Home

S / R / P / RHP / PCF

image

Contents

1. Ka pe ey Ka Joy Ne jos em q e 4 eh I pe H1 8 Fesch 1 5 Brief Description of the Unit Casings of air handling units are made of galvanized steel sheets which are powder painted Mineral wool is used for thermal insulation and sound attenuation Unit cover panels are 45 mm thick The air handling units are intended for ventilation of medium sized and big sized spaces eg shops offices etc having operating ambient temperature and relative humidity As standard the unit is designed for indoor and outdoor with additional parts placement The operating temperature range for the unit is 30 C 40 C outdoor air temperature The air handling unit is not to be used to transport solid particles even not in areas where there is a risk of explosive gases VERSO R is equipped with a rotary heat exchanger VERSO RHP air handling units with a rotary heat ex changer and a heat pump system VERSO P PCF with plate heat exchanger air filters an electric or water heater fans and automation control system to ensure safe and efficient operation of the unit Before you open the door the unit must be switched off and the fans must have been given time to stop up to 3 minutes The unit contains heating elements that must not be touched when they are hot To maintain a good indoor climate comply with regulations and to avoid condensation damage the unit must never be stopped apart f
2. Cleaning and Inspection of Fans and Fan Space Polluted fans decrease efficiency AN Before performing any inspection work check whether the unit is switched off from the electric power supply Inspect and clean the fan impellers to remove possible dirt deposits Check the impeller to make sure that it is not out of balance Clean or brush off the fan motor It can also be cleaned by carefully wiping it with a damp cloth that has been dipped in a solution of water and dishwashing detergent Clean the fan space if needed 2 2 Plate Heat Exchanger in VERSO P PCF Air Handling Units When operating the air handling unit equipped with the plate heat exchanger unit control automation should have function of protection from frost Condensate can accumulate in a plate heat exchanger therefore it is essential to install siphons on the con densate drainpipes Depending on the unit construction plate heat exchanger section may have 1 or 2 siphones It is important to maintain cleanliness of the plate heat exchanger to change filters installed in the air handling unit on time if the heat exchan ger gets dirty to perform heat exchanger periodical cleaning The temper ature effectiveness of a dirty heat exchanger can diminish considerably E UAB AMALVA reserves the right to make changes without prior notice komfovent eee A 1 Plate heat exchanger 2 Support frame NN
3. 1 Electric drive fixed to the air handling unit installed in a building 2 Electric drive fixed under the cap to the air handling unit installed outdoors 2 5 Air Filters and Filter Change Procedure Synthetic or fiberglass bag filters are used When operating the air handling unit the unclean filters should be changed on time Pressure level drop at which it is recommended to change filters and the measurements are in the technical data pages UAB AMALVA reserves the right to make changes without prior notice EJ 1 Upper filter holder 2 Lower filter holder 3 Changeable filter Air filter clogging check The filters should be changed when the filter alarm has been activated We recommend to change filters at least twice per year before and after heating season or more Clogged filters unbalance ventilation system air handling unit uses more power If air handling unit is working in small speed the filters must be checked on unit maximum speed Filters are one time used We do not recommend cleaning them Stop the air handling unit before changing filters AN Before changing air filters check whether the unit is switched off from the electric power supply 2 6 Water Air Heaters Air Coolers Direct Evaporation Air Coolers Mostly used with aluminum plates 2 5 3 or 4 mm fin pitch and copper pipes Upon additional order can be assembled with plugged connection for frost se
4. temperature 7 e Evaporating temperature Figure 4 1 Zone inside the operating limits 6 Min compression ratio the prevention is active to avoid going outside the limits 7 Min differential pressure 2 Max compression ratio 8 Min condensation pressure 3 Max condensation pressure 9 Min evaporation pressure 4 Max motor current 5 Max evaporation pressure UAB AMALVA reserves the right to make changes without prior notice E CEND Defrost management HP operation at low outdoor air temperatures and high indoor humidity potential evaporator freezing in exhaust air flow At the time on the heat exchanger forms white frost snow ice As a result e Increases air pressure drop through the heat exchanger e Decreases heat exchanger efficiency To manage the freezing and defrosting process the controller sets the defrost function This function is acti vated when e The device operates in heating mode Exhaust air temperature is lower than 4 C Additional to the standard controller C5 elements this function has extra elements e Pressure transducer for air flow pressure drop through the evaporation extract air heat exchanger e Solenoid valve in refrigeration circuit During defrost mode Compressor speed up to maximum allowable speed e Solenoid valve open and hot gasses go to evaporator Reduces rotation speed efficiency of the rotary heat exchanger in order to maintain 8 C after the rotary heat
5. Risk areas with rotating parts Moving parts are the fan impeller drive pulleys of the rotary heat exchan ger if fitted and by pass shut off damper of the plate heat exchanger if fitted The lockable inspection doors serve as protection from contact with the fans and the heat exchanger If the fan outlets aren t connected to any duct they must be fitted with a protective screen wire mesh Attention After initial unit start up also every time after replacing of the fil ters it s necessary to perform clean filters calibration procedure see 6 5 1 5 Chapter UAB AMALVA reserves the right to make changes without prior notice 5 CEND 1 1 VERSO Air Handling Units marking VERSO Air Handling Units marking warning Note Caution Important information in the Rotating parts instruction manual Note Place for siphon Before performing any inspection work inside the unit be sure the unit s electric power supply is disconnected VERSO Air Handling Units marking informative E E o am Oo Plate heat exchanger Noise attenuator Water air heater Inspection Electrical air heater UAB AMALVA reserves the right to make changes without prior notice komfovent 1 2 VERSO S Air Supply Units 1 Air damper closing 7 Base frame 2 Supply air filters 8 Sections connection 3 Fan with electric motor 9 Sealing gasket 4 Air heater water or electric 10 Connecti
6. control panel which can be installed in the convenient place for the user 6 A RH pressure and temperature sensors Control panel 6 1 Picture is designed for remote air handling unit komfovent control setting and display of controller parameters 6 1 Picture Control panel 6 2 Control panel indication Time WR N Ee Indication of unit operation modes and functions Main parameters overview window Temperature e Switching between overview windows Selection of op ECONOMY 1 Menu eration modes Explanation of the displayed symbols a Supply air tempera Fan operation Air humidifier operation N d ture A Extract air tempera t Air flow increasing C Summer night cooling ture by activated function mode see chapter Functions NI SG Wane O Weekly operation mode A Air flow decreasing Extract air volume by activated function ill Holiday operation mode R see chapter Functions SN Supply air humidity e Energy recovery operation Override mode HA iy A GC Extract air humidity A Air heater operation A Alameina e A Extract room zb Air cooler operation G Ead cicis rec peuisicd air quality UAB AMALVA reserves the right to make changes without prior notice EN CEND 6 3 Parameters overview The main parameters of the unit are indicated in four main windows of the panel temperatures indication air flow air qua
7. EEEa a AARRE TE US E TE 42 6 4 Operation modes SOIC COIN neger Eegen 42 65 DMN PEU E REI RR ERN rU 42 0 9 1r VSI GW E r 43 Le Me Ma ME RS TET TENTE 43 6 5 1 2 Operation C NtErS Nae eer een RANDE MEE 43 OD OM Efficiency StatUS RR oS I t em 43 6 5 1 4 Detailed information EE 43 Fe E IEN 43 UAB AMALVA reserves the right to make changes without prior notice EJ 6 5 1 6 Inspection lightning RET ERST 43 603 2 FUNCIONS E 44 6 5 2 1 Air q ality COMMON ME ERRORI E E AAEE EE EEEa E EEEE aS 44 6 5 2 2 Operation on demand EE 44 6 5 2 3 Outdoor compensated ventilation sess 45 6 5 2 4 SCENE 45 6 5 2 5 Minimum temperature control ET 45 6 5 2 6 Ov rrid UNTO E 46 RSEN NI ineo dore piro EE 46 6 5 2 8 ROC INC IAN nien pire MER RE o m ntt eeee 47 6 5 39 SChed liNg INIRE Rc 47 6 5 3 1 Operation program NE RR RE RED REND 47 SES E SM n 0 9 ET 48 6 5 3 3 Recirculation schedule c 48 Lee E ELUM Se Sas E E E A eh D 48 6 5 4 1 Air handling unit nde 48 ee MET 49 6 6 Control of air handling units through web browser issussscs datae raku kr in dFgx RS rrr ER nn d AR UDDP EXE Ir bna cxx db E 50 6 7 Additional control ee Le NO TOO 50 6 7 1 Combined water coil control erc 50 6 7 2 Multi level control of direct evaporation cooler 51 6 7 3 Reversal of direct evaporation coolers RENE EEN 51 6 7 4 Inverter direct evaporation cooler CODtrol iuusiuu
8. Frame 3 Gasket E UAB AMALVA reserves the right to make changes without prior notice komfovent VERSO sections connection using clamping elements ojo olon xD y View A The sections clamping elements are supplied to the device They are used in the front and back of the unit in the upper part of the section Sections are tightened with screws in the frame holes image A Tightening the two equal in height single flow sections clamping elements are located on the top of section and if allows unit construction on the sides of the section image B First the individual elements are screwed on the same height on the two different sections and then using the clamping screw and nut sections are joined view C Prior to joining all the sections must be sealed with a gasket 12x6 supplied to the device Cleaning and Inspection of Coil Heat Exchanger Always clean against the regular direction of airflow Make sure that the coils are purged of air If a droplet eliminator is fitted remove it and fush it clean with water Also check that the condensate drain is not clogged UAB AMALVA reserves the right to make changes without prior notice E CEND 2 7 Electric Air Heaters in VERSO S Series Air Handling Units Three interconnected unit parts are bolted together When heating capacity exceeds 45 kW additional electric heater section may be used also up to 45 kW In such a case additional heater is
