1. CODICE SALITA LIFTING CODE The internal diameter of the pipes must be adequate so as to prevent the loss of load and unsatisfactory counter pressure leading to an increase in pressure throughout the whole system 4 5 STANDARD 01 02 HYDRAULIC SYSTEM SEE FIGURE 2 WARNING When the system is sta v tionarv the pressure e needed for the flow of oil through the pipes must not exceed three 3 bar CAUTION Use oil pressure winch control distributors which have V1 V2 drainage lines in neutral posi tion configuration H in order to prevent the negative brake from being accidentally released by any hydraulic pressure remaining in the pipes when the winch is stationary CAUTION During normal winch operation the nega tive brake will be au tomatically released by means of the valve or the motor itself when the motor is started up and must lock again when the motor stops running To release the brake pressure is taken from the supply line to the motor When the winch stops in Pbrevini winches Le tubazioni devono avere un diametro inter no di dimensioni adeguate per non creare perdite di carico e contropressioni indeside rate e qui
2. Pbrevini winches 4 1 NORME PER LA CORRETTA INSTALLAZIONE ATTENZIONE La corretta installazione Y dell argano deve esse e re effettuata da Opera tori e Tecnici Qualificati L argano deve essere montato tramite la sua interfaccia sul supporto predisposto dall uti lizzatore la struttura a cui va istallato deve essere rigida con un buon piano d appoggio e fissata in applicazione finale con viterie di qualit Si consiglia l utilizzo di viti con classe di resi Torque for bolts and screws stenza tipo 8 8 o 10 9 utilizzandole con cop Nm pie di serraggio secondo normative correnti e indicate nella sottostante tabella mm 8 8class 10 9 class screws screws M12 90 113 M14 144 180 M16 225 281 M18 309 387 M20 439 549 M22 597 747 M24 759 949 M27 1110 1388 M30 1508 1885 M winches NOTE For correct assembly use the holes pro vided on the winch application interface 4 2 LUBRICATION The winch is supplied with the amount of lubricant oil inside it VG 150 mineral ISO 3448 as stated in the winch s specifications sheet The first oil change must be done prior to completion of 50 hours of operation initial running in period After this every 500 hours of winch operation For controlling topping up and changing the oil use the plugs pro vided for this purpose as shown in the spe cifications sheet The washer seals under the p
3. VEDI FIGURA 5 SENSI DI AVVOLGIMENTO DELLA FUNE Ponendo l attenzione sul senso di avvolgi mento proprio della fune possiamo definire avvolgimento Z quello dove tenendo la fune in posizione verticale presenta all osserva tore le spire visibili nella direzione del tratto REGULAR CROCIATA Figura 6 Feature 6 RIGHT DESTRA 2 5 when we can see the letter S again holding the rope vertically and looking at the direction of the threads in the mid section This defines the direction of the strand twist in the ropes we must now define the direction of the outer strand wires SEE FIGURE 6 There are four possible cases 215 right regular lay rope strands Z and wires s S z left regular lay strands S and wires 212 right lang lay strands 2 and wires 8 5 left lang lay rope strands S and wires s Pbrevini winches LANG PARALLELA SSN 22 S NS 772 72 Wi 2 55 75 22 2 gt 7 27 j LS WM 2 22 SSS IIL 772 2 LEFT SINISTRA RIGHT DESTRA LEFT SINISTRA S z 7 7 5 5 mediano della lettera 2 mentre avvolgimento S quello tenuta sempre in posizione verti cale la fune che presenta all osservatore le spire visibili nella direzione del tratto mediano della lettera S Questo ha definito il senso di avvolgimento dei trefoli nelle funi poi resta da definire il sen so di avvolgimento dei fili e
4. 7 Punti d attacco controllare le rotture dei fili analogamente esaminare la sezione di fune che sta sopra o nella zona vicina alle pulegge di compensazione 7 Connection points check for broken wires in the same way inspect the sec tion of rope above or close to the compensating pulleys 8 Cercare le deformazioni 8 Check for deformation 9 Controllare il diametro della fune 9 Check the diameter of the rope 10 Esaminare attentamente il tratto che si avvolge sulle pulegge ed in particolare il tratto che sta sulla puleggia quando l appa recchio sotto carico 10 Inspect carefully the section that winds around the pulleys especially the section being on the pulley when the equipment is loaded 11 Ricercare le rotture di fili e l usu ra superficiale 11 Check for broken wires and sur face wear 12 Esaminare la corrosione mittent load Carico 12 Inspect any corrosion Load Pbrevini wines Espulsione di fili Wire protrusion Espulsione di trefoli Strand protrusion Riduzione localizzata del diametro della fune Local reduction of rope diameter Espulsione di trefoli Strand protrusion Flattened portion Waviness Parte appiattita Ondulazione Pbrevini winches Pbrevini winches Deformazione a canestro Basket deformation Usura esterna External wear Ingrandimento della Fig L Enlargement of Fig L Corrosione esterna
5. External corrosion Ingrandimento della Fig N Enlargement of fig N Fili rotti nella parte esterna della fune Broken wires on the crowns of the strands of the rope P Fili rotti nei solchi a volte chiamati fazzoletto o interstizi tra i trefoli esterni della fune Broken wires in the vallevs sometimes called gussets or interstices between the outer stranas of the rope Q Espulsione dell anima Core protrusion Pbrevini winches Pbrevini winches 1 0 Aumento localizzato del diametro della fune dovuto all espulsione dell anima Local increase in rope diameter due to APPEN DICE B core protrusion TEORIA RECUPERO E DEL TRAINO Occhiello Parte appiattita Flattened portion APPENDIX B NOTIONS ou TOWING AND RECOVERY You can achieve the best results in using winches for recovery if you know a little about the mechanics involved and the difference between the lifting and pulling of a vehicle Resistance to lifting is very different to resi stance to pulling and can be deduced from 4 main factors affecting the recovery of a vehicle the inherent resistance to move ment of the vehicle 2 the total weight of the vehicle 3 the type of surface where the vehicle is to be pulled across 4 the gradient of the surface whe re the vehicle is to be recove red The inherent resistance of a vehicle depen ds on the state of its tyres surface frict
6. La garanzia non avr validit se l inconve niente o anomalia risulter dipendente da applicazioni non corrette o non adeguate al prodotto e se lo stesso non sar in conformit alla messa in servizio da effettuarsi non oltre i sei 6 mesi dalla spedizione 1 4 INFORMAZIONI AL PERSONALE E obbligo del datore di lavoro provvedere ad informare il personale sui seguenti argomenti inerenti la sicurezza nell utilizzo dell argano comunque obbligo dell Operatore e del Tecnico Qualificato rispettare scrupolosa mente le norme di sicurezza e antinfortunisti che del paese di destinazione dell argano Sia l Operatore che il Tecnico Qualificato prima di iniziare il lavoro devono conoscere le caratteristiche dell argano e devono avere letto integralmente il presente manuale Le eventuali modifiche o sostituzioni di parti dell argano non autorizzate per iscritto dalla Brevini Winches S p A possono costituire pe 13 Pbrevini winches due authorisation issued by Brevini Winches S p A in writing could result in damage to things or injury to people In such case the winch manufacturer is no longer liable for any civil or criminal damages 1 5 How TO USE THIS MANUAL We have made it easier to consult this manual by adding a general index on page 3 This will help you to find the topic you are looking for The chapters are arranged in a hierarchy structure to facilitate the search for the infor mati
7. M brevini BREVINI WINCHES S p A 42100 REGGIO EMILIA Italy Via Degola 1 Tel 39 0522 277711 Fax 39 0522 514977 e mail brevini breviniwinches it Manuale di installazione utilizzo e manutenzione www breviniwinches com argani da sollevamento e traino Installation operation and maintenance manual hoisting and recovery winches INDEX 1 GENERAL INFORMATION 1 1 1 2 1 3 1 4 1 5 1 6 1 7 INTRODUCTION page 9 AIM OF THIS MANUAL page 9 GUARANTEE AND TESTING page 11 INFORMATION FOR PERSONNEL 11 HOW TO USE THIS MANUAL page 12 REPRODUCTION AND COPYRIGHT page 12 VERSIONS OF THIS MANUAL page 12 2 PACKING SHIPMENT HANDLING ARRIVAL OF GOODS 2 1 PACKING AND SHIPMENT page 15 2 2 ARRIVAL OF GOODS page 15 2 3 HANDLING THE WINCH WITHOUT PACKING page 16 2 4 HANDLING page 17 2 5 STORAGE page 17 3 MACHINE DESCRIPTION AND SPECIFICATIONS 3 1 OPERATING PRINCIPLE page 21 3 2 CONFIGURATION AND CONSTRUCTION TYPE page 21 3 3 TECHNICAL REFERENCE STANDARDS page 21 3 4 OPERATING ENVIRONMENTAL CONDITIONS page 21 3 5 OPERATION IN CONTAMINATED ENVIRONMENTS page 21 3 6 VIBRATION page 22 3 7 NOISE page 22 3 8 ATMOSPHERES WITH EXPLOSION AND OR FIRE HAZARD page 22 Pbrevini winches SOMMARIO 1 INFORMAZIONI GENERALI INTRODUZIONE 9 SCOPO DEL MANUALE pag 9 GARANZIA E COLLAUDO pag 11 INFORMAZ
8. aumentare dell angolo di deviazione aumenta la rotazione indotta VEDI FIGURA 9 61 Pbrevini windies Figura 10 Feature 10 When the rope is wound onto drums without grooves or in several layers the angle of deviation must not exceed 1 30 in order to prevent irregular winding of the rope onto the drum If the angle exceeds this a rope guide should be used When the rope is wound on to a grooved drum the angle of deviation should never exceed 4 SEE FIGURE 10 AND 11 NOTE For practical reasons the construction dra wings of some cranes and hoists may not be able to comply with these instructions re commended values In this case the life ofthe rope will be affected 62 Quando la fune si avvolge su tamburi non scanalati o su pi strati l angolo di deviazione non deve superare 1 30 per evitare l irrego lare avvolgimento della fune sul tamburo Se l angolo superiore si raccomanda l impiego di un guida fune Quando la fune invece si avvolge su un tamburo scanalato l angolo di deviazione y non deve superare mai i 4 VEDI FIGURA 10 E 11 NOTA Per ragioni pratiche il disegno costruttivo di alcune gru e paranchi pu non essere in grado di rispettare tale prescrizione valori raccomanda ti in tal caso verr influenzata negativamente la vita della fune Figura 11 Feature 11 EE EE 9 SI H HU r 55 sz az li Pbrevini winches
9. imballo o di ogni onere accessorio ed il pagamento dovr essere effettuato anticipatamente e dovr essere ricevuto dal FORNITORE al pi tardi 10 giorni prima della data stabilita per la consegna 9 2 termini di pagamento sono tassativi ed essenziali In caso di ritardato pagamento senza necessit di costituzione di mora il FORNITORE potr applicare interessi in ragione del tasso ufficiale di sconto TUS in vigore all epoca s com aumentato di cinque punti 9 3 In caso di pagamento dilazionato qualora non fosse puntualmente pagata anche una sola rata di prezzo il FOR NITORE potr esigere immediatamente l intero prezzo pattuito indipendentemente dalle condizioni di cui all art 1186 CC ovvero considerare risolto il contratto per inadempienza in tal caso il FORNITORE potr trattenere le somme eventualmente 91 Pbrevini winches 9 4 In no case can the payments be su spended or delayed in the event of di sputes legal action cannot be initiated or continued if the payment of the price has not first been made in accordance with the terms and methods agreed 9 5 The SUPPLIER is free to accept or not accept the CUSTOMER s contractual proposal at its own final judgement at all events the content of the following articles shall still be applicable 1460 CC 1461 CC 2762 CC 10 WARRANTY 10 1 Unless otherwise agreed in writing the SUPPLIER shall guarantee its pro ducts against manufacturing defec
10. tratto tra il CLIENTE e il FORNITORE salvo accettazione scritta da parte del FORNITO RE L accettazione da parte del FORNITO RE di una qualunque richiesta d acquisto da parte del CLIENTE espressamente condizionata dall accettazione da parte del CLIENTE delle presenti Condizioni Generali di Vendita L accettazione dei prodotti co stituisce in ogni caso accettazione da parte del CLIENTE 2 2 Gli obblighi del FORNITORE ed il con tratto non entreranno in vigore fintanto che il FORNITORE non ha provveduto ad inviare conferma scritta di accettazione dell ordine al CLIENTE o a fatturare quale dei due avviene prima 87 Pbrevini winches 3 PRICES 3 1 Unless otherwise confirmed in writing by the SUPPLIER the prices quoted or bil led shall be net and do not include packa ging and shipping costs 3 2 The prices do not include taxes stam ps customs duties and any other additional costs Unless exempted these costs and charges shall be paid by the CUSTOMER and if paid by the SUPPLIER they will be billed in total to the CUSTOMER in addition to the prices quoted 3 3 The prices shall be subject to correc tions resulting from printing errors 4 TECHNICAL DATA DRAWINGS AND DOCUMENTS CONCERNING THE SUPPLY 4 1 All the drawings photos illustrations descriptions technical data and services and all other data and information provided concerning the products whether they are contained in documents or d
11. Feature 9 As the rope continues to move from the pulley it moves away from the flange until it reaches the race bottom During this movement the rope rolls and slips at the same time As a result of the roll the rope will turn on its own axis causing a twist which can be generated on the rope or outside of it both by shortening and lengthening the winding pi tch resulting in inferior fatigue performance in the worst case in a structural damage to the rope which takes on a bird cage shape As the angle of deviation increases so does the induced rotation SEE FIGURE 9 Pbrevini winches angolo della scanalatura y angolo totale nella condizione pi sfavorevole Ogni qualvolta esiste un angolo di deviazione come la fune entra nella puleggia essa inizial mente entrer in contatto con le flangie della puleggia Nello svolgersi del movimento di passaggio continuo della fune della puleggia il cavo si sposta dalla flangia fino a raggiun gere il fondo gola della puleggia Durante tale spostamento la fune rolla e scivola allo stesso tempo Come risultato del rollio la fune ruoter sul proprio asse causando un giro che pu essere prodotto nella fune od al di fuori di essa sia accorciando che allungando il passo di avvolgimento risultando in una riduzione della performance della fatica e nel peggiore dei casi in un danno strutturale della fune che prende la forma di infiascature bird cage All
12. le vibrazioni non sono tali da far insorgere situazioni di pericolo Se esse si verificassero dovr arrestare immediatamente la macchina e segnalare il fenomeno al Servizio Tecnico Brevini Winches 3 7 RUMORE L argano progettato e realizzato in modo ta le da ridurre alla sorgente il livello di potenza sonora La Brevini Winches informa l utilizzatore in merito alle emissioni sonore dell argano per far si che egli assuma provvedimenti adeguati in funzione alle condizioni ambientali di eser cizio esempio presenza di parti pi o meno riverberanti o di altre fonti sonore poste nelle vicinanze 3 8 ATMOSFERA CON RISCHIO DI ESPLOSIONE INCENDIO L impiego dell argano non previsto in am bienti con atmosfera esplosiva Nel caso dovesse essere previsto questo uti lizzo occorre obbligatoriamente consultare il Servizio Tecnico Brevini Winches 4 INSTALLAZIONE INSTALLATION 4 1 RULES FOR CORRECT INSTALLATION WARNING The winch must be in v stalled bv Operators and Qualified Techni e cians The winch must be assembled onto the sup port prepared the user using its interface It must be installed onto a rigid structure with an even surface secured using good qualitv bolts and screws for final application Screws should be used with resistance class 8 8 or 10 9 and with torque according to standards in force as indicated in the table below
13. the SUPPLIER may apply interest at the mini mum lending rate MLR in force at the time increased by five points 9 3 In the event of payment by instalments if just one instalment is paid in arrears the SUPPLIER can immediately demand the full price agreed irrespective of the condi tions stated in Article 1186 of the Civil Co de or consider the contract as terminated through non compliance In this case the SUPPLIER can withhold any sums recei ved on credit by way of indemnity for the damage and claim the return of the goods delivered Pbrevini winches 8 6 Salvo diverso accordo scritto qualora la merce venga pronta per la consegna pri ma della data stabilita il FORNITORE potr effettuare la spedizione ed il CLIENTE non potr rifiutare di prendere in consegna la merce 8 7 Nel caso di mancata presa in consegna della merce da parte del CLIENTE per fatto a lui imputabile o comunque per cause in dipendenti dalla volont del FORNITORE il CLIENTE si assumer i rischi e le spese per la loro custodia 8 8 Per prodotti speciali il FORNITORE si riserva la facolt di consegnare nella misura del pi o meno 5 della quantit ordinatale e considerare l ordine evaso completamente Il pagamento sar per le quantit effettivamente consegnate 9 PAGAMENTI 9 1 Salvo diversamente concordato e confermato nella conferma scritta di ac cettazione dell ordine i prezzi s intendono netti non comprensivi del costo d
14. 1 000 1 3 280 196 848 2 237 3 6 1 meters s 1 Km ora 0 9133 54 68 0 6214 0 278 1 km hour Pressione Pressure ATMOSFERA TORR BAR ATMOSPHERE 1 inch Hg 0 491 0 0334 25 4 25 4 0 0339 0 00339 0 0345 1psi 2 036 ES 0 0680 51 715 51 715 0 0689 0 00689 0 0703 1Atmosfera 29 921 14 696 760 760 1 0133 0 10133 1 0332 1 Atmosphere 1 torr 0 0394 0 0193 0 0013 EN 0 0013 0 00013 0 00136 83 12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE 1 DEFINITIONS In the present General Conditions of Sale un less the context calls for a different interpre tation the following words and expressions shall be taken as follows SUPPLIER shall mean BREVINI WINCHES S p A based in Via Degola 1 Villaggio Industriale Crostolo 42100 Reggio Emilia Italy CUSTOMER shall mean the person firm or company from whom the purchase order is received 2 SCOPE AND FIELD OF APPLICATION 2 1 All the sales and supplies made by the SUPPLIER shall be regulated exclusively by the present General Conditions of Sale Ac ceptance of any offer by the CUSTOMER is subject to these General Conditions of Sale All additional and or different terms and conditions shall be deemed worthless No additional and or different terms or con ditions may become part of the Contract between the CUSTOMER and the SUP PLIER unless accepted in writing by the SUPPLIER The SUPPLIER s acceptance
15. 200 C Nel caso di temperature superiori ai 200 C devono essere utilizzati lubrificanti particolari e si consiglia di consultare il produttore della fune Anche le parti terminali di una fune hanno dei limiti di utilizzo in funzione della temperatura in aggiunta a quanto indicato sopra NORME PRE UTILIZZO buona norma ispezionare la fune ed i do cumenti ad essa collegati prima di utilizzarla perch la descrizione e o la sua designazione permetter di identificare le parti che la com 51 Pbrevini winches INCORRECT ERRATO so that routine inspection and handling are possible in order to improve the effect of the lubricant MEASURING THE ROPE DIAMETER Rope diameter is the diameter of the circle circumscribing the rope section You should consider the rope s diameter to be the sa me as the circle circumscribed around the section taking care to measure the distance between the outer edge of a strand and the one diametrically opposite when taking the measurement SEE FIGURE 3 How HANDLE THE ROPE Before fitting new rope you should control the conditions and dimensions of the machine parts connected to the rope such as drums pulleys and rope guides etc in order to verify that they are still within the operating limits provided for by the manufacturer of the ma chine if they have been used previously It is always good practice to verify that all pulley blocks and rope guide pulle
16. SUPPLIER s factory and the costs of transport and other expenses will be borne by the CUSTO MER 10 5 If the CUSTOMER in agreement with the SUPPLIER requests that the replace ment and or repair take place at its own premises the former will be charged for the travel and accommodation costs of technical personnel provided by the SUP PLIER and will provide all the means and additional personnel needed to carry out the intervention quickly and safely 10 6 The aforesaid warranty exclusively covers the products manufactured by the SUPPLIER Products supplied by the SUPPLIER but not manufactured by it will be covered by the same warranty that the SUPPLIER receives from the supplier of the said goods 10 7 The aforesaid warranty represents the only and exclusive guarantee provided by the SUPPLIER for the finished products thereby excluding any other guarantee of any kind both express and implicit inclu ding but not restricted to the guarantee of correct operation suitability for use and the commercial nature of the products No affirmation or statement made by the SUPPLIER in this conditions or elsewhere may be construed as an extension of the aforesaid warranty 10 8 The CUSTOMER declares that it freely chose the goods at its own final judgement from the vast range of products offered by the SUPPLIER The SUPPLIER does not know and is not responsible for the practical use that the CUSTOMER will make of the goods Pbrev
17. Tenere lontano il collo dalle zone di passag gio Non appoggiare l argano direttamente sul pavimento 3 DESCRIZIONE DELLA MACCHINA E DATI TEGNICI MAGHINE DESCRIPTION AND SPEGIFICATIONS 3 1 OPERATING PRINCIPLE In its various configurations this winch is de signed for lifting or recovery jobs 3 2 CONFIGURATION AND CONSTRUCTION TYPE The configuration of the winch is defined by contract The winch is basically composed of Drum Supporting structure Epicyclical reduction gear Fail safe negative brake Valve for blocking and controlling descent Or recovery Hydraulic motor Accessories 3 3 TECHNICAL REFERENCE STANDARDS The specifications sheet is stored in the Tech nical Department It contains the engineering documents the standards applied calcula tions verifications of gear systems referen ces of material test certificates dimensions assembly drawings and lists of spare parts 3 4 OPERATING ENVIRONMENTAL CONDITIONS To ensure correct winch operation it must be used in places where the room temperature is between 10 C and 40 C Contact Brevini Winches Technical Department prior to use in case of other operating temperatures 3 5 OPERATION IN CONTAMINATED ENVIRONMENTS Should the winch be used in corrosive situa tions with coarse pollutants or extremely fine dust clean the winch with water or appro Pbrevini winches 3 1 PRINCIPIO DI
18. after the change or can cellation 8 DELIVERIES 8 1 Unless otherwise indicated in writing by the SUPPLIER in the written confirmation of acceptance of the order the goods shall be sold ex SUPPLIER s factory 8 2 On delivery of the goods to the CU STOMER or to the carrier the SUPPLIER is released from the obligation to deliver and all risks involving the materials pass to the CUSTOMER irrespective of the terms of transport even in the event that the SUP PLIER is charged to provide transport 8 3 Any delivery date stated on the written confirmation of acceptance of the order is purely indicative The SUPPLIER will make all reasonable efforts to respect the stipula ted delivery date However the SUPPLIER will not be responsible for any delays and the CUSTOMER will be obliged to accept delivery of the goods when the latter are ready 8 4 The delivery dates are calculated with effect from the date on which the SUP PLIER gives written confirmation of accep tance of the order 8 5 The delivery deadlines will be auto matically extended a if the CUSTOMER does not supply the data required for the supply in good time or if it requires altera tions during the course of execution or if it delays responding to requests to approve drawings and executive schemes b if the CUSTOMER is not in line with payments c if at the SUPPLIER s final judgement the customer s financial situation and or the extent of its credit is deemed s
19. alle quali la fune risulta essere esposta Il lubrificante di servizio deve essere compati bile con il lubrificante originale del costruttore e i metodi di applicazione sono diversi dalla spazzola all oliatore a goccia o a spray pi o meno pressurizzato sempre consigliato utilizzare lubrificanti per funi di tipo neutro ed appropriato alla tipolo gia ed al luogo d uso SELEZIONE DELLA FUNE Quando si a conoscenza che il fattore pri mario del deterioramento l abrasione usura per il contatto ripetuto e continuo con un altro corpo quali tamburo pulegge ecc bisogna indirizzare la propria scelta verso una fune avente i fili esterni pi grandi possibile Si consigliano funi parallele aventi entrambe le estremit bloccate ed impossibilitate a girare e funi con trefoli compattati dove si in pre senza di elevata abrasione Lo schiacciamento un altro fenomeno che pu accadere a causa di una serie diverse di ragioni ma pi frequentemente quando la fune soggetta ad avvolgimento multistrato su tamburo Ancora si riscontra una maggiore pressione tra la fune e la superficie liscia o piana rispetto a quella di un tamburo scana lato Nel caso di avvolgimenti su pi strati per il sollevamento non dovrebbero essere utiliz zate funi e trefoli con anima tessile Funi con anima di acciaio e con trefoli compattati sono maggiormente resistenti allo schiacciamento ed alle deformazioni Per combattere la corrosio
20. exceed three 3 bar when the winch is stationary NOTE The winch is designed for lifting or recovery loads Any use with loads exceeding the tions listed in the specifications sheet is considered IMPROPER Using the winch for lifting or transporting people is strictly prohibited IMPORTANT f The person in charge of the final application of the winches is responsible for their safe emplovment including issuing the list of further risks and the application of the safetv devices required bv standards in force WARNING v It is important to bear in e mind that starting up any type of appliance inevitably entails a certain amount of risk Therefore every single action should be awarded maximum at tention and concentration 36 entrambi i sensi di rotazione Eseguire il primo sollevamento con un carico modesto ad un altezza di circa un metro veri ficare il corretto funzionamento del freno Accertare che la discesa avvenga in modo controllato e che la pressione nel ramo di ritorno dell argano fermo non superi i tre 3 bar NOTA L argano un apparec chio utilizzato per il sollevamento o il traino di cari chi pertanto considerato USO IMPROPRIO l utilizzo degli stessi con valori superiori da quelli in dicati nelle schede tecniche assolutamente vietato l uso per il sollevamento o il trasporto di persone IMPORTANTE la messa in sicurezza de f gli argani demandat
21. nel caso in cui una estremit libera di ruotare nettamente inferiore rispetto ad una fune con uno strato singolo di trefoli ANGOLO DI DEVIAZIONE L angolo di deviazione l angolo formato dall asse della fune con il piano passante per la gola della puleggia Questa deve essere 59 Pbrevini wincdhes Figura 8 Feature 8 SEE FIGURE 8 The figure shows a large helical grooved drum whose pitch has angle and race pulley bending When the rope unwinds starting from the drum towards the pulley it forms the angle of deviation a On the drum the rope will be subject to bending equal to angle y x maximum angle of deviation on the first pulley groove angle Y worst case total angle Every time there is an angle of deviation as the rope enters the pulley it will initially come into contact with the pulley s flanges 60 orientata in modo da ridurre al minimo l an golo d entrata che varia da zero quando la fune si trova a met del tamburo al massimo quando si trova in prossimit di una delle due flangie VEDI FIGURA 8 La figura mostra un ampio tamburo scanalato elicoidale con un passo avente un angolo B ed un piegamento della puleggia gola Quando la fune si svolge partendo dal tam buro verso la puleggia forma un angolo di deviazione a Sul tamburo la fune subir un piegamento ad un angolo a angolo massimo di deviazione sulla prima puleggia Figura 9
22. non siano state manomesse Quando la gru sta operando normalmente le funi dovreb bero essere ispezionate per accertarsi della presenza di eventuali fili rotti deformazioni od appiattimenti od altri indicatori di dan no consumo eccessivo e corrosione della superficie almeno una volta alla settimana Tutti i terminali della fune girevoli perni ed accessori di ritenuta e le pulegge dovrebbero essere controllati per eventuali danni bronzi ne consumate o grippate Anche i ganci ed altri attacchi per il sollevamento sicurezze e girevoli dovrebbero essere controllati per eventuali danni libert di movimento od usura Ogni gancio a gambo filettato ed il dado di sicurezza dovrebbero essere con trollati per accertare eventuali movimenti non consentiti che potrebbero significare usura e corrosione LUBRIFICAZIONE DELLA FUNE La protezione garantita dal lubrificante utiliz zato dal costruttore della fune solitamente tion of a service lubricant The recommended type depends on the ap plication of the rope and the conditions the rope is exposed to The service lubricant must be compatible with the original one used by the manufacturer and the methods of application vary from brush lubricators to drip feed lubricators high or low pressure sprays It is always advisable to use lubricants suita ble for neutral rope as well as for the type and place of use ROPE SELECTION Once you verify that the primary factor deter mini
23. of any purchase request by the CUSTOMER is expressly conditioned by the CUSTOMER s acceptance of these General Conditions of Sale At all events acceptance of these products shall constitute acceptance by the CUSTOMER 2 2 The SUPPLIER s obligations and the contract shall not enter into force until the SUPPLIER has sent written confirmation of the order to the CUSTOMER or has issued the invoice whichever comes first Pbrevini winches 1 DEFINIZIONI Nelle presenti Condizioni Generali di Vendita le seguenti parole ed espressioni dove il con testo non richieda una diversa interpretazio ne hanno il significato riportato per FORNITORE s intende BREVINI WIN CHES s p A con sede in Via Degola 1 Vil laggio Industriale Crostolo 42100 Reggio Emilia Italia per cliente s intende la persona la ditta o societ dalla quale si riceve l ordine di acquisto 2 OGGETTO E AMBITO DI APPLICAZIONE 2 1 Tutte le vendite e forniture effettuate dal FORNITORE saranno disciplinate esclusivamente dalle presenti Condizioni Generali di Vendita L accettazione da par te del CLIENTE di una qualunque offerta limitata alle presenti Condizioni Generali di Vendita Ogni termine o condizione in ag giunta e o diverse con quelle indicate nelle presenti Condizioni Generali di Vendita so no da ritenersi prive di effetto Nessuno di questi termini o condizioni in aggiunta e o diverse potranno diventare parte del Con
24. person who is completely or partially within a danger area Operator a person in charge of installa tion start up adjustment maintenance and cleaning of the machine as a whole Qualified Technician a trained person in charge of special maintenance or repairs requiring particular expertise concerning the machine including its operation its safety devices and how they operate WARNING Standards for the preven v tion of accidents for the Operator and the e Qualified Technician Pbrevini winches 1 1 INTRODUZIONE Brevini Winches ringrazia per la preferenza accordata ai propri prodotti ed lieta di anno verarla tra i propri Clienti Confida che l uso dell argano sia per lei moti vo di soddisfazione 1 2 DEL MANUALE Il presente manuale fornisce all utilizzatore degli argani le informazioni necessarie alla corretta installazione uso e manutenzione dello stesso nel rispetto dei limiti di sicurezza dettati dalle norme vigenti Per migliorare la comprensione di questo manuale precisiamo di seguito i termini e le simbologie in esso utilizzati ATTENZIONE Norme antinfortunistiche per VOperatore e il Tecnico qualificato Pbrevini winches CAUTION Possibility of machine damage and or dama ge to machine parts PRECAUTION IMPORTANT Additional information relating to the process f in question s NOTE Useful important information Please con
25. simple formula is shown below for a rough calculation of the power of resistance of a vehicle to be towed on any type of non slo ping surface in the list 74 recuperato nel pantano avra bisogno di una forza equivalente a circa il 50 del suo peso complessivo La tabella sottostante mostra le differenti su perfici con le relative proporzioni di sforzo per produrre il movimento nel veicolo tipo di superficie e sforzo richiesto per muo vere il veicolo in proporzione al suo peso Per coeffiicienti di attrito mancanti atte nersi a quanto idicato dalle pubblicazioni tecniche W overall weight S coefficient of resistance according to the table W x S Power of resistance However if the surface is not flat the calcu lation must take into account the resistance of the slope depending on its gradient The coefficient for determining resistance based on the slope s gradient when the distances are short or if the distance is lon ger but has no bumps or obstacles of any type is simple Usually each degree of gradient can be said to correspond to a coefficient of 0 017 of the vehicle s weight up to a maximum of 45 gradient of 100 above this it is conside red lifting When slopes are involved this handy formula is added to the previous one indicating the degrees with G and resulting in W x S G x Wx 0 017 Power of resistance Should maximum winch recovery capacity be exceeded w
26. tipo ordi naria oppure straor dinaria ATTENZIONE Tutte le attivit di manu v tenzione sia ordinaria e che straordinaria de vono essere eseguite in condizio ni di massima sicurezza in locali attrezzati allo scopo perfetta mente aerati ed illuminati 6 1 MANUTENZIONE ORDINARIA La manutenzione ordinaria di pertinenza dell Operatore con le seguenti attivit Dopo un periodo di funzionamento non superiore alle 50 ore rodaggio cambiare l olio del riduttore come specificato al pa ragrafo 4 2 Controllare periodicamente a prescindere dalla tipologia di lavoro dell argano lo stato e il livello del lubrificante ed eventualmente ripristinare i livelli normali Dove necessario ripristinare il quantitativo di grasso nel cusci netto di rinvio a supporto del tamburo nor malmente indicato sulle schede tecniche NOTA Si consiglia per ogni argano di tenere una scheda che verr de bitamente compilata e aggiornata ogni qualvolta si esegua una ope razione di manutenzione 39 M brevini winches 6 2 SPECIAL MAINTENANCE CAUTION Brevini Winches S p A does not allow the opening of the hydrau motor or any work on the negative brake Brevini Winches does not allow the opening of the reduction gear for any reason except for routine maintenance Contact Brevini Winches Technical Department if necessary 39 0522 277711 39 0522 514977 6 3 SPECIAL MAINTENANC
27. 1 STRATO SERIAL NR MAX LINE PULL Teo LAYER PRESSIONE MAX PRESSURE PESO MAX PORTATA WEIGHT MAX OIL FLOW NOTA Lo smaltimento dei materiali d imballag gio sar a cura del destinatario che dovr eseguirlo in conformit alle norme vigenti nel Paese nel quale l argano v montato 2 3 IMOVIMENTAZIONE DELL ARGANO SENZA IMBALLO ATTENZIONE Prima di rimuovere v dal proprio e imballo assicurarlo con gli accesori di sollevamento idonei allo scopo proteggere le parti verniciate in modo che non possa scivolare o ribaltarsi Prima di movimentare l argano togliere gli eventuali tacchi di legno inseriti nell imballo per assicurare la stabilit durante le operazio ni di movimentazione e trasporto Sollevare l argano facendo attenzione non sbilanciare il carico durante le manovre 2 4 HANDLING WARNING When moving pallets v use vehicles suitable e for the tvpe of packing and offer sufficient carrving capa citv for the job in question Do not tip or overturn when lifting or mo ving If items are moved with a fork lift truck make sure the weight is distributed evenly on both forks If items are moved using a hoist make sure the weight is distributed evenly and use lif ting accessories in the sling which are ap proved in compliance with legal standards For items shippe
28. 2 514977 B SERIAL NUMBER OF THE WINCH C YEAR OF MANUFACTURE indicando Pbrevini winches This information can be found on the name plate attached to the winch VIA U DEGOLA 1 yl a 2 www breviniwinches it TIPO A DIAMETRO FUNE TYPE ROPE DIAMETER NUM MATR B TIRO MAX 1 STRATO au NR MAX LINE PULL Teo LAYER ANNO PRESSIONE YEAR MAX PRESSURE PESO MAX PORTATA WEIGHT MAX OIL FLOW NOTE The Customer is respon sible for the disposal of the packing mate rials and must ensure this is done in compliance with the regula tions in force in the country where the winch is to be used 2 3 HANDLING THE WINCH WITHOUT PACKING WARNING Before taking the winch v out of its packing e secure it with suitable lifting accessories protect any painted surfaces so that it will not slip or overturn Before handling the winch remove any wooden blocks inserted inside the packing to safeguard stability during handling and transport When lifting the winch take care that the wei ght is distributed evenly during handling 18 Queste indicazioni vanno rilevate sulla tar ghetta identificativa fissata sull argano VIA U DEGOLA 1 l iibrecimi 42100 REGGIO EMILIA ITALY Te 39 0522 277711 NS www breviniwinches it TIPO A DIAMETRO FUNE TYPE ROPE DIAMETER NUM MATR B TIRO MAX
29. 4 CONNECTING THE HYDRAULIC SYSTEM TO THE WINCH The winch must be connected to the hydrau lic system by means of three pipes two of these handle its supply and the third one is connected directly to the hydraulic system s tank for draining the motor when necessary the dimensions and the specifications of the couplings for connecting the pipes to the hyaraulic motor are stated in the specifica tions sheet for the winches negativo della valvola selettrice per l aper tura del freno e della valvola per il controllo del carico in discesa indispensabile avere una filtrazione dell olio idraulico in entrata al motore 10 micron assoluti VEDI FIGURA 1 4 4 COLLEGAMENTO IMPIANTO IDRAULICO ALL ARGANO L argano deve essere collegato all impianto idraulico per mezzo di tre tubazioni due che provvedono all alimentazione dello stesso ed una terza collegata direttamente al serbatoio dell impianto idraulico per il drenaggio del motore ove necessario le dimensioni e le ca ratteristiche degli attacchi per le connessioni delle tubazioni al motore idraulico sono indi cate sulla scheda tecnica degli argani 29 Pbrevini winches Figura 2 Feature 2 SCHEMA IDRAULICO CONSIGLIATO CON DRENAGGIO MOTORE MESSO A SCARICO DIRETTO IN SERBATOIO RECOMMENDED HYDRAULIC LAYOUT WITH DIRECT MOTOR DRAIN INTO THE TANK CODICE SALITA LIFTING CODE
30. DIXA 10 APPENDICE B istruzioni tecniche contenute nella ROPES PULLEYS AND DRUMS page 49 TEORIA DEL RECUPERO presente pubblicazione e seguire E DEL TRAINO pag 71 10 APPENDIX B i MORONS DN TONING 11 TABELLE DI CONVERSIONE riportate AND pag 79 Conservare il presente manuale 11 CONVERSION TABLES 12 CONDIZIONI GENERALI tutte le pubblicazioni allegate in un RE RES 79 ae DI VENDITA luogo accessibile e noto a tutti gli 12 GENERAL TERMS OF SALE EIER pag 85 utilizzatori operatori e personale 85 addetto alla manutenzione 1 INFORMAZIONI GENERALI GENERAL INFORMATION 1 1 INTRODUCTION Brevini Winches would like to thank you for choosing one of its products and is pleased to welcome you as a Customer We are confident you will find using this winch very satisfactory 1 2 AIM OF THIS MANUAL This manual aims at giving the users of our winches all the necessary information in order to install operate and maintain correctly the winches in compliance with the safety limits provided for by the standards in force In order to facilitate the understanding of this manual we are listing the terms and symbols used below Danger Area area in or close to the machi ne where the presence of an unprotected person constitutes a risk for the health and safety of the person himself Unprotected Person any
31. E OF THE NEGATIVE BRAKE After 1000 hours of winch operation with ave rage operating cycles at 6096 nominal load a full service of the negative brake is mandatory This work must be done by Brevini Winches Technical Department or by an authorised service centre 40 6 2 MANUTENZIONE STRAORDINARIA AVVERTENZA La Brevini Winches S p A vieta l apertura del motore idraulico e di intervenire sul sistema del freno negativo La Brevini Winches vieta l aper tura del riduttore per qualsiasi operazione che non sia compresa nella manutenzione ordinaria In caso di necessit contattare il Servizio Tecnico Brevini Winches 39 0522 277111 39 0522 514977 6 3 MANUTENZIONE STRAORDINARIA DEL FRENO NEGATIVO Dopo 1000 ore di funzionamento dell argano con cicli di lavoro medio pari al 6096 del cari co nominale obbligatorio eseguire una revi Sione completa del sistema freno negativo Questa operazione deve essere eseguita presso il Servizio Tecnico Brevini Winches o Suo centro di riparazioni autorizzato DISPOSAL 7 DEMOLIZIONE WARