Home
TP250/400 Owners Manuals (Publication #E1399)
Contents
1. Step 4 Roll carriage assembly onto the base At this time lock the base in place using the Safety Pin as shown Be sure to loop the lanyard over the carriage base as shown Important Always check for wear or damage to the safety pin cable pull ring assembly Failure to replace damaged safety pin cable assembly may cause damage or personal injury 3 Tie Down Engineering 255 Villanova Dr SW Atlanta Georgia 30336 Assembly Instructions for the TP250 Hoist Instructions for the TP400 Hoist skip to page 11 Step 5 Lay one track section on a flat floor with the front side up This is Front determined by the space between the track cross bar and the track section edge as shown above Back Step 6 Attach splice plates to the bottom section of the track Splice plates are mounted on the outside track section Slide the top section track into the groves on the inside track section attach with 2 nuts and bolts per side Pictures 4 amp 5 NOTE DO NOT SUBSTITUTE NUTS AND BOLTS Use 3 8 3 4 bolts and 3 8 nut keeps lockwasher and nut combined Picture 6 Step 7 Reattach the top cap to the end of the last section of track section you intend to use Assemble with two 3 8 3 4 hex head bolts with lock nuts provided Make sure that the top cap end slides into the outside of the track section picture 6 404 344 0000 Fax 404 349 0401 www tranzsporter com 4 Assembly
2. spor RIOR I ae Platform Hoist i Owners Manual Updated 3 23 15 oe nt 250 Ib Capacity For the Most Up to Date SASS Information and instructions Visit the TranzSporter Web Site at www tranzsporter com Pd 400 Ib Capacity Instructions 08238 TIE DOWN ENGINEERING 255 Villanova Drive SW Atlanta GA 30336 F www tiedown com 404 344 0000 Fax 404 349 0401 ENGINEERING EAJK UZIS Congratulations on your Purchase of the TranzSporter Lift Hoist The TranzSporter Lift Hoist was designed to provide safe and continuous operation Features Include Collapsible carriage comes with track cam followers for better tracking and handling Aluminum deck and flap for lighter weight and longer life Rolled goods plywood bracket comes with unit and pins into carriage Motor base is manufactured using laser cut steel tubing for extra strength and durability Belt guard and foot pedal are detailed with aluminum diamond plate Dual versatile brake may be operated from either side of platform hoist An additional handle may be used to engage the carriage instead of using the foot pedal 448468 handle kit sold separately A 4 ft heavy duty aluminum base track utilizes laser cut steel tube support plates for job site toughness Base track features large cast aluminum feet for added stability Dual band brake system for smoother stops Amber colored carriage bumpers to protect a
3. level to another Do not climb the TP Series hoist or use as a personnel ladder Do not overload maximum lifting capacity for the TP250 is 250 Ibs with a load capacity of 230 Ibs Maximum lifting capacity for the TP400 is 400 Ibs with a load capacity of 380 Ibs Keep hands feet and other body parts as well as clothing away from the track sections and moving or rotating parts of the TP Series hoist when starting the engine or when operating the hoist Do allow any persons to walk or work under or near the TP Series hoist while in operation Do not use this hoist to transport hot asphalt or any other hot molten substance from one elevation to another Do not operate indoors or in an area with poor ventilation Electric motor model is excluded Never lift sheet or panel goods without the use of the plywood brackets and the tie down straps provided See page 9 Remember Safety First Warning labels are attached to the TP250 400 and are weather resistant If you notice any of these decal s missing from your hoist please contact TIE DOWN ENGINEERING for a replacement label TOP OF HOIST MUST BE SECURED TO ROOF USING S HOOKS PROVIDED H 0 C K H AZA R D AND TWO LENGTHS OF ROPE NOT PROVIDED BRAKE TENSION SPRINGS MUST BE CHECKED FOR CORRECT TENSIONING DAILY KEEP ENTIRE LIFT HOIST BEFORE USE IN ORDER TO PREVENT LOAD SLIPPAGE CLEAR OF ALL UTILITY KEEP BRAKE DRUMS AND BRAKE SHOES FREE OF OIL LUBRICANTS AND AND