9. air handling unit most important is to check the components that get dirty the soonest for example filters heat exchangers etc Periodical check ups of the air handling unit are done every 4 months During the check up the heat exchanger condition is checked whether the condensate drainage siphon and other components of the air handling unit are not dirty When the filters are dirty the warning system informs about it such system has to be installed when installing the unit Check ups and technical service has to be performed by the qualified specialists It is necessary to follow the instructions of heating system during exploitation period of the unit AN Specific warranty conditions are in unit warranty list UAB AMALVA reserves the right to make changes without prior notice CEND 5 ELECTRICAL INSTALLATION MANUAL Installation works may be performed only by duly qualified personnel The following requirements must be fulfilled during installation AN It is recommended to lay control circuit cables separately from power ca bles or to use shielded cables In this case the cable shielding must be grounded 5 1 Air Handling Units Sections Connection After unit parts have been connected together see Units Installation Instructions the connecting cables and wires of the sections of the unit are connected Connector connection is performed strictly according to numeration given in wiring diagram or adequate marking
10. and lt boe English Flow units m h Screen saver On Panel lock Off Touch sound Click N wv MM OM UAB AMALVA reserves the right to make changes without prior notice 49 CEND 6 6 Control of air handling units through a web browser You may not only monitor the operation of VERSO air handling units and the functionality of their individual com ponents change settings and activate extra functions by means of control panel but also by your computer All you need is to connect the unit to the computer local area network or the Internet using a network cable ES Standard CAT 5 network cable How to connect the unit directly to your computer 1 Plug one end of the network cable into the controller port on the unit see Picture 5 3 a and the other end to the computer 2 Go to the properties of your network card and enter IP address e g 192 168 0 200 and subnet mask 255 255 0 0 3 Open the web browser on your computer and disable all proxy servers in the settings 4 In the address bar of your web browser enter the IP address associated with the air handling unit the default IP address is 192 168 0 50 You can change it at any time on the control panel or from web browser see connection settings C5 Komfovent gt 192168050 Note It is recommended to download the latest version of your web browser before use 5 f the connection is successful a window prompting to enter your
11. compressor speed quickly to the start up value and this value is maintained throughout startup time as shown in the follow profile Figure 2 After startup procedure BLDC compressor are regulating by demand Inverter increase and decrease com pressor s speed by request BLDC compressor startup and control diagram Speed rps Request ke rm rm rm rm rm Startup speed Min speed Quick speedup Startup time Figure 2 E UAB AMALVA reserves the right to make changes without prior notice komfovent Compressor startup is a critical phase and for this reason controller has differentiated control for certain alarms to exceed the transition phase from compressor startup and allow it to reach operating condition The alarms that use this characteristic are the following Low pressure from pressure switch alarm Low evaporation pressure alarm The alarm condition is ignored with the compressor off and during startup Once the startup phase is complete the operation phase is entered and the alarm is trigged when the delay is exceeded It will behave as follows Low pressure alarm delay Compressor Condition Alarm Alarm iyi 5 4 f Startup delay K X Running delay Running delay Figure 3 Compressor is controlled to work in envelope zone The description of the work zones of a generic envelope are shown below Compressor s envelope N o A 5 Condensing
12. control panel 1 The control console should be installed in a room where the following conditions are ensured 1 1 ambient temperature 0 C 40 C 1 2 relative humidity range 20 80 96 1 3 protection against vertical dripping of water IP X2 2 Control panel connection is provided through a hole in the back or bottom side 3 The panel can be mounted on a flush mounting box or in any other place just screwing two holes on the fasten ing surface 5 6 Control panel connection The control panel is connected to the controller box see Picture 5 3 a The length of the cable for connecting the panel with the unit may not exceed 150 m The cable type is indicated on the electrical diagram of the unit p e a TL ee 1 os i 5 6 Picture Control panel connection Control panel connection and other cable thicknesses are specified in the wiring diagram 40 UAB AMALVA reserves the right to make changes without prior notice komfovent 6 OPERATION MANUAL 6 1 Unit Control Air handling units control system ensures control of the physical process es that are taking place inside the air handling unit 1 8 30 Control system consists of e main controller module 21 5 Circuit breakers and main switch
13. exchanger Compressor remain at fixed speed during the defrost function When the condition of defrost is deactivated the hot gas valve are closing compressor comes back to regu lated speed rotary heat exchanger increase rotation speed to normal Maximum defrost length is 20 minutes If after three defrosting attempts measured air pressure differential are higher than 0 9 p frost controller indicates Evaporator is icing alarm Controller has preventive defrost function It occurs every 300 min if the defrost function are activated de scribed above EI UAB AMALVA reserves the right to make changes without prior notice komfovent 2 4 Air Dampers Closing air dampers with aluminium or galvanized steel blades are used in the units Air damper is fixed to the air handling unit with screws 1 Aluminum or galvanized steel blades 2 Rubber sealing 3 Plate shaft for the actuator 4 Shaft for bypass damper closing opening 5 Fastening bend 6 Screw Installing Electrical Drives on the Air Dampers Electrical Dampers Safety The electrical actuators control air dampers of the air handling unit If air handling unit is installed outside then all the drives outside have to be protected from moisture and dust T a i BUSSE WE TT I M SSS BI Pe ENEN TTT MTT Tt d Hs ee eee E d f i l l ss e M p
14. for planning of the air handling unit operation lt Scheduling according to the weekly program and the annual cal Operation program gt endar GA LA Holidays gt Overview Scheduling Recirculation schedule Vv Functions Settings 6 5 3 1 Operation program lt TRAD User can set up to twenty operation programs for the unit For each program possible to adjust the mode of V Enable epu le operation day of the week and the time interval Weekdays Mo Tu We Th Fr Sa Su Program 1 N No w Start time 00 00 Stop time 24 00 Vv Delete program UAB AMALVA reserves the right to make changes without prior notice Default setting CEND 6 5 3 2 Holidays Holiday schedule specifies the time period during which the unit operates under selected mode Possible to set up to ten holidays 6 5 3 3 Recirculation schedule The recirculation level in terms of percentage points and operation time are set Up to 5 recirculation sched ules can be set This menu item is available when recirculation con trol according to the weekly schedule is activated 6 5 4 Settings This menu is for air handling unit and the user param eter setting 6 5 4 1 Air handling unit settings Temperature control lt Holidays Holidays 1 3 Add new holiday Recirculation schedule Schedule 1 gt Add new schedule Functions Settings The
15. from freezing in VERSO units Please look at the siphon installation guide Ej UAB AMALVA reserves the right to make changes without prior notice komfovent 3 VERSO AIR HANDLING UNITS TRANSPORTATION VERSO Air Handling Units Transportation by Crane Lift Truck and Carts The unit is transported separately While transported each section is fixed to a wooden pallet and wrapped Dampers and flanges are supplied not fixed to the unit They are on the top of each unit section Sealing connecting and fixing bolts are inside in each section Base frame is separate from the unit during the transportation When unit is loaded or unloaded by crane cargo rope is fastened in its designated places Lift truck or cart can transport air handling unit as it is shown in the pictures A Separate unit part is lifted by crane on a wooded pallet B Unit is transported by lift truck on a wooded pallet C One section of the unit is transported by lift truck on a wooden pallet D One section of the unit is transported by cart on a wooden pallet E Carts on a wooden pallet transport the unit UAB AMALVA reserves the right to make changes without prior notice EJ CEND 4 VERSO AIR HANDLING UNITS INSTALLATION 4 1 VERSO Air Handling Units Maintenance Space Maintenance space is needed for convenient inspection of the unit perform maintenance works when there is a need to pull it out for inspection change parts of t
16. of separate circuits Atskiry kontury skaicius 1 Quantity of refrigerant in first circuit Saltnesio kiekis pirmajame kont re P peroa K9 Quantity of refrigerant in second circuit Saltnesio kiekis antrajame kont re Dan kg 7 jette Cu Hermetically sealed system Hermetiska sistema Contains fluorinated greenhouse gases covered by Kyoto Protocol Sud tyje yra Kioto protokole nurodyt fluorintu iltnamio efekt sukelian i duj DO NOT VENT INTO ATMOSPHERE NEISLEISTI APLINKA R 410A Global Warming Potential GWP 1730 N R 410A Globalinio silt jimo potencialas GWP 1730 Win Komfoventcom UAB AMALVA reserves the right to make changes without prior notice CEND Troubleshooting of heat pump Possible solution Possible solution No Message Probable cause in heating mode in cooling mode Compressor moar dave See operation manual p 60 or control system failure The compressor has operated in critical conditions or there is insuf Overload protection ficient refrigerant amount in heat pump hydraulic circuit Check the activated working conditions and make sure they are in limits Low refrigerant level see item C8 Low air flow Increase supply air flow Increase extracted air flow Condenser obstructed Clean condenser surface Check pressure in heat pump system with manometers If pressure reading does not match check cable connection or replace transmit ter if necessary Compres
17. or heater if installed Heat pump capacity depends from air flow It s not recommended to use units with high air flows difference between supply and extract air If there are more than 20 difference between supply and extract air flows heat pump efficiency and capacity decreases or heat pump may not work properly at all Heat pump will be switched off if one or both air flow will be as in table 1 Heat pump capacity will be reduced to 60 96 if one or both air flow will be as in table 1 Table 1 Air flow when heat pump capacity are limited m3 h SSES UAB AMALVA reserves the right to make changes without prior notice EI CEND Diagram above illustrate heat pump capacity limitation Req min in diagram are minimum request 30 95 Request management from air flow Air flow Limited heat pump capacity Heat pump switched off Heat pump capacity Figure 1 Exhaust air temperature after rotary heat exchanger is 11 C or lower heat pump automatically switch off And will turn on when temperature increase up to 9 C Start up of compressor is performed when e No alarm condition is present e Compressor timing are satisfied Pressure difference Condensing evaporating is lower than maximum allowable value e The unit is required ON To optimize BLDC compressor start up the electronic expansion valve is kept opened in stand by mode for startup period the inverter is commanded to bring the
18. outside the unit hanging bar only as additional set 3 VERSO R RHP or VERSO P PCF with a suspended air heater outside the unit UAB AMALVA reserves the right to make changes without prior notice CEND Water Air Heater Air Cooler Direct Evaporation Air Cooler Connection to VERSO P PCF and VERSO R RHP Series Air Handling Units When connecting heat exchanger to the system it is necessary to use two pipe wrenches AN Be careful when exploitating hot water air heaters as the heating agent temperature may reach 130 C When operating air handling unit in the temperatures lower than 0 C it is necessary to use glycol additionally or assure the reversible heating agent temperature more than 25 C It is important to maintain air heaters and coolers cleanliness that is to change filters installed in the air handling unit on time If the air heater or cooler gets dirty to perform periodical cleaning Glycol is used in the air handling units with coil heat exchanger Never pour glycol down a drain collect it in a receptacle and leave it at a recycling centre or the like Glycol is highly dangerous to consume and can cause fatal poisoning or damage the kidneys Contact a doctor Avoid breathing glycol vapour in confined spaces If you get glycol in your eyes fush them thoroughly with water for about 5 minutes 1 Electric Water heater Air cooler or direct evaporation air cooler mounting pin 2
19. user name and password appears User user Password eeee Note the user name is user The initial password is also user after logging in the user can later change the password to any other of his her choice see user interface settings AN In case you forget your new password you can restore the initial password user at any time through control panel settings 6 7 Additional control options 6 7 1 Combined water coil control For the air handling unit with the combined water coil Combi coil heater and cooler in one the control of the mixing valve actuator is provided both under the air heating and cooling modes The actuator is connected to the control terminals of the heating circuit and operates only under the heating mode by default However upon trans fer of the feedback signal confirming that there is cold water within the circulation system to the control terminals IN4 of the external control e g by connecting additional device thermostat switch etc the air cooling function will be activated and the mixing valve actuator TG1 will be controlled under the air cooling mode AN Combi coil control function must be ordered in advance Ey UAB AMALVA reserves the right to make changes without prior notice komfovent 6 7 2 Multi level control of direct evaporation cooler For air cooling in the air handling unit there is provided 3 control contacts connection is shown in Picture 5 3 b Dependin
20. www bvtpartners ee Fl MKM Trade Oy www komfovent fi FR AERIA www aeria france fr Supply Air Ltd www supplyair co uk Ds ELTA FANS www eltafans com IR Fantech Ventiliation Ltd www fantech ie Isloft ehf en isloft is IS Hitataekni ehf www hitataekni is Ventilair group www ventilairgroup com i Vortvent B V www vortvent nl Ventistal AS www ventistal no NO Thermo Control AS www thermocontrol no PL Ventia Sp z 0 0 www ventia pl SE Caverion Sverige AB www caverion se Sl Agregat d o o www agregat si SK TZB produkt s r o www tzbprodukt sk TR Agon Mekanik www agonmekanik com 09 2015
21. 3 Frame 7 4 Bottom shields A 5 Place of sections connection 6 Bypass damper with actuator 7 Drop eliminator if needed 8 Condensate bath with drainage 4 8 1 7 Plate heat exchanger can be easily removed for inspection Removing plate heat exchanger from VERSO P PCF air handling units Demounting of the section l l ff t Zi Screws are unscrew bottom shields are removed Plastic axle pin Screw Frame bolts are removed the frame is removed Frame Frame bolts Plate heat exchanger is removed Condensate diversion mechanism is removed Bolts connecting the sections are removed Ooo oo0RoN 2A Cleaning and Inspection of Plate Heat Exchanger Always clean against the regular direction of airflow Inspection and dedusting of the plate heat exchanger is performed once per year it is removed from the unit and blown with an air blast or washed with tepid water Inspect the condensate drain to make sure that it isn t clogged UAB AMALVA reserves the right to make changes without prior notice DI CEND 2 3 Rotary Heat Exchanger in VERSO R RHP Air Handling Units The heat exchanger actuator mechanism is oiled with synthetic solution therefore there is no need to oil mechanism during its exploitation It is important to make sure that the rotary heat exchanger mechanism is clean to change the filters i
22. Check and replace if necessary element failure Heat pump will start operating Too low outdoor tem when the outside air temperature Heat pump does not perature will be above 15 C approxi DEED start mately Low supply or and Set the air flow more than 40 per Heat pump works regulary but with an 4 way valve failure Check 4 way valve coil Check 4 way valve and replace if necessary insufficient capacity Defrost solenoid valve Check solenoid valve coil Check solenoid valve and replace if is open necessary Low pressure trans ducer failure UAB AMALVA reserves the right to make changes without prior notice komfovent Possible solution Possible solution No Message Probable cause in heating mode in cooling mode Fxpansion valve OBS Check and replace if necessary not work properly Frost in compressor Refrigerant filter suetianiti clogged Check and replace if necessary Evaporator obstructed Clean evaporator surface Components vibrate Abnormal noises in Th p E heat pump system ede aed S Replace the compressor C the cause must be eliminated only by qualified person Table of terms factory setting Heat pump management Heat pump built in air handling unit are controlled by air set point temperature Heating or cooling function is activated automatically by set point and demand Default temperature control order 1 Rotary heat exchanger 2 Heat pump 3 Additional cooler
23. Cq room air pollution sensor VOCp room relative humidity sensor e room temperature sensor Operation on demand start up shut down is performed by the same sensor which is used in the control of the Air quality function eset settings A room sensor with the analogue output 0 10 V DC should be de signed for this function Factory setting m UAB AMALVA reserves the right to make changes without prior notice E komfovent 6 5 2 3 Outdoor compensated ventilation The ventilation compensation function adjusts the air volume depending on the exist lt Outdoor compensated ing outdoor temperature It is possible to enter four temperature points with two of V Enable them defining winter conditions and the other two defining summer conditions When i i Winter stop compensation start and end points for both winter and summer seasons are entered 15 C gt it is also possible to enter only one of them example only winter compensation in av this case the start and the end points of summer compensation should be the same 5 C gt the current ventilation intensity will be decreased in proportion according to the out Summer start 5 door temperature until it reaches the minimum possible ventilation level of 20 25 C Summer stop gt 35 C Reset settings Ventilation intensity 9o F1 F1 user selected air flow actual F2 minimum air flow 20 96 W1 winter compensat
24. Overview v Functions Settings 6 5 1 1 Alarms This menu displays the notification of existing faults After failure elimination see chapter 6 8 mes sages are deleted by selecting Delete By clicking on History can be viewed up to 50 registered alarms lt Alarms 21A Electric heater overheating 3B VAV calibration fail 6 5 1 2 Operation counters This menu displays operation time of the fans the con sumed energy of the heater and how much energy was recovered by the heat exchanger Delete lt Efficiency status Heat exchanger efficiency 83 History 6 5 1 3 Efficiency status Menu for the heat exchanger efficiency and energy re covery monitoring in real time Energy savin 6 5 1 4 Detailed information 30 i All temperature sensor readings functioning of sepa Energy recovery rate air handling unit elements and other detailed infor Ab kW mation is available in this menu komfoven Overview Alarms Operation counters Efficiency status Detailed information Filter status Inspection lighting lt Operation counters Air heater 121 kWh Supply fan 873 h Exhaust fan 875 h Recovered energy 1440 kWh N N Mw YM lt Detailed information Supply air temperature 21 9 C Extract air temperature 22 1 9C Outdoor air temperature 16 6 C Water temperature 25 3 C Supply air flow 350 m h 6 5 1 5 Filt
25. Siphon without the valve Condensate Condensate A Lee Nei e le 140 310 Ei UAB AMALVA reserves the right to make changes without prior notice komfovent Precaution The drainage siphon should be mounted on the outlet fitting pipe of every drip tray for complete condensate drainage from the air han dling unit and prevention of penetration of offensive odours from an efflu ent into the ventilation system In case of the outdoor operation of the air handling unit the siphon and the bleeders should be heated with an electric thermal cable if ambient air temperature t m lt 0 C The siphon and the bleeders should be heat insulated with an insulating material Water trap installation for a unit section mounted on the pressure side Since the fans in most air handling units are not last in the chain of functions and generate over atmospheric pressure inside the cooling section In such case the consisted condensate can be easily removed from AHU and there will be no strict requirements for siphon s installation A drainage siphon is enough with a minimum rake RECOMMENDATION The drainage siphon must be installed in connection with not less size pipe diameter 4 5 Check up before turning on VERSO Air Handling Unit e Before turning on air handling unit clean installment dust and waste Check whether cable and wires are connected firmly e Take off the unit all supporting shiel
26. T GONsy d DR Eo gt ty S a o WI fy cor ABEL AND E WM L3 pon 11 3 5 CA CERS Gg gt bai o s dp OVS e ert I Oo at UU XL Vs Aes e A Kies wm BZ S V uen H 9 a6 ON Lid PN ah a E S IN uum Gam S z 7 PAL CN So SS Ca xe c N QW oi pu A f E HOCH E Ee Oy GAINS 5j e eC r S LR D JAD SS DE oW AS L 1 j REGGE A TN Fe AC Lei Li ek 3 3 7 3 3 2 N 2 3 4 3 HP3 HP2 HPT3 Service ports UAB AMALVA reserves the right to make changes without prior notice Seulelyal 06 08 02 09 dHy OSYSA seuieuijes UAB AMALVA reserves the right to make changes without prior notice VERSO RHp unit data 10 20 30 40 50 60 70 80 90 Number of circuits 1 1 1 1 1 2 2 3 3 Compressors quantity per circuit 1 1 1 1 1 Refrigerant quantity in 1st circuit kg 2 8 3 5 5 6 8 0 10 0 8 0 90 9 0 9 5 Refrigerant quantity in 2nd circuit kg 6 0 6 7 7 0 7 5 Refrigerant quantity in 3rd circuit kg 7 0 L Informative sticker inside the unit Em d ala LEE JK Tr I A VS Gi LT Saeed p eg pm Pn Femme komfovent Air handling unit model V dinimo jrenginio modelis Verso 30RHp Malsimalus darbiniesl gis P nax bar 42 Refrigerant Saltnesis R410A Number
27. air handling unit provides for several temperature control modes e Supply The unit supplies air according to the temperature preset by the user e Extract Unit automatically supplies air of such temperature to maintain preset exhaust air temperature e Room Operation is similar to the mode exhaust but temperature is maintained by the sensor mounted in the room B8 e Balance Supply air temperature maintenance value will be determined automati cally from the existing exhaust air temperature i e what the air will be removed from the premises and the same will be returned back lt Holidays 2 Operation mode gt STANDBY From 12 14 gt Till 12 26 gt Delete holiday lt Schedule 2 Level 63 Weekdays Mo Tu We Th Fr Sa Su Start time 20 00 N N N UNA Stop time 24 00 Delete schedule Settings Air handling unit Personalization lt Air handling unit Temperature control Flow control Time Date Connectivity Reset settings AN When Balance is selected the temperature setpoint disappears UAB AMALVA reserves the right to make changes without prior notice komfovent Air volume control Supply and exhaust air volumes control modes have been provided in the unit CAV constant air volume control mode The unit will supply and extract a constant air flow which is preset by the user irrespective of any changes occurring in the venti
28. al switches over the unit to operation according to the weekly schedule Reset settings The OVR function provides for three operation modes selectable depending on the needs of the user 1 The mode When on the function will respond to the external control contact only when the air handling unit is on 2 The mode When off the function will respond to the external control contact only when the air handling unit is off 3 The mode Always the function will respond to the external control contact irrespective of the operating condition of the unit The OVR function has the top priority and therefore ignores all previous modes The function remains active as long as the external control contact is in the closed position 6 5 2 7 Humidity control Humidity control function is designed for maintenance of air humidity determined by lt Humidity control the user For proper operation of the function one or two additional humidity sensors V Enable shall be connected depending on where humidity will be maintained There are two l Ss Setpoint 1 modes for maintenance of humidity 5595 EH e Supply air The determined humidity of supply air is maintained using the sup Geet ply air duct humidity sensor B9 COMFORT 1 Room air The determined humidity of indoor air is maintained using the room Setpoint 2 N air or exhaust air duct humidity sensor B8 The supply air humidity limit is set 30 RH using th
29. alva lt KLAIP DA Dubysos g 25 LT 91181 Mob tel 8 685 93706 8 685 93707 el p klaipeda amalva lt SIAULIAI Metalistu g 6H LT 78107 Tel 8 41 500090 mob tel 8 699 48787 el p siauliai amalva lt PANEV YS Ber g 44 LT 36144 Mob tel 8 640 55988 el p panevezys amalva lt EXPORT amp SALES DEPARTMENT Ph 370 5 205 1579 231 6574 Fax 370 5 230 0588 export komfovent com GARANTINIO APTARNAVIMO SK SERVICE AND SUPPORT Tel Ph 370 5 200 8000 mob tel mob ph 370 652 03180 service amalva lt www komfovent It OOO AMATJIBA P Poccua MockBa KpoHlUTagTcKuN OynbBap Dom 355 ocbuc Ne 179 Ten cpakc 7 495 640 6065 info amalva ru www komfovent ru NOOO KomcboBeHT Pecny6nuka Benapycb 220125 r Munck yn Ypyuckas 21 423 Ten 375 17 266 5297 266 6327 minsk komfovent by www komfovent by Komfovent AB Sverige Ogardesvagen 12B 433 30 Partille Phone 46 314 87752 info_se komfovent com www komfovent se PARTNERS AT J PICHLER Gesellschaft m b H www pichlerluft at BE Ventilair group www ventilairgroup com CZ REKUVENT s r o www rekuvent cz WESCO AG www wesco ch CH SUDCLIMATAIR SA www sudclimatair ch KAPAG Kalte Warme AG www kapag ch Rokaflex Zahn GmbH www rokaflex de Ventilair group www ventilairgroup de UNIQ COMFORT ApS www uniqcomfort dk AIR2TRUST www air2trust com EE BVT Partners
30. ck the heating equipment temperature mixing valve or contactor is blocked f The emergency overheating protection of Protection can be reset only by pressing the RE EES the electrical heater has actuated SET press button on the heater Evaporator air temperature The evaporator air temperature sensor is not Check connections of the sensor or replace the sensor failure connected or broken sensor The evaporator is iced over due to exces Evaporator icing sively high humidity content in the exhaust air and low outdoor temperatures Check the operation of the evaporator defrost sys tem see Troubleshooting of heat pump p 62 Compressor system operated in an overload mode as a result of too high temperature in the condensing unit Low pressure on Compressor system is leaky or the amount Indentify the cause and eliminate it see Trouble compressor of refrigerant is insufficient shooting of heat pump p 62 High pressure on compressor Indentify the cause and eliminate it see Trouble shooting of heat pump p 62 Check supply voltage on the circuit breaker and or No power supply make sure whether it is on Check that the supply voltage is on all three phases Supply voltage mismatches if necessary swap the two phase conductor posi Compressor failure tions Check the compressor motor and replace it if nec Compressor motor failure essary S Check the operation of the compressor drive and Compressor drive
31. con nected to the supply air vent after the ventilation section AN Each electric heater section has separate main switch to which electric power supply is connected 1 Electric heater 2 Heater main switch 3 Unit main switch 2 8 Electric Air Heaters in VERSO P PCF and VERSO R RHP Series Air Handling Units Electric heater is mounted to the unit supply air vent and screwed to a side panel with pins ite Z i ij 4 N D N Lin 1 Pin by which electric heater is mounted to the unit supply air vent 2 Frame 3 Gasket Electric Air Heater Connection to VERSO P PCF and VERSO R RHP Series Air Handling Units a After opening doors of the air handling unit linkage 4 connecting the heater and the unit is connected b Unit electric power supply is connected to the heater introductory main switch 3 Unit electric power supply is connected The cable is put through the sealant 1 Ey UAB AMALVA reserves the right to make changes without prior notice komfovent 1 Sealant 2 Unit main switch 3 Heater main switch 4 Linkage connecting the heater and the unit Electric Air Heaters Protection from Overheating Three safety measures protect electric air heaters from overheating 1 70 C heater overheating protection When airflow velocity is too low it does not allow the heater elements to get hotter more than 200 C Protection system works automatically overheat is indicated on the remo
32. d to VERSO units through L 20 connectors VERSO units of size 60 70 80 90 are connected through L 30 Air damper connection to the air duct 1 Bolt 2 Connector 3 Flange 4 Air duct 5 Single sided adhesive gasket Flange connection to the air duct Screwed bolts M8x20 in the corners Special adhesive gasket ensures tightness 2 1 Bolt 2 C profile for flange connection 3 Single sided adhesive gasket 4 4 VERSO Air Handling Units Sloping Drain Tray The bend of the water trap can be repositioned by turning it to the right or the left The drain line from the water trap must be arranged so that it will not damage adjacent unit sections or building elements If the drain line is run through cold spaces it should be insulated to prevent freezing A heating cable may be required Water trap installation for a unit section mounted on the suction side Since the fans in most air handling units are last in the chain of functions and generate sub atmospheric pressure inside the unit it is very important to correctly install the water trap Because of that reason condensate can be hardly eliminated from the air handling unit and the technical premise may get covered with condensate Height H must be at least equivalent in mm to half of the negative pressure inside the unit in mm water gauge Height H must be at least equivalent in mm to the negative pressure inside the unit in mm water gauge Siphon with the spherical valve
33. ds and covers and other things left after installment of the unit e Before turning on the unit it is necessary to close all the doors and bolt all protection shields e Check whether air dampers open and close properly e Check whether heat exchangers are connected tightly e The air handling unit can be turned on only according to projected control system order if the air handling unit has the manufacturer s automation see control system instruction e f the air handling does not have manufacturer s control system the company installing control system is responsible for the unit s functioning and safety reliability e Before operating the unit air handling system tune up works must be performed VERSO Air Handling Units Warranty Conditions Warranty is not valid if the unit was installed or operated improperly or it was damaged mechanically also if the unit constituent parts are changed unauthorized or operation conditions are not suitable aggressive environment humidity etc It is forbidden to destroy wilfully air handling unit sections frames fan motor or other air handling unit parts during warranty period If this requirement is not followed the unit will not be serviced under the warranty service conditions When operating the unit periodical air handling unit checks ups by the user should be recorded in the Techni cal Service Register Qualified specialist authorized by the user should make the entries When operating the
34. e 46 UAB AMALVA reserves the right to make changes without prior notice E komfovent MEAS QUUM cea a lt Recirculation control The air handling unit with a mixing section has the extract air recirculation function i e when the extract air flow is returned to the room V Enable Recirculation can be performed according to Eemer e Room air quality In this case air quality sensor should be additionally con 800 ppm nected to the controller terminals B8 Air quality sensor The user can set the sais FREE amd air quality value to be maintained so that when it is exceeded the recirculation 30 damper is closed and the unit supplies more fresh air Mode 1 d COMFORT 1 External temperature Recirculation will be controlled to the external temperature curve set by the user e g Recirculated air 100 H eet ate Outdoor temperature 0 C 20 0 20 30 e Weekly schedule The user can set an automatic program for the whole week where the following can be assigned the moment and percentage of required recirculation The recirculation schedule is set with the scheduling menu e External contact If a device switch relay timer etc is connected to the external control terminals NA see Picture 5 3 b recirculation will be activated when the contacts are short circuited and will operate at the recirculated fresh air ratio set by the user 6 5 3 Scheduling Menu
35. e N t 5 AAN o s jj Me cm aml emery ied cera M J 0 0U gu o 6 t gt 6 E Oo no bp o Ce C 2g 2 oC 2 v D Se oc o OF OD SZ om S oe d oO e Des EE ET gt ak xe ox Ow OF Dv O ES DE e OS d oo 0 oe DC OC Oo oO KM SVR EXV SVD QC c0 P100 ON o Dischagre gas temperature DT ov ai Fe tU D o ERTER SEOED 5 05 gn OL2HC Gef gc oog9 9 ilo si 0552222 EE oo UD DNB copre SEKR 6 21 1r Ir ST LPT LP HPT HP UAB AMALVA reserves the right to make changes without prior notice komfovent VERSO RHP 10 20 30 UAB AMALVA reserves the right to make changes without prior notice 15 VERSO RHP 40 50 Tiekiamas Salinamas UAB AMALVA reserves the right to make changes without prior notice komfovent Two and three circuit system Two circuits system e e E o e mo Lr E N N N eo N 2 o o O amp SS 55 4 e e T mE Ko Bo ma bs o o s 92 SEKR 2 D DH EReeES S UD D ERz o o o c e oe e 2 G eg Z SSC o S2oB8 200929 o o202531 5490ov55252 0oo950oczoSoon059pbO SEES raTa gpp c E SEKR 9 E 9orzcotootzzcc z Hi oo D oe DZ 0 3 e e En be gt OD WO miu Ot ug 2 N CODN 0 LL A 5 1a 5 zctzO krkanka o o iN SN OW sch I X Co DU co 4 I i atb A O i e E e CASAS M4 Cc WC 2 i AU wu Y v QN CO 10 CO t o GC E o f C QN QUS e
36. e duct humidity sensor or hydrostat B9 Mode 2 gt ECONOMY 2 One of the below methods can be chosen for maintenance of the determined humidity Reset settings e Humidification of air There is a control signal of 0 10 V directly reflecting the capacity of the humidifier from 0 to 100 If humidification is required the control is transferred through the output TG3 of the controller e Dehumidification of air There is a control signal of 0 10 V directly reflecting the capacity of the dehumidi fier from O to 100 96 If dehumidification is required the control is transferred through the output TG3 of the controller e Dehumidification of air cooling heating Dehumidification is performed using the coolers and heaters available in the air handling unit If there are several coolers and heaters then it shall be pre determined which of them will be used in the dehumidification process e Humidification and dehumidification of air For humidification of air the control signal of 0 10 V is used through the output TG3 of the controller and the dehumidification of air is performed using the coolers and heaters available in the unit AN If the maintenance of the room air humidity is provided for then the humid ity function will prevail over the air quality and recirculation functions i e when humidification or dehumidification is required these functions will be blocked AN Humidity control function must be ordered in advanc
37. e e e Ke E 5 3 a Picture 1 Control panel connection 2 Ethernet computer network or internet connection 3 Fuse 1A External control elements connection MODBUS RS485 connection External control External stop Fire system OVR control Common Return water temperature sensor Supply air temperature sensor mixing valve actuator mixing valve actuator Cooling water pump 230V AC 1A Heating water pump 230V AC 1A External control Lag D a Weg zilzlz Indication Cooling control z 25 o E t E os E o5 x O as O Humidity sensor Air quality sensor Exhaust air pressure sensor pressure sensor DX2 signal DX1 signal Common DX3 signal 230V AC 0 5A D UI co gt lt 5 3 b Picture UAB AMALVA reserves the right to make changes without prior notice EJ CEND 5 4 Temperature Sensors Installation The supply air temperature sensor B1 5 4 a Picture is mounted in the air duct in a projected place for it after electric heater or cooler section if provided The minimal distance from the air vent of the unit up to the sensor should be not less than a diagonal of rectangular connection The water temperature sensor B5 5 4 b Picture is mounted on the water pipe by screwing it into the provided hole The sensor must be thermo insulated Supply air temperature sensor B1 Water temperature sensor B5 5 4 a Picture 5 4 b Picture 5 5 Requirements for the installation of the
38. er or wet textile UAB AMALVA reserves the right to make changes without prior notice EJ CEND 2 9 VERSO Series Air Handling Units Designed for the Outdoor Use VERSO air handling units which are designed for outdoor use can be additionally assembled with roofs with water drain tray to opposite viewing side Every section has separate roof which must only be connected together Roof Roof plate Roof plate fixer Air intake hood Exhaust hood External grills Valve actuator cap Roof screw Front roof support 10 Middle roof support 11 Side roof support oooxoonsow Installation process if the roof is delivered separately On the edge of the unit place and fix front roof plate with screw 4 2 x 13 Place on the top roof plate 2 Find the right place of middle roof support 10 Mark it Replace roof plate Fix middle roof support with screw 4 2 x 13 Fix roof plates to the supports with screw 4 8 x 20 If itis side section of the unit fix side roof support 11 If section is middle no supports are needed Roof must be joint and fixed with plate fixer 3 with screw 8 4 8 x 20 with EPDM rubber pU ue wes On the supply and exhaust air vents there is a possibility to mount additional casings and external grills AN Joints need to be additionally sealed if units are intended to be used out side Sealant is not included in unit set AN It is needed to protect water trap tubes
39. er status It is possible to monitor the pollution level of filters and to calibrate clean filters It is recommended to perform the initial calibration of filters after the first start of the unit When filters are replaced dur ing operation it is recommended to perform the clean filter calibration 6 5 1 6 Inspection lightning In this menu item you can switch on off the light during the unit inspection for in stance when replacing filters The option appears on the panel only if the air handling unit has been pre ordered with built in lighting UAB AMALVA reserves the right to make changes without prior notice Filter status Outdoor air filter impurity 55 Extract air filter impurity 60 Clean filters calibration CEND 6 5 2 Functions In this menu item the user can activate and set ad Air quality ditional unit functions WI Control IS A GA E Operation on gt blank box function is not activated z demand m gray box function is activated but currently not operating Overview Scheduling Outdoor compen m blue box currently operating function Ll sated ventilation Summer night L cooling Minimum tempera I O S gt ture control Vv Functions Settings 1 2 gt lt Air quality control 6 5 2 1 Air quality control Air quality control is designed according to e CO sensor 0 2000 ppm V Enable e air q
40. failure We replace it if necessary Supply fan drive failure Atann signal Has DEEN Teceived mom Ts Check the supply fan drive and its messages supply fan drive Supply fan drive overload The supply fan drive is overloaded Ge SEENEN Supply fan motor failure The supply fan is broken Check the supply fan and replace it if necessary Check the condition of the supply fan and make sure Supply fan motor overload The supply fan is overloaded that the resistance of the ventilation system is not ex ceeded Exhaust fan drive failure Araul sane nas DESIT RE Ce Nee MONTEE Check the exhaust fan drive and its messages haust fan drive Exhaust fan drive overload The exhaust fan drive is overloaded neck the condition of the exhaust fan drive and its cooling Exhaust fan motor failure The exhaust fan is broken Cheek ihe exhaust fan and replace ii if necessary Check the condition of the exhaust fan and make Exhaust fan motor overload The exhaust fan is overloaded sure that the resistance of the ventilation system is not exceeded Rotor drive failure A tauli EE Check the rotor drive and its messages tor drive Rotor drive overload The rotor drive is overloaded SCH PS GEES DEER BNG and Its Ee Rotor motor failure The rotor motor is broken Check the rotor motor and replace it if necessary Check the condition of the rotor motor and make Rotor motor overload The rotor motor is overloaded sure that the rotor is not blocked No commun
41. g on how much will be cooling steps and how it will be divided on steps automatically will be selected optimal control method If the capacity of all steps is the same then only three control steps are possible If cooling capacities of steps are close to ratio 1 2 4 the capacity of each of the following steps is double the previous then cooler control will be realized with seven cooling steps Example To the terminals DX1 is connected 1kW cooler to DX2 2kW and to terminals DX3 connected cooler with 4kW capacity Control will be in steps 1 1kW 2 2kW 3 1kKW 2kW 4 4kW 5 1kW 4kW 6 2kKW AkW 7 1KW 2kKW 4kW The function of step rotation is provided when capacities of coolers are the same The number of direct evaporation cooling units must be provided in ad vance 6 7 3 Reversal of direct evaporation coolers There is a reverse option of direct evaporation coolers i e when the cooler is switched to the heating mode In such case there must be only max 3 cooling control steps There are control terminals DX3 for connection of the cooler reversing signal Heating Pic 5 3 b The option of reversal of direct evaporation cooling units must be provided in advance 6 7 4 Inverter direct evaporation cooler control There is an inverter unit control which power can be managed smoothly For the inverter unit power control there is a modulated signal TG2 as well as signals cooler start DX1 cooling demand DX2 heat
42. he unit or even the whole unit In order to change some unit components there might be a need to demount the unit partially or completely The minimal unit maintenance space range is enough to change air handling unit filter A recommended space for the unit maintenance Amin minimal necessary space for the unit operation H free space over the installed air handling unit B recommended space behind the air handling unit E UAB AMALVA reserves the right to make changes without prior notice komfovent 4 2 Setting and Installing VERSO Air Handling Units Before installing air handling unit it is important to remove transportation elements If the unit was transported not on the positioning frame sections should be placed from wooden panels to positioning frame The unit is installed on even and solid base location that was assigned to it According to the unit weight which is indicated in technical specifications dimensions and other important parameters special construction calculations should be done If the unit is ordered with adjustable feet unit can be leveled with its help Leveling up to 50 mm AN If the surface on which the unit is installed is not even the air handling unit can distort because of that doors may not close correctly there may be gaps between jointed sections It is advisable to put a gum seal between the air handling unit and the base AN It is forbidden to install the air handling un
43. he unit performs air ventilation with regeneration func tion and air is heated with additional heater if provided e Carefully high pressure inside up to 42 bar e High pressure cut out 42 bar cut in 33 bar automatic reset Low pressure cut out 1 7 bar cut in 2 7 bar automatic reset e For stable operation of the device set the device controlling mode under the outdoor temperature duct or room e Inside the unit is refrigerant R410A friendly to environment e Before commissioning make sure that the air handling unit is filled with refrigerant This can be done by look ing through the moisture indicator ke UAB AMALVA reserves the right to make changes without prior notice komfovent The unit is equipped with moisture indicator At high moisture content of the system it must be cleaned changed the filter and re filled with refrigerant e The unit washing cleaning maintenance is carried out as well as any other type of device described in this manual e Device information sticker of the used refrigerants is applied near to the high and low pressure filling valve Sticker is seen when doors are opened n heating mode supply air temperature can range due to frozen evaporator Therefore this unit is not rec ommended for use as a basic unit for heating at low outdoor air temperatures use with a secondary heater D exhaust air C extract indoor A outdoor intake B suppl
44. he unit the VAV mode should be selected and calibration procedure should be confirmed After the end of the calibration depending on the configuration of pressure sensors VAV mode status will change to Supply Extract Double After calibration the air handling unit further will operate in the previous mode DCV direct controlled volume The air handling unit will operate similarly as in the CAV mode but air volumes will be maintained directly in accordance with the values of the B6 and B7 analog input signals of controller After giving the signal 0 10 V to the appropriate input it will be converted according to the current determined air volume For example if the maximum air flow of the unit is 1000 m h setpoint in the panel 800 m h and the B6 input value 7 V the unit will supply constant air volume of 560 m h i e 70 of the set value The same applies to the exhaust air only by B7 input see picture 5 3 b Time Date Time and date is required for air handling unit operation planning Connectivity other control panel settings Language IP address and subnet mask Setting is required when air handling unit is connected to PC network or Internet Controller ID Number that identifies the controller when several air handling units are connected to common network and controlled by one control panel 6 5 4 2 Personalization is i e P lizati In this item for the user are presented menu language measurement units
45. ication with the internal com ponents of the air handling unit controller Communication error extension modules frequency converters fans etc or one several of them are bro ken Controller failure Main controller module fault Replace the main controller Check internal connections and functioning of sep arate components UAB AMALVA reserves the right to make changes without prior notice ES The emergency protection of the electrical heater against overheating can be reset with the RESET button only if the cause of the overheating of the heater has been clarified and eliminated AN If the unit is shut down and a red light diode is shining and a failure text message is shown on the control panel the fault must be eliminated AN Before performing any jobs inside the unit make sure that the unit is stopped and disconnected from the electrical power supply After failure has been eliminated and power supply connected the error messages should be deleted How ever if the failure has not been eliminated unit either starts operating and after some time it stops again or it does not operate and failure message is indicated ED UAB AMALVA reserves the right to make changes without prior notice cafftalva UAB AMALVA VILNIUS Ozo g 10 LT 08200 Tel 370 5 2779 701 Mob tel 8 685 44658 el p info amalva lt KAUNAS Taikos pr 149 LT 52119 Tel 8 37 473 153 373 587 Mob tel 8 685 63962 el p kaunas am
46. ing demand DX3 see Pic 5 3 b There are three different control methods 1 Universal control suitable for most cooler units 2 Control adapted to Panasonic cooler units 3 Control adapted to Daikin cooler units AN The inverter cooling unit controls should be provided in advance 6 7 5 Additional zone control By connecting the additional extension module to the air 1st additional zone control handling unit the supply air temperature is maintained j j Overide functi E in a separate ventilated area room i e the module has Lieu gt V Enable the option to independently control additional heaters and j 1st additional zone gt Setpoint 5 coolers In this case the user can have a separate tem contral 21 0 C erature setting for the particular area 2nd additional zone d d j L control There is a possibility to control up to 2 additional areas two additional extension modules Reset settings N N Vv AN Detailed information is presented in the additional zone installation manual The purpose of additional zone heater cooler could be changed from independent to additional control In such case this control mode can be used when the air handling unit is equipped with several heaters coolers of the same type or when the standard configuration of the control system does not provide the required demand AN Additional zone control is ordered in advance UAB AMALVA reserves the right
47. ion start point W2 winter compensation end point 1 summer compensation start point S2 summer compensation end point l Outdoor i temperature 30 C 6 5 2 4 Summer night cooling Summer night cooling function is intended for energy saving during the summer sea son by utilizing the outside chill of night hours it is possible to cool down heated V Enable rooms i e to remove excessive heat that accumulated in the room during day hours Re RETRY Summer night cooling function can start at night from 00 00 h to 06 00 h a m 25 eC at any time even when the air handling unit is not working and is in standby mode NEUEN E User can set indoor temperature at which this function starts and stops 20 C gt When this function is active the current ventilation level is switched to the maxi mum ventilation intensity 100 and ventilation is performed only by means of fans i e at that time neither the air cooling nor the energy recovery functions operate Summer night cooling Summer night cooling function has an operating priority over the fol CURES lowing functions outdoor compensated ventilation and the air quality function 6 5 2 5 Minimum temperature control In winter time the minimum temperature control function forcibly reduces the supply lt Minimum temperature and extract air flow set by the user when the heater capacity available in the unit is V Enable ins
48. its one on the other AN Wiring connection see electrical installation manual 1 Fastening place for the key to the doors during air handling unit transportation 2 The key Noise Caused by VERSO Air Handling Units Air handling unit causes some acoustic noise more specific data is available in the technical unit specification and this has to be taken into consideration when installing air handling unit Comfort in the facilities depends not only on the air handling unit but also on the quality of the ventilation system installment quality and other factors noise reduction means and etc Recommended e To install air handling unit not closer than 500 mm from a wall if needed use additional noise reducing materi als for example layers of mineral wool e Make sure that vibration from the air ducts does not transmit to the building construction therefore it is recommended to use flexible connectors absorbing air duct holders Air ducts must be selected so that air flow would not create additional noise and vibration e Air handling unit has to be installed on a fairly massive and solid base considering mass of the unit and the construction standards It is recommended to lay gum sheets between air handling unit and the base UAB AMALVA reserves the right to make changes without prior notice EJ CEND 4 3 Connection to the air duct VERSO Air Handling Unit is connected to the Air Duct in Two Ways Air ducts are connecte
49. komfovent e e D e e Ti ies j Mies S ul ZS Ae 2 Ae s A 3 RE e 7 rt NEL NN NN VERSO S R P RHP PCF CEND Installation and Maintenance Service Manual komfovent Content 1 VERSO AIR HANDLING UNITS EE 9 1 1 VERSO Air Handling Bett le E oo Tec 6 Oo cfr ues Bo Re TH 7 1 3 VERSO P PCF Air Handling Units Equipped with Plate Heat Exchanger ssssnnnn00nannnnnnnennnnnnennnene 7 1 4 VERSO R RHP Air Handling Units Equipped with Rotary Heat Exchanger ssasnnn0nnnnnnnnnnnnnnnnnnnneni 8 129 Briel Description of the UNI e m m 8 1 6 VERSO Air Handling Units Composing Optons sissscocccessessitetccceneenoncidasiidcnnceteenseannioebeedddedeeteseasadssesenacanaeoets 9 2 VERSO AIR HANDLING UNITS CONSTRUCTION seen nnn nennen nennen rns 10 CAD ML IM RI E H 10 2 2 Plate Heat Exchanger in VERSO P PCF Air Handling Untts nnn 10 2 3 Rotary Heat Exchanger in VERSO R RHP Air Handling Units eese 12 ZEN I eA CREE TU EN 25 2 5 Air Filters and Filter Change ee vccscscnussasendeeccesstetsnssiabisdectorsncuaas cans cesaeaitenieatsaseaandevessnsaaatirecateues 25 2 6 Water Air Heaters Air Coolers Direct Evaporation Air Coolers 26 2 7 Electric Air Heaters in VERSO S Series Air Handling Units ENNEN 30 2 8 Electric Air Heaters in VERSO P PCF and VERSO R RHP Series Air Handling Units 30 2 9 VERSO Series Air Handli
50. lation system VAV variable air volume control mode The unit will supply and extract an air flow with regard to the ventila tion needs in different rooms In case of frequently changing ventilation demands this air volumes mainte nance mode signally reduces unit exploitation costs It is possible to use a simplified VAV control function single flow VAV control It means that the performance of this function requires only a single air flow pressure sensor which is installed in a variable air duct system e g in supply air This variable system is called the master ventilation system according to which control is performed while the other air flow in this case discharged air operates as the slave ventilation system and always follows the master one If the supply air requirement in the ventilation system which is assigned as the master system decreases the intensity of discharged air in the slave system is reduced correspondingly by the same percentage AN If the variable air volume control function is mode is selected the initial calibration of the control mode must be performed otherwise the unit will not operate if the VAV mode is selected Variable air volume control mode calibration Before start of calibration the air distribution and exhaust devices in ventilation system should be adjusted all valves for variable air flow in a way enabling air supply to all ventilated premises should be opened After switch on of t
51. lity humidity and energy saving All other unit parameters are presented in the menu Overview see 50 page RN Ee RN Kod Ae ya er eh Ze 12500 m h 21 3196 13100 m3 h Hr Temperature Air flow Air quality Energy saving e gt ECONOMY 1 S ECONOMY 1 ECONOMY 1 ECONOMY 1 6 4 Operation modes selection Six operation modes are possible one of them user can select directly from control panel main window Two Comfort and two Economy modes for each of them the user can set air flow and temperature e Special mode allows the user not only to set air flow and temperature but also to select blocking or using heating cooling and other functions OFF mode completely turns off the unit lt Operation modes lt ECONOMY 1 Supply air flow as COMFORT 1 Sens d 9 COMFORT 2 Extract air flow Se S O 1250 m h gt A ECONOMY 1 Setpoint n O 20 oC gt Om ere e han Temperature M gt SPECIAL rue Reset settings 6 5 Menu Menu of panel consists of the four points 2 Overview Scheduling Temperature gt Functions Settings ECONOMY 1 42 UAB AMALVA reserves the right to make changes without prior notice 6 5 1 Overview Main air handling unit parameters are presented in the main windows Chapter 6 3 All other information re lating to the operation of the unit malfunctions and ef ficiency status is detailed in overview menu C Scheduling
52. ng Units Designed for the Outdoor Use nnnnnnnnnnnnnnnnnnnennnrsrnnnrnnnnnnnnenrrren nnn 32 3 VERSO AIR HANDLING UNITS TRANSGPORTATION nene nnne nennen nennen 33 4 VERSO AIR HANDLING UNITSINSTALLATION nnne nnne rrr nenne nnns 34 4 1 VERSO Air Handling Units Maintenance Space osea nazek exa eno xn nah ki ER nen kit aaa pavo a 1t e anpra rr rnnt EE EEN 34 4 2 Setting and Installing VERSO Air Handling Units aen 35 4 3 Connection Belge i c SPP ET TL TT UU TUNE REPRE 36 4 4 VERSO Air Handling Units Sloping Drain seesuuneocucc e oae hose o ure Lbs vase auda cani ce Me opas d ERE n annEE a EP Robes ames 36 4 5 Check up before turning on VERSO Air Handling Unit 37 5 ELECTRICAL INSTALLATION MANUALE 38 5 1 Air Handling Units Sections Connection E 38 5 2 Electric Power Supply COMME CON x eooooo iier unos UEM MEE ERE rubG Ced n PI cUm art eege 38 5 3 External Elements Connection NE T UU Onn EEEEE nEn EEEn 38 5 4 Temperature Sensors Installation EE 40 5 5 Requirements for the installation of the control panel cccccssssescececeessseeeeeeceeeeeeeeeeseeesseeeeeeesaaseeees 40 5 6 COntrol EELER p PNE D EE EEN 40 6 OPERATION m IL reene 41 6i Unit COMON T E 41 6 2 Control panel indication MEE EE o ttrt Attn ttt E P 41 Boc Parameters OVER VIGW tacaceaasaarashitaceraacatodsadxsnnnceabasananannceuniaieteadnnnddastpopppoumitand E AEA EERE
53. nsor 1 2 3 4 1 Water air heater 3 Direct evaporation air cooler 2 Water air cooler 4 Two step direct evaporation air cooler Water Air Heaters Air Coolers Direct Evaporation Air Coolers in VERSO S Units ER d t Possible VERSO S composition options with the air heater and air cooler and additional heater mounted out side the unit E UAB AMALVA reserves the right to make changes without prior notice komfovent Water Air Heaters Air Coolers Direct Evaporation Air Coolers Mounted at the Bottom of VERSO P PCF VERSO R RHP Units The section of air heater air cooler or direct evaporation air cooler insulated in mineral wool is mounted on the outside of the unit Therefore air handling unit takes less space and it is more convenient to install 1 VERSO R RHP or VERSO P PCF with air heater installed outside the unit 2 VERSO R RHP or VERSO P PCF with air heater or air cooler installed outside the unit Water Air Heaters Air Coolers Direct Evaporation Air Coolers Mounting Types at the Top of VERSO P PCF VERSO R RHP Units 1 VERSO R RHP or VERSO P PCF with air heater and air cooler positioned on the welded frame outside the unit base frame with legs for heat recovery section only as additional set 2 VERSO R RHP or VERSO P PCF with air heater and air cooler suspended
54. nstalled in the air handling unit on time to perform periodical heat exchanger cleaning The temperature efficiency of a dirty heat exchanger can diminish considerably 1 Rotary heat exchanger frame 5 Main C5 module 2 Rotor 6 Heat pump system 3 Shaft 7 Inverter driver for compressor 4 Actuator with reducer 8 Heat pump control module Cleaning and Inspection of Rotary Heat Exchanger Inspection of the rotary heat exchanger is performed once per year Free rotation of the rotary heat exchanger con tinuity of the rotating belt absence of damages of the rotor drums and the seal gasket are checked It is necessary to check the stretch of belt Free belt will slide and the efficiency of rotary heat exchanger will fall down To reach maximal efficiency rotor must turn at least 8 times per minute Polluted heat exchanger will decrease efficiency Clean heat exchanger with an air blast or wash with tepid water Check out water falling on the electric motor If the fabric drive belt is worn or substantially fouled it should be replaced Do not lubricate it Contact service personal Rotary heat exchanger s service and maintenance details are described in Rotary heat exchangers manual VERSO RHP air handling units with integrated heat pump e Air handling unit with integrated heat pump operation range is from 15 to 35 C At lower temperatures from 15 to 30 degrees heat pump system is switched off T
55. on bolt 5 Air cooler water or direct evaporation 11 Extension module 6 Frequency inverter 12 Main module 1 Air dampers closing 2 Supply air filters 3 Exhaust air filters 4 Supply air fan with electric motor 5 Exhaust air fan with electirc motor 6 Plate heat exchanger 7 Air heater water or electric 8 Air cooler water or direct evaporation 9 Main module 10 Base frame 11 12 13 14 15 Sections connection Sections connection Sealing gasket Connection bolt Frequency inverter 16 Extension module 10 16 15 4 7 8 UAB AMALVA reserves the right to make changes without prior notice CEND 1 4 VERSO R RHP Air Handling Units Equipped with Rotary Heat Exchanger 1 2 3 4 5 6 T 8 9 10 11 12 13 14 15 16 SR ele BARBS dI 1169 11 Air dampers closing Supply air filters Exhaust air filters Supply air fan with electric motor Exhaust air fan with electirc motor Rotary heat exchanger Air heater water or electric Air cooler water or direct evaporation Main module Base frame o p ee CG S a SI a es I i z iM CE K Sections connection de Sections connection 2 i Sealing gasket Connection bolt Frequency inverter Extension module
56. replace the VAV calibration fail kei Sensor Change outdoor air filter The fresh air filter is blocked Shut down the unit and replace the filter Change extract air filter The extract air filter is blocked Shut down the unit and replace the filter Too high resistance of the ventilation sys Low supply air flow fain Too high resistance of the ventilation sys Low extract air flow tem As soon as the heater cools down protec tion resets automatically It is recommended to increase the ventilation intensity level Temporary mode which can be activated by The service mode is switched off by simply deleting Service mode the service personnel the alert message The heater is disconnected due to too low Electric heater off air volume Supply air temperature sen The supply air temperature sensor is not Check connections of the sensor or replace the sor failure connected or broken sensor Outdoor air temperature The external air temperature sensor is not Check connections of the sensor or replace the sensor failure connected or broken sensor Exhaust air temperature The exhaust air temperature sensor is not Check connections of the sensor or replace the sensor failure connected or blocked sensor Water temperature sensor The water temperature sensor is not con Check connections of the sensor or replace the failure nected or broken sensor Return water Return water temperature of the heater Check the statu
57. rom during service maintenance or in connection with an accident If the unit is placed in spaces with high humidity condensation might occur on the surface of the unit when outdoor temperatures are very low Under conditions when the outdoor air temperature is low and humidity is high risk of heat exchanger frost ing may appear For this reason anti frost protection function is foreseen in the controller of the Komfovent air handling units Depending on the type of the recovery different methods of anti frost protection are available cold air by passing or and supply air fan speed reducing For extremely low outdoor air temperature the duct mounted preheater is recommended Counter cross flow heat exchanger is the mostly sensitive for low outside air temperatures as the risk of frosting appears in the temperature range from 0 to 5 C and below Standard aluminium cross flow plate heat exchanger has better features as the risk of freezing appears only at 10 C The lowest risk and the highest resistance to cold outside air is a competitive feature of the rotary heat ex changer as it is not freezing even at the temperatures of 30 C if the humidity level of the air is appropriate UAB AMALVA reserves the right to make changes without prior notice komfovent 1 6 VERSO Air Handling Units Composing Options VERSO S VERSO P PCF VERSO R RHP II f ALTE outdoor intake gt gt supply air gt extract indoor d e
58. s see unit electric scheme When disconnecting sections of the unit do not pull connecting wires and cables 5 2 Electric Power Supply Connection Electric power supply 400 V AC 50 Hz voltage is connected to the main switch which is envisaged in the heat exchanger middle section of the air handling unit Prior to connecting to the power supply the main switch must be installed near the unit in the intended place or directly on its wall It is necessary to connect earthing AN Unit must be connected to the stationary installation by solid cable through circuit breaker with 300 mA current leakage protection The power supply cable of the unit and electrical heater is selected according to the maximum current strength indicated in the presented technical data sheet The cable types are indicated in Table 5 2 5 2 Table Electric power supply cable types 5 x 6 0 mm Cu 5 100m Cu 5 160m Cu 5 250m Cu Before connecting unit to the electrical power supply it is necessary to check whether earthing has been installed properly 5 3 External Elements Connection The air handling unit is designed with external connection terminals which are located on the controller box in the middle heat exchanger section All external control elements are connected to the terminals EJ UAB AMALVA reserves the right to make changes without prior notice komfovent Controller with connection terminals fett i ws a 2 Mi
59. s and operation of the circulation temperature low dropped below the permissible limit pump heating system and mixing valve actuator Check the ventilation system Find the source of the heat A fire signal has been received from the fire Delete alarm message and restart the unit when the External fire alarm cn WEE signalization system of the building fire signal disappears A signal from an external device switch As soon as the auxiliary device is switched off the timer or sensor has been received unit will operate in the previous mode e Blocked or not rotating rotor by pass damp Check the rotor drive replace the belt or check the Heat exchanger failure er failure by pass channel operation Check the operation of the rotation heat exchanger drive or the air bypass damper of the plate heat exchanger Low supply air temperature The HES equipment tals tO Operate ollis Check the heating equipment capacity is insufficient E UAB AMALVA reserves the right to make changes without prior notice Extract air temperature sen The discharged air temperature sensor is Check connections of the sensor or replace the sor failure not connected or broken sensor Internal fire alarm Fire danger in the ventilation system External stop Icing may form under a low outdoor tem neskexenabger icing perature and high room humidity komfovent Message High supply air The heating equipment is not controllable Che
60. sor failure High pressure trans ducer failure Incondensable gas in heat pump hydraulic Recharge circuit after having drained and evacuated it High pressure on com circuit ressor i i p Refrigerant filter Check and replace if necessary clogged Excessive refrigerant Discharge the excess gas charge Expansion valve does Check and replace if necessary not work properly Liquid receiver rotalock Check and open valve is closed Increase supply air flow Increase extracted air flow Frosted evaporator See item D1 o E Check pressure in heat pump system with manometers If pressure reading does not match check cable connection or replace transmit ter if necessary Evaporator obstructed Clean evaporator surface Expansion valve does Low pressure on not work properly Check and replace if necessary compressor Refrigerant filter Check and replace if necessary clogged Mose in ne PUMP Replace filter and dry out system hydraulic circuit P y y Check circuit with leak detector Repair evacuate and refill circuit Low level of refrigerant with refrigerant Refrigerant filter Replace filter clogged Check solenoid valve coil Check Defrost solenoid valve solenoid valve and replace if does not open necessary PM Check air pressure measure Evaporator is icing Air pressure transducer fail t ment tubes Replace air pres l sure transducer if necessary Evaporator tray heatin D iid 9
61. te control device 2 100 C heater overheating protection After disconnecting electric power supply from the heater protection is restored manually the reset switch on the heater is pressed overheating is indicated on the remote control device 3 60 C triac overheating protection Heater control is terminated protection resumed automatically message is displayed on the remote control device There is a possibility to resume overheat danger safety by pressing RE SET button only if before reasons for the heater overheating are clarified and eliminated Cleaning and Inspection of Electric Air Heaters Recommended to perform periodical inspection and cleaning of heater Check the plates of water air heater The air heater is cleaned with hoover from supply air side or with air blast from exhaust air side If it is very dirty wash with tepid water which will not make corrosion of aluminium Check if position of return water temperature sensor is right Check if electric air heater is properly fixed wires connections are not damaged and heating elements are not bent They can be damaged or bent due to uneven heat or uneven and turbulent air direction Check if electric air heater is clear of unnecessary things and heating elements are not clogged because this can cause unpleasant smell or in the worst case dust can start burning Air flow through the air heater should be greater than 1 5 m s Heating elements can be cleaned with hoov
62. to make changes without prior notice Eg CEND 6 8 Troubleshooting If the unit fails to operate Make sure that the unit is connected to the power supply network e Check whether the main switch if designed is turned on e Check all fuses of the automatics If necessary replace blown out fuses with new ones having the same elec trical parameters the sizes of the fuses are indicated on the schematic electrical diagram e Check whether there is any failure message on the control panel If there is indication it needs to be elimi nated first In order to eliminate the failure follow the table e If nothing is indicated on the control panel check whether cable connecting control panel with the unit is not damaged 6 8 Table Alarms indicated on the control panel their possible causes and elimination methods Message Possible cause After disconnecting the unit from power supply it is necessary to carry out periodic inspection of the unit i e to check the condition of the heat exchan ger the heater and fans If unit continuous operation without breaks Service time was 12 months then periodic inspection message appears Check pressure pipes air dampers air filters and make sure that the ventilation system is not blocked Check pressure pipes air dampers air filters and make sure that the ventilation system is not blocked ee Pressure sensors are not connected or bro Check connections of the sensor or
63. uality sensor VOCq 0 100 96 Sone e air pollution sensor VOCp 0 100 94 1000 ppm relative humidity sensor 0 100 96 temperature sensor 0 50 C COMFORT 1 Setpoint 2 d Depending on the type of the selected sensor the value of the air quality function EM to be maintained is set and the air handling unit intensity will be adjusted according DE uS gt to that value Ventilation intensity will be increased automatically in the case of de viation from the set value and decreased again when it is approached For example if the unit is designed with the CO maintenance function and is equipped with a CO sensor after setting value 800 ppm this set CO level will be maintained by adjust ing ventilation intensity i e ventilation intensity will be increased if the CO level grows and will be decreased when it returns to the previous condition Reset settings The function of air quality operates only if no other below function is active at the same time summer night cooling min temperature control outdoor compensated ventilation 6 5 2 2 Operation on demand The air handling unit start up function is designed to start the unit which currently off lt Operation on demand when one of the selected parameters has exceeded the critical limit Z Enable The function provided for the start up of the unit according to l Setpoint room CO sensor 1000 ppm room air quality sensor VO
64. ufficient and or heat recovery does not ensure minimally possible temperature I supply to the room The user can set a separate supply air temperature value so pg that when that value is not achieved the intensity of the ventilation unit starts to be reduced automatically The air flow may be reduced to the minimally possible ventilation intensity of 20 96 During the summer when the air handling unit provided with cooler this function according to the same user set value limits the cooling capacity thus ensuring the minimum possible temperature supply to the room Reset settings UAB AMALVA reserves the right to make changes without prior notice CEND 6 5 2 6 Override function Override OVR control of the unit can be performed by the external contact see Picture 6 3 b or device timer switch thermostat etc The received signal from V Enable the outside activates the OVR function which ignores the current operation modes MER of the unit and performs one of the selected actions listed below If on e Switches off the air handling unit Mots e switches over the unit to operation according to the mode Comfort1 ECONOMY 1 gt Switches over the unit to operation according to the mode Comfort2 Switches over the unit to operation according to the mode Economy1 switches over the unit to operation according to the mode Economy2 switches over the unit to operation according to the mode Speci
65. us ania xiii ouo eax n bk 6s RRE ARENS 51 6 7 5 Additional zone control EE 51 6 8 e le ien Tm DL o EU THEE 52 This symbol indicates that this product is not to be disposed of with your household waste according to the WEEE Directive 2002 96 EC and your national law This product should be handed over to a designated collection point or to an authorised collection site for recycling waste electrical and electronic equipment EEE Improper handling of this type of waste could have a possible negative impact on the environment and human health due to potentially hazardous substances that are generally associated with EEE At the same time your co operation in the correct disposal of this product will contribute to the effective usage of natural resources For more information about where you can drop off your waste equipment for recycling please contact your local EE city office waste authority approved WEEE scheme or your household waste disposal service E UAB AMALVA reserves the right to make changes without prior notice komfovent 1 VERSO AIR HANDLING UNITS UAB Amalva thanks you for choosing VERSO air hadling unit Because a lot of attention is given towards unit quality we will be thankful for your help expressing your comments and responses or suggestions regarding technical and running qualities of the unit To avoid misunderstandings before installing the unit carefully read this instruction Keep the instruction warrant
66. xhaust air IS 1 Air handling unit inspection doors on the right supplied airflow into room is on the bottom of the unit IS 2 Air handling unit inspection doors on the left supplied airflow into room is on the bottom of the unit IS 3 Air handling unit inspection doors on the right supplied airflow into room is on the top of the unit IS 4 Air handling unit inspection doors on the left supplied airflow into room is on the top of the unit UAB AMALVA reserves the right to make changes without prior notice E CEND 2 VERSO AIR HANDLING UNITS CONSTRUCTION 2 1 Fans VERSO air handling units are equipped with radial fans with direct drive AN Motors of the fans with backward curved blades must be controlled by frequency converters Frequency set by the frequency inverter cannot exceed frequency data specified in the print out Note fan type is specified in the print out Measuring device for determining air volume The differential pressure compares the static pressure in front of the inlet ring with the static pressure in the inlet ring of the narrowest point The differential pressure between the static pressures is related to the air vol ume via the energy conservation rate as follows y amp Ap where k takes into account the specific ring characteristics Example If differential pressure of 700 Pa is measured for size 630 the air flow rate can be calculated V k An 381 700 210080 m h
67. y air RCA recirculated air Using Verso RHP devices with recirculation section the supply air temperature sometimes can t be supported For this it is recommended to choose an additional heater cooler to ensure the supply air temperature Otherwise the supply air temperature will not reach set point Verso RHP air handling sizes 10 70 are supplied with two inspection sections figure bellow Exhaust air in spection section are supplied with drop eliminator heating cable and pan for extract air coil Supply air inspection section are with pan and drop eliminator when design air flow velocity threw supply air coil are more than 2 m s If supply air velocity threw supply air coil are lower than 2m s where are no pan and drop eliminator Inspection Inspection Filter fan section section section Filter fan section Exhaust Exhaust RHP section Supply Supply zjp IRm SUE 4 E II E S r T g E E S E sl O I 1 olli o H E 9I E al I E 4 II E E II II E amp l E E E E gt 8 E I Hl E II II E E LI mi Eee E J UAB AMALVA reserves the right to make changes without prior notice EE VERSO RHP functional schemes One circuit system Service ports B CX FRAM de lie LU LE QU am QN NN Gi GN ho Re E A A
68. y and technical information data you may need them during exploitation AN Inspect the air handling unit carefully to make sure it was not damaged dur ing transportation More detailed information about the parameters of the VERSO air han dling units can be found in the AHU s printout technical specifications AN Do not switch on an ungrounded air handling unit AN Before switching on the unit all doors must be closed and locked the safety covers should be bolted AN Before switching on the unit its compartments have to be fixed fast among them There is pressure inside the air handling units this is why it is forbidden to open any doors before switching off the unit AN Before performing any inspection work inside the unit be sure the unit s electric power supply is disconnected and there are no rotating parts AN Before opening the doors switch off the unit and it s main switch and wait for 1 2 minutes till the fans will stop rotating Before switching on the air handling unit activate all the safety functions The air handling unit can be switched on or off only by the means specified in the control system AN Be careful when doing water air heater assemblage works heat exchan ger can get as hot as 130 C Warning If the air handling unit does not have the manufacturer s control system then the company that installed automation is responsible for the unit s functioning and safety reliability

Download Pdf Manuals

image

Related Search

Related Contents

Wentronic SVGA 15-pin, 5m  Tiffen Magnum X3T User's Manual  Présentation et mise en œuvre du système de mesure CLIO "Pocket"  ASUS SABERTOOTHZ87 User's Manual  V2406 Series Datasheet  Epson WF-2520 Quick Guide and Warranty  Hoist Fitness HF4985 User's Manual  Sony XR-6690RDS User's Manual  PCD4511/4521/4541 User`s Manual 040227  INSTALLATION INSTRUCTIONS  

Copyright © All rights reserved.
Failed to retrieve file