Home
MMS Tote & Platform Lift MMS-30 Service Manual - Lift
Contents
1. ousisecnger a __ 2a copperwester 2 L9 rmprme Ja 3 as ores 2 TT TT as sensn pos ore pa eene mms 2 ewe 3 wow fo e EI fa Cs ee 1 foamea To ore 2 a0 seers a _ senate L3 ar sene 3 E net pa IE az seme JT da PARTS LIST FOR MMS 30 No name arv REMARK no NAME Janv remark 33 rostonrarine emeena fa Ew esee 3 Jrompning pa Css roses 2 75 orres a 36 Postonngting 2 7 sear a a7 singe dvecson 3 7 meses pa ae rena a e rentem fa Cs sus 2 nemo fa P owes TEO
2. 14 chassis angle iron And also ensure the positioning hole on the bottom of the cylinder pump plate is identical with the positioning bolt of No 14 chassis cylinder Connect tightly and deadly No 12 the handrail and No 14 chassis with No 16 the bolts 4 Connect tightly the bolts of No 13 cylinder chains and No 11 platform connecting plates and use a split safe 5 The platform lift height after being installed can be adjusted the parameter Make sure all the parts are fixed and the bolts connected tightly and have been adjusted well When operated without load the platform lift raised and falls stably and normally When operated with the rated load the platform lift rises and falls stably the foot wheels move flexibly and the brake works effectively Attention and Warning 1 2 The platform lift shall be used on the flat and hard floor The load shall not exceed the max load Transport goods strictly according to the load curved to assure the load balance Operational Instructions 1 2 Lock the brake And close the falling valve pole Operate the rising footstep pole to make the platform rise stably to the max height Turn open the falling valve pole and the platforms fall Turn and close the falling valve pole so that the platforms can stop at any height without sliding down When the load exceeds 1 2 times of the rated load the safety valve of the cylinder works so that the platforms cannot rise and the safety
3. MMS Tote amp Platform Lift MMS 30 Service Manual LIFT PRODUCTS INC PO BOX 349 ELM GROVE WI 53122 262 521 5720 FAX 262 521 5725 Toll Free 877 543 8776 Model MMS 30 S N Customer LIFT PRODUCTS INC LIFT PRODUCTS INC REGISTRATION INFORMATION To validate your warranty and receive updated service bulletins please complete this form Date Model No How did you first hear of Lift Products Magazine Ad Specify which magazine Recommended by a dealer Name of Dealer Received information in the mail Internet Other Please specify What factors caused you to choose Lift Products Describe how and where products are being used Name of person completing this form Title Company Street Address City State Zip Phone Fax No Purchased From Name of Dealer Street Address City State Zip Phone No Fax No Please fax this form to 262 521 5725 CONTENTS External Shape amp Parameter Form Names of Parts Assembly and Debug Attention and Warning Operational Instructions Daily Maintenance and Regular Inspection Hydraulic Principle Drawing Display of the Combination Lists of the Parts Thank you very much for using this series of platform lifts This operation manual has a description of the right operational methods to ensure safety and the maintenance methods to extend the use lifetime The operator shall read car
4. efully and completely understand it before using the platform lift This series of platform lifts are mainly used to load lift and pile goods or take down goods from a certain height on the flat and solid floor It is widely used in various plants markets and warehouses 1 External Shape and Parameter Form Technical parameters of PF series of platform lifts Model MMS 30 880 Lbs able Hei Platform Size LxW 25 x 22 75 38 x 22 5 x 57 5 Pp asters d 2 Name of the Parts Front Wheel Chassis Assembly Work Platform Cylinder Assembly Chains and Wheel Slideway Handrail Assembly Footstep Lever Back Wheel NOWURWNE 3 Installation and Debug The parts are packed when delivered out of the factory The user can install quickly and easily according to the part numbers in the following order Please have two 13 14 or 17 spanners and other necessary tools besides when fixing 1 Confirm No 11 is the platform assembly No 12 13 are the handrail and cylinder assembly No 14 is the chassis assembly No 16 is the connecting bolts 4 sets Confirm all these are available 2 On the float floor put No 11 the platform on No 14 the chassis according to the drawing 3 Make No 12 handrail go through No 11 platforms and four rolling wheels 15 till the position of No
5. est position The oil shall be filled to the position of the filling hole Hydraulic Oil 5 C 45 C L HM68 hydraulic oil equivalent to ISOVG68 15 C 5 C L HM46 hydraulic oil equivalent to ISOVG46 7 Hydraulic Principle Drawing 1 iN HT iti tll Out pushing Cylinder Turning Lifting and Falling Valve 3 E Safety Valve Cil Returning Valve Work Valve Work Cylinder 8 O Y pp ne ql t 8 Exploded View and Part List PARTS LIST FOR MMS 30 NO Name anv REMARK no NAME arv remar 2 sisewarionamar 1 pejeese fail 7 Pa usd IEC orres fa Ps waster fe as ossswes E a menses 2 IE orarscover fa _ seem e oem 3 3 Cw Le dbeb E IEA res fe eie o Ls pes as remo isa Sid Fs waster _ 2 ports a Domaine Cu ormeeserm a ps wesesme Ji az rome CIO LER rens a Cs mesmo a rumproe pa d aa rennen 2 5 menos fa _ is sonans 5 Pumpsprnacover a is wea Tp eecentieseaing fa ar scorns 7 E otrunosorne a _ is renes 2 s hem o is messen 3 Pp miro 3 3 ao fian fo L9 weme 3 Em mememenes ore TT a fewe 2 frere 3 _ 23 means 2
6. of the operation and equip ment are assured When driving the platform lift load make sure the platforms fall to the lowest posi tion to ensure safety The falling speed of the platforms is adjustable by adjusting the angle of the position ing ring on the falling valve pole Don t operate the rising footstep pole quickly Otherwise the cylinder will run empty The falling vale shall be turned open slowly with heavy load to make sure the plat forms fall slowly Otherwise dangers will happen When the rising operation or stops at any height are done with heavy loads the fall ing pole shall be closed tightly Otherwise the platforms will fall Daily Maintenance and Regular Inspection 1 w Daily check if there are any deformations looseness or abnormal noises of the con necting bolts wheels rolling wheels lifting chains and wheel the parts of hydraulic cylinder moving parts Daily check if there is any oil leakage of the hydraulic system Check monthly the wear and tear of the platforms rolling wheels chains and wheel After the lifting cylinder runs for 20 hours accumulative in the beginning The hydrau lic oil shall be charged Afterwards the oil shall be changed once every 300 hours When the accumulated hours are not so much change the oil once every 18 months Please fill in the specified hydraulic oil at the following temperatures listed below When changing the oil adjust the pole of the pillar piston to the low
Download Pdf Manuals
Related Search
Related Contents
取扱説明書 蓄圧式大型粉末消火器 取扱説明書 Cheddar 1.3p2 user's guide FLT V4 User Manual K1 - T + A Debit Card User Guide-eng Belkin Mobile Cassette Adapter Copyright © All rights reserved.
Failed to retrieve file