4. NEVER USE INDOORS OR IN AN AREA WITH POOR VENTILATION ELECTRIC MODEL IS EXCLUDED NEVER USE HOIST TO LOWER MATERIAL Tie Down Engineering 255 Villanova Dr SW Atlanta Georgia 30336 Safety Instructions CAUTION Please read the safety warnings and Instructions contained in this manual before operating the lift hoist Failure to obey the warnings contained herein could result in damage to the equipment personal injury or death this information should not be a substitute for routine accident prevention but rather an addition to routine accident prevention GENERAL SAFETY INSTRUCTIONS 11 12 Store all parts of the TP Series hoist in such a fashion as not to damage any of the components 14 15 Transport and handle your lift hoist with care Unpack the TranzSporter carefully and inspect for any damage that may occur during transportation DO NOT USE THE HOIST IF ANY PART IS DAMAGED Please observe all safety and warning labels attached to the hoist Use only replacement parts furnished by the manufacturer Always keep the area around the base section of the TranzSporter hoist clear to help prevent slipping tripping or falling against the hoist DO NOT ALLOW ANYONE TO OPERATE THE TRANZSPORTER HOIST WHO HAS NOT BEEN THOROUGHLY AND PROPERLY TRAINED IN THE CORRECT OPERATION AND USE OF THIS HOIST This hoist is manufactured to lift materials only Do not use the lift hoist for the purpose of transporting personnel from
5. Instructions for the TP250 Hoist Instructions for the TP400 Hoist skip to page 11 Step 8 Feed end cable From the back side of the hoist remove the end of the cable from through pully the drum shown right It helps to attach the brake handle use the brake handle back releases the brake drum The cable will then easily un spool Staying on the outside back of the base section and track section take the cable to the top of the last track section where the top cap pulley is attached Attach cable to the back of the carriage cross bar Unwind cable Step 9 from the back Feed the cable end through the pulley as shown above and down the front side of the track section to the back of the carriage assembly Carriage Cross Bar Step 10 Attach cable to the carriage assembly pass bolt through lock washer washer and cable end eye Tighten bolt as shown right Bolt x er Lock Washer You have completed the assembly of the TP250 Hoist Skip to page 9 for Operation and Placement Instructions 5 Tie Down Engineering 255 Villanova Dr SW Atlanta Georgia 30336 Assembly Instructions for the TP400 Hoist Congratulations on purchasing the TranzSporter TP400 Hoist Please read the following instructions completely before starting assembly The TP400 Hoist ships in 4 units 1 Box Base Section Top Cap amp Brake Handle 2 Box Collapsible Carriage amp Plywood Attachments 3 Box Motor Weld
6. Set Up Distance at Job Site Track lengths in excess of 28 feet require the use of the telescoping brace 2260005 The table below provides the suggested information for the distance of the bottom track from the building and the location of the track support for various conditions Building Length of Base To Track Brace Location Height Track Building Cross Tie from Bottom 12 16 4 6 Not Required T 8 6 Q 0 19th and 21st 4 10 0 26th and 25th 42 44 max 107 6 25th and 27th 20 0 24 J 28 36 40 0 44 WARNING BEFORE LOWERING THE TRACK SECTIONS CAREFULLY CHECK FOR OVERHEAD OBJECTS AND POWER LINES ELECTRICITY KILLS Raising the platform with or without load WARNING THE OPERATOR OF THIS HOIST UNIT SHOULD WEAR APPROPRIATE SAFETY EQUIPMENT WHICH SHOULD INCLUDE APPROVED HAND PROTECTION HEAD PROTECTION AND EYE PROTECTION To raise the platform on the TP250 face the platform and stand as far as possible from the hoist to operate Place your foot on the foot control pad to engage the motor to the cable drums V belt permitting the platform fo roll up the track section When the platform reaches the top release foot IMMEDIATELY This will apply the self energizing brakes Move away from the hoist while the load is being removed from the platform Lowering the platform To lower the carriage stand to the right or left side of the hoist and grasp the brake handle Lightly feather t
7. bottom base section to prevent slippage of the hoist shoes The third man on the ground may aid in erecting by walking the hoist up hand over hand by the rungs When the hoist reaches a vertical position carefully turn the hoist 180 degrees with the platform pointing away from the building Move the bottom of the hoist away from the building 1 4 of the height of the building where the top of the hoist is to be supported Angle of track sections from building should be between 18 and 20 degrees Make allowances for an overhang See track section chart for approximate distances of the base from the building Tie the track section to the roof with a rope fastened to a cross tie on the top bracket to prevent slippage of the track section DO NOT TIE ROPE TO THE RAILS THIS WILL PREVENT THE PLATFORM FROM OPERATING PROPERLY Mount the power unit to the top rung of the bottom base section Attach the V belt to the pulley on the power unit Slide the brake handle over the brake arm and install the locking pin provided Remove any ropes used fo secure the platform during transportation Make certain the shoes on the steel bottom section are firmly resting on level ground This will help to prevent track section slippage or uneven loading of the track section which could cause damage or injury to personnel and or to equipment 11 Tie Down Engineering 255 Villanova Drive SW Atlanta Georgia 30336 Track Section Chart Brace Support and Proper
8. E OF OVERHEAD OBJECTS NEVER CLIMB HOIST ELECTRICITY KILLS The hoist assembly is extremely top heavy and must be kept under control at all times Two alternate methods are suggested for raising the platform hoist to the operating position See Track Section Support Chart page 8 for approximate distances of the base from the bottom track Procedure A This procedure requires two or preferably three men 1 2 Lay the assembled track sections with the platform attached parallel to the building wall that is to support the hoist Tie a rope to the head bracket and have the man on roof pull up the hoist while the other man on the ground braces the shoes on the bottom base section to prevent slippage of the hoist shoes The third man on the ground may aid in erecting by walking the hoist up hand over hand by the rungs When the hoist reaches a vertical position carefully turn the hoist 90 degrees with the platform pointing away from the building Move the bottom of the hoist away from the building 1 4 of the height of the building where the top of the hoist is to be supported Make allowances for overhang Procedure 1 2 Place track section assembly perpendicular to the building with the bottom shoes of the steel bottom section resting against the building to prevent slipping Tie a rope to the top bracket and have the man on the roof pull up the hoist while the other man on the ground braces the shoes on the steel
9. ELECTRICAL WIRING EXCESSIVE MOISTURE CHECK FOR DAILY WEAR AND REPLACE WHEN NECESSARY DO NOT OPERATE THIS UNIT IF ANY COMPONENT PARTS EXHIBIT DAMAGE OR WEAR THIS INCLUDES ALL TRACK SECTIONS Instructions Inside Tube Remove Red End to Read FAILURE TO READ AND UNDERSTAND THE OPERATING INSTRUCTIONS CAN RESULT IN PROPERTY DAMAGE PERSONAL INJURY OR EVEN DEATH TO USER OR OTHERS 404 344 0000 Fax 404 349 0401 www tranzsporter com 2 Assembly Instructions for the TP250 Hoist Instructions for the TP400 Hoist skip to page 11 Congratulations on purchasing the TranzSporter TP250 Hoist Please read the following instructions completely before starting assembly The TP250 Hoist ships in 4 units 1 Box Base Section Top Cap amp Brake Handle 2 Box Collapsible Carriage amp Plywood Attachments 3 Box Motor Weldment amp Manuals 4 Bundle of Tracks 3 8 ft Sections Step 1 If you have not already assembled the carriage assembly Stop Now You must first assemble the carriage follow the assembly instructions included in 2 Box Collapsible Carriage amp Plywood Attachments Step 2 Remove base section from its box and place on a clean floor or assembly area Remove the top cap with a 7 16 wrench one bolt nut on each side Step 3 Starting at the top of the track section slide carriage assembly onto track section so that the four rollers connect to the top rail of the track section
10. ase shown right Step 14 Slide the brake handle over the brake arm and tighten thumb screw provided Step 15 If needed remove plywood brackets and rotate 90 degrees Secure the two plywood rolled goods brackets with push pins provided shown right IMPORTANT When lifting panel goods panels must be secured with tie down straps Tie Down Engineering 255 Villanova Drive SW Atlanta Georgia 30336 Assembly Instructions TP250 400 Secondary Handle Kit 48468 Purchased Separately Allows use of a left side handle to engage the motor and carriage It is highly recommended when using with the Solar Plywood Saddle Carriage Can be used for both TP250 amp TP400 models Parts included with the Secondary Handle Kit 1 Handle 2 Pivot Brake Weldmont 3 2 Mounting Plates 4 4 Screws Mounting Holes Step Lay the base section flat on hard surface Locate the mounting slot and holes on the bottom portion of the base section Step 2 With one hand hold the pivot brake weldment just EY above the lower base section Slide the mounting plates over the pivot brake rod Make sure the raised hole side of the mounting plates goes on the inside Step 3 Holding the pivot brake weldment mounting plates with one hand slide the mounting plates into the slots on both sides of the base section The plates should slide into place with the notch fitting thru the base section Using the two holes provided inse
11. ck section where the top cap pulley is attached Step 9 Feed the cable end through the pulley as shown above and down the front side of the track section to the back of the carriage assembly Feed the cable end through the pully on back of TP400 carraiage Return the cable end to the top cap Step 10 Remove the nyloc nut washer lock washer from the top cap assembly place the eye end over the bolt replace the washer lock washer and tighten the nyloc nut as shown right 404 344 0000 Fax 404 349 0401 Feed end cable through pully Double back feed end cable through pully on the back of carriage cross bar Unwind cable from the back _ Washer a Nyloc Nut Lock Washer Commo Bolt Cable Eye End Cable is looped around carriage pully e www tranzsporter com 8 9 Step 11 See Raising Hoist instructions page 7 for proper positioning placement of base at the set at job site Engine Base Assembly Arm Engine Base Assembly Arm Retaining Step 12 Mount the motor assembly to the base unit from behind the hoist the foot pad of the motor base slides under the track base section while hanging the motor base The motor assembly arms must fit outside the two retainer rings shown above Step 13 Before starting the engine Attach the V belt to the large pulley next to cable drum assembly on track base then to the small pulley on the motor b
12. gainst damage and wear from repeated lowering can be rotated Oversized clip pins for fast and simple removal of quick change cable drum and belt replacement User Responsibilities PERFORM THE FOLLOWING AT THE START AND END OF THE WORK DAY AND AFTER 4 HOURS OF OPERATION DURING THE DAY Check oil level in engine and fill according to manufacturer s specifications Check cable for smooth operation and for signs of wear Check for loose bolts and tighten according to specifications Check track sections and all other moving parts for excessive wear or fatigue Check general condition of equipment Check and confirm operator s understanding of the proper operation for this equipment When using the electric motor check extension cords and connections for wear or damage Check brake parts regularly for wear or damage Check cable drum bearings they should run smoothly when the brake is released If there is any noise or if the cable drum does not spin freely replace drum bearings immediately Check for minimal clearance between outer track cam followers WARNING DO NOT OPERATE THIS EQUIPMENT IF ANY UNSAFE CONDITIONS EXIST OR OCCUR DURING OPERATION KEEP TRACK SECTION CLEAR OF ALL ELECTRICAL WIRES AND EQUIPMENT ALWAYS LOOK UP FOR ELECTRICAL WIRE PRIOR TO MOVING TRACK SECTIONS BE AWARE OF OVERHEAD OBJECTS NEVER USE TRACK SECTIONS AS A LADDER NEVER OPERATE HOIST WITH A HUMAN ON PLATFORM NEVER STAND UNDER PLATFORM WHEN LOWERING
13. he load THIS WARRANTY DOES NOT COVER NOR EXTEND TO INCIDENTAL OR CONSEQUENTIAL DAMAGE Some states do not allow the exclusion or limitation of incidental or consequential damages so the above limitation or exclusion may not apply to you This warranty gives you specific legal rights and you may also have other rights which vary from state to state No representative has authority to make any representation promise or agreement except as stated in this Limited Warranty TIE DOWN reserves the right to make design and other changes upon its products without any obligation to install the same on any previously sold or delivered products THERE ARE NO WARRANTIES WHICH EXTEND BEYOND THOSE DESCRIBED ABOVE EFFECTIVE JANUARY 2015 THIS WARRANTY SUPERSEDES ALL PRIOR WARRANTIES WRITTEN OR IMPLIED TIE DOWN ENGINEERING 255 Villanova Drive SW Atlanta GA 30336 J www tiedown com 404 344 0000 Fax 404 349 0401 ENGINEERING E1401 Rev 050615 Part 48467 48469 48468 10092 10091 60005 48599 ENGINEERING Solar Plywood Panel Saddle Carriage Allows lifting of four solar panels or plywood sheets Unique design allows panels to roll off towards the contractor preventing leaning while on the roof top Requires roof top anchoring straps included with carrier Solar Plywood Panels attach to TP400 Carriage frame Solar Plywood Panel Kit 48469 is a complete carriage system for use with the TP250 Secondary Handle K
14. he platform down by engaging and disengaging the brake to slow the carriage Lower the carriage to the ground at a slow speed not to exceed 50 feet per minute Continue to decelerate the platform as it nears the ground to prevent damage to the platform or bottom bumper stops DO NOT USE THE HOIST TO LOWER MATERIALS CAUTION NEVER APPLY THE BRAKE ABRUPTLY BROKEN HOIST CABLES AND OR SEVERE INJURY TO PERSONNEL OR EQUIPMENT MAY OCCUR MAKE CERTAIN PLATFORM DOES NOT EXCESSIVELY STRIKE THE BOTTOM BRACE STOPS UPON REACHING THE BOTTOM OF THE TRACK SECTION Lower and dismantle the platform hoist assembly in the reverse of the erection procedure observing all safety procedures REPAIR INFORMATION Your lift hoist is designed to provide years of service however when your hoist requires parts service or repairs please contact your nearest authorized dealer or call 1 800 241 1806 Ext 1525 for information on where take your platform hoist 404 344 0000 Fax 404 349 0401 www tranzsporter com 12 Plywood Flat Panel Tie Down and Lifting Instructions FAILURE TO READ AND UNDERSTAND THE OPERATING INSTRUCTIONS CAN RESULT IN PROPERTY DAMAGE PERSONAL INJURY OR EVEN DEATH TO USER OR OTHERS i Use the proper tie down equipment If you are not securing your cargo with the proper safety straps it could come loose during lifting resulting in injury or death Never hoist anything wider than the 8 larger plywood sheet
15. it Allows use of a left side handle to Telescopic Support Brace engage the motor and carriage It is highly recommended when using with the Solar Plywood Saddle Carriage Includes all hardware brackets and handle Can be used for both TP250 amp TP400 models Hoist Accessories TranzSporter Solar Plywood panel accessory for TP400 Platform Hoist Complete Solar Carrier for TP250 Secondary Handle Kit for TP250 amp TP400 4 ft TranzSporter Track Section for TP250 and TP400 TranzSporter Track Section for TP250 and TP400 Telescopic Support Brace for TP250 and TP400 TranzSporter Stand Off Stabilizer Roofing Products Division TIE DOWN ENGINEERING 800 241 1806 ISO 9001 2008 Certification Manual 08238 Rev 3 2 2015 Used with TP250 amp TP400 models over 28 ft Stand Off Stabilizer This unique stabilizer attaches to the platform hoist track section allowing proper stand off from roof and gutter Helps prevent costly gutter damage when placed directly on roof Assembly required 255 Villanova Drive SW Atlanta Georgia 30336 404 344 0000 Fax 404 349 0401 Trade brand names and drawings are the intellectual property of TIE DOWN ENGINEERING 2014 TIE DOWN Inc
16. ment amp Manuals 4 Bundle of Tracks 3 8 ft Sections Step If you have not already assembled the carriage assembly Stop Now You must first assemble the carriage follow the assembly instructions included in the 2 Box Collapsible Carriage amp Plywood Attachments Step 2 Remove base section from its box and place on a clean floor or assembly area Remove the top cap with a 7 16 wrench one bolt nut on each side Step 3a Starting at the top of the track section slide carriage assembly onto track section so that the four rollers connect to the top rail of the track section Adjustable Inside Track Roller Guide Tension Bracket Step 3b Adjust Tension Bracket Make sure the TP400 carriage rollers are on track and the carriage rolls easily There are two adjustable track roller guides on the inside carriage assembly see right Turn the nut clockwise counter clockwise the adjust the tension free play between the carriage and the tracks If the carriage moves too much in and out tighten the adjustable tension bracket nut Correct adjustment should alow for minimal contact between the carriage and the tracks 404 344 0000 Fax 404 349 0401 www tranzsporter com 6 Assembly Instructions for the TP400 Hoist Step 4 Roll carriage assembly onto the base At this time lock the base in place using the Safety Pin as shown Important Always check for wear or damage the safety pin cable
17. pull ring assembly Failure to replace damaged safety pin cable assembly may cause damage or personal injury Step 5 Lay one track section a flat floor with the front side up This is Front determined by the space between the track cross bar and the track section edge as shown above Back mmm Step 6 Attach splice plates to the bottom section of the track Splice plates are mounted on the outside track section Slide the top section track into the groves on the inside track section attach with 2 nuts and bolts per side Pictures 4 amp 5 NOTE DO NOT SUBSTITUTE NUTS AND BOLTS Use 3 8 3 4 bolts and 3 8 nut keeps lockwasher and nut combined Step 7 Reattach the top cap to the end of the last section of track section you intend use Assemble with two 3 8 3 4 hex head bolts with lock nuts provided Make sure that the top cap end slides into the outside of the track section shown right 7 Tie Down Engineering 255 Villanova Dr SW Atlanta Georgia 30336 Assembly Instructions for the TP400 Hoist Attach cable to the back side of the pully bracket Step 8 From the back side of the hoist remove the end of the cable from the drum shown right It helps to attach the brake handle use the brake handle back releases the brake drum The cable will then easily un spool Staying on the outside back of the base section and track section take the cable to the top of the last tra
18. rt two screws per side Tighten screws using a screw driver or wrench Mounting Plate Notch Attach secondary handle on either side of the hoist 404 344 0000 Fax 404 349 0401 www tranzsporter com 10 Engine 9 10 12 Handle fuel with care It is EXTREMELY flammable and explosive under certain conditions Do not smoke allow open flames or sparks to be present during the refueling operation Use only an approved fuel container to transport fuel Do not fuel while engine is hot allow to cool before attempting the refueling operation Replace all fuel tank caps securely and wipe the spilled fuel before restarting engine Do not operate the TP Series gasoline engine in an enclosed area The exhaust can be especially hazardous and cause death in an enclosed area Stop the engine and lower the platform when leaving the vicinity of the hoist Always stop the engine lower the platform wait for all moving parts to stop and allow the engine to cool before disassembling or moving the hoist Disconnect the spark plug wire from the plug before disassembling or moving the hoist DO NOT store the engine in an enclosed area Allow engine to cool before storing DO NOT store engine where it might be subjected to flames sparks extreme heat or any other source of combustion Raising the Track Section Assembly WARNING KEEP TRACK SECTIONS CLEAR OF ALL ELECTRICAL WIRES AND EQUIPMENT BE AWAR
19. s can make controlling your hoist difficult and dangerous especially when considering windy conditions Wide panels must be centered to prevent tipping Attach your safety straps to slotted tie down points Do not hook your tie down straps to the plywood straps must pass over the top Secure your safety straps to the carriage top flaps slotted holes the metal frame and to the plywood brackets only Refer fo the drawings for tie down slot locations Tie Down Strap Slots Tie Down Strap Slots Maintain a manageable speed The wind s effects on sheets of plywood or panel goods as well as the higher center of gravity can make hoisting difficult and dangerous Check all tie down connections Safety straps may come loose during transport Always check strap for damage or wear Replace when damaged or worn Tie down strap must loop over all materials and must attach at tie down locations Platform Back N lap Tie Down Plywood Bracket ecure straps through Tie Downs flap slots provided 5 t th h ies eaten ecure straps throug NOTE slotted holes provided ALWAYS CENTER FLAT PANEL LOADS 43 Tie Down Engineering 255 Villanova Drive SW Atlanta Georgia 30336 TRANZSPORTER PRODUCT LINE LIMITED WARRANTY Tie Down Engineering will repair or replace free of charge any part or parts of the TranzSporter lift hoist that are defective in material or workmanship or both The limited warranty i
20. s in effect for 90 days from date of purchase Return the defective unit to the dealer or contact Tie Down direct at 800 241 1806 x1525 This warranty does not apply to damage or loss caused by any or all of the following circumstances or conditions e Damage caused during assembly or installation e Parts accessories materials or components used with or replacing any TIE DOWN lift hoist part not obtained from or approved in writing by TIE DOWN e Misapplication misuse and failure to follow the directions or observe cautions and warnings on installation operation application inspection or maintenance specified in any TIE DOWN quotation acknowledgment sales literature specification sheet or installation instruction and service manual applicable literature e Use of product in any other application other than those described in TIE DOWN s product information materials lf any TIE DOWN products are found upon TIE DOWN s examination to have been defective when supplied TIE DOWN will either credit the purchaser s account for the purchase price of the TIE DOWN product replace the TIE DOWN product or repair the product TIE DOWN has sole discretion in choosing which option to provide For this LIMITED WARRANTY to apply TIE DOWN must receive notice of the alleged defect within 30 days of either the discovery of the alleged defect or the expiration of the warranty period whichever is earlier Any claim not made within this period shall concl
21. usively be deemed waived lf requested by TIE DOWN purchaser shall return the alleged defective product to TIE DOWN for examination at purchasers expense TIE DOWN will not pay for expenses incurred in returning a product to TIE DOWN without TIE DOWN s prior written authority TIE DOWN shall not be liable for any other expenses purchaser incurs to remedy any defect Purchasers waive subrogation on all claims under any insurance Limitation of Liability It is expressly agreed that the liability of TIE DOWN is limited and TIE DOWN does not function as an insurer THE REMEDIES SET FORTH IN THIS WARRANTY SHALL CONSTITUTE THE EXCLUSIVE REMEDIES AVAILABLE TO THE PURCHASER OR USER AND ARE IN LIEU OF ALL OTHER REMEDIES EXPRESS OR IMPLIED THE LIABILITY OF TIE DOWN WHETHER IN CONTRACT IN TORT UNDER ANY WARRANTY OR OTHERWISE SHALL NOT EXCEED THE PURCHASE PRICE OF THE PARTICULAR PRODUCT MANUFACTURED SOLD OR SUPPLIED BY TIE DOWN To Obtain Technical Assistance To enable TIE DOWN to respond to a request for assistance or evaluation of customer or user operating difficulty please provide at a minimum the following information by calling 404 344 0000 Model number serial number and all other data on the specific component which appears be involved in the difficulty e The date and from whom you purchased your TIE DOWN product e State your difficulty being sure to mention at least the following application nature of load involved and weight of t
Download Pdf Manuals
Related Search
Related Contents
文化シャッター手動式.. Manual del usuario Intuos Pro Bedienungsanleitung - psg Yokogawa CA150 Calibrator Manual PDF ICOM IC-V8000 - Manual de instruções (Port.) wine cooler Graco 1762542 Stroller User Manual スライド 1 - 経済産業省 Copyright © All rights reserved.
Failed to retrieve file