI B18 22 1 1965 R2003 d vh Type A Series W Plain n 2 Washer Required at 51mm Each Anchor Location O t F1 T Minimum Minimum Embedm nt Section B B Pad B B Minimum Hole Thickness Depth Uu Q Specified by Engineer of Record Floor Anchoring Dimensions a C B Field Welding of Unit to Floor Stand Unit Must Be Welded to Floor Stand to Maintain Certification 1 8 3mm Typ y 5 H Anchor bolt sized per Hilti Kwik Bolt TZ carbon and stainless in concrete ICC ESR 1917 DPN002538 Alternates are subject to review by Emerson or engineer of record Pg 2 Rev 2 Table 5 Dimensions in Fi
13. supplied plenum Plenums must be flexibly attached to the duct system if applicable Unit and plenum must be anchored as defined in this document Liebert DSE unit with factory installed seismic option installed on an Emerson supplied IBC certified floor stand and attached securely to the building structure The floor stand and mounting system must be Emerson catalog items purchased from Emerson The system must be anchored as specified in this document The certification excludes all non Emerson supplied accessories including but not limited to floor stands isolators and restraints Use of non Emerson accessories will void IBC certification of the Liebert DSE system 5 Liebert DSE IBC Seismic Supplement Site Requirements of Seismic Installation 3 0 SITE REQUIREMENTS OF SEISMIC INSTALLATION All floor and housekeeping pads must be approved by the structural engineer of record to resist the added seismic loads from components being anchored as specified in 8 0 Anchor and Load Requirements of Seismic Installation When anchoring the Liebert DSE to a floor rebar interference must be considered The minimum housekeeping pad thickness must be the thickness required by the qualification report for the selected post installed anchor or 1 5 times the depth the anchor is embedded whichever is greater A WARNING Risk of concrete failure and or loose or unsecured mounting anchors Can cause unit to fall over or
14. 150 165 Anchor Detail Typical 8 Places ANSI B18 22 1 1965 R2003 Type A Series W Plain Washer Required at Each Anchor Location Minimum n Embedment Minimum Hole Thickness Depth C Specified By Engineer Of Record Floor Anchoring Dimensions 140 1 2 3569mm e 81 3 2064mm 22 559mm 43 1 2 1105mm E ae 83mm 6 1 2 165 Anchor bolt sized Hilti Kwik Bolt TZ carbon and stainless in concrete ICC ESR 1917 Alternates are subject to review by Field Welding of Unit to Floor Stand Emerson or engineer of record Unit Must Be Welded to Floor Stand to Maintain Certification a 4 102mm 4 102mm T Anchor Size 1 2 12 7mm 2 2 51mm 51mm to li EU _ z T BE 118 2 51mm 2 2 51mm 2 3mm DPN002538 51mm 51mm Pg 4 Rev 2 Liebert DSE IBC Seismic Supplement 14 Electrical Considerations of Seismic Installation 5 0 ELECTRICAL CONSIDERATIONS OF SEISMIC INSTALLATION Input power and control wiring connections to the Liebert DSE must be flexible and able to withstand movement in three dimensions Relative motion caused by a seismic event must be absorbed to prevent damage to the unit buildi
15. Background The International Code Council s International Building Code IBC is the primary code document for the design and installation of building systems This has brought about increased scrutiny of mechanical and electrical equipment that is used in the operation of facilities particularly those buildings designated as essential facilities Previously codes focused only on preventing equipment from breaking free from anchoring and becoming projectiles and did not consider its structural integrity These new codes depending on the Use Group and Importance Factor of the building may require equipment to function after a seismic event IBC 2009 and 2012 has made the manufacturer of mechanical and electrical equipment responsible for designing testing and certifying systems Emerson through a recognized approved agency has conducted analytical modeling and dynamic shake table testing of the Liebert DSE to provide an option for those systems requiring seismic certification of compliance The seismic shake table testing was conducted in accordance with ICC ES AC 156 This certification goes beyond the equipment s ability to withstand seismic forces The IBC system approach includes the equipment equipment anchoring and the connections to the equipment power water supply and return and ducting In essential applications the equipment must be capable of performing its primary function after a seismic event within the limit of certif
16. F SEISMIC INSTALLATION All fluid connections to the unit must be flexible and able to withstand movement in three dimensions Relative motion caused by a seismic event must be absorbed to prevent damage to the unit building structure and piping It is recommended that all connections to the unit are made as low as possible 6 1 Fluid Connections Risk of water leaks Can cause unit and or building damage This unit requires a water drain connection and an external water supply to operate Improper installation application and service practices can result in water leakage from the unit Do not install this unit above equipment or machines that could be damaged by leaking water Do not install equipment or machines that could be damaged by leaking water below this unit Emerson recommends installing leak detection equipment for unit and supply lines 6 1 1 Condensate Piping Field Installed A Risk of boiling water Can cause personal injury The unit requires a drain line that may contain boiling water Only properly trained and qualified personnel wearing appropriate safety equipment should service the drain line or work on parts near or connected to the drain line Whether supplied with 3 4 NPT gravity drain connection or 1 2 copper sweat connection from a factory installed condensate pump the drain line of the unit will require a flexible element to permit movement When selecting a suitable flexible element consider the following The drain line
17. Liebert DSE IBC Seismic Supplemental User Manual 80 165kW Downflow m ETT i JE E Cm N AN es EMERSON WIS Danas Network Power TABLE OF CONTENTS IMPORTANT SAFETY 5 1 SAVE THESE INSTRUCTIONS OE seen ses 1 1 0 LIEBERT DSE NOMENCLATURE 3 2 0 INTRODUCTIONS thaws ad obec Y ea wate a See eee 4 2 1 BackPfOound4s Me oe OU ae du m MM te a e Dod eee ud 4 2 2 Determining Whether Unit is IBC Compliant 4 2 3 Certification Criteria os Uer Soe ere a ote BAe INE SEEN cadre Ge eg ES dus 4 3 0 SITE REQUIREMENTS OF SEISMIC 5 6 4 0 FLOOR AND FLOOR STAND SEISMIC MOUNTING 7 4 1 Anchoring Systems 5222555 avr EL CENSURE EATER RNC Ime RATIS IEEE 7 4 1 1 Floor Stand Anchoring Requirements for Seismic Installations 8 4 1 2 Floor Stand Anchoring LG FF eer es 11 5 0 ELECTRICAL CONSIDERATIONS OF SEISMIC lNSTALLATION 15 6 0 PIPING CONSIDERATIONS OF SEISMIC 17 6 1 Connections NU 17 6 1 1 Condensate 1 amp 14
18. e Improper installation application and service practices can result in water leakage from the unit Water leakage can result in severe property damage and loss of critical data center equipment Do not install this unit above equipment or machines that could be damaged by leaking water Do not install equipment or machines that could be damaged by leaking water below this unit Emerson Network Power recommends installing leak detection equipment for unit and supply lines NOTICE Risk of structural damage Drilling holes all the way through the floor or housekeeping pad may cause damage to the structure and can result in damage to lower floors Drilling holes that penetrate either the floor or the housekeeping pad must be properly filled and sealed Liebert DSE IBC Seismic Supplement 2 Liebert DSE Nomenclature 1 0 LiEBERT DSE NOMENCLATURE 10 11 12 13 14 gt 4 2 5 9 1 2 D A Product Family DA Downflow Standard Nominal kW 80 165 Air Discharge D Downflow R Front Air Supply System Type A Air Cooled W Water Glycol P Air Cooled with EconoPhase Airflow fan type 1 EC Plug fans H EC Plug fans with THD filter Voltage A 460 3 60 B 575 3 60 C 208 3 60 D 230 3 60 2 380 3 60 Factory Configuration Number 000 999 3 Liebert DSE IBC Seismic Supplement Introduction 2 0 INTRODUCTION 2 1 2 2 2 3
19. g the EC fans Unless the floor stand is installed in the correct position the blowers will not lower into the floor stand Anchoring Systems Units installed on floor stands must be welded to the floor stand as specified herein Emerson provides a floor stand and mounting systems as selectable items that are IBC certified and matched to the Liebert DSE The unit certification is valid only with the Emerson IBC certified matched floor stand Clearances behind the unit of floor stand mounted systems require space for access to the system anchoring points and clearance for unit movement during a seismic event 7 Liebert DSE IBC Seismic Supplement Floor and Floor Stand Seismic Mounting 4 1 1 Floor Stand Anchoring Requirements for Seismic Installations Anchoring Requirements Without a Floor Stand Anchor selection must meet or exceed IBC 2009 and 2012 compliance requirements All anchors listed and any housekeeping pad must be installed to meet compliance Anchors must be installed per ICC ESR instructions Special inspection per IBC Section 1704 is required on all installations Liebert DSE DA080 085 Twelve 12 concrete expansion anchors Twelve 12 Type A Series W plain washers Liebert DSE DA125 150 165 Sixteen 16 concrete expansion anchors Sixteen 16 Type A Series W plain washers Anchoring Requirements with a 7 inch 178mm Floor Stand Anchor selection must meet or exceed IBC 2009
20. gure 3 A B D Model in mm in mm in mm in mm DA080 DA085 32 5 826 65 1651 97 5 2477 31 5 800 1 2 2 51 4 102 DA125 DA150 DA165 45 5 1156 93 2362 140 5 3569 43 5 1105 Source DPN002538 Rev 2 Liebert DSE IBC Seismic Supplement 12 Floor and Floor Stand Seismic Mounting Figure 4 Seismic anchoring dimensions DA080 085 Anchor Detail Typical 8 Places SF ANSI B18 22 1 1965 R2003 Type A Series W Plain Washer Required at Each Anchor Location Minimum Pad Thickness p LJ LJ Minimum Specified by Engineer of Record Floor Anchoring Dimensions 97 1 2 2477mm 48 8 1238mm Embedment Minimum Hole AS 1 Depth P di amp RSS 31 1 2 6 1 2 165mm Field Welding of Unit to Floor Stand Unit Must Be Welded to Floor Stand to Maintain Certification 4 zd 102mm Anchor Size 1 2 12 7 mm 2 51mm 51mm 51mm y 2 51mm 9n 51mm 51mm Anchor bolt sized per Hilti Kwik Bolt TZ carbon and stainless in concrete ICC ESR 1917 Alternates are subject to review by Emerson or engineer of record DPNO002538 Pg 3 Rev 2 13 Liebert DSE IBC Seismic Supplement Floor and Floor Stand Seismic Mounting Figure 5 Seismic anchoring dimensions DA125
21. ic application of flexible loops DPNO02538 Pg 9 Rev 2 19 Liebert DSE IBC Seismic Supplement Plenum and Ducting Consideration of Seismic Installation 7 0 PLENUM AND DUCTING CONSIDERATION OF SEISMIC INSTALLATION 7 1 Plenum Installation Seismic certified installation of Liebert plenums requires the plenum to be securely attached to the top of the unit Refer to the plenum instructions 197652P1 included with the plenum for details A WARNING Risk of improper plenum mounting Can cause equipment damage injury or death in a seismic event A WARNING Risk of high speed moving parts Can cause injury or death Open all local and remote electric power disconnect switches before working in the unit A WARNING Risk of top heavy unit falling over Can cause equipment damage injury or death Read all of the following instructions before attempting to move lift remove packaging from or prepare the unit for installation All clips and fasteners are required maintain IBC certification of conformity Figure 10 Plenum seismic mounting data Liebert DA080 085 3 8 97mm Top Duct Opening Shown See Specification Sheet for Specific Application Plenum Hold Down Clip Detail Front Panel Removed For Clarity 1 4 Self Drilling Screws Through Clip Into Unit Top and Plenum Panel Flange Screws Required 18 Hold Down Clips Required 6 All clips and fasteners a
22. ication NOTE An approved agency is defined by IBC section 1702 as An established and recognized agency regularly engaged in conducting tests or furnishing inspection services when such agency has been approved Determining Whether a Unit is IBC Compliant The catalog Liebert DSE unit is IBC compliant to a maximum 5 of 1 50g 1 50 times the force of gravity units must be ordered with the factory built seismic floor stand To be IBC compliant to a maximum level of S of 3 75g units must be ordered with the factory installed seismic bracing option Liebert DSE units with the seismic bracing option will have Certification label near the unit nameplate behind the front panel Certificate of compliance included in the customer envelope with this manual Factory installed seismic bracing components Factory built seismic floor stand NOTE Factory installed seismic bracing components are painted red and must not be removed Certification Criteria Liebert DSE units equipped with the seismic option are certified to a maximum 5 of 3 75g 3 75times the force of gravity adjusted by the soil site coefficient to Soil Site Class D as the default when neither the site soil properties nor the final equipment installation location is known The certification maximum Sg value of 3 75g includes Soil Class and Seismic Use group corrections Soil Classes A D E Seismic Use groups I II III IV and Seismic Design Categories
23. lutely necessary If any bracing is removed for service access reinstall it immediately after servicing unit 9 1 1 Temporary Service Access A Risk of unit collapse Can cause injury or death Braces are required for seismic certification If removed for service access reinstall brace after servicing unit Seismic bracing is fastened to the unit frame with 1 4 self drilling screws or bolts requiring a 3 8 10mm wrench for removal Any bracing removed for service must be reinstalled and the 1 4 fasteners must be tightened to 10 ft lb 13 5Nm If a screw is stripped out install a replacement at a new location within 1 2 12mm of the original location 9 2 Inspection of System Connections Check all connections to the system during routine maintenance and take appropriate action to correct any issues System maintenance schedules must be established and performed 23 Liebert DSE IBC Seismic Supplement Maintenance 9 3 Post Seismic Inspection Many areas of the country that are subject to seismic activity are working to draft local and national guidelines and procedures for evaluating earthquake damaged buildings and equipment In 1989 with funding from the California Office of Emergency Services California Office of Statewide Health Planning and Development and the Federal Emergency Management Agency the Applied Technology Council ATC published the ATC 20 Procedures for Post Earthquake Safety Evaluation of Buildings Ins
24. may contain boiling water Drain is trapped internally Do not trap external to the equipment Gravity drain line must be sized for 2 gpm 7 61 l m flow Condensate pump discharge sized based on available head Drain line must comply with all applicable codes 6 1 2 Humidifier Supply Water Optional Infrared or Steam Generating Humidifier When selecting a suitable flexible element permitting movement in three dimensions of sufficient length to make up for the maximum displacement consider the following The humidifier supply connection is 1 4 copper line with a maximum water pressure of 150 psi 1034kPa Size the supply line for 1 gpm 3 8 l m with a minimum water pressure of 20 psi 138kPa 17 Liebert DSE IBC Seismic Supplement Piping Considerations of Seismic Installation 6 2 Refrigerant Piping The refrigerant connections of the Liebert DSE as with all connections require a flexible element permitting movement in three dimensions to avoid damage to the unit structure or piping system For these connections Emerson recommends flexible expansion loops Loops typically consist of two flexible sections of convoluted stainless or bronze metallic hose with braided cover two elbows and 180 return section with or without support bracket These loops minimize the seismic loads to the piping system anchor points Depending on the manufacturer the connections to the loop are available in female copper sweat NPT
25. move during a seismic event resulting in building damage injury or death Installation in structural lightweight concrete is not permitted unless otherwise approved by the structural engineer of record Structural engineer of record is defined as The registered design professional responsible for the design of the designated seismic systems on the building construction documents Contact your Emerson representative if a detailed Seismic Installation Calculation Package is required The information required to perform the calculations should include but not be limited to Floor Data Concrete compressive strength and aggregate content Slab or lightweight concrete over metal deck Thickness Type of reinforcement rebar wire mesh or none Housekeeping Pad Concrete compressive strength and aggregate content Length width and thickness Type of reinforcement rebar wire mesh or none Doweled to floor or integrated Liebert DSE IBC Seismic Supplement 6 Floor and Floor Stand Seismic Mounting 4 0 FLOOR AND FLOOR STAND SEISMIC MOUNTING 4 1 Whether floor mounted or installed on a floor stand the Liebert DSE must be anchored to the floor or housekeeping pad Field welding is required for seismic installations In addition to the clearances specified in the Liebert DSE user manual SL 18925 clearance is required behind the unit to prevent damage to the equipment or building structure in a seismic event
26. ng structure and wiring It is recommended that all connections to the unit be made as low as possible The flexible connection should include at least one bend between the unit connection location and the first clamping point at the foundation or structure It must be of sufficient length to makeup for the maximum displacement indicated in Figure 6 A A A A WARNING Risk of electric shock Can cause injury or death Open all local and remote electric power disconnect switches before working within unit electrical enclosures Before proceeding with installation read all instructions verify that all the parts are included and check the nameplate to be sure the voltage matches available utility power The Liebert iCOM microprocessor does not isolate power from the unit even in the Unit Off mode Some internal components require and receive power even during the Unit Off mode of the Liebert 1COM control The factory supplied optional disconnect switch is inside the unit The line side of this switch contains live high voltage With disconnect Off check for voltage on load side The only way to ensure that there is NO voltage inside the unit is to install and open a remote disconnect switch Refer to unit electrical schematic Follow all local codes WARNING Risk of high speed moving parts Can cause injury or death Open all local and remote electric power disconnect switches before working in the unit WARNING
27. om the bottom of the foot to the top surface of the upper tube eguals the finished floor height Turn the floor stand right side up Place the floor stand in the final location in the correct orientation NOTE The floor stand used with EC units is not symmetrical and its orientation to the Liebert DSE 10 is critical to lowering the EC fans Unless the floor stand is installed in the correct position the blowers will not lower into the floor stand Level the stand by turning the foot isolator up or down as necessary Make sure all feet isolators are firmly resting on the floor Tighten foot isolator Jam nuts to prevent movement Mark foot isolator hole locations on the floor or housekeeping pad Remove floor stand and set floor stand aside Drill holes and install anchors according to the manufacturer s recommendations Set the floor stand into position over the anchor studs and tighten all hardware to the manufacturer s torgue specifications Position the unit on the floor stand and weld the unit base to the floor stand gussets using a 1 8 3mm continuous weld See Figures 3 4 and 5 A WARNING Risk of top heavy unit falling over Can cause equipment damage injury or death Read all of the following instructions before attempting to move lift remove packaging from or prepare the unit for installation A WARNING Risk of arc flash infrared exposure hazardous fumes and toxic gases during welding operations Can cause
28. pections outlined in the document may be required by areas that have adopted ATC 20 and must be performed by a qualified individual The Liebert DSE seismic certification of conformity is an assurance that the system will withstand a seismic event occurring within the defined limits of 2 3 Certification Criteria and continue to perform the primary function of cooling After any significant seismic event greater than magnitude 6 5 Emerson requires an inspection of the system structure and connections by a registered professional engineer with five years of experience in seismic anchorage This inspection will apply to equipment within a 100 mile 160km radius of the seismic event If evidence of structural cracks yielding or loosening of structural members is found the system must be replaced or restored to the original design configuration Liebert DSE IBC Seismic Supplement 24 Maintenance NOTES 25 Liebert DSE IBC Seismic Supplement Maintenance Liebert DSE IBC Seismic Supplement 26 While every precaution has been taken to ensure the accuracy and completeness of this literature Liebert Corporation assumes no responsibility and disclaims all liability for damages resulting from use of this information or for any errors or omissions 2014 Liebert Corporation All rights reserved throughout the world Specifications subject to change without notice Liebert is a registered trademark of Liebert
29. re required to maintain IBC certification of conformity Plenum Hold Down Clip Dimensions DPNO002538 Pg 7 Rev 2 Liebert DSE IBC Seismic Supplement 20 Plenum and Ducting Consideration of Seismic Installation 7 2 Duct Connections Duct connections made to the unit or unit mounted plenum must be connected with a flexible transition that will not transfer damaging loads to the unit or plenum NOTE Special inspection per IBC section 1704 may be required on ductwork installation Figure 11 Seismic duct connection considerations Seismic Compensation Downflow Ducting Example for Seismic Applications All ducted units must be attached to the ducting system using flexible duct designed for seismic movement Flexible loops must be capable of movement in each plane and must completely isolate the equipment from the duct work Refer to Emerson installation instructions for ducting requirements Follow manufacturer s installation instructions for proper seismic application of flexible ducts DPNO02538 Pg 10 Rev 2 21 Liebert DSE IBC Seismic Supplement Anchor and Load Requirements of Seismic Installation 8 0 ANCHOR AND LOAD REQUIREMENTS OF SEISMIC INSTALLATION All floor and housekeeping pads must be approved by the structural engineer of record to resist the added seismic loads from components being anchored as defined in thi
30. s section Data is presented by system configuration The maximum system loads are given for each loading location or floor stand foot The maximum load at the anchor is provided for proper sizing of the anchors not provided by Emerson E 4 NOTE The floor stand used with EC units is not symmetrical and its orientation to the Liebert DSE is critical to lowering the EC fans Unless the floor stand is installed in the correct position the blowers will not lower into the floor stand NOTE Load interactions must be considered when selecting anchors Table 6 Downflow Liebert DSE models DA085 165 on floor stand with 18 457mm filter plenum Maximum Maximum Floor Stand Operating Load per Anchor Load per Location Anchors Height Mass Restraint Tension Shear Tension Shear per Model in mm Ib kg Locations Ib kg Ib kg Ib kg Ib kg Location 48 1219 2318 1051 6 1683 1 763 4 302 6 137 3 3283 4 1489 3 554 0 2513 2 DAOSOD 24 610 2222 1008 6 1197 1 543 0 290 1 131 6 2335 0 10591 531 0 240 9 2 7 178 2110 957 8 507 7 230 3 128 5 58 3 1325 9 601 4 383 8 174 1 patzsp _48 1219 4248 1927 8 1593 9 723 0 417 7 189 5 3156 7 1431 9 885 1 4015 2 DA150D 24 610 4194 1902 8 1133 4 514 1 412 4 187 0 2245 17 1018 3 873 8 396 4 2 DATGSD 7 478 3962 1797 8 564 6 256 1 229 8 104 2 1527 5 692 9 695 0 3152 3
31. thread flange or grooved Figure 7 Horizontal expansion loop ax S lt Figure 8 Vertical expansion loop DN S TL IMSS QA Manual shutoff valves should be installed at the supply and return lines to each unit This provides for routine service and emergency isolation of the unit To prevent water damage install a water detection system such as a Liebert Liqui tect or floor drains with wet traps Liebert DSE IBC Seismic Supplement 18 Piping Considerations of Seismic Installation Figure 9 Piping seismic considerations Upflow with Floor Stand Anchor to Floor Stand Upflow Rigid Mount Anchor to Unit Anchor to Downflow Anchor to Floor Stand Foundation Secure pipes To Unit oe to floor stand Prefabricated seismic compensation piping Anchor Piping AUN Seismic J2 Compensation Device Flexible Loop Example Floor Stand Mount Flexible Loops All units must be attached to the piping system using flexible loops designed for seismic movement Flexible loops must be capable of movement in each plane and must completely isolate the equipment from the piping The loops must be suitable for the system s operating pressure and temperature refer to Emerson installation instructions This includes 1 4 copper humidifier supply condensate drainage and chilled water supply and return Follow manufacturer s installation instructions for proper seism
32. vent resulting in building damage injury or death Installation in structural lightweight concrete is not permitted unless otherwise approved by the structural engineer of record Structural engineer of record is defined as The registered design professional responsible for the design of the designated seismic systems on the building construction documents A CAUTION Risk of sharp edges splinters and exposed fasteners Can cause injury Only properly trained and qualified personnel wearing appropriate safety headgear gloves shoes and glasses should attempt to move lift remove packaging from or prepare the unit for installation NOTICE Risk of overhead interference Can cause unit and or building damage The unit may be too tall to fit through a doorway while on the skid Measure the unit and doorway heights and refer to the installation plans to verify clearances prior to moving the unit NOTICE Risk of damage from forklift Can cause unit damage Keep tines of the forklift level and at a height suitable to fit below the skid and or unit to prevent exterior and or underside damage NOTICE Risk of improper storage Can cause unit damage Keep the Liebert DSE upright indoors and protected from dampness freezing temperatures and contact damage NOTICE Risk of leaking water Can cause equipment and building damage This unit requires a water drain connection It may also require an external water supply to operat

Download Pdf Manuals

image

Related Search

Related Contents

Tripp Lite DVI to VGA Y Splitter Adapter Cable (DVI-I-M to 2x HD15-F), 1-ft.  Hunter 45140 User's Manual  Ateca AT187BP094 flat panel floorstand  DEH-4450BT  hearth products kits and accessories installation instructions  Descargar Manual de Usuario  Wasabi Storage Builder® for NAS User's Manual  Manuel d`utilisation - Table-de-massage  Mode d`emploi détecteur de présence PD2 MAX Master 1C  Sirena da esterno lampeggiante  

Copyright © All rights reserved.
Failed to retrieve file