Home
Field Manual 5-484 Procedures for Well Drilling
Contents
1. eee 8 8 Table 8 4 Correction factors 2 e s sz s ez sr ss ss sas ss sas ee 8 8 Table 9 1 Standard drive pipe dimensions eer 9 8 Table 9 2 Formation identifications ee ss ss ss s 9 15 Table 11 1 Methods of exploration and sampling 11 1 Table B 1 ITWD specifications eee ss sa a tt ttr B 2 Table C 1 RED HORSE units 2 mmm rh C 1 Table C 2 Well drilling team organization ee ees C 2 xviii FM 5 484 NAVFAC P 1065 AFMAN 32 1072 PREFACE PURPOSE This manual is a guide for engineer personnel responsible for planning designing and drilling wells This manual focuses on techniques and procedures for installing wells and includes expedient methods for digging shallow water wells such as hand dug wells SCOPE AND APPLICABILITY Engineer personnel assigned to well drilling teams must have a basic understanding of groundwater principles and well drilling mechanics and hydraulics to successfully install wells A well driller enhances his skills primarily from experience in solving problems overcoming obstacles in the field and learning from failures This manual reviews common experiences well drillers encounter in the field including well installation and completion in North Atlantic Treaty Organization NATO countries ACKNOWLEDGMENTS Acknowledgment is gratefully made to the organizations listed below for permitting the use of copyrighted materia
2. nt ee pata satay sat i ee a H A 999 Ao Co o mpm A 3 OO O1 0A LRR pR M RLy h J 3 AO 31d Army Navy Air Force EA e aay A M a sE cae ana ene See A Balls Eeee See Be o S Multiservice Procedures for lt Well Drilling Operations ral Penn manas ET TPT E T MM EE N EE MM i A Ree F A K K S E m iet riui parses EE sata ats a aat 2 mn Mone E eR m one ans B aya aya sitet AA SA E jj Iw UB ll 0 l Llll l elet ao e c UU o A ees npn RNA a 1 P O O Nm o N W p RI GA R K E E SEO eee nana EE ST tl Kre ea SE eli L Nh lL O A yY E E ODE ID Se l jll Jim YY j ji W A F ORE eta Pana a a eid mnn RA A d A H LA T IoU MW avers wasanman aa LA a VI 9 tD amp NLS N S S V RA L S A A w L N R DRPVHTR KAT TK T qHAIGITAQF UYU ts O 0 0U M ee E T b WM mL IR 1 J 1l i AE K Ed i mi i jh j MI F m o o 2 sy 0 ooo oe T 51 DA F l UD ULG A ems ERE Y C I 4 A V ussll LIB AFJ Law A MO an bor int PTT R E Te m me anann O A O O di ll X Nl rene rere P S E R ET EH T A MUI S 2 jH eA EM a ent A A ACU r W Nl e aN AM a M lV OAS 2 dad K utet d E E P b T Pre
3. cens Chapter 11 Auxiliary Activities 11 1 Exploratory Drilling ens Canlrrmimeo 1 Dar sal Geological LXpiora HOR S Hehe ee Seaweed usw aree eS Logging Techniques rd 84 tae Ge Ne a ee Oe eN Drilling Action 11 2 Sampling Soil and Rock ss Rotary COMES i uu dra do AAA EROS DEG TYanth Natarminatinn LM PU Lil L W LL mina LLL s lt o e e t t s e t t QQ q q ou oo 9 o 9 9 e Undisturbed Soil Samples Rack Care Camnlas ANVVUR WV Wail ipio se gt o a e y 9 o 11 3 Installing Monitoring Wells rnm SafelV Shee se bee ee EA AA Se ee ee R armirarm a IAS UNJWILWIIL e e 0 e e gt e o o i e w a s 9 9 i e 4 o IST OD saes E S Qar Rees hee we ee Se a ee a TEARS 11 4 Supporting Construction and Demolition viii e AE fy e e e nx J 2 A A ar A 1 A 6 B 1 B 2 C 2 A 2 A 3 A 4 A 5 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Page Appendix A Water Detection Response Team CONCEDE 6 u ly kek a Se mna he eo a eR re ee A 1 Organization lt o s ea a Gs SSE A A A N A 1 Deployment s e xs OES Aa AAA AA aa do A 1 Operational Concept and WRDB A 2 Water Resources Overlays
4. 7 NAVFAC P 1065 a EI a AFMAN 32 1072 a Er eatery A E K MA oso e llcl l LCICICL IIxI L I IL O A Mil o Headquarters o Department of the Army Department of the Navy o Department of the Air Force a EUS ASS E O A NA NNNM lt A E Rap E E A A OU ES L 00 ERMMMM de DISTRIBUTION RESTRICTION Approved for public release distribution d s a as Oe EA UA M A ITT Tr atr pte aa H if yo ee eo 7 aa GMK Ec AS rl SU Rau od Bem a Sete as e mm Re ire m em ae Aaaa l yX pk aaa P Is unlimited EH BB ih i nom e s p V a a aa aaa a d URL Q Q Q Q Q Q lt Q e dtt T 3 3 7 3 3 9 3 9 7 3 9 R P R P FF K R NN R H RN mamam m aa d d d m d RUN dB 3 RR RR E E ER E B RR B E E d d d M Md P M LR E RR B B E a RE M H d dd d d d d Roe P P n n p p pu n u n n n a a a a a a a a a a a E E E E b K BP K p r AA ad SU Rd A A 0 JS A A A A SR E A O A A A SR anna nee Mt A Casasia asuata nq aaEa as saus aq dala aaa ya TI EDAM PP E DE E estes EEN meen rara NA HE seo ed A A I I EE II MM ri dr c EI E E END tater LM Dist sre resi er e ara na aame tH M dota M M M M e M M M ED M EE ERE RS ns aaa naaa DEE e A i i FOREWORD This publication may be used by the US Army US Navy and US Air Force during training exercises and contingency operations FREDERICK M FRANKS JR RICHARD M DEMPSEY General USA Captain CEC USN Commanding General Deputy Commander United States Army Training Military Readiness SEABEES a
5. es 3 5 Table 3 2 Support vehicle specifications ooo oo st oo 3 6 Table 3 3 1 500 foot well drilling machine specifications lt lt lt 3 9 xvii FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Page Table 3 4 Draw works and mast loads example 3 15 Table 4 1 Guide to pump selection eee 4 2 Table 4 2 Pump readings cess 4 13 Table 4 3 Submergence for air lift pumping 4 14 Table 5 1 Relative performance of different drilling methods in various types of geologic formations ooo o 5 2 Table 5 2 Recommended rotating speeds for bits in RPM 34 Table 5 3 Drill collar weights pounds ees o ns 9 6 Table 5 4 Weight on bit and rotary speed o o o 5 7 Table 5 5 Drillingflas u ad SUE EU ER CE HES OSES AR ADA 5 9 Table 5 6 Additives for drilling fluids eee 5 12 Table 5 7 Common problems with air foam systems o eas Hao ica s 5 27 Table 5 8 Air consumption eee ee ee 5 29 Table 6 1 Well casing hole diameters 610 eere 6 2 Table 7 1 Well development methods o ooo se sz sz eere 7 1 Table 7 2 Recommended pipe sizes for air lift pumping c TA Table 8 1 Constants oui R obe OR E a a SE oe eH 8 3 Table 8 2 Circular orifice flow measurements eee 8 7 Table 8 3 Open pipe flow measurements
6. 9 9 c9 9 o o 9 o o 9 9 o 9 9 A du Cable Reel and Reel Case 4 oe doe ooo UR s as k san was ea wass D 2 Extender Cable Reel Assembly D 3 Surface LES u lt ps Same S ORR a Aa C Ee E SI S 3 D 3 D 2 Types of Logging sa sa t n ng D 3 With the Normal Arrangement ee s sz ss ss ss nh D 3 With the Lateral Arrangement 49r s sz sa o ee os D 4 D 3 Mud Probe on Units Modified for Mud Logging D 5 EUCUIPEESESETTOTLIDITCLCULL a A D 5 Setting up th Equipment s soss ac 24 08 a A EE D 5 D 4 Troubleshooting Procedures cler D 6 Checking Batteries 503 ov Wo ue yo ewe SUS dex dde eue AAA D 6 Usnea Voltmeter so pued Auk OE eo Oe cA RM E ed EA Gee Cea d D 7 Calibrating the DR 74 Mud Logger with a Known Salt Solution D 7 D 5 Maintenance sa sa s sa sa s a sa s EC sa e o e e e D 8 Of Resisitivity Measurement ee o se sa sa ss se tnn D 8 Of Cable and Reel Case a sea sa sas ee sas esas D 8 D 6 Interpretation of Electrical Logs s D 8 Pieparation or the Log sn Oa eh eh eee A D 8 Signifi ifi cance of 0 25 Foot Spacing ee ses s s ss s s s s es D 8 Significance of 2 5 Foot Spacing st ss te s D 8 Significance of the Lateral Log ee s ss ss ss ss se s D 9 Interpretation of
7. P ge rr pr i o e 6 e e 2 36 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Well Mean sea level Water table Figure 2 40 Pumping effects in salt water water will enter the well if drawdown is maintained substantially below sea level for extended periods The pumping rate should not exceed the rate of recharge Saltwater intrusion is a potential problem when drilling in coastal plain environments Salt water may move into zones previously occupied by fresh water this is called saltwater encroachment The fresh water and the salt water migrate toward the well screen until a new balance between the waters is established Figure 2 41 Pumping well Land surface Unconfined aquifer e alty water lt a E OM E E e 6 y od a e tes su s e lt we e 9 a EE Confining bed A o o gt c Groundwater Contamination Possible aquifer contamination from human activities should be considered when evaluating potential supplies of groundwater Waste products are sources of groundwater contamination in some areas Sources of waste products include agricultural activities domestic municipal and industrial waste disposal operations mine spoil piles and tailings and 2 37 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 animal feedlots Figure 2 42 shows how waste contamination enters the groundwater Nonwaste pollutants include leaks fro
8. lesum n nonstandard Spec d Other ify c Height above list in feet c Air Rotary 19 WELL Sr TON 10 HOLE AND CASING DIAMETER Change inches to feet a Super Chlorination ce ae ES Y Ld c Nearest source of possible contamination 1 Type inches inches feet inches 20 GEOCRA ewe Whe VUI _ feet enm TO Ten nes 7 WDRT te 2 Local inches _ feet 21 inches _ feet G WaterResowceOverlays Water Resource Overlays 11 COMPLETION KIT USED a E 4 Other Specify mires t 500ft 600 feet Standard 2 IF No specify type of completion materials d Down hole Loc L l a steel_ j l Qoter fe Attached DD Form 2680 OCT 93 0 ES A OQ gt Z 2 gt te M 21 OVERBURDEN MATERIALS 28 SKETCH OF WELL AND PUMP SCALE REMARKS 27a SUBMITTED BY Type or print name 27b GRADE RANK 27c UNIT 29 SIGNATURE OF PROJECT OFFICIAL 30 DATE OF SIGNATURE FM 5 484 NAVFAC P 1065 AFMAN 32 1072 1 500 foot well drilling machine See CF 15 S drilling system 600 foot WDS 3 4 through 3 7 3 9 5 18 5 28 ACE See Assistant Chief of Engineers ACE adjusting to variables 5 31 aerial port of debarkation APOD 3 12 of embarkation APOE 3 12 AFL See Air Force instructions AFT AFSC See Air Force Specialty Code AFSC air amounts 4 13 compressors See
9. washdown method Installing screen in an aquifer that is composed of fine to coarse sand wit little or no gravel wash in method Installing casing by advancing the borehole for an expedient jetted well construction water table wells Wells drilled into an unconfined aquifer WDRT Water Detection Response Team WDS well drilling system well probe A device on the electrical logging system that consists of one brass current electrode and three lead oxide potential electrodes WES United States Army Corps of Engineers Waterways Experirment Station wetlands Marshes bogs and swamps that arc indicative of very shallow groundwater WRDB Water Resources Data Base XS extra strength Y yes yield Volume of water discharged from a well per unit of time when water is being pumped or is flowing freely yield point Mud quality broadly included m viscosity Glossary 11 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 References SOURCES USED These are the sources quoted or paraphrased in this publication International Standardization Agreement STANAG 2885 ENGR Edition 2 Emergency Supply of Water in War 9 November 1990 Military Publications PM 5 33 Terrain Analysis 11 July 1990 FM 5 34 Engineer Field Data 14 September 1987 EM 5 116 Engineer Operations Echelons Above Corps 7 March 1989 TM 5 725 Rigging 3 October 1968 Nonmilitary Publications Baroid Properties and Performance of Drilling Muds Baroid Drilling
10. 0 nar a RAS ROS SUR Rees RS a 6 11 Opeu Hole Method 5 6x 4 4463 a aie eo pi EAS ae es 6 11 Washdown Method o 6 12 Bail Down Method 2 446404 a cR M UC se sa sa e a sa se sas eo 6 13 6 7 Placing Gravel isa Behe dedo a xy e 6 15 Open Hole Placement z y yu sus ace Ge d aed Edu CR e S Sok a 6 15 Tremie Placement goes uox voa RI Ed AAA sos sa sos sas s s ss e 6 16 Bail Down Placement 2 a s s a s a sas va sees se ses s e a 6 16 Double Casing Placement oc vas Ke ERA X CES Vs p Sup KES 6 16 6 8 Using Alternative Methods ns 6 16 Formation Stabilizer 2 wen ono XU Sau el Mode W LW Sus JO ORQ A 6 16 Unscreened Well ocios criada 6 19 Chapter 7 Well Completion Procedures 7 1 Well Development T ee s sa sa sas sas sos 7 1 Jetting Metodo aaa na A a PP WO ed toe d odes 7 1 Pump Surge Method si ainda 24S R k ug is R al ee R 7 2 Gravity Outflow Method IIT IO 7 2 Pressure Pumping Method ccr o ca sas vs a s e S S 7 2 Sure Block Method eee Se ies Boe ROC Ho do qo D KR La 7 2 Compressed Air Methods ew Sea H Br OIR SP S 7 3 7 2 Dispersion Treatment 1 1 te sas ses sas se es 7 7 7 3 Rock Development o sa sa n se 7 7 7 4 Well Protection and Treatment eee en Bees 7 8 External Preparations lt s s s s s s e eee 9 s sz sa de s
11. PAS v ST ARAS A te nd AQ ftre m w a as 9 EI X LN es CU rs IH Aur XX 2 y vedi EL se yet Act ae MEAT SE Td m CERA eine See Aa ES 4 gt gt ROC MC PL K PH HARE Ak MTN L i a BO M3 AK tet a EN x ses t L p b MS EY gt uii E is ee re peeks AY ees LM JS 4 5 hy eae auc k Le lt pete AD IS m M ees fa a nu Re 3 He Po e E due Y Rok 5 C4 k n F U wl P H be a EA A 0 PLA Ags Dee Ceu c E a d uM fe au e 9 2 Perniko drilling rig 9 2 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 readily displaced except by a small cutting stream delivered at high pressure You can get a pressure of 200 psi from small nozzles in the drill bit 6 Bits In soft soil you may use a paddy or expansion bit to make a hole that is slightly larger than the casing Use the percussion method with a hand rig and straight bits to penetrate hard layers Use drill like bits with heavier rigs to penetrate hard layers that do not yield to the water jet See Figure 9 3 for bits used in jetting b Methods 1 Wash In Before washing the casing into the hole cut the lower end of the casing to form a toothed cutting head Figure 9 4 page 9 4 Normally four to six l inch long minimum teeth are sufficient Use the following steps to complete the wash in method e Step 1 Mark the outlines of the teeth on the casing using a power drill or cutting torch
12. in Pump ir inlet A Figure 4 11 Submergence percentage 4 12 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 4 Correct Air Amounts For efficiency the compressor must deliver the correct amount of air Too much air causes excessive friction in the pipe lines and waste of air from incomplete expansion in the discharge pipe Too little air results in a reduced yield and a surging intermittent discharge To calculate air compressor requirements see Table 4 2 Table 4 2 Pump reading feet percent Up to 50 66 to 70 50 to 100 100 to 200 200 to 300 300 to 400 I 400 to 500 33 to 40 5 Performance and Efficiency The performance and efficiency of an air lift vary greatly with the percent of submergence and the amount of lift Generally a submergence of 60 percent or more is desirable If a well has a considerable pumping level depth you will have to use a lesser submergence percent However if the submergence is too low the air lift will not operate See page 4 14 for performance data for air lift pumps corresponding to different submergence conditions and lifts The values are for properly proportioned air and eductor pipes with minimum frictional losses The efficiencies indicated in terms of gallons of water per cubic foot of air probably cannot be fully attained in military field operations 6 Foot Piece For best efficiency the end of the air pipe should have a foot piece page 4 11
13. 166 6 127 9 138 8 149 9 161 5 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 CAUTION Use the pulldown feature on the drill rig as a last resort for short distances in hard strata Bit weight required to cut rock depends on the design of the bit and the strength of the rock Roller bits need a minimum of 2 000 psi of bit diameter for soft rock and shale and a maximum of 6 000 psi of bit diameter for hard rock Before drilling add drill collars instead of drill pipe until the load is sufficient for reasonable cutting As you dig deeper and add drill pipe you may have to hold back on the drill string See Table 5 4 for weight on bit and rotary speed Table 5 4 Weight on bit and rotary spec Weight per in cm of Bit Diameter Rotary Speed Bit Classification pin kgem RPM sottomaion ERE ferro opn Soft formation 4 050 to 7 800 725 to 1 400 180 to 60 Medium formation 4 500 to 9 000 806 to 1 610 120 to 40 Hard milled tooth bit 5 600 to 11 250 1 000 to 2 010 70 to 35 2 250 to 5 600 403 to 1 000 70 to 35 Hard insert bit 4 500 to 9 000 806 to 1 610 65 to 35 Hard friction bearing bit 4 500 to 6 750 806 to 1 210 Ingersoll Rand 3 Drill Steel Drill rods collars stabilize subs and bits are available in different sizes and materials In most drilling systems drill rods are either steel or aluminum and come in lengths of either 5 or 20 feet 4 Rotation Speed Rotation speed is determined by the weight
14. 8 1 through 8 4 See also yield drill See also bits drill steel drill down hole 5 27 11 1 rig 3 3 rig setup 5 15 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 driller s 3 1 11 2 A 1 log 3 1 5 34 See also DD Forms drilling See also fluid drilling air foam gel 5 26 air rotary 5 24 10 4 B 2 action 11 2 areac A_A aL da Li T blind 5 23 equipment 10 2 See also well drilling equipment exploratory 11 1 mud rotary 5 1 5 5 percussion 5 27 5 29 problems 5 22 rotary 5 22 10 2 water well 5 8 5 10 drive clamp s 9 9 head s 9 9 monkey 9 ii pipe 9 6 naint ce DA puvuiuo 7 U shoe 9 9 weight 9 1 driven method See installing casing driven method of driven point well See welKs driven point dump bailer method See grouting and sealing casing dump bailer method of ps echelons above corps EAC 1 2 1 electrical logs correlation of D 9 effect of metal on the resistivity log of D 10 interpretation of D 8 interpretation of resistivity values of D 9 preparation of D 8 selection of formation contacts of D 9 significance of lateral log of D 9 significance of 0 25 foot spacing of D 8 Significanct of 2 5 foot spacing of D 8 SP curve of D 10 Electrical Logging System DR 74 D 1 electric line method See measuring water level electric line method of elevation and relief 2 25 elevator 9 9 equipment 3 4 5 28 9 1 9 6 9 15 10 2 B 1 C 3 Se
15. Analysts use surface water groundwater and_existing water facilities overlays from the worldwide Water Resources Data Base WRDB Appendix A Surface and existing water facilities water sources are identified primarily from maps and visual inspection Groundwater sources are identfied by analyzing information from groundwater 1 1 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 resources overlays maps aerial imagery terrain studies hydrologic and geologic data well drilling logs and local national sources Two methods of locating groundwater are e Method 1 WDRTs equipped with special devices that use geophysical techniques electrical resistivity and seismic refraction may be deployed to locate groundwater e Method 2 Well drilling teams may drill exploratory or test wells to detect groundwater The second method is accurate but time consuming Teams should use this method only if all other water detection methods are unsuccessful or are not available The methods used for detecting water depend on the urgency for finding groundwater and the resources available Speed and accuracy are essential for locating water in any TO c Equipment The WDRT s water detection equipment can be deployed by air sea or ground transport into a developed or undeveloped TO 1 3 Well Drilling Wells provide water to the deployed forces in an undeveloped TO to the forward deployed units in a developed theater and to the forces that occupy permanent or
16. D 3 with lateral arrangement D 4 with normal arrangement D 3 loss zone 5 23 lost circulation 5 23 LVS See Service Logistical Vehicle Systems LVS maintenance of cable and reel case D 8 of resistivity measurement D 8 M Scope 8 4 magma 2 5 Marsh funnel 5 11 through 5 14 measured container method See measuring discharge rate measured container method of measuring discharge rate 8 5 circular orifice method of 8 5 flow meter method of 8 5 measure container method of 8 5 open pipe method of 8 6 measuring water level 8 4 11 5 air line method of 8 4 lata cx lma mothnd af Q A Ne IN NLA M IRN LALI Ui DS tape method of 8 4 A TTT T SU EDEVAC See medical evacuation MEDEVAC medical evacuation MEDEV AC metamorphic rocks See rock s metamorphic micatex 10 3 lt PT military water well completion summary rt See DD Form 2680 Mississippi River Basin See basin s Mississippi River Missouri River Basin See basin s Missouri River mountains Appalachian 2 2 Rocky 2 2 Index 6 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 mud See also drilling mud rotary pump s mud viscosity mud hopper 3 15 pit s 3 13 5 18 11 2 B 2 probe D 5 products 5 13 A A a testing S 14 NATO See well s North Atlantic Treaty 2 4 ST TTM Organization NATO naval construction force NCF B 1 naval mobile construction battalion NMCB B 1 NAVISTAR nr hac
17. For extremely hard formations milled teeth are replaced with connected carbide buttons 2 Drag Bits These bits are used in soil and other unconsolidated materials The blades are designed so that they cut into the formation with a carving or scraping action Drag bits may have multiblade hardened steel finger shaped teeth or may have connected carbide reinforced cutting edges 5 3 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Table 5 2 Recommended rotating speeds for bits in RPM Very Hard Soft Medium Hard Sandstones Hard Brittie Unconsolidated Shales Quartzite Shale and dig Angular Limestone Bit Sizes and Shales Soft Limestones Conchoidal pes Gumbos et Chalk S 13t0o20ina j Drag 100 130 100 130 __ C j Zubin 100160 100 150 100 175 Rock rolling cutter 125 200 100 200 0 to 13 inch Se Drag 100 175 100 300 p Disc 110180 0 _ Zublin 125 175 125 200 125 200 125200 0 Rock rolling cutter 150 300 100 250 80 120 40 80 60 150 Btotoincn Dag 1520 1020 Zubin na s ux SS Rock rolling cutter 150 300 100 250 80 125 40 100 60 200 The minimum speeds given are for flat lying strata and certain type bits The maximum speeds are for flat or inclined formations The maximum allowable weight may be carried in flat beds a
18. If you screen multiple intervals you must place gravel packs around the screens and backfilling between the screens If sufficient gravel pack material is available use it continuously to above the top of the screen 2 Stainless Steel Screens These screens are usually 6 inches in diameter and come in 10 and 20 foot sections You can join the sections to make longer pieces Most stocked screens have 0 025 inch openings that are suitable for Figure 6 5 PVC screens medium sand formations Screens with other slot openings are available and may be needed for special installations Various end fittings are available so you can use different installation methods Sed paragraphs 6 6a throughld pages 6 10 through 6 12 for uses of these end fittings 6 7 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 3 Pipe Base screen You make this screen by wrapping a trapezoidal shaped wire around a pipe base that has drilling holes evenly spaced A pipe base screen is strong and suitable for deep wells The screen has two sets of openings Outer openings are between adjacent turns of the wrapping wire and inner openings are the holes drilled in the pipe base The percentage of open area per foot of screen usually low governs the efficiency of the screen These screens come in 3 and 4 inch pipe bases for field operations b Lengths Use the electric logging units in the well completion kits to determine the location depth and thickness of an aq
19. Mix a sufficient quantity of grout and pump it through the tremie pipe or let it descend naturally mms Mea 6 6 As the grout is placed lift the tremie pipe slowly but keep the lower end submerged in the grout 6 5 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 e Step 3 Fill the casing with water as the grout is placed to balance the fluid pressure inside and outside the casing Doing so prevents grout from leaking under the bottom of the casing You can quickly place grout near the surface using a tremie or by dumping the grout in the hole around the casing and puddling it with pipe lengths However this procedure only provides a surface seal around the casing and cannot be used as a normal grouting method Grout out a Grout pumped in va Drill hole Ma MP W Grout pipe n E Figure 6 3 Outside tremie grouting method 6 5 Selecting Screens The military uses continuous slot screens Figure 6 4 when drilling wells using the rotary method You make the screens by winding triangular sections around a skeleton of longitudinal rods Join the triangular sections and rods securely wherever they cress The screens are constructed of either PVC or stainless steel and are packed in the well completion kits Some important factors to remember when selecting screens are that they M e Must produce a sand free well of less than 2 ppm e Should prevent minimu
20. S besten EM o 0 0 0 0 0 1 1 HM C 0 2 ME E Ratt tae ET nee sassa tll n A P os P lo flf CL Do MR 50 L NN R PR R T q PSQI atta retains RE A JI 7 Ic A vl L UL SE a IM LM IIR S 0 S 0 dT o AM E a aap b aad l adli dL o d jJ sS S Q hb DN TT AR A A Ll1 ame 0 mj k d 1 Q QQ AAA AR Te OO VMEEMM A X i N LM shah iyisi setae ta BB Pl ae AN Ga ID p T c s Y A Tu Tues etude Tue 222223 sia AA BA Wm jt A as a G atta Sas aa teen retta Loser serra Manor aia OLD rara aeg HM 0 l h MRTG lN A PS ee e E AW emg 001 3 4o AXEEMJIIN h W a CA e e y uda B gt Vv LUUD O N55 aai eee STER Bi Xt XD amp s A AWA a Lone a 1 m e et d DE EFE UO gw x X A SE g p n KN ni L d Perea e AN AGE Doe 5 Du xt Cam LA MSN Lr anata ed mA o ipa RE gpp ee fll Tet e a uy D FM 5 484 uaa Go LLL O LULLLLOLL111111111ldll ldliill x bgljlo lB NiaNVaxlllllee lll LY D LLLLLLLLLLLLLL LLLLLLLLLLLLL EILLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL
21. ait foam gel technique Adding foamer to a fluid in the same proportions as clear water to get a richer more stable foam air lift method A pump testing method that uses an air lift pump air line method A procedure to measure the water level using an air line the air line is copper tubing or DT pipe that is long enough to extend below the lowest water level being measured air rotary driling A well drilling method that uses compressed air as the circulating fluid alligatoring A network of fine cracks and small carbide flecks on a bit that appear after hours of drilling in nonabrasive soft rock alluvium 5oils that are deposited by running Water alt attitude ant mound like openings 5ee qanat AO area of operations APOD aerial port of debarkation APOE aerial port of embarkation aquagel Commercial chemical agent added to mud drilling fluid to prevent it from freezing See also barite fibratex gel flake impermex micatex smentex aquiclude Subsurface rock or soil unit such as clay shale and unfractured igneous and metamorphic rock that does not transmit water readily and cannot be used as a water supply source Glossary 1 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Glossary aquifer Saturated rock or soil unit such as gravel sand sandstone limestone and fractured igneous and metamorphic rock that has sufficient hydraulic conductivity to supply water for a well or spring aquitard A unit that retards or
22. ar A 3 Existing Water Supply Overlay o o eene A 3 Surface Water Overlay oie daa A 3 Groundwater Overlay e ra de 9 0 ES A See de Aa A 3 Overlay Symbols aura ER aku AAA BO DE ee ER we A 3 Potential Drilling Areas ee ee A 4 Appendix B Navy Well Drilling General 44 5445 48 2 ea 2 b WOO Y SSE PITT B 1 EGui DINGO 22 aretes avs ead k on d ERE E 9 S ey e ee ele d B 1 The KI D 4 acus dog geo UR Ue AO ee ae LOU ew Ree d SEU p ROO GE B 2 AIPCORIDIESSO uu See we ACE BUREAU et doo suh US HG Se arare EES B 2 Wel Completion Kit ss rimane oe Ro SUS Oe REESE ER ERGO ESE BEER RS B 2 Appendix C Air Force Well Drilling General O eee Ge s eS C 1 i Ll tu u doe acs Ge ee ss AAA C 1 RAE u at a ae ae ead os ace S doe Oe ad ee d C 1 E U ZZ asun AAA C 1 Organization and Scope eee sa sa sas sos sa C 1 CapabilitieS a pio ROO I a OS 1E EIE ORAE EAT dos C 1 IRATUS S E RUE DOS E T S ET ET STO t Ll D ALLLIOGILIIILLLL C 2 Team Composition uo Roe 44 R R o Oe qx T RR es C 2 Publications and Documentation s s C 3 Aen I RENE DIIIT L5 AE e o de y A C 3 ix FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Page Appendix D Electrical Logging System D 1 dl P P T D 1 TB ana 4 Sos dedero as e aa RE D 1 Resistivity Instrument eoe Se enero ee ow He a he Ge O RE 8 D 1 POWEESUDDIV ite Ade V og og aon ee se ae ee OR Ge SS S D 2 I nagging Cahle D 2 LUKSE wa DIC e e
23. areas such as springs lakes and rivers Typical aquifers are gravel sand sandstone limestone and fractured igneous and metamorphic rock Those subsurface rock or soil units that do not transmit water readily and cannot be used as sources of water supplies are called aquicludes Typical aquicludes are clay shale and unfractured igneous and metamorphic rock Aquicludes that exist between aquifers are confining beds the water moves only within the aquifers a Unconfined These are aquifers that are partly filled with water have fluctuating water levels and can receive direct recharge from percolating surface water Wells drilled into an unconfined aquifer are called water table wells Figure 2 12 page 2 12 b Confined These are aquifers that are completely filled with water and are overlaid by a confining bed The water level in a well supplied by a confined aquifer will stand at some height above the top of the aquifer Water that flows out of the well is called flowing artesian page 2 1 2 Water rises because of the pressure that the overlying materials exert on the water anc the height of the column of water driving the water through the interconnecting pores of the aquifer The height of the column of water that is driving water through the aquifer is the head The height that the water will rise to inside a tightly cased artesian well is the potentiometric surface and represents the total head of the aquifer c Perched These aqu
24. bit is 300 feet deep pump down a marker strew or oats The majority of the material should take 4 minutes and 45 seconds to return 300 feet at 400 fpm takes 45 seconds and 300 feet at 75 fpm takes 4 minutes To clean all the cuttings from a 300 foot depth with an average up hole mud velocity of 75 fpm will require more than four minutes of pumping Consider this concept regarding sampling cuttings from the return mud If cuttings remain in the annular space between the drill rod and borehole wall when circulation is stopped they will produce a denser fluid than the clean drilling mud inside the drill rods The denser mud in the annular space will then flow down the hole and force the clean drilling mud up the drill rods This causes a geyser effect and the drilling mud may shoot several feet into the air until the mud columns equalize Some drillers mistake this for a caving hole If this situation happens when adding drill rods the circulation time should be increased after drilling down the next rod Use the following formula to calculate the annular space volume y D 42 6 5XD 1 000 where V annular space volume in cubic feet D hole diameter or bit size in inches d drill hole or drill steel collar diameter in inches L hole length in feet Figure 5 4 page 5 8 9 Mud Pits Rotary chilling preparation is the design and excavation of an in ground mud pit or installation of a portable mud pit and the mixing of the
25. inside tremie method of installation design 4 11 installing casing See also casing driven method of 6 3 open hole method of 6 3 single string method of 6 3 uncased interval method of 6 3 wash in method of 6 3 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 installing screen 3 20 6 10 bail down method of 6 13 open hole method of 6 11 pull back method of 6 11 single screen method of 6 10 mala A Aare N Ae wasSnaown memoga Ul 6 12 International Standards Organization ISO B 1 Intemational Standards Organization ISO air transportable water drill ITWD B 1 B 2 ISO See International Standards Organization ISO ITWD See International Standards Organization ISOVair tra FE MUERA IN DE W Amr nr gor WERE CU mSpor WEN IF Y STA drill ITWD JCS See Joint Chiefs of Staff JCS dod drilling 10 3 et umn See numn s H iind wells See welKs jetted jetting method 9 1 11 1 See also well development jetting method of JOG See Joint Operations Graphics JOG t Chiefe nf Staff TSX AO LA WIN WAR M VOLLE VALE A JCS PX Joint Operations Graphics JOG A 3 joints 2 22 See also structure density and orientation karst topography 2 14 2 23 2 32 lag time 11 2 landform s 2 24 lava 2 5 limestone 2 5 2 14 2 17 A 4 lithification 2 24 local national sources 1 2 locating well sites 1 1 LOG See logging LOG logging LOG D 2 D 4 cable D 2 techniques 11 1 types
26. lt NIC cz 3 SE N lt Ry UL V lt CS AW N y i E Dry playa 6 2 A KA Phreatophytes 9 EA gt AA ka I w Water table I iC s Deposits ex Impermeable bedrock 7 4 to FY a ee po AAAS basin closed basin X closed area tributary area Single basin Regional system system Figure 2 21 Alluvial basin e Glaciated regions Glaciated and postglaciated areas can yield water from glacial deposits Figure 2 22 Large quantities of alluvium laid down by steams emerging from glaciers glacial contain a higher percentage of gravel and coarse sand than clay contains Such areas are good sources of groundwater Extensive deposits occur in all glaciated regions of the earth especially in the northern United States northern Europe and areas bordering high mountains Many large cities including some in the upper Mississippi basin get their water from glacial outwash sediments Glacial materials deposited directly by ice glacial till are poor water bearers yielding barely enough for farm wells In places where outwash sands and gravels are interbedded or associated with the till good aquifers form Some of these aquifers may carry water under pressure 2 20 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Figure 2 22 Glaciated region 5 Stratigraphic Sequence The stratigraphic sequence of geologic strata that occurs in an area can give clues to the types and depths of aq
27. semipermanent freed Army installations in a developed TO Wells are located and drilled in secure areas in an installation or in the area of operation at brigade level or higher a Forward Deployed Forces in a Developed TO Well drilling operations support forward deployed forces and force buildup in a developed TO Groundwater sources supplement but do not replace surface water sources Well drilling teams conduct well drilling operations during all phases of an operation Rapid movement of the well drilling team into the TO is not essential Teams with organic equipment arrive at the TO primarily by sea or ground from pm positioned locations The teams depend on engineer units for logistical and administrative support Transportation support is required for movement of will drilling equipment and components b Permanent or Semipermanent Fixed Installation Forces in a Developed TO These echelons above corps EAC installations are located in built up or rural areas where water sources may be available Groundwater sources supplement existing water sources to meet installation water requirements The wells are permanent The facilities engineer manages all water utilities on an installation c Combat Zone Corps Level and Below The Operations and Training Officer US Army S3 of the engineer battalion that the well drilling team is attached to coordinates operations with the quartermaster unit When the well drilling team completes a well t
28. ss e 4 6 Submersible Pump wu ares ELE A K X dos SC Roe UN 4 6 TUPDIDE PUND Z S ya z de EUR d de de A SECURE EW oe WS 4 7 Helical Rotor PUMP se 5 3e bua a ha ua Ye C IRL o eS rus 4 7 Jee PMD osa eite te tina Ge de ned rl es ge a ed c Dat ab og e EA 4 9 4 4 Air Lift Pumps leet ns 4 10 PHBUCIDIE iu a ku N Sra ANTA E UO A NOI Ead eise Rodi Sete ci m 4 10 Installation DESIOIL ia Sore aS EUR Ue BE Wu S SUS A 4 11 PART TWO WELL DRILLING Chantar K Wall Drilinga Mathnac Wi purl ee VY AA R PR X11111 35 LY LLI ILL O 5 1 Mud Rotary Drilling 2 1 et sas sa sas sas ttn 5 1 Iota RIOS lt uw a oe Ry o BONN de e Nis A v e A IS diete 5 1 DIL BIS E watt Wee tes A ENSEM RICH IN MUS UE Robo AE a 5 3 Rotary OperatOl x zzy w icy LR Aes Eo op S Supap Sox d dc oe ee dens 5 5 Vanables Z 2 25 ay eu vs tek aria de ea ee et we Ge a o 5 5 1V FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Page Dniline PIS 2 ss Si Ses Soe A REOR 0 E neat ves nt E nd 5 8 Rotary Drilling Problems eee 5 22 5 2 Air Rotary Drilling s sa sa sa sas RR 5 24 AUT SUDDIV s 25 9 559 30 5 55 3 30 Gee Sos AUR Gace Gg gs dr adt ede due oue d 5 24 POAMNGIS u 2 RS ETS e GO en ee S io Se Goat R 5 26 5 3 Percussion Drilling nn 5 27 Equipment ae ates gua za Greate wt puma Po 5 28 Power di a uk m p Z E ad a ee 5 29 Procedure er 2 oe ae ARA Se ee Ge rica 5 29 Adjusting to Variables ee
29. swelling soil See soil swelling switch current D 1 electrode selector D 2 function D 2 probe selector D 1 SP polarity reversing D 1 SP shutoff D 1 swivel 5 1 6 2 9 1 symbols overlay A 3 table of allowances TOA B 1 table rotary 3 13 5 1 TAC See Terrain Analysis Center TAC TAD See Transatlantic Division TAD tag along 5 28 tape method See measuring water level tape method of tank water storage 3 10 team s composition C 2 concept 3 1 deploying 3 3 planning and coordinating 3 1 planning and preparation 3 1 TEC See US Army Corps of Engineers Topographic Engineering Center TEC technical manual TM 2 11 temporary wells See well s temporary Terrain Analysis Center TAC A 1 A 2 terrain analysts 1 1 A 3 testing pumps See pump s testing air lift method of 8 2 submersible pump method of 8 2 theater of operations TO 1 1 C 1 See also TO thick continuous permafrost See permafrost thick continuous Thompson equation 5 22 TM See technical manual TM TO See also theater of operations TO forward deployed forces in a developed 1 2 developed 1 1 1 2 permanent or semipermanent fixed installation forces in a developed 1 2 well drilling in the 1 2 TOA See table of allowances TOA tool pusher C 2 C 3 tools 5 7 See also equipment top head 5 1 Index 10 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Transatlantic Division TAD A 1 transmiss
30. the buttons pop out Figure E 9 C This greatly reduces the life of the bit ta TN 7 a i t s T mA bi be s s iu put H eroded body metal shows the lip next to the button and the extent to which the Body metal is another type of bit failure Figure E 10 A shows a condition called body wash Figure E 10 B E 10 b E 4 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Figure E 9 Popping button is protruding The combination of a flat carbide and a large beam of exposed carbide generates side loading which fatigues the base in which the button rests Figure E 10 C shows that the carbide and body have separated just below the rim of the socket while a fatigue crack has developed in the body metal Cracks in the body Figure E 10 D can lead to entire pieces of the bit shearing off Figure E 10 Body metal failure E 5 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 For optimum performance introduce a bit to new rock regularity If cuttings remain in the hole the energy to break new rock is not transferred putting undue stress on the bit the drill and the drill string Each component will undergo more unnecessary stress and will fatigue faster and fail earlier Figure E 11 shows an extreme example of what will happen if air is not continually fed down the hole This bit has been plugged solid by the cuttings If rotation is too fast flat spots heat checks and shearing will occur If rotation is too
31. water well Waterways Experiment Station See US Army Engineer Waterways Experiment Station WES WDRT See Water Detection Response Team WDRT WDS See well drilling system WDS weight on bit See bit s weight on weir 5 21 5 22 well s See also hydraulic s well augered 9 15 87a bara nt ram l dain x 04 consumucuon atemaive 9 1 driller s log See DD Form 2678 driven 6 3 driven point 9 6 head and collar 7 9 installing monitoring 11 5 installation and completion 10 4 installation procedures 6 1 jetted 6 3 9 1 casing and completion method for 9 6 self jetting method for 9 4 wash in method for 9 3 North Atlantic Treatv Organization n UULUS CLM IEVOLy 71 BON EAE X performance testing procedures 8 1 permanent 8 1 probe D 1 protection and treatment 7 8 requiremenis 11 5 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 wells continued safety 11 5 screen See screen s well temporary 8 2 unscreened 6 19 well completion kit 3 7 3 9 B 2 procedures 7 1 well development 3 20 5 32 7 1 chemicals used in 7 7 closed well method of 7 5 compressea air meinog 01 5 gravity outflow method of 7 2 jetting method of 7 1 open well method of 7 3 pressure pumping method of 7 2 pump surge method of 7 2 surge block method of 7 2 o zz BE RIOT EN eii drilling weil drilling 10 2 See also Army TO well drilling in the Air Force 1 3 C 1 equipment 11
32. width at bottom 2 C Ideal dimensions for two basic pits In general the pit should be three times the volume of the finished borehole Each mud pit should have a settling section and a suction section The dimensions of the settling pit can be determined by using a basic equation to establish the width Once the width is known the length and depth can be calculated hole volume gal x2 Width 2 125 x 7 5 Length 2 5 x width Depth 0 85 x width For the suction pit the length is 1 25 x width and the depth is 0 85 x width Figure 5 8 Mud pit layout with pit capacities and dimensions Mud pits are part of the circulating system for mixing and storing drilling fluid and for settling cuttings The ground slope will affect site layout Pit design can enhance pit performance Most drillers agree amp t using multiple pits is best when dropping drill cuttings from the fluid The volume of the pit should be one and one half to three times the volume of the hole This will provide fluid to fill the hole and an excess volume to allow stilling and settlement or processing before returning to the drill string A volume of three times the hole volume will minimize drilling fluid and mud pit Mein rrr page 5 20 shows a mud pit that is prepared onsite Figure 5 10 page 5 20 shows a portable mud pit 5 19 Suction hose V Ditch 4 inches Ay ww T 7 Drill rod 3 inches Ditch ete METAL Mw A P 4 N d y a Y
33. xiii FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Page Figure 3 13 Mud hopper 0 et s sz s a s az saa sa sas sa sas es 3 15 Figure 3 14 Drill bus o aoo k Oba Supi a A e ssp o 3 15 Figure 3 15 Making up the kelly to the threads s 3 17 Figure 3 16 Placing the hoisting plug on the drill steel gt 3 17 Figure 3 17 Taking samples eee 3 18 Figure 3 18 Connecting an elevator to casing 3 19 Figure 3 19 Setting slips eee t nr 3 19 Figure 3 20 Casing in a spider bowl ees 3 19 Figure 4 1 Pitcher pump ett n 4 3 Figure 4 2 Rotary pump ii se sz s sz REE ER RC BED sas sa OM ES 4 3 Figure 4 3 Centrifugal pump eee sas ss es 4 4 Figure 4 4 Self priming pump lt eee 4 6 Figure 4 5 Submersible pump e LI Figure 4 6 Turbine pump ertt tt nn 4 8 Figure 4 7 Helical rotor pump ee sas ttn 4 9 Figure 4 8 Jet pump E x AR op RA BSS de sa sa YRS Ss 4 9 Figure 4 9 Air lift principle ee Br 4 10 Figure 4 10 Air pipe in an eductor pipe lt lt ooo e 4 11 Figure 4 11 Submergence percentage o eee e a Se ee 4 12 Figure 5 1 Mud pump 0 sa sas sa sa sa se 5 3 Figure 5 2 Guide for bit selection o n 5 4 Figure 5 3 Plumbing the kelly s s sz s sua ss sas sa sos sas sos s
34. 0 2 6 0 2 154 9 0 0 0 250 64 86 41 0 0 0 312 79 27 1075 20 STD 220 5588 21 250 539 8 0 375 95 8661 1289 227 1 565 525 160 30 XS 220 558 8 21 000 5334 0 500 127 11148 1708 540 3 723 1 248 380 O 6096 8 0 250 94 35 O 6006 840 312 7 117 4 O 600 6 6 0 375 95 140 8 0 6006 20 500 12 186 7 260 6604 6 0 250 6 102 3 260 660 4 6 0312 79 127 4 260 660 4 4 0 375 95 152 7 26 0 4 0 0 500 12 202 7 280 711 2 4lo 250 64 7409 1102 280 711 2 4 0312 7 26 137 3 280 7112 2 0 375 95 6 1646 280 7112 500 12 9 2186 300 7620 29500 7492 0 250 64 7943 1182 26 179 60 18 300 7620 29376 746 2 0 312 7 9 9893 1472 51 352 118 36 STD 30 0 7620 29 250 7430 0375 9 5 187 1766 89 614 205 63 20 XS 30 0 7620 129000 7366 0500 127 157 5 2344 213 1 469 491 150 6 2 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 6 3 Installing Casing a Open Hole Method With this method install casing using the following procedures e Step 1 Clean the borehole by allowing the fluid to circulate with the drill bit close to the bottom so cuttings will come to the surface You may carry the borehole deeper than necessary so that if any material caves in the material fills the extra space below the casing depth e Step 2 Attach a coupling to the top of the casing Suspend the casing by either attaching a hoisting plug to the coupling using a sub adapter if necessary or by placing a casing elevator or a pipe clamp around the casin
35. 10 feet into the reck Step 2 Flush the hole with clean water Step 3 Fill the rock interval with grout and immediately set the casing into the hole Let the grout set around the bottom of the casing Step 4 Drill through the grout plug in the lower casing and progess into the aquifer Step 5 Complete an open hole well or install a smaller casing and screen inside the outer casing NOTE You cannot pour grout through drilling fluid to properly seal the casing 6 2 Selecting Casing Well casing is plastic wrought iron alloyed or unalloyed steel or ingot iron Well completion kits have either plastic Figure 6 1 or steel casing You must know the properties of other casings because you may have to use them When selecting the casing consider the stress factor during the installation process the corrosive element of the water and the subsurface formation If you use casings other than those in the well completion kits you must specify the weight per foot of pipe you want to use The tables in A100 66 American Water Works Association Standard for Deep Wells AWWA present data on the steel and wrought iron pipes used as permanent well casings Joints for permanent casings should have threaded couplings or should be welded or cemented so they are watertight from the bottom of the casing to a point above ground This precaution will prevent contaminated surface water and groundwater from entering the system Table 6 1 pa
36. 2 11 5 B 1 See also drilling equipment equipment logs 1 3 machine 3 8 methods 5 1 Navy 1 3 B 1 operation s 1 2 3 4 A 1 responsibilities system WDS 5 32 C 2 See also 600 foot WDS CF 15 S drilling system team s 1 3 3 1 A 1 B 1 C 2 C 3 WES See US Army Corps of Engineers Waterways Experiment Stations WES wetlands 2 30 5 11 WRDB See Water Resources Data Base Index 12 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 8 MARCH 1994 By Order of the Secretaries of the Army the Navy and the Air Force GORDON R SULLIVAN General United States Army Official Cluef of Staff MILTON H HAMILTON Administrative Assistant to the Secretary of the Army 6076 Official JOHN H DALTON Secretary of the Navy Official MERRILL A McPEAK General United States Air Force Chief of Staff RONALD W YATES General United States Air Force Commander Air Force Materiel Command DISTRIBUTION Active Army USAR and ARNG To be distributed in accordance with DA Form 12 11E requirements for FM 5 484 Multiservice Procedures for Well Drilling Operations Qty rqr block no 0756 w U S GOVERNMEBT PRINTING OFFICE 1994 528 027 80127 PIN 072131 000
37. 5 5 Figure 5 4 Hole diameter ee sa sea t ttn 5 8 Figure 5 5 Stabilizer eee tt tnn 5 8 Figure 5 6 Marsh funnel eee htt tnn 5 14 Figure 5 7 Nomograph for determining hydrostatic head produced by drilling fluids ees 5 15 Figure 5 8 Mud pit layout with pit capacities and dimensions wee 5 19 Figure 5 9 Mud pit prepared on site oo ee nnn 5 20 X1V FM 5 484NAVFAC P 1065 AFMAN 32 1072 Page Figure 5 10 Portable mud pit lt lt lt o t 5 20 Figure 5 11 Rectangular weir with end contractions eee 5 21 Figure 5 12 Triangular notch weir with end contractions ee 5 22 Figure 5 13 Fishing tools eee hn S24 Figure 5 14 Nomogram to calculate up hole velocity ee 5 26 Figure 5 15 Foam from the well 6 06 tnr 5 27 Figure 5 16 Down hole bit 2 0 0 ee ss ss sa sa sas ttn 5 28 Figure 5 17 Reverse circulation rotary drilling ee s t es 5 33 Figure 5 18 Well driller slog ss ss sas sas t tne 5 35 Figure 5 19 Piping and casing log e t t tn 5 37 Figure 6 1 Plastic casing nn cT 6 1 Figure 6 2 Inside tremie grouting method e o nn 6 5 Figure 6 3 Outside tremie grouting method 4 o rn 6 6 Figure 6 4 Continuous slot screens eee tht nr 6 7 Figure 6 5 PVC screens emittit 6 7 Figure 6 6 Screen hook installation method n 6 10 Figure 6 7 Single string asse
38. 8 With this method the diameter of the screen must be smaller than the casing since the hole drilled for the screen will be no larger than the inside diameter of the casing Also make sure that the packer fitting at the top of the screen is the proper size to seal inside the casing The drilling mud must be heavy and thick to prevent the open borehole from caving in and the mud must be completely removed from the aquifer during development d Washdown Method This method works best if the aquifer is composed of fine to coarse sand with little or no gravel The screen fittings you need for this method are a washdown or self closing boton Figure G shows a fitting you can use when using a telescoping method to set the screen through the casing Set the casing from the surface to slightly below the depth where you will install the top of the screen Screw a section of wash pipe into the left hand female thread of the self closing bottom and attach the bottom to the screen or sand trap with the wash pipe projecting through the screen Lift the entire assembly by the wash pipe and lower the screen inside the casing Add sections of wash pipe until the bottom of the screen is near the lower end of the casing Use the following procedures for the washdown method e Step 1 Connect the top of the wash pipe to the kelly and start the mud pump Circulate water not drilling mud down the wash pipe e Step 2 Let the screen move down as circulation contin
39. Basement Figure 2 15 Catchment type of perched aquifer Catchments cannot provide large quantities of water but they may provide easily developed groundwater for small demands or temporary supplies for drilling operations e Material 1 Soil These aquifers occur in unconsolidated deposits Examples of sediment deposits and their sources are e Alluvium which comes from running water e Glacial drift which comes from flowing ice e Sand dunes which come from blowing winds 2 13 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Sand and gravel deposits are the primary materials of unconsolidated aquifers Alluvial deposits are prevalent in river valleys in humid environments and in dry wadis in arid environments In many desert areas alluvial deposits may be the primary source of groundwater These deposits may be unconfined confined or perched 2 Rock This aquifer is a mass of rock that can store and transmit groundwater a Limestone and dolomites These are carbonate rocks that dissolve when carbon dioxide from the atmosphere and groundwater mix to form carbonic acid The acid dissolves and widens the fractures and bedding planes into larger rock openings These openings may eventually develop into caves Limestone with fractured zones develop solution channels Caves can be productive aquifers that yield appreciable quantities of groundwater Figure 2 16 Discharge Recharge area a area i gt A
40. Development Use this method to develop wells in rock formations You can obtain good results by combining jetting with air lift pumping from a limited zone isolated by inflatable packers The objective is always to wash out fine cuttings silt and clay that have worked into the fissures crevices or pores of the rock during the drilling operations Openings that remain plugged reduce water flow into the well Develop the well thoroughly to remove all obstructing material When drilling through limestone formations use acid to dissolve lime like cementing material and to open up connections with joints or fissures beyond the borehole wall However such operations are rare in military well drilling FM 5 484 NAVFAC P 1065 AFMAN 32 1072 7 4 Well Protection and Treatment a External Preparations You should disinfect and protect a well before starting the borehole Some other preventive measures are e Stopping surface contaminants from entering the well e Ensuring that the drilling water s quality is suitable e Cleaning and disinfecting all drilling equipment before starting a new well Disinfecting the water used for drilling if you use a mud based drilling fluid If you use a synthetic drilling fluid chlorinate the fluid However doing so will break down the fluid and reduce its life e Circumventing possible water quality problems by stopping potentially harmful fittings and equipment from entering the borehole Carefully check the
41. EO1 3 6 Transportation a 600 Foot WDS This system can be transported by three C 130s two C 141s one C 5 or by rail A minimum amount of equipment disassembly is required 3 10 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Elbow Nipple Gate valve Coupling Adapter pipe to hose Nipple N Electrical box connector Uu Well head cap Lum Nipple Reducer Pipe flange 8 inch metal pipe Hose 2 1 2 inch metal pipe 10 inch metal pipe 6 inch metal pipe Electrical cable Pipe clamp Cementing basket Cable ties Check valve Well screen Deep well pump Pump motor centralizer Casing shoe Figure 3 7 Well completion kit 1 C 130 The well drilling team and the organic and support equipment require up to six C 130s for transportation Support equipment includes a 5 4 and 5 ton truck with a 10 ton trailer Ihe well drilling machine and support vehicles have roll on roll off capabilities page 3 12 The load configuration for transportation by C 130 is as follows e The well drilling rig and two pallets of components and accessories are on the first aircraft e The support vehicle and one pallet of components are on the second aircraft e The pipe dolly with two pallets of completion material is on the third aircraft page 3 12 2 C 141 The WDS is transportable in a C 141 without any special disassembly but parking shoring is required for the front axle of the drilling rig FM 5 484 NA VFAC P 1065
42. Fluids Inc Houston Texas Catalog no WW 1000 01 1989 Geology and Geophysics for Military Well Drillers Geotechnical Laboratory US Army Engineers Waterways Experiment Station Vicksburg Mississippi Groundwater Atlas of the United States Hydrologic Investigations Atlas Department of the Interior USGS Denver Colorado Chapter 730 A Introductory material and nationwide summaries Segment no 0 Chapter 730 B California Nevada Segment no 1 Chapter 730 C Arizona Colorado New Mexico Utah Segment no 2 Chapter 730 D Kansas Missouri Nebraska Segment no 3 Chapter 730 E Oklahoma Texas Segment no 4 Chapter 730 F Arkansas Louisiana Mississippi Segment no 5 Chapter 730 G Alabama Florida Georgia South Carolina Segment no 6 Chapter 730 H Idaho Oregon Washington Segment no 7 Chapter 730 1 Montana North Dakota South Dakota Wyoming Segment no 8 Chapter 730 J lowa Michigan Minnesota Wisconsin Segment no 9 Chapter 730 K Illinois Indiana Kentucky Ohio Tennessee Segment no 10 Chapter 730 L Delaware Maryland New Jersey North Carolina Pennsylvania Virginia West References 1 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Virginia Segment no 11 Chapter 730 M Connecticut Maine Massachusetts New Hampshire New York Rhode Island Vermont Segment no 12 Chapter 730 N Alaska Hawaii Puerto Rico Segment no 13 Ground Water and Wells Third Edition Johnson Filtration Sy
43. MILITARY WATER WELL COMPLETION SUMMARY REPORT TO FROM List Unit and complete mailing address to include Street DI Ulla he Y WP WA and 9 digit Z ZIP Code US Army Topographic Engineer Center ATTN CETEC TC H FT Belvoir VA 22060 5546 703 355 2921 PHONE NUMBER Include Area Code s T Ta la Completionkit e pvc le Stainless Steel 2 DATE OF REPORT d Other Specify ea A a saei enia Me NE qum a Military water supply i A feet slot EM b Construction ES I INE c Humanitarian feet Slot d Other Specify 113 GRAVELPACK Ia Yes b No If Yes complete 1 thru 4 a Country U Source Q Gradation d 4 Depth to top of b Map name edition d Coordinates e Scale 6 TOTAL HOLE DEPTH 2 9 a 5 TOP OF HOLE ELEVATION a Standard b 600 feet Je 1500feet d Nonstandard Electric G Model Number 4 Horsepower a Number feet b Below Grade u Orop pipe M Material c AboveGrade _ d DateMeasued e Hand Pumptype 8 TYPEOFDRILLINGMACHNE Depthof Pump installation list in feet senes emm or 17 PUMPING TEST ave No h d Other Specify 1 if Yes feet Below Grade Above Grade i b Well Yield GPM or LPM a Direct Rotary b Reverse Rotary 1o WEEL HEAO COMETE HON m i
44. Resistivity Values D 9 Selection of Formation ania dae aro A a ee D 9 Correlation of Electrical L OOS ca r R R RR A A OS A A Se D 9 Effect of Metal on the Resistivity LOB a e UP ee ee ee D 10 SP Cine u doond os ew Edie OR a aide dv a R 22 15 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Page Appendix E Bit Maintenance EL Maintenance uo moo ox vu EORR ADR ACA HEU SER Cp dee ee ed E 1 E2 rd sir a E RA a E 2 E 3 Reconditioning 2 1 0 s a sas sasa sa sas sa sas sas s s E 6 E 4 R leof Thom oscila ER UNS SR OS E 6 Glossary lt lt nux oe ECKE So ade 3090 Se SAC Wak a Glossary 1 References u usce hoo NAS BEARS ae LEDER OR ade ne rs References 1 l u TmrIITE Index 1 xi FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Figure 2 5 Figure 2 6 Figure 2 7 Figure 2 8 Figure 2 9 Figure 2 10 Figure 2 11 Figure 2 18 Figure 2 19 Figure 2 20 E poten Figure 2 26 List of Figures and Tables FIGURES Water flow from recharge to discharge areas lt Mississiz DI River DAS s uo Opus Susa RE A 3 e e es v dIVIFosraphic basin uomo ERO Bek a BS UR RULES ORA eS Primary and secondary openings eee Hydraulic conductivity la oe deem mE e sos NV Aeg ne F F PP L PAS MS IPS PA BEP Hydr autic CONGUCLLVELY OJ TOCKS UNA Specific TeleRtion vu seg hee Oe Lae RA AA Difference betwe
45. T S Ls y RT KL d A Sia m DIS 1 PRA EN ES oF ite ye Y d M Ot 4 K L d t a Centering device Outer casing ready Fa a L Gravel treatment gt to be pulled back tlt U VOIE o completed T Figure 6 13 Double casing gravel pack placement 6 18 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Step 1 Center the screen at its final position in the open section of the borehole using a centralizer if needed e Step 2 Place the stabilizer material by dumping and tamping it down the hole or by using a tremie Raise the level of stabilizing material above the top of the screen and add additional material as development progresses Step 3 As you develop the well the level of the stabilizing material drops as the material is pulled into the screen You must replace this material to maintain the level above the top of the screen b Unscreened Well In competent rock you usually tap the aquifer through numerous irregularly spaced fractures Once cleared of mud and rock fragments the fracture stay open and the intake interval functions efficiently for a longtime You should not need a screen in such a rock well If you anticipate an unscreened well design you must be particularly attentive to the location of the top of the unscreened intake interval and its relation to the position and thickness of any impermeable layer 6 19 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Chapter 7 Well Compl
46. VEFAC P 1065 AFMAN 32 1072 7 Casing Ring and Slips Figure 9 12 Use a casing ring to suspend the casing at the ground surface and for pulling pipe from the hole using jacks placed under each side of the casing ring The rings are made of cast steel and are fitted with handles All slips are cast steel with sharp teeth properly hardened Swivel pin hook 8 Pipe Tongs Figure 9 12 Use chain tongs to tighten the 6 and 8 inch drive pipe Should the pipe turn in the hole while adding a elevators top length hold the lower E Pipetongs pipe with one tong and Casing rings and slips tig Henie top lengt h with another If friction in the borehole is enough to hold the pipe while making up top lengths use both tongs on the top length opposite each other Doing so puts an even strain on the pipe eases the operation and makes abetter joint Pipe joints must be tight and kept tight while driving pipe however keep tong pressure low enough to avoid collapse of the pipe Figure 9 12 Various pieces of well drilling equipment 9 Pipe Clamps Figure 9 13 You can construct wooden pipe clamps for 6 and 8 inch drive pipe You can use the clamps to hold the pipe at any position in the hole during drilling operations b Procedures 1 Borehole Generally driven wells are started in a hole bored with a hand auger The diameter of the borehole should be larger than that of the well point and the borehole s
47. Weight This is weight you drop on nose aoaaa the pipe to help penetrate clayey or semifirm soil 3 Jetting Fluid Water is commonly used in jetting but a fluid with greater viscosity and weight may be prepared with clay or commercial bentonite However a heavier fluid tends to seal the borehole wall preventing water penetration In the jetting Pipe process fluid is led from the borehole to a pit where cuttings settle to the bottom The jetting pump then b recirculates this fluid Under certain conditions in l the Arctic steam is used to construct jetted wells Figure 9 1 Small diameter jetting pipe connection 9 1 4 Hoist You need a hoist to handle the drill pipe and casing You may use hand operated equipment such as a tripod with tackle If available you should use a percussion type drilling rig with a power hoist Figure 9 2 5 Pump A pump with suitable hose connection able to deliver 50 to 100 GPM at 50 psi is adequate The quantity of water needed to jet a well varies with the type of sediment being penetrated Sand requires the most water however high pressure is not necessary A nozzle pressure of 40 psi is usually sufficient Clay and hardpan require less water However they are not Drive weight rope to hoisting drum or spool Drive W N Clamp for turning drill pipe Drive T S lt Pipe wrench for turning casing b Saye We nat wie ott en ue vis x a MM MI
48. a drive shoe is threaded to fit the pipe or casing dump bailer method Placing grout in a casing using a dump bailer machine EAC echelons above corps electric line method A procedure to measure the water level using an M Scope See also M Scope electrode selector switch A five position switch located directly above the ohmmeter on the electrical logging system Glossary 3 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 elev elevation elevator casing A device used to handle pipe the elevator is clamped around the pipe directly PM the coupling See also pin hook sand ine ENGR engineer evaporation Direct radiation from the sun that causes liquid at the surface of a body of water to change from a liquid to a vapor evaporite Sedimentary rock that is generall capable of storing and transmitting groundwater but teds to dissolve in the water E Z Mud A synthetic inorganic polymer F Fahrenheit fall in Material that accumulates in the bottom of the borehole after circulation stops falling weight Driving method that uses a steel driving bar attached to a rope the bar falls freely inside the pipe and strikes the base of the drive point feed drive Mechanism on a rotary rig that applies a downward thrust to the drill string fibratex Commercial chemical agent added to mud drilling fluid to prevent it from freezing See also aquagel barite gel flake irnpermex micatex smentex filter cake Solids from the drilling
49. a mast Make sure the wire rope is long enough to reach the anticipated depth Advance the borehole using a suspended bit for chopping the soil or rock at the bottom of the hole Thread the wire rope through the walking beam and over a sleeve at the top of the mast As the walking beam goes down the bit is lifted as the walking beam comes up the bit is dropped As you dig the borehole unreel the rope to keep the bit just at the bottom If the borehole is dry add water to a few feet off the bottom As you lift and drop the drill bit the material is chopped and mixed with the water After an advance of a few feet use a bailer to remove the mud 2 Tools A complete set of drilling tools includes the chopping bit and a set of heavy drill jars located above the bit The stroke of the drill jars is such that when the walking beam is all the way down the bit is above the bottom of the hole When the walking beam goes up the bit drops to the bottom of the hole as the drill jars close the bit is impacted Using a drive barrel and long jars take a sample from the bottom The stroke of the long jars is longer than the stroke of the walking beam so that the drive barrel is not lifted off the bottom of the hole while driving with the impact of the jars Cable tool drilling involves many cycles Each cycle involves reeling and unreeling wire rope and is a slower operation compared to a cycle on a rotary rig 9 5 Augered Wells You can construct bored wel
50. acts as a guide through the head and furnishes the weight needed for driving 4 Drive Heads Drive heads Figure 9 10 placed on the pipe protect the threads from the driving blows of the drive clamps The drive heads are put on by unscrewing the bit slipping the drive head over the drilling stem and making up the joint again If you use the screw drive head make sure you unscrew the drive head from the pipe coupling before pulling the tools from the hole Inside drop head Outside drop head Screw type drive head Figure 9 10 Drive heads 5 Drive Shoe Always attach a drive shoe Figure 9 11 to the lower end of the pipe to prevent the pipe from crumpling while being driven A drive shoe is threaded to fit the pipe or casing The inside diameter of the shoe below the shoulder is the same as the inside diameter of the pipe A drive shoe is forged of high carbon steel without welds and is hardened at the cutting edge to withstand hard driving Screw the drive shoe tightly to butt the inside shoulder against the end of the pipe 6 Elevator Sand Line and Pin Hook page 9 10 Use casing elevators to handle pipe The device clamps around the pipe directly under the coupling You can use the sand line with the elevator for lifting one or two half lengths of pipe For heavier strings of pipe use the elevator with the swivel hook attached to the rope socket on the drilling line Figure 9 11 Drive shoe 9 9 FM 5 484 NA
51. also installing casing single string method of installing screen single string method of sinker rod D 1 site cA 3 3 smentex 10 3 snow melt patterns 2 32 nil See nin dem d d il See also dep moisture 2 32 sampling 5 34 swelling 5 24 3 F 3 SOP See standing operating procedures SOF NY SP See spontaneous potential SP curve specific yield and retention 2 8 spontaneous potential SP curve D 1 See also electrical logs SP curve of FM 5 484 NAVFAC P 1065 AFMAN 32 1072 springs 2 1 2 11 2 29 10 2 A 3 spudding in 3 16 squeezing 5 24 stabilizer s 5 8 formation 6 16 stainless stee screens See screens stainless steel STANAG See Standardization Agreement STANAG Standardization Agreement STANAG 7 1 7 8 standing operating procedures SOP 3 2 steel drill 3 5 3 16 5 7 B 2 straight pumping method 9 13 Stratigraphic sequence 2 21 2 22 stream s 2 1 2 32 A 3 and coastal terraces 2 18 string failure 5 24 structure density and orientation 2 22 stuck drill string 5 23 submergence 4 11 submersible pump See pump s submersible submersible pump method See testing pumps submersible pump method of support vehicle 3 5 B 2 supporting construction and demolition 11 5 surface See also casing surface indicators surface lines D 3 water divides 2 28 water sources 1 1 surge block method See well development surge block method of
52. and proceed with well development If you use a different type of bail down shoe the left hand threaded connection for the bailing pipe may be in the opening in the shoe or it may be in the packer fitting at the top of the screen In either case use the same procedures as above for operating the bailing down plugging the bottom and removing the bailing pipe Under certain conditions you can bail down a well screen without using a bail down shoe The bailing pipe is not connected to the screen You fit the pipe s lower end with a flange or coupling large enough to press on the packer at the top of the screen The weight of the bailing pipe rests on the screen You fit the lower end of the screen with an open ring or a short piece of pipe Be very careful when using this method because the screen is not connected to the bailing pipe and you cannot control the screen s movement from the surface Careful measurements will prevent sinking the screen too far This method should be limited to fairly short screens Plug the bottom of the screen by putting a small bag of dry concrete mix in the bottom and tapping the concrete lightly with the drill bit or other tool 6 7 Placing Gravel The most important criteria for grovel pack artificial sand filters are comet grain sizes and screen slot opening Grading should be in proper relation to the grading of the sand in the aquifer You could have trouble if you use gravel that is too coarse Coarse uniforml
53. and size of fractures in rocks TE The hydraulic conductivity of rocks and soil can be measured by field or laboratory tests Findings are recorded as volume of water flowing per unit area per unit of time and expressed as foot per day or centimeter per second Steamlines representing laminar fiow am ee ee a r d s ww m ww wncr e A e lt gt rico w s F e 00 0e8 O 6 4 o 0 o Confined aquifer gt o o o o o o o oo Confining bed Helght 1 m 4 Unit prism of aquifer Figure 2 6 Hydraulic conductivity 2 6 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 igneous and Metamorphic Rocks Unfractured Basalt Unfracured Fractured JJ Lavaflow Sandstone Fractured Semiconsolidate Shale Unfractured Fractured Carbonate Rocks Fractured Cavernous Clay Silt Loess Clean Sand Fine Glacial Till Gravel Silty Sand md Lo dl dido I od uM 10 10 10 10 10 10 10 1 10 10 10 10 10 fta daaa 0 9 gal d ft Figure 2 7 Hydraulic conductivity of rocks and soil 2 7 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 c Specific Yield and Retention Table 2 2 shows specific yield and retention percentages Only a portion of the water stored in pores can be pumped out of a well Specific retention Sr is the water that cannot be pumped out of a well and is left as a film on the rock surfaces Specific yield S is the water that can be pumped f
54. and the drill pipe has wallowed into the wall the pipe can become wall stuck Pipe friction and relatively high borehole pressure can move the pipe tighter into the wallowed groove as you pull the string An alert driller should recognize early stages of deviation and take measures to realign the hole 4 String Failure When the drill string parts leaving a portion in the borehole the drill string is rung off The portion in the borehole is a fish and attempts to retrieve the portion is fishing Fishing tools include a tapered tap and an overshot die Figure 5 13 Ringing off is normally fatigue failure in the drill rod joints caused by excessive torque or thrust repeated flexing and vibration that crystallizes heat treated tool joints or by borehole deviation with flexing of the string Examine drill rods for signs of failure 5 Deviation A deviated borehole is called going crooked If you make the initial setup without plumbing the kelly you can expect the borehole to go crooked A crooked borehole usually amplifies other problems and can make a borehole unsuitable for a well You should always anticipate deviation since the borehole naturally tends to spiral from bit rotation Variations in the formation badness may start deviation Excessive bit load magnifies minor initial deviation Use all available guides and collars and a reduction in bit load to minimize deviation 6 Swelling Soil The in hole effects of swelling soil sh
55. are preferred logs for most wells If you want an SP curve the electrode selector switch should be in the 0 25 foot position However in a large borehole or in an exceedingly high formation resistivity you may have to use the 10 foot NORMAL position In the NORMAL position the instrument is not directly reading Use 40 as the multiplying factor To become proficient in the above procedures use the test set and practice taking readings Ihe spacing between readings depends on the amount of detail being sought For most situations take readings every 2 5 feet In 1 to 2 foot thick formations take readings every 1 foot to 2 feet up the well born In logging mud filled or deep holes attach a sinker rod to the probe so you can feel the bottom of the well When using metal cover the metal with friction or electrical tape and attach the sinker to the well probe with a leather thong b With the Lateral Arrangement In areas that have highly resistive surface materials deserts or dunes or large and varying ground potentials highly industrialized areas using large direct current generators you may not be able to make a normal log Use a lateral log to overcome these difficulties Ihe setup is similar to the NORMAL arrangement except you will not need the lead oxide surface electrode POT You can complete the current circuit CUR by attaching the red wire to the well casing or any other good ground The electrode selector switch must be in one
56. breaks as a result Also when changing bits after starting a hole do not put a larger bit into an existing smaller diameter hole Always measure bit gauge and use the larger bit first to prevent pinching the gauge carbides Figure E 7 B Figure E 7 Bent casing and pinching After many hours of drilling in nonabrasive soft rock the carbide begins to fatigue A network of fine cracks appear and small flecks of carbide break away Figure E 8 The buttons have a polished effect with no flats and there is minimum abrasive wear on the bit body If not checked this will lead to further breakdown of the carbide side loading and carbide shear To prevent this type of failure in soft formation drilling reconditioning must be scheduled at intervals that do not exceed 10 percent of the overall life expectancy of the bit Popping of carbide inserts is a result of loose running A carbide will pop clean from its socket if the drill string is not properly fed up in the hole Figure ES A This is most common in overburden drilling or in broken and unconsolidated formations A large amount of energy is produced from the piston striking the shank in drifter drilling or the bit in down hole drilling if the bit is not fed up to the rock Instead of breaking the rock this energy is retained in the bit and will cause the carbides to pop Figure E 9 B When body metal around the carbide becomes too weak due to overrunning the bit without proper grinding
57. can be unstable If the mud pressure far 5 15 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 exceeds the formation pressure the cuttings may be suppressed and reground by the bit The result of recutting reduces bit life and lowers drilling rate Mud density is increased by drill cuttings the mud rising in the hole is heavier than the mud returning to the hole All cuttings should be removed from the drilling mud in the settling pits and not recirculated Although 100 percent removal is unrealistic well designed mud pits and mechanical screens desanders and desilters materially aid in removing cuttings from the mud Water weighs 8 34 pounds per gallon Clean low solid bentonite mud can weigh 8 5 to 9 0 pounds per gallon try to maintain that weight Increasing density of the mud during drilling indicates that the mud contains native solids The drill s penetration rate could be exceeding the combined effort of the mud pit desanders and fluids to effectively separate solids from the drilling mud To correct this problem slow down the penetration rate and run the desanders to remove the solids You can determine the density or weight of the drilling mud using a mud balance Fill the mud balance cup with mud and place the inset lid in the cup Excess mud will be displaced through a hole in the lid Clean the outside cup area place the assembly on the center pivot and balance it using sliding weight You read mud density as pounds per gallon and pou
58. compressor s air pressure 4 11 5 26 5 30 rotary drilling See drilling air rotary supply 5 24 transportation See C 130 C 141 C 5 transportation air Air Force instructions AFT C 1 C 2 Specialty Code AFSC C 2 well drilling See well drilling Air Force air lift method See testing pumps air lift method of pump See pump air lift air line method See measuring water level air line method of alluvial valley s See valley s alluvial alluvium 2 13 2 17 alternative completion methods See completion methods alternative well construction Se alternative American Water Works Association AWWA 6 1 S w 4 j annular space volume 5 18 Index 1 anode See sacrificial anode AO See area of operations AO APOD See aerial port of debarkation APOD APOE See aerial port of embarkation APOE Appalachian Mountains See mountains Appalachian aquagel 10 3 aquiclude s 2 11 aquifer s 2 11 6 1 A 3 A 4 confined 2 11 contamination See contamination aquifer material 2 13 perched 2 11 tests 2 11 unconfined 2 11 aquitard 2 21 arctic water supply 10 1 well construction 10 1 area of operations AO 1 1 Army well drilling 1 2 See also well drilling Assistant Chief of Engineers ACE A 2 attapulgite 5 13 5 17 See also mud products augered wells See well s augered auger s hand 9 10 9 16 hollow stem 11 1 power 9 16 auxiliary a
59. drill string and hoses The ports in the drill bit are smaller to prevent large particles from entering and becoming lodged Pumps are available that can pass granular soil but not without damage Pumps are not designed to handle large gravel To prevent cuttings from passing through the pump a jet eductor is used to create a vacuum Water is pumped through the eductor at a high rate 600 to 1 200 GPM producing a vacuum approaching 28 inches of mercury and pulling large volumes of water and cuttings Bolted flanged pipe connections are popular The flanged joint makes a reasonably smooth joint inside Kelly and swivel assembly Draw works assembly T Power unit Vacuum priming pump Kelly bar Vacuum tank Figure 5 17 Reverse circulation rotary drilling 5 33 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 and the large torque required to rotate the bit does not over tighten the joint Air bubbles injected into the circulation system at the bit increase turbulence and velocity and decrease fluid density inside the drill string Reverse circulation drill pipe is fabricated from 6 inch ID tubing with standard pipe flanges and air pipes Generally two 3 4 inch pipes are welded 180 degrees apart along the outside of the drill pipe with holes drilled through the flanges These pipes are turned into the system near the bit Compressed air is pumped through these pipes to assist in removing cuttings The flanged pipe connections are adaptable to the a
60. drilling the circulating fluid is pumped at high velocity down the drill string and up the annulus Weighty thick building materials are dispersed in the fluid to help lift the cuttings You will need additives because the annulus area is greater than the cross sectional area of the drill pipe and the upward velocity in the annulus is much slower than the downward velocity inside the drill pipe Additives help stabilize the borehole wall and keep it open With reverse circulation fluid is sucked up the drill string at a high velocity and then moved down the annulus The larger the annulus the slower the descending velocity This method of drilling is used primarily for large diameter shallow over 300 feet water wells in alluvial materials a Advantages and Disadvantages Reverse circulation is most effective in granular materials with little cohesion In cohesive soils fluid will not clean the drill bit The advantages of reverse circulation are e Slow moving fluid in the annulus walls are less apt to erode e Additives usually are not needed since the turbulence and high velocity inside the pipe lift the cuttings e Borehole wall cake is finely filtered and easily removed during well development The following lists disadvantages of reverse cumulation 5 32 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 e Stability depends on excess inside pressure acting against the borehole wall e Borehole wall is not sealed by an effective filte
61. drilling fluid For standard drilling operations that use well completion kits well depths could range from 600 to 1 500 feet For wells up to 600 feet using the 600 foot WDS use portable mud pits For wells over 600 feet use dug mud pits In either case you will have to clean cuttings from the pits as drilling progresses Design considerations include the anticipated depth and diameter of the drill hole since the material cuttings from the hole will be deposited in the mud pits Figure 5 4 page 5 8 page 5 8 The volume of the pits must equal the volume of the completed hole Therefore during drilling you will have to clean the cuttings from the pits frequently If you have a backhoe to dig and clean the pits size and depth of the pits are not critical If you must dig and clean the pits with shovels width and depth are important Drilled cuttings should drop out of suspension in the mud pit Therefore long narrow pits are better Figure 5 8 shows a mud pit layout and a chart depicting mud pit capacities and dimensions NOTE Portable mud pits will require constant cleaning 5 18 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Pump Hose Suction pit Shallow ditch Flow ditch Rig Settling pit Direct Rotary A Rectangular mud pit Volume gal length ft x width ft x depth ft x 7 5 B Pit with sloping sides N Y Volume gal length ft x average width ft x depth ft x 7 5 Average width width at top
62. earth material making up the formation e Degree of cementation of the formation e Water quality of the formation water e Porosity of the formation e Diameter of the well born e Resistivity of the fluid in the well bore Granular materials will have high resistivity compared to fines such as silt and clay crystalline materials such as limestone or granite will have high resistivity compared to the granular materials The quality of the formation water will affect the measured resistivity In general the resistivity of a formation will vary in an inverse proportion to the total dissolved solids For example if all conditions remain the same but the total solid content increases the formation resistivity will decrease Hence a clean sand filled with salty water may actually have extremely low resistivity Porosity of the formation also has an effect on the resistivity In the logging of chemical precipitates such as limestone changes in porosity may enable you to detect the water producing zones Increased porosity will lower the formation resistivity and hence in such material a low resistive zone where no shale is present is indicative of increased porosity This is then indicative of possible water production In the midwestem United States clean sand and grovel generally exhibit resistivity values of 350 to 1 000 ohm feet The lower values apply to formations having water quality in the range of 300 to 400 ppm total solids and th
63. either inside the earth s crust or on the earth s surface lava Basalt and granite are two common igneous rocks that military well drillers encounter 2 Sedimentary These rocks are composed of sediments that are converted to rock through compaction cementation or crystallization Sedimentary rocks cover about 75 percent of the earth s surface Over 95 precent of these rocks are comprised of shale sandstone and limestone 3 Metamorphic These rocks are igneous sedimentary or preexisting metamorphic rocks that undergo further transformation by temperature pressure or chemical changes The transformation usually occurs very deep in the earth s crust Schist and gneiss are common metamorphic rocks 2 5 Groundwater Hydraulics a Porosity Soil and rock are composed of solids and voids pores Groundwater can fill up and flow through pores Pores formed at the same time as the rock such as in sand gravel and lava tubes in basalt are called primary openings Pores formed after the rock was formed are called secondary openings Examples are fractures in massive igneous rocks like granite and the caves and caverns in limestone The pore sizes vary and mayor may not be filled with water The ratio of volume of the pore space to the total volume of the soil or rock is called porosity Porosity is normally expressed as a percentage Table 2 1 Figure 2 5 page 2 6 shows primary and secondary openings b Permeability The p
64. filter pack sand while tapping and twisting the string to settle sand firmly Continue falter pack addition upward to at least 1 foot above the screen e Add bentonite pellets to the annulus above the filter pack for at least 2 feet Seal the remainder of the annulus to the ground surface and grout in a protective collar 11 4 Supporting Construction and Demolition Support for drilling operations for a construction or demolition unit is an expedient mission The supported unit determines drilling requirements A support mission is used as an alternative to mobilizing and fielding a separate drilling operation For construction support you can use a water well rig with supplemental equipment for rock excavation You will need bits designed specifically for drilling rock rapidly without sampling Rock bits include button bits used in down hole drilling and tricone and other hard roller bits for 11 5 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 rotary rigs Rock drilling applications might include foundation preparation road cuts and weapons pits For demolition support a demolition specialist will provide specifications and guidance for preparing area for emplacing demolitions or munitions For information regarding safety when using explosives and demolitions see FM 5 250 You should use the rotary rig and special bits for expedient drilling and for placing demolitions In soil auger bits are ideal for shallow depths The auger has large diame
65. fracture joint or fault that disrupts the continuity of rock units geyser effect A result of denser mud in the anuular space flowing down the hole and forcing the clean drilling mud up the drill rods going crooked deviated borehole GPH gallon s per hour GPM gallon s per minute gravel pack Artificial sand filter gravity outflow method A backwashing method that involves pouring water into the well rapidly to produce outflow through the screen openings groundwater indicators Features that suggest the presence of groundwater hand auger A device that consists of a shaft or ipe with a wooden handle at the top and a bit With curved blades at the bottom a hand auger Glossary 4 can penetrate clay silt and those sands in which an open borehole will stand without caving helical rotor pump A positive displacement rotary screw or ee RAD e m designed for relatively low capacity high lift wells that arc 4 inches or larger in diameter HQ headquarters hydraulic conductivity A measurement of the relative flow of water through a subsurface material the results of the measurement are related to the size and spacing of particles or rains in soils or to the number and size of ractures in rocks hydrographic basin local drainage basin Subdivision of a regional river basin See also drainage basin major river basin regional river basin hydraulic gradient Determines the direction of groundwater flow hydrologic c
66. from recharge to discharge areas 4 Surface Water Divides Surface water divides can form boundaries between groundwater tlow systems The mounding of groundwater under areas that receive recharge from the intiltration of precipitation causes groundwater to flow away from the recharge area Similarly surface water flows away from topographic highs that often correlate with groundwater recharge areas so that surface water flow patterns usually coincide with groundwater flow patterns The identification of surface water divides can help define groundwater flow systems 2 28 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 c Surface Indicators Surface indicators are those features that suggest the presence of groundwater These indicators can provide information about the depth quantity and quality of the groundwater resoures in an area however they do not positively indicate the presence of groundwater The resource potential of an area is an inference on the basis of the presence or absence of certain indicators and particularly the association of these indicators 1 Springs Springs are effluences of groundwater occurring where the water table intercepts the ground surface Springs are usually good indicators of the presence of shallow groundwater occurrences However the presence of shallow groundwater may not be indicative of a good area for well construction Springs occur where groundwater discharges to the earth s surface Figure 2 32 shows
67. harder to blow out of the borehole or the cuttings may stick to the borehole wall causing constriction Minor wetting or dampening makes some walls more stable excessive wetting can cause a wall to fail Adjusting the amount of water injected into the borehole takes experience Air has no wall stabilizing qualities In soils where sloughing and caving are a problem injection of a thin drilling mud bentonite mixed with the injection water will control the dust and can contribute to stability In drilling large diameters 12 inches with standard drill pipe 3 1 2 inches OD the annulus equals 0 7 square feet Using a 1 000 cfm compressor the up hole velocity would be about 1 400 fpm which is not enough velocity to remove cuttings While penetration will progress the cuttings tend to stay at the bottom of the borehole under the drill bit and are recrushed These cuttings act as a pad under the teeth of the bit and prevent proper cutting action The compressor normally cannot drill holes by straight air rotary Use the following equations to estimate compressor size up hole velocity and hole size requirements for air drilling op Figure 5 14 page 5 26 to determine up hole velocity The recommended up hole velocities are 3 000 fpm minimum 4 000 fpm fair and 5 000 fpm good Vmin D d 16 5 where Vmin minimum velocity in cfm D hole diameter or bit size in inches page 5 8 d drill steel or drill collar in diameter
68. high lifts 100 to 200 feet 22 to 26 feet 22 to 25 feet Up to 600 feet Up to 600 feet above cylinder Very efficient pump for capacities above 50 GPM and heads up to about 150 feet 1 Loses prime easily 2 Efficiency depends on operating under design heads and speed 1 Smooth even flow 2 Pumps water containing sand and silt 3 Pressure on system is even and free from shock 4 Low starting torque 5 Usually reliable and good service life 10 to 20 feet 100 td 150 feet i centrifugal single stage Reduction in pressure with increased capacity not as severe as straight centrifugal Same as straight centrifugal except maintains priming easily 28 feet maximum b Regenerative 100 to 200 feet 1 Efficiency depends on operating under design head and speed 2 Requires straight well large enough for turbine bowl and housing 3 Lubrication and alignment of shaft critical 4 Abrasion from sand Impellers 50 to 300 feet 100 to 800 feet Same as shallow well turbine submerged la Vertical line shaft turbine multistage Difficulty with sealing has caused uncertainty as to service life to date ib Submersible 50 to 400 feet 80 to 900 feet 1 Same as shallow weil turbine turbine multistage 1 Repair to moto
69. in areas without geologic maps Landforms can provide information related to water depth well production potential and water quality Table 2 5 lists landform classifications with hydrogeologic conditions that may be based on the presence of the landforms 2 24 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Table 2 5 Landforms and hydrogeologic characteristics Hydrogeologic Characteristics Mountains Mass Mountains are usually recharge areas and Range locations of flow system boundaries Chain Plains River floodplains and playas are usually Active river floodplain discharge areas and have fair to poor water Structural plain quality Structural plains have little groundwater Playa potential Valley plains typically have good Other alluvial plains otential because of high transmissivity Wind formed features Wind formed features typically indicate the lack Yardang of recharge and very low groundwater potential Dune at shallow depths aithough deep confined Blowout aquifers may exist Water formed features Terrace Deltas and alluvial fans are recharge areas for Alluvial fan surface runoff Swamps marshes and Delta wetlands are discharge areas and indicate Swamp marsh and wetlands shallow water Badlands indicate the lack of a Al atrial taba atar tahla INCILUI CU ICA CAGWI LLAMAS TZ Badlands iibi ets features Marine formed features indicate very shallow Ti hup but saline groundwater Man made features Mining pit Man made
70. installing casing and completion See welKs jetted casing and completion method for and well screen 3 18 See also screen s well bent E 4 PVC 6 7 ring and slips 9 10 sealing 7 8 See also grouting and sealing casing selecting 6 1 setting 6 1 surface 3 18 6 10 catchment 2 12 cathodic protection 7 9 caving hole 5 18 CF 15 S drilling system 3 4 3 8 3 9 3 12 3 13 cfm See cubic feet per minute cfm rx ea rwu r le Coo wall dawalanmant rhamirale Witt EE RE e M3 L KK VY B wa YE S44 X F used in circular orifice method See measuring discharge rate circular orifice method of circulation pressure and velocity 5 7 closed well method See well development closed well method of combat zone 1 2 communications zone 1 3 Index 2 completion methods alternative 9 13 compressed air methods See well development compressed air methods of compressor s 4 11 5 25 air 3 8 8 2 B 2 w3 wv lt estimating size of 5 25 conductivity hydraulic 2 6 through 2 11 A 4 consolidated deposits See deposits consolidated construction See supporting construction and demolition contamination 10 3 11 2 11 5 A 4 See also seal s sanitary aquifer 2 35 groundwater 2 37 Continental United States CONUS C 1 continuous slot screens See screens continuous slot CONUS See Continental United States CONUS core barrel s 11 1 11 3 core method 11 3 CPM See cri
71. into that space enter the screened interval and degrade the well The decision to use this material usually occurs during the well construction process In unstable formations consider stabilizing wherever the annular space is more than 2 inches thick 6 16 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Bailing pipe Gravel added as screen is bailed down ER C wonao E A SA Rc SI t ER Sra a re T T HTHH III xa Vt P gt E 5 EU LM A t t id LE pos NT s te x ag alee nae faut ET EES w gt x LP 5 S PS p M 2 Vw e s m K I U E L a ae N s id ou 4 A m le A A P zo gt a S Le ar A 2 me be 9 x E E t A a sae x A E ova t o gt LI U a Figure 6 12 Bail down placement Grain size is important since you will develop the aquifer naturally and as much as half of the stabilizing material could flow through the screen The grain size should average slightly coarser than that of the aquifer and should be well distributed Widely used formation stabilize are 6 16 FM 5 484 NAVEAC P 1065 AFMAN 32 1072 Permanent casing Temporary casing Yj oa Yj yy 7 ed Wj O at 1 Pe pg a e e or ere Ni A iva do 7 e fe a T LES es d dor Es U Uu zy
72. is affected by its density and the density of the drill cuttings If the cuttings are denser than the fluid they will descend The magnitude of the difference in density particle size and fluid viscosity affect the rate at which a particle descends Particle slip denotes this downward movement through the fluid Ignoring thixotropy the actual downward particle slip is constant regardless of velocity of flow However when the upward velocity of fluid exceeds the downward particle slip the new movement of the particle is upward Up hole velocity plays a major role in determining the carrying capacity of the cumulating fluid The practical limits of up hole velocity depend on pump size and capacity inside diameter ID of the drill string jet size in the bit viscosity of the fluid cross sectional area of the annulus and stability of the borehole wall Up hole velocity is not as simple as the comparison of pump capacity drill string ID and annulus Up hole velocity is not a constant The density of the drill fluid serves other purposes Depth of in rotary drilling Heavy fluids can control hold Mrd down formation pressures encountered in drilling 100 You can build heavy mud by adding a weighing Bottom material such as ground barite specific gravity 4 25 306 Kun Fluid Prepare drilling mud in excess of 20 pounds per gallon psi ele by using barite First mix bentonite and water to build b gal Ib ft en 50 viscosity Then add fin
73. is not transportable in a C 141 Even in the reduced weight configuration the rig still exceeds the maximum allowable weight per axle The machine may be transported by C 5s in its operational configuration without any special procedures or disassembly See Technical Order TO 1C 130A 9 for specific loading instructions 3 12 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 0 5 0G 9 d 9 d 9 s quam aum ws Air compressor Mast support Air tank Hinge post top section Wire line guide Engine Mud pump Air line quard Mast raising cylinders Air pipin S 1 2 3 4 5 6 Figure 3 10 Preparing the CF 15 S for loading 2 Ground For ground transportation the kit requires 7 long bed 5 ton cargo trucks or 3 tractor trailer trucks 3 Rail For rail loading the mast must be removed and secured to one flat car The rest of the drilling machine is mounted on a second flat car 3 7 Drill Rig Setup Before setup teams must inspect the rig for damages during deployment During the inspection they should perform preventive maintenance checks After inspecting the rig setup can begin Teams should use the following steps for the setup Step 1 Position the drill rig The rotary table should be over the center of the hole location If you are using a portable mud pit set the pit in position with the overflow pipe over the well location Extend the rotary table on the drill rig to the working position and move the rig if
74. is satisfactory for lubricating and cooling the tools However water has limited abilities to carry cuttings and stabilize the borehole wall Many drilling fluid additives are prepared and formulated for various purposes Polymer fluids and water based clay fluids 5 are the primary additives used in water well drilling Table 5 5 lists drilling fluids Mud cools and lubricates through heat absorption from the bit and reduction of drill string abrasion against the borehole wall Heat is generated as the bit scrapes and erinds Without the cooling fluid the bit would overheat and be useless Research indicates that removing the cuttings around and under the bit is the most important factor in keeping the bit cool Requirements for cooling fluid are less than those for removing the cuttings FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Table 5 5 Drilling fluids Primary Application Weighting Agents and Viscosifiers RR l gt Bentonite IMCO GEL Aquaigei Magcogei Viscosity and filtration contr water based drilling fluids Sub bentonite IMCO KLAY Baroco High Yield For use when larger particle size is Blended Clay desired for viscosity and filtration control Attapulgite IMCO BRINEGEL Zeogel Salt Gel Viscosifier in saltwater drilling fluids Beneficiated IMCO HYB Quik Gel Kwik Thik Quick viscosity in fresh water with bentonite minimum chemical treatment Polymers Natural organic Revert Lightweight
75. k A Y L i gt pon aes I I D esed 2 a fm a a w Y Rest I Y i I l 3 teet Pi Suction screen E 4 feet Drill casing Settling pit SEE TR Se EE Pe Ce ER L 5 feet Storage pit Figure 5 9 Mud pit prepared on site Primary mud pit Secondary mud pit Overtlow pipe Drive sleeve Suction fitting Cn Gasket Figure 5 10 Portable mud pit 5 20 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 If drilling mud is processed through shale shakers desanders desilters and space and time for cuttings settlement are not important long narrow pits connected at opposite ends by narrow shallow trenches are preferred If using a polymer fluid that has no thixotropic qualities the settlement of cuttings is a function of time at low velocity or no flow With polymer fluid a long path mud pit is ideal if part of the flow almost stops cutting settlement is enhanced If you use a clay based mud with thixotropic qualities and the mud moves slowly or flow stops the gel strength can hold the cuttings High velocity through narrow shallow trenches holds the cuttings in suspension If mud runs over one or more wide baffles or weirs flow shear and velocity are low These factors enhance cuttings to drop out If mud processing equipment is available use it Recirculating clean fluid_reduces power requirements wear and erosion
76. list of the hardware and materials placed and left in the well NOTE Well casings should extend no more than 12 inches above the pump house floor on a final grade elevation and not less than 12 inches above the normal anticipated flood level b Sealing Casing A well must be carefully protected from sewage and other contaminants that could migrate down the well column to the aquifer and well screen Sources of pollution could be on the surface or in shallow perched water unusable aquifers and intermittently saturated beds Carefully planning the well s location could help avoid the surface sources However you may not know about subsurface contaminants until you start drilling the well If that occurs you will have to alter plans and seal the well quickly Chapter suse sealing or grouting operations See STANAG 2885 ENGR Edition 2 for sealing a NATO well A rock well may be grouted from the lower end of the casing to the surface You can place erout between the inner and outer casings and around the inner casing in a portion of the drilled borehole below the outer casing Make sure that overburden does not seal the borehole after you set the casing c Disinfection All newly constructed wells should be considered contaminated from the construction process and disinfected immediately after completion Well completion kits provide packages of a dry chlorinator for breaking down synthetic drilling fluids to disinfect the wells Prepare a chl
77. low solids drilling fluid for polymer viscosity and filtration control in Lightweight low solids drilling fluid for Z m fa ii s PN m City eld Ar nwn trl im VIDLAJ O ty AI 11 U 9 OUA IUWI H water based drilling fluids made with bentonitic additives water based drilling fluids Synthetic organic E Z Mud aia an m aa Foaming agents IMCO Foamant Quik Foam i Used in air drilling to increase hole cleaning capability and reduce compressor requirements for a given depth or rate of water inflow Sodium tetrapyro IMCO PHOS Barafos Magco Phos Thinner for freshwater drilling fluids with phosphate clay additives NA1P207 Sodium acid pyro Used in water based drilling fluids made with Clay additives to aid in dropping am al beet won s mmm Domus Min pl sand 4 LO UGT MS 11 1 OMS S torque anu minimizes bit balling Paraformaldehyde Aldacide Prevents organic additives from PRESERVALOID Eu d degradation Commercial Chemicals Sodium hydroxide Caustic soda Caustic soda Caustic soda For pH control in water based drilling NaOH fluids Sodium chloride Salt Salt Salt For solution weighting of water based NaCl drilling fluids made with polymeric additives Calcium chloride Salt Salt Salt For solution weighting of water based CaClo drilling fluids made with polymeric NT U additives Also used for development of wells drilled with bentonite additives Th
78. make all observations and logs Table 11 1 Methods of exploration and sampling All soils cannot penetrate Samples recovered from the Almost valueless sometimes boulders wash water deceptive Open end pipe or spoon Reliable inexpensive soil driven into soil at bottom of compaction is measured by hole resistance to advance Wash boring All soils cannot penetrate Drive sample boulders or large obstructions Cohesive soils and an s Samples recovered from Visual classification and Ran NE oe sroundwater elevation matenal brought up by augers limited tests Bailed sample of churned Visual classification and Cable tool All soils rock and boulders matenal or cav socket Rotary drill Cuttings recovered from i ed hol All soils rock and boulders circulating fluid caring for Visual classification ineo cownnos undisturbed samples All soils lowering of Samples taken by hand from Material can be inspected in roundwater may be necessar iginal position in ground natural condition and place Equipment commonly used for drilling water wells Test pit 11 1 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 The driller should log each borehole regarding the depth reached and material taken For field logging of unconsolidated materials use the Unified Soil Classification System in FM 5 410 for consistency and compatibility of terms The driller may have to rely on initial visual examination of cuttings to describe the format
79. nation may also require more detailed documentation on the water sources Because of the amount of water consumed during desert operations up to 20 gallons daily per person the challenge may not be in locating and drilling for water but in finding who can identify water sources and give permission for using the sources In desert mountain areas wells should be sited on the alluvial fans that extend from the mountains to the desert Figure 2 35 page 2 34 Mountain areas usually receive more rainfall and the streams draining away from the mountains carry coarse gravels and sands that when deposited produce the fans Figure 2 36 page 2 34 At moderate depths these fans may yield water In 2 33 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Consolidated i A lt Water bearinc Alluvial deposits A fractures yw is v A NINO Granitic and metamorphic rock Figure 2 35 Geologic features in an intermontaine valley Fan deposits overlying the rock pediment Canyon Salt flats or playas Figure 2 36 Desert mount and plain terrain deserts such as in Egypt Jordan and Saudi Arabia deep confined aquifers are capable of producing extensive quantities of water Locally shallow confined aquifers come to the surface at an oasis characterized by more extensive vegetation than the surrounding areas Figure 2 37 Wells may be sited in the vicinity of an oasis to tap the confined aquife
80. oee e S Pasa Zatan eee te L S ele t gt LNH a b tta Laan Sua Q nO lt a P lt k ias ee oF none cent s Fete te MAIS t os otro 6 e 9e eu Z AP 9 ae een 0070002 MO e otro to HAVANA Jo O TO e ka tee te PA TIRAS Fete Pa 0 0 ev er or 9 09 0 a 9 9 00 ACC i oar 9 e eee o ATE eee t t eto LN HOAT e e AA tots e rr tros w 9 9 a oes e e AES Tee Soo ee 00 se DOUJ e s 1 ARS eoo oe t ee OPP LPT IATA ZEN CLE ee eee e M Pto gett ocn ee eee fs 2 oe e MN EXE eof e 2 eq a v q esses tena 2 e e deos ee nat c e oe oue e Pu ec TARA IIA e 9 3 Ce MIDA AAEE TOTE LUN TT AA weet e eet ANAL 5 5 5 j HH LC e e o Cer r equat e leto etes qe e Saee b eee oe eo 9 0 o aT nooo rr otr e KEL 0 KAT E oe org 9 7 799 9 e e q ee b L YUNA gt ATLET T M3 dj e Seana Le CY RUE a oe IES a cronos 6 900 Lo 0 6 e e to e acter an ot 0 eee so o e 4 e ttoo e 96 0 7 49 759 o 9 99 49 a b e qe rro tr e AI 5 52 G PIANO C ss e otto e e aet eee e oe o9 0 09 o o e e o qatos AE EII oe N POR et AM Chee eS at ea RAT Pe AA oe AR o ROC an Zep sanh ea t e P E Pae CODO RIADA eten eeo TOT Peet a POTTER o e see to SER
81. of flow depends on the cross sectional area of the fluid course and the velocity density and viscosity of the fluid In water well drilling the cross sectional area of the annulus is usually several times that of the inside diameter of the drill string Because of the increase in volume in the annular space flow at the point the fluid leaves the bit is turbulent The fluid becomes laminar flow when it begins flowing up the annular space The returning fluid velocity is slower and the drill fluid is more dense and probably has more apparent viscosity which affects the flow pattern To clean the hole and carry the drill cuttings out turbulent flow in the annulus would be better 5 17 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Picture the flow in the annulus as a series of nested tubes Velocity varies as if these tubes were sliding past one another while moving in the same direction Flow near the wall and near the drill string is at a slower rate than near the center Cuttings near the center can be vigorously lifted while cuttings near the wall and drill string actually slip in a net fall Rotation of the drill string changes the flow pattern near the drill string and materially enhances particle lift For example if you use a 3 1 2 inch ID and 4 inch outside diameter OD pipe to drill a 9 inch hole and pump 200 GPM the velocity of the ID pipe is 400 feet per minute fpm and the velocity of the OD pipe is 75 fpm To test cumulation at these rates
82. of water significantly 4E _DE 1h 74 M nail NE ER on_41 0n Pae a arrani eNi a man alis an A IS PA AS 7e MMI 1 VA Neu Us SJ UU rc ror nomma OMN CONUMONS Sana sui aig ciay 25 40 Ib 100 gal 55 70 x 80 120 For gravel and other coarse grained poorly con solidated formations gal Water Polymer natural increases vi em lifting capacity of water significantly 4 0 1b 100 gal 35 55 80 120 For normal drilling conditions sand silt and clay 6 1 1b 100 gal 65 75 80 120 For gravel and other coarse grained poorly consolidated formations 6 5 Ib 100 gal 75 85 80 120 For excessive fluid losses Cuttings should be removed from the annulus before the pump is shut down because polymeric drilling fluids have very little gel stren 3 000 5 000 Fast drilling and adequate cleaning of medium to fine cuttings but may be dust problems at the surface 4 500 6 000 This range of annular uphole velocities is required for the dual wall method of drillin Air Water air mist 0 25 2 00 N A 3 000 5 000 Controls dust at the surface and is suitable for GPM formations that have limited entry of water Air Surfactant water air foam N A 0 1 000 Extends the lifting capacity of the compressor 1 2 qt 100 gal For light drilling small water inflow sticky clay wet 0 25 0 5 surfactant sand fine gravel hard rock few drilling problems For average drilling conditions larger diameter UE 3 qt 100 gal deeper
83. on the bit and the material being drilled Try to regulate the speed to produce the correct size cuttings Experience will help you determine and regulate rotation speed 5 Fluid Requirements Fluid requirements depend on size weight nature of cuttings and circulation velocity Velocity depends on capacity and condition of the mud pump annular area in the borehole and the stability and permeability of the formation Sed paragraph 5 16 page 5 8 for more information on drilling fluids Use the following calculation and Figure 5 4 page 5 8 to estimate the mud pump output and velocity and the hole size requirements V D 422 where V velocity in GPM D hole diameter or bit size in inches d drill steel or drill collar diameter in inches 6 Circulation Pressure and Velocity These elements of the drilling fluid are controlled by the pump capacity and speed The fluid s density velocity and viscosity let it carry cuttings If the drilling fluid is too thick cuttings will not settle in the mud pit Sufficient velocity with a fluid of low viscosity even water will carry drill cuttings to the surface Excessive velocity will erode the wall of the hole to the extent of failure 5 7 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Rotary drill d lt q Drill steel size S Figure 5 4 Hole diameter Figure 5 5 Stabilizer Pump pressure results from flow resistance caused by viscosity fri
84. on the screen If the openings are too large you may have to develop the well more than usual or you may not be able to clear the well of sand 6 9 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Screen slots that are sized to retain the coarsest one third to one half of sand or gravel of the aquifer work best in a naturally developed well About two thirds of the sand in the layer behind the screen should pass through the slots A screen set across both coarse and fine strata may need sections with different slot sizes If you have to pack the screen with gravel artificially make sure the slot openings correspond to the size of the gravel you use Screen openings that retain about nine tenths of the gravel work best 6 6 Installing Screen You can use several methods to install screens in rotary drilled wells To set well screens you will use the screen hook and casing elevators You use the hook to engage a bail in the bottom of the screen to suspend the screen on either the sand line or hoist line while lowering the screen into the well Figure 6 6 Do not pull the screen with the hook after the formation has closed in around the screen If you are installing a screen using the telescoping method and you must seal the casing you will need rubber or neoprene packers All screen setting methods require accurate and complete measurements of pipe screen cable length and hole depth a Single String Method With this method you Wine install the ca
85. organic inorganic natural synthetic ors synthetically formulated natural polymers Polymer additives are formulated for various drilling fluid purposes and can be used alone or to enhance clay muds Polymers containing salt and other contaminants are available and are compatible with water Polymers are more sensitive to pH than are bentonite muds Change the pH to effect desirable changes in the polymer fluid Drilling fluid weight impacts drilling rate and high density drilling fluid reduces drilling rote There is strong indication that the solids of a fluid have a similar effect as density Polymer fluids are very different from clay muds because a large part of the polymer is soluble in water and becomes a solution when mixed with water Long complicated molecular chains tie up the water and can build viscosity without solids In water well drilling many polymers are manufactured for producing drilling fluids such as E Z Mud Revert and Poly Sal E Z Mud is a synthetic inorganic polymer Revert is a natural organic polymer fluid derived from the guar plant Polymers are generally best mixed through a mud gun Polymers used for special purposes are available from the manufacture complete with specifics on how to use the product Most polymers can hydrate more water than a high grade bentonite Up to ten times more bentonite is needed to build the same viscosity in a given amount of fluid depending on the quality of the polymer A polymer doe
86. paragraph 9 3a 1 page 9 6 If you find groundwater in jointed clay complete bored wells by lining the hole with clay tile Use bell and spigot type tile and set the tile in the hole with the bell ends down Pour coarse sand around the tile You cannot ensure a sanitary well using this completion method Therefore use this method when it is the only possible solution FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Chapter 10 Arctic Well Construction 10 1 Considerations a Arctic Water Supply Supplying water for operations or bases in the Arctic and adjacent cold regions requires careful planning due to the harsh climate and ground conditions Potable water is widespread at the surface in some cold regions but is uncommon in more arid cold regions Locally surface water can be melted from ice or pumped from unfrozen lakes or glacial melt pools Many surface sources are only dependable during the summer months leaving potential problems in supplying water throughout the year More dependable year round supplies of groundwater may be developed through wells in relatively shallow unfrozen strata Figure 10 1 and from wells that fully penetrate the permafrost WARNING Do not touch cold metal with your bare hands Active layer does not always extend to permafrost table Permafrost island PER SEIS L or lens Unfrozen ground Nee RR RI i Discontinuous Permafrost Active layer Usually extends to permafrost table Perm a
87. required to the final position Set the rotary table exactly over the well or the mud pit overflow pipe Step 2 Position and extend the leveling jacks The jacks level the drill rig remove the weight from the rig s suspension system and provide a stable rigid drilling platform In soft soil you may have to use timber under the jack pads to prevent the rig from sinking into the soil Step 3 After extending the jacks raise the drilling rig mast Figure 3 1 page 3 14 Check for overhead obstructions or power lines Periodically release the hoisting drum and auxiliary drum brakes to allow slack in the cables After fully raising the mast lock it into position and recheck the drill rig s level Step 4 Check and if necessary connect the discharge piping Depending on the type of drilling operation connect either the air compressor or the mud pump to the standpipe on the mast Step 5 Install or dig a mud pit whichever is applicable Make the appropriate connections to the mud pump to ensure continuous cumulation of the drilling fluid 3 13 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 DANGER Before drilling check the area for underground electrical cables DANGER You must wear hard hats or helmets when working within 50 feet of the rig TII ARA AA AAA ARA ARA RARA ARMA B Tg gg gg ag lf of QW S ua P o E ER p nee YH r r Z Z DAP 73 s 7 TIA Aa SS SS N When drilling pa
88. responsible for producing and maintaining the WRDB The WRDB provides information on quantity quality and availability of water resources worldwide on an areal or point basis This information helps commanders make water support logistics decisions and supports the Defense Mapping Agency s DMA terrain analysis program The data base includes hard copy thematic overlays 1 250 000 scale base maps that show the location quantity quality and accessibility of existing water resources surface water supplies and potential groundwater sources in selected arid regions in Southwest Asia The terrain team evaluates the database and responds directly to the requester if sufficient data is available If no data is available or if more information is needed a WDRT could be formed The terrain team sends a request for assistance in locating groundwater supplies through Army Command channels to the U5 Army TEC TAC The WDRT manager at TEC TAC designs a team from the on call roster Ihe chain of command for other components from unified or specified commands to request data is the Terrain Team of the Army component command or through command channels Joint Chiefs of Staff JCS and DA Locating and evaluating water supplies in an area would be conducted in an integrated systems manner beginning with data base querying and followed by examining imagery and maps The support command would decided which areas needed additional surveys A WDRT may be deployed t
89. rig can often drill blind successfully but reestablishing circulation is always safer Reestablishing circulation can involve several techniques You can add commercial items such as chopped paper straw cottonseed and nut hulls to the mud pit Sometimes while the loss zone is grouted and redrilled the grout is lost into the formation In this situation you may have to set casing through the loss zone Occasionally reducing fluid velocity while continuing to drill will plug the loss zone with drill cuttings Reestablishing circulation is usually a trial and error process The longer you drill without circulation the more difficult it will be to reestablish circulation 2 Fall In Fall in is material that accumulates in the bottom of the borehole after you stop cumulation This material is borehole wall material that results from sloughing or caving or cuttings previously carried in suspension Fall in occurs when you encounter a loose unstable formation and the drilling fluid weight is insufficient to stabilize the formation If you anticipate or suspect fall in raise the drill bit off the bottom of the hole 20 foot minimum each time drilling is interrupted This will prevent the cuttings and fall in from settling back around the bit until the problem is solved 3 Stuck Drill String The drill bit and any collars just above the bit are larger in diameter than the drill pipe The string becomes stuck when cuttings collect on the bit and co
90. rig does not have a portable mud pit or if the portable pit does not have sufficient volume teams should construct a pit during the site preparation phase 3 5 Equipment Current Army well drilling and well completion equipment consists of the 600 foot well drilling system WDS that includes e A truck mounted drilling machine e A truck mounted tender vehicle e A well completion kit The Army also uses the CF 15 S trailer mounted 1 500 foot well drilling machine and 1 500 foot completion kit The 600 foot WDS replaced the CF 15 S trailer mounted machine and 1 500 foot completion kit However the CF 15 5 may still be found forward deployed for contingency purposes a 600 Foot WDS This system is used to support well drilling requirements The WDS can be deployed with minimal preparation and support equipment anywhere in the world The WDS consists of FM 5 484 NAVFAC P 1065 AFMAN 32 1072 e An LP 12 rotary well drilling machine mounted on a NAVISTAR 6 by 6 truck chassis e A support vehicle e A lightweight well completion kit including accessories supplies and tools needed for drilling a well With the completion kit drillers can complete a well to a depth of 600 feet using mud air or a down hole hammer with or without foam injection By adding an auxiliary air compressor and a drill pipe the 600 foot WDS can drill to depths of 1 500 feet and accommodate the 1 500 foot well completion kit The well drilling machine
91. s log FM 5 484 NAVFAC P 1065 AFMAN 32 1072 So Surse pue Surdid aides s an VE OE X i Null 4 p e q YOLVIIGNI IHH IM ididH2V1H19N11 3WI1 32V14 NI 3WI1 31vVG STVILING siuITNYO L m SEC bi st qu 994 hoyo WI apa LT aer it lot fom ul aS ot veo Pugh ISN ANY IZIS Jdid S YIIWNN TIIM I 201 DNISVI QNYV DNIdid 5 37 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 4 YOLYHONI LH95I3AA JALLVINWND LHOIZAA Zo Suisvo pue Suidid s duieg penunuoo 6T S mi 3did H2V3 LHOIZAA 79 IAILVINWND H19N31 Jdid HJV J H19N11 oror Ri UTE 7J HT 3WIL 32V Td NI OYSTER 120 6297 unoj aa nd 3 gt 6 dic 45 k he X de a q e INLUILVO S1VULINI SjuzTuua Panunuo gt SUVLIO ONITT HNC 9 5 38 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Chapter 6 Well Installation Procedures 6 1 Setting Casing In rotary drilled water wells you can set the casing in the borehole after you finish drilling However you must set the casing and grout it near the surface This prevents the upper portion of the borehole from caving in For water wells drilled in rock aquifers you can place the casing through the unconsolidated strata and into the rock to get a tight seal However this method does not ensure a tight seal You can improve the seal by using the following procedures Step 1 Drill a borehole about
92. sa ss ee B 1 Figure E 1 Rock drill bit and rock formations ee E 1 Figure E 2 Bitareas eee eee tt ttn tn E 2 Figure E 3 Bit Shapes o aao dd A SUR oec e Po Ee E 2 Figure E 4 Carbide shear ee sas ea se y tt tn E 3 Figure E 5 Flats on carbides e th E 3 Figure E 6 Cracks and shearing on bits eee E 3 Figure E 7 Bent casing and pinching eee E 4 Figure E 8 Carbide fatigue enn E 4 Figure E 9 Popping ehh s s E 5 Figure E 10 Body metal failure eee ne E 5 Figure E 11 Pluggedbit a a s s ts s a sa sas sa Ih E 6 Figure E 12 Wear on bits from slow rotation eene E 6 Figure E 13 Restoring bits tnn E 7 Figure E 14 Reconditioned button enn E 7 Figure E 15 Bit reconditioning ooo E 8 TABLES Table 2 1 Porosity percentage values in percent by volume ee 2 5 Table 2 2 Specific yield and retention percentages values in percent by volume 2 8 Table 2 3 Hydrogeologic indicators for groundwater exploration 2 16 Table 2 4 Rocks in groundwater hydrology o ee 2 17 Table 2 5 Landforms and hydrogeologic characteristics ooo ooo oo or 2 25 Table 2 6 Plant information eo 2 30 Table 2 7 Well location information rn 2 38 Table 3 1 LP 2 well drilling machine specifications
93. several types of springs Faults valley depressions and alluvial fan springs may discharge appreciable quantities of groundwater 2 Vegetation Type Certain types of vegetation or vegetative assemblages are associated with specific hydrogeologic environments Some plants phreatophytes can only exist if their root systems are in direct contact with groundwater Phreatophytes such as mesquite tress have tap roots that go down more than 100 feet Shrubs such as saltbush have roots that descend only a few feet making them excellent indicators of shallow groundwater Table 2 6 page 2 30 lists several plants that indicate the presence of shallow groundwater The density of vegetation can help Spring i i zd a s cem s Zt 7 Impervious EBS Valley Depression Spring Spring at Foot of Alluvial Fan WN Figure 2 32 Types of springs 2 29 define the location of recharge and discharge areas Dense stands of vegetation along stream channels are riparian vegetation Riparian vegetation along streams that discharge mountainous watersheds indicates that surface water is infiltrating the streambed and recharging the groundwater In many cases the vegetation will decrease in density after the stream reaches the valley floor Somewhere along the sterambed the riparian vegetation assemblage will give way to the typical valley floor vegetation Table 2 6 Plant information Plant Species Depth
94. shallow Desert willows groundwater local water table may be at 5 feet or more Generally within 10 feet of the surface 15 to 60 feet luxuriant growth where water is within 15 feet Cottonwood trees Generally good Elderberry shrubs and small trees Alfalfa 3 Playas These are dry lake beds composed mainly of clay and located in intermountain valleys Figure 2 33 During rainy seasons playas may store large quantities of surface water _ 4 Wetlands Wetlands such as marshes bogs and swamps are indicative of very shallow eroundwater Although wetlands are not typical of arid environments they have been observed in arid flow systems where groundwater accumulates behind flow barriers Wetlands can also occur in low lying areas where the discharge of regional spring water accumulates The presence of wetlands is an excellent indicator of groundwater However wetlands generally are not suitable for water well locations because of low permeability of wetland soils marginal water quality from 2 30 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 the evapotranspiration processes of wetland vegetation and severe mobility constraints Wetlands are important in groundwater detection because they usually represent regional discharge points Areas upgradient of wetlands are usually favorable targets for groundwater development 4 Could vary from meters to many kilometers Floods Salt Low tide Sea level Sabkha M Temporary
95. the presence of foreign material such as rock cuttings or use of rock drill oil with a high sulphur content Drilling with a large amount of water may also accelerate corrosion on the striking end A badly worn striking end is a sure sign that you should check the piston of the drill Replacing the piston before breakage will usually save the cylinder You should recondition the carbide insert or button Figure E 3 to maintain its original shape throughout its useful life Most bit failures involve carbide breakage or loss of carbide resulting from improper preventative maintenance or drilling practices E 2 Failure Carbide shear Figure E 4 A is the most prevalent type of carbide breakage Tungsten carbide is very strong in compression yet is relatively weak when placed in a tensile or shear mode As the buttons begin to wear they develop flat spots Figure E 4 B As these flats develop the loading on the carbide begins to move from its basically vertical position or compression load to a horizontal position or shear load This side loading or pinching of the carbide in the hole can ultimately result in carbide shear shows an overrun bit with severe flat Figure E 3 Bit shapes spots This condition will soon lead to button failure Buttons must be ground to restore their original shape at the first sign of a developing flat High rotation speeds tend to accelerate the development of flats on the carbide Although RPM will vary
96. water supply JOG Joint Operations Graphics karst topography Results from the dissolution of carbonate rocks by groundwater and is characterized by caves sinkholes closed depressions and disappearing streams kg kilogram s kg m kilogram s per meter kv kilovolt s kw kilowatt s lag time The time it takes sample material to reach the surface during a depth determination teat lava Magma that cools or solidifies on the earth s surface See also igneous rock magma Ib pound s lb ft pound s per foot limestone A carbonate rock that dissolves when carbon dioxide from the atmosphere and groundwater mix to form carbonic acid lithification The process by which sediments are converted to rock lithifitation includes compaction consolidation cementation and desiccation LOG logging Position on the function switch on the electrical logging system FM 5 484 NAVFAC P 1065 AFMAN 32 1072 logging cable A cable on the electrical logging system used to lower the probe into the well loss zone Area where grout is lost into the formation lost circulation Volume loss of the drilling fluid returning to the surface LPM liter s per minute LVS Service Logistical Vehicle Systems m meter s ma milliampere s magma Hot molten material See also igneous rock lava major river basin Largest member in the river basin grouping the Mississippi River Dasin is a major river basin See also drainage basin hydrographic b
97. 0 11 4 ROWPU See reverse osmosis water purification units ROWPU RPM See revolutions per minute RPM rung off 5 24 runoff 2 1 S3 1 2 1 3 sacrificial anode 7 9 safety 11 5 salt encrustation 2 32 saltwater intrusion 2 36 salty environment 5 17 samples rock core 11 4 undisturbed soil 11 3 sampling and logging 3 17 soil and rock 11 2 tubes 11 1 sanded in 5 23 sand line 7 4 9 9 sandstone 2 11 2 14 sanitary seaXs See seaKs sanitary Fw d Screens continuous slot 6 6 diameters of 6 9 installing See installing screen lengths of 6 8 6 9 open area of 6 8 pipe base 6 8 PVC 6 7 selecting 6 6 Slot sizes of 6 9 Index 9 stainless steel 6 7 surface area of 6 8 total area of 6 8 transmitting cz capacity of 6 8 well 3 18 6 10 7 3 7 7 sealing casing See casing sealing seal s sanitary 3 20 sediment deposits 2 13 sedimentary rock See rock s sedimentary selecting casing See casing selecting O Z waar awana gq Can mmmn nl AL ma SCIVCTS oee scr COD SCELTU self jetting method See wells jetted self jetting method for self potential potentiometer D 1 self priming pump See pump s self priming Service Logistical Vehicle Systems LVS B 2 Setting casing See casing setting shale 2 5 2 17 5 3 5 21 5 24 shallow well pump s See pump s shallow well shoe bail down 6 13 6 14 shooting heads 7 3 single string method See
98. 0 60 1 67 476 53 Best 266 115 0 96 1 04 566 47 Maximum 339 147 1 18 0 85 639 Minimum 197 S s 1 88 547 Maximum o 1 06 700 Minimum ets 2 07 615 Best Be 1 45 702 Maximum 0 79 1 26 769 Minimum 0 44 2 27 682 5 Best A 0 61 1 65 776 Maximum 173 0 68 1 48 849 Minimum les S E 2 46 758 Best 1 85 848 Maximum iad 1 66 926 Minimum 2 65 833 Best 387 2 05 917 Maximum 1 86 1 000 Minimum 28 128 2 81 896 Best 173 Ba 2 25 1 000 Maximum p 204 0 49 2 06 1 071 Minimum 320 139 0 34 2 94 962 Best 416 180 0 42 2 40 1 066 Maximum nag e 2 0 44 2 26 1 140 Minimum 0 33 3 00 1 045 Best ie 0 39 2 55 1 148 Maximum e 228 0 42 2 40 1 228 4 14 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Part Two Well Drilling Chapter 5 Well Drilling Methods 5 1 Mud Rotary Drilling Rotary drilling with mud is the most widely used method for water well construction A rotary drill rig has three functions rotating the drill string hoisting the drill string and circulating the drilling fluid A bit is rotated against the formation while mud is pumped down the drill pipe through ports in the bit and back to the ground surface through the annulus between the drill pipe and the borehole wall page 5 2 shows the relative performance of drilling methods in various geologic formations Drill cuttings rise to the ground surface in the drilling fluid Rotary drilling is sometimes called mud rotary drilling Drill pipes or rods are joined to a bit to form the drill string
99. 0 feet P pamphlet particle slip Downward movement of an object through fluid pendulum effect Action of creating a straight borehole from a weighted drill string and bit perched aquifer An aquifer that lies above an unconfined aquifer and is separated from the surrounding groundwater table by a confining ayer percussion drilling A method of drilling that involves crushing by impact from the teeth of the drill bit percussion drilling for water wells pe down hole pneumatic percussion hammer rills permafrost Permanently frozen rock and soil that is widespread in the Arctic north of 50 N latitude permafrost is either continuous or discontinuous See also continuous permafrost discontinuous permafrost permeability The capacity of a porous rock or soil to transmit a fluid pH Negative logarithm of the effective hydrogen ion concentration or hydrogen ion activity in gram equivalents per liter used in expressing acidity and alkalinity on a scale of O to 14 with 7 representing neutrality pin hook Device used with an elevator to lift very heavy strings of pipe the hook is attached to the rope socket on the drilling line See also elevator casing sand line pipe clamp A device used to hold the pipe at any position in the hole during drilling operations FM 5 484 NAVFAC P 1065 AFMAN 32 1072 pipe tong Device used to tighten 6 and 8 inch drive pipe pitcher pump A surface mounted reciprocating or single acting pis
100. 2 December 1985 FM 5 434 Earthmoving Operations 30 September 1992 FM 22 100 Military Leadership 31 July 1990 EM 25 101 Battle Focused Training 30 September 1990 FM 5 430 00 1 AFP 93 4 Vol I Planning and Design of Roads Airfields and Heliports in the Theater of Operations Road Design To be published withing 6 months FM 5 430 00 2 AFP 93 4 Vol II Planning and Design of Roads Airfields and Heliports in the Theater of Operations Airfield Design To be published withing 6 months ARTEP 5 500 Engineer Cellular Teams 30 July 1980 Nonmilitary Publications Applications of Electrical Logging to Water Well Problems F L Bryan Water Well Journal 4 1 1950 References 3 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Application of Electrical and Radioactive Well Logging to Ground Water Hydrology E P Patten and G D Bennett US Geological Survey Water Supply Paper 1544 D 1963 Electric Logging Applied to Groundwater Exploration P H Jones and T B Buford Geophysics 16 1 January 1951 Electrical Well Logging H Guyed The Oil Weekly a series of articles published from August 7 to December 4 1944 Interpretation of Electric and Gamma Ray Logs in Water Wells H Guyed American Geophysics Union Technical Paper Mandrel Industries Inc Houston Texas 1965 Investigation of Ground Water Supplies with Electrical Well Logs H Guyed Water Well Journal May 1957 Investigation of Groundwater Supplies with Elect
101. 31 Figure 2 34 Pivot irrigation patterns ee ee ee es e ee eee 2 33 Figure 2 35 Geologic features in an intermontaine valley 2 34 Figure 2 36 Desert mount and plain terrain cens 2 34 Ligure 2 37 DASS v uu oue UE and AUN eS eS le 3 OS EEE ER e does 2 35 Figure 2 38 Qanat system a a s a s a sas e a n n ng n n n nsn 2 35 Figure 2 39 Permeable sands surrounded by salt water 2 36 Figure 2 40 Pumping effects in salt water o 2 37 Figure 2 41 Saltwater encroachment eere 2 37 Figure 2 42 Groundwater pollution eere 2 38 Figure 3 1 600 foot well drilling machine lees 3 6 Figure 3 2 Support vehicle aro ARA A sas sas sas sas Oe ae 3 7 Figure 3 3 600 foot well completion kit ss ss 3 8 Figure 3 4 Hose on well completion kit 2 ees 3 9 Figure 3 5 Steel mid Pilas Vu uso ES HS AA 2 S um RON UO UR Re 88 3 9 Figure 3 6 CF 15 S drilling machine ees 3 10 Figure 3 7 Well completion kit sas sas sas ss s 3 11 Figure 3 8 Casing for 600 footWDS coco sa es s e 3 12 Figure 3 9 Loading support truck on aircraft ees 3 12 Figure 3 10 Preparing the CF 15 S for loading 3 13 Figure 3 11 Raising a drilling rig mast ees 3 14 Figure 3 12 Draw works and mast loads ees 3 14
102. 32 1072 Page 2 7 Groundwater Exploration 2 14 Reservoir Indicato odo puas ROR SE wee MI dk Bre DEC USER 2 16 Boundary Indicators Dr 2 26 Surface Indicators ads eux RICE p uw w S a QU w S ee Oe AS 2 29 2 8 Desert Environments ee ee ee ea 2 33 2 9 Water Quality aa rio NU Re 2 35 Aquifer Contamination ss ease sas ss 2 35 Saltwater Intrusion T as aa sa sa sas as asas sa es s 2 36 Groundwater Contamination 0 00 cee eee ee ea sas ee s a 2 37 Chapter 3 Field Operations JL Team Concept ouod doe Sw oS ace da BE QW GR BA SA d die ra 3 1 Commander 2 9 293 39 Sua gu UN Bos Ae a Q S ey UE Ee sn S 3 1 do MCI cnr 3 1 alor on 33 S 2 ys eine are R a Bs a ce Gee aes 3 1 3 2 Team Planning Coordination and Prenaratinn 2 1 ae A ww A UA E AP X C AE WVERRRAVE UEU 19 944994 A aw pos CEMU EE s ae ae gt e c o o 6 o a 8 e SL 3 3 Deploying Teams o sas se eo e 3 3 3 4 Site Preparation 2000 c s EM s a sas ease RES SOS 3 3 os Bqupment sese p AA Gu Q E POE dy A ES 3 4 G00 Foot WDS 6 3 2 ue wee RR a cR S S QUQ SGS JUN a S SV de do a 3 4 CF 15 S Drilling System oc cw te odo Sk OR AGO EO eet UR CSS 3 8 3 6 Transportation ee RR RR RR II Bii 3 10 DUD EO0t WDS au S50 su p E IE RE ed es dide Se bos CR bos 3 10 CF 15 5 Dilling Syste
103. 4 Mud Testing The Marsh funnel Figure 5 6 is routinely used to give an indication of thickness or apparent viscosity of drilling fluid The Marsh funnel is 12 inches long and 6 inches in diameter and has a No 12 mesh strainer and a 1 000 milliliter ml cone The funnel has a 2 inch long calibrated hard rubber orifice with an inside diameter of 3 16 inch The funnel s cup is marked with a capacity of 1 000 ml Use the following procedure for the Baroid Marsh funnel e Hold or mount the funnel in an upright position and place a finger over the hole e Pour the test sample freshly taken from the mud system through the string in the top of the funnel until the level touches the top of the screen e Immediately remove the finger from the outlet tube and measure the number of seconds for a quart of mud to flow into the measuring cup e Record time in seconds as funnel viscosity NOTE Calibration time for fresh water at 70 F is 26 seconds The funnel viscosity measurement obtained is influenced considerably by the gelation rate of the mud sample and its density Because of these variations the viscosity values obtained with the Marsh funnel cannot be correlated directly with other types of viscometers and or rheometers Graduated in cubic centimeters cc and fluid ounces the 1 000 cc measuring cup is designed specifically for use with the Baroid Marsh funnel viscometer A quart volume is clearly marked on the measuring cup The desir
104. 48 hours of a validated tasking The team may convene at the TEC TAC to begin work by reevaluating data and imagery for the area of interest The knowledge of the team and available information may be sufficient to identify areas with high potential for developing water sources Additional information such as data from remote sensing systems and hydrogeologic data may be acquired from other sources A 3 Deployment If data is still insufficient WDRT will select and specify areas for conducting field reconnaissance and geophysical surveys Depending on mission requirements a team may deploy before or with the well drilling team to assist with site selection and well design Team members contact host nation groundwater experts evaluate any existing local groundwater sources and conduct detailed hydrogeologic reconnaissance of areas previously identified as high potential water sources The geophysical element of the team has the capability to conduct electrical resistivity seismic refraction and other geophysical surveys to assist in this field work Once the well drillers begin drilling the supporting specialists can assist with well design drilling expertise A 1 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 and on site geologic support On site geologists assist in logging and interpreting cuttings from the well and with down hole geophysical logging when necessary Down hole logging is crucial in identifying the highest water producing zones dur
105. 5 AFMAN 32 1072 The thrust mechanism on most top head rigs is a pair of roller chains consisting of two chain sections One end of each section is attached to the swivel at the top of the kelly bar The other ends are dead headed to the top and bottom of the mast Sprockets at the top and bottom of the mast act as idlers Chains are powered in either direction by hydraulic rams These rams apply thrust and are used in a hold back mode to reduce the bit load of the weight due to the drill string This chain mechanism is also the main hoist for lifting the drill string 4 Mud Pump A mud pump Figure 5 1 on a rotary drill is usually a positive displacement double acting piston pump with capacities ranging from one to several hundred GPM at pressures up to several hundred psi Power may be provided through a mechanical PTO and clutch with or without a separate transmission Power may also be provided by a separate engine or a hydraulic or air motor Other types of pumps are often used successfully but their limited pressure capacity may jeopardize the success of the drilling operation Most well drilling machines have dual piston double acting positive displacement mud pumps Pump capacity volume and pressure can limit the effective depth of a drilling operation The horsepower required to drive a mud pump often exceeds the power required to hoist and rotate the drill string 5 Hoists Man drill head hoists draw works are mechanically or hyd
106. 62 L MASCICCOOUQOQOOOOQOOODOOOOOODOOOO000000000000000000000000000000000000000000500000 5 5 019 it iD OS SAO AALAN 0 X X D eae A R AAEN A AE WA A A EEA EAE 900 000 000000 ODOO000000000000000000000000000000000000000 AAA AAA RA OK AAA AAA AAA A EAE AEA OO 0O00 0000000000000 000000000000000000000000006 OOOO 1 OS O O TOS OPS OSO LODO QOO 0335 AR N OSO O AO DOQOQ QOO UO OUO OOOO0000000 00 UL LUAAAAA U 4 t WO 0000000 6n d L d N ve LAA LR L LR XR LAA MAAN R R NNN KW Lj 1 1 66161 tos t LA LLASA DO ote ea ees eee en s MAS A UAAAAA LA LALA UU U ADD OOOO UUUOUDOODOODOODDCODODOO LLJOODOOOOOOODOODOOODO000000000000000000000CO000000000000XY 18 10 U 0000000000 OR XXX 1 FOOD OOOO RRR NN NK OOO OAO OAA J Figure 2 13 Flowing artesian well development In some arid environments perched aquifers form sources of shallow and easily developed groundwater d Catchment This is formed where impervious rock underlies a zone of fractured rock or alluvium that serves as a reservoir for infiltrated water Figure 2 15 A catchment can be a special 2 12 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Perched water table i i vid Ji 1 dias A x E 5 m Spring q a nro e Y Tight clay layer P Reta INES O O ASE PT EN emt t O Ie Kre E MOTE HTHH RRIF A m Water table 0d Hae bed i asi m BRO COO M ROI ED E E MS SEN OO OE A Ro Nc xu de gd Principal aquifer i 4 9 7 9 9 9
107. 84 NAVFAC P 1065 AFMAN 32 1072 Part Three Special Considerations Chapter 9 Alternative Well Construction 9 1 Fundamentals Under special conditions methods other than the rotary and down hole hammer may be more expedient for well drilling Conditions favoring less standard methods include the following e Availability of local nonstandard drilling equipment and qualified personnel e A shallow aquifer that can be developed quickly without mobilization delays Availability of unskilled personnel only e Requirements for a small water supply 9 2 Jetted Wells In the jetting method you dig a borehole using a high velocity stream of water Ihe stream loosens the soil and washes the fine particles up and out of the borehole The jetting method is particularly successful in sandy soils when the water table is close to the surface Jetting is simple and dependable and you use hand tools rather than bulky drilling equipment Two jetting procedures are available washing in a casing or sinking a self jetting well point With the jetting method you can sample the general character of a formation by examining the cuttings brought to the surface in the return flow a Equipment 1 Swivel The water swivel must be able to carry the weight of the drill pipe and must sustain the maximum pressure delivered by the pump Figure 9 1 shows a connection that you may use at the top of small diameter jetting pipes in place of a swivel 4 2 Drive
108. 9 a 0 0 o 0 0 4757070 ete a ARAH 7 759 949 4 9 4 9 9 9 e 9 0 0 9 4 0 5 0 07874 94 9 0 0 4 0 0 0 9 9 e o 0 6 970 9 9 9 970 47979757 5 a ste 7 9 9 9 9 0 0 0 0 974 qo 9 0 974 4 q79 57 9 9 4 9 4 9 4 4 8 Ta 8 e Sa aaa a a i OO O ORO heee OIR IA a a a DO eee KLL EU ON NOA 9 450 a O 50747 499194 aig 9 9 0 0 e a a 4 0 4 5 5 5 gis eg TR ELE 04 4 e 0 a 6 e e 0 9 4 q TARA 04 EN Impervious rock faut tee wees es d gt EMS 1 242 6 PEE 2227242 292325192022 322222522 222 20 252 E re PCD See ee Me Oe bee he SO ratos 9040409494244 22 o oteoe orot PO RR 0 59 09 0900 06 12222 Sosa Se Se See Se IR 2 9 9 99 9 94905192924 ISDE O 2252 26 20 0 515 0 5 7472929 070 09595929 0 a 9095 949 ile LJ OO a 71 2529090494 2042 2 24 09 0 Ah E Paha tet et etat at aT AR KP AR e tere N mM LI M M M X e e ooo ok ee Sek bel ee Sel a hel hed hak toro n a o Tat ee S Poo 9 0 0 0 9 0 0 0 DAHA RE II ll Figure 2 14 Perched water table Good well Good wel in in Dry well fractures Low yield well Dry well weathered zone 0 DN Ee LER AAA MTT TT 10 We BSP DLL Z x TE T 4 20 y N4 T ue 4 0 c z 30 iN t MEPS Pe We Fractu S 40 T E es Basement t M som f A 0 T 2 000 m Qm Hardpan N Fault Resldual clay Ed Sand and boulders Fa
109. A LEE ey UU gene COPPER PSS Pty AAA e penosos ro ATA RTS ARA La XC pou D e e e e si RTIRA NCA w s ee tite CT ted ba PALO AAA ADA ote 9 5999 9 aR AT AT e A PSSS AAA LAA AAA ARA g g7 AS AA AS ATA AI e e o e BOF OF 6 19 04 e e A ARP 9 4 9 94 rey arto el EB j H BH E Ke e s 6 oe e oos e ee OA t dentes o oro e S ooo H BR E j 1 B E P AA Aaa 1 tere eel RI SR usus EE ED eene EEES e an RARA to rro ton tr tooo seo ee eoo o oot Fa oat Pe AT eE ese ee PEO SOOT 7 EY 20 oe 9 e oe ee e ero ro potrero F IH BE B KS roto nto tor mt o rte 2S 0 MP II o L Zas ea eA tor NAAL LHA LALAN oe x ee 9 299 pet e oot ete ee veces ee sos A E oe eee are see LED EE ELIGE SPOTLESS api o e E 11 De QD 0o 0 0 27 t 9 47 aR ue e e TAR ee e e e e e ao ES jl NEN j Muro re 220 Lo ro e SIS Re I N Sv Packer e 1 9 0 2 ADA T te en Xesex c e os jl B M B s ATT ee PTT bee 0900 ee Pe hd ae od bd PR LT ee j jH ER HE B for 2099 APTA dI ER E LANT c e CIARA TTE 8 HE B e eee eee JH I Vo ICONOS Pete tease tate wt DELE e o eons ese K en 20 OOF AK toota tou a 80 0 0 a9 Dye e x e o 0 aL re a ec eR e t tuo we
110. AFMAN 32 1072 WX w di Sees ze 9 Figure 3 9 Loading support truck on aircraft 3 C 5 The WDS is transportable in its operational configuration without any disassembly or special procedures 4 Rail No special disassembly is needed to transport the WDS by rail Also the 6 by 6 truck chassis transports provide excellent road and cross country mobility b CF 15 S Drilling System This system can be deployed by air sea or ground The machine is not rapidly deployable by aircraft and requires extensive material handling support equipment Though designed for transport in a C 130 almost 12 000 pounds must be removed to meet a 13 000 pound weight restriction pe axle in the aircraft Figure 3 10 shows the components that must be removed from the rig for a C 130 transport Loss of any of these items in transit will render the machine inoperable It takes about 6 to 8 hours to prepare the rig for loading and 10 to 12 hours to reassemble the rig Because the rig must be partially disassembled material handling equipment such as a crone or forklift must be available at the aerial port of embarkation APOE and aerial port of debarkation APOD The prime mover must be transported on a separate aircraft which means that the mover may not be available at the forward airfield to remove the rig 1 Air Six C 130s are needed to transport the CF 15 5 drilling machine and completion kit The CF 15 5 rig
111. Because this unit is not overlain in the area by an aquitard it could be an unconfined aquifer The stratigraphic sequence indicates that the Eureka Quartzite underlies the aquifers and is an impermeable barrier or aquitard This unit is underlain by the Pogonip Group that could provide suitable quantities of groundwater Because this unit is overlain and underlain by aquitards it is a confined aquifer By using the geologic map it is possible to estimate the thickness of each unit and the anticipated well depth If data exists for this aquifer in other areas it may also be possible to predict the expected well yield and groundwater quality In soils the stratigraphic sequence is usually less extensive more variable and not as well known as rock Alluvial deposits often consist of interbedded gravel sand silt clay mixtures of these materials and possibly interbedded evaporite deposits These sediments often occur in complex stratigraphic sequences with some units discontinuous and other units grading into different soil types vertically and horizontally Unless sufficient existing well data is available it is impractical to define the stratigraphic sequence of such sediments 6 Structure Density and Orientation Geologic structures such as folds fractures joints and faults are features that disrupt the continuity of rock units For groundwater exploration identifying folds has a limited use but identifying faults and fractures is impo
112. Code 0 O DIRECTOR US Army Topographic Engineer Center ATTN CETEC TC H FT Belvoir VA 22060 5546 703 355 2921 2 DATE F REPOR 1 vL Q AC fo mary water sup b Construction ma c Humanitarian WE d Other Specify 4 LOCATION sin PEPPER GOO J RRR feet Slot e Set between feet manne TT T complete 1 thru 4 gt Country DUTY a cd CITIES T TUM avons ves 52 za LoT ll bepintotopelpack 2007 TI SANITARY SEAL a aA E P LOI b Depth OQ 120 feet 15 WELL DEVELOPMENT d Coordinates A S b e Scale N 250 000 Q S TOP OF HOLE ELEVATION P NN Standard Y b 600feet aO 90 AM e isooteet 14 Nonstandord Electric 6 TOTAL HOLE DEPTH so P of dS 1 Typ e 2 Manufacturer S j ls le 3 Model Number 4 Horsepower 7 STATIC WATER LEVEL S Power Source b Below Grade Je AboveGrade Td Date Measured 27 Sep 43 le Hand Pumptyp 8 TYPE OF DRILLING MACHINE L Depth of Pump Installation list in feet i pol DET 4b 17 PUMPING TEST X ves evo Other Specify m If Yes LO feet Below Grade Above Grade ta TestDate el Sop 43 hers ci TEIR 9 b Well Yield y GPM or LPM 18 WELL HEAD COMPLETION a Standard b Nonstandard Specify Ra ws tary eN G Other Specify c Height above ground list in feet lt 19 WELL DISINFEC
113. Drill or cut holes in the casing to form the gullets of the teeth B S m it MSN U Expansion bit closed Expansion bit open Straight jetting bit Straight bit Side bit Figure 9 3 Bits 9 3 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 e Step 2 Cut the sides of the teeth with a hacksaw or an oxyacetylene torch to meet the outside circumference of the drilled holes Rounded holes are desirable so the teeth can readily clear themselves of gravel or other material Bend half the teeth outward so they cut a hole slightly larger than the casing e Step 3 Place a capon the top of the casing and attach the discharge hose from the pump to the connection provided in the top of the cap Suspend the casing vertically using a hoist Lay the cutting head on the ground preferably in a shallow hand dug hole The majority of the casing s weight should rest on the ground e Step 4 Operate the jetting pump at full capacity The casing will fill with water and begin to sink by its own weight as the ground is washed out from under it The hoist must keep sufficient tension on the casing to hold it vertical If resistance stops the downward movement of the casing lift it up 2 or 3 feet and then drop the casing u di en A ty T N i SUMMA i v e Step 5 Use chain tongs or wrenches to rotate the casing so the teeth at the lower end will cut into the bottom of the borehole If you wash in mo
114. Faults and springs 7 Dissolution Potential Dissolution potential is the potential for the development of high secondary permeability yin a soluble rock because of the dissolution of the rock through contact with groundwater Unfractured soluble rocks such as limestone have a low permeability referred to as the primary permeability of the reck Where fractured the rock has a secondary permeability that is related to the size and density of the fractures If the rock is soluble and saturated the contact between the groundwater stored or moving through the fractures and the rock may result in dissolution of the rock The dissolution process increases the size of fractures and can result in an increased secondary permeability Many of the world s caves and sinkholes karst topography result from limestone dissolving in groundwater and are indicators of high dissolution potential However if such features are not present dissolution potential must be estimated on the basis of rock type and structure density The highest dissolution potential occurs in heavily fractured carbonates limestone and dolomite and evaporites Other rock types generally do not dissolve in groundwater and identifying dissolution potential is of little use 8 Grain Size and Sorting The grain size and sorting of an aquifer are related to the porosity and permeability of the aquifer and the production capability of the aquifer Fine grained materials clay have a high por
115. ITHJ2 EB F LLL T ER REESE Ae PREECE EEE FF FH T FH T HZ 9 lil CA e UT III III A AA O RT ATA TT CECE at eae BR888R7 9895 7988895 48889888 30 COCO eet ee LIDLIDILITITLILTLDDILLELLMLLLPLLTELALLTTTELLLLIT S000 0000000 00S lt A Ltt TE TT LI Lt SEER ERR EERE a 3 5 1 8888989888888988 Submergence A Ae percent tt tH HH I LE E E Fy Ft ALi lli Tt te TTT TT TT TTT AA HHHH Baas B Ll il Free air required per gpm of water cfm 100 200 300 400 500 600 700 800 900 Total pumping lift ft Figure 8 1 Cubic feet of air requirements for various submergences and pumping lifts Table 8 1 Constants FM 5 484 NAVFAC P 1065 AFMAN 32 1072 The pressure required to start pumping will be equal to the depth of water over the submerged end of the air pipe After pumping has started the water in the well will draw down to a working level The air pressure required will be the total lift in feet from the working water level plus the friction loss in the airline Conduct the test and try to measure flow rate and drawdown quickly Pumping creates turbulance in the well Use the air line method paragraph 8 2c to try and measure drawdown Because of entrained air use the measured container MAN En to obtain flow rote measurements 8 2 Measuring Water Level a Electric Line Method Water levels can be measured accurately with a two conductor battery powered indicator known as an M
116. S teles B E D TDI MOL AS Y Lr CENA ata I A rie CIA See tao P gt E 1 0 0 OE T ORTO EL DD H DS INE 9 T e oF A 4 Ye s e 1 9 Grout se R FEE 97 et 2000 KAS ener OP A an os q tremo e T AA LANE f Te D Rr A pete NEAR i332 Z Nan e EE yera EROS eq ADM Fe EK A esce rto P e Se i wee e HO L Hr elt Faget Pe tare M E I T er ee tu ert MO aes see reat OO came d nee Aeneis ra i eV MSS IBID EE A eres ost N A a A e AI ne i t 245 9 gt so on pe K p vec ae ag O La A t as aA T mto e A a s e e p car q A 6 K ew Mag Ct REO MEI T PO AE Lda R ere ae Zaid e edat B screen As ferent Pl ty Lis AAA Nee S v a se ut a 0 40 aa rete s H Tae e AA Oi A A AE RATA K AR PE eet ses bel EO iio AS PX AN eg diee RAN ETA IES LP aa w gt a DA a Epod Un a a tee res eve IM eh Tees Toe H AL NAN ve PHONE bv SX Pe eSI Meters ste iets v XT x a Dn vele s PE n OE Atl ae a Piti NUS wets ose s ee e FL LAAL rta ars A O a me EA TEPA A 0 DO ve Cor eee i AS a UM RE Washdown EDO dp PELO E tug ttes Brews N ate Itting mv M 9 2 eee gle LA wet ee S K s XP AO p A E eu 3 Treg Be eM e cs LS d ete e I e CO bare ee 5 it tat PAN ut Ves a EET QA Tt rt ELTE DRE ET ES kas Se sa era ass Keneta se S
117. S3 Operations and Training Officer US Army sacrificial anode A simple method of protecting metal casing from corrosion by connecting a galvanically active metal bar to the casing salt encrustation Surface indicator that often occurs in playas and is indicative of saline groundwater saltwater encroachment Movement of saltwater into zones previously occupied by freshwater saltwater intrusion Invasion of salt water into freshwater during pumping sanded in A condition that exists when the strin becomes stuck when cuttings collect on the bit and collar shoulder Glossary 8 sand line Device used with the elevator for lifting one or two half lengths of pipe See also elevator casing pin hoo sandstone Consolidated or cemented sand saturated thickness Distance between the top of the groundwater and the bottom of the aquifer SC supply catalog SCFM sea level cubic foot feet per minute semipermeable barriers Features faults or fractured rock m that restrict flow but do not act as a complete barrier sedimentary rock Rocks that are composed of sediments that are converted to rock through compaction cementation or crystallization self jetting method Digging a jetted well by sinking a continuous slot brass jacket or jet head tapering type well point self potential potentiometer The instrument in the electrical logging system that balances out the SP that exists between any pair of potential electrodes self
118. Scope Figure 8 2 Well completion kits usually contain an M Scope The M Scope is a battery and a meter connected in series When the upper wire on the tip of the M Scope in the well touches the water the circuit is completed and the meter gives a steady reading Measure the amount of wire in the well to determine the depth to the water level The wire is marked at 5 foot intervals for easy measuring b Tape Method Use this method to measure the depth to the static level in a shallow well Conduct this test as follows e Chalk one end of a weighted steel tape with carpenter s chalk Lower the tape into the well to a depth of 1 or 2 feet past the chalk You can use soluble felt tip markers as an alternative to chalk eS sre ewe eho CY the total length lowered below the reference point to obtain the water depth This test is accurate to within 0 01 foot c Air Line Method You can measure the water level with an air line to follow drawdown and confirm a stable head during a test Figure 8 4 page 8 6 The air line is usually 1 8 or 1 4 inch copper tubing or galvanized pipe that is long enough to extend below the lowest water level you are measuring Fasten the air line to the pump bowls or cylinder Install the airline with the pump The pipe must be airtight makeup all joints carefully Measure the vertical length of the airline from the pressure gauge to the bottom of the line at the time of installation Figur
119. Selt closing bottom FM 5 48 NAVFAC P 1065 AFMAN 32 1072 or 2 male threads Temporary jetting pipe Well screen e ee Continuous Slot Type Brass Jacket Type Jet Head Tapering Point Figure 9 5 Well points Use the following steps for the self jetting method Step 1 Couple the well point to the bottom of the riser or well pipe Attach the swivel to the other end of the well pipe Connect the discharge hose of the pump to the swivel and dig a shallow hole Step 2 Upend the well point assembly with the well point standing vertically in the hole Start the pump and partially open the discharge valve The jet of water will displace the self closing valve in the well point and flow through the openings in the head The soil is washed from under the well point allowing the point to sink into the ground Using an up and down movement of the well point assembly will speed penetration Step 3 Increase the water flow by opening the pump discharge valve more as jetting continues Inmost sands a pressure of 40 psi at the well point nozzle will displace soil readily You may need pressures of 100 to 150 psi to move gravel or penetrate clay If a regular jetting pump is not available two standard centrifugal pumps operating in series may work satisfactorily Step 4 Remove the hose from the riser pipe and couple the pipe to the suction side of the pump after sinking the well point to the desired depth Step 5 Develop the well b
120. TION T INEA HOLE AND CASING DIAMETER ECT E ge inches to ee a Super Chlorination m d b Other Specify c Nearest source of possible conta mination Type UO Ue amm m maa hai Tow 20 s DATA AVAILABLE a Yes c tf Yes SITE GE P arma 3 Water Resource Overlays 11 COMPLETION KITUSED X a Yes ib No aires 15008 X 600 feet Standard 2 IF No specify type of completion materials d Down hole Loc ee eene Dp re me DD Form 2680 OCT 93 SS inches Figure 7 7 Sample well completion summary report 7 11 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 28 SKETCH OF WELL AND PUMP 21 OVERBURDEN MATERIALS PAX a Unconsolidated s Sandstone ce etimeoe Tes igneous _ e Other Specify a SandandGravel__ b Sandstone X li menn if danny ide i Mot 24 WATER QUALITY a Tested X 1 Yes 2 No 3 Date V b Fresh c Brackish d Saline j un 59 Cher I4 25 SKETCH OF LOCATION Y e vad s yon tle ther dolom i v 3 9 C Ocean gt 24 A 26 REMARKS Well dni M M fen issued Rroug led Ed tonnene office 1 eco GR M Pmt Wo 422 941 27a SUBMITTED BY Type or print name 1 en att N K g CN 30 DATE OF SIGNATURE 93 29 SIGNATUR po PROJECT OFFICIAL f ay N al ss ie Fi
121. The drill pipe is the link transmitting torque from the rig to the bit and the pipe carries the drilling fluid down the hole a Rotary Rigs Rotary rigs vary in design Drilling rigs are truck or trailer mounted and are powered by an on board engine or by a PTO from the truck transmission Power is delivered to the various components through hydraulic pumps and motors or through mechanical transmissions and clutches and geared on roller chain drives Many drill rigs may use both mechanical and hydraulic drives Torque is applied to the drill string which rotates by using three basic designs rotary table top head and quill and drive bar Military drilling machines use rotary table drives 1 Rotary Table The rotary table is a rotating platform that transmits torque to the drill rod through the kelly The kelly which is attached to the mud swivel is the uppermost section of the drill string that passes through the rotary table The drill string may be square hexagonal or round with grooves or flukes on the outside wall The drive kelly bar slides through the rotary table while rotating By removing the kelly bar you can add drill pipe and work the pipe through the open hole in the rotary table The rotary table normally is a mechanical positive drive mechanism 2 Top Head The top head drive uses a power swivel Torque is applied at the top of the drill string The top head mechanism moves down along the rig mast as the boring is advanced
122. This device breaks the air into small streams so that the bubbles formed will be as small as possible You can make a foot piece by drilling numerous small holes in a short section of pipe 7 Discharge Pipe You can approximate the discharge pipe length from Table 4 3 Lower submergence than those shown result in a lower pumping efficiency The planned pumping rate must not cause an excessive drop in the water level reducing the submergence The two chief losses in the discharge pipe are air slipping through the water and the water friction in the discharge line As the velocity of discharge increases slippage decreases and friction increases Eductor intake loss occurs at the lower end of the pipe due to friction and to the energy required to accelerate the flow of water into the pipe FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Table 4 3 Submergence for air lift pumping VIMUS Gallons of Cubic Total Feet of Air Length of m d soc de Air Line percent Rating tofair of wa 4 55 0 22 8 34 0 12 Minimum Best Maximum I 0 07 49 Minimum 0 40 102 35 Best 0 23 143 28 Maximum s 0 15 179 Minimum 0 70 189 Best ied s 25 0 37 250 Maximum 203 3 70 0 27 303 z Minimum 1 05 0 95 Best 2 04 0 49 pe Maximum 2 70 0 37 59 Minimum 139 0 85 1 18 339 48 Best 216 54 1 54 0 65 416 41 Maximum 288 125 1 89 0 53 488 Minimum 160 69 0 71 1 41 410 Best 240 104 1 21 0 83 490 Maximum 318 138 1 45 0 69 568 63 Minimum 176 76
123. W a Sinkhole Na nG l 4 lakes Wi te _ i 7 Va y Y cs es Potentiometric surface y a 4 e RE L Shale formation nay Sinkholes Figure 2 16 Karst topography carbonate aquifer b Basalt This is an igneous rock and can be a very productive water bearer The water flows through openings that include lava tubes shrinkage cracks joints and broken or brecciated zones at the top of cooled lava flows Figure 2 17 c Sandstone This is consolidated or cemented sand In unfractured sandstone groundwater can be stored in the pores between individual sand grains and can be recovered through pumping Water in sandstone may flow through bedding planes and joints 2 7 Groundwater Exploration In groundwater exploration it is possible to preedict the location of an unconfined aquifer within alluvial sediments However identifying these unconfined alluvial aquifers requires a detailed knowledge of sediments in the area Usually this information can only 2 14 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 be obtained from existing water or oil well drilling records or from an exploratory drilling program For development of water supplies in support of tactical operations the unconfined aquifer will be the preferable target zone Deeper confined aquifers should be investigated if an unconfined aquifer cannot provide an adequate water supply o
124. Wells 2 5552 E io Ow Od 84 SSS OH HESS RE ROSES SS dic N 9 1 BOUE a s ZZ Z ue rd MODE aa O A dede BS Q Sr Spa 9 1 Methods i uu 2 ot eec xS on P do dd dx SE ee SC de ede Q apa 9 3 9 3 Driven Point Wells 2 1 s sz sz e s sa s s sz sos s s v sos s 9 6 EGUIPIDEDE ur cos dd GP eS aupra pauk kS ee 9 6 PROCEQUICS xw Goss dere aha A dee Eo REE SS Gre SU qe o es 9 10 Well Completion Z u L R opo do an sub Eo ee used qub oc o 9 13 9 4 Cable Too Method een 9 15 OU JU J z gt Qu 64 6 ya eS oS Sau uQ s Oe PDT 9 15 Equipment and Procedure sssaaa aa 9 15 90 5 Aupered Wells _ RR sa sas sas sas oy AAA 9 15 EQUIPMENT 3 SE A Se GE pz A 9 16 Proceduiess 4 4 2 05 E DROIT m a SO a 3 ae Se eS LS COT a 3 1 Well Completion sus Sica GREE BS EAA Se SES See ee A 9 16 Vil FM 5 484 NAVFAC P 1065 AFMAN 32 1072 10 Arctic Well Construction Arctic Water Supply a oe E EU ROUX Y RE CA a su a S N Discontinuous Permafrost s os dee a BN asa SE Sa Sa 21222 ee Ud 2 Thick Continuous Permafrost 0 ee s s s s s s w x 10 2 Well Drilling Drilling Equipment 4233 543 3 64 aia EWR Q SONU NUS EO RN A X yuca e pol Say es ates eas ip ne a Da AE Jet Drive Drilling 44 5443 ego A ox Rom A Sa ee w 3 Dilling PIGS 4 s uq RAR S he WOR diede Gi dnce DATAE RR Air Rotary Drilling ue dob oo A a oe a aaa Well Installation and Completion
125. a string of 2 inch or larger pipe into the annular space between the inner and outer casings Feed the gravel into the hopper at the top of the pipe Feed water into the pipe with the gravel to avoid bridging the material in the pipe The pipe raises as the gravel builds up around the well screen The tremie system is practical for placing the gravel pack in shallow to moderately deep wells c Bail Down Placement With this method you can place a gravel pack as you install the screen Feed the grovel around the screen it will go downward with the screen The bail down shoe used is somewhat larger than the screen so that gravel being added will follow down and around as the screen sinks in the formation Figure 6 12 shows this operation Development work is an essential part of this method Screen openings must be larger than the grain size of the aquifer so enough aquifer sand will pass through and the gravel pack will replace the sand around the screen d Double Casing Placement With this method you place gravel and use a temporary outer casing Figure 6 13 page 6 18 With this method you pull back the casing as you pour gravel into the space This method is somewhat similar to pull back screen installation 6 8 Using Alternative Methods a Formation Stabilizer When you do not use a grovel pack you can place formation stabilizer material to help prevent deterioration of the annular space outside the screen Fine loose strata may cave
126. age 3 10 The machine can drill to a depth of 1 500 feet and is equipped to use the 1 500 foot well completion kit The 600 foot well completion kit may also be used with the CF 15 5 to complete a shallow well The drilling machine is powered by an 8 cylinder 2 cycle diesel engine coupled to a PTO Other major components include an air compressor air compressor drive transfer case auxiliary transmission mud pump mud pump drive subdrive assembly rotary table rotary table transmission and a 3 drum draw works An installed hydraulic system operates the leveling jacks mast raising cylinder rotary table cylinder pulldown and holdback assemblies and breakout trailer for mobility Two lifting slings are welded to the frame The sling lifting eyes are located adjacent to the four leveling jacks The slings are used to hoist the entire drilling machine on board a surface carrier The machine is equipped with a detachable mast for loading the machine on an air carrier In addition it is e Air transportable C 130 e Equipped for rotary drilling with mud air or foam circulation e Towable by semitrailer tractor or 5 ton truck using a dolly 3 8 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 L WU a Figure 3 4 Hose on well completion kit d R L unm Figure 3 5 Steel mud pit Table 3 3 1 500 foot well drilling machine specifications Model CF 15 S down the hole p
127. ain pulldown to advance the hole beyond the first run 20 feet Ideally keep the drill string in tension Add drill collars heavy wall drill steel at the bottom just above the bit See Table 5 3 for drill collar weights Table 5 3 Drill collar weig Collar Bore of Collar in OOOO MBoreofOolar in 0 0 OD n 1172 134 2 21 4 212 2136 3 314 312 334 4 3 3 8 ar 5 lt lt 31 26 7 24 5 3 3 4 31 5 29 3 37 8 340 31 9 29 4 26 5 4 35 7 34 5 32 0 29 2 41 8 394 372 347 319 41 4 422 40 0 37 5 34 7 4 1 2 48 0 45 8 43 3 40 5 43 4 542 52 0 49 5 46 7 43 5 5 60 1 58 5 55 9 53 1 49 9 51 4 67 5 65 3 62 8 59 9 56 8 53 3 5 1 2 74 7 72 5 69 9 67 2 63 9 60 5 56 7 53 4 821 79 9 77 5 74 6 71 5 67 9 64 1 6 89 9 87 8 85 3 82 5 79 3 75 8 71 9 67 8 63 3 6 1 4 98 1 95 9 93 5 90 6 87 5 83 9 80 1 75 9 71 5 61 2 1066 1045 101 9 99 1 95 9 92 5 88 6 84 5 79 9 63 4 1155 1133 1108 1079 1048 101 3 97 5 93 3 88 8 7 1246 1225 119 9 117 1 1139 1105 1066 1025 979 93 1 87 9 7 1 4 1341 1319 1295 1266 1235 119 9 116 1 111 9 107 5 1026 97 5 71 2 1439 141 7 1393 1365 1333 1298 1259 121 8 1173 1125 107 3 7 3 4 1541 151 9 149 5 1466 1435 1399 136 1 131 9 127 5 1226 117 5 249 9 277 3 253 1 280 4 5 6 242 6 238 4 269 9 265 8 Taso 3024 289 9 187 8 212 4 133 1 143 9 155 1
128. ale or clay that absorbs water from the drilling fluid is squeezing The result is a borehole that is undergauged to the extent that you cannot pull the bit by normal hoisting methods In such cases you can cut back through the Figure 5 13 Fishing tools blockage with a roller rock bit or a drag bit Swelling can cause caving and failure of the wall Keep water out of the formation to prevent swelling Special polymer drilling fluid additives that limit water absorption are available High quality bentonite forms a thin but highly impermeable filter cake 5 2 Air Rotary Drilling Air rotary drilling is similar to mud rotary drilling except that the fluid circulated is compressed air The air is not recirculated Using compressed air is advantageous when water for drilling is inconvenient fluid is being lost to the formation while drilling or you have difficulty washing sticky clay formations from the hole Also air rotary drilling requires much less development time You may have to adjust air rotary techniques with each well you drill Some disadvantages to air rotary drilling are that air cannot support the wall of a hole in an unstable formation changes in the return air flow are not as readily apparent as in mud flow and air is not as effective in cooling and lubricating the drill bit and string a Air Supply Air has no density or viscosity so cuttings are blown out of the hole at high velocity The up hole air flow is turbulent and mo
129. ality groundwater Groundwater under lakes may exhibit poor water quality because evaporation of lake water may increase the concentration of chemicals in the lake and any recharge derived from the lake Groundwater recharged from streams is usually intermediate quality between groundwater recharged by precipitation and lakes Subsurface recharge from adjacent basins is often difficult to assess By knowing the elevation of eroundwater in adjacent areas the transmissivity of the aquifer and the width of the recharge area it is possible to estimate the amount of recharge from subsurface flow This estimate usually is not possible in areas with limited data It is possible to infer that such flow is occurring on the basis of differences in elevation and the location of barriers or conduits between hydrographic basins 2 Discharge Areas Recharge to and discharge from a hydrographic basin must be equal Figure 2 30 page 2 28 shows a sketch map of a hydrographic basin with identified discharge areas Figure 2 31 page 2 28 shows the directions of groundwater flow from the recharge to the discharge Land Noe Z Y YY T Recharge PELEA ndwater BS Figure 2 29 Mounding 2 27 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 areas groundwater discharge can occur in streams and lakes through consumption by plants or man and by subsurface flow to adjacent down gradient basins The location of discharge areas can help ide
130. and is raised to the top of the mast to add a length of drill pipe Top head drive drill rigs do not use a kelly bar Most top head drives are powered by hydraulic motors capable of variable speeds rather than positive constant rotation 3 Feed Drive Rotary rigs are equipped with a mechanism to apply a downward thrust to the drill string This mechanism is called a pulldown or feed drive Generally two roller chains apply the thrust for rotary tables The chains are attached to the kelly swivel and extended over sprockets at the top of the mast and under the rotary table On older rigs the sprockets under the rotary table are powered mechanically through a PTO and clutch The pulldown chains on modem drill rigs are powered by a hydraulic motor which provides better thrust control 5 1 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 l lqtSsodtu sensse1d Buiuguoo yy jepun pues eAnoe urejuoo oj ejqe me s eJnssexd ogersojp Au yuepyns Bujunssy L ep euo PNT EEE HS i T du Rane BARU B ng sping uuw euureu Gujseo sewusey are aye yum pue pues esoo Rue sung u14104 jo ed oynespAy lejoy esjoAoH K rmejoH osJoA0H uy no1u jig ejoy oy umog reioy 199110 spiny yum Amoy 399410 Joo eique Amoy jeng Amoy posa uone OJ dSO 093 JO sodA SNOLIGA ur SPOY IUI SUN LIP 3u219 rp JO IUBULIOJ 10d VAY TS AQEL on 5 2 FM 5 484 NAVFAC P 106
131. and clay with a few sand stringers A shallow well has a small chance of striking such a sand stringer The sands may be so fine grained that most wells will have small or moderate yields For large supplies several wells or deeper wells may be needed b Stream and coastal terraces Stream and coastal terraces usually are underlaid by grovel or sand deposits similar to floodplain alluvium If the terraces are fairly bread and the deposits thick they may be good water sources Figure 2 19 In someplace terraces are so deeply trenched 2 18 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 by stream erosion that most of the groundwater rapidly drains out of the terrace gravels through the stream cut slopes Well drillers must be swam of the possibility of saltwater intrusion problems when drilling in coastal areas Fresh water Salty water Figure 2 19 Water in a coastal terrace c Fans Alluvial fans can be found where steep mountain slopes rise abruptly from adjacent plains page 2 20 The stream coming from the mountains drop coarse material near the apex of the fan and progressively freer material down the slope At the toe of a large fan the deposits are mostly silt and clay with few sand stringers Alluvial fans often produce groundwater the water depth is greater than the depth in alluvial valleys The aquifers often have a braided pattern and individual beds are limited in extent aquifers are abundant near mountains However to reach wa
132. and enhances drilling rate See Figure 5 11 and Figure 5 12 page 5 22 to calculate weir dimensions and volume SS y SS NN Bo dec gt VA W Figures are In GPM Additional for each foot GPM for each over 5 feet gt foot over 5 feet 5 1 4 395 5 12620 21300 434 0 14 1 2 5 475 5 1 2 421 6 13520 22820 465 0 15 5 740 5 3 4 449 0 114420 24400 4950 151 2 6 015 5 21 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 b dk e 2 12 40 7 16 8 397 229 18 3 016 741 21 4 16 70 9 62 8 1 4 429 248 18 1 2 3 229 864 2 1 2 21 70 12 50 8 1 2 462 267 19 3 452 99 2 3 4 8 3 19 1 1 _ ah RISE 3 5 3 4 174 00 100 00 13 1 2 1 469 848 6 193 00 112 00 14 1 609 929 6 1 4 214 00 124 00 14 V2 1 756 1 014 6 1 2 236 00 13600 15 1 912 1 104 6 3 4 260 00 150 00 15 1 2 2073 1 197 Based on Thompson equation Q O 5 D H gH where Q flow of water in feet cubed per second L width of notch at H distance above apex in feet H head of water above apex of notch in feet Figure 5 12 Triangular notch weir with end contractions f Rotary Drilling Problems Some problems in rotary drilling are minor and others are serious and can result in failure to complete a hole or even loss of equipment Many serious problems start minor but can become serious if not recognized or handled properly For example in a loose sand zone the borehole walls can slough and cause drilling fluid loss By
133. and so forth You must record the exact times you take readings of the drawdown and flow rate measurements The length of a test usually depends on the purpose of the well the urgency for water and the time available On small water supplies you can perform an adequate evaluation in 4 to 5 hours For large permanent supplies tests could take from days to weeks The GPM footage of drawdown and available drawdown give an immediate indication of the well s capacity If the pump from the well completion kit is capable of producing more water than the well can you should put a throttle or a valve on the pump Doing so will help regulate water extraction and will prevent pump damage Step 4 Set and adjust the pump The well is now ready for use or for connecting to a treatment storage and distributions system 3 21 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Chapter 4 Pumps 4 1 Fundamentals a Pump Types Pumps maybe classified according to use for shallow or deep wells design variable or positive displacement or method of operation rotary reciprocating centrifugal jet or airlift This chapter deals with shallow and deep well pumps Shallow well pumps suction lift pumps are normally installed above ground on or near the top of the well casing Deep well pumps are installed in the well casing with the pump inlets submerged below the pumping level These inlets are always under a positive head and do not require suction to mo
134. ar technical information on the feature Information such as construction and design of existing wells pumping test results and other data that will aid in the design of new wells or assist in the maintenance of existing wells should be included Most overlays are classified SECRET or CONFIDENTIAL To order overlays write to US Army Topographic Engineer Center ATTN CETEC TC H Fort Belvoir Virginia 22060 5546 or call DSN 345 2921 or commercial 703 355 2921 A 4 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Appendix B Navy Well Drilling B 1 General The Naval Construction Force NCF Seabees as part of their primary mission are tasked to provide water well drilling support for the Marine Corps Doctrine for this support is in OH13 4 NWP 22 9 Each naval mobile construction battalion NMCB table of allowances TOA includes four water well drilling technicians NEC 5707 and well drilling equipment and materials to develop water wells from deep subsurface aquifers To accomplish the well drilling missions well drilling teams deploy from an NMCB by land air or sea B 2 Equipment The NMCB TOA includes one International Standards Organization ISO air transportable water drill TWD Figure B 1 one 750 psi 300 cfm air compressor and two 1 500 foot well completion kits Figure B 1 ITWD machine B 1 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 a The ITWD This machine replaces the LP 12 1 500 foot well drilling machine and the semit
135. asin major river basin reservoir indicators Characteristics in soils rocks and landforms that define the ability of an area to store and transmit groundwater but which do not directly indicate the presence of groundwater Revert A natural organic polymer fluid derived from the guar plant See also polymer RH 1 An air transportable RED HORSE echelon composed of 16 people and ready for deployment 12 hours after notification RH 2 An air transportable RED HORSE echelon composed of 93 people and ready for deployment 48 hours after notification RH 3 A RED HORSE echelon composed of 295 people and ready for deployment six days after notification ringing off Fatigue failure in the drill rod joints caused by excessive torque or thrust or by borehole deviation riparian vegetation Dense strands of vegetation along stream channels rivers See streams and rivers rock development A well development method used in rock formations that involves combining jetting with air lift pumping to wash out fine cuttings silt and clay rotary pump A pump that uses a system of rotating gears to create a suction at the inlet and force a water stream out of the discharge rotary table Rotating een on a rotary rig that E torque to the drill rod through the elly ROWPU reverse osmosis water purification units RPM revolution s per minute rung off See string failure runoff Precipitation on land surfaces that flows along the surface
136. asin regional river basin Marsh funnel Device used to test mud viscosity the funnel is 12 inches long and 6 inches in diameter and it has a No 2 mesh strainer a 1 500 ml cone a 2 inch long calibrated hard rubber orifice pem diameter of 3 16 inch and a 1 000 ml capacity cup Marsh funnel test Procedure routinely conducted to determine the thickness or apparent viscosity of drilling fluid MEAPO Middle East Africa Project Oftice measured container method A procedure used to determine flow rate from a well or pump b measuring the time required to fill a contamer with a known volume MEDEVAC medical evacuation metamorphic rock Igneous sedimentary or prea metamorphic rock that undergoes urther transformation by changes in pressure temperature or chemistry micatex Commerical chemical agent added to mud drilling fluid to prevent it from freezing See also aquagel barite fibratex gel flake Impermex smentex min minute s ml milliliter s mm millimeter s MO Missouri monitoring well Small water well used for measuring water level estimating well yield and taking samples for quality analysis monitoring wells are drilled next to permanent wells at specified intervals mph mile s per hour MS Mississippi M Scope Two conductor battery powered indicator used to measure water levels mud pump A positive displacemenc double acting piston pump with capacities ranging from one to several hundred GPM at pres
137. asing and could ruin the well by bringing clay down into the formation Three way valve Air cock OH a arine T with packing gland Blank flange d E E Discharge Companion flange UU Well screen ta co LII Figure 7 4 Arranging equipment to build up air pressure 7 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Use the following procedures to develop a well using this method e Step 1 Arrange the equipment as in Figure 7 4 and turn the three way valve to deliver air down the air line preferably with the air cock open This will pump water out of the well through the discharge pipe e Step 2 When clear water emerges cut off the air and let the water in the well regain its static level e Step 3 Listen to the air escaping through the air cock as the water rises in the casing to determine stability Close the air cock and turn the three way valve to direct the air supply down the bypass to the top of the well forcing the water out of the casing and back through the screen This technique will agitate the sand and break down any bridging of the sand grains When the water has been pushed to the bottom of the drop pipe air escapes through the drop line You can prevent air logging of the formation by keeping the drop pipe above the well screen e Step 4 Cut off the air supply and reopen the air cock so the water can reach the correct static level when you hear the air escaping from the discharge pipe or wh
138. at relatively shallow depths The leaching action of irrigated water and the use of chemical fertilizers may impair the groundwater quality in such areas Figure 2 34 Pivot irrigation patterns 13 Population Distribution Population distribution in arid regions or sparsely populated areas is closely related to water availability Because of the lack of resources and technical capabilities for wide scale groundwater development projects population centers in arid environments without surface water are usually good indicators of groundwater supplies These centers are often located on perched aquifers with limited capabilities the population sizes are direectly proportional to the production capacities of the aquifers 2 8 Desert Environments For contingency water well drillers must become familiar with drilling operations in an arid or desert environment An arid environment usually has less than 300 millimeters mm of rainfall per year and high average daily temperatures Most of the soils are coarse grained with high porosity and permeability Because of low rainfall only deep water tables may exist Therefore any well drilling units and equipment or kits deployed to a desert AO should be capable of achieving maximum depth of 1 500 feet Generally the more arid the region the greater the controls the host nation will place on well drilling activities because of the potential impact of drilled wells depleting scarce aquifers The host
139. at CUR or CAL mode energize the current switch and record the battery voltage underload The voltage should remain at or slightly below the open circuit voltage Replace the battery if the voltage should continue to change value when the current switch is energized 2 Five 9 Volt Batteries Place the function switch at DC volts and the range switch at full scale reading closest to but not lower than 50 volts Connect the red lead to the exposed positive terminal male and the black lead to the exposed negative terminal female of the battery string Record this open circuit voltage Place the function switch at CUR or CAL mode energize the current switch and record the battery voltage under load The voltage should remain at or slightly below the open circuit voltage Replace all the batteries if the level should continue to change value when the current switch is energized In adverse or cold weather conditions install an alkaline type battery in the unit because those batteries have better voltage cunent characteristics c Calibrating the DR 74 Mud Logger with a Known Salt Solution Place instrument in mud mode Connect probe to unit Lock SP potentiometer at zero Place function switch at LOG Put probe in known concentration of sodium chloride and distilled water Take temperature of water sample Clean probe in distilled water when necessary Refer to resistivity concentration and temperature chart
140. atelets in face to face contact Bentonite is mined in many states but the best grade Wyoming bentonite is mined only in Wyoming and South Dakota Wyoming bentonite contains sodium montmorillonite the active part of the clay mineral and is small in size which is important in building viscosity Mud drilling fluids should be mixed with a mud gun When agitated and sheared with water the bentonite platelets absorb more than 25 times their own weight in water separate and swell The amount of surface area wetted determines the ability of the particle to build viscosity One ounce of Wyoming bentonite dispersed in water has more surface area than five football fields Interparticle activity between platelets gives the mud its gel properties The chemical composition of the mixing water affects the ability of bentonite to develop desirable qualities These qualities can be manipulated by adding small amounts of various chemicals 3 Mud Viscosity True viscosity is a term relating only to true Newtonian fluids such as water and is a proportional constant between shear stress and shear rate in laminar flow Drilling muds act differently in that the proportion between shear stress and shear rate is reduced when shear rate is increased Drilling muds are thixotropic The viscosity of a drilling mud refers to the thickness of the mud while flowing Gel strength is the term used to describe the thickness of drilling mud at rest Gel strength develops o
141. ater into a string of 3 4 inch pipe that is resting on the sediment to remove the fine material by a jetting action This procedure requires a large supply of water and a motor driven or hand force pump 9 14 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Table 9 2 Formation identifications Type of Drivin Sound of Resistance to FPN rege SER Aeon Soft moist clay moist cla Rapid Dui Noe Slight but continuous Fine sand Varied Freqent quent Easy Unsteady Hs em ui a is easy and Coarse sand especially penetration for il daa i a gritty when saturated successive blows Unsteady irregular Rotation is dumm and Gravel penetration for accompanied S a gritty successive blows sound Dependent on formation Boulder and Almost Sometimes both U 9 4 Cable Tool Method a General Cable tool drilling churn drilling produces a chopping action The method and the tool are not expensive and one person can operate the rig Cable tool drilling is a very slow method and is not as widely used as rotary drilling and percussion drilling are used You can use a cable tool drill to penetrate rocky soil or moderately hard sedimentary rock The drill does not require large amounts of drilling fluid Since the borehole is not full of fluid you must drive casing as you dig the hole deeper to stabilize the wall b Equipment and Procedure 1 Rig The rig consists of a winch with a large wire rope reel a walking beam and
142. ater lubricated line shaft bear Bronze water lubricated threaded column spider Threaded column pipe coupling Replaceable stainless steel sleeve rotates in the rubber water lubricated line shaft bearing Discharge bowl casting ing Long bronze bearing A A y Top bowl Stainless steel bowl shaft Semi open impeller Bronze suction bowl bearing Suction bowl Conical type strainer for threaded suction pipe Figure 4 6 Turbine pump 4 8 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 d Jet Pump This pump is a dl U Shatt coupling combination of a surface centrifugal Shaft collar pump down hole nozzle and venturi Spider bearing assembly arrangement Figure 4 8 It can be used in small diameter wells that Bottom shaft require a lift of 100 feet or less The pump supplies water under pressure ea to the nozzle The increase in velocity Rubber sandtrap at the nozzle results in a decrease in Double spider bearing assembly pressure at that point which in turn draws water through the foot valve Standard butt pipe coupling into the intake pipe The combined flow then enters the venturi where the velocity is gradually decreased and the pressure head recovered The excess flow is discharged at the surface through a control valve which also maintains the required recirculating flow to the nozzle Cable drive Intermediate nipple with cable bushing Rotor adapter coupling Upper stator coupling Roto
143. aterial plugging the screen openings and brings the fine sand and silt into the well point If you pump continuously for severe Iminutes these particles may be raised from the well When the flow is clear the well is ready for use Check the pump to ensure that the valves and plunger are free of sand 2 Alternative Completion Methods If you cannot clear all the sediment from the well point by pumping try any of the following methods e Method 1 Lower a series of connected lengths of 3 4 inch pipe into the well with the lower end resting on the sediment in the well point Clamp the pipe in position and attach a hand pump to the upper end Run water into the well pipe not the 3 4 inch pipe and operate the hand pumps By steadily pumping the sediment will be lifted through the 3 4 inch pipe Continue to lower the 3 4 inch pipe to the sediment level until the well is cleared FM 5 484 NAVAC P 1065 AFMAN 32 1072 iC KW Pulley and weight Drive cap Coupling Casing Section through drive cap Figure 9 17 Drive monkey e Method 2 Insert a string of 3 4 inch pipe into the well and fill the well with water Repeatedly raise and lower the pipe sharply Hold your thumb over the top of the 3 4 inch pipe during upward movements and remove your thumb during downward movements A jet of muddy water is expelled on each downward stroke When the material loosens and is suspended you can pump out the muddy water e Method 3 Pump w
144. bits BOM bill of materials boundary indicators Characteristics that are indicative of local or regional groundwater flow systems ed acket type drive point Consists of a perforated pipe wrapped with wire mesh and covered with a perforated brass sheet brass tube type drive point Consists of a brass tube slipped over pertorated steel pipe for a rugged construction cable jack A four pronged receptacle located in the upper right comer of the panel on the electrical logging system cable tool method A very slow drilling method that can be used to in rocky soil or moderately hard sedimentary rock the drill used in this method does not require large amounts of drilling fluid CAL calibrate CAL T calibration adjustment Located in the lower right hand comer of the panel on the electrical logeing system and used to Zero the galvanometers when calibrating the instrument carbide shear The most prevalent type of carbide breakage in bits casing ring and slip A device used to suspend the casing at the ground surface and for pulling pipe from the hole using jacks under each side of the casing ring catchment Formation whine impervious rock underlies a zone of fractured rock or alluvium that serves as a reservoir for infiltrated water a catchment can be a special type of aquifer cathodic protection See sacrificial anode CB construction battalion cc cubic centimeter s centrifugal pump A variable displacement pump in w
145. ble barriers Fracture density Wetlands Surface water divides Dissolution potential Playas Cumulative structure density Wells Drainage basin size Reservoirs Drainage basin elevation and relief rainane nattarn LZ i bad A Sw py tee HI Drainage density Landforms Crop irrigation Salt incrustations Population distribution treams and rivers Snow melt patterns Karst topograph a Reservoir Indicators These indicators are characteristics in soils rocks and landforms that define the ability of the area to store and transmit groundwater but do not directly indicate the presence of groundwater One of the first steps in groundwater exploration is to identify and evaluate reservoir indicators The size shape and water bearing characteristics of a hydragraphic basin are important in evaluating water resources The characteristics could be more useful in selecting sites for ground level study or drilling than knowing the indicators that indicate the presence of groundwater Plants around a dry lake bed are good indicators of groundwater However dry lake beds contain very fine grained sediments wells in these areas usually produce low water yields and contain poor quality groundwater The rock or soil type present could be the most important reservoir indicator as it usually defines the type of aquifer and its water producing characteristics For reconnaissance it is only necessary to recognize t
146. ction When drilling consolidated rock is harder to penetrate but is more stable than unconsolidated rock Well drillers usually use a down hole air hammer on consolidated rock with no well casing for support Drillers must support holes in unconsolidated rock to avoid cave ins Wells in unconsolidated rock frequently yield more water at a shallower depth than wells in consolidated rock a Unconsolidated Deposits Soil Unconsolidated deposits e Cover the majority of the earth s surface e Range in thickness from a few inches to several thousand feet 2 3 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Scale in 1 000 feet a 8 0 8 16 Delaware River Figure 2 4 Hydrographic basin e Can underlie consolidated rocks e Consist of weathered rock particles of varying materials and sizes e Include clays silts sand and gravel e May include salt deposits and fragments of shells of marine organisms See FM 5 410 for descriptions and detailed analyses of the engineering properties of unconsolidated deposits 2 4 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 b Consolidated Deposits Rock These rocks consist of mineral particles of different sizes and shapes Heat and pressure or a chemical reaction has formed the rocks into a solid mass often called bedrock Geologists classify consolidated deposits into the following three categories depending on origin 1 Igneous These rocks form when hot molten material magma cools or solidifies
147. ction weight of the fluid column or restrictions in the circulating system Pressure should be exerted at the ports in the bit causing a downward jetting as the fluid exits Regulate mud pump pressure by varying the RPM of the pump Mud pump pressure against the bit is not harmful if it does not exceed the operating pressure of the pump Other sources of fluid pressure can be detrimental Pressure from friction occurs if the drill string is long for its inside diameter or pipes are internally upset Frictional pressure increases wear in the pump Pressure from the weight of the fluid column in the annulus or from a restriction in the annulus caused by an accumulation of cuttings indicates insufficient cleaning This type of pressure can cause formation damage resulting in lost circulation and wall damage 7 Stabilizers Unless the drill string includes stabilizers Figure 5 5 for large drill bits drill a pilot hole using drill collars as stabilizers The initial pilot hole 6 to 7 1 8 inch diameter will be straighter and easier to sample The location of aquifers will also be easier to determine Use a larger bit to ream the hole to the desired size Use overreaming bits if available because they follow the pilot hole best e Drilling Fluids Drilling fluid is circulated in rotary drilling to cool clean and lubricate the drill string to flush cuttings from the hole and to stabilize the borehole wall Water is the basic fluid and
148. ction pump and plumbing can be extremely dangerous if failure occurs because they are subjected to maximum pressure CAUTION Do not exceed the maximum air pressure ratings of percussion drills WARNING Rapid expansion of compressed air from bursting hoses and loose connections can cause injury Only use replacement parts in the air system that the appropriate TMs recommend 4 Rotation As drilling progresses adjust the bit rotation to the penetration rate As the hole deepens the bit should make one revolution equal to the length of exposure of the carbide buttons in the bit about 1 3 inch The rule of thumb is that the rotation rate in RPM should about equal the penetration rate in feet per hour The rotation rate for percussion drilling is slower than for rotary drilling For percussion drilling to function at maximum proficiency the rotation must be constant As the piston strikes the bit shank about 1 200 blows per minute at maximum air 5 30 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 pressure the constant rotation allows the bit buttons to chip continuously at new rock If the rotation rate is not constant stops and jumps the buttons hammer several times atone place before jumping to new rock Erratic rotation produces variable sized chips which are harder to clean from the hole Erratic rotation also causes the buttons to penetrate too deep increasing drag on rotation and excessive wear and button breakage Th
149. ctivities 11 1 AWWA See American Water Works Association AWWA backwashing method 7 1 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 bail down method See installing screen bail down method of placement See placing gravel bail down placement of bailers 11 1 balancing out SP D 4 Barafos 7 7 barite 5 13 10 3 barreling E 2 harriers LFUW R L RWA W impermeable 2 28 semipermeable 2 28 basalt 2 5 2 14 basin s 2 2 2 19 alluvial 2 19 Great 2 21 hydrographic 2 2 Mississippi River 2 2 Missouri River 2 2 Ohio River 2 2 batteries checking D 6 D 7 bentonite 3 15 5 13 Wyoming 3 15 5 13 best guess methods A 1 bit s 3 15 9 3 11 1 crackerjack 11 1 design 5 5 drag 3 15 5 3 drill 5 3 5 15 failure E 2 maintenance E 1 reconditioning E 6 rule of thumb on E 6 tricone roller 3 15 5 3 weight on 5 6 5 29 body metal E 4 Borax 5 11 borehole s 3 15 through 3 18 6 1 6 3 6 5 6 11 6 15 7 8 9 1 9 4 9 10 9 15 11 1 boundary indicators See indicators boundary 1 EL IEEE in n brine 10 3 C 130 3 11 3 12 B 2 C 141 3 11 3 12 C 5 3 10 3 12 cable jack D 2 cable reel and reel case D 2 cable reel assembly D 3 D 5 cable tool method 9 15 CAL ADJUST See calibration adjustment CAL ADJUST Calibrating D 5 D 3 D j calibration adjustment CAL ADJUST D 2 D 3 capabilities C 2 carbide shear E 2 casing 9 3 through 9 6 9 11 See also
150. d pressure and flow will allow the cuttings to enter the core barrel along with the core and plug the bit Try to use experienced personnel to regulate the bit pressure speed of rotation and drilling fluid pressure However you might have to experiment due to the variety of core barrels and drilling fluids and variations in soils d Rock Core Samples You may recover undisturbed core samples from hard rock formations with the rotary drilling rig As with other sampling methods core drilling requires special auxiliary equipment and procedures The diamond core bit and double tube core bard are basic equipment Figure 11 1 The assembly consists of an outer rotating tube or barrel attached to a core barrel head at the top end and the diamond drilling bit at the bottom An inner tube and core lifter receive and hold the sample stationary within the rotating assembly during drilling Drilling fluid circulated downward between the inner and outer tubes and the sample remain protected To take samples Lower the core barrel and bit into the borehole through the hollow drill rod e Start circulating the wash water before the core barrel reaches the bottom of the hole to prevent cuttings or sludge from entering the core barrel at the start of coring Figure 11 1 Core drilling equipment Ihe optimum rotation speed of drilling varies with the type of bit used the diameter of the core barrel and the kind of material to be cored Exc
151. d the exhaust hole to peen over This action restricts the flow of air and causes even poorer hole cleaning It is essential to grind exhaust holes open for best results e On down hole drilling DHD bits always apply grease to the spline before assembly in the chuck On threaded bits grease all shoulder and threaded areas Figure E 1 Rock drill bit and rock formations E 1 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Asa bit begins to wear the face of the bit begins to look washed worn away The metal is washed at a faster rate than the carbide wears The carbide should be ground until no more than 3 8 inch protrudes from the metal surface If carbide is allowed to project further than 3 8 inch carbide breakage is inevitable e Abnormal spline wear is usually caused by a worn chuck excessive feed force or high RPM operation By checking the bit for spline wear you maybe able to prevent shanking of the bit damage to the hammer and loss of the hole e Although abnormal body wear or failure is not common in percussion drilling check the bit body for fractures By checking the body you may prevent the loss of the bit in the hole If barreling occurs grind the bit body because the body of the bit should be kept in its original shape Barreling results when a wear pattern occurs causing the diameter of the bit body to exceed the gauge diameter of the buttons e Check the striking end for excessive pitting Pitting is usually caused by
152. d water supply is an Army combat service support function however Army engineer organizations are responsible for the following water related actions in a TO e Surveying identifying and compiling data pertaining to surface water sources to supplement existing data e Compiling data using information such as well drilling logs and ground surveys to establish well drilling sites for groundwater e Well drilling by teams that are organic or attached to nondivisional engineer units e Constructing and repairing rigid water storage tanks and water pipelines when used e Improving water point sites requiring construction support e Constructing and maintaining permanent and semipermanent water utilities at fixed Army installations including water wells To accomplish the well drilling mission well drilling teams with organic equipment are deployed to the TO by air sea or ground Each team has a truck or semitrailer mounted drilling machine They use these machines to reach deep aquifers and develop wells Teams also have well completion kits Kits include the casing screen pumps and generators and other necessary equipment needed to provide an aquifer to storage tank capability The teams depend on engineer units or the facilities engineer for logistical and administrative support Transportation support is required to move well drilling equipment and components b Navy See Appendix B for information on Navy well drilling teams a
153. d will be at least three times the diameter of the orifice d Open Pipe Method With this method the pipe is fully open and you measure the distance the water stream travels parallel to the pipe at a 12 inch vertical drop Figure 8 6 page 8 8 Use the following procedure 8 6 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Wu Orifice piate 1 16 inch thick with hole of exact size ME e Step 1 Measure the inside diameter of the pipe and the distance the stream travels parallel to the pipe at a 12 inch vertical drop Your results will be in inches e Step 2 Estimate the flow from the pipe diameter and the distance the stream travels Table 8 TNI Bn wn E Sari a M gauge page 8 8 Your results Hubb will be in GPM Y pose 7 E E Hole in pi For partially filled pipes cae dt measure either the water depth or the may be used as orifice plate freeboard Divide the diameter by e the water depth to get a percentage ratio Measure the stream as above and calculate the discharge The actual discharge will be approximately the value for a full Pipe of the same diameter multi ae od he correction factor from Table page 8 8 Figure 8 5 Circular orifice flow meter Table 8 2 Circular orifice flow measurements Head of Water In Tube 6 nch 8 Inch Pipe Pipe Pipe Pipe Pipe Center of i 24nch 3 inch 34nch 4 inch 5 inch 4 inch 54nch 6 inch Orifice Opening Opening Opening Openi
154. day in frozen ground If the ground is thawing the footage per day is reduced The well can yield 40 gallons of water per minute from a 2 inch well equipped with a suction pump with less than 20 feet drawdown At a depth of more than 100 feet jet drive drilling becomes rather slow and difficult Therefore try to limit jet drive drilling to the southern portions of the permafrost zone d Drilling Fluids The fluid used in drilling through permafrost must remain in a liquid state during drilling operations and must not contaminate possible water sources You can eliminate possible contamination through pumping When using mud try to keep the mud from freezing by adding chemical agents such as aquagel gel flake barite fibratex smentex micatex and impermex Be careful during periods of excessive permafrost thawing The hole could slough during drilling Do not heat the drilling fluid An increase in the viscosity of the drilling mud will result in a decrease in mud flow eventually causing freezing or sticking of the bit Brine as a drilling fluid is not ideal in permafrost areas because it promotes contamination and excessive thawing It could corrode the drill string rig and pump and cause a skin rash on personnel Use brine sparingly when required In normal water well drilling you develop the well by pumping after drilling which clears the well of brine A suitable brine solution would be 35 pounds of rock salt mixed with 53 gallons of wa
155. des is full of material remove the auger and empty it Repeat the operation until you reach the desired depth When constructing bored wells you may hit small rocks or boulders that will prevent further penetration When this occurs lift the auger from the hole remove the cutting bit and replace it with a spiral or ram s horn Lower the tool into the hole and turn the auger clockwise The spinal should twist around the rock so you can lift the rock to the surface Remove the spiral replace it with the regular bit and continue boring If you hit a large boulder that you cannot remove with a spiral abandon the hole and start somewhere else Wells less than 15 feet deep should not require equipment other than the auger For deeper wells use a light tripod with a pulley at the top or a raised platform so you can insert and remove a longer auger rod from the hole without damaging the rod and without unscrewing all pipe sections c Well Completion If you reach loose sand and gravel you may not be able to bore below the water table To overcome this problem lower a pipe or other casing to the bottom of the hole and continue to remove material while adding weight at the top of the casing to force the pipe down If you cannot remove material from the hole use a bailer or sand pump and make the hole deeper Complete bored wells by installing well screens in the aquifer and developing the well as described inlChapter 7 You may also use drive points
156. develop a well The simplest method follows e Step 1 Attach a weighted plunger or surge block to the sand line Lower the surge block into the well below the water level but above the screen e Step 2 Lift the block and then drop the block 3 to 4 feet repeatedly to surge the well Continue this action for several minutes e Step 3 Remove the surge block and lower a bailer into the well All of the sand that was pulled into the well is bailed from the sand trap e Step 4 Repeat the process noting the amount of sand brought into the well each time Development is complete when 5 milligrams or less of sand per liter of sampled water is removed e Step 5 Sanitize the well with calcium hypochlorite 3 13 Sanitary Seals All wells must have a sanitary seal to prevent contamination from surface runoff Mix cement grout and place it in the annulus between the well casing and the borehole wall Extend the grout from the surface to the top of the backfill material 30 foot minimum You should also pour a concrete platform about 4 feet by 4 feet around the casing at the surface with the casing extended at least 1 foot above the surface The upper surface of the slab and the surrounding area 3 20 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 should be gently sloping away from the well for better drainage In addition to a surface grouting you need to install a well seal a type of bushing or packing gland to prevent foreign materials from enter
157. discharges large bubbles of compressed air into the screen The submergence ratio must be 60 percent Submergence is the extent to which the air pipe is submerged in the water compared to the extent the pipe is between water and ground level Work efficiency decreases rapidly as the submergence ratio drops below 60 percent In deep wells with a considerable head and a low submergence ratio you can perform some effective work by shooting heads FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Table 7 2 Recommended pipe sizes for air lift pumping Size of Eductor Pipe Size of Well Casing if Minimum Size of Pumping Rate Eductor Pipe is Used or eres qe pu eductor Air Line in in mm i to a i to un 4 102 or visse 2 51 60 to 80 327 to 436 5 127 or larger 3 76 1 os 80 to 100 436 to 545 6 152 or larger 3 1 2 89 1 25 100 to 150 545 to 818 6 152 or larger 4 102 1 1 4 32 150 to 250 818 to 1 360 8 203 or larger 5 127 1 1 2 38 250 to 400 1 360 to 2 180 8 203 or larger 6 152 2 51 400 to 700 2 180 to 3 820 10 254 or larger 8 203 3 64 700 to 1 000 3 820 to 5 450 12 305 or larger 10 254 3 64 1 000 to 1 500 5 450 to 8 180 16 406 or larger 12 305 4 102 Actual pumping rate is dependent on percent submergence igure 7 3 shows the proper method of placing the drop pipe and airline in the well Use a hoist line to easily handle the drop pipe Suspend the air pipe on the sand line Fit a T at the top of the drop pipe with a short discharge pipe at the side o
158. does not have to be modified when drilling with mud to 1 500 feet however additional equipment and more drill pipe are required to use the 1 500 foot well completion kit Additional equipment includes casing elevators and slips larger drill bits and 900 feet of additional drill steel Well drilling teams should ensure that they have the rig accessory kit for the LP 12 to be fully mission capable The 600 foot WDS is e Air transportable e Equipped for air percussion drilling and for rotary drilling with mud or air e Equipped to drill wells up to 600 feet e Adaptable for drilling to depth of 1 500 feet e Truck mounted for mobility e A three mode water transfer pumping system 1 Well Drilling Machine Table 3 1 lists specifications for the LP 12 machine This machine is a truck mounted rotary well drilling machine that has a 32 foot mast 3 drum draw works assembly rotary table mud pump and air compressor page 3 6 The components are powered by the truck engine through a power take off PTO subdrive A hydraulic system operates the leveling jacks mast raising cylinders and breakout cylinders The vehicle is equipped with attachments to tie down and lift the vehicle during transport For operation and maintenance procedures see TM 5 3820 256 10 Table 3 1 LP 12 Well drilling machine specifications 88 2 Support Vehicle Table 3 2 page 3 6 lists specifications for the support vehicle This vehicle is t
159. drilling mud and cement for grouting the completed well page 3 8 Ihe completion kit is an expendable item Teams use a collapsible drop hose to connect the pump with the surface The hose is extremely lightweight and will not corrode in water page 3 9 For instructions on using the kit see TM 5 3820 256 10 The kit has a portable steel mud pit with internal baffling that eliminates the need for a backhoe or similar piece of earth moving equipment This mud pit is designed to recover the drilling fluid that recirculates through the system This mud pit is of limited size and requires frequent cleaning during a well drilling operation page 3 9 3 7 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Nipple Elbow Nipple Drawdown hole Well seal Pipe coupling Hose coupling Coupling lamp es ELIT Power cable Screw Hose Well casing Clamp Cable ridge C Coupling clamp amp r asl Sctew w w Hose coupling zL Check valve Cable guard w Nippie pe Submersible pump M Screw Cable 8 Cable E Lock washer Meter Casing O ring Strainer coupling Strainer Interlock end Figure 3 3 600 foot well completion kit Gate valve b CF 15 S Drilling System 1 Well Drilling Machine lists specifications on this machine The CF 15 5 is a compact mobile drilling unit that can handle exploration and well drilling using air rotary mud rotary and down hole hammer techniques p
160. drive point fitted to the lower end of tightly connected pipe sections into the ground Figure Ihe drive point consists of a perforated pipe with a steel point at its lower end to break through pebbles or thin hard layers Use 5 to 6 foot pipe sections for the pipe string and as the casing for the completed well Driven wells are usually 1 1 4 to 2 inches in diameter The small diameter pipe required for these wells is light and portable and is easy to install You can also construct wells up to 4 inches in diameter The casing used in these wells is heavier and more difficult to drive However you can install deep well pumps in the pipe casing to a depth of 25 feet or more below ground If you use a common pitcher or a centrifugal pump the water level should not be deeper than 25 feet a Equipment 1 Drive Points The continuous slot drive point page 9 8 has a screen with horizontal openings and one piece welded construction and contains no internal perforated pipe to restrict the intake area The pipe will withstand hard driving but should not be twisted while being driven The brass jacket type consists of a perforated pipe wrapped with wire mesh and covered with a perforated brass sheet Because the pipe body must be strong the number and size of holes are limited restricting the effective intake area Ihe brass tube type consists of a brass tube slipped over perforated steel pipe for a rugged construction This tube has about the same in
161. e 8 2 M Scope Attach a pressure gauge to the airline at the surface with an ordinary tire valve so you can pump air into the line Pump air into the line until you get a maximum reading The reading should be equal to the pressure exerted by the column of water standing outside of the airline Subtract the reading from the total vertical length of air line to get the depth to the water below the center of the gauge Readings are measured in feet so you may have to convert your figures 8 3 Measuring Discharge Rate a Measured Container Method You can determine the flow rate from a well or pump by measuring the time required to fill a container with a known volume With this method use small containers for early measurements and large containers for later measurements Also use an instrument such as a stop watch for accurate time measurements Use the following equation FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Fingernail at even meter or foot mark Well casing Surface Section of tape coated with carpenter s chalk Water level Lead weight Figure 8 3 Steel tape measurement method FR V 60 T where FR flow rate in GPM v volume in gallons T time required to fill container in seconds b Flow Meter Method A turbine type flow meter will give an acceptable flow rote reading These meters are used by civilians You can also use a totalizer type water meter when the yield is low Use thes
162. e also tools evaporation 2 1 evaporite s 2 17 external preparations 7 8 facilities engineer 1 2 fall in 5 23 fans alluvial 2 19 Fast Break 5 11 ilte 9 99 9 28 Co lo f mau vrd una nn amcitbur anal faults lt he cm M L orientation feed drive 5 1 feet per minute fpm 5 18 5 25 fibratex 10 3 field manual FM 2 4 11 2 field water supply 1 1 field operations 3 1 8 2 11 1 filter cake 5 16 filtering and backfilling 3 20 fish 5 24 fishing 5 24 Fleet Marine Force FMF B 2 floor hand C 3 flow meter method See measuring discharge Y ate flow meter neuioad Oi flow rate 8 5 fluid consistency 5 5 drilling 3 15 5 8 6 1 7 8 10 3 11 1 11 4 jetting 9 1 FM See field manual FM FMF See Fleet Marine Force FMF foamer s 5 26 m NR J Index 4 folds 2 22 See also structure density and orientation foot piece 4 13 formation stabilizer See stabilizer formation fpm See feet per minute fpm fractures 2 22 See also structure density and orientation gallon s per hour GPH 2 9 gallon s per minute GPM 2 9 2 19 3 21 4 6 4 7 4 11 5 3 5 18 5 25 5 32 5 33 7 4 8 1 8 2 8 5 9 1 galvanometer D 1 gel flake 10 3 geologic structure See structure density and orientation geological exploration 11 1 geological setting 2 3 geyser effect 5 18 glaciated regions 2 20 going crooked 5 24 GPH See gallon s per hour GPH GPM See gal
163. e bailing pipe and lower the screen inside the well casing Add lengths of bailing pipe as the screen descends until it reaches the bottom of the borehole Screen Bailing pipe removed Tapered and weighted wooden plug Left hand thread T Wl Special nipple 7 Bail down shoe OS Figure 6 11 Shoe with a guide pipe e Step 6 Mark off the length of the screen on the bailing pipe that projects above the casing using the top of the casing as the reference measuring point Run a bailer or sand pump inside the bailing pipe and start bailing sand from below the shoe 6 14 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 e Step 7 As you remove sand from below the shoe by the bailer the combined weight of the screen and the string of bailing pipe will cause the screen to move downward Attach additional weights to the bailing pipe if necessary e Step 8 Monitor the progress of the work carefully and stop the operation when the screen reaches the desired depth The packer should be near the lower end of the casing but still inside the casing Accurate measurements will avoid sinking the screen too far e Step 9 Drop a weighted and tapered wooden plug Figure 6 11 through the bailing pipe to plug the special nipple on the bail down shoe When the plug is in place unscrew the left hand threaded joint at the upper end of the nipple by turning the entire string of bailing pipe to the right Remove the bailing pipe
164. e cuttings are removed Raise the tool string until the tool joint is 4 to 6 inches above the rotary table Step 5 Disengage the mud pump and set the slips to support the tool string Disconnect the kelly from the string and set the kelly back to the cradle position Step 6 Run out the sand line remove the end cap and connect a hoisting plug to another drill collar or to a joint of drill pipe Step 7 Lift the drill steel with the hoist line or sand line and place the hoisting plug on the drill steel Figure 3 16 page 3 20 Step 8 Remove the lower end cap Clean and lubricate the threads Make up the threads to the string in the hole with pipe wrenches Step 9 Lift the entire string slightly and remove the slips Lower the string until the tool joint is 4 to 6 inches above the rotary table and the slips are reset Step 10 Make up the kelly to the tool string remove the slips engage the mud pump lower the string to the bottom of the borehole and continue drilling Repeat the process until you reach the desired depth Step 11 Reverse the process to come out of the borehole 3 16 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 WARNING To prevent injuries from shifting loads use taglines when hoisting a load Attach long taglines to the load to maintain control 3 10 Sampling and Logging You should take samples and record them on every well drilled During the drill operation take samples of the cuttings in the drill
165. e facilities and water distribution systems b Requirements The hazards and risks associated with water well drilling require the highest standards of training proficiency and safety The following publications have specific responsibilities that apply to water well operations AFI 10 209 AFI 91 301 AFI 91 202 TA 429 Operations maintenance and repair manual for the assigned well drilling rig Repair parts manual c Team Composition A water well drilling team will be composed of a minimum of 12 trained personnel The team must provide a four man 8 hour shift 24 hour drilling operation Teams should be primarily 3E2X1 construction equipment personnel in grades E3 through E8 However other Air Force Specialty Codes AFSCs should be considered such as 3E4X1 utilities system specialist The team must consist of 8 RH 2 and 4 RH 3 personnel The officer in charge or noncommissioned officer in charge of the RH 2 or RH 3 team has the responsibility for well drilling The 12 man team should be broken down to 3 four man teams Special positions and duties are as follows Tool pusher supervisor Outlines the drilling program and sees that it is carried out Driller Operates the drilling rig Derrick hand Works in the mast racks the steel and so forth Floor hand Makes and breaks the connections cares for all tools and equipment Both floor and derrick hands carry out the mud program Table C 2 Well dril
166. e meters to measure the total gallons pumped and determine the flow rate To do this record the number of gallons that have flowed within a set amount of time and compute the flow rate c Circular Orifice Method A circular orifice meter Figure 8 5 page 8 7 is a device you can make to measure discharge rates This device gives good results and is compact and easily installed The meter consists of a sharp edged circular orifice at the end of a horizontal discharge pipe The orifice is from one half to three fourths the diameter of the pipe The inside of the pipe must be smooth and free from obstructions for a length of 6 feet from the orifice The discharge pipe has a small hole on one side with a rubber tube connection The pipe is designed so that you can measure the pressure head in the discharge pipe at a distance of 2 feet from the orifice FM 5 484 NAVFAC P 1065 AFMAN 32 1072 77 Static water level 0535 w Ke ocu Mm a L a w HUT 2 Pumping pipe a Air pressure JP MI CERNI y a balances this V ee UE amount of aE SUP water column 70 L 1 Figure 8 4 Air line measurement method The length of hose and ruler depends on the pipe size you use Table 8 2 The discharge pipe must be horizontal and the stream must fall free from the orifice The orifice must be vertical and centered in the discharge pipe The combination of pipe and orifice diameters for a given test should be such that the head measure
167. e mud probe the surface lines are not used A special jumper makes the proper electrical connections between the unit and the cable reel Use the following procedures for calibrating e Step 1 Place probe selector switch to MUD e Step 2 Connect the mud probe to the 500 foot cable Press the connectors until you hear a pop which indicates that the waterproof sealing surfaces are mated Secure the threaded locking rings Step 3 Pull desired length of cable from the reel and attach the mud logger jumper to the instrument and cable reel Place unit in any of the NORMAL logging positions Step 4 Pack the probe with mud or lower it into the borehole Step 5 Place the function switch at CAL energize the current switch and make sure that the galvanometers needle is centered If needle swings full left place function switch at CUR and check for probe current The needle should deflect about ten divisions to the right of zero indicating that about 1 milliampere ma of current is flowing If you note a zero deflection the probe electrodes have not made contact with material to be measured Step 6 If you get proper indication at CAL or CUR place the function switch at LOG and adjust the SP or the 0 on the galvanometers Step 7 Energize the current switch while adjusting the ohmmeter potentiometer until you notice minimal or zero deflection of the galvanometers If the current switch keeps energizing the galvanometers needle ma
168. e sampled material Rotate the piston rod extensions to the right until the piston rod clamp or locking mechanism in the sampler assembly is released Clamp the piston red extensions to the drill rig mast Place a mark on the piston rod extension where it emerges from the drill rod Marking the rod will help you determine the exact length of drive The sampler is ready to push The capability of the drilling rig to perform a continuous smooth push limits the length of the drive In noncohesive soils below the water table the vacuum caused by the piston can cause piping of the sample if the drive length is excessive Samplers 24 to 30 inches in length are reasonable The most satisfactory method of pushing an undisturbed sampler is with the drive mechanism preferably hydraulic on the drill rig The rig must be firmly anchored to prevent the reaction of the drive from raising the rig and the sampler piston Screw type earth anchors are sometimes used You must advance the sampler in one continuous push at a uniform rate Do not rotate the sampler during the drive If the drive is interrupted do not restart it Adhesion and friction develop between the sample and the tubing wall during an interruption Restarting the drive will result in increased penetration resistance and disturbance of the sample Withdrew the sampler advance and clean out the hole and make a new sample drive 2 Core Method If the sample material contains gravel or is too hard fo
169. e screen and backfill material around the casing If you place the screen in material such as gravel or very coarse sand you may not need a gravel pack Place the gravel filter material around the outside of the casing Deposit the material to the bottom of the well Add gravel to about 5 feet from the top of the screen Use the sounding method to determine the level of the gravel Add impervious backfill around the casing from the gravel pack to about 10 to 20 feet from the surface If you use grout instead of impervious material add a couple of feet of clay above the gravel to prevent the grout from entering the gravel filter Bring the grout to the surface 3 12 Well Development Frequently when a well is frost installed the efficiency production per foot of drawdown is not satisfactory and you must develop the well either by pumping or surging or both Developing a well removes the remaining drilling fluid breaks down any filter cake buildup on the borehole wall and flushes the fines in the formation adjacent to the grovel pack into the well Make sure that you pump the well of all fine sediments and sand with an airlift before installing the submersible pump If you do not the pump and components will wear out prematurely To develop a well pump or blow the drilling fluid out of the well Agitate the water in the well to produce an alternating in and out flow through the well screen or gravel pack There are several methods available to
170. e the aquifer Step 6 Let the well pump as an air lift for a short time and then shoot another head Step 7 Repeat this process until no sand shows indicating the completion of this stage of development Step 8 Lift the drop pipe to a position 2 or 3 feet higher in the screen and follow the same procedure This develops the entire length of the screen a few feet at a time Step 9 Return the drop pipe to its original position and shoot one or two more heads Step 10 To complete the development process and thoroughly clean out any loose sand pull the air line up into the drop pipe and use it as an air lift to pump the well FM 5 484 NAVFAC P 1065 AFMAN 32 1072 h lt Clamp Pumping Lm Clamp Well casing s T Screen zac TET N M ee Air pipe in position x ES to back blow Ey AE Coarse sand piace e Ea os bythe development a Re Figure 7 3 Placing d the drop pipe and air line in the well 2 Closed Well Method With this method you use compressed air to close the top of the well with a cap and arrange the equipment so air pressure can build up inside the casing to force water out through the screen openings Figure 7 4 page 7 6 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Disadvantages with this method are e That valves and fittings may not be available for military field operations e The danger of forcing water upward outside of the casing This will loosen the c
171. e to supply the cuttings Slow down the pumping rate to reduce pressure on the formation while bridging the open spaces With sufficient bridging a suitable filter cake follows circulation is regained and normal drilling operations are resumed In the field you can test the filtration properties and filter cake thickness using the filter press kit This kit consists of a press with a mounted pressure gauge and a CO charging system that is used to simulate the hydrostatic pressure inside a 200 foot hole By placing a sample of drilling mud in the press and charging the system you can forma filter cake The filter cake should be less than 2 32 inch thick 7 Salty Environment A high chloride content in the mixing water causes bentonite to react anomalously or not react at all The ground bentonite remains agitated it does not disperse hydrate or swell In salt water bentonite is an inefficient clay additive for drilling mud The dissolved salt is an electrolyte that changes the interparticle activity of bentonite If you add sufficient amounts of salt water to a fresh water and bentonite mud mixture the dispersed platelets will form lumps Viscosity and filtrate loss increase and the mud s ability to build a thin impermeable filter cake decreases Attapulgite is often used for salty formations The small particles produce a high surface area to volume relationship and good viscosity building Unlike bentonite the particle shape is needle li
172. e upper values apply for formation waters having 100 to 150 ppm total solids f Selection of Formution Contacts When selecting the formation boundaries use the 0 25 foot curve when possible The inflection point of the resistivity curve the point midway between changes in curvature of the resistivity curve is used to mark the contact between different formations g Correlation of Electrical Logs You can use the electrical logs to correlate formation thicknesses and depths from one well to another For example two wells within a few feet of each other invariably will give identical electrical logs When the wells are farther apart you should still be able to recognize the correlation Studying the changes thickening or thinning of beds could be useful for further exploration In bedrock formation correlation is possible with distances of thousands of feet However such distances are the exception D 9 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 h Effect of Metal on the Resistivity Log Because metal is a good conductor its presence in the measurement zone will cause a major decrease in the resistivity and make the log unusable for determining formation type However using metal could help locate steel in the well In making the log the bottom of the well casing will be detected when the probe enters it The effect on the curves will be that both fall off to extremely low values 5 to 20 ohm feet and then remain fairly constant Where
173. ections Sometimes insufficient current results from high resistance at the steel surface current electrode If the galvanometers shows less than 9 ma and you cannot increase the amount by rotating the CAL ADJUST knob then the contact resistance at the steel stake is too high Reduce the resistance by driving the stake deeper or pour water around it or double stake until you get an excess of 8 ma If you cannot get a minimum of 8 ma the ground circuit is too resistive a situation encountered in areas having a thick cover of dry sand or where there is frost on the ground To get a log in this case use the lateral arrangement of electrodes with the CUR wires connected to the well casing 2 Fluctuating SP This problem occurs when the galvanometers needle fluctuates uncontrollably when the function switch is at LOG To correct the problem check the surface potential reference lead oxide flag to make sure it is buried in moist soil and that the wire is not frayed or broken If the SP fluctuates badly stray ground potentials are the cause This situation can occur in highly industrialized areas To correct the problem use the LATERAL arrangement of electrodes 3 Unable to Zero the Meter with Self Potential Potentiometer To correct the problem reverse the SP polarity switch To zero the galvanometers the injected voltage must be the correct polarity If reversing the polarity switch does not work check the voltage of the 1 1 2 volt C batt
174. ectlons together until tack welded Tack weld remove collars and complete weld Figure 9 15 Alignment collar Successful construction of driven wells depends on close observation and correct interpretation of certain work aspects while driving Interpretation of details such as penetration made with each blow drop and rebound of the maul or weight sound of the blow and resistance of the pipe to rotation helps the well driver to determine the character of the materials being penetrated Table 9 2 page 9 15 outlines a guide for the identification of the formation being penetrated 9 12 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 3 foot cold rolled shafting Rope about 22 pounds B PUN H Well casing Welded joint NU OD same as ID of pipe Small n D E rivi ng har MMA L Sand screen 36 by 3 foot pipe i about 25 pounds Driving point c Well Completion a 9 g Eom 1 Straight Pumping Method You can develop a well with a pitcher spout hand pump The pump has a plunger and a check valve arranged so that the check valve trips when you raise the pump handle as high as possible With this method you can pump for an extended period before tripping the check valve Tripping allows water to run back down the well pipe By applying a heavy suction on the well and tripping the valve you produce a surging action through the screen openings The flow reversal due to the surging loosens the fine m
175. ed mud consistency depends on many factors The nature of the formations will dictate mud qualities However you will not know all the conditions before you start to drill The inexperienced driller must be careful because mud with the correct thickness often is too thin You can adjust the viscosity by adding water or clay A good range for drilling muds is 32 to 50 seconds per quart Viscosity is influenced by mud density hole size pumping rate drilling rate pressure requirements and geology Considering the thixotropic qualities of drilling mud a funnel viscosity of 100 seconds per quart may be no more viscous than a funnel viscosity of 50 seconds per quart if both fluids are in motion You can use test readings as an indicator of changes in mud that might lead to problems Therefore conduct Marsh funnel Figure 5 6 Marsh funnel tests before beginning operations and record the findings Take 5 14 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 mud samples for each test from the same location in the circulating system just before returning to the hole The apparent viscosity of the drilling mud in motion affects carrying capacity the pump pressure hydrostatic down hole pressure required for circulation and the ability to drop cuttings in the settling pit These characteristics are also intrinsically involved with well hydraulics density of mud density and size of cuttings and particle slip 5 Density The carrying capacity of a mud
176. ee ee sas sos 5 31 5 4 Reverse Circulation 02 0 eee e sa sas sas ee 3 37 Advantages and Disadvantages ees 5 32 Rig Config uratioti 2o Giese ca RU E ue REA Ie x ei EL eae 5 33 5 5 Drilling Information x a sa 3 34 Daler op canon or ee S S X S 9b ELE SUE AAA m d 5 34 Sol Sampling rubro iaa a US dox DR x qnm deus Sw dos 5 34 Chapter 6 Well Installation Procedures 6 1 Setting Casing eee tnn 6 2 Selecting Casing eem nn 6 3 Installing Casing t t B ng B Open Hole Method 1 8 a sa sa sa sa sa ee Single String Method enn Wash In Method Jetted Wells T fe ls a te Driven Method Driven Wells o s s s s s tnn Uncased Interval Method eee ee ee 6 4 Grouting and Sealing Casing ee saa sas s ens Dump Bailer Method 2 2 o ee sa ss nn Inside Tremie Method s sz sea s s s s s s s s s n ng Outside Tremie Method h 1 a s a s s saa s s s s s s FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Page Diameters yack L ad a ES BUE SOR dre VPE Rub we qood an ee N 6 9 SIOESIZ6S 1 doni doe E do pen er ee eg a ae US deaf ee TA 6 9 6 6 Installing Screen _ sa sa sea B nns 6 10 single Strine Method uoces desee S S s ILE e e AE RE N 6 10 Pull Back Method
177. eee o e 97T O a v 34 E H Hi 1 1114 yor romo Pe PoE 2 5 eL A he nd n id fa cili tate IHH RR ES ef OOIIS IRIA Nra TACHITIATAS 4 Y H NE Y Jg 51 7 5 ote eae tots cos ra tte sy LOM NAN read tachi es I UO we Pee TE Tyee riel eis dd 7 EC Check valve boves s ees US m Boris VISAS SER j retum of grout UE a ML eL JOCLOHEIHERE A RA qa S0 Sane oS IAEA IDA ARA e al es RDC A 03409 0 0795 o eno 25760090 o e qe acea aee oq nos ou retorne no 0 Td ere bare he APP E e e 6 0600 RA oro a el be Be io Seen we s 19 097 99994 9 eos en T Ea 04496 Portege 59 a09 44 o 9 99099 nn Remove and clean the tremie pipe The check valve prevents the grout from moving back into the casing e Step 3 The grout should set and harden in about 24 to 72 hours depending on the cement you use Drill out the packer and continue drilling the well below the grouted casing c Outside Tremie Method With this method you use a tremie pipe to deliver grouting outside the casing This method is not recommended for depths greater than 100 feet You can use this method if the space between the casing and the borehole wall is large enough to contain a 1 inch tremie pipe Use the following procedures to complete grouting using this method e Step 1 Lower the pipe to the bottom Make sure that the lower end of the casing is tightly seated at the bottom of the borehole e Step 2
178. eic 3 5 A49 A SAAN VIGIL Navy well drilling See well drilling Navy NBC See nuclear biological or chemical NBC NCF See naval construction force NCF NMCB See naval mobile construction battalion NMCB nuclear biological chemical NBC 1 1 OD See outside diameter OD Ohio River Basin See basin s Ohio River ohmmeter D 2 open hole method See installing casing open hole method of installing screen open hole mathan of placement See placing gravel open hole placement of open pipe method See measuring discharge rate open pipe method of open well method See well development open well method of operational concept A 2 operation rotary 5 5 organization and scope C 2 outside diameter OD 5 18 5 25 outside tremie method See grouting and sealing casing outside tremie method of overlay s See also symbols overlay existing water supply A 3 Index 7 groundwater A 3 surface water A 3 water resources A 3 particle slip 5 15 pendulum effect 5 30 percussion drilling See drilling percussion aut TADA Oe Leds panior mance i permafrost discontinuous 10 2 thick continuous 10 2 permanent wells See welKs permanent permeability 2 5 2 32 5 7 petroleum oil and lubricants POL pH 5 10 5 11 physical properties 2 3 pin hook 9 9 pipe s 9 11 clamp s 6 3 9 10 joint 9 10 PVC 7 2 tongs 9 10 piping and casing log See DD Form 2679 pitcher
179. ell drillers must have knowledge of drilling fluids and their use for successful rotary drilling Drillers must also know about drilling fluid additives used to prevent problems in drilling Preventing drilling problems such as an unstable borehole wall or a stuck tool is easier than fixing the problem after it occurs Seg paragraph 5 le page 5 8 for information on drilling fluids Before drilling with mud build a mud pit The pit may be either a portable pit or an excavated page 5 18 for more information on mud pits mud pit The decision depends on the hole depth and the alternatives available See EGG d Variables Bit design weight on bit rotation speed fluid consistency and cumulation pressure and velocity affect rotary drilling Experience helps the driller handle unique problems and conditions Continue to experiment wherever you drill to develop the best drilling procedure Before starting the hole plumb the kelly to provide a straight hole Figure 5 3 1 Bit Design Rotary drill bits are designed to cut specific material types Choose the drill bit based on the anticipated formation Either drag or rotary bits are available at a drill site Normally you will use drag bits for beginning a borehole in unconsolidated overburden materials These bits are used for hard medium and soft rock and are part of the drilling rig equipment When drilling in soft rock use a medium soft rock drill bit In very hard
180. ell to a water purification team installation or host nation official e Well completion kit or component resupply e Communications support e Reporting procedures Planning for the next mission 3 2 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 3 3 Deploying Teams Army well drilling units are considered and organized as a specialized skill engineer team They are not self sufficient These teams depend on an engineer battalion or a higher headquarters that is capable of providing support needed to accomplish the mission A well drilling team leader must ensure that the unit the team is attached to understands the mission and capabilities of a team Because a well drilling team is small there is little redundancy and no surplus labor The leader must request additional personnel needed to complete the mission A well drilling team has only the equipment necessary to drill under optimum conditions A well drilling team leader must request the following from the engineer unit Transportation support of the equipment and personnel by land air or sea according to the unit movement books and operator manuals Routes to the proposed drill site WDRT assistance and graphic products from the water resources data base and an indication of where the TO commander wants the well Security during movement and drilling Clearing and leveling of the drill site Excavation and maintenance of mud pits Off loading and transportation of well com
181. ely ground barite so the mud La will hold the barite in suspension Use heavy drilling 10 E80 mud only when absolutely necessary to control 12 I IET pressures since the muds have disadvantages 18 15 High density mud increases pressure on the formation by the weight of the fluid column Figure 5 7 shows the nomograph for determining the hydrostatic head produced by drilling fluids The increased pressure is Drilling fluid weight in Ib gai A 7 481 weight in Ib tt Drilling fluid weight in psi 100 ft weight in R H x 1 44 Drilling fluid weight in psi 100 ft weight in ib gal x 5 194 Example Depth 650 ft Density 9 5 Ib gal Lay straight edge from 650 on depth column to 9 5 Ib gal on density scale Read down hole pressure 310 psi Figure 5 7 Nomograph for determining hydrostatic head produced by drilling fluids further increased by the pump pressure required to mobilize the fluid in circulation The increased pressure can cause formation damage and loss of circulation In formations that are strong enough to withstand the pressures without being damaged the drilling operation can still suffer Ihe pressures from the mud and the formation should be balanced so that the borehole bottom exposed to the drill bit is near surface eruption from pore pressure That balance makes the formation easy to fracture and enhances the cutting rate If the mud pressure is much lower than the formation pressure the borehole
182. en Depending on the construction method set the well casing in the well before or at the same time as you set the well screen The 600 foot WDS has no surface casing If the borehole has a tendency to cave in during drilling install the casing while drilling but before reaching the desired depth Use this procedure when drilling in loose unconsolidated materials When installing the casing before the well screen such as surface casing the casing must be larger than the screen Therefore use a larger drill bit than the one used to complete the screen portion of the borehole The gt yA r vk Ihe decision to use surface casing should be A made before mobilizing and should be gt 7 based on the geologic information about the 2 site a Surface Casing Use the following Figure 3 17 Taking samples steps to install the surface casing Step 1 Drill the borehole to a predetermined depth and remove all the cuttings by circulating the drilling fluid Withdraw the drill string and remove the bit Step 2 Set the kelly back in the cradle Connect the elevators to the first section of surface casing that is lifted over the borehole by using a casing elevator and the hoist or by using a sand line Figure 3 18 Step 3 Lower the casing into the well and set the slips Figure 3 19 which suspend the casing in the well in the spider bowl Figure 3 20 e Step 4 Disconnect the elevator H
183. en hydraulic conductivity and transmissivity Drawdown x L uu ot Se Ao Sd Se dre Roy E es a eS Hydraulic erauielt x au d DE A GS ERS A ds OUR 1 SAE A I fua ennad sia aA ami for e Unconfined aac uycr ee Q y e 9 9 e s Q 9 Flowing artesian well ees c Perched water table lt coo a eS Gwe BE SRS RES MG QICNINIONE 2 ess a Wk SE Na e SAS RH Q Se N WC qk EARS Water flow throi MUON lava esa ee Ob ak OS ew UR f Sa ough lava Alluvial valley yu ARA RA a RE de eR RR BS 8 Water in a coastal terrace c t tnn Alluvial fan EET a TE E Alluvial basin o 2 AA Q SOS EH BO eS eae e ae re 2 22 Glaciatedregion ee EEUU Figure 2 23 Figure 2 24 Figure 2 25 Hydrogeologic strat column of the Great Basin Structure map of western lran enn Faulis and sDHhHgs 22 woo x AS ox ao E ox EEE xii lt FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Page Figure 2 27 Stream drainage patterns o een 2 26 Figure 2 28 Hydrographic basin with recharge areas 2 27 Figure 2 29 Mounding eee es 2 27 Figure 2 30 Hydrographic basin with discharge areas 2 28 Figure 2 31 Groundwater flow from recharge to discharge areas 2 28 Figure 2 32 Types Of springs ee es 2 29 Figure 2 33 Playas and salt encrustation deposits ee 2
184. en the pressure stops increasing e Step 5 Turn the three way valve and direct the air supply down the airline to pump the well e Step 6 Repeat this process until the well is thoroughly developed You should not have to bail the well after developing it because the water velocity usually cleans out the sand from the well However if you did not initially bail the well thoroughly you may have to repeat the bailing process to clean out the well 7 2 Dispersion Treatment Dispersing agents mainly polyphosphates when added to drilling fluid backwashing jetting water or water standing in the well counteract the tendency of mud to stick to sand grains These agents are procured locally on an as need basis Baroid Industries produces Baratos a white granular sodium tetraphosphate thinner and dispersant You may use chemicals such as sodium hexametaphosphate tetra sodium pyrophosphate sodium tripolyphosphate and sodium septaphosphate to develop wells Dispersants work effectively when applied at the rate of one half pound of chemical to 100 gallons of water in the well Let the mixture stand for about one hour before starting well development Wetting agents such as CON DET increase the dispersion action of polyphosphates when added to the solution at a ratio of 1 100 Be careful when using the dispersion process because you could have an adverse reaction The driller should make the decision to use or not to use dispersants 7 3 Rock
185. en using polymer fluids Since most of the cuttings are dropped out friction and wear in the pump are minimized and the drilling rate is not impeded by cuttings or high density A major advantage of polymers is the lack of mechanical wear to the drill rig mud system Some drilled fines clay silt circulate back down the hole Recirculated solids are much less a problem with polymer fluids than with clay fluids Revert will not hydrate in water containing any appreciable amount of borate However Borax can be used to produce a gel plug in hydrated guar gum polymer With a pH of 7 5 the borate cress links the polymeric chains and forms a strong three dirnensional molecular gel If a strong gel plug is necessary to get through a lost circulation zone mix 1 cup of borax in 5 gallons of water and pour slowly into the pump section while pumping at idle speed When the berated fluid stringy gelled mass recirculates stop pumping for one half hour Resuming normal drilling should be possible after wasting the borated fluid Repeat the procedure if necessary Although the polymer fluid is not thixotropic and has no gel strength it thins somewhat while being pumped 5 11 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Table 5 6 Additives for drilling fluids B Additive Final Uphe na ase ve unne ole s Fluid Concentration Viscosity Velocity Observations Water Clay high grade bentonite increases viscosity lifting capacity
186. enings Periodically pump the well to remove the sand brought in by surging e Step 2 Remove the pump and bail out the material in the sand trap after surging e Step 3 Repeat the process until the well stops producing sand c Gravity Outflow Method Backwashing by gravity outflow involves pouring water into the well rapidly to produce outflow through the screen openings Inflow through the screen is then produced by bailing water from the well rapidly This is a slow surging technique requiring several minutes to complete a cycle If the static water level is high enough to permit pumping b y suction lift you can use a small centrifugal pump instead of the bailer to speed up the work If there is room in the well casing connect the discharge side of the pump to a string of small diameter pipe that is lowered into the well The water added is pumped down inside the screen creating a turbulence that will help to develop the formation d Pressure Pumping Method Occasionally wells are backwashes by capping the casing and pumping water into the well under pressure Water is forced outward through screen openings similar to the closed well method of using compressed air for development paragraph 7 1f 2 page 7 5 Pressure pumping is an inefficient method because the desirable surging effect is difficult to produce You must make sure to seal the casing tightly in the borehole and prevent water from being forced up around the outside of the casi
187. eptember 1990 SIP 5 62 12 SM TG Soldier s Manual and Trainer s Guide MOS 62 General Construction Equipment Operator Skill Levels 1 2 15 October 1986 STP 5 62N34 SM TG Construction Equipment Supervisor Soldier s Manual and Trainer s Guide MOS 62N Skill Levels 3 4 21 February 1989 References 2 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 SC 3820 97 CL E01 Pneumatic Tool and Compressor Outfit 250 CEM Truck Mounted 14 June 1974 AFI 10 209 Civil Engineering RED HORSE Squadron April 1983 API 91 202 US Air Force Mishap Prevention Program March 1987 AFT 91 301 Air Force Occupational Safety Fire Prevention and Health Program May 1990 TO 1C 130A 9 Cargo Loading Manual 16 June 1980 w changes 1 through 8 5 December 1988 A100 66 American Water Works Association Standard for Deep Wells Waverly Press Baltimore 1925 READINGS RECOMMENDED Military Publications AR 600 200 Enlisted Personnel Management System 15 September 1990 AR 735 5 Policies and Procedures for Property Accountability 31 January 1992 AR 750 1 Army Materiel Maintenance Policy and Retail Maintenance Operations 27 September 1991 FM 5 33 Terrain Analysis 11 July 1990 w change 1 September 1992 EM 5 100 Engineer Combat Operations 22 November 1988 FM 5 104 General Engineering 12 November 1986 FM 5 233 Construction Surveying 4 January 1985 FM 5 333 Construction Management 17 February 1987 w change 1 April 1991 FM 5 335 Drainage
188. ercussion Air tank 7 5 cubic feet Shipping weight 47 270 pounds Length 45 feet 2 inches Shipping dimensions 4 549 cubic feet Width 8 feet 4 inches Fuel tank capacity 100 gallons Height mast lowered 12 feet 4 inches Hydraulic reservoir 48 gallons Height mast raised 45 feet 4 3 4 inches Water injection tank 100 gallons 2 Well Completion Kit This kit is designed to support the CF 15 5 well drilling machine but may also be used with the 600 foot WDS page 3 11 The kit is an assembly of machinery hardware and bulk material that is either used up in the drilling process or dedicated to the water well after the drilling is completed These kits include the following items e A6 8 and 10 inch steel well casing to case the hole e A stainless steel well screen e Drilling fluid 3 9 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 e Submersible pump with pump cable and drop pipe The pipe is capable of pumping 50 GPM at 1 245 feet A 30 kilowatt kw generator All necessary plumping to configure the well from the well screen to the pump discharge into a 3 000 gallon portable collapsible water storage tank The kit has enough material to drill and complete a production water well in consolidated or unconsolidated formations anywhere in the world These kits are maintained as depot war stocks until needed Each kit weighs over 60 000 pounds For a description of all components see Supply Catalog SC 3820 97 CL
189. ere are two main causes for erratic rotation Top head drive rigs rotate the drill string with a hydraulic motor Even though you can apply tremendous torque a hydraulic system does not produce positive movement but reacts to drag or resistance to drill string rotation The hydraulic top head drive rig is highly susceptible to erratic rotation The primary force resisting rotation is weight on the bit If this weight is excessive the hydraulic drive produces a series of pressure variations and the bit rotates in a sequence of starts and stops Even with mechanical drive rotation which is nearly positive movement dragon the drill bit will cause twist in the drill string resulting in erratic rotation of the bit This occurrence is more pronounced in deep holes The secondary cause of erratic rotation is borehole wall friction You cannot eliminate all friction between the borehole wall and the drill string The more a borehole deviates from being straight the greater the friction It is easy to visualize a distorted drill string caused by excessive top loading and how the distortion can cause increased borehole wall friction Other contributors to borehole wall frictional rock abusiveness poor lubrication of the drill string injected or natural water condition and poor cutting removal d Adjusting to Variables Economical and satisfactory drilling using the down hole percussion drill requires fine tuning of the variables Efficiency is directly
190. erefore if you keep the borehole clean with the fluid as you drill you also cool and lubricate This is true with clay muds and polymer fluids Clay muds are colloidal suspensions Solutions are chemical mixtures that cannot be separated by simple filtering Suspensions are physical mixtures of solids and liquid that can be separated by filtering This distinction underlies the difference in behavior between drilling polymers solutions and drilling muds suspensions You can mix natural clays with water for use as a drilling mud Drillers often use water in shallow clayey FM 5 484 NAVFAC P 1065 AFMAN 32 1072 strata and depend on the formation clay to produce a suitable mud Natural clay mud properties are marginal for good water well drilling Hydrostatic pressure allows the fluid to support the borehole wall and is a function of the density or weight of the mud column Important characteristics of a drilling mud are viscosity and weight to carry cuttings gel strength yield point and active clay solids for filter cake Use the following formula to calculate hydrostatic pressure Hp Md d 0 052 where Hp hydrostatic pressure in psi Md mud density in pounds per gallon d hole depth in feet For example the hydrostatic pressure of a 200 foot hole with a mud weight of 9 pounds is as follows 9 ft x 200 ft x 0 052 93 6 psi 1 Polymers Polymer fluids are water based and very low in solids The polymer admixture can be
191. erennial water bodies lakes and reservoirs streams and rivers dams canals and surface water access areas The overlay will contain information if available on water volume flow rates quality and seasonality of water c Groundwater Overlay A groundwater overlay concentrates on groundwater potential If existing facilities cannot meet field water supply needs planners should use the surface and eroundwater overlays to determine where and when to drill water wells If planners decided to develop a water well they should look at the information on the groundwater resources to help site the well The drilling unit should also have this information to execute a successful completion Whenever possible the WDRT should assist by recommending specific drilling sites Military terrain analysts and well drilling planners use the groundwater overlay to identify areas of groundwater resources Using the overlays greatly increases the potential of siting and developing successful water wells From the overlay areas of greatest groundwater potential can be determined along with the expected characteristics of the aquifer and overburden material to be drilled through to reach the aquifer d Overlay Symbols Potential water sources where a point feature is located are depicted by symbols and include water wells well fields springs and qanats Symbols that appear on the overlay with an adjacent number are keyed to a table with additional informat
192. ery and replace the battery when necessary Note The SP polarity may change during the logging 4 No Meter Response to Self Potential Potentiometer If the instrument has not been used for a while the SP shutoff switch could stick at OFF Push the button up and down several times to release the switch Also check all plug in connections and surface lines particularly the potential surface line and where it connects to the lead flag 5 Meter Deflection with No Connections to Instrument This condition exists when water has entered the current switch causing an electrical connection to remain in the switch without the switch being activated To correct the problem dry the switch by applying heat to the switch If this condition occurs frequently install a rubber boot on the switch D 6 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Note This condition is not normal If you can effect proper calibration and operation of the unit with the test set then the instrument will operate properly when you activate the current switch b Using a Voltmeter Conduct the following checks with the test set 1 One 9 Volt Battery e Place the voltmeter function switch at direct current DC volts and the range switch at full scale reading closest to but no lower than 10 volts Connect the red lead to the positive male and the black lead to the negative female battery terminals Record this open circuit voltage Place function switch
193. es mentioned above To collect a specific cutting sample stop drilling and continue fluid circulation to wash most of the cuttings from the hole When the hole is clean advance the bit through the sampling interval and stop Collect samples from the fluid of the drilled section Resume drilling after taking samples Redundant sampling impacts on drilling progress However collect several samples regardless of schedule impact to obtain worthwhile information Field modifications of well design are often required especially when subsurface information has been sparse In most cases the changes made during well drilling are minor For example placing a screen a few feet higher or lower to match the position of the most gravelly part of an aquifer or adjusting a grout interval to match an impermeable layer above the aquifer 5 34 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 30 s 1o L1p ISA ardues gT s 910814 6 120 8297 w104 00 CEN 383 lt a d E g A 8 O h s a 2 NN NA EI k SNVLIG DNIVUVO S 6 Su VIN3U nee 119 NOILVINUOS JO IHAL aaa STWLLINI S u11140 U YISINNAN TITAN YO 31410 123 OUd 71 9017 S 4ITUYO TIIM 9 35 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 H N REMARKS TYPE OF FORMATION DEPTH VISCOSITY 5 DRILLING DETAILS Continued A Y E Ao zt cz 5 36 DD Form 2678 OCT 93 BACK Figure 5 18 continued Sample well driller
194. es where deep mineral rich water migrates upward When the minerals and water mix they precipitate travertine or other minerals along the fault zone This can result in barriers to groundwater flow in areas selected as potential well sites on the basis of the fault zones 10 Drainage Basin Size Because most groundwater is derived from the infiltration of precipitation over an area the size of individual drainage basins can help define the overall eroundwater potential Large drainage basins may receive more precipitation and have a larger eroundwater supply than smaller basins This is true where precipitation is the same over a region however it may not apply in areas of high relief or variable climate Perhaps the most useful areas where drainage basin size can give an indication of groundwater potential is in mountainous terrain near coastal areas In such areas the larger drainage basins receive more recharge from precipitation This recharge flows toward the coast and the areas of highest groundwater potential occur along the coastal plains adjacent to the larger basins In arid environments recharge usually coincides with areas where surface water drains from the mountainous areas and infiltrates into the groundwater system The magnitude of this infiltration usually depends on drainage basin size and on the groundwater resource potential of the area 11 Landforms Identifying landforms with drainage patterns can help identify rock types
195. essed air is supplied is the difference in hydrostatic pressure inside and outside the pipe resulting from the lowered specific gravity of the mixed column of water and air bubbles The energy operating the air lift is contained in the compressed air and released in the form of bubbles in the water Figure 4 9 shows the operating air lift principle WARNING Air and fluids under pressure can cause injury Make sure all air couplings are tight and that lines and hoses are in good condition You should arrange an air lift Discharge LANAS with the air pipe inside the eductor Le oa RAF S pipe Figure 41 You can use this EA arrangement for test pumping wells and for well development You can use the well casing for the eductor pipe However to pump sand and mud from the bottom of a well during well development and completion use a separate eductor pipe This type of pump is also useful in wells that Column of because of faulty design produce arandwater sand with the water This condition will quickly create excessive wear on most pumps By setting the educator pipe to the bottom of the screen sand will be removed before it fills the screen Column of water Figure 4 9 Air lift principle 4 10 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 b Installation Design 1 Submergence Submergence is the proportion percentage of the length of the air pipe that is submerged below the pumping level Use the following form
196. essive rotation speed will result in chattering and rapid wear of the bit and the core will break Low speed results in less wear and tear on the bit and better cores but lower rates of progress In medium to hard rock use 300 to 1 500 RPM for diamond bits and 100 to 500 RPM for metal carbide bits The advance rate of the coring bit depends on the material s firmness the downward pressure applied on the bit and the rotation speed The driller must carefully adjust the pressure Too much pressure causes the bit to plug and to shear the core from its base Bit pressure is controlled by a 11 4 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 hydraulic or screw feed on the drilling machine The weight of the drill rod column seldom exceeds that of the optimum bit pressure for coring medium and hard rock You may have to apply additional downward pressure 11 3 Installing Monitoring Wells These are small water wells used for measuring water level estimating well yield and taking samples for quality analysis These wells are drilled next to permanent wells at specified intervals a Safety Before installing a well the safety of the drill crew and impact of drilling on the environment must be considered especially in areas containing hazardous wastes Potentially hazardous categories are chemical wastes and residues flammable wastes explosives and explosives wastes biological materials toxins radioactive materials and harmful secondary vapors Dril
197. etion Procedures This Chapter implements STANAG 2885 ENGR 7 1 Well Development Table 7 1 shows the different well development methods and some characteristics of each method All methods are designed to produce a stable flow condition Be careful not to let the drill strike the bottom plug during well development especially when using PVC pipe Table 7 1 Well development methods Effective on mud cake needs abundant Pump surge Airlift or deep well pump needed Simple and slow bail or use small pump Pressure pumping Mostly inefficient oe leakage outside Surge block Simple effective and slow Compressed air open Requires high E head needs Potential leakage and disturbance outside Compressed air closed casing needs compressor and fittings a Jetting Method With this method you use a jetting tool that you inside th Use the followi dures for this method ower inside the screen Use the following procedures for this metho Ce Step 1 Attach the jetting tool in the well completion kit to the bottom of the drill string Figure 7 1 Step 2 Use the string to lower this tool into the screen Step 3 Connect the upper end of the pipe to the kelly or the discharge side of the mud pump Step 4 Pump water into the screen and rotate the jetting tool slowly so that the horizontal jets of water wash out through the screen openings Step 5 Raise the string of pipe gradually and continue rotat
198. ety guidelines for the well drilling team b Driller A drill team which consists of a driller and two helpers operates the drilling rig A driller s responsibilities include e Operating and controlling the drilling rig e Establishing and modifying when necessary the drilling rate e Ensuring a proper mud mixture and sufficient volume e Sampling and monitoring the drill cuttings e Maintaining a driller s log of the well e Preventing accidents around the drilling rig c Helper A helper is responsible for e Making drill rod connections e Ensuring an adequate mud mixture during drilling s Maintaining and caring for the rig tender and tools during the drilling operation 3 2 Team Planning Coordination and Preparation A well drilling team s primary responsibility in planning and preparing for a drilling operation is to maintain a state of readiness Ihey must train practice and discuss operations continuously They should study information about specific sites and determine alternate solutions to potential problems Periodically teams should check each component of the well drilling equipment Team members must maintain drilling rigs and tender trucks in good operating condition Before leaving for the mission area teams should inventory all tools parts drilling accessories and supplies Planning requirements to support Army well drilling teams are similar to those needed for any augmentation team Well drilling team
199. fected Another method is to suspend cable acting as the anode into the well The anode continues to operate and protect the casing until it is consumed Periodically replace the e T anodes as continuing maintenance noctu orton e Well Head and Collar Use the well head in the well completion kit otherwise extend the casing at least 1 foot above the general level of the surrounding surface Seal the space around the outside of the casing by pouring a concrete platform around the casing at the surface page 7 10 To form a concrete platform you will need the following bill of materials BOM e Two 2 inch by 10 inch by 8 foot boards Cut these in half for the walls Eight 2 foot long No 4 reinforcement bars for the comer stakes e One 4 by 4 foot wire mesh e About 0 5 cubic yard of concrete Ground surface Use the following procedures to make the platform Figure 7 5 Sacrificial anode e Step 1 Clear the site with shovels e Step 2 Dig a 4 inch excavation e Step 3 Construct the form e Step 4 Place the wire mesh snipping out the center for the casing pipe e Step 5 Mix and pour the concrete quickly e Step 6 Pull the wire mesh up through the concrete e Step 7 Screed with a 2 inch by 4 inch by 8 foot board If you do not have a container to mix the concrete construct a mortar box using the following materials e One 4 foot by 8 foot by 1 2 inch piece of plywood for the base Four 2 inch b
200. from a well spring Effluence of ire ed where the water table intercepts the ground surtace a spring is a good surface indicator of the presence of shallow groundwater occurrences SP poani reversing switch A switch on the electrical logging system that is located directly below the SP potentiometer the switch shows the polarity of the particular cable electrode being used SP shutoff switch A spring return switch on the electrical logging system that is located in the upper left comer of the panel this switch automatically shuts off the 1 1 2 volt C battery when the instrument lid is closed spudding Raising or lowering the drill string spudding in Starting the borehole squeezing See swelling soil Sr specific retention stabilizers Items such as drill collars used on the drill string during drilling operations STANAG Standardization Agreement STD standard STP Soldier Training Publication straight pumping A well completion method that uses a pitcher spout hand pump FM 5 484 NAVFAC P 1065 AFMAN 32 1072 streams and rivers Surface indicators that are usually recharge areas in arid regions and may be recharge or discharge areas in temperate climates areas adjacent to streams are considered good ato for wells but are not always the best available areas for water wells because of soil content string failure A condition that exists when the drill string parts leaving a portion in the borehole the drill string is ru
201. frost Permafrost table upper surface of permafrost Continuous Permafrost Figure 10 1 Unfrozen strata 10 1 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Permanently frozen rock and soil are widespread in the Arctic north of 50 N latitude This condition restricts groundwater development because some of the groundwater is permanently frozen and not available The frozen zones which vary in thickness from a few feet to 2 000 feet are impermeable aquicludes and inhibit the upward movement of unfrozen groundwater The difficulty of obtaining water increases northward as the permafrost thickens and becomes colder and more continuous b Discontinuous Permafrost In this zone permafrost will be thin and may be absent on the south slopes of hills in valley bottoms containing permeable alluvial material sand and grovel and under surfaces that have been cleared of vegetation airport runways farmlands forest fire scars and logging tracts Obtain information from local sources regarding springs icings existing wells unfrozen zones and caves used for storage Consider obtaining water from surface sources before drilling and developing wells in the permafrost zone The existence of a good year round water source at the surface in the discontinuous zone will indicate that the ground is not frozen beneath the well Year round springs large streams and lakes can serve as water sources Even if the water is unpotable these sources indicate w
202. ft in 2 minutes or less depending on the length and size of the suction pipe If you use a valve in the discharge line you must open it wide during priming If the pump fails to prime look for the following e Plugged priming hole e Air leak in suction pipe or hose e Collapse of lining suction hose e Plugged end of suction pipe or suction strainer e Lack of water in pump housing e Clogged worn out or broken impeller e Worn or damaged seal 4 5 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Figure 4 4 Self priming pump 4 3 Deep Well Pumps a Submersible Pump This is a centrifugal pump closely coupled with an electric motor that can operate underwater The pump is typically multistage containing two or more impellers depending on head requirements housed in a bowl assembly Because the system is designed for underwater operations it has a waterproof electric motor watertight seals electric cables and connections The motor is located beneath the bowl assembly with the water intake screen between the two units Military well completion kits contain the submersible pump Figure 4 5 The pump produces 50 GPM at 600 feet and is powered by a 15 horsepower 460 volt 3 phase electric motor The pump comes with 700 feet of electrical conductor cable and 660 feet of 2 inch drop hose that supports the pump and brings the water to the surface distribution system Currently the submersible pump is the standard in deep well hi
203. g Pee ne F 32 23 14 4 13 22 31 40 132 PARA ETEHHEELET ELA Tm HTIHTTITITTIIHIITHTITTHHIIH TET HH 11 00 5 1 24007 HH HHHH HHL T F sitesi Htt 10 33 SERRE 09991 DOE ttt htt hd gue ia a EEGs I UJ jll l Ill l l D O ttt tt tt 199999 898998 HH ad H BERBUEPES a ECO PEA 9998 RUGS 009999 89698 D 1 205 HHHEEHAEHHHEGLE e GER CURA CARAS TURON EAN A TT 10 00 a UE HHE AA Pr TET GLE LTT ie tt T T la cea ATH LI I IR LLLA 8 t an a 116477 2225153391 HH BR 585 Chany HERE cesar ER ERE sence EE SS 9 66 gt AAA AA secanae TT rH Hr rr Ss su HHH Taa LI ILE LLLI FETH sesases bad eat he LI III PT PD 33 TTT e er HHEHIBHHEHHEHHEHH 9 S HH TTT STET TT TTT EE tetas d TUE THT 244444944 00 Ope AAA AAA HEHTHEHHHEHHBEHI 9 HHHH riii Q 1 04f Ta Duet EHE 8 66 dE THERHEHHHHEHEE HEHEHHEHE 1 00E 6999998698999699 HHIH HHH 888688888 1 8 33 0 5 10 15 20 25 30 35 40 Temperature C Figure 10 3 Specific gravity of drilling fluids 10 4 Weight Ib gal FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Chapter 11 Auxiliary Activities 11 1 Exploratory Drilling a Geological Exploration Use the same drilling methods for subsurface geological exploration as for standard well drilling However you will need special accessory equipment See Table 11 1 for drilling methods and material samples Auxiliary equipment for exploration drilling may include solid and hollow stem augers samp
204. g under the coupling e Step 3 Lower the first length of casing until the coupling casing elevator or pipe clamp rests either on the rotary table or on another support placed around the casing If lifting with a sub unscrew the sub on the first length of casing and attach it to the second length of casing If lifting by elevators or pipe clamps release the elevator bails from the casing in the hole and attach it to another elevator casing or pipe clamp on the second length of casing Lift it into position and screw it into the coupling of the first casing length Lightly coat the threads of the casing and coupling with a thin oil Screw the lengths tightly together to prevent leaking Remove the elevator or other support from the casing in the hole and lower the string that is supported by the uppermost coupling s Step 4 Repeat the procedure for each casing length you install If a cave in occurs attach a swivel to the casing with a sub and circulate the drilling fluid through the casing to flush out the hole and wash the casing down After the casing is set on the bottom of the hole drill through the casing into the aquifer b Single String Method With this method you install the casing and screen that have been joined in a single assembly See paragraph 6 6a page 6 10 for installation c Wash In Method Jetted Wells With this method you advance the borehole for an expedient jetted well construction See paragraph 9 2b 1 pa
205. ge 6 2 lists hole diameters for various sizes and types of well casings Figure 6 1 Plastic casing 6 1 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Table 6 1 Well casing hole diameters Wall Collapse Strength Thickness Water kg m psi kPa feet meters 6 625 168 3 6 313 160 3 0 156 4 0 10 78 16 04 600 4137 1 386 423 6 625 168 3 6 249 158 7 0 188 4 8 12 92 19 22 1 030 7 102 2379 725 6 625 168 3 6 187 157 1 0 219 56 14 98 22 29 1 521 10 48 3 511 1 070 6 625 168 3 C 41 155 5 0 250 6 4 17 02 ry An 4 MEN 497 A C CS A Ed 4 frc 168 3 1 10 2 7 1 18 97 219 1 5 10 1 4 8 25 21 219 1 9 0 2 5 5 29 25 219 1 3 0 2 6 1 1 10 2 7 2 19 1 17981 2027 0322 82 2855 4248 1 10 75 2731 10 374 263 5 10488 4 8 21 21 31 56 246 1 696 568 173 20 10 75 273 1 110 250 260 3 10 250 6 4 28 04 41 72 579 3 992 1 336 407 30 75 273 1 110 136 257 5 10 307 7 8 34 24 50 95 1 0 7 226 2 421 738 40 STD 75 273 1 10 020 254 5 10 365 9 3 40 48 60 23 1 611 11 10 13 721 1 134 75 12 37 14 3 0 188 48 1 01 75 12 25 11 1 10 250 6 4 2 75 12 126 308 1 0 312 7 9 4 12 090 307 1 0 330 8 4 5 12 000 304 9 0 375 9 5 7 13624 346 0 0 188 48 13 50 42 8 0 250 6 4 9810312 7 9 610 375 9 5 210 219 56 6 4 7 9 1 on On On On NN NN 0 00 00 OD OND 0 0 M teo 0 0 0 0 0 0 0 6 0 0 4 0 0 0 o 0 4 o 0 4 0 0 2 0 0 8 0 0 2 o 4 78 0 2 o 9 97 61 0 0 0 5 117 0
206. ge 9 3 for installation d Driven Method Driven Wells Install the casing as with the borehole the cable tool or driven point well method See paragraph 9 3 page 9 6 for installation e Uncased Interoal Method In rock you normally leave the lower portion of the borehole uncased because water emerges from irregular functions in the borehole wall Therefore for the well to function properly you must be careful when locating the bottom of the cased portion in relation to any impermeable zone Once you establish the depth drill down and set the casing Then drill a smaller hole to full depth and proceed with development 6 4 Grouting and Sealing Casing Once grout is mixed it starts to set Therefore place the mixture immediately after mixing it You must have freshly mixed grout continuously to meet requirements Portland cement meets most grouting requirements You can use a quick hardening cement to save time For proper consistency use no more than 6 gallons of water per 94 pound sack of cement If you need a large amount of grout add 1 cubic foot of fine or medium sand for each sack of cement Add a few pounds of bentonite or hydrated lime per sack of cement for a better flow For small jobs and if no equipment is available use a 55 gallon steel drum as a mixing tank Put 20 to 24 gallons of water in the bard and slowly add 4 bags of cement while stirring or 6 3 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 jetting the water Use a
207. gh production systems 4 6 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Check valve DANGER Radial bearing Do not handle live electrical wires when wet or while standing in water Do not step on exposed electrical cables Impellers The following improvements have made the P intak ump intake submersible pump a reliable pump Seal e Motors cables and seals have very low maintenance requirements Electric motor e Noise levels are reduced because the motor is located in the well Pressure equalizing tube e Motor operates at a cooler temperature because it is submerged Thrust and radial bearin e System does not require long drive shafts and bearings so maintenance problems and deviations in vertical well alignment are not critical factor when using this pump J The main disadvantage with the pump is that the entire pump and motor assemblies must be removed trom the well if repairs or services are required Fluid chamber Figure 4 5 Submersible pump b Turbine Pump The turbine line shaft pump is a shaft driven centrifugal pump The pump is hung in a well at the lower end of a string of pipe called the column pipe The shaft which drives the pump runs through the column pipe and extends from the pump to the ground surface where it is connected to a pump head assembly Bearings in the column pipe are used to stabilize the shaft The turbine pump page 4 8 is a multistage pump containing severa
208. graphic basins for each tributary Figure 2 4 page 2 4 The boundaries of 2 2 FM 5 484 NA VFAC P 1065 AFMAN 32 1072 Peper p a A PF l an C uM x p e qo Goar e y Seve Sas A es val MS Figure 2 3 Mississippi River Basin hydrographic basins are usually represented by mountains or hills which restrict the flow of water and by low areas where the water is discharged out of the basin The depth to groundwater may range from 10 feet to more than 1 000 feet In most arid areas the shallowest groundwater sources occur in recharge and discharge areas Precipitation over mountainous areas results in a groundwater recharge at the base of the mountains into alluvial valleys Precipitation over a mountainous area results in higher runoff and lower groundwater recharge ratios on the slopes of mountainous terrain Even though groundwater may be shallow in these areas the rough terrain and the rocks make mountainous areas difficult sitings for water wells Even though mountainous areas are presumed to be recharge areas military engineers will not drill tactical water supply wells on mountain sides 2 4 Geological Setting The ability of soils and rocks to hold and transmit water varies and the depth to groundwater varies in different geological settings Physical properties of soils and rocks such as degree of consolidation cementation and hardness determine drilling methods and the potential for groundwater produ
209. gure 7 7 continued Sample well completion summary report E DD Form 2680 OCT 93 BACK 7 12 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Chapter 8 Well Performance Testing Procedures 8 1 Testing Pumps You will normally use the permanent pump for pump testing If you use a temporary unit it must be adequate to draw down the water and hold it at a prescribed flow rate for a period of hours This test will determine the specific capacity of the well You can estimate the yield of a small well by bailing water from the well rapidly if no pump is available You must know the bailer s volume and count the number of times per minute the bailer is brought up full to estimate the GPM of the well Accurately measuring drawdown is not possible during the test because the water level constantly fluctuates a Permanent Wells You should use two different testing procedures when a pump is available depending on the intended use of the well and the available testing time If the well will be a permanent installation and maintained in the future you should conduct a detailed test Measure the static water level in the well before testing and measure the drawdown during the test Conduct the test as follows e Pump ata rate that will lower the water in the well about one third of the maximum drawdown possible one third the distance from the static water level to the top of the well screen or about one third of the rated capacity of the pump e Mo
210. h Sandstone and limestone aquifers have properties between sand and grovel and igneous aquifers If a limestone aquifer is cavernous and is expected to yield large quantities of water the analyst preparing the overlay could rate the aquifer as a 2 This rating indicates that the aquifer material is better than the 3 rating normally assigned to limestone A 6 Potential Drilling Areas The following are reasons for areas to be eliminated or marked as unsuitable well drilling sites e If an aquifer is more than 1 500 feet deep because military well drilling machines cannot reach that depth e f no significant groundwater exists e If successful well completion is unlikely because of overburden materials limited aquifer extent or groundwater barriers restricting water flow Besides map legends Supplemental Information should include detailed statements on seasonal groundwater fluctuations bacterial contamination geology and other pertinent information Feature with numbered symbols on the overlay are entered into a Potential Water Data Table The numbered features include information on the following e Well location Well yield e Water quality e Well depth Overburden and aquifer materials e Well use e Water chemistry data e Water fluctuations Feature names Numbered features on the overlay may also be keyed into a WRDB Analyst Report Form Record Characteristics form that allows for the recording of particul
211. hallow aquifer sources It has been shown that sources a few feet below the surface can be reached by septic tanks outhouses and human waste Locate wells at higher elevations than potential contamination points Some minimum distances from potential biological pollution sources have suggested in Gibson s Water Well Manual for sand filtration capacity soil As a minimum a well should not be located within 1 10 feet of a cast curb sewer or sewer lines 2 50 feet of a septic tank or tightly jointed tile sewer 3 75 feet of an earthpit privy or a dralnfield 4 100 feet of a cesspool with raw sewage although the US Public Health Service recommends at least 150 feet Gibson U C and Singer R D 1971 Water Well Manual California Premier Press p 156 2 38 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Chapter 3 Field Operations 3 1 Team Concept a Commander Well drilling teams deploy to the field to construct water wells These teams normally deploy with the organic equipment they use to drill and complete the well Teams are manned for continuous operations and consist of two complete drilling crews a mechanic and a detachment commander The detachment commander is usually responsible for Training and care of team members Care and maintenance of team s organic equipment e Support coordination with the supporting engineer unit e Deploying the team e Laying out the drilling site e Developing saf
212. he atmosphere and can accumulate as clouds When the clouds accumulate enough moisture and conditions are right the water is released in the form of rain sleet hail or snow precipitation a Recharge and Discharge Precipitation on land surfaces maybe stored on the surface It also flows along the surface runoff or seeps into the ground infiltration Surface storage is in lakes ponds rivers and streams and is snow and ice Polar ice caps and glaciers store 85 percent of the earth s freshwater Runoff provides the main source of water for streams and rivers Water infiltrating into the soil is the major source of groundwater Water that seeps into the ground recharges groundwater resources As groundwater moves from the recharge area it may discharge back to the surface Groundwater flows from recharge areas to discharge areas where the water is discharged to lakes rivers springs and oceans page 2 2 Another form of discharge is the consumption of water by plants and animals Plants draw large quantities of water from the soil and return this water to the atmosphere transpiration Man also causes water discharge for consumption b Water Storage Water wells are constructed to produce water supplies from groundwater reserves Developing a groundwater supply has many advantages over using surface water Groundwater is more abundant than surface water is cleaner requires less treatment and may be easier to protect than surface water
213. he top of the casing until the grout is set e Step 5 Drill through the cement that has hardened in the lower end of the casing and continue drilling to the required depth Green cement will increase the viscosity of the drilling mud If you anticipate difficulty in filling the casing with water when it is lifted in the borehole you can add water on top of the grout without lifting the casing Calculate the volume of grout in the casing Fill the casing to the top with water Connect a pump so that you can force in additional water Pump water into the casing measuring the volume pumped until you put in a quantity equal to the volume of grout This will force all or most of the grout out of the lower end of the casing You can place a wad of burlap on top of the grout before filling the casing with water to keep the fluids separated b Inside Tremie Method With this method you place the grout in the bottom of the hole through a tremie pipe that is set inside the casing Figure 6 3 The grout will either descend naturally or you may have to pump it through the pipe Make sure that the tremie pipe is at least 1 inch in diameter With this method and any other method where you place the grout inside the casing make sure that water or drilling fluid circulates up and around the casing before you start grouting To check this cap the casing and pump in water If the water comes to the surface outside the casing you can start grouting Use the fo
214. hey turn it all installed equipment and technical specifications over to the S3 The 53 then turns the operation over to the quartermaster unit The quartermaster unit is responsible for e Drawing water from the stave tank to purify treat store and distribute water e Operating all equipment at the well site to include the well pump and generator e Maintaining all equipment except the well pump and screens Any well repair or maintenance that exceeds the capability of the responsible quartermaster unit will be coordinated through the staff engineer of the corps support group or the engineer unit that supports the area 1 2 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 d Communications Zone EAC The well drilling team s 53 coordinated operations with quartermaster units civil affairs units or host nation support personnel When the well drilling team completes a well they turn over the operating well all installed equipment and the technical specifications to the 53 who then turns the operation over to the facilities engineer The facilities engineer coordinates with the quartermaster planners civil affairs personnel or the host nation regarding well operations and maintenance Host nation support is used whenever possible to support well drilling operations 1 4 Well Drilling Teams a Army Army well drilling teams have qualified personnel and equipment to drill and develop water wells and to repair wells on a limited basis Fiel
215. hich water flows by the centrifugal force transmitted to the pump in designed channels of a rotating impeller cfm cubic foot feet per minute cfs cubic foot feet per second circular orifice meter A device used to measure discharge rates circular orifice method A procedure to measure discharge rates using a circular orifice meter closed well method A compressed air method that involves using compressed air to close the top of the well with a cap and by arranging the equipment so air pressure can build up inside the casing to force water out through the screen openings cm cubic meter s compressed air methods Rapid effective well development methods See also closed well method open well method CON DET A wetting agent added to drilling fluid to increase the dispersion action of polyphosphates confined aquifer An aquifer that is completely EM with water and is overlaid by a confining ed confining bed Aquiclude that exists between aquifers water moves only within the aquifer consolidated deposit Rock that consists of mineral particles of different sizes and shapes continuous permafrost A zone where permafrost will be thick with no unfrozen ground See also discontinuous permafrost permafrost continuous slot drive pointA screen with horizontal openings and one piece welded construction and contains no internal perforated pipe to restrict the intake area CONUS continental United States core barrel A d
216. hick solution infiltration into the permeable wall is reduced However insoluble portions of some polymer colloids do exist The insoluble and cuttings are surrounded with thick coatings that are more impermeable per unit thickness than a bentonite filter cake The insoluble and cuttings seal the wall of the hole with a thinner less active layer The impermeable layer performs the same function as the filter cake in clay muds but does not restrict the annulus The colloids in the polymer fluid are nonionic have no chemical interaction and are easier to remove in water well development When the viscosity of the fluid is broken much of the cohesive function of the thin film becomes a water like liquid and is washed out of the water well Field testing of polymer fluids using the falter press and the Marsh funnel yields different results The mud balance for measuring fluid density does not change Weighing of the polymer fluid is limited You can add sodium chloride to the fluid to bring the weight up to about 10 pounds per gallon The addition of heavy solids ground barite is ineffective because of the polymer fluid s lack of thixotropic qualities 2 Mud Products Commercially processed clays for drilling are bentonite and attapulgite Bentonite is superior except in brackish or salty water Use attapulgite in these waters Bentonite forms naturally from decomposition of volcanic ash when ground Bentonite consists of aggregates of flat pl
217. hile maintaining the load apply air pressure and slowly rotate the drill When these actions are balanced the drilling operation is optimal Balance is attained by experimenting during drilling 1 Weight on Bit The weight applied to the drill must be sufficient to hold it in the closed position while drilling While the drill bit is splined and can move in relation to the drill the bit should not move in the splines while drilling The required weight on the bit bit load varies somewhat with percussion drills from different manufacture With a given drill the bit load varies with the air pressure used for drilling The air pressure does not tend to enter the drill bit open 5 20 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 position however the energy with which the piston strikes the bit shank is directly proportional to the air pressure applied Consequently you will need more bit load to keep the bit in the closed position with higher air pressure See the manufacturer s manual for specific recommendations for minimum bit load The range for a 6 inch drill generates about 2 500 pounds total bit load at 125 psi to 4 000 pounds total bit load at 200 psi Increasing bit load above the recommended minimum does little to increase the drilling rate To achieve an increase in production rate add weight if it does not adversely affect the rotation speed or constancy Too much bit load will e Affect the constancy of the rotation which is detrime
218. his is a black plug receptacle used to connect the surface potential ground wire lead oxide flag to the instrument CUR This is a red plug receptacle used to connect the surface current ground wire steel stake to the instrument e Test set With the test set you can check the instrument operation and condition of the batteries without using the logging cable The test set is normally kept in the base of the instrument To use the set do the following plug the set into the cable jack the red plug into CUR and the black plug into POT Follow the usual logging procedure You will have little or no SP The electrode selector switch may be in any of the NORMAL logging positions c Power Supply Three power sources of 1 1 2 9 and 45 volts are requited You can use a C size battery for the 1 1 2 volt source and a 9 volt battery for the 9 and 45 volt sources d Logeing Cable This cable used to lower the probe into the well The cable has four conductors that are made of copper coated steel wire and are covered with a tough durable 60 percent natural rubberjacket The cable is very resistant to abrasion is flexible at low temperatures and has a high breaking strength of 320 pounds The cable is marked every five feet with numbered markers e Cable Reel and Reel Case The reel case is made of drawn aluminum The reel is made of aluminum and PVC The reel ends ride in bronze bearings attached to the reel case Whenever possible nonferro
219. hod 11 3 PVC See polyvinyl chloride PVC screens PVC qanat s 2 34 A 3 quartermaster unit 1 2 1 3 Quik Gel 3 15 ansportation Se isportation r rapid engineer deployable heavy operational vem air arnnadena D CTN HI ADCOES rt ivpaou OY MAK VI INIA 1114 15 Wel recharge 2 1 a AZ areas Z ZO RED HORSE See rapid engineer deployable heavy operational repair squadron RED HORSE reel cases See cable reel and reel case relief 2 27 requirements 11 5 C 2 reservoir and lakes 2 32 indicators See indicators resistivity inetriiment 11_1 ALAM A M L Ld A measuring D 4 reverse circulation 5 35 reverse Osmosis water purification units ROWPU 2 35 Revert 3 15 5 11 revolutions per minute RPM 4 7 5 8 5 25 5 29 5 30 11 4 rig s configuration 5 33 rotary 5 1 11 6 ringing off 5 24 RH 1 C 1 RH 2 C 1 RH 3 C 1 rivers 2 1 2 32 A 3 a E rock s 2 14 See also deposits consolidated samples rock core consolidated 2 5 development 7 7 igneous 2 5 2 16 A 4 metamorphic 2 5 2 16 sedimentary 2 5 2 17 9 15 unonnenlidated 9_A4 VELA SAL A M ANS UG KA Uig lt Y Index 8 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Rocky Mountains See mountains Rocky sath Cuttings See cuttings rotary drilling See drilling rotary operation See operation rotary rigs See rig s rotary table See table rotary rotation speed 5 7 5 3
220. holes large cuttings increasing volumes of 5 0 75 aurfactant lor te asas NS T7 AGE oT Yo oo Waser in flow larae heavy cuttinas sticky and incompetent T agus i Cu tus ei wy w wm r w wp ea ewe re formations large water inflows For difficult drilling deep large diameter holes 0 75 1 surfactant Iniection rates of surfactant water mixture 3 4 gt 100 gal Unconsolidated formations 3 10 GPM Fractured rock 3 7 GPM lt Solid rock _ 35 GPM Surfactant colloids water stiff N A 580 100 Greatly extends lifting capacity of the compressor foam 3 4 qt 100 gal For difficult drilling deep large diameter holes 0 75 1 surfactant plus large heavy cuttings sticky and incompetent 3 6 ib polymer 100 gal or formations large water inflows 30 50 ib bentonite 100 gai 4 8 qt 100 gal For extremely difficult drilling large deep holes lost 1 2 surfactant plus a FC Welt URP A g F 3 6 Ib polymer 100 gal or 30 50 Ib bentonite 100 Con piled partly 1 from information presented in Imco circulation incompetent formations excessive water inflows ervices 1975 M w EE versa eere wz Li sp Mage ji weer way gcobar 1977 and Baroid 1980 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Polymer fluids build a type of membrane on the wall different from clay mud Unnatural clay particles bentonite are not introduced into the hole Since the polymer fluid is partly a t
221. hould be as deep as the auger will work In clay soils boring with an auger is much faster than drilling 2 Pipe Joints Construct pipe joints carefully so that joints are airtight to prevent d threads from breaking If available use special Figure 9 13 Pipe clamps 9 10 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 drive pipe couplings Figure 9 14 Screw all joints tightly after cleaning and oiling the threads Use joint compound to improve airtightness When transporting and storing joints you should protect them with caps or couplings To ensure that joints remain tight give the pipe a fraction of a turn with a wrench after each blow until the upper pipe joint sets permanently Do not twist the pipe string while driving E Female drive cap e Male drive cap Special drive coupling Figure 9 14 Pipe joints 3 Pipe You must keep the well pipe vertical To check the angle hold a plumb bob at arm s length from the well pipe and from two directions at right angles to each other If the pipe is not vertical during the early part of the driving straighten it by pushing on the pipe while the blows are delivered If you cannot straighten the pipe withdrew it and start in a new location Use a maul or sledge to strike the drive capon the well pipe Hit the drive cap squarely to avoid pipe damage An alternative to manual driving is a driver that fits over the drive cap If available use a pneumatic tamper or sheet
222. hree types of rock and one type of soil 1 Igneous Rocks These are poor aquifers except where the rocks have been disturbed by faulting or fracturing Table 2 4 In many cases the rocks are not capable of storing or transmitting eroundwater and will act as a barrier to groundwater flow In other cases the stresses and movements of mountain building may have resulted in fracturing of the rock groundwater can accumulate in fractures and move through the rock if the fractures are connected Most groundwater bearing fractures are within 500 feet of the surface and drilling deeper to find water in igneous rocks is not advised Wells in these aquifer are often poor producers and are seldom developed unless no other water source is available 2 Metamorphic Rocks These areas rarely produce sufficient groundwaterand are considered Table 2 4 2 4 an effective barrier to groundwater flow Metamorphic rocks have poor potential for groundwater development 2 16 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Table 2 4 Rocks in groundwater hydrology Sedimentary Rocks B c ord sa Igneous Rocks Consolidated pores Extrusive fractures and pores tubes Groundwater Unconsolidate d Solution Intrusive rubble zones Supply Source Dor nings Fractures fractures and fractures FUE Balsalt and other Large Dolomite igneous rocks Gneiss Silt Conglomerate Quartzite schist Gran
223. ht base development during the initial phase of contingencies Light base development includes installing aircraft arresting systems expedient airfield matting and essential utility systems c RH 3 This is a RED HORSE echelon composed of 295 people An RH 3 team is ready for deployment six days after notification Continental United States CONUS based RH 3 personnel usually deploy by air to the TO where they can be joined with pre positioned RH 3 equipment CONUS based RH 3 equipment usually moves overland to the TO However most RH 3 equipment is air transportable on a C 5 With equipment an RH 3 team is capable of performing heavy repair runway repair facility hardening and airfield expansion to include erecting relocatable facilities to support contingency operations C 2 Organization and Scope Well drilling teams are required to develop and provide adequate water resources for deployed forces a Capabilities The well drilling teams should be able to do the following C I FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Disassemble transport and reassemble the drilling rig Set up the well drilling rig and support equipment Drill a 1 500 foot 6 inch diameter well Drill with mud air and foam circulation Drill with down the hole hammer Drill in sand soil clay rock or other geological formations Perform operator s service checks and maintenance Develop the well for connecting and interfacing with storag
224. ifers lie above an unconfined aquifer and are separated from the surrounding groundwater table by a confining layer Figure 2 14 page 2 13 The aquifers are formed by trapping infiltrating water above the confining layer and are limited in extent and 2 11 FM 5 484 NA VFAC P 1065 AFMAN 32 1072 Water table well Surface Artesian well Potentiometric surface s gt AM I 5 ate Unsaturated zone Capillary fringe o N t P T Wellscreen 3 Satur ated zone un i y Confined aquifer nconfined aquifer Flowing artesian well Artesian well Recharge area Water table aquifer tor artesian aquifer Piezometric level A Water table BEN PDODO 560 OOOO IOI IO ODODOO0000000000000000X 13 KR 000000000000000000000Y WAOU TROON OOOO ICKL LI AOXOCODOO00000000 00000000000 000 LAA ALLA ANR DE DE EE DE RR N NK NN DOO00BO000000000000000000 LAM EN OOOO OOOO ICN II A 3 Qe OUQOQ OO OQQ0000 000000900990 see nee aaa PUIG OOOO OO OO ORK KKK SBEN S OOOO AAA OOO ARO OOOO ODO ODO COSO ONO v lia SAM DOOOOOO00000000 DO D RAO OU pi X V N iud AW ku WO OAO Con solidated rock O0 O DOC 4 O OCU IOC a COPADO CORONAS U LR AAA A lt r y HT ate O QUOOOOOOOOOOOOOOO00000000000000000000000000000 0p 00060 AEA OOOO 000000001100 OU UR Bunt in Y VASA DI AE AAA ASA 3
225. igh transmissivity areas will produce high well yields Wells in low transmissivity areas will produce low well yields Appendix Hia the Electrical Logging System you can use to log shallow wells in various rock formations e Yield and Drawdown Yield is the volume of water discharged from the well per unit of time when water is being pumped or is flowing freely Yield is commonly measured in units of gallons per minute GPM and gallons per hour GPH for small yields or in cubic feet per second cfs for large yields Yield is a measure of how readily an aquifer gives up its supply of groundwater Drawdown is a measure of how much the water level near the well is Figure 2 9 Difference between hydraulic lowered when the well is pumped conductivity and transmissivity Drawdown is the difference in feet between the static water level and the water level when pumping Figure 2 10 page 2 10 See for methods of measuring yield and drawdown f Hydraulic Gradient Darcy s Law describes the flow of groundwater and is applied to evaluate aquifer and aquifer material hydraulic characteristics The hydraulic gradient is the change in head water elevation with distance The hydraulic gradient determines the direction of groundwater flow To calculate the hydraulic gradient use the following formula Ui h2 L where i hydraulic gradient in feet h hydraulic head in feet L horizontal distance from hto h in feet Figu
226. ill be injected The foaming and mixing with air largely occurs when exiting the drill bit If air flow is reduced from the volume required for air rotary drilling and the injection rate is tuned to the airflow the foam leaves the hole as a slow moving mass Figure 5 15 Ihe foam is laden with drill cuttings and the borehole is effectively cleaned with only 10 percent of the air volume required had foam not been used You can drill boreholes 2 feet or more in diameter with a well tuned air foam operation using air compressors Sed Table 5 7 for a list of common problems with air foam systems Commercial foamers vary and come with mixing instructions on the container You may need only a few foamers to produce large volumes of rich foam Less than one quart of foamer mixed with 100 gallons of water injected at a 2 to 3 GPM rate is sufficient for a 12 inch diameter borehole Ihe column of foam provides slight stabilization to the wall You can increase the richness and density of the foam by mixing bentonite with the injection water before adding the foamer A very thin fluid of 15 to 20 pounds of bentonite mixed in 100 gallons of water is suitable for injection in air foam drilling Adding foamer to this fluid in the same proportions as clear water results in richer more stable foam This technique is sometimes called air foam gel drilling The gel refers to the bentonite fraction Because of the increased richness stability and density of the air f
227. illing the actual hole consider drilling a 6 to 71 2 inch test hole Doing so will ensure that you dig the larger hole straight and you should locate the aquifer quicker Use the following steps to start the drilling operation Step 1 Make up the drill bit on the kelly and lower the bit to the ground Step 2 When the bit contacts the ground engage the rotary table and clutch to start drilling Step 3 After the borehole advances 6 to 12 inches engage the mud pump to start circulating the drilling fluid which will be mud or air Step 4 After drilling down the kelly stop the rotation and raise the kelly about 4 inches off the bottom of the borehole Circulate the drilling fluid until all drill cuttings are removed Step 5 Disengage the mud pump raise the kelly and remove the bit b Finishing the Operation After spudding in use the following steps to finish the operation Step 1 Makeup the bit on a drill collar Suspend the collar and bit in the borehole using the hoist or sand line Support the drill collar in the hole using slips Step 2 Clean and lubricate the threads on the kelly bar and makeup the kelly to the threads Figure 3 15 Step 3 Remove the slips and lower the kelly so that the drive bushing engages the rotary table and that the tool string is lowered to the bottom of the borehole Step 4 Engage the mud pump again and continue drilling After drilling down the kelly circulate the drilling fluid until th
228. iments fresh water floats on salt water Contact between the two is determined by the head of the fresh water above sea level and by the relatively greater specific gravity of the salt water The average specific gravity of sea water is about 1 025 taking pure water as 1 000 For every foot of fresh water above sea level about 40 feet of freshwater is below sea level in homogeneous soils The condition is best exhibited by small islands and peninsulas composed of permeable sands surrounded and underlain by salt water Figure 2 39 The head of fresh water and resistance of the pores in sand prevents saltwater from entering the middle zone and mixing with fresh water The diffusion zone contact between fresh water and salt water is narrow less than 100 feet wide unless affected by heavy pumping The amount of freshwater that can be pumped without intrusion of salt water depends on local conditions type of well rate of pumping and the rate of recharge by fresh water Any decrease in the head of fresh water by pumping or decrease in rainfall raises the saltwater level Figure 2 40 The cone of depression drawdown produced in the freshwater level around a well allows a corresponding rise in the underlying salt water Pumping a well should be restricted because salt Water table Mean sea level SLL wis Y j O e JA e LL ur VERA Salt wa e es ere i s ett e w s Zone of contact e estt 4 o o
229. in inches page 5 8 and 5 25 FM 5 484 NA VFAC P 1065 AFMAN 32 1072 C Pum V Vm edd mu gpm 1 Connect hole diameter DH goo with pipe diameter DP where 2 Mark pivot DH DP 3 Connect pivot with pum V actual up hole velocity i nr MMC Midi aiu Mi ds dd y in fpm Pi 4 Find annular velocity on slant E compressor capacity in cfm hve line i Vmin minimum velocity in cfm dia in 700 5 157 Air drilling has a depth limitation because of water in the borehole Air pressure must 9 da a displace the head of water in the borehole 6 a 8 before it can exit the bit An advantage is that when you encounter water it will discharge 5 9 with the air As drilling progresses you can S M estimate the amount of inflow to the well 1 When calculating the static head of water 4 remember that 0 434 psi equals 1 foot of head 4Vs 12 1 4 or 1 psi equals 2 3 feet of water For example s Lo the minimum psi required to overcome a 3v n 400 foot static water level column is 173 6 psi 2nd 400 ft x 4 34 psi 173 6 psi Figure 5 14 Nomogram to calculate b Foamers Commercial foamers for up hole velocity drilling enhance the air s ability to carry cuttings and reduce the velocity required to clean the borehole The foamer is mixed with the injection water but does not foam with gentle stirring therefore pumping is not hindered Foam must be pumped at a pressure greater than the air line pressure into which it w
230. indows in the permafrost where dug driven jetted or drilled wells may be located Vegetation could indicate the presence and thickness of permafrost Tree roots rarely exceed a depth of 3 feet Therefore the presence of large trees may indicate that only the top of the permafrost during the thawing season is deeper than usual Large trees along a river could suggest that either the top of the permafrost is depressed to afford a limited supply of water or that permafrost may be absent The presence of pine or aspen may indicate a similar depression of the permafrost table or possibly the complete absence of permafrost The presence of willow shrubs not trees peat and moss or stunted tamarack and birches may indicate a thin zone of summer thawing active zone and the presence of cold thick permafrost near the surface These indicators are more frequent in a thick continuous permafrost zone c Thick Continuous Permafrost Generally you will have to use surface sources when underlain by thick continuous permafrost Available groundwater will require drilling deep several hundred feet wells through the permafrost Such a task may be beyond the scope of a military operation 10 2 Well Drilling a Drilling Equipment You will use the same drilling equipment as for normal well drilling and additional accessories required because of adverse weather conditions You will need portable gasoline or diesel heaters for personnel and equipment at
231. ing fluid Figure 1 page 3 18 Record the samples in a driller s log according to basic classifications sand clay or granite and describe their color and consistency coarse or free when possible Also record the approximate depth of the sample If you want samples from a specific depth stop the drilling operation and let the drilling fluid circulate until the cuttings reach the surface Y Other information you should record are yy 2 Y yap advance rate reaction of the drill rig any loss of oe EA circulation and changes in drilling fluid Figure 3 15 Making up the kelly consistency Periodically check the drilling fluid to the threads for viscosity weight and sand content Log the test results and any adjustments you made 20d 7 Wy h I re Finally if the drill rig breaks down or needs repair or maintenance record the information in the log The information in the driller s log can provide you with an insight into local conditions and help you determine well screen locations and plan for additional or future well installations Always place the screen sections into the aquifer and not at the bottom of the hole ew SCR we w TIT O QUES a SES w ww OR VEU l Figure 3 16 Placing the hoisting plug on the drill steel 3 17 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Y lt HEISE K 7 j M K f 7 z i d w n Y N E 3 11 Casing and Well Scre
232. ing rotary mud drilling Subsurface geophysical surveys take time If the geophysical element of WDRT deploys enough lead time must be allotted for the team to conduct surveys Planners overseeing contingency plans should include WDRT work in their plans Much of the work can be done before drilling by specifying areas of interest so that data and imagery can be collected analyzed and placed on file Planners should inform WDRT of the following e Size of unit to be supported Type of unit e Quantity and quality of acceptable water e Duration of requirement Ihe WDRT usually deploys on military cargo aircraft with detection equipment packages of up to 1 000 pounds of geophysical equipment Once deployed WDRT maintains this equipment shipping it back to the owning agency for contract repair if necessary For seismic work WDRT may use small explosives some of which may be standard military block explosives The explosives are binary in nature and are mixed in the hole before detonation The area commander supports the WDRT with logistical and administrative support to include transportation shelter medical support communications food water and other classes of supply A 4 Operational Concept and WRDB Army commanders or staff officers who require the potential well site locations should contact the supporting Army Engineer Terrain Team This team evaluates available data especially the data supplied from the WRDB The TEC TAC is
233. ing the inside of the well casing You normally install the well seal when you install the pump which is after you complete all development testing and disinfecting 3 14 Pumping Tests After installing a well you should perform a pumping test The test will show you if the well can produce the required amount of water If the well is considered permanent the pumping test should help you evaluate any future performance deterioration Evaluation parameters are flow rate time and drawdown in the well Before you start the test place a sounding device such as an M Scope in the well to measure the water level during the test You must also measure and regulate the flow rate during the test The most proficient way to measure the flow rate is with a flow meter However you can use a calibrated container and a stop watch Use the following procedures to perform the pumping test e Step 1 Temporarily install a pump in the well below the anticipated drawdown depth but above the screen e Step 2 Measure the static water level and start the pump During the test one team member should monitor the flow rate and try to keep the flow rate constant e Step 3 Record the drawdown with the flow rate Take early readings quickly then spread out the readings as testing progresses An ideal reading schedule would be the initial reading and then a reading at 30 seconds 1 minute 2 minutes 4 minutes 8 minutes 15 minutes 30 minutes 1 hour 2 hours
234. ing x to backwash the entire surface of the screen If possible use a J pump pressure of 100 psi This backwashing method is effective in removing caked drilling mud from the borehole wall A disadvantage in military field operations is that this method requires a large supply of water After covering the entire screen with the jetting tool remove the tool Remove the sand that has collected Figure 7 1 Jetting in the sand trap with a bailer Repeat this process until the well stops aal on bottom of producing sand If a significant volume of material is removed during drill string 7 1 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 development you should add more filter material around the screen to keep the top of the grovel pack above the top of the screen b Pump Surge Method This backwashing technique involves alternately pumping water to the surface and letting the water run back into the well through the pump column pipe Use an air lift pump or a deep well turbine pump without a foot valve Shape do discussions on pumps Do not use the permanent well pump for development Pumping sand could damage the pump Use the following procedure for this method e Step 1 Start the pump As water comes to the surface stop the pump to release the water The power unit and starting equipment determine the starting and stopping action of the pump The effect is to lower and raise the water level in the well intermittently through the screen op
235. ion The areas of potential groundwater development are designated as Good G Marginal M Poor P or Unsuited U Areas of similar potential groundwater development may be further subdivided and designated with number suffixes such as M 1 and M2 Each potential area is keyed to a characteristics table printed in the margin of the overlay These characteristics describe the potential yield of a well depth to aquifer aquifer thickness water quality overburden materials and aquifer materials Each area designated will have a set of groundwater characteristics associated with them The characteristics are given a numeric code that places them in one of four classes The rock types listed under overburden materials and aquifer materials should be considered only representative of the properties and not exact geologic descriptions The driller can expect the hardness of the overburden to increase as the class number increases from 1 to 4 Aquifer material classes indicate the more favorable aquifer in terms of yield and ease of drilling the greater the number the less favorable the aquifer Sand and grovel aquifers consist of unconsolidated materials with a large percentage of unfilled pore space These aquifers are usually the best regarding yield A 3 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 and ease of drilling Igneous aquifers are usually the largest and have the least amount of porosity and hydraulic conductivity and may be tough to drill throug
236. ion being penetrated c Drilling Action The driller should recognize changes in earth formations by the actions and sounds of all well drilling equipment For example a change in pump circulation could indicate an aquifer The driller should include such information in the log 11 2 Sampling Soil and Rock A valuable source of geologic and hydrologic information is cuttings from the penetrated rock Handle these cuttings carefully Collect samples from various depths to obtain the complete lithologic character of the formations penetrated Use the coring method to take samples With this method you extract a solid piece of the formation However you can achieve the same results by carefully collecting loose cuttings a Rotary Cuttings 1 Method Examine the cuttings deposited in the return ditch or around the collar of the hole to determine the material the bit penetrates If you are digging a deep well take a sample every 5 feet If you are digging a shallow well take samples at shorter intervals Hoist the bit about 1 foot off the bottom and rotate slowly while the mud circulates at full volume Continue until the hole washes free of drill cuttings Resume drilling for another 5 feet raise the drill pipe slightly and let the mud circulate until it is clean of drill cuttings If you use this procedure the mud is screened carefully as it flows in the return ditch You can obtain samples to identify the different beds 2 Contaminatio
237. ion pump in line oiler four comer mounted leveling jacks fore and aft pintle hooks utility hoist driller s station and driver s station are mounted on the ITWD The ITWD is deployed with a kit that includes lightweight drill steel drill collars tricone bits down hole air hammer and miscellaneous subs and adaptors for drilling to a depth of 1 500 feet Because of the various drilling capabilities the ITWD can drill in any geological formation If drilling requires the air compressor it is brought to the site with the drill rig or delivered by a support vehicle For mud drilling operations teams need a water truck and the equipment to dig the mud pits b Air Compressor One wheel mounted diesel engine driven 750 cfm 300 psig air compressor is included in each NMCB TOA for performing down hole hammer drilling techniques The ITWD is capable of towing this air compressor The ITWD does not have on on board air compressor c Well Completion Kit Each NMCB TOA includes two 1 500 foot well completion kits Materials in these kits are considered consumable project materials The kits are used to develop and complete a well The supported unit is responsible for replacing the materials in the kits FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Appendix C Air Force Well Drilling C 1 General Air Force well drilling teams are organized and assigned according to Air Force Instruction AFI 10 209 This publication outlines the organizational c
238. ir pipe alignment The rotating swivel at the top of the drill string is complicated by the need to inject air Making connections to add a joint of flanged pipe is more time consuming than with standard screwed joint drill pipe A 20 foot length is about maximum for drill pipe The vacuum lift is from the water level in the hole to the rotary water swivel the maximum suction lift is 22 to 25 feet 5 5 Drilling Information a Driller s Log Prepare a driller s log for every well drilled The log contains data such as water bearing strata information you use to locate and drill a well Figure 5 18 pages 5 25 and 5 36 is an example of a well driller s log Department of Defense DD Form 2678 Fue 5 19 pages 5 37 and 5 38 is an example of a piping and casing log DD Form 2679 These forms are in the back of this manual for reproduction and use Items to record in the remarks section of the well driller s log could include the following Changes in circulation color and consistency of drilling fluid e Observations of the cuttings carried to the surface e Depth to material contacts e Size and apparent classification of the cuttings e Fluid loss or gain e Penetration rate e Soil description fine or course clay or sand b Soil Sampling Try to obtain good material samples and log the depth from which the samples came Cuttings continuously wash to the surface during drilling These cuttings are useful but are not the sampl
239. ite and other Till Siltstone Schist coarse grained pts to Coquina Tillite rare Slate schist igneous rocks small Marble Clay Confining beds o se O 3 Sedimentary Rocks These areas have the greatest potential for groundwater development Table 2 4 Sedimentary rocks are capable of supplying low yields if unfractured and moderate to high well yields if fractured Sandstone limestone shale and evaporites are the four common types of sedimentary rocks a Sandstone Sandstone s ability to stem and tramsmit groundwater varies If the sand grains are small and tightly cemented together a well will have a low yield but if the rock has been fractured extensively a well could have a high yield If the sand grains are relatively large and poorly cemented moderate to high well yields may be possible b Limestone and dolomites Undisturbed limestone and dolomites are poor aquifers but limestone can bean excellent water source where fractured In some areas of the world limestone areas are the principal groundwater sources Fractures in limestone are more important than in other fractured rocks because when groundwatermoves through the fractures it can dissolve the rock and enlarge the fractures This process is called dissolution Dissolution allows the rock to store and tramsrnit greater volumes of water than other types of fractured rocks In most cases limestone has been fractured and is considered the highest potential
240. ivity 2 9 2 27 transportation See also C 130 C 141 C 5 air 3 10 3 12 ground 3 13 rail 3 13 tremie placement See placing gravel tremie placement of trouble shooting D 6 turbine pump See pump s turbine uncased interval See installing casing uncased interval method of unconfined aquifer See aquifer s unconfined unconsolidated deposits See deposi unconsolidated unconsolidated rock See rock s unconsolidated United States Geological Survey USGS A 1 unscreened well See well s unscreened US Army Corps of Engineers Topographic Engineering Center TEC A 1 A 2 TY A US Army Corps of Engineers Waterways Experiment Station WES A 1 USGS See United States Geological Survey USGS valley s alluvial 2 18 valve relief 5 23 variables in rotary drilling 5 5 vegetation type 2 29 velocity 5 7 minimum 5 25 5 26 e 5 25 wall stuck 5 24 Index 11 wash in method See installing casing wash in method wells jetted wash in m thod for washdown method See installing screen washdown method of water detection 1 1 See also Water Detection Response Team WDRT equipment 1 2 procedures 1 1 responsibilities 1 1 Water Detection Response Team WDRT 1 1 A 1 water level measuring See measuring water level water quality 2 35 Water Resources Data Base WRDB 1 1 2 38 A 2 water storage 2 1 See also tank water storage water well drilling See drilling
241. ke Viscosity building in attapulgite depends on the entanglement of these needles The disorderly arrangement of the particles accounts for the poor filtration qualities of attapulgite The filter cake is more like a layer of strew or sticks Attapulgite clay does not have the physical qualities to build a thin impermeable filter cake If you can mix bentonite in fresh water first and then add salt water as make up water the bentonite flocculates that flocculation can be reversed by chemical treatment 8 Well Hydraulics You must have a basic understanding of well hydraulics Fluid is pumped down the drill string out the ports in the bit and up the annular space between the drill string and the wall The fluid empties into the mud pit through any mechanical solids separating equipment and is picked up from the pit by the mud pump for recirculation The system is intended as a conservation system Except for mud lost into the formation or where artisan water exceeding hydrostatic pressure flows into the hole the return is largely complete and the mud pit level does not change Even if thes system is in equilibrium you need to understand the up hole rearrangement of flow patterns Fluids flow in two distinct patterns Laminar flow is orderly The streamlines remain distinct and the flow direction at every point remains unchanged with time Turbulent flow is disorderly The flow lines and directions are confined and heterogeneously mixed The type
242. king the center of the flat with ink represents the original cutting point and is the same length from the bit body as the other buttons Carefully grind the worn button to a round shape leaving a flat 1 16 inch diameter at the ink mark Grind each button consistently realizing that the reshaped buttons will not be perfect 5 28 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 b Power Operating the down hole drill is not difficult Percussion drills are designed to operate at air pressures of 150 to 350 psi The percussion drill is an orifice that leaks air out of the system Air passing through the percussion drill actuates the piston and exhausts into the hole The air volume used to actuate the drill is consumed by the drill As the air consumption of the percussion drill increases the air pressure delivered to the drill increases Table 5 8 For example if a percussion drill consumes 150 cfm of air at 200 psi you will need a compressor that maintains 200 psi while losing 150 cfm of air to drill at 200 psi Compressors are positive displacement air pumps Pressure is a function of chamber ratio and leakage within the displacement mechanism For example a 200 psi compressor will produce 200 psi in a closed receiver while turning a few RPM The volume of air produced is a function of the displacement chamber size of the cylinders or rotors and the speed of rotation Volume output is directly proportional to speed of rotation Efficiency of the compre
243. l impellers or bowl assemblies The main advantage to the turbine pump is the accessibility to the power source The power source is either a hollow shaft electric motor or a reciprocating engine connected by a right angle drive and is located above ground The main disadvantages are maintenance requirements for the shaft and bearings and the requirement that the well be vertical with no deviations for installation c Helical Rotor Pump This pump is a positive displacement rotary screw or progressing cavity type pump page 4 9 The pump is designed for relatively low capacity high lift wells that are 4 inches or larger in diameter The main elements of the pump are a highly polished stainless steel helical rotor a single thread worm and an outer rubber stator The rotor is located in the stator During the rotation process the rotor forces a continuous stream of water forward along the cavities in the stator producing a uniform flow The helical rotor pump is designed to produce 50 GPM at 1 800 revolutions per minute RPM against a 250 foot head 4 7 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Top shaft nut Right angle gear drive Pump top shaft Threaded well inspection hole Water slinger Water lubricated packing gland assembly Sanitary well seal for water lubricated discharge base casting f 1 3 Line shatt coupling Line shaft Threaded column pipe for water lubrication LL ma r L Rubber w
244. l in the preparation of this manual Baroid Drilling Fluids Inc Houston Texas Ingersoll Rand Company The Button Bit vs The Rock Johnson Filtration Systems Inc Ground Water and Wells 3rd Edition Sandvik Rock Tools Inc Percussion Drilling Equipment Operation and Maintenance Manual The proponent for this publication is HQ TRADOC Submit changes for improving this publication on Department of the Army DA Form 2028 Recommended Changes to Publications and Blank Forms and forward it to Commandant US Army Engineer School ATTN ATSBTDM P Fort Leonard Wood MO 65473 6650 The previsions of this publication are the subject of international agreement STANAG 2885 ENGR Edition 2 Emergency Supply of Water in War Unless otherwise stated masculine nouns and pronouns do not refer exclusively to men This publication contains copyrighted material XIX FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Part One Basics Chapter 1 Introduction 1 1 Field Water Supply In the theater of operations TO the tactical or installation commander provides water support requirements to the combat service support CSS elements The CSS elements task is to provide water Requests for well drilling support go through operational channels to corps or theater army headquarters Tactical and logistical personnel plan and coordinate water support functions They ensure that sufficient water production and distribution assets are available to conti
245. lake dry silt clay crust Salt free NES flood water e Ka 2 Temporary lake dry salty crust Salty flood wate Salt Playa 5 5 7 Low water table 3 m e e s a a a as e oc e e Damp salty er High water table gt 2 m Salina LG gt gt e e f 6 o e CE Ux o s 2 9 N Name Teran Groundwater Table Thick surface salt crust from evaporating sea brines sait usually includes carbonates sulphates chlorides and so forth Coastal flat inundated by sea water either tidally or during exceptional floods Very near the surface Too deep for the capillary moisture zone to reach the ground surface but area will be a temporary lake during floods Inland shallow centrally draining basin of any size 1g MK None if temporary lake is of salt free water Playa Surface salt deposits from evaporating temporary salty lake water salts usually include chorides and sometimes nitrates sulphates and carbonates Same as playa but often Same as playa but lake is smaller salty water Near surface capillary moisture zone from salty groundwater can reach the surface Surface crust from evaporating salty groundwater salts include carbonates and many others Figure 2 33 Playas and salt encrustation deposits 2 31 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 5 Streams and Rivers S
246. lakes and pits are often recharged Tailinma nila arane ac ara arane arliarant tn amhankmante cA Wwe pus CA VAO UN SI Y CUI CAV CANA BR MM M R RMA ETATE FNIT DANS Embankment and mounds Tailings piles may be located Mound near existing dewatering wells inside of mines Lakes 12 Elevation and Relief Elevation and relief provide an idea of the amount of groundwater replenishment within a drainage basin and its groundwater potential In a region of about the same latitude precipitation distribution is related to the elevation of the area with zones of higher elevation receiving more precipitation than lower areas A small drainage basin at a high elevation may receive appreciably more recharge from precipitation than a much larger basin at a lower elevation Relief also has some effect on groundwater recharge Areas with high relief valleys bounded by prominent mountain ranges have well defined and easily identifiable recharge areas In broad plains or plateaus the moderate relief does not indicate recharge areas and other indicators grain size or drainage density must be used 13 Drainage Pattern and Density Recognizing drainage patterns can help define rock types recharge areas and potential and general hydrologic conditions of an area Without geologic maps or other information on rock types classification of the drainage pattern and landforms can provide an accurate interpretation of rock types and recognition of the area s struct
247. ler Figure 4 3 A closed case with a discharge opening surrounds the impeller The case has a spiral shaped channel for the water The channel gradually widens towards the outlet opening As water flows through the channel speed decreases and pressure increases The hydraulic characteristics of the pump depend on the dimensions and shape of the water passages of the impeller and the case The centrifugal pump works as follows e Water enters the pump at the center of the impeller and is forced out by centrifugal force You may have to fill the pump and suction pipe with water before starting the pump e The expelled water forces the water in the casing out through the discharge pipe producing a partial vacuum in the center e Atmospheric pressure acts on the surface of the water in the well and forces more water up the suction pipe and into the impeller to replace the expelled water coro 1 Head Head is the L pressure against which a pump must work the suction lift and friction losses and the system pressure that the pump must develop If the head is increased and the speed is unchanged the flow rate will decrease To increase the flow rate you must increase the speed or decrease the head If you increase the head beyond the pump s shutoff head capacity water will not be pumped The impeller only churns the water inside the case the energy expended heats the water and the pump If such action continues enough heat ma
248. ling crews may need protective clothing and respirators while working in such areas b Requirements Well drilling equipment is suited for installing monitoring wells Use the hollow stem auger for boring clean holes while simultaneously supporting the borehole wall during installation Some piezometers use stock porous well points However the installation methods are quite similar Be careful when taking samples for water pollution testing so that contamination is not caused by the installation process c Installation 1 Materials and Construction Casings and screens can be mild steel stainless steel PVC or chemical resistant plastics such as teflon Casing ends are threaded for tight couplings Monitoring wells have a casing screen filter pack and grouted intervals similar to water wells except smaller A 2 inch casing is the most common Filter pack sand should be just coarse enough to stay outside the slotted semen You can use bentonite pellets above the filter pack and screened interval to seal the annulus and prevent water from leaking downward into the sampled stratum and contaminating well intake Make sure that all materials used in the well are sterilized including the drill rig 2 Procedure To install a monitoring well e Drill the hole about 1 foot below the position of the screen bottom e Place 1 foot of filter pack sand in the bottom Insert casing and semen single string and center in the hole e Slowly add
249. ling team organization Well Drilling Team Headquarters PIO LJDOTrt P x Shiti Shft2 Shits Tool pusher NCOIC Tool pusher NCOIC Tool pusher NCOIC Driller Driller Driller Derrick hand Derrick hand Derrick hand Floor hand Floor hand Floor hand C 2 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 d Publications and Documentation In addition to the publications listed in C 2b each squadron will maintain at a minimum the following standard documentation and publication files TM 5 545 e Ground Water And Wells third edition Ground Water Hydrology Water Well Handbook Drilling Mud Data Book Engineers Handbook e Percussion of Drilling Equipment Operation and Maintenance Manual Catalog 4500 2 e Equipment The equipment in the RED HORSE units is not standardized and varies in make and model FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Appendix D Electrical Logging System D 1 Logging Unit The DR 74 Electrical Logging System has been designed for use in logging shallow vertical wells It is a hand operated unit You manually lower and raise the well probe in and out of the well The operator takes readings point b y point up the well bore and records these readings The data is plotted on a logging form to get the graphical log needed for interpretation When using the gear you can get a spontaneous potential SP curve and three normal and two lateral resistivity c
250. ling tubes core barrels and bits crackerjack bits wash casing and bailers All the equipment is effective for sampling but varies for exploratory drilling depending on conditions In shallow depths use augers However auger samples are disturbed and are not suitable for strength determinations The samples can provide data such as soil type water content layer thickness and changes in formation Use a rotary or a down hole drill for depths beyond an auger s range Use these methods to obtain data for placing bridge abutments and structures and for determining the location depths and bearing stratum for other structures such as foundations piles dams and underground facilities You may have to drill boreholes to reach the materials that have good bearing capacities to establish soil and bedrock profiles and to reveal flaws in rock formations You may perform the same well drilling procedures for several tasks When drilling be swam of water occurrences and where drilling fluid loses circulation These signs could indicate flaws in the rock In shallow depths use the jetting method to obtain the same information b Logging Techniques In exploratory drilling on military installations or major facilities a geologist will often be assigned to conduct the logging at the rig The geologist provides directions on objectives and assistance on methods of sampling Inexpedient field operations the driller may have to serve as a technician and
251. ll drilling may have on the surrounding environment Layers of rock and different formations protect the groundwater supply from contamination Drilling a hole through these protective layers provides an access for bacteria and chemicals that could degrade water quality Well drillers must take precautions to ensure that they will not contaminate the well and the aquifer Teams must level the site and clear it of obstacles and any potentially combustible materials If overhead power lines area problem teams must move the rigs or make previsions for removal of the power lines The drilling platform or drilling area should be large enough so teams can safely operate each component during the drilling operation DANGER Check for overhead power lines before moving a rig on site Check the clearances listed below CLEARANCES If the power lines have a voltage of less than 50 kilovolts kv place the rig at least 10 feet from the power lines If the power lines have a voltage of more than 50 kv place the rig 10 feet plus 0 4 foot for every kv over 50 kv from the power lines NOTE Consider all overhead power lines as being energized Teams should consider locations for the rig and mud pit working areas and well completion components and accessories location for and access to drill pipe racks and location and maneuverability of the tender truck Teams should determine if they need a mud pit before starting the site preparation If the drill
252. llar shoulder This condition is called sanded in Be careful because you can break the drill pipe while trying to remove the drill string Regaining circulation and working the sand out are seldom successful If the formation will not take the fluid when you engage the pump clutch the relief pop off valve will operate to relieve the pressure Little can be done to free the drill string except to wash a small pipe down the annulus to the bit and jet the settled sand back into suspension When the annulus is too small to pass a jet pipe a part of the drill string may be lost DANGER Never try to stop the relief valve operation to get higher pressure Do not override the relief valve it protects equipment and operators When the annulus is small excessive up hole velocity can promote erosion of the filter cake in granular zones and allow caving against the drill pipe If this occurs try to maintain circulation and rotation even if circulation is slight Where the grains are angular the drill pipe can become locked while being rotated This situation is similar to a sanded in bit With smooth pipe not upset hammering up and down will sometimes dislodge the string You can reestablish circulation 5 23 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 and continue drilling Be careful because hammering up and down can produce unfavorable compacting of the sand In a hole of fine grained soil or shale where the alignment has significantly deviated
253. llowing procedures to complete the tremie method e Step 1 Continue pouring grout until it appears at the surface around the casing Once the grout reaches the desired depth it will fill the space around the outside of the casing Step 2 Suspend the casing about 2 feet above the bottom of the borehole during the operation Once the grout is in place lower and seat the casing in a permanent position 6 4 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Grout in Grout out s ms si Lan nann a a E T a pwu c I l Hi R als 6 A AI TA OP Posi eal B j B B e A Au Pe 9 eee SSIES ee te ce sate POT be tee Pe PES ht ad C Le ae jJ H BM Mao ASEDIO 109 Dato ro 0000000 40 e Comes 95099004 9 0 Oa OO eM a pom oo i e RARA ESET ARETE TL St PEE OYA B j Hl K TA r 98 ECCO eee e e a do 77 c Lae eee eh jH BI Res eke eT E 8 eg nos M p EE EE Suha ll 9 4 90 99 ye Pee e aste aro EDO e e 979 Qo ee 0452 099 94 9 92 U ease ga Pao seo ES I e Oo Oe FO cet 9 100 Pg tp roto e A eet ULH gt ee MINE POCO MER e e SR 659 Se XA 40 0 oe ase ee eA K AK uo eaa e o 9o ee N ete etr ee ea c e eee AISLADAS 94 06 0 ee Re ut ee t ee ee Pr eco oe HAD OTAN AA PSA a nat ne otro e KAT gata o AAR e 0 e Co oO q 99 2 9 9 4 1 9 AA OT TY Yn ORY ot tete ESEETO Oe ET ie RRR re ona
254. lon s per minute GPM grain size and sorting 2 23 gravel pack 3 20 See also placing gravel gravity outflow method See well development gravity outflow method of ground survey teams 1 1 ground transportation See transportation ground groundwater contamination See contamination groundwater exploration 2 14 See also indicators boundary indicators reservoir indicators surface fundamentals 2 1 hydraulics 2 5 See also aquifer tests conductivity hydraulic gradient permeability porosity specific yield and retention transmissivity yield and drawdown Index 5 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 occurrence 2 1 source s A 1 A 2 grouting and sealing casing 6 3 See also casing dump bailer method of 6 4 inside tremie method of 6 4 outside tremie method of 6 5 hammer s down hole 3 15 5 5 5 28 B 2 hand auger See auger s hand helical rotor pump See pump s helical rotor helper 3 1 hoist s 5 3 9 2 10 3 hole size estimating 5 25 hollow stem augers See auger s hollow stem host nation support 1 3 hydraulic s See also conductivity hydraulic gradient 2 9 well 5 17 hydrologic cycle 2 1 hydrostatic pressure 5 10 ID See inside diameter ID igneous See rock s igneous impermex 10 3 indicators boundary 2 26 reservoir 2 16 surface 2 29 infiltration 2 1 2 26 2 28 inside diameter ID 5 15 5 18 inside tremie method See grouting and sealing casing
255. long rivers alluvial fans glacial outwash plains and alluvial basins and between mountains and coastal terraces Factors that have an important bearing on groundwater yield in soils are particle size cleanliness percent of frees and degree of sorting or gradation Clay yields almost no water silt yields some but very slowly A well sorted clean coarse sand or gravel yields water freely a Valleys Alluvial valleys are one of the most productive terrains for recovering eroundwater Figure 2 18 Normally sand and gravel form a large part of the stream alluvium so that wells located in the alluvium are likely to tap a good aquifer or series of aquifers Individual aquifers do not usually extend far and the number and depth of water bearing sands and grovels change rapidly from place to place River Terrace Flood piain Oxbow lake v adn m e mony PH eee e i o ety e r Tea Pw e e Py d gt e Pa e X p d oe h i a o lt lt aaa z a emp lt o aa fum L lad an e 9 o o s s 9 Othe ne eu SUS dy sit and da A i A j EE unesene Figure 2 18 Alluvial valley Alluvium tends to become progressively finer downstream as the stream gradient decreases and the distance from outcrops of rock increases In lower stream courses far from had reck highlands alluvium is mostly silt
256. ls using hand or power driven earth augers Boring is practical where groundwater can be obtained at shallow depths and when small quantities are needed Augered boreholes range from 2 to 32 inches in diameter and reach depths of 25 to 50 feet Engineer troops can construct small diameter bored wells using organizational equipment 9 15 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 a Equipment 1 Hand Auger These augers consist of a shaft or pipe with a wooden handle at the top and a bit with curved blades at the bottom The standard engineer auger has fixed blades but there are bits with blades adaptable to different diameters Hand augers usually come with several shaft extensions and couplings To add an extension remove the handle couple a section to the pipe and replace the handle Hand augers can penetrate clay silt and those sands in which an open borehole will stand without caving 2 Power Auger These augers are rotated raised and lowered by power driven mechanisms The turning force is transmitted to the auger through jointed square or polygonal stems The power auger issued to engineer troops has a depth limit of about 10 feet You can use this auger only in areas where the water table is close to the surface b Procedures To start boring with an auger force the auger blades into the soil while turning the tool The auger will cut into the ground at a rate determined by the hardness of the soil When the space between the bla
257. lso be used The WDRT provides technical skills in remote sensing geophysics geology and hydrology The WDRT currently consists of on call federal civilian employees who respond within 48 hours to a request to assess the subsurface hydrological situation any place in the world Plans for on call military personnel are also being developed The team recommends drilling sites that have the best potential for producing water to meet tactical requirements Specialists are drawn primarily from the Corps of Engineers Other government organizations such as the United States Geological Survey USGS participate when needed Corps of Engineers organizations include the e US Army Corps of Engineers Topographic Engineering Center TEC e US Army Corps of Engineers Waterways Experiment Station WES e Transatlantic Division TAD e Mobile District Savannah District and other Corps Districts A 2 Organization The WDRT consists of four functional elements data base remote sensing supporting specialists and geophysical The TEC Terrain Analysis Center TAC manages WDRT and provides leadership for the data base and remote sensing elements The geotechnical laboratory at WES provides leadership for the supporting specialists and geophysical elements The supporting specialists consist of civilian personnel who are geographers botanists hydrogeologists foresters well drillers and area experts A working team is selected and mobilized within
258. m 3 Sce sine ok Sae qe y EE dy 3 E 3 7 Drill RigSetup sa sasa sas m I R m Is 3 13 3 8 Drilling Hiuaid cre 3 15 3 9 Well Drilling Operations enm 3 15 Starting the Operation vue o a a s sz sa sa OD RE Oe 3 16 Finishing the Operation gt uc SK odeur Su ROR We A poe Be ee ob 3 16 3 10 Sampling and Logging ees 3 17 3 11 Casing and Well Screen 3 18 111 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Page Suildce CASiNS 02205 9 desc Sew es OO ee a aaa ok a ws eed ae 3 18 SEMENE 22 208 509 Q ts ace CR al Be A ar qst Ge h 3 20 Filtering and Backfilling ens 3 20 3 12 Well Development 0 00 ee ee ee ee a a ee ng g lg 3 20 3 13 Sanitary Seals o ee et te sas tt as s ee 3 20 3 14 Pumping Tests da oo Ghd te Whe te Gas diuo t SUL pr eS 3 21 Chapter 4 Pumps 4 1 Fundamentals o sas sas sas esas ne 4 1 EMI IPS ic ost eo o EE EE RESO S S hw ESR sk 5 Selection Criteria ir sa RE we tanri Ped AVE A Oe ES 4 1 4 2 Shallow Well Pumps eee ls 4 1 Pitchet PUMP x ss EN A aao olo 99 9 Roe e Vc UA FOES Leg 4 3 Rotaty PUMP es am egeo 1 E oe A Sa Sp XC c ER gear eee 4 3 Centnbupal Pump suu k es c Wie Wut ge arb UP RUE N coe aci deme gs 4 4 Self Piming PUD lt u ever a basa ua Se LE OOS eS RES 4 5 4 3 Deep Well Pumps 00 sa va I
259. m buried pipelines highway deicing salting pesticide and herbicide applications and accidental spills from surface transportation and manufacturing activities Supplemental information on WRDB overlays often indicate the severity of man induced pollution Especially important are aspects of bacterial contamination that will preclude the use of the eroundwaters prevalent in many developing countries Well drillers should consider the proper location of water wells shown in Table 2 7 Rural Areas Density Effects x T ev d d Gasoline t LLL L Wate ZO X NL RA 44444 400420 E UNT TT VM e Pd mr PE Groundwater polluted byd 4 Groundwater polluted by industrial Groundwater polluted by substances less dense septic tanks animal gasoline and more dense feediots crop fertilizers brine than water pesticides and herbicides and municipal waste leaking sewers lawn fertilizers pesticides and herbicides Confining Distance Effects END Waste disposal ponds _ pd LN Lu T i _ te El aad Groundwater polluted by sites at different distances from discharge area Groundwater pollution occurs in both urban and rural areas and is affected by differences In chemical composition blological and chemical reactions density and distance from discharge areas Figure 2 42 Groundwater pollution Table 2 7 Well location information Small wells often have s
260. m head loss e Should be of a commercial grade Screen sizes are in increments of 0 005 inch e Should lend themselves well to development allow for a two way flow 6 6 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 a Types 1 PVC Screens These screens must beat least 8 inches in diameter Continuous slot PVC screens are in the 600 foot well completion kits packed in boxes containing four 20 inch long sections that can be joined together Figure 6 5 The kits should contain enough sections to assemble up to 50 feet of continuous slot 8 inch well screen You can use the PVC casings to construct an alternative screen You saw or mill horizontal slots in sections of the 20 foot long casing You cut six rows of slots down the casing The slots are 1 2 inch apart at a width of 0 025 inch You can construct PVC screens in the field by cutting slots in PVC casing with saws The following lists saws and approximate slot sizes e Hacksaw about 0 035 inch e Handsaw 0 050 to 0 080 inch e Circular saw 0 100 to 0 125 inch These makeshift screens are not as efficient as the continuous slot screens because of the relatively low open area per foot of screen However you should use these screens when the kit contains an insufficient number of continuous slot screens The alternative screens are the same as the casing sections You can place the screens intermittently up the well if you screen more than one aquifer or water bearing strata
261. mbly ee ttn n 6 11 Figure 6 8 Closed bail plug e tte 6 13 Figure 6 9 Screen fittings for washdown installation lt lt lt 6 13 Figure 6 10 Assembled bail down shoe e t nn 6 14 Figure 6 11 Shoe witha guide pipe t tt 6 14 Figure 6 12 Bail down placement ett t t ttt t 6 17 Figure 6 13 Double casing gravel pack placement 6 18 Figure 7 1 Jetting tool on bottom of drill string o t nn 7 1 Figure 7 2 Surge block MMC 73 Figure 7 3 Placing the drop pipe and air line in the well e 7 5 Figure 7 4 Arranging equipment to build up air pressure n ne 7 6 Figure 7 5 Sacrifiialanode t t t ttn 7 9 XV FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Page Figure 7 6 Concrete platform ee tes 7 10 Figure 7 7 Sample well completion Summary report lt lt lt a 7 11 Figure 8 1 Cubic feet of air requirements for various submergences and Pumpe IUIS 05 is rV SOR IR wisa BS SEN e EE ie die dens 8 3 Figure 8 2 M Scope thm nn eae 8 4 Figure 8 3 Steel tape measurement method eee 8 5 Figure 8 4 Air line measurement method o a a ee o ee ee 8 6 Figure 8 5 Circular orifice flow meter E ee 8 7 Figure 8 6 Open pipe flow measurement method ee ss ts 8 8 Figure 9 1 Small diameter jetting pipe connection x 9 1 Figure 9 2 Pe
262. moves metallic ions that are necessary for viscosity in polymers Adjust the pH of drilling water to 7 5 Temperature affects the viscosity and stability of some polymers Consider the following examples e Seven pounds of Revert per 100 gallons of water at 45 F yields Marsh funnel viscosity of 125 seconds per quart The same mix at 85 F yields 70 seconds per quart e A 0 87 weight mix of Revert at 68 F yields a viscosity above 90 seconds per quart for three and a half days The same mix at 80 F maintains viscosity of 80 seconds per quart for only two days Polymer drilling fluids can break down viscosity Without treatment the viscosity of some polymers Revert completely breaks down in one to six days depending mainly on temperature You can correct this by adding chlorine Revert requires Fast Break E Z Mud needs sodium hypochlorite at a ratio of 2 quarts for every 100 gallons of water Other polymers such as E Z Mud and Poly Sal maintain their viscosity for long periods of time since natural breakdown is not significant Table 5 6 page 5 12 lists additives for drilling fluids Polymer drilling fluids have virtually no gel strength because the colloids are nonionic and exhibit no attraction for each other Most of the drill cuttings should be washed out of the borehole before circulation is stopped A polymer fluid does not have thixotropic properties to hold cuttings in suspension Shakers desanders or desilters are not needed wh
263. mud deposited on the borehole wall as the water phase is lost into the formation fish Portion of the drill string left in the borehole See also fishing string failure fishing An attempt to retrieve the portion of the drill string left in the borehole See also fish string failure flow meter method A procedure used to measure flow rate using a turbine type flow meter FM field manual FMF Fleet Marine Force foamer Substance used in air rotary drilling to enhance the air s ability to carry cuttings and reduce the velocity required to clean the borehole foot piece A device at the end of an air pipe that breaks the air into small streams so that the bubbles formed will be as small as possible formation stabilizer Material placed on the outside of the screen to help prevent deterioration of the annular space usin formation stabilizer is an alternative method to using gravel pack material fpm foot feet per minute ft foot feet ft min foot feet per minute function switch A three position selector switch located directly beneath the galvanometers on the electrical logging system gal gallon s galvanometers A zero centered micrometer on the electrical logging system el flake Commercial chemical agent added to mud drilling fluid to prevent 1t from freezing See also aqualgel barite fibratex impermex micatex smentex gel strength Thickness of drilling mud at rest geologic structure Feature such as a fold
264. n Soft formations have a tendency to cave in and add extra materials to the drilling fluid When the drilling mud circulates this material comes to the surface and contaminates the sample Material from the upper formation can also contaminate the sample when drilling mud is not heavy enough to cushion the impact of the drill pipe against the walls of the well You can eliminate much of the contamination if you make the mud pits large enough to ensure the settling of all the particles of the cuttings before the mud circulates into the hole If you want an uncontaminated sample stop drilling and continue circulation until all cuttings are washed to the surface Clean the ditch proceed with drilling for a few inches and catchall the cuttings that wash out This sample represents the material drilled provided the fine sand and silt are not carried into the settling pit in the drilling mud b Depth Determination Determine the depth of a sample by measuring the lag time which is the time it takes for material to reach the surface Lag time depends on s Size of the hole e Condition of the hole e Type of formation penetrated e Type and viscosity of the mud e Actual depth of the hole You can measure lag time by placing material such as cut straw into the intake drilling mud pipe and recording the time it takes for the material to math the surface Or you can e Stop the drill FM 5 484 NAVFAC P 1065 AFMAN 32 1072 s Circulate the mud un
265. n the electrical loging system that is located directly below the SP shutoff switch on units modified for mud logging psi pound s per square inch psig pound s per square inch gauge Glossary 7 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 PTO power takeoff pull back method A way of installing telescoping screen pulldown See feed drive pump surge method A backwashing method that involves alternately pumping water to the surface and letting water run back into the well through the pump column pipe push tube A method of collecting undisturbed soil samples this method uses thin wall freed piston samplers in very soft to stiff clays silts and sands that do not contain appreciable amounts of gravel PVC polyvinyl chloride anat A man made gently inclined underground channel that allows groundwater to flow from alluvial gravels at the base of hills to a dry lowland qanats appear as a series of ant mound like openings that run in a straight line and act as air shafts for a channel qt quart s Quick Gel Wyoming type bentonite drilling fluid used for mixing mud recharge Water that infiltrates the soil recharge area Area where the groundwater reservoir is replenished RED HORSE rapid engineer deployable heavy operational repair squadron regional river basin Subdivision of a major river asin the Missouri River Basin is a regional river basin of the Mississippi River Basin See also drainage basin hydrographic b
266. nd Doctrine Command MERRILL A MCPEAK General USAF Chief of Staff FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Field Manual yM 5 484 No 5 484 NAVFAC P 1065 AFMAN 32 1072 Navy Facilities Engineering HEADQUARTERS Command Pamphlet DEPARTMENT OF THE ARMY No 1065 DEPARTMENT OF THE NAVY DEPARTMENT OF THE AIR FORCE Air Force Manual Washington DC 8 March 1994 No 32 1072 MULTISERVICE PROCEDURES FOR WELL DRILLING OPERATIONS Contents Page List of Figures and Tables saa sas sa sas nn s n gg XV qo A o a a a AA id E IR Ad REEL AS xix PART ONE BASICS Chapter 1 Introduction 1 1 Field Water Supply s s s sa s ss sa ease 1 1 1 2 Water Detection uuu 6 oe SER SRS OE ER SS ARA as AR 1 1 Responsibilities 5 4 0 6 4 6 6 L Ee ku De ASSESSES SESS RS 3 1 1 PIOCECUICS OE RR E M CIN C C ER AA Se e Sh en Oe a DI 1 1 EGUIDIDEDE diras e rad Y APO dix He ee eS 1 2 DISTRIBUTION RESTRICTION Approved for public release distribution is unlimited This publication supersedes FM 5 166 30 June 1975 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Page 1 3 Well Drllif08 ria Ee a A oie ae nde haba ac w Qo ew S 1 2 Forward Deployed Forces in a Developed TO eee 1 2 Permanent or Semipermanent Fixed Installation Forces in a Developed TO 1 2 Combat Zone Corps Level and Below ee tees 1 2 Communications Zone EAC 1 0 eee sa sa sos sas ts 1 3 1 4 Well Drilling Team
267. nd disappearing streams page 2 14 These features indicate that the rock has a very high dissolution potential and that groundwater is present Collapse type sinkholes irregular debris filled sinkholes usually indicate the presence of shallow groundwater because they result from the collapse of the surface materials into a dissolution cave In some cases the water provides evidence of the depth to groundwater 8 Soil Moisture Soil moisture content can provide some indication of recharge and discharge areas Areas with high soil moisture are not necessarily areas with high groundwater potential and good water well locations Soil moisture content is related to local rainfall and to groin size The smaller the grain size the higher the soil moisture Playas and lake deposits often exhibit high soil moisture but very poor groundwater potential resulting in low well yields 9 Salt Encrustation Salt encrustations often occur in playas and are indicative of saline groundwater page 2 31 Often salt buildups result from the evaporation of surface water and can cover many acres Certain salt tolerant plants may grow in such areas indicating shallow groundwater containing high concentrations of sodium potassium and other soluable salts Although salt encrustations indicate shallow groundwater drilling for groundwater should be avoided even if water treatment equipment is available Surface salt deposits usually indicate deep evaporite deposits S
268. nd operations c Air Force See Appendix C for information on Air Force well drilling teams and operations FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Chapter 2 Groundwater 2 1 Fundamentals To locate and evaluate water sources engineers must know about the earth s topography and geologic formations Surface sources of water such as steams lakes and springs are easy to find Quartermaster personnel are responsible for locating surface water sources and for providing adequate water supplies to troops in the field Groundwater sources often require more time to locate Geologic principles can help engineers locate groundwater supplies and eliminate areas where no large groundwater supplies are present About 97 percent of the earth s fresh water not counting the fresh water frozen in the polar ice caps and glaciers is located underground Most of the groundwater tapped by water wells is derived from precipitation on the earth s surface 2 2 Hydrologic Cycle The constant movement of water above on and below the earth s surface is the hydrologic cycle page 2 2 The concept of the hydrologic cycle is that precipitation returns again to the atmosphere by evaporation and transpiration Undemanding this cycle is basic to finding groundwater Three fourths of the earth s surface is covered by ocean water Direct radiation from the sun causes water at the surface of the oceans to change from a liquid to a vapor evaporation Water vapor rises in t
269. nd the minimum in steeply dipping strata Slower and faster speeds than these recommended are useful in specific and more or less unusual cases Brantly 1961 WELL DRILLING SELECTION GUIDE Type of Information Geologic Origin Igneous and Metamorphic Sedimentary Granite ee Limestone Sandstone Shale Clay Sand Gravel Basalt Gneiss Schist Hardness p Very hard to hard Unconsolidated Examples p gt Drilling Methods Rotary drill Downhole drill Air or foam rotary Mud rotary p gt Carbide insert bit Carbide tooth bits Steel tooth bits Small 4 8 in Small to medium 6 12 in Depth Shallow 50 200 ft Shallow to deep 50 1 000 ft Figure 5 2 Guide for bit selection 5 4 before starting rotary drilling operations FM 5 484 NAVFAC P 1065 AFMAN 32 1072 DANGER Remove all jewelry and loose clothing c Rotary Operation Standard rotary drilling involves the bit rotating against the formation Drilling fluid is pumped through the drill string and face of the drill bit and backup the annulus to the surface The rotary action of the bit loosens the material while the drilling fluid cools and lubricates the drill pipe and bit and carries cuttings to the surface The drilling fluid is under high hydrostatic pressure and supports the wall of the borehole against caving The properties of the drilling fluid are important to the drilling operation W
270. nd the pump handle may fly up when released during the downstroke b Rotary Pump These pumps use a system of rotating gears Figure 4 2 to create a suction at the inlet and force a water stream out of the discharge The gears teeth move away from each other at the inlet port This action causes a partial vacuum and the water in the suction pipe rises In the pump the water is carried between the gear teeth and around both sides of the pump case At the outlet the teeth moving together and meshing causes a positive pressure that forces the water into the discharge line SPT ISN Water carried around both Be sides of the pum M o 2 L Water carried around both NS sides of the pump S gt l YA SA Figure 4 2 Rotary pump FM 5 484 NAVFAC P 1065 AFMAN 32 1072 In a rotary gear pump water flows continuously and steadily with very small pulsations The pump size and shaft rotation speed determine how much water is pumped per hour Gear pumps are generally intended for low speed operation The flowing water lubricates all internal parts Therefore the pumps should be used for pumping water that is free of sand or grit If sand or grit does flow through the gears the close fitting gear teeth will wear thus reducing pump efficiency or lifting capacity c Centrifugal Pump These are variable displacement pumps in which water flows by the centrifugal force transmitted to the pump in designed channels of a rotating impel
271. nds per cubic feet If you know the mud weight that enters and exits the drill hole you can evaluate the efficiency of the mud pit and mechanical separators determine when to clean the mud pit and tell how well the mud is cleaning the hole If you take samples from only one location take them from the return end of the pit 6 Filter Cake Filter cake consists of solids from the drilling mud deposited on the borehole wall as the water phase is lost into the formation Desirable properties are thinness and impermeability Drilling mud is a colloidal suspension that can be separated by simple filtering With the hole kept full of mud the hydrostatic pressure inside usually exceeds the formation pressure Occasionally an artisan aquifer is penetrated with formation pressure higher than the hydrostatic in hole pressure When the borehole pressure is higher than the formation pressure the drilling mud tends to penetrate more permeable formations Solids from the mud filter out and deposit on the wall and the liquid phase of the mud filtrate enters the formation Filter cake can be compacted against the wall by the excess hydrostatic pressure in the borehole If the drilling mud is a well conditioned bentonite and water mixture most of the solids plastered against the wall will be flat platelets of highly active clay The filter cake is self regulating based on its degree of impermeability As long as filtrate can pass through the filter cake contin
272. ng e Surge Block Method With this method water is surged up and down in the casing with a surge block or plunger A surge block can be a solid plunger or swab or a plunger equipped with or without a valve opening igure 72 The valve type plunger gives a lighter surging action than the solid type Light surging is advantageous in developing tight formations Therefore start the surging process slowly and increase the force as the development proceeds Be careful when working with wells using PVC pipe The casing or well screen could collapse from vigorous surging action Plugging the valve of the plunger changes it to a solid type plunger that you can use when you need greater surging force Attach sufficient weight to the surge plunger to make it fall with the same speed on the downstroke as the drilling machine uses on the upstroke The drill stem provides the weight required for the surge block Use the following procedures for the surge block method e Step 1 Lower the surge plunger into the well until it is in the water above the top of the screen Keep the plunger a few feet above the screen so that it will not strike the screen while surging e Step 2 Start surging slowly and gradually increase the speed until the surge plunger rises and falls without slack With a rotary rig lift the plunger 3 or 4 feet before dropping it When using the sand line control movement by using the hoist brake and clutch e Step 3 Continue su
273. ng Opening Opening Opening Opening inches GPM GPM GPM GPM GPM GPM GPM GPM 6 62 102 7 66 110 88 8 70 118 94 180 350 170 280 440 9 75 126 100 190 370 180 295 465 10 80 132 106 200 390 190 310 490 12 87 145 115 220 425 210 340 540 14 94 156 125 238 460 225 370 580 16 100 168 132 253 490 240 390 620 18 106 178 140 268 520 255 415 660 20 112 188 150 283 550 270 440 695 22 118 198 158 298 575 280 460 725 25 125 210 168 318 610 300 490 780 30 138 230 182 350 670 330 540 850 35 150 250 198 375 725 360 580 920 40 160 265 210 400 780 380 620 980 45 170 280 223 425 820 400 660 1 040 50 180 300 235 450 870 425 700 1 100 60 195 325 260 490 950 465 760 1 200 8 7 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 r Horizontal distance D Volume of flow Q Area of pipe A Q 1 05A xD Figure 8 6 Open pipe flow measurement method Table 8 3 Open pipe flow measurements Pipe Horizontal Distance D Diameter inches inches 12 14 16 18 20 22 24 26 28 30 amp 2 4 48 5 68 68 96 102 3 90 105 120 135 150 165 100 4 150 181 207 232 284 _ 6 32 410 470 528 587 645 705 762 821 880_ 8 eo 712 813 915 1 017 1 119 1 221 1322 1 425 1527 10 960 1 280 1 440 1 600 1 760 1 930 2 080 2240 2 400 12 1378 1 607 1 835 2032 2 286 2 521 2 760 2980 3210 3 430 Table 8 4 Correction factors FM 5 4
274. ng and slips with two hydraulic jacks to pull the pipe If the screen moves upward as you pull the pipe lower the drill bit or other tool inside the screen to hold the screen down Step 5 Hold the casing with pipe clamps until either the hole caves around the casing and grips the pipe or until you can place grout around the casing and the grout sets after pulling the casing to its permanent position e Step 6 Bail out the drilling mud so that the sand and gravel of the formation will close in around the screeen c Open Hole Method Use this method to install telescoping screen when the depth and thickness of the aquifer have been predetermined Use the following procedures for this method FM 5 484 NAVFAC P 1065 AFMAN 32 1072 e Step 1 Sink the well casing into the aquifer to a depth slightly below the desired position from the top of the well screen Fix the casing in place by grouting or other means e Step 2 Mix drilling mud and fill the casing Using a bit that will pass through the casing drill into the aquifer below the casing to make room for the length of well screen to be exposed Step 3 Lower the screen into position ensuring that the rubber or neoprene packer remains inside the casing near its lower end when the screen is on bottom If the hole is too deep drop gravel into the hole to the correct height Use the closed bail plug and the packer top end fittings to support the screen and sand trap Figure 6
275. ng off See also fish fishing submergence The proportion rds y of the length of the air pipe that is submerged below the pumping level submersible pump A centrifugal pump closely coupled with an electric motor that can be operated underwater submersible pump method A pump testing method that uses a submersible pump to pump test the water well surface indicator Feature that suggests the presence of groundwater surface water divide Boundary between groundwater flow systems surge block method A backwashing method that involves developing a well by surging water up and down the casing with a Surge block or plunger swelling soil squeezing In hole effects of shale or clay that absorb water from the drilling fluid Sy specific yield TAC Terrain Analysis Center TAD Transatlantic Division tag along compressor auxiliary compressor tape method Procedure to measure the depth to the static level in a shallow well TEC united states Army corps of Engineers Topographic Engineering Center TM technical manual TN Tennessee TO technical manual TO theater of operations TOA table of allowances top head A mechanism on a rotary rig that moves down along the rig mast as the boring is advanced and is raised to the top of the mast to add a length of drill pipe the top head drive uses a power swivel TRADOC United States Army Training and Doctrine Command transmissivity The product of hydraulic conductivity and the satu
276. ng the instrument Calibration is required at the start of the logging operation and after every 50 feet of logging Use the LOG position during the logging operation e Calibration adjustment The CAL ADJUST is located in the lower right hand comer of the panel and is used to zero the galvanometers when calibrating the instrument e Ohmmeter This instrument is located directly above the CAL ADJUST and indicates earth resistivity directly in ohm feet A reading at 0 25 foot NORMAL equals 1 ohm foot for each division and 1 000 ohm feet at full scale A reading at 2 5 foot NORMAL equals 10 ohm feet for each division and 10 000 ohm feet at full scale A reading at 10 foot NORMAL equals 40 ohm feet for each division and 40 000 ohm feet at full scale Electrode selector switch This five position switch is located directly above the ohmmeter On the right side it makes circuit connections for either the 0 25 or 2 5 foot NORMAL arrangement When the switch points straight up the connections are for the 10 foot NORMAL arrangement On the left side the connections are for the 0 25 and 2 5 foot LATERAL arrangement as marked In the LATERAL arrangements the 10 foot electrode is the reference for both positions e Cable jack This is the four pronged receptacle located in the upper right comer of the panel The jumper cable from the logger cable case plugs into the jack thereby connecting the instrument to the well probe Potentiometer POT T
277. nitor and adjust the flow rate early in the test because as the drawdown increases the flow rate decreases e Continue pumping at a constant flow rate until the drawdown remains constant about 1 to 4 hours e Record the flow rate drawdown and testing time Initially take readings rapidly and then spread out the readings as the test continues A reading schedule that doubles the time between readings is preferable The recommended schedule is as follows 0 at the start of the test 30 seconds 1 minute 2 minutes 4 minutes 8 minutes 15 minutes 30 minutes 1 hour 2 hours 4 hours and so forth e Establish the desired constant flow rate quickly You must record the exact time of each reading not the intended or scheduled time After the drawdown stabilizes 1 to 4 hours the pumping rate should increase to a new constant flow rate which will produce two thirds of the capacity of the pump Do not stop the pump between these test segments e Repeat the measurements noting the exact time that the new flow rate was started Try to follow the above reading schedule starting from the time the flow rate was increased When the drawdown stabilizes increase the pumping rate to produce the maximum drawdown or about 90 percent of the maximum capacity of the pump Conduct another reading schedule until the pumping level stabilizes You may modify the above procedure depending on well requirements and local site conditions You should not m
278. njection rates salts contamination Formation water entry with possible and possibly increase percent of foaming agent Quick pressure drop Air has broken through foam mix Increase liquid injection rate or preventing formation of stable foam decrease air injection rate Slow gradual pressure increase increase in amount of cuttings or se air inj formation fluid being lifted to surface Quick pressure increase Stop drilling and attempt to regain circulation by moving pipe 5 3 Percussion Drilling This type of drilling involves crushing by impact of the teeth of the drill bit Most percussion drills are actuated by compressed air pneumatic percussion Essentially percussion drilling for water wells uses down hole pneumatic percussion hammer drills Down hole means the percussion motor actuating device is at the bottom of the drill string Bit plugged or formation packed off around drill pipe Percussion drills are best suited for drilling brittle moderately soft to hard rock In hard rock with percussion drills you can drill faster and more economically than with other drilling methods The air blows the cuttings from under the bit and up the annulus to the surface The air s ability to carry the rock chips depends primarily on high air velocity An up hole velocity of about 4 000 5 27 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 fpm is required to remove cuttings If drill penetration rates are high 30 fpm or m
279. not to slam the care ohmmeter and self potential potentiometer dials against their zero stops When the dials are turned completely counterclockwise they should read zero If they do not loosen the two setscrews set them 90 degrees apart and reset the knob to zero To set the screws use the allen wrench that is taped on the potentiometer b Of Cable and Reel Case When handling the cable be careful not to damage the insulation Always clean the cable before storing it Store the reel case in a dry place Keep the reel case lid left open until the cable is thoroughly dry D 6 Interpretation of Electrical Logs a Preparation of the Log When preparing the log plot the 0 25 foot reading NORMAL arrangement at the depth you read from the marked cable Plot the 2 5 foot readings about one foot above that point You plot the readings in this manner because the cable markings have been measured from the current electrode For the LATERAL arrangement plot the values as for the NORMAL arrangement If you use the 10 foot NORMAL plot the readings about 5 feet above the marked cable reading b Significance of 0 25 Foot Spacing The reading you get from the 0 25 foot spacing is greatly influenced by the fluid in the well bore The reading is only a fraction of the formation resistivit y However the short spacing lets you to see changes in resistivity with greater detail With this electrode spacing you can detect formations with a thickness of ab
280. ntal to drilling production rate e Damage the drill s Cause excessive wear and premature failure of the bit 2 Plumbness Water wells should be plumb and straight Apply bit load by using drill collars to hold the drill string in tension Most rigs have a mechanism designed for that purpose Because the drill string is relatively flexible loads applied from the top will cause the drill string to flex and can misalign the drill bit This procedure can cause the drill to deviate from vertical Continued top loading will exaggerate deviation Apply bit load by adding heavy drill pipe sections drill collars at the bottom of the drill string just above the bit If you add a sufficient load at the bottom you can hold the drill string in tension while drilling The borehole tends to be straight because of the pendulum effect Borehole deviations from vertical are sometimes associated with fast drilling rates Such deviations actually result from crowding the bit trying to increase the penetration rate by overloading the bit 3 Air Pressure Exceeding the 350 psi rating of the drill is not possible with the supplied compressors The energy output of the drill is proportional to the air pressure delivered Try to operate the drill at the maximum air pressure available Lubricate the drill using an in line oiler designed for operation at the maximum anticipated working pressure To control dust inject a small amount of water into the airline The inje
281. ntify areas of shallow groundwater Streams sustained by groundwater seepage wetlands and certain types of vegetation indicate discharge areas where groundwater is close to land surface Some types of vegetation are capable of sending tap roots to depths of over 100 feet and are not indicative of shallow groundwater The location of subsurface discharge areas requires more detailed knowledge of the hydrologic balance of the area 3 Impermeable and Semipermeable Barriers The quantity and rate of groundwater flow from recharge areas to discharge areas are controlled by the transmissivity of the aquifers Impermeable barriers are those features solid rock masses through which groundwater cannot flow Semipermeable barriers are those features faults or fractured rock masses that restrict flow but do not act as a complete barrier Such features should be recognized because they usually form the boundaries of groundwater flow systems and when located within a flow system can result in areas of shallow groundwater Basin boundary NN NNNN SNNNNSNNSNNNNNNNNNNSNNNNNAN NERIS AA Ss Basin boundary Discharge to subsurface groundwater flow Discharge to lakes Sese Discharge of springs and streams Discharge to wetland vegetation Figure 2 30 Hydrographic basin with discharge areas T eo l MA gt N gt TM 4 ff ia O FKF La e Basin ay A Figure 2 31 Groundwater flow
282. nuously support the forces in the TO Planners should consider the following items when locating well sites e Tactical situation e Geographical area of operations AO e Location of existing water sources e Size of the force being supported e Planned force deployment rates e Dispersion of forces in a geographic area e Water consumption rates and anticipated well capacity e Availability of transportation to move well drilling equipment and well completion materials e Logistical support and main supply routes e Availability of assets for water distribution e Time required to drill and prepare a well for production Groundwater sources are normally used to supplement surface water sources In arid environments exploring and using groundwater can reduce the need to transport water to a desired location Groundwater may also be used when threat forces employ nuclear biological chemical NBC munitions which could contaminate surface water supplies in the TO 1 2 Water Detection a Responsibilities In an undeveloped or a developed TO terrain analysts ground survey teams and well drilling teams identify surface water and groundwater sources Water detection may be provided for all forces in the TO with assets from the Water Detection Response Team WDRT See Appendix for details on the WDRT Engineer ground survey teams determine whether a groundwater source is adequate and accessible for development b Procedures
283. o conduct field geologic reconnaissance and geophysical surveys Geologic reconnaissance will often be conducted without actual geophysical surveying All available information including field reconnaissance will be used when categorizing potential well drilling sites for the supported unit A 2 FM 5 484 NAVFAC P 1065 AFMAN 321072 A 5 Water Resources Overlays The product of WRDB is a set of three transparent overlays keyed to standard 1 250 000 scale Department of Defense DOD Joint Operations Graphics JOG topographic maps The overlays provide the most current information for existing water supply facilities surface water resources and groundwater resources The three overlays should always be used together to determine the water supply potential of the area a Existing Water Supply Overlay An existing water supply overlay displays all known man made or improved facilities except for surface water bodies larger than 0 25 square kilometeters canals wells springs and qanats This overlay also shows the location capacity and quality of water in existing production distribution and storage facilities These facilities include desalination waste treatment and other purification plants storage facilities pumping facilities pipelines and miscellaneous supply facilities such as ice making and water bottling plants b Surface Water Overlay A surface water overlay supplements the map and depicts surface water resources such as p
284. oam gel the air s cutting carrying capacity and the wall stabilization are enhanced Foam reaching the surface must be carried away from the drill rig to avoid mounding over the work area Foam eventually dissipates 5 26 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 when exposed to the atmosphere Use either of the following methods to remove the foam from the rig area UT PEE ma r 1 GTA DIAL AAA CALLAN e Method 1 Use a packer to seal the top of the surface casing around the drill pipe or kelly bar so either rotates freely Fit the top of the surface casing with a T below the packer for connecting a waste pipe As foam comes out of the waste pipe remove it from the rig Method 2 Place a T at the top of the casing with an air line eductor that causes a vacuum at the top of the hole The foam is vacuumed into and blown through the waste wae pipe By using an eductor you can observe and regulate the returning foam The eductor is fabricated and the drilling operation does not usually require the full output of the Evi compressor VA PEL Figure 5 15 Foam from the well ACUSAN VALLA El oolli Table 5 7 Common problems with air foam systems Corrective Adjustment Air blowing free at the blooey line with Air has broken through foam mix increase liquid injection rate or a fine mist of foam preventing stable foam formation decrease air injection rate Foam thin and watery Increase liquid and air i
285. odify the precision and accuracy of the measurements taken Test results should become a part of the permanent records The results are useful for evaluating the efficiency of the well in the future and for determining the need for well rehabilitation Calculating the GPM per 8 1 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 foot of drawdown gives the capacity of the well You can use this information to estimate production and to regulate the pump s flow rate to prevent dewatering of the well and possible pump damage b Temporary Wells Conduct a single stage test rather than the step drawdown test To establish the flow rate conduct a 1 to 2 minute test to determine the GPM per foot of drawdown Let the well return to the original static water level before testing about 1 hour Select a flow rate that will produce about two thirds of the available drawdown but will not reach more than 90 percent of the pump s capacity Conduct the test as described above but with only one segment When the drawdown stabilizes for the selected flow rate stop the test c Methods See Chapter 4 for a description of pumps used in testing and well production 1 Submersible Pump Method Use the submersible pump in well completion kits to pump test the water well Set the pump deep enough to attain the maximum pumping rate and drawdown When testing a well with a screen set the suction of the pump above the top of the screen to prevent lowering the water level below
286. of Groundwater _ Chemical Quali At surface or within a few feet Generally good but not invariably Giant reed grass At surface or probably within 8 feet Generally good but not invariabl Wild cane Near surface to 10 feet or more Generally good but not invariably Giant wild rye Near surface to 12 feet or more Generally good but not invariabl Salt grass Near surface to 10 feet or more Good to very bad Generally highly mineralized Generally within a few feet but locally Pickleweed may be as much as 20 feet immediately under the water table but possibly a little better in deeper water Surface to possibly 25 feet heavy Artow weed growth usually indicates water within 5 Generally good but not invariably to 10 feet of surface Potable water generally can be found Palm trees Within a few feet of the surface in vicinity of healthy palms but locally may be very bad Generally good Surface to 12 feet or more 5 feet or less to 25 feet and in places Alkali sacaton much more luxuriant where depth to Good to very bad water table is 5 to 15 feet Luxuriant growth indicates water table Willow trees Rabbit brush at 8 to 15 feet locally as shallow as 2 feet 3 feet or less to 40 feet or more Greasewood abundant and luxuriant where depth is Doubttul pura Bu between 10 to 20 feet Mesauite 10 feet or less to 50 feet or more Generally good but not invariabl Abundant groundwater generally good within 20 feet Generally indicates
287. of a reconditioned button Although gauge buttons receive most of the wear erind all of the buttons if necessary Figure E 15 A page E 8 grind the flute re E 15 BJ check the blowholes Figure E 15 C and grind them back into shape Fig E 4 Rule of Thumb In down hole and drifter drilling the most important factor contributing to poor performance and premature bit failure is operating the bit beyond the reconditioning point A fixed guide outlining exact bit reconditioning intervals would be ideal However changing drilling E 6 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 conditions make the establishment of such a guide unrealistic Therefore establishing such intervals will ultimately be determined on the job Consider the following recommendations In hard abrasive rock recondition at the first sign of a flat on the button bit A flat width should never exceed 1 4 inch e In soft or less hard abrasive formations recondition before reaching 10 percent of the expected life of the bit This prevents alligator type failures and ensures proper bit life Figure E 13 Restoring bits Grind off cd Grind off New ball after grinding Figure E 14 Reconditioned button E 7 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 e he 4 tioning Figure E 15 Bit recondi E 8 ACE Assistant Chief of Engineers AF Air Force AFI Air Force instruction AFP Air Force pamphlet AFSC Air Force Specialty Code
288. of the two LATERAL positions To complete the reading use the procedure as for the NORMAL arrangement However the meter does not provide a direct reading For the 0 25 foot lateral the factor is 1 025 essentially direct for the 2 5 foot lateral the factor is 13 33 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 D 3 Mud Probe on Units Modified for Mud Logging a Calibrating Unit calibration is a rear panel adjustment and is adjusted for the mud logger probe furnished with the unit However the CAL ADJUST potentiometer will effect some adjustment to accommodate changes due to temperature and battery condition If the rear panel adjustments are not tampered with and the galvanometers needle remains within 2 minor divisions of zero when calibrating the instrument in the CAL position of the function switch the calibration of the instrument will be 10 percent of the obtained reading Unit checkout of the instrument in the mud mode of operation with the test set may be done as in the normal mode with the results obtained Electrode switch must be in one of the following NORMAL positions e CUR position at 10 divisions e CAL position within 2 divisions of zero e LOG position reading on ohmmeter of about one tenth the value marked on test set or as indicated on resistivity chart furnished with instrument Note Self potential potentiometer must beat zero b Setting up the Equipment Since the electrode array is contained within th
289. og a well includes the following e Logging instrument s Logging cable e Surface potential wire black with lead oxide flag e Surface current wire red e Steel rod that is about 1 4 to 1 2 inch in diameter and 2 to 3 feet in length Use the following procedures when preparing to log a well e Step 1 Plant the lead oxide flag and the steel rod on opposite sides of the well about 75 feet from the well Bury the lead oxide flag which has been moistened with water and tamped in a hole about 1 foot deep Plug the black wire into POT and the red wire into CUR on the instrument panel e Step 2 Connect the probe assembly to the logging cable only if the waterproof connectors and their pins and sockets are clean If the connectors do not mate easily after the pins are aligned apply silicone spray or grease to the surfaces The connectors are mated properly when you hear a pop e Step 3 Secure the locking rings e Step 4 Lower the probe to the bottom of the well and plug the jumper cable into the cable receptacle on the instrument panel On units equipped with a mud probe place probe selector switch NORMAL 2 Calibrating To calibrate place the function switch at CAL and the electrode selector switch at any NORMAL position hold the CUR switch at ON and zero the galvanometers needle by adjusting the CAL ADJUST knob Calibrate at the start of each job and after every 50 feet of D 3 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 l
290. ogging If cannot zero the galvanometer you may not have enough current flowing See paragraphl page D 6 3 Logging a Balancing out SP With the electrode selector switch at 0 25 NORMAL turn the function switch to LOG and zero the galvanometers needle b y adjusting the self potential potentiometer The dial reading on the potentiometer is the SP in millivolts with the polarity of the probe electrode as indicated on the reversing switch If you cannot zero the galvanometers reverse the polarity switch and try again If reversing does not work see paragraph D 3 and paragraph D 4 page D 6 b Measuring resistivity After balancing the SP hold the current switch at ON and return the galvanometers needle to zero by adjusting the ohmmeter Release the current switch The dial reading of the ohmmeter is the resistivity for the 0 25 foot NORMAL electrode spacing Turn the electrode selector switch to 2 5 foot NORMAL and repeat a and b Multiply the dial reading on the ohmmeter by 10 to obtain the apparent earth resistivity for this electrode spacing To obtain a log the well probe must be below the fluid level in the well When you pull the probe out of the water the resistivity instrument will go dead To quickly check the fluid level depth turn the function switch to CUR and hold the current switch at ON When you pull the well probe out of the fluid the galvanometers needle will return to zero The 0 25 and 2 5 foot NORMAL readings
291. oist the next casing section with the elevator and place it in the first section Join the two sections Slightly lift the string of casing and remove the elevator from the lower section Lower the casing and repeat the process until you suspend the last casing section in the well e Step 5 Grout the casing in place with a cement grout After the grout sets about 24 hours resume drilling operations using a drill bit that will fit inside the surface casing Drill the well to the desired depth and case and screen the lower section of the well using the single string method 3 18 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Figure 3 19 Setting slips Figure 3 20 Casing in a spider bowl 3 19 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 b Screening You can use the following method to install screens e Step 1 Place a casing section in the well Cap the casing on the lower end so materials from the bottom of the well will not enter the well e Step 2 Suspend a screen section over the well and attach the screen section to the casing section e Step 3 Lower the screen and casing section Suspend them in the well either by the elevator resting on the rotary table or by slips in the spider bowl e Step 4 Add casing until the screen reaches the desired depth Chapter 5 discusses other methods of screening c Filtering and Backfilling The last procedure when installing screen and casing is to place a gravel pack filter around th
292. oncepts and capabilities of the Rapid Engineer Deployable Heavy Operational Repair Squadron RED HORSE This squadron provides the Air Force with a highly mobile self sufficient rapidly deployable civil engineering heavy construction and repair capability The Air Force headquarters control RED HORSE Welldrilling units are assigned as a special skills team to an operational RED HORSE unit The unit provides the logistical support necessary to complete the well drilling mission and the administrative support well drilling teams require Table C l _ Table C 1 RED HORSE Units _ Airfield lighting team Communications Concrete asphalt operations Explosive demolitions operations Aircraft arresting team Materieis testing Quarry operations Rapid runway repair Revetment erection Well drilllng team Automatic building machine These units are classified for deployment using the following categories a RH 1 This is an air transportable RED HORSE echelon composed of 16 people An RH 1 team is ready for deployment 12 hours after notification The squadron can perform advanced airfield surveys and site layout and can prepare for the orderly establishment and future development of a base of operations during contingencies b RH 2 This is an air transportable RED HORSE echelon composed of 93 people An RH 2 team is ready for deployment 48 hours after notification The squadron can erect base shelters and perform limited earthwork and lig
293. operation an air actuated piston impacts the drill bit shank Porting within the drill case forces the piston up and down with the full force of the air pressure The drill bit shank is splined and can slide in the splines about 2 inches until fully extended The bit is held in the drill by a retainer ring and can have several design shapes Currently all down hole bits are set with carbide buttons specifically formulated for the percussion application The carbide button bit is more durable than other bits made from hardened steel However the drill bit dulls and buttons flatten from wear A dull bit is less efficient works harder is easily damaged and has a reduced production rate Flattened carbide buttons can be reshaped with a green stone An experienced operator recognizes excessive wear and knows when to reshape the button A percussion drill bit should drill 1 000 feet or more in hard rock without reshaping A properly maintained bit has the longest service life and drills the most economical holes Sharpening and reshaping the carbide buttons are detailed procedures See the manufacturer s service manual for these procedures The object of reshaping the button is to restore the hemispherical shape without removing excessive carbide material The cutting points on a reshaped bit will be about equal in length The flat area of each button is symmetrical around the cutting point and each button wears equally which makes reshaping simple Mar
294. ore you may need a higher up hole velocity to clean the hole To drill water wells with percussion drills you need to balance drill paragraphmeters to the materials to be drilled Down hole hammer drilling with a large diameter hammer or bit Figure 5 16 usually results in a very crooked hole unless you use drill stabilizers or drill the hole in two steps For two stage drilling drill a small pilot borehole with a 6 to 6 1 2 inch bit on a small hammer using drill collars as stabilizers Enlarge the borehole using a stinger bit for drilling The Navy s well drilling package contains the stinger bit a Equipment Shallow holes for loading explosives in rock quarries and other excavations have been drilled by percussion Percussion drills are used because they penetrate quickly even through hard rock Most percussive motors or actuating devices are above ground Top head percussion drilling is not practical for deep boreholes because too much energy is lost in the long drill string The down hole drill was developed for efficiency This drill is adaptable to most rigs and can drill water wells to depths exceeding 2 000 feet To operate the drill you hoist handle and rotate the drill string and drill motor and have an adequate air supply You can supplement the air supply with an auxiliary tag along compressor through simple plumbing The 600 foot WDS comes equipped with auxiliary air connections Figure 5 16 Down hole bit During
295. orine solution by e Mixing 1 heaping tablespoon of calcium hypochlorite with water to make a thin paste Break up all lumps e Stirring mixture into 1 quart of water Let the mixture stand a short time e Pouring off the clear liquid The chlorine strength of the solution is about 1 percent One quart of the liquid is enough to disinfect 1 000 gallons of water Larger quantities of the solution may be prepared in the same proportion and if placed in sealed containers preferably glass can be stored for several years without losing its effectiveness Estimate the volume of water standing in the well Pour in the corresponding ratio of solution to gallons of water in the well For safety use less solution than too much solution Agitate the 7 8 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 water in the well thoroughly and let it stand for several hours preferably overnight Flush the well to remove all of the disinfecting agent You can disinfect the well casing by returning water to the well during the early stage of flushing and washing the walls with chlorinated water d Cathodic Protection A sacrificial anode Figure 7 5 is the simplest method of protecting metal casing from corrosion Connect a galvanically active metal bar such as magnesium coated wire to the casing Bury the anode bar near the casing below the water table In this cell ions flow to the casing through the groundwater While the anode corrodes the casing remains unaf
296. ork schedule He should include repairing existing and recently drilled wells in the work estimate The senior engineer must also determine if the teams have the skills or equipment needed to repair the wells before falling a request The engineer unit s construction section in coordination with the well drilling team should prepare a construction estimate to determine the needed support for the well drilling operation Team experience and land formations will dictate the length of a well drilling operation Staff personnel should consider the following when planning for the augmentation of a well drilling team e Transportation of the well drilling team s equipment and personnel by land air or sea according to the unit movement books and operator manuals e Reconnaissance and route selection to mission sites WDRT assistance and graphic products from the water resources data base to select a potential drilling site e Security during movement and drilling operations Earth moving assets to clear and level the drilling site and excavate mud pits e Material handling equipment to offload well completion kit materials as needed Administrative support including postal and legal services e Logistical support including all classes of supply and arrangements for mess petroleum oils and lubricants POL maintenance and medical support e Delivery of the initial drilling water supply if required Turnover of the completed w
297. osity but a very low permeability and are poor aquifers Sands have porosity about half that of clay and high permeability and are usually productive aquifers Generally well production capacity is directly promotional to grain size Areas of fine grained sediments playas and lake beds have poor water production potential Areas of coarse grained sediments alluvial fans have a higher potential 2 23 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 9 Lithification This is the process by which sediments are converted to rock Lithification includes compaction consolidation cementation and desiccation The degree of compaction or consolidation affects the porosity and permeability of an aquifer Figure 2 26 Porosity and permeability of unconsolidated materials subjected to little or no overburden pressure are related to grain size With compaction and consolidation the pore spaces between grains are reduced and the porosity and permeability of the aquifer are decreased Q O o CS O O os o Unconsolidated Consolidated Figure 2 26 Effects of consolidation on porosity and permeability Another source of lithification is the cementing of groins by the precipitation of minerals from solution in the groundwater Many fragmented sedimentary rocks are cemented by silica or calcium carbonate precipitation from the waters they are deposited in or from waters introduced after they are deposited Cementation often occurs along fault zon
298. ouble tube sampler used to collect undisturbed soil s in material that either contains gravel or is too hard for a thin wall sample CPM critical path method Glossary 2 crop irrigation Surface indicator that shows the use of surface water or groundwater for agriculture CSS combat service support CUR current A red plug receptacle used to connect the surface current ground wire to the instrument current switch The ON OFF switch located directly below the function switch the current is a momentary spring return togele switch d depth DA Departmnt of the Army Darcy s Law Principle that describes the flow of eroundwater DC direct current Denisen sampler See core barrel DD Department of Defense DHD down hole drilling discharge Water that moves from one area into another discontinuous permafrost A zone where permafrost will be thin and maybe absent on the south slopes of hills in valley bottoms containing permeable alluvial material and under surtaces that have been cleared of vegetation See also continuous permafrost permafrost dispersion treatment Adding dispersing agents to tilling fluid backwashing jetting water or water standing in the well to counteract the tendency of mud to stick to sand grains dissolution potential The possibility of developing high secondary permeability in a soluble rock because the rock dissolves through contact with groundwater DMA Defense Mapping Agency DOD De
299. out 6 inches or more Because you can see more detail use the 0 25 foot curve to pick formation boundaries c Significance of 2 5 Foot Spacing The 2 5 foot electrode spacing gives you the closest true formation resistivity for wells with diameters up to 16 inches and for formations thicker than 5 feet For larger diameter wells or thinner formations the measured resistivity will depart somewhat from the true For qualitative interpretation this departure is not significant Because the 2 5 foot curve gives you the formation resistivity use it to identify the type of material penetrated FM 5 484 NAVFAC P 1065 AFMAN 32 1072 d Significance of the Lateral Log You get a lateral log by combining either the 0 25 or 2 5 foot electrode with the 10 foot electrode Because the distance of the 10 foot electrode is larger than the other electrodes you can interpret the log as for the normal log after using the appropriate correction factors For the 0 25 foot lateral log the meter factor is 1 025 For the 2 5 foot lateral log the meter factor is 13 33 e Interpretation of Resistivity Values When interpreting the resistivity values the following generalities may apply clays and shales will have low resistivity sands grovels sandstones and limestones will have high resistivity igneous and metamorphic rocks granites and gneisses will have extremely high resistivity The exact range of numerical values will depend on the following e Type of
300. ove the top of the screen Gravel works downward as sand and silt are removed from the formation around the gravel pack by subsequent development Development work must be thorough when you drill the borehole using the rotary method because the mud cake on the borehole wall is sandwiched between the gravel pack and the face of the formation You must break up the mud cake and bring it up through the gravel into the well Any mud cake not removed reduces the efficiency and yield of the completed well To ensure that you remove all of the mud cake limit the thickness of the gravel envelope around the screen to a few inches A common mistake is to drill a very large borehole and use a small screen making the gravel too thick for satisfactory results Another common mistake is to try and place gravel pack into a small annular space such as 1 inch The gravel pack usually bridges at a coupling and does not get down around the well screen A 2 inch annular space is minimum 3 to 5 inch spaces are best Remember the annular space is the difference between the outside of the casing and the wall of the borehole with the casing centered in the hole In most cases you must also consider the outside diameter of the couplings b Tremie Placement You can use a tremie pipe when placing gravel pack materials The fine and course particles should not separate as in the open hole placement when the aggregate settles through the drilling fluid in the well Lower
301. partment of Defense dolomite A carbonate rock that dissolves when carbon dioxide from the atmosphere and groundwater mix to form carbonic acid FM 5 484 NAVFAC P 1065 AFMAN 32 1072 double casing placement A method of placing gravel using temporary outer casing drainage basin An area drained by a stream or river See also hydrographic basin local drainage basin major river basin regional river basin drawdown Measure of how much the water level near the well is lowered when the well is pumped draw works Main drill head hoists that are ee or hydraulically driven wire line winches drilling blind A condition that exists when a m continues to drill when fluid circulation is ost drive clamp Uused in driving easing or pipe and is attached to the square of the drill stem drive head Device that is placed on the pipe to protect the threads the the driving blows of the drive clamps a drive head is put on b unscrewing the bit slipping the drive head over the drilling stem and making up the joint again drive monkey A weight that slides over the pipe and is used in the falling weight method o driving a well driven method Installing casing as with the rd the cable tool or driven point well method drive point Perforated pipe with a steel point at the lower end to breakthrough pebbles or thin hard layers drive shoe Device attached to the lower end of the E to prevent the pipe from crumpling while eing driven
302. performance and well efficiency are tested by placing boreholes through the aquifer Testing and recording the yield and the drawdown can provide useful information to select the best pumping equipment and well screens for the actual well Measurements of drawdown in observation wells near the pumping well and accurate pumping rates of the actual well will provide useful information on the hydraulic characteristics of the aquifer Aquifer tests provide values of hydraulic conductivity and transmissivity that better represent the actual aquifer than laboratory permeability tests conducted on small intact samples The much greater volume of aquifer material tested in a field aquifer test takes into account secondary porosity in fractures and connected voids as well as the primary porosity of the materials Field aquifer tests may also reveal the presence of boundary zones which are zones of greater or lesser permeability or recharge zones that define the limits of the aquifer Aquifer test data are useful in determining well yield discharge for groundwater supply and in engineering projects requiring dewatering of excavation sites and subsurface excavation Field testing of aquifers is described in Chapter 7 and Appendix Cl of Technical Manual TM 5 818 5 2 6 Aquifers Saturated rock or soil units that have sufficient hydraulic conductivity to supply water for a well or spring are aquifers Aquifers transmit water from recharge areas to discharge
303. pile driver with an air compressor if the pipe is strong A weak pipe will break at the couplings if you do not use a butt joint 4 Casing If you use unthreaded casing butt weld the casing lengths Use an alignment collar for initial tack welding page 9 12 The collar is used to align the pipe or casing to get a straight tight joint With the welded casing you can drive a pipe string and possibly eliminate casing damage Remove the collars when you complete tack welding Another driving method involves a steel driving bar attached to a rope The bar falls freely inside the pipe and strikes the base of the drive point Figure 9 16 page 9 13 This method is safest because it does not weaken the pipe Ihe falling weight method uses a drive monkey which is a weight that slides over the pipe page 9 14 A simple arrangement of this method is one in which the monkey slides on a bar supported by the well pipe Use a drive cap with this arrangement Another method is to slide the drive monkey over the well pipe to strike the drive clamp that is around the well pipe You must use a tripod with either method In soft formations the descent rate may be 2 or 3 inches per blow In sand or compact clay using water in and around the pipe makes driving easier Extremely compact clay is difficult to penetrate and requires many blows to penetrate a few inches FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Bolts to hold collar Aligning bolts hold s
304. pletion materials Administrative support including postal and legal Logistical support including all classes of supply with special emphasis on repair parts Mess and potable water Fuel and POL products and continual resupply Specialized maintenance evacuation and on site welding support Medical support including medical evacuation MEDEVAC procedures Initial water supply and resupply Timely delivery of pea gravel for gravel packing material Arrangements to turn over the completed well to the supported unit operations cell Communications support Reporting procedures Resupply of completion kit materials for next mission Plans for the next mission 3 4 Site Preparation Most sites require some preparation before setting up the drill rig In rugged terrain teams may have to excavate into a hillside They may have to prepare a drilling platform Teams should always place the drill rig on stable level ground Where excavation is not expedient teams may have to construct mat or timber platforms to level the rig CAUTION Avoid setting the rig up on a fill area The rig could overturn on soft soil or fill 3 3 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 DANGER Do not raise mast around electrical wires without a ground guide NOTE Historically groundwater coming from its natural environment has been considered of good sanitary quality Because of this personnel in well drilling must understand the effects we
305. priming pump A pump with a priming chamber that makes repriming unnecessary when the pump is stopped for any reason other than au intentional draining semipermeable barriers Features faults or fractured rock masses that restrict water flow but do not act as complete barriers shale Fine grained sedimentary rock that does not store much groundwater and does not transmit large quantities of groundwater single string method of installing casing Installing casing and screen already joined in a single assembly single string method of installing screen See single string method of installing casing sinker rod An insulated device that can be attached with a leather thong to the probe on the electrical logeing system if more weight is needed to carry the probe to the bottom of a well smentex Commercial chemical agent added to mud drilling fluid to prevent it from freezing see also aquagel barite fibratex gel flake Impermex micatex Glossary 9 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 snow melt pattern Surface indicator that can provide evidence of recharge areas and directions of groundwater flow soil moisture Surface indicator that can provide some indication of i pls and discharge areas soil moisture content is related to local rainfall and to grain size SOP standing operating procedures SP spontaneous potential specific retention Water that cannot be pumped out of a well yield Water that can be pumped
306. proportional to the air pressure delivered to the drill Operating at the maximum air pressure should be the constant The bit load ideally a bottom string load should exceed the maximum load required for the drill so the load can be properly adjusted by increasing hold back with the drill rig Do not overload the bottom string because the drill string weight increases as the depth increases Do not overload the hoisting capacity of the rig Adjust the rotation speed to the penetration rate and use the constancy of the rotation to regulate weight on the bit Air blows the rock chips from under the drill bit on up the annulus to the surface Since air has no effective viscosity or density to float the chips removal is a function of the velocity of the returning air You will need a minimum velocity of 3 000 to 4 000 fpm Larger diameter drill pipe reduces the area of the annulus which effectively increases the velocity of a fixed air volume If you cannot achieve the required up hole velocity add foam to help remove cuttings Effectively removing cuttings as drilling progresses is critical When the drill bit is extended in the splines to the open position the maximum volume of air passes through the drill Cuttings may not be removed efficiently from the hole resulting in an accumulation of cuttings around the drill Accumulation may increase when compressor capacity is insufficient to maintain maximum pressure while drilling This condition may be
307. pump See pump s pitcher pivot irrigation patterns 2 32 placing gravel 6 15 bail down placement of 6 16 double casin g placement of 6 16 wear AA f wA V AW open hole placement of 6 15 tremie placement of 6 16 planning and coordinating teams See teams planning and coordinating playas 2 30 plumbness 5 30 POL See petroleum oil and lubricants POL polymers 5 10 through 5 13 popping E 4 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 population distribution 2 33 porosity 2 5 2 24 A 4 POT See potentiometer POT potentiometer POT D 2 pounds per square inch psi 4 1 4 11 5 26 5 29 7 1 7 3 7 4 9 1 9 5 power auger See auger power power supply D 2 power take off PTO 3 5 5 1 precipitation 2 1 2 2 2 24 pressure pumping method See well development pressure pumping method of priming 4 5 psi See pounds per square inch PTO See power take off PTO am Dsl e Neue publications C 2 pull back method See installing screen pull back method of pull down 5 1 pump s 4 1 air lift 4 10 7 2 centrifugal 4 4 7 2 9 5 deep well 4 6 7 2 9 5 helical rotor 4 7 jet 4 9 mud 3 13 2 1 ud 3 13 3 15 pitcher 4 3 9 6 rotary 4 3 selection criteria for 4 1 self priming 4 5 shallow well 4 4 1 submersible 4 6 Surge method See well development pump surge method of testing 8 1 turbine 4 7 7 2 pumping tests 3 21 push tube met
308. r Qanats are good indicators of groundwater in some desert areas like Iran A qanat is a man made gently inclined underground channel that allows groundwater to flow from alluvial gravels at the base of hills to a dry lowland Figure 2 38 In effect qanats are horizontal wells On aerial photographs qanats appear as a series of anf mound like openings that run in a straight line and act as air shafts for the channel They may be found in arid regions of Southwest Asia and North Mica Qanats may be up to 30 kilometers in length 2 34 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Figure 2 37 Oasis Water producing section Air shafts A urface canai Fields a as a A A a is A A x Aduiclude AR A A A A A A A A A e A A A A A Figure 2 38 Qanat system 2 9 Water Quality Most water is run through reverse osmosis water purification units ROWPU before it is used so the effect of contamination is minimal a Aquifer Contamination Military engineers must be aware of possible aquifer contamination As groundwater is transmitted from recharge to discharge areas it contacts soils and rocks of the earth s crust Contact causes some dissolution of soil and rocks into the water and alters the chemistry of the groundwater Discharge areas that appear to be good well sites because of shallow groundwater may have poor water quality and may be poor sites for groundwater development Discharge area
309. r Stator bonded to pipe Lower stator coupling Column bumper Hex nut Pressure pipe Flat washer Foot valve and strainer assembly W o Pump Suction pipe B Venturi tube A Figure 4 7 Helical rotor pump A jet pump s efficiency is low compared to an ordinary centrifugal pump However other features make the jet bang pump a desirable pump They are Intake pipe e Adaptability to wells as small as 2 inches in diameter Foot valve e Easy accessibility to all moving parts at the ground surface Figure 4 8 Jet pump 4 9 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 e Simple design resulting in datively low purchase and maintenance costs 4 4 Air Lift Pumps a Principle Water can be readily pumped from a well using an air lift pump There are no air lift pumps in the Army supply system however in the field you can improvise and make a pump using compressed air and the proper piping arrangement The assembly consists of a vertical discharge eductor pipe and a smaller air pipe Both pipes are submerged in the well below the pumping level for about two thirds of the pump s length The compressed air goes through the air pipe to within a few feet of the bottom of the eductor pipe and is then released inside the eductor pipe A mixture of air bubbles and water forms inside the eductor pipe This mixture flows up and out the top of the eductor pipe The pumping action that causes water to rise as long as compr
310. r a thin wall sampler use a double tube core barrel or a Denisen sampler These barrels are commonly used in obtaining samples of very stiff brittle dense or partially cemented soils and of soft broken fissured or friable rocks Use the following procedures for this method e Step 1 Lower the core barrel to within a few feet of the bottom of the hole e Step 2 Circulate the drilling fluid to remove any excess cuttings that may have settled to the bottom 11 3 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Step 3 Lower the core barrel to the bottom Rotate and force the barrel downward at a uniform rate If the soil erodes easily and the inner barrel shoe will penetrate the soil under the pressure exerted on the core barrel the inner band shoe should extend below the cutting teeth of the outer bard If this does not occur use a shorter shoe that has a cutting edge even with or slightly above the cutting teeth of the bit Adjust the rotation speed and the advance rate to ensure that the bit penetrates continuously If the bit advances too rapidly it will become plugged and grind away the core If the bit advances too slowly or intermittently the core will be exposed to excessive erosion and torsional stresses Use a rotational speed of 50 to 150 RPM for most soil coring You must control the drilling fluid pump pressure and flow when removing cuttings Too much drilling fluid pressure and flow will erode the core Too little drilling flui
311. r cake Keep the borehole full and backed with a large water reserve to maintain an excess hydrostatic head Make sure that the fluid level is several feet above the water table to ensure an excess head in the borehole If the fluid level is not correct an unexpected coarse zone can take a large volume of fluid and the wall will collapse Reverse cumulation is normally used for large diameter over 30 inches holes such as large irrigation wells Permanent relief wells are often installed by reverse circulation because the well can be developed to a higher efficiency than with standard rotary drilling Theoretically in reverse circulation the maximum depth would not be limited The maximum depth without air assist is about 200 feet and with air assist is up to 400 feet b Rig Configuration Rig configuration for reverse cumulation rotary drilling Figure 5 17 differs from rotary drilling Hoisting and rotating the drill string procedures are similar but you must change the fluid circulating system All cuttings must pass through the drill string These materials could be granular large grovel and small cobbles Occasionally cobbles or small boulders that are too large to pass can be wallowed to the bottom of the hole When several large pieces accumulate in the hole you will have to pull the drill string and remove the rocks using an orange peel bucket or similar device Most reverse cumulation rigs are 6 inch ID and include items such as the
312. r if the unconfined aquifer is contaminated Rock aquifers should be considered for exploration only when soil aquifers are not present or when soil aquifers cannot provide a sufficient water supply Identifying suitable well sites in rock Older mountains SANS Cp River canyon Water flow between lava layers Present soil zone Lava gt Interlow zone Flows EE Silt and clay Coollng fractures Figure 2 17 Water flow through lava 2 15 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 aquifers is more difficult than in soil aquifers Water development in rock aquifers is more time consuming and costly and has a higher risk factor However in some areas rock aquifers may be the only source of groundwater Indicators of groundwater resources are those conditions or characteristics that indicate the occurrence of groundwater No indicator is 100 percent reliable for detecting groundwater but the presence or absence of certain indicators can be used as detection possibilities Indicators useful in identifying groundwater resources are called hydrogeologic indicators Table 2 3 Table 2 3 Hydrogeologic indicators for groundwater exploration Reservoir Indicators Surface Indicators Boundary Indicators Rock ype and geometry Springs and seeps Location of recharge areas tratigraphic Soil moisture Location of discharge areas Degree of lithification Vegetation type Impermeable barriers Grain size Vegetation density Semipermea
313. r or pump requires pulling from well 2 Sealing of electrical equipment from water vapor critical 3 Abrasion from sand Pump and motor submerged 2 Easy to frost proof installation 3 Short pump shaft to motor 15 to 20 feet 80 to 150 feet below ejector Up to 15 to 20 feet below ejector 1 High capacity at low heads 2 Simple in operation 3 Does not have to be installed over the well 4 No moving parts in the well 1 Capacity reduces as lift increases 2 Air in suction or return line will stop pumping Jet 1 Shallow well The amount of water returned to ejector increases with increased lift 50 percent of total water pumped at 50 foot lift and 75 percent at 100 foot lift Same as shallow well jet 25 to 120 feet 200 80 to 150 feet feet maximum 15 to 20 feet Same as shallow well jet below ejector x 2 Deep well Rotary 50 to 250 feet 1 Positive action 1 Subject to rapid wear if water 11 Shallow well 2 Discharge constant under contains sand or silt gear type variable heads 2 Wear of gears reduces x 3 Efficient operation efficiency 2 Deep well Usually 50 to 500 feet 100 to 500 feet 1 Same as shallow well rotary Same as shallow well rotary A cutless rubber stator increases life of pump flexible drive coupling has been weak point in pump be
314. railer mounted Portadrills models 501 and 521 The ITWD is an all wheel drive self propelled rig that can be shipped in a standard 8 by 8 by 20 foot IS0 shipping container The ITWD can also be shipped on a C 130 or larger aircraft without disassembly The machine is an all hydraulic top head drive unit with a telescoping mast capable of employing standard 20 foot drill steel The ITWD has a top speed of 10 miles per hour mph and is not designed for over the road mobility It is lightweight highly mobile and suitable for rapid deployment with Fleet Marine Force FMF engineer units The machine is compatible with the Service Logistical Vehicle Systems LVS See Table B 1 for specifications on the ITWD Table B 1 ITWD specifications Weight 25 000 pounds Heiaht mast raised 31 feet Engine type in line 6 cylinder liquid cooled 4 stroke cycle turbocharged diesel Engine collant capacity 11 1 quarts Maximum engine torque output 370 pound foot at 800 RPM Drilling capacity mud rotary techniques 12 inch to 1 200 foot hole down hole percussion 6 inch to 1 500 foot hole through rock formations Shipping dimensions 1 026 cubic feet We Perret PIS pulldown 13 000 pounds pullback 30 000 pounds rotary torque 60 000 inch pound The ITWD is capable of mud and air rotary drilling rotary percussion or down hole hammer drilling using an auxiliary air compressor A mud pump water inject
315. rated thickness e in gallons per day per foot of aquifer idth transpiration Water that Wrens to the atmosphere from plants tremie placement Placing gravel pack material using a tremie pipe tricone bit A bit that consists of three con shaped rollers with steel teeth milled into the surfaces turbine pump A shaft driven multistage centrifugal pump containing several impellers or bowl assemblies uncased interval method Installing casing in wells located in rock formations unconfined aquifer An aquifer that is partly filled with water has fluctuating water levels and can receive direct recharge from percolating surface water unconsolidated deposit Consists of weathered rock particles of varying materials end sizes unscreened well A well in competent rock that does not require a screen the aquifer is tapped through numerous irregularly spaced fractures US United States of America USAF United States Air Force USGS United States Geological Survey vegetation type Surface indicator that can help efine the location of recharge and discharge areas end groundwater viscosity Relates to true Newtonian fluids such as water viscosity is a proportional constant between sheer stress and rate in laminar flow Glossary 10 FM 5 484 NAWAC P 1065 AFMAN 32 1072 wall stuck A condition that exists when the alignment of a fine grained soil or shale hole deviates significantly and the drill pipe wallows into the wall
316. raulically driven wire line winches Mud pump On top head rigs the pulldown chains are used as the main hoist Many drill rigs have auxiliary hoists for handling pipe and other equipment and for bailing The bailing drum usually has less lifting capacity and a faster spooling rate than hoisting drums Bailing drums can spool several hundred feet of wire line which is sufficient to reach the bottom of most wells Auxiliary hoists may be powered mechanically or hydraulically rtable mud pit b Drill Bits See Table 5 2 page 5 4 for recommended rotating speeds for all sizes and types of bits in various formations Se d Figure 5 2 page 5 4 for bit selection Appendix E discusses characteristics and maintenance for drill bits Drilling rig Figure 5 1 Mud pump 1 Tricone Roller Bits These bits are best suited for brittle or friable materials The tricone bit consists of three cone shaped rollers with steel teeth milled into the surfaces Tooth locations are designed so that as the cone rotates each tooth strikes the bottom of the hole at a different location Drilling fluid is jetted on each roller to clean and cool it The cutting action is a progressive crushing under the point load of each tooth Roller bits designed for rock rocky soil gravel and soft formations shale have long teeth The bits for harder formations have smaller stronger teeth The gauge teeth on bits designed for very hard rock are reinforced with webs
317. rcussion type drilling rig sas se e 9 2 Figure 9 3 DiS usce deep ath a 2 bach a Eee RR Qha ya Be CRE eS 8 9 3 Figure 9 4 Cutting a casing sas sas sas sas e 9 4 Figure 9 5 Wellpoints 5 2 s s sz sz AT s ss sa sea sas sas sas sos ex 9 5 Figure 9 6 Drive point well sz se az sz sz sz s sa ss sas 9 7 Figure 9 7 Continuous slot drive points 9 8 Figure 9 8 Buttjoint _ _ h AR see sa sas sas sas D RR de ch EAR 9 8 Figure 9 9 Drive clamps 20 RA A RR a o Bs 9 9 Figure 9 10 Drive heads ett 9 9 Figure 9 11 Drive shoe 6 uw OR Aw ee sos as s s sas sos wn 9 9 Figure 9 12 Various pieces of well drilling equipment lt lt lt lt lt se 9 10 Figure 9 13 Pipe clamps x uoo RH AER ESHER ES BES Ee sas ee 9 10 Figure 9 14 Pipe joints eee BR B RB A 9 11 Figure 9 15 Alignment collar ooo e m Bn 9 12 Figure 9 16 Drive point ooo o sa sees 9 13 Figure 9 17 Drive monkey ccc ccc cc ccc eee eens AA 9 14 Figure 10 1 Unfrozen strata ss 10 1 Figure 10 2 Jet drive point o o o oak 10 4 Figure 10 3 Specific gravity of drilling fluids ew en 10 4 xvi FM 5 484 NA VFAC P 1065 AFMAN 32 1072 Page Figure 11 1 Core drilling equipment lt o ee ses ss e 114 Figure B 1 TWD machine r ss sa sa sees
318. re than one length of casing keep the borehole and EE lp E first length of casing full of water while attaching Figure 9 4 Cutting a casing the second pipe length and connecting the pump to the pipe Doing so maintains fluid pressure against the borehole wall and should prevent caving Step 6 Stop the pump and remove the cap at the top of the casing when the casing reaches the desired depth If the casing is permanent telescope a well semen through the casing until it rests on the bottom of the well Pull the casing up until the screen is exposed to the aquifer and cut the casing off at a point about 1 foot above the ground surface If the casing is temporary attach a well pipe to the screen before lowering it into the casing When the screen is resting on the bottom of the borehole pull the entire casing out of the borehole You can reuse this casing 2 Self Jetting Figure 9 5 shows the well point types needed in self jetting The continuous slot has a semen constructed of a narrow ribbon of metal wound spirally around a skeleton of longitudinal rods The brass jacket consists of a woven wire gauze wrapped around a perforated pipe and covered with perforated brass sheet The jetting head contains a spring loaded disk or ball type valve that opens when water is forced through during the jetting operation The valve closes automatically when jetting stops or the well is completed and pumping begins LA 71 1 2 female threads
319. re 2 11 page 2 10 2 9 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Land surface Land surface Potentiometric surface Water table Limits of cone of depression ZZN A N J S Drawdown Cone of depression y Confining bed it I i oQ G w o Confined aquifer Unconfined O Confining bed Confining bed Figure 2 10 Drawdown Measuring point top of casing Well 1 Well 2 t alt 100 m alt 98 Lada Distance 780 m l m Land surface 15 y m Head loss a 18m ae oe s Ee t HA s s 2 e Pressure e T round a o a S Z Unconfined aquifer water t gw o ll screen o tL We daia aiin movement E lt Bottom of aquifer gt O ul 2 Datum plane National Geodetic Vertical Datum of 1929 pe I Figure 2 11 Hydraulic gradient Darey s experiments show that the flow of water through a column of saturated sand is proportional to the difference in the hydraulic head at the ends of the column Darey s Law is still used as the basic principle that describes the flow of groundwater and is expressed as follows 2 10 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Q KIA where Q quantity of water discharged in cfs K hydraulic conductivity constant factor i hydraulic gradient in feet A cross sectional area in square feet g Aquifer Tests Groundwater aquifer
320. re effective in lifting the cuttings The lack of density and viscosity increases the particle slip so a continuous and high velocity up hole flow must be maintained to keep the hole clean An upward velocity of about 4 000 fpm is sufficient to clean 5 24 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 cuttings out of the hole Cutting removal also depends somewhat on size density and amount of cuttings Up hole air velocity is computed by dividing the output volume of the air compressor in cfm by the cross sectional area of the annulus of the hole in feet Air compressors are rated on the following items e Intake air volume e Condition Compressors wear with use causing capacity to decrease e Sea level Output volume capacity is reduced about 3 5 percent for every 1 000 feet above sea level Temperature Efficiency is reduced when temperatures are above 60 F and is increased when temperatures are below 60 F Rotation speed Output from the compressor is directly proportional to the motors RPM Do not operate a compressor at lower RPM to reduce wear Dry material drilled by air will create a large amount of dust when blown from the borehole Inject water to control the dust Depending on the nature of the material drilled the amount of water could be 1 2 to 5 GPM Water injection increases air density and improves carrying efficiency for the cuttings Adversely water can cause the cuttings to stick together making them heavier and
321. reducing or increasing fluid velocity you can stabilize the wall and regain fluid circulation However if you do not recognize the condition and you continue drilling the wall will slough and create a cavity The cuttings lose velocity become suspended in the cavity and tend to fall back into the hole when you add a rod This action can result in the rods or the bit becoming stuck in the hole Other problems can result from subtle changes in geology imbalances in the drilling operation or equipment failure 5 22 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 1 Lost Circulation Lost circulation refers to a loss in volume of drilling fluid returning to the surface The implication is that some fluid pumped down the drill pipe is entering the formations The mud pit will lower since some of the mud is used in forming a mud cake on the borehole wall however increased lowering can indicate circulation loss Losses can occur through open graded sand or gravel or open joints in rock A loss can occur when cuttings are not washed out and the borehole annulus becomes restricted resulting in increased down hole pressure Spudding raising and lowering the drill string the hole too violently can cause loss Spudding helps wash cuttings but down hole pressures increase momentarily Experienced drillers can estimate when spudding is safe When fluid cumulation is lost and a driller continues to drill he is drilling blind An experienced driller that knows the
322. ressure on the water in the well then forces the water up through the suction line into the pump The atmospheric pressure is the only force available to lift water to the pump At sea level the force is about 14 7 pounds per square inch psi about 34 feet of water The maximum is never reached because pumps are not 100 percent efficient and because other factors water temperature and friction or resistance to flow in the suction pipe reduce the suction lift Since a partial vacuum is required in the suction line the line must be airtight if the pumps are to function properly Threaded joints must be carefully sealed with pipe joint compound and all connections to the pump must be tight 4 1 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Table 4 1 Guide to pump selection Practical Suction Well Pumping Pressure Lift 22 to 26 feet Advantages Disadvantages Remarks 1 Best suited for capacities of 5 to 25 GPM against moderate to high heads 2 Adaptable to hand operation 3 Can be installed in very small diameter wells 2 inch casing 4 Pump must be set directly over well deep well only 1 Pulsating discharge 2 Subject to vibration and noise 3 Mainteriance cost may be high 4 May cause destructive pressure if operated against closed valve 1 Positive action 2 Discharge against variable heads 3 Pumps water containing sand and silt 4 Especially adapted to iow capacity and
323. rging for several minutes Pull the plunger out of the well and lower the bailer or sand pump into the screen When the bailer rests on the sand that has been pulled into the screen check the depth of the sand by measuring on the sand line Bail all the sand out of the screen e Step 4 Repeat the surging operation and compare the quantity of sand with the first quantity Bailout the sand FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Drill stub Leather valve disk DON Y SS SRN SX TAWA P VE TPZ LL aX Figure 7 2 Surge block e Step 5 Repeat surging and bailing until little or no sand can be pulled into the well Lengthen the period of surging as the quantity of sand removed decreases f Compressed Air Methods Compressed air provides rapid and effective development of wells using an open or closed well method You can use the standard 350 cfm compressor for developing most wells at a pressure of at least 100 psi However a higher pressure is preferable The 250 cfm compressor will pump wate submergence and size of the pipes you use r by air lift from 100 to 150 GPM depending on the Table 7 2 page 7 4 shows the recommended sizes of pipe and air lines and the pumping rates you should use for various sizes of wells 1 Open Well Method The surging cycle is established by pumping from the well with an air lift and by dropping the air pipe suddenly to cut off the pumping This cycle
324. ric Well Logs T S Morris Water Well Journal May June 1952 The Quantitative Aspects of Electric Lag Interpretation J E Walstrom Trans Am Inst Min and Met Engrs Vol 195 1952 Well Drilling Manual National Water Well Dublin Ohio ISBN 0 318 15937 6 Well Drilling Operations National Water Well Dublin Ohio ISBN 0 318 23051 8 Well Site Geologists Handbook Donald McPhater Tulsa Oklahoma ISBN 0 87814 217 References 4 6 190 8 97 w104 00 3 NOILVIAYO3 JO 3d AL STVILINI sS u31Tuug Su Vvi3a5Nimma s S3A 1 amp C SW VIAL Y IdAL IZIS Lig YILVM YU STVILINI Q SAILVNIOYOOD Pp YIGINNN 133H gt S IYU3TUYO JO 3IWVN ep LINN DNITUYO E EAM AYINNO e 907 S YITUYO NIM YIGINNN TIM HO 31111 103fOUd 1 5 DRILLING DETAILS Continued e 2 id S a REMARKS TYPE OF FORMATION Y lt E z DD Form 2678 OCT 93 BACK 6 120 6192 u103 qq q INIL 32V 1d NI 3WIJ 31 VQ S1VILINI SyuaTiig SUV13I0 5NITIIsG 9 ISN GNV 3ZIS Jdid S S IVITUYO 3O 3WVN ey S31VNIGNOO2 P YISWNN 133HS YIINWNNYIMOL YIGANNNTIIM L 907 ONISVD GNV 9NIdid WDVG 6 120 6297 w104 qq u YOLVIIONI LHOISM JALLVINWNS LHOIM Jdid H2V3 LHOISM IALLVINWASD H19N31 p T Jdid H2V3H19N11 IWIL IDV 14 NI 3WIL 31VQ STVILINI SIVITUYO p nunuo2 SUVLIO ONITUYO 9
325. rock stop mud rotary drilling install casing to the rock layers use a down hole air hammer The objective is to produce a hole quickly and efficiently Be careful that you do not 5 5 A NUR d SOUL QUU EURIBOR e lt eim T A N Ar ow a MINIMA LAA wa h P a IU UE uic WWW WM y iet y E Sle Q ATEN IUI Ld N gt e ae te L FM 5 484 NAVFAC P 1065 AFMAN 32 1072 penetrate too quickly Producing cuttings faster than you can remove them can cause serious problems such as the drill string sticking in the hole excessive completion delays and loss of equipment and the hole 2 Weight on Bit Adding weight on the bit increases the torque required for rotation Too much weight can cause excessive penetration and produce cuttings that are too large and heavy Large cuttings are difficult to wash out and may cause gumming and premature failure of the bit Insufficient weight reduces or stops penetration and can produce fine cuttings In cohesive soils fine cuttings may thicken the drilling fluid and fail to settle in the mud pit How weight is applied can also cause serious alignment problems and difficulty in well construction Rotary drilled boreholes spiral slightly and are seldom straight Once spindling occurs weight added by pulling down with the drill rig bends the string and magnifies the deviation You should never use the ch
326. rom a well and is that part of the water that would drain under the influence of gravity Figure 2 8 The S and S percentages compared to porosity indicate how much water can be developed from a rock formation Table 2 2 Specific yield and retention percentages values in percent by volume Material Porosi Yield Retention Ssa OU 55 40 15 Water Water retained as a film on rock surfaces and in capillary size openings after gravity drainage Sr 0 1 m Granular Material Sy 0 2m n Sy Sr o2nr 0 inf z 0 30 im in Fractured Rock Figure 2 8 Specific retention 2 8 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 d Transmissivity Although hydraulic conductivity measures the relative flow of water through a subsurface material the results may not be an accurate measurement of the yield that can be obtained from the material The inaccucy exists because hydraulic conductivity does not account for the thickness of the water bearing unit aquifer For example a well in a 100 foot thick aquifer will produce more than a well in a 10 foot thick aquifer provided both aquifers have the same permeability Hydraulic conductivity y is the water transmitting capacity of a unit of an aquifer see Figure 2 9 A Transmissivity is the water transmitting capacity of a unit prism the saturated thickness of the aquifer and usually is expressed in units of gallons per day per foot of aquifer width see Figure 2 9 B Wells in h
327. roperty of permeability is related to porosity In qualitative terms permeability is expressed as the capacity of a porous rock or soil to transmit a fluid Large interconnected pore openings are associated with high permeability while very small unconnected pore openings are associated with low permeability Sand and grovel with large interconnected pore openings have high porosity and permeability Clay tends to have high porosity but the very small openings tend to inhibit the passage of water Therefore clay displays low permeability Table 2 1 Porosity percentage values in percent by volume Material Primary Openings Secondary Openings Equal size spheres marbles o Loosest packing 48 o Tightest packing 26 55 Soil Gee 20 5 5 Limestone 3130 2 10 Sandstone semiconsolidated 10 2 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Primary Openings Porous material Well sorted sand Poorly sorted sand lt 7 Secondary Openings OS WK SASS A Fractured rock Fractures in granite Caverns in limestone Figure 2 5 Primary and secondary openings Hydraulic conductivity is a measurement of the capacity of rock or soil to transmit water The higher the hydraulic conductivity the faster the water will flow at a given pressure Figure 2 6 Hydraulic conductivity is related to the size and spacing of particles or groins in soils or to the number
328. rtant especially in rock aquifers The ability of rock aquifers to transmit groundwater is related to the number and size of fractures in the rock Density of fractures is an important consideration in locating well sites in rock terrain Figure 2 24 shows a structure map of part of western Iran The best potential well sites are located at the intersection of fracture zones Secondary sites are along individual fracture zones Areas with no fractures are probably low permeability areas and poor sites for water wells P a L Z Anticline arrow shows plunge A syncline x j 4 Thrust fault teeth on upper 4 7 plate other faults Z J ZZ i x Lll K he A gt x f 17 x ps 7 L X O Primary well sites ot 5 _ e IL Figure 2 24 Structure map of western Iran O Secondary well sites 2 22 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Fracture orientation is an important characteristic of rock aquifers and of soil aquifers Faults may act as either barriers to or conduits for groundwater flow To distinguish between fault conduits and fault barriers vegetative indicators are important If a fault zone is acting as a barrier to groundwater flow groundwater accumulates behind the barrier and often becomes shallow enough to support springs or dense stands of vegetation or it forms wetlands Figure 2 25 4 Recharge area Fault direction i l ae e MS V hee E d dr Se o A NE ILL o Figure 2 25
329. ruck mounted with a 1 000 gallon water tank a hydraulically driven water pump an electric fuel pump and fuel dispensing nozzle a welder generator assembly and an electro hydraulic crane page 3 7 The support vehicle has a storage area for transporting drill steel pipes collars hand tools and operating and accessory equipment for the drilling machine and the well completion kit The support vehicle provides hoisting winching pumping welding generating burning and storing requirements to support field drilling operations Because of these provisions additional equipment needs are reduced in a well drilling operation For operations and maintenance procedures see TM 5 3820 256 10 Model LP 12 Manufacturer George E Failing Company FM 5 484 NAVFAC P 1065 AFMAN 32 1072 IP ALA i rn GET Jr i j y TE S IN Set EE ES S T O HHE E ES Model Rig tender truck entoces George E Failing Compan Fuel tank capacity 230 gallons ength 33 feet 9 inches Waterbed capacity 1 000 gallons Width 8 feet Fuel tank truck 200 gallons Height 8 feet 5 inches Hydraulic reservoir 7 5 gallons o FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Figure 3 2 Support vehicle 3 Well Completion Kit This kit consists of equipment needed to complete a 600 foot well It consists of polyvinyl chloride PVC well casing and screens a submersi ble pump with starter electrical wire
330. s Some recharge occurs in mountain areas as direct infiltration The precipitation that does not infiltrate runs off into the local drainage network Some recharge occurs along the streambeds and the remaining runoff discharges on the alluvial fans where it infiltrates Precipitation over the valley floor is channeled and quantities of recharge occur along the valley drainage system Various amounts of recharge are derived from lakes ponds or channels that may occur within the basin The recharge of groundwater from surface water sources usually results in a mound bulge in the surface of the groundwater Figure 2 29 Groundwater in such areas flows away from the recharge sources If the source is a lake flow is radial away from the source If the source is a linear source mountain range or a stream the groundwater divides and flow is primarily in two directions from the source Areas recharged by direct infiltration or precipitation usually contain 2 26 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Basin boundary ever 00008 en eoe qee LA ani Z ttt aay Sittin ITTA a N e N 77 7777 o Are e E Ss Sn e NN AN NSE see R afe S Cee V ee NN NN S W Y eres SEEN NAT Basin boundary Recharge from lakes SSS Recharge from subsurface groundwater flow WX Recharge from precipitation in mountains ros Recharge from infiltration along alluvial fans Figure 2 28 Hydrographic basin with recharge areas good qu
331. s 1 ee se sr sa sas t B ss ose 1 3 AMY sh or aa t AAA ee aC Se Oe we 1 3 nrc TT 1 3 A Ir Foie MER sas A A ADA BE SS wee OEA 1 3 Chapter 2 Groundwater 2 1 FundamentalS ss ts ee ee eee 2 1 2 2 Hydrologic Cycle 54 4444 eth S om nos 2 1 Recharge and Discharge o t n n nn 2 1 Water Storage eee o o m m rt et ee 2 1 2 3 Groundwater Occurrence ee ee ee ee nn 2 1 2 4 Geological Setting sas sa sa sas te B B B B B 2 3 Unconsolidated Deposits Soil ne 2 3 Consolidated Deposits Rock s s sess tt ss nnn 2 5 2 5 Groundwater Hydraulics 1 ee s s ss ss sas n nn 2 5 Baag lt 2 z y woy so BS E at EY EE ee ee ee SS 2 5 Permeability uu u zu a pa a Oe hi kup OCA ede eh S 2 5 Specific Yield and Retention sa sa sas ss ses se es 2 8 TransmissiVity 4 t ee ee RR wee 2 9 Yield and Drawdown cc 1 eese s a sas sa sas 2 9 Hydraulic Gradient yv oe he AR Rowe cy RS 2 9 Aduifer Tests se sasan ALES Ro Rae pu or StS apos AAA 2 11 2 5 Rr ve ara a uama Sua A E SQ Eod es 2 11 Unconf ed ssa yy u ls SE AAEM aS RE e EE S Se CR Ia 2 11 eT aT Z ek hw Sh EE OSE OE OEE OVO Ge CES UE 2 11 Perched ia dw bo a aO ee u ee kaq QW A BGR SS SS 2 11 Catchment opcs a acd s G 9 b EE ee ee Rode Se And 2 12 ii FM 5 484 NAVFAC P 1065 AFMAN
332. s do not have an organic headquarter Well drilling teams should be deployed and employed by an engineer headquarters capable of providing equipment 3 1 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 maintenance administrative and logistical support Water wells are engineer construction projects and must be planned researched managed inspected and reported just as other projects are The unit that the well drilling team is attached to should provide the team with construction field or tactical standing operating procedures SOP The team should report well drilling progress and procedures according to the SOP The well drilling project should be managed by the critical path method CPM The well drilling team s commander must coordinate and work closely with the construction or operation officers of the higher headquarters unit to ensure timely researching and reporting When well drilling teams complete the well drilling mission they turn the well over to the operations officer S3 for disposition The team then moves to the next project The 53 arranges transfer of the completed well operating equipment and technical specifications to a water purification team an installation or a host nation official Well drilling teams will be in great demand in most TOs Teams may not be able to return to a well site to perform repairs and keep up with the anticipated work load The senior engineer will have to set priorities for the team s w
333. s many mixing barrels as the job requires If a concrete mixer is available mix batches and dump them into a storage vat for future use You can force grout into place using pumps or air or water pressure In some cases you can place grout using a dump bailer If you use the tremie methods you will need one or more strings of pipe with small diameters Other equipment you may need to place grout are a mixing tank hoses and a feed hopper a Dump Bailer Method With this method you can place grout simply and with a minimum amount of equipment On the dump bailer the bottom valve opens and the operator can unload grout at a specified location This method works best when you need to grout only the lower portion of the casing Use the following procedures to place grout e Step 1 Run the casing in the hole and mix enough grout to fill the lower 20 to 40 feet of the hole A quick method of mixing the grout is to put the required amount of water in a barrel and circulate the water using a high pressure jet while adding cement Step 2 Place the grout inside the casing with a dump bailer Step 3 Lift the string of casing 20 to 40 feet off the bottom depending on the amount of grout placed The lower end of the casing should be below the top of the grout Fill the casing with water and cap the top e Step 4 Lower the casing to the bottom of the hole to force most of the grout up the annular space outside of the casing Do not uncap t
334. s method in warm or discontinuous permafrost The wells are usually 2 inches in diameter and are drilled to a depth of 200 feet Use the procedures and equipment described in Chapter 9 to construct the wells Ihe equipment is simple and light and consists of small derrick and a small engine with a cathead You push the pipe into the ground and advance it manually dropping a small weight fastened to a line running over a sheave on the derrick to the cathead The jet point is made from a reducer which is ground into a bullet shape and attached to the end of the 2 inch pipe Drill several 1 4 inch holes above the jet point a distance of 1 to 2 feet A thaw line pipe projects a maximum of 2 feet through the head of the drive point Pump a water jet through the thaw line pipe during drilling operations Suspend the pipe on a simple chain hoist and slowly move the pipe up and down The thaw line pipe will penetrate the sediments ahead of the jet point When the thaw line pipe is about 2 feet ahead of the jet point retract the pipe The casing is driven as far as it will go repeat the process Use water no warmer than 40 F in this process Jet drive drilling proceeds about three times as fast in permafrost as in thawed ground Se urea page 9 2 for a rig you can use in Arctic well drilling Figure 10 2 page 10 4 shows a jet drive point you should use with the rig For depths of 100 feet or less one man operating a rig can jet drive about 28 feet per
335. s not fully hydrate as quickly as bentonite Mix the polymer very slowly through the mud gun a minimum of four hours before using for more complete hydration The fluid will thicken as hydration continues so do not mix to the desired viscosity Some polymers possess physical qualities that can result in unusual hydration gelling and viscosity Follow the manufacturer s recommendations for hydration Factors that affect the viscosity are quality of polymer concentration and size of colloid metallic ions in mixing water temperature rate of shear and pH Water is the primary building block for drilling fluids Water quality affects the overall performance of drilling fluids The action of bentonite in water is seriously impaired by dissolved acids or salty substances Acidic water usually contains dissolved metals that cannot be used unless treated Hard water affects the suspending and sealing qualities of bentonite You can test the pH level by using paper pH strips The pH level should be 8 to 9 If the water is too acidic treat it with 5 10 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 soda ash at a ratio of 1 to 5 pounds of soda ash per 100 gallons of water Following treatment retest the pH level as before Do not use water from wetlands swamps or small ponds for mixing drilling fluids because the water may be contaminated If you use water from these sources chlorinate the water before making the drilling fluid Be careful because chlorine re
336. s often correspond to zones of poor water quality Generally the longer the distance between the recharge and discharge areas the poorer the water quality at the discharge area The water quality reduction is from the contact between the groundwater and the 2 35 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 aquifer material during flow Water consumption by plants often results in decreased water quality by the concentration of soluble salts in the groundwater In very shallow groundwater less than 10 feet below land surface water quality can be decreased by direct evaporation of water from the soil Vegetation type can be used to infer groundwater quality characteristics Saltbush around playas indicates not only the presence of shallow groundwater but also the probable occurrence of saline water which would require treatment The high evaporation rate in arid environments concentrates chemicals in the water resulting in brackish or saline water quality b Saltwater Intrusion Saltwater intrusion into fresh groundwater is a problem in coastal areas and on islands Saltwater is unfit for most human use and is harmful to automotive cooling systems boilers and other types of machinery Chemical analysis determines the accuracy of contamination and salt levels The average concentration of dissolved solids in sea water is about 35 000 parts per million ppm 3 5 percent Most salts are chlorides When salt water and fresh water are present in sed
337. screen required at one tenth foot per minute of velocity with a slot opening of 0 040 inch a wire size of 0 092 inch and a pumping requirement of 800 GPM SA t OD 12 3 14 12 12 452 16 square inches _ 80 go 0 040 SO WD 0 040 0 092 TA SA OA 452 16 0 3030 137 square inches TC TA 0 31 42 47 GPM OA 100 30 30 percent c Diameters The diameter of the well screen usually corresponds to the diameter of the well casing If you are considering alternative diameters consider the following e Increasing the screen diameter to increase the yield or capacity of a well The increase is not proportional e Doubling the diameter of a well screen increases the capacity of the well by about 10 percent Using a larger diameter screen if the aquifer is thin or the pump is large Using a long screen with a smaller diameter in a thick aquifer for better performance s Increasing the length not the diameter of the screen to increase the yield of a well in a thick aquifer d Slot Sizes You should understand the function of slot size in well construction When possible choose the screen slot size to fit the gradation or grain sizes of the aquifer Sand and gravel interaction greatly affects the development of the formation around the screen Small openings limit well yield Also small slot sizes produce high velocity in the water passing through the screen In time scale or incrustation tends to form
338. se 75 percent of the mast capacity leaving 25 percent for breakout 3 8 Drilling Fluid If you use rotary drilling with mud connect or place the suction line of the mud pump in the mud pit and fill the pit with water Close the standpipe valve and prime the mud pump Mix the drilling fluid in the mud pit by slowly circulating fluid through the mud pump and adding drilling mud to the mixing hopper Figure 3 13 The drilling fluids usually used for mixing mud are a Wyoming type bentonite drilling additive Quick Jel or an organic or inorganic polymer fluid Revert or E Z Mud Mix the additives until you reach the desired weight and viscosity for the drilling mud Chapter 5 details mud mixing 3 9 Well Drilling Operations Before you start drilling you must select a drill bit Consider the well diameter and the type of formations you will drill through The types of bits are e Drag bits Use these bits for soil unconsolidated materials usually found near the surface e Tricone roller rock bits Use these bits for a variety of materials from soft formations through hard rock Figure 3 14 The bits are available in different degrees of hardness Bits used for softer formations have longer teeth on the roller cones Roller Type Figure 3 14 Drill bits 3 15 FM 5 484 NAVFAC P 1065 AFMAN 32 1072t a Starting the Operation The first operation is spudding in starting the borehole Before you start dr
339. signaled by the drill sticking which retards downward movement and affects bit load and drilling energy The sound of the drill indicates this problem Apparent change in the air return cuttings returned from the annulus and other indicators learned from experience also indicate an accumulation problem Detrimental effects of inefficient cutting removal include reduced penetration rate damage to the formation by fracturing induced instability in the hole wall damage to or even loss of drilling 5 31 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 equipment and loss of the borehole Accumulation may be caused by insufficient drilling air volume a percussion drill not suited for the hole a sudden influx of groundwater or too rapid a penetration rate large load of cuttings The alert driller will sense a problem before it seriously affects the operation Keep the hole and blow out all cuttings before shutting off the air to add another rod By raising the drill slightly the bit is extended in the splines open piston the percussive action stops drill bit penetration production of cuttings stops and maximum air passes through the drill to clear cuttings from the borehole The alert and efficient operator will use this technique as conditions dictate The down hole percussion drill is designed to operate in extremely unfavorable conditions The service life can be dependable with proper care Lubricate the drill during operation Use the manufact
340. sing and screen as one assembly Figure 6 7 53x shows a single string assembly equipped with fittings for 5 the washdown method You can omit the washdown farenin fittings if the hole stays open at the bottom Use the Kee following procedures to install the assembly Au o DESEAS e Step 1 Attach couplings to the top of the casing piere E s and screen section Install a sand trap to the eS gt bottom of the string ES e Step 2 After running the entire string into the ASS borehole use casing elevators to carry most of the weight of the string until the formation collapses in around the screen Step 3 Run the drill pipe inside the casing to the bottom of the screen and pump water into the well to displace the drilling fluid Step 4 Raise and lower the drill pipe to wash A TUE x A AS DOLE ete etat eg E oe ope rie a bl dr ee gt Bail bottom Pata z E Seem L A EA the full length of the screen Figure Ec nio Step 5 Wait for the formation to settle around installation method the screen Proceed with well completion and development For deep wells and wells requiring surface casing you can use the following modified telescoping procedure e Step 1 Grout the surface casing in the borehole before you drill the well to the final depth e Step 2 Use the single string method inside the surface casing while bringing the inner casing
341. slow lopsided wear on the carbides will occur Figure E 12 shows a bit that has been rotated too slowly The button is barely out of the impression it made with the previous impact when it is struck again Undue wear is caused on one side of the button creating a point on the carbide When the point is sharp enough it chips or portions of the button break away Figure E 11 Plugged bit Figure E 12 Wear on bits from slow rotation E 3 Reconditioning The following lists some suggested equipment necessary for proper bit reconditioning e A bit grinding stand and a vitrified silicon carbide wheel that is 1 inch by 1 inch in diameter and rated at 25 000 RPM An I R DIR DG121 grinder or its equivalent e Safety glasses hard hat ear protection and gloves You must restore the original shape of the button when regrinding To come close to this shape draw a pencil line down the center of the flat on the gauge button Figure E 13 A Using the line as a guide grind the button on both sides but leave the pencil line Bd Figure E 13 B Leaving the pencil line ensures that the reground bit carbide will be concentric to the bit Shank When concentric the carbides carry an equal share of the load Also leaving the pencil line prevents you from grinding away too much carbide thus extending bit life Finally blend the mtouched line area Figure 13 O When finished the button should look almost new Figure is a diagram
342. slows the passage of water AR Army regulation Ark Arkansas ARTEP Army Training and Evaluation Program attapuigite Commercially pio es clay used for drilling in brackish or salty water ATTN attention augered well A well that is bored using hand or power driven earth augers AWWA American Water Works Association backwashing Well development method See also jetting method gravity outflow method pressure pumping method pump surge method surge block method ball down method Installing screen using a special end fitting bail down placement A method of simultaneously placing the gravel pack and installing the screen Barafos A white granular sodium tetraphosphate thinner and dispersant added to drilling fluid to prevent mud from sticking to sand grains barite Commercial chemical agent added to mud drilling fluid to prevent it from freezing See also aquagel fibratex gel flake impermex micatex smentex Wear pattern that causes the diameter of the bit body to exceed the gauge diameter of the buttons basalt An igneous rock that is a very productive water bearer FM 5 484 NAVFAC P 1065 AFMAN 32 1072 bentonite Commercially processed clay used for drilling bentonite forms naturally from decomposition of volcanic ash consists of ageregates of flat platelets and contains sodium montmorillonite which is important in building viscosity body metal A type of bit failure body wash Eroded body metal in
343. source of groundwater from rock c Shale Shale is fine grained does not usually store much groundwater and does not transmit large quantities of groundwater Where fractured shale generally can only produce a few gallons per minute However identifying shale units is important because shales could indicate that artesian conditions exist in more productive water bearing units below or between shale layers d Evaporites Evaporites are generally capable of storing and transmitting groundwater but tend to dissolve in the water Groundwater from evaporites is often unfit for human consumption and often not fit for any use Because of the poor water quality evaporites are generally considered to have poor potential for development Because evaporites can dissolve in the water during drilling immediate surface areas could collapse and men and equipment could be lost Special protective measures must be taken when developing a well in evaporites 4 Alluvium groundwater is most readily available in areas under soils unconsolidated sediments This is largely because uncemented or slightly cemented and compacted materials have maximum pore space are relatively shallow and are easily penetrated Soils deposited by running 2 17 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 water are called alluvium Alluvium has been formed in relatively recent geologic time and is generally restricted to lowland terrain features such as alluvial valleys terraces a
344. ssor is adversely affected by wear within the compressor and the elevation and ambient temperature Choke Size inches EET 36 5 6 Energy output bak any drill is directly proportional to the air pressure delivered to the drill Table 5 8 The percussion drill reacts to a pressure differential between intake and exhaust The pressure delivered to the drill is somewhat less than the gauge pressure at the compressor because of friction loss in the plumbing pressure in the borehole increases with depth because of friction and the load of cuttings and water Increased pressure in the borehole reduces the effective pressure differential cross the drill You can calculate friction losses in plumbing and pressure at the bottom of the hole but the calculations are not very useful When drilling you can hear the hammer operating in the hole when it reaches the bottom If the hammer fails to start operating do not let the bit rotate on the bottom of the hole because you could destroy the buttons c Procedure Attach the percussion drill to the drill string or drill kelly and lower the drill until the drill sets on the material Extend the drill bit open position in the splines If you apply air with the drill bit extended the air blows directly through the drill and the drill does not function the piston is not actuated Weight applied on the drill must be sufficient to push the drill bit into the drill closed position and hold it closed W
345. st 600 feet the Figure 3 11 Raising a drilling rig mast kelly draw works must be rigged with a double block to create a three or four part line Figure 3 12 Using the sheave block provides a mechanical advantage that allows heavier weights to be lifted By using sheaves the load is supported by two or more lines This provides two or three times the tensile strength used to hold the load Also using more lines allows the winch to pull on the first layer of the cable on the drum which increases the capacity and saves wear on the chains Table 3 4 is an example of Figure 3 12 For more information on drill rig setup see the operator s manual for the drilling system you use Figure 3 12 Draw works and mast loads DANGER You must wear protective eyeglasses and protective clothing when using down hole hammers during drilling operations 3 14 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Table 3 4 Draw works and mast loads example Required Equipment sounds feet pounds 74 piece drill steel 212 15 688 1 drill collar 1200 2 16 888 ddilbt a00 O 17 188 45 000 pounds gross mast capacity with 2 lines and no sheaves 22 250 pounds on each line 45 000 pounds gross mast capacity with 3 lines and 1 sheave 15 000 pounds on each line 45 000 pounds gross mast capacity with 4 lines and 2 sheaves 11 250 pounds on each line The winch is rated at 15 000 pounds on the bare drum When calculating static load u
346. st adapted for low capacity and high heads 2 Only one moving pump device in well helical rotary type submerged except no gear wear L Practica suction life at sea level Reduce lift 1 foot for each 1 000 jeet above sea level 4 2 a Pitcher Pump This is a surface mounted reciprocating or single acting piston pump Figure 4 1 The pump has a hand operated plunger that works in a cylinder designed to be set on top of the well casing The suction pipe screws into the bottom of the cylinder The plunger has a simple ball valve that opens on the downstroke and closes on the upstroke Usually a check valve at the lower end of the cylinder opens on the upstroke of the pump and closes on the downstroke continuous upstroke and downstroke actions result in a pulsating flow of water out of the discharge pipe By lifting the pump handle as high as possible the check valve lower end of the cylinder will tilt when the plunger is forced down on top of the valve Tilting the check valve allows the pump and suction line to drain Figure 4 1 Pitcher pump Meshing teeth form a seal that forces water into discharge line To reprime the pump after draining pour water in the cylinder from the top of the pump To maintain the pitcher pump renew the plunger check the valve leathers and clean the suction pipe Clean the suction pipe when it becomes clogged with sand gravel or other material The pump will be noisy a
347. stems Inc St Paul Minnesota ISBN 0961645601 1989 Percusion Drilling Equipment Operation and Maintenance Manual Catalog no M500 2 Mission Drilling Products Division TRW Energy Products Group Houston Texas Techniques of Water Resources Investigations of the United States Geological Survey Applications of Borehole Geophysics to Water Resources Investigations Book no 2 US Geological Survey Arlington Virginia The Button Bit vs The Rock Publication Form no 769 1 Ingersoll Rand Company Roanoke Virginia Water Well Manual U C Gibson and R D Singer Premier Press California 1971 DOCUMENTS NEEDED These documents must be available to the users of this publication DD Form 2678 Well Driller s Log October 1993 DD Form 2679 Piping and Casing Log October 1993 DD Form 2680 Military Water Well Completion Summary Report October 1993 DA Form 2028 Recommended Changes to Publications and Blank Forms February 1974 DOD Defense Mapping Agency Catalog of Maps Charts and Related Products Part 3 V FM 5 250 Explosives and Demolitions 15 June 1992 EM 5 410 Military Soils Engineering 23 December 1992 TM 5 545 Geology 8 July 1971 TM 5 818 5 Dewatering and Groundwater Control 15 November 1983 w change 1 June 1985 TM 5 3820 256 10 Operating and Maintenance Instructions for Drilling System Well Rotary Truck Mounted Air Transportable 600 Feet Capacity Model Number LP 12 15 March 1989 w change 1 1 S
348. supplies A water well is easy to seal from natural contamination and to protect from clandestine contamination Short term droughts have little effect on groundwater which can be depended on when surface sources dry up 2 3 Groundwater Occurrence The hydrologic cycle exists on global and local levels By understanding the local hydrologic cycle it is possible to predict the directions and rates of groundwater flow to identify groundwater resources and to select development areas An area drained by a stream or river is a drainage basin For example the Mississippi River Basin includes 2 1 FM 5 484 NA VEAC P 1065 AFMAN 32 1072 K T N A C C Cf T on v Rain cloud J A ON NN r ev Cloud formed by condensation of water vapor 3 AU ur y w uw Evaporation yor Infiltration mh MI ete S55 tan nar 9 GT PE X ALAS SLB Water table erre regnr Te VET AMEL RRIAT e Percolation um E apes a m Gu Q a s s s s s s s amm mm um s A s a am ep jam AAA Se Centuries Groundwater Milennium Figure 2 2 Water flow from recharge to discharge areas most of the area between the Rocky and Appalachian Mountains Figure 2 3 Major river basins can be subdivided into smaller basins The Missouri and Ohio River Basins are regional subdivisions of the Mississippi River Basin These subdivisions can also be divided into local drainage basins hydro
349. sures up to several hundred psi mud rotary drilling A well drilling method that uses mud to circulate the drilling fluid during the drilling process N no N A not applicable NATO North Atlantic Treaty organization NAVFAC Naval Facilities Engineering Command NBC nuclear biological chemical NCF naval construction force NCOIC noncommissioned officer m charge NMCB naval mobile construction battalion No number NSN national stock number OD outside diameter ohmmeter An instrument on the electrical TRES system that is located directly above the C DJUST the ohmmeter indicates the earth resistivity in ohm feet open hole method of installing casing Installing casing into a borehole one casing section at a time open hole method of m screen Installing telescoping screen when the depth and thickness of the aquifer have been predetermined open hole placement A method of installing eravel pack material m a well Glossary 6 open pipe method A procedure to measure discharge rates using a fully open pipe and measuring the distance the water stream travels parallel to the pipe at a 12 inch vertical drop open well method A compressed air method that involves establishing the surging x by pumping from the well with an air lift and b dropping the air pipe suddenly to cutoff the pumping action outside tremie method Placing grout outside the casing using a tremie pipe this method is not recommended for depths greater than 10
350. sz sa Cx CR sos se ea 7 8 Sealing Casi uidere he as UC A S SW 8 rr peek qa ats Bh 7 8 Disinfection uo dv 07 Uu Q AC SCR he cd amp ee se Boe TOS HESS 7 8 Cathodic PIOIECHOl uu ly Su de Re qo dic oe ee dio 7 9 Well Head and Collar o c cs sss 309 RG AS Na Soin OR ee CR PUE OR a 7 9 7 5 Well Completion Report o sa sa sa s a 7 10 vi FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Page Chapter 8 Well Performance Testing Procedures 8 1 Testing Pumps e qae ORR FN sas cb er decas 8 1 Permanent Wells usv 9 amp us kuya O de AE diode E vii oni A 8 1 Temporary Wells 4 4 lo u suytu Er doe uxo a s UU Ee Logd No dos 8 2 Methods lt 64 S Saam upan E a 2 2 2 p Q T we ee E os DG TUTTI 8 2 8 2 Measuring Water Level ss sa sas sas sas oas res 8 4 El ctric Lin Meth d o uo ge ya sS he EAA EEE bu SG SS 8 4 Tape Method Gu eee A ce Saa Ae BSS AA SUN ee d n 8 4 Airline Method ito u WAR e Ps ES SS Ee do Ro p USO SS 8 4 8 3 Measuring Discharge Rate _ 1 0 ss sa sas ss sas e 8 5 Measured Container Method 8 5 Flow Meter Method ee a s a 8 5 Circular Orifice Method saua 8 5 Open Pipe Method 0 ce ee a sa sa se sa nnn 8 6 PART THREE SPECIAL CONSIDERATIONS Chapter 9 Alternative Well Construction 9 1 Fundamentals _ C a SEER OA Soe ee ra sa sas ep es 9 1 9 2 Jetted
351. t t gv nS dL PM LEE DU L A RT A FIA fv t tatur KRA IM DEDE s EIS Cen o ee Pa Figure 6 9 Screen fittings for washdown installation e Bail Down Method With this method vo need special end fittings for the screen Figure 6 10 page 6 14 shows an assembled bail down shoe in the bottom of the screen The bail down shoe has a special nipple that has right and left hand threads and a coupling with right and left hand threads Figure 6 11 page 6 14 shows a shoe with a guide pipe that extends below the screen Use the following procedures for the bail down operation e Step 1 Start the operation after you sink the well casing to its permanent position The casing s lower end should be slightly below where you install the top of the screen 6 13 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Left hand threads Self Closing Bottom Right hand threads Special nipple Left hand threads Special coupling Right hand threads Bail Down Shoe with Balling Pipe Connection Figure 6 10 Assembled bail down shoe e Step 2 Assemble the bail down shoe special nipple and special coupling in the bottom of the screen e Step 3 Screw a length of n pipe into the right hand alf of the special coupling This pipe which will extend up through the screen is called the bailing pipe or conductor pipe Step 4 Screw one or more packers to the top of the screen Step 5 Lift the whole assembly by th
352. take area as the brass jacket type All drive points have steel point bottoms and pipe shank tops The brass jacket types have steel points with a widened shoulder to push gravel or rocks aside and reduce the danger of ripping or puncturing the jacket 2 Drive Pipe Standard drive pipe is furnished in 6 and 8 inch sizes with the dimensions as shown in Table 9 1 page 9 8 The two ends of the pipe should meet in the center of the coupling making a butt joint Figure 9 8 page 9 9 Drive pipe threads are not interchangeable with standard pipe threads 9 6 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Drive head Coupling Figure 9 6 Drive point well 9 7 OCA AA Si Ini A A A A CUUNEE KOLLEEGI CELINI Contlnuous Brass jacket Brass tube slot type type type Figure 9 7 Continuous slot drive points Diameter Couplings E inches per foot x 1D Length OD perinch inches _ OD 6 1945 6625 8 3 a8 2565 sem son ewe ose 8 ams p i End of pipe thread Coupling A x Inside thread of coupling Drive Pipe Standard Pipe Figure 9 8 Butt joint 9 8 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 3 Drive Clamps Drive clamps Figure 9 9 used in driving casing or pipe are attached to the square of the drill stem When driving the clamps strike the drive head or coupling at the top of the casing The stem
353. ter In the Arctic 100 pounds of rock salt is ample for drilling a 15 to 20 foot hole page 10 4 shows the specific gravity of drilling fluids when using salt additives in mud drilling operations You must clean drilling equipment after using brine 10 3 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Holes for jetting Figure 10 2 Jet drive point CAUTION Adding salts to drilling fluids will reduce the viscosity e Air Rotary Drilling This is the preferred drilling method for intermediate or large depth wells if you have the equipment You do not have to take the same precautions as with rotary drilling f Well Installation and Completion You can use some of the same installation and development methods in cold climates as you did in warm climates with some precautions Try to minimize prolonged contact of surface water with any permafrost Doing so will avoid freezing in the hole or thawing and sloughing the previously frozen wall and the need to redrill You can use the single string method to install screen and casing together for wells in rock like permafrost because disturbance is minimal The potential for water freezing after the well starts routine production should be reviewed You could insulate the well by centering a regular well casing in an oversized drill hole and by packing the annulus with dry sand through the permafrost interval You could then fit the well for continuous rather than intermittent pumpin
354. ter capabilities that may be necessary for placing large charges The demolition specialist will describe techniques for handling equipment and accessories during emplacement You can provide information about cavities and joints in formations that could adversely affect demolition and about the position of the water table which could be important in dry versus wet conditions WARNING Handle and use explosives and demolitions properly 11 6 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Appendix A Water Detection Response Team A 1 Concept In a combat environment well drilling production supplies the water requirement Groundwater sources must be located quickly before committing well drilling teams Terrain teams assigned to theater corps and division level units make recommendations on well drilling sites If the geographic information the military provides the terrain teams is insufficient terrain or well drilling teams determine well drilling sites by best guess methods Also terrain teams are not trained or equipped in groundwater detection techniques Because of these limitations the WDRT concept was developed to increase the overall effectiveness of well drilling operations Professionals and state of the an equipment help accomplish the roundwater detection mission The subsurface WDRT consists of US government personnel who support military well drilling operations by performing groundwater detection Civilian contractors may a
355. ter may require drilling several hundred feet Large boulders which are common at the apex of the fan can make drilling difflcult Down the slope of a fan aquifers get progressively thinner pinch out In the lower part of a large fan test drilling may be needed to locate a productive bed d Basins Alluvial basins are in regions where mountains alternate with structural troughs page 2 20 Erosional products from the mountains partly fill the basins with alluvium aid down as a series of coalescing alluvial fans The upper alluvial slopes form piedmont plains or alluvial aprons that gradually decrease in slope toward the interior of the basin until they merge with the interior flats Lakes or playas occupying part of the central flat are usually saline Lake bottom deposits are largely clay Many alluvial basins are good sources of groundwater Good wells yield several hunched to a thousand or more GPM 2 19 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Trapped water Dry wells Deep freshwater well Shallow well possible 9 A hi D igh mineral content a X pa ry well 5 e e A e Pa po A e p La p LAE s e 3 P a Cm Anna LO Ped eee aro ve S A A a P ral A m e A et Te Ne Am Clay and silts A A e p r Pad Ls on Pa E P d a rx L3 d Soot L LOB m r m n B A A gt T pe q O mm q Figure 2 20 Alluvial fan x A 3 p FN N N gt wa
356. the SP shutoff switch on the units modified for mud logging When using the switch the operator can select either the normal probe with the 0 25 2 5 and 10 foot electrode spacings or the mud probe for monitoring conditions in the mud pit or borehole e Self potential potentiometer This instrument balances out the SP that exists between any pair of potential electrodes You must obtain a balance before making any resistivity reading Balance is indicated when the galvanometers needle goes to zero If you want an SP curve record the potentiometer reading Each division is one millivolt a full scale is 1 000 millivolts e SP polarity reversing switch This switch is located directly below the SP potentiometer and shows the polarity of the particular cable electrode being used When using the switch the operator can change the polarity of the injected voltage as required by borehole conditions e Current switch This is the ON OFF switch located directly below the function switch it is a momentary spring return toggle switch The spring return is an automatic shutoff safety feature D 1 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 e Function switch This is the three position selector switch located directly beneath the galvanometers The three positions are CUR current CAL calibrate and LOG logging Use the CUR position when checking the system to determine if you are using the correct amount of current Use the CAL position when calibrati
357. the casing is seated into very low resistive shale it may be rather difficult to determine the exact position of the casing by this method i SP Curve This curve shows a great deal of character and can be related to relative changes in formation permeability When logging in freshwater horizons the SP curve will usually be featureless and provide little or no useful information D 10 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Appendix E Bits E 1 Maintenance The rock drill bit Figure E 1 A is the least understood component in a drilling system The parts of a drifter or down hole drill undergo constant dynamic loading that can be accounted for with design However this is not true with the bit Drilling in rock may mean a radical change of hard consolidated rock to a broken unconsolidated seam The characteristics of rock compressive strength abrasiveness and fracture pattern are never consistent in either production or water well drilling Figure E 1 B shows drilling through various rock formations Flushing passages Figure E 1 C must be well maintained and fairly deep to clean the hole As the gauge of the bit is reduced by abrasive wear many drillers forget to grind the slots deeper Poor hole cleaning is a major cause of stuck drill string Ihe following describes the areas to maintain on the bit for effective operation Figure E 2 page E 2 shows the areas described e Abrasion and poor hole cleaning will cause material aroun
358. the construction site You will also need electrical or oil immersion heaters for storage and settling reservoirs You should have tents or sheds as protection for personnel from cold winds or storms b Rotary Drilling In permafrost regions use the rotary drilling method for deep drilling and large diameter holes and for shallow drilling and small holes The procedure for rotary drilling in frigid climates is the same as in temperate climates except for temperature requirements of the drilling fluid In adverse weather conditions extremely low temperatures and snowstorms construct shelters to protect the rigs and to maintain comfortable working temperatures At temperatures below 20 F generally no drilling is done The mud used in rotary drilling should beat near freezing temperatures when entering the drill stem to prevent thawing and caving 10 2 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 of the hole When necessary apply enough heat to the mud to prevent the hole from freezing Make sure the rig operates continuously to prevent the mud pump and accessories bits and casing from freezing during operations If you must stop operations at night remove the tools let ice form and drill out the ice in the morning In a finished well you can use the rotary rig to circulate the water to prevent freezing until you can install a pump c Jet Drive Drilling This is another method of constructing small wells in cold climates You can also use thi
359. the screen When testing a well without a screen try not to dewater the production part of the aquifer For proper testing you must have a reliable power source so that testing will not be interrupted The power must be sufficient to drive the pump at a rated speed so that full capacity can be developed 2 Air Lift Method This method is sometimes best for military field operations especially if the well may produce sand that could damage or reduce the life of a submersible pump An air lift pump has two major problems Air turbulence could make drawdown measuring difficult and entrained air may cause considerable error in measuring the flow rate After constructing an air lift pump check the pump capacity against the expected well yield To conduct the test set the pump according to the readings in Table 4 2 page 4 13 An air compressor that puts out 350 cfm at 200 psi is suitable for performing most air lift pumping operations To determine the amount of air needed for pumping water use the following equation or refer to Figure 8 11 h v C log H 34 i 43 where V free air actual required to raise one gallon of water in cubic feet h total lift in feet log logarithm c value H operating submergence in feet C constant Table 8 1 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 4 5 BERR ER III II lI ERR ERR OA AAAMOOO III III LLL II Il lli ESR KELL LL ELI LL Ill l l ig 4 0 THHIHTHILHIHITHTITHHIHHH
360. tical path method CPM crackerjack bits See bit s crackerjack critical path method CPM 3 2 crop irrigation 2 33 CSS See combat service support CSS cubic feet per minute cfm 4 11 5 25 5 26 7 3 8 2 CUR See current CUR current CUR D 2 b er ud cuttings rotary 11 2 DA See Department of the Army DA DD Form 2678 5 34 2679 5 34 2680 7 10 deep well pump s See pump s deep well Index 3 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Defense Mapping Agency DMA A 2 A 4 demolition See supporting construction and demolition Denison Sampler 11 3 density 2 25 5 7 5 15 Department of Defense DOD A 3 A 4 Department of the Army DA A 2 deploying teams See teams deploying deployment A 2 B 1 deposits eronenlidated 2 amp WSL AIRS ALMA di P unconsolidated 2 3 derrick hand C 2 C 3 desert environments 2 33 om mu cp P i deviation 5 24 discharge 2 1 4 2 8 7 areas 2 1 2 27 line 4 3 pipe 3 13 4 3 7 4 8 7 rate See measuring discharge rate disco nt itinuous permat matr discontinuous dispersion treatment 7 7 dissolution potential 2 23 DMA See Defense Mapping Agency DMA DOD See Department of Defense DOD double casing placement See placing gravel double casing placement of down hole drill See drill down hole down hole hammer See hammer down hole drainage basin size 2 24 pattern and density 2 25 drawdown 2 9 2 36 4 1
361. til it is free of cuttings e Drill down a few inches e Stop drilling and measure the time required for the cuttings to reach the surface The last procedure has the advantage of furnishing an accurate sample of the formation at the depth of the bit Use the procedure when you want very accurate formation samples c Undisturbed Soil Samples To collect these samples advance the hole using a rotary or auger rig to a position just above the sampling interval Clean the hole in the dry when using an auger or by flushing when using a rotary rig Recover the soil sample using either of the following methods 1 Push Tube Method With this method you can use thin wall fixed piston samplers in very soft to stiff clays silts and sands that do not contain appreciable amounts of gravel Use 5 inch diameter sample tubes for all clays and silts that you can remove from the tube and keep in an undisturbed state Some very soft clays and silts will not support their own weight so you will not be able to remove them in an undisturbed state You can take samples of these soil soils with either 3 or 5 inch diameter sampler tubes Seal the sample in the tube with expanding packers Generally a 3 inch diameter sample of clean sand is sufficient Before sampling chuck the drill rods in the drill rig with the drive mechanism raised to its maximum height Doing so prevents the weight of the drill rods and sampler from bearing on and possibly disturbing th
362. to determine the resistivity of the sample known concentration and temperature If in ohmmeters multiply reading by 3 28 to convert to ohm feet Set ohmmeter potentiometer to this reading and lock Place function switch at LOG FM 5 484 NAVFAC P 1065 AFMAN 32 1072 e Center CUR ADJUST potentiometer on front panel to center of travel e Energize CUR switch momentarily and the CAL ADJUST potentiometer marked log which is on the circuit board on the back of the galvanometers to zero the needle to that position when CUR switch is not energized e Place function switch to CAL Rotate the CAL ADJUST potentiometer on same bored to zero the needle in the same manner as above when energizing the current switch e Recheck the log position If necessary readjust both potentiometers until you get proper readings D 5 Maintenance Keep all plugs panel connections and cable and reel case clean and dry Moisture on the panel plugs or cable plug can cause current leakage and cause the gears to operate improperly When pulling the cable out of the well wipe it clean Do not let water accumulate in the reel case a Of Resistivity Measurement Required maintenance is cleaning and changing batteries The test set will indicate when to replace the 9 volt batteries Replace the 1 1 2 volt cell every two months The battery box is at the bottom of the case Lift the instrument panel to access the batteries When operating the instrument be careful
363. to the surface 6 10 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 e Step 3 After placing the gravel pack around the screen and impervious backfill on top of the grovel grout the entire annulus between the inner and outer casing to the surface A disadvantage of the single string method is the weight of a long string of casing on top of the screen When the screen touches bottom it becomes a loaded column that can easily buckle because of its slenderness When the screen reaches the correct depth you can prevent buckling by supporting the screen on casing elevators until the formation material collapses around the screen and supports it laterally b Pull Back Method This is another method of installing a telescoping screen Use the following procedures for this method e Step 1 Sink the well casing to the full depth of the well and clean out the hole to the bottom of the pipe with the bailer e Step 2 Assemble the closed bail plug in the bottom of the screen screw one or more packers to the top of the bail plug e Step 3 Lower the screen inside the well casing using the sand line After setting the screen on the bottom pull the casing back far Well casing Wooden wash ring Screen Wooden wash plug Back pressure valve Mule foot nipple Figure 6 7 Single string assembly enough to expose the screen in the aquifer and to a position where the packer is still inside the casing e Step 4 Use a casing ri
364. ton pump pitting A condition on bits that is caused by the presence of foreign material such as rock cutting or the use of rock drill oil with a high sulphur content playas Dry lake beds comprised mainly of clay and located in intermountain valleys POL petroleum oils and lubricants polymer A water based organic inorganic natural synthetic or synthetically formulated additive polymers are formulated for various drilling fluid purposes and can be used alone or to enhance clay muds Poly Sal Synthetic inorganic polymer See also polymer popping A condition whereby a carbide insert will pop clean from its socket if the drill string is not properly fed up in the hole population distribution Surface indicator that could indicate water availability because of population density porosity Voids in soil and rocks POT potentiometer A black plug receptacle used to connect the surface potential ground Wire to the instrument power auger A device that is rotated raised and lowered by a power driven mechanism a power auger has a depth limit of about 10 feet and can be used only in areas where the water table is close to the surface ppm parts per million precipitation Moisture released from clouds to the earth in the form of rain sleet hail or snow pressure pumping method A backwashing method that involves capping the casing and pumping water into the well under pressure probe selector switch A switch o
365. treams and rivers including dry streambeds and riverbeds are usually recharge areas in arid regions and may be recharge or discharge areas in temperate climates depending on seasonal rainfall This type of recharge is especially true of major streams that drain the central portions of most valleys Because recharge occurs along stream courses and streams occur in lower elevation areas in the valley the areas adjacent to streams are considered good locations for wells especially near the intersection of major streams However such locations are not always the best available areas for water wells Streams often migrate over large areas of the valley floor and deposit mixtures of gravel sand silt and clay Often these deposits are discontinuous and result in a vertical sequence of poorly sorted materials with low overall permeability and low to moderate well yields Older buried stream channels may be better aquifers because they are composed of coarser subgrade materials and much of the surface contamination has been filtered out 6 Snow Melt Patterns Snow melt patterns can provide evidence of recharge areas and directions of groundwater flow Snow packed in mountainous areas is usually a good source of recharge because slowly melting snow produces more infiltration than rainfall 7 Karst Topography Karst topography results from the dissolution of carbonate rocks by eroundwater and is characterized by caves sinkholes closed depressions a
366. ubsurface evaporite deposits are very susceptible to collapse and should be avoided 10 Wells One of the best indicators of groundwater is groundwater development with well systems Water wells are difficult to detect especially from imagery It is possible to detect wells indirectly from irrigation patterns Pivot irrigation patterns are distinctive and are usually supplied by centrally located water supply wells Such teatures are good indications that quality groundwater is present at economic pumping depths 11 Reservoirs and Lakes Surface water bodies can be groundwater recharge discharge or both artificial surface water reservoirs usually capture surface water and represent areas of 2 32 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 recharge as do natural reservoirs am created by the damming of L Residential area WR NN TEB 2 PES 4 K streams Natural reservoirs in 47 le lowland areas are often formed by s x the discharge of groundwater from E a seeps along the lake bed or from B springs u y 12 Crop Irrigation Crop yt pim irrigation indicates the use of LOR Field surface or groundwater for agriculture In most arid environments surface water based irrigation is located adjacent to streams and rivers Beyond the river floodplains agriculture is negligible Agricultural development in areas without surface water is a good indicator of the presence of groundwater
367. ues and material washes Take measurements and stop the descent of the screen when the packer is near the lower end of the casing If drilling mud is still washing out of the well continue pumping water until most of the mud is displaced e Step 3 Stop the pump and let the aquifer close in around the screen When the formation develops friction on the outer surface of the screen turn the entire string of wash pipe to the right to unscrew the left hand joint at the bottom e Step 4 When the wash pipe is free pump in more water Raise and lower the string several times so that the lower end travels the full length of the screen This action will wash out more drilling mud and some fine sand from the formation e Step 5 Start development work Remove the wash pipe and continue the development work R Neoprene packer top Closed bail bottom Figure 6 8 Closed bail plug FM 5 484 NAVFAC P 1065 AFMAN 32 1072 e I UV d E z A 4 a 7 I I sat m DN b wee 5 M oe e A Wi h 7 E y W ie s M Ld Nae ash pipe 34 ao Q SK l s D A N lS babi lt gt s gt a LEN d i N N i EI ve mm T j IA N Ten P GPUs ae A o Aem ou ES k L e 4 ias 9m tee N D d E d tett n as lt L LOA e E E Vosetts P PD AP E Hiper ed Deke acker ted
368. ues to thicken A thick cake detrimentally increases down hole cumulating pressure by restricting the annulus making it difficult to pull the drill string because of the physical size of the drill collars and bit In deep and somewhat deviated holes the danger of key seating increases Because a thick filtercake is of a lower quality and depends on its thickness to be effective it is more easily damaged and eroded A thick filter cake may indicate that the fluid has a high percentage of native solids You may have to clean these solids from the mud before drilling progresses A thin highly impermeable filter cake bonds well to the wall and provides a surface for the hydrostatic pressures to act against to support the wall Filtrate loss into the formation can account for significant fluid loss if the consistency of the drilling mud is not good Good consistency does not necessarily mean thick it has to do with the bentonite content and the quality of falter cake If a permeable formation is encountered with pore spaces too large to be plugged by the fine bentonite particles the drilling mud will enter the formation That mud loss can take the entire output of the 5 16 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 mud pump The drill cuttings being carried up the annulus can sometimes be beneficial The cuttings are coarser than the bentonite particles and may help bridge across formation pores If you use this technique maintain the normal drilling rat
369. uifer Screen length should not exceed the thickness of thin aquifers You should screen the bottom third of unconfined aquifers and 75 to 80 percent of confined aquifers However for interlayered fine and coarse beds consider the thickness of the coarse strata when determining screen length Set the screen in the coarse strata If you have a choice of slot sizes consider the percentage of the open area or intake area of the well screen to determine length Use the following calculations to determine the amount of screen to use during drilling operations 1 Surface Area SA t OD 12 where SA surface area in inches per foot OD z outside diameter of the screen in inches 2 Open Area SO olm SO WD dud where OA open area as a percentage SO slot opening in inches WD wire diameter in inches 3 Total Area TA SA OA where TA total area in square inches SA surface area in inches per foot OA open area as a percentage 4 Transmitting Capacity TC TA 31 where 6 8 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 TC transmitting capacity in GPM per foot of screen based on one tenth foot per minute of velocity TA total area in square inches 5 Screen Length PR S where SL screen length required in linear feet PR pumping requirement in GPM TC transmitting capacity in GPM The following example uses the above equations to determine the amount of 12 inch
370. uifers present Figure 2 23 shows a stratigraphic column for a portion of the arid Great Basin The Great Basin contains a number of individual rock units Some of these units such as the Ely Limestone can readily transmit water but other units such as the Eureka Quartzite are relatively impermeable and cannot store or transmit exploitable quantities of groundwater Relatively impermeable units are aquitards or aquicludes Aquitards are units that retard or slow the passage of water a Groundwater Symb IS pans Saeg Age Aquitard Tv Volcanic rocks undifferentiated Muddy Creek formation Aquifer No 10 Bird Spring formation Aq Scotty Wash quartzite Aquae s Challamate shale vaen i 8 Monte Cristo limestone AquiferNo6 Lonesountaindolomite Silurian Elv Sprinqs dolomite o Aquitard No 5 Ordovician cda E undifterentiatec Middle and upper Columbian limestone and dolomite Chisholm shale Cambrian 7 7 Aquitard No 1 Pioche shale uu Prospect Mountain quartzite EN Figure 2 23 Hydrogeologic strat column of the Great Basin 2 21 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 In the stratigraphic sequence there are five discrete aquifers and six discrete aquitards By knowing the stratigraphic sequences in a region it is possible to predict the type of aquifer present at a given depth For example the Ely Springs Dolomite is not highly fractured but the dolomite is a productive aquifer where it is fractured
371. ula and Figure 4 1 page 4 12 to determine submergence percentage submergence gt x 100 where Neppe x vertical distance from A to C y vertical distance from C to D F eUI pipe 2 Air Pressure To calculate the required air pressure to start the air lift you must know the length of air pipe submerged below the static level See Figure 1 page 4 12 area from point B to point D for the starting air pressure Well casing Divide the area from point C to D by 2 31 constant conversion factor to get the required air pressure psi 3 Compressors The 350 cubic feet per minute cfm compressor on military drilling rigs such as the LP 12 is sufficient for operating an air lift With a submergence of 60 percent a lift not exceeding 50 feet and the compressor Tae Foot plece delivering 350 cfm of air a well can be pumped at over 200 GPM If you need more air use another compressor in parallel The maximum pressure that the compressor will produce is 200 psi which is enough to start an airlift with about 420 feet of air pipe submerged Figure 4 10 Air pipe in an eductor pipe CAUTION Operate compressors upwind of the drilling rig If you do not dust could damage the equipment 4 11 FM 5 484 NA VFAC P 1065 AFMAN 32 1072 ir pipe A To compressor SE Ground level ta i n m x ae Y lt X ee META 4 ipe Eductor p g level
372. ump is mounted on a frame with and driven by a two cylinder three horsepower military standard engine page 4 6 The unit is close coupled The impeller is secured to an adapter shaft that is fastenec and keyed to the engine stub shaft A self adjusting mechanical seal prevents water from leaking between the pump and the engine The pump is designed for optimum performance with a suction lift of 10 feet You can operate the pump at greater suction lifts but the capacity and efficiency of the unit are reduced proportionately 1 Installation Install the pump as close to the source of water supply as possible to minimize the required suction lift Install full sized suction piping and keep friction losses as low as possible by using the least possible number of pipe fittings elbows bents unions To ensure that joints do not leak use pipe cement or teflon tape on all joints If you use a suction hose try to ensure that the hose is as airtight as possible If you have to remove the suction or discharge piping or hose frequently you should make the connections with unions to reduce wear on the pump housing 2 Priming To prime the pump remove the priming plug on top of the pumping case and pour water into the pump case to the discharge opening level Failure to fill the priming chamber may prevent priming If the pump takes longer than 5 minutes to prime a mechanical problem exists A self priming pump is normally primed from a 10 foot suction li
373. ure Because most groundwater recharge occurs as infiltration of surface water drainages areas with high drainage densities receive more recharge than areas with low drainage densities Recognizing drainage patterns and density can provide indications of the type of aquifers the magnitude of recharge in an area and directions of groundwater Tow Figure 227 pag 2 26 shows some of the more common drainage patterns Rock has widely spaced rectangular or dendritic patterns and alluvium has medium to widely spaced parallel drainage patterns along alluvial fans and dendritic patterns along valley ares and floodplains 2 25 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 E Annular Dendritic Figure 2 27 Stream drainage patterns b Boundary Indicators These are characteristics that are indicative of local or regional groundwater flow systems By identifying the boundaries of flow systems it is possible to define directions of groundwater flow and to estimate the depth and quality of groundwater within an area Boundary indicators do not directly indicate the presence of groundwater in an area 1 Recharge Areas These are areas where the groundwater reservoir is replenished Recharge may be derived from the runoff of precipitation into rock fractures in mountainous areas leakage along streambeds or under lakes or the flow of groundwater from upgradient areas Figure 2 28 shows a sketch map of a hydragraphic basin with identified recharge area
374. urer s recommend injection of a minimum of one quart of rock drill oil during each hour of drilling During drilling the LP 12 is oiled with an in line oiler plumbed into the drilling air line Water injection into the air line is common and is not detrimental to the lubrication process Drill rigs used for pneumatic drilling are equipped with a small positive displacement pump injection pump Injecting water is helpful because it reduces dust at the surface improves cuttings removal and stabilizes the borehole wall A water injection of 2 to 5 GPM is satisfactory Adjust injection rates to the specific material drilled Water injection improves lubrication of the drill string provides some cooling of the compressed air and drill system and is beneficial for rock drilling When you remove the drill from the borehole break it down inspect it clean it and repair it as necessary Oil all machined surfaces and lubricate threads with tool joint compound before returning the drill to the borehole or to storage Often a drill is left idle in the hole for an extended period If this occurs lubricate the drill Lift the drill off the bottom close the water injection valve blow air through the hammer and add oil 1 to 2 quarts to circulate and lubricate the surfaces Reasonable service and care improve the life of the drill 5 4 Reverse Circulation Military well drilling systems are not currently designed for reverse cumulation drilling In rotary
375. urves a Well Probe The well probe consists of one brass current electrode and three lead oxide potential electrodes Each electrode is internally insulated with epoxy resin and each is connected to the surface by a separate conductor The potential electrodes are spaced at 0 25 2 5 and 10 feet from the current electrode The current electrode is drilled so that an insulated sinker rod can be attached to the probe with a leather thong if more weight is needed to carry the probe to the bottom of the well With the resistivity instrument at the surface the operator can read the SP in millivolts and the resistivity in ohm feet The reel holds about 500 feet of cable An additional 500 feet of cable can be attached to work at depths of 1 000 feet A test set is provided for checking the operation of the instrument b Resistivity Instrument This instrument uses direct current and is of the null reading type The instrument reads directly in ohm feet The use and operation of the various controls on the instrument panel follow e Galvanometer This is a zero centered micrometer All operations of the instrument involve returning the meter needle to the zero position e SP shutoff switch This is a spring return switch located in the upper left comer of the panel The switch automatically shuts off the 1 1 2 volt C battery used in the SP circuit when the instrument lid is closed e Probe selector switch This switch is located directly below
376. us metals have been used to construct the logging gear Before removing or D 2 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 installing the reel unreel the cable to lighten the reel To remove the reel from the case unscrew the six screws from each bearing block and carefully lift the reel and bearings from the case f Extender Cable Reel Assembly Use this cable when logging past 500 feet The assembly has an S stamped on the flange to which you mount the jumper connector This cable must be used first When you reach the 500 foot marker attach the second waterproof connector to the cable reel This connector will be located at the hub of the cable reel assembly The second cable is then connected to the instrument by means of the jumper g Surface Lines Two small lengths of stranded conductor insulated wire are included with the unit The red wire has a plug on one end for connecting to CUR on the instrument panel and a clamp at the other end for fastening to a steel stake The steel stake is not furnished The black wire has a plug on one end for connecting to POT on the instrument panel and a piece of oxidized lead on the other end If these lines become worn or broken replace them with any 18 to 20 gauge stranded conductor insulated wire These lines and reels are too large for the instrument cases so they are carried separately D 2 Types of Logging a With the Normal Arrangement 1 Setting up Equipment The equipment required to l
377. utlet Wrap a sack around the air line where it enters the drop pipe to keep water from spraying around the top of the well Discharge from the compressed air tank to the well should be the same size as or one size larger than the airline in the well Connect a quick opening valve in the line near the tank You need a pressure hose 15 feet long minimum for moving the drop pipe and air line up and down Use the following procedures to start developing the well using this method Step 1 Lower the drop pipe to within 2 feet of the bottom of the screen Place the air line inside the drop pipe with its lower end 1 foot or more above the bottom of the drop line Step 2 Let air enter into the airline and pump the well until the water appears to be free of sand Start slowly If all the water is suddenly removed the casing may collapse in deeper wells especially when using PVC pipe Step 3 Close the valve between the tank and airline and pump the tank full of air to a pressure of 100 to 150 psi Step 4 Lower the air line until it is about 1 foot below the drop pipe Open the quick opening valve so the air in the tank can rush with great force into the well A brief forceful head of water will emerge or shoot from the casing and from the drop pipe Step 5 Pull the airline back into the drop pipe immediately after the first heavy load of air shoots into the well Doing so will cause a revered of flow in the drop pipe that will effectively agitat
378. ve or pump the water b Selection Criteria Consider the following items when selecting a pump e Size of the well e Quantity of water to be pumped e Drawdown and pumping levels e Type of available power e Yield of the well e Estimated total pumping head Well yield is frequently overlooked when selecting a pump for small wells Installing a pump that can handle a large discharge capacity can either temporarily drain a small well or exceed the maximum possible suction lift Therefore pumping requirements and well characteristics must be matched to determine the optimum pump for each installation Table 4 1 page 4 2 provides a general guide for use in pump selection Military well drillers deploying with well completion kits will normally use the deep well submersible pumps that are supplied with the kits 4 2 Shallow Well Pumps These pumps are limited to the depth from which they can lift water At sea level the practical limit is 22 to 25 feet for most pumps This value decreases about 1 foot for each 1 000 foot increase in elevation above sea level The operative principle of a shallow well pump is similar to drinking through a strew A partial vacuum is created and the difference between the pressure inside the straw and the liquid outside the straw forces the liquid upward to a new equilibrium A pump exhausts air from the intake line thus lowering the pressure on the intake side below atmospheric pressure The atmospheric p
379. ver a short period of time Yield point is the mud quality broadly included in viscosity You need more stress pump pressure to cause the gelled drilling mud to start flowing than to sustain flow once the gel is broken The stress required to initiate shear or flow is the gel strength of the mud The stress required to maintain shear is the viscosity You want a higher yield strength with respect to the gel strength so the mud becomes very thin in flow shear The primary function of viscosity is to help lift drill cuttings from the borehole Other mud characteristics affecting lifting capacity are density velocity and flow patterns Gel strength holds 5 13 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 the cuttings in suspension at the bottom of the hole when circulation is stopped The stress hydraulic pressure required to break the gel strength to initiate cumulation can be detrimental Required bottom hole pressures can cause fracturing or opening of fractures in the formation resulting in loss of drilling fluid formation damage and borehole wall damage Down hole pressure required to continue circulation depends on friction density or weight of fluid column and viscosity of the mobilized fluid These pressures can also cause serious problems Therefore it is desirable to use a drilling mud of relatively low density and viscosity moderate gel strength and high yield point relative to the gel strength a very thin fluid in circulation
380. with local conditions rotating the bit faster will not increase the penetration rate but will increase the chances of shearing a carbide Figure E 5 B Figure E 2 Bit areas E 2 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 teas PE a a PI d ok Paes fe O ERE tes Gauge V oton L a Ua Said N J L Fea RR E SS AK Rost gt a NX RON 1 Wir Rock QQ t Gauge button Shear Mitre Gauge O E 4 Carbide shear ew eget 5 CETUR so piia P2944 Sd ot p a Free a ee sow e 9 ZL 4 7 ow ets P fuel eti eat L AER es re gt ve a ALD a Ftd Els RIA aet S 4 Eine PAM M MUTO apo SENI n DER na Als 5222665 MV x vn li n i Lii b Figure E 5 Flats on carbides Progressive heat checking in the developed flats indicates excessive RPM Small cracks Figure E 6 A develop on the face of the flat and if not reconditioned breakdown of the button continues until it finally splits The button then shears off and the effectiveness of the bit is lost Figure E 6 B A A a one mune is to rotate at the lowest RPM that permit smooth operation Figure E 6 Cracks and shearing on bits E 3 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 Another condition that can result in carbide shear is drilling through bent casing Figure E 7 A A bent casing will cause the carbides to be pinched as the drill string passes through it and the carbide
381. y develop to boil the water and generate steam causing the impeller to rotate in vapor rather than water With no coolant the bearings seize resulting in severe Figure 4 3 Centrifugal pump pump and possible motor damage 4 4 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 2 Connections You may have to use several pumps to meet head or flow requirements You can connect the pumps either in series or in parallel If you connect two centrifugal pumps in series the discharge of the first connected to the suction of the second the discharge capacity stays the same However the head capacity is the sum of both pumps head capacities The increased head capacity is only available as discharge head You will not gain any appreciable increase in suction lift You can obtain the same effect by using a multistage pump that contains two or more impellers within one casing If you connect two centrifugal pumps in parallel both suctions are connected to the intake line and both discharges connected to the discharge line the discharge head is the same as that of the individual pumps The discharge capacity is close to the sum of the capacities of both pumps The increased flow rates result in extra friction losses that prevent the combined flows from being the exact sum of the two pumps d Self Priming Pump This pump has a priming chamber that makes repriming unnecessary when the pump is stopped for any reason other than an intentional draining The p
382. y 6 inch by 8 foot boards for the walls e One 2 inch by 4 inch by 8 foot screed beam FM 5 484 NAVFAC P 1065 AFMAN 32 1072 n Mya Js yen mr j 4 Figure 7 6 Concrete platform NOTE When mixing concrete add the water slowly Use 5 gallons of water per sack of concrete Mix it with a hoe and place the concrete quickly The upper surface of this slab and its immediate surroundings should be gently sloping so water will drain away from the well You should also place a drain around the outer edge of the slab and extend it to a discharge point that is far away from the well A well with pipe casing should have a sanitary seal at the top that fills the space between the pump pipe and the well casing This device consists of a bushing or packing gland that makes a watertight connection 7 5 Well Completion Report Figure 7 7 pages 7 11 and 7 12 is an example of a military water well completion summary report DD Form 2680 This form is used to update the world wide resource data base After you complete all well drilling operations fill out the form and send to the address on the form DD Form 2680 is in the back of this manual for reproduction and use 7 10 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 MILITARY WATER WELL COMPLETION SUMMARY REPORT FROM List Unit and complete mailing address to include Street and 9 digit ZIP Code amp 5424 E E visui C ecl mo PHONE NUMBER include Area
383. y graded filter sand about 1 8 inch makes the best gravel pack for most fine sand aquifers You should use fine gravel 1 4 inch maximum size to pack aquifers consisting of medium or coarse sand Use a screen with openings that cover about 90 percent of the gravel pack The following is a field method for producing a filter material or gravel pack from a sand and gravel deposit for a medium sand aquifer Make two sieves with lumber Cover one sieve with 1 4 to 3 8 inch hardware cloth Cover the other sieve with window screen NOTE A layer of hardware cloth under the screen provides extra strength to the sieve e Discard all material that will not go through the hardware cloth but that will go through the window screen Save the materials that the screen retains for analysis and logging purposes a Open Hole Placement Where drilling mud keeps the borehole open you can install a gravel pack using the positive placement method This method is the most common and best suited to military field operations Use the following procedures for this placement method e Step 1 Drill a large diameter borehole the full depth of the well 6 15 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 e Step 2 Set a smaller diameter screen and casing centered in the large diameter borehole NOTE Basket type centering guides work best e Step 3 Fill the annular space around the screen with properly graded gravel e Step 4 Fill the borehole with gravel well ab
384. y quickly opening and closing the discharge valve while operating the pump at a moderate speed Continue this operation until you clean out all of the fine material from the well point screen 9 5 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 3 Casing and Completion Jetting fluid effectively prevents caving or collapse of the drilled hole Insert the casing in a single string only after jetting reaches the full depth If you do so before the casing sinks as fast as jetting proceeds If you encounter too much resistance you may have to force the casing down For depths of 200 to 300 feet you can use a casing of 4 inch diameter pipe If you sink a deeper well place a smaller string 3 inch diameter pipe inside the first string To complete the jetted well connect a hose to the exposed end of the well pipe and couple it to the pump intake The well will yield water immediately if the pump is in good condition and you have properly placed the well screen When you first start pumping a considerable amount of fine sand will be drawn into the well screen and be discharged with the water Because of this action direct the water stream into the annular space around the well pipe at the ground level Doing so washes the coarse sand and gravel into the borehole and packs the sand and gravel firmly around the well screen and pipe The well is then ready for continuous pumping 9 3 Driven Point Wells Small diameter driven wells are constructed by driving a
385. y start to swing to the left as an induced voltage is set up in the probe You can verity this by turning the galvanometers needle back to the right an equal distance as the left swing that shows up as an SP on releasing the current switch FM 5 484 WNAVEAC P 1065 AFMAN 32 1072 D 4 Troubleshooting Procedures The logging unit has a test set that you can use to check the instrument s operation independent of the cable assembly If the instrument reads the correct value for the test set then the instrument is functioning properly and the trouble is somewhere other than in the electronics of the instrument See page D 2 for operating instructions for th The electrode selector switch must be in any NORMAL logging position a Checking Batteries With the test set plugged into the instrument turn the function switch to CAL and try to calibrate the instrument If you cannot calibrate the instrument turn the function switch to CUR and check the current by throwing the current switch If the current flowing is less than 8 ma replace all six 9 volt batteries Refer to battery voltage checking procedure to check the batteries with a voltmeter The following lists some common problems with the corrective procedures 1 Unable to Calibrate Instrument This problem occurs because of insufficient or no current flowing in the ground circuit To correct the problem check the batteries and replace them when necessary Check all lines and plugs for bad conn
386. ycle The constant movement of water above on and below the earth s surface ID inside diameter igneous rock Rock that forms when hot molten material magma cools or solidifies either inside the earth s crust or on the earth s surface lava See also lava magma impermeable barriers Features solid rock masses through which groundwater cannot OW impermex Commerical chemical agent added to mud drilling fluid to prevent it from freezing See also aquagel barite fibratex gel flake micatex smentex in inch es infiltration Precipitation on land surfaces that seeps into the ground inside tremie method Placing grout in the bottom of the hole through a tremie pipe that is set inside the casing ISO International Standards Organization ITWD International Standards Organization air transportable water drill Glossary 5 FM 5 484 NAVFAC P 1065 AFMAN 32 1072 JCS Joint Chiefs of Staff jet drive drilling A method of constructing small wells in cold climates the wells are usually 2 ES in diameter and are drilled to a depth of eet jet pump A combination of a surface centrifugal pump a down hole nozzle and a venturi arrangement used in small diameter wells requiring a lift of 100 feet or less jetted well A well that is dug using a high velocity stream of water jetting method A backwashing method that involves a jetting tool to remove caked drilling mud from the borehole wall this method requires a large
Download Pdf Manuals
Related Search
Related Contents
MEIKOUKEN TECHNICAL INFORMATION Elta 2957 User's Manual Trekstor DataStation pocket x.u 250 GB Bolt-On System mit Handkurbel Zagg GZKMHFBKLIT103 Bedienungsanleitung mit Wartungs FooBar 2000 TS/TS-SW Series 取扱説明書 - Panasonic Copyright © All rights reserved.
Failed to retrieve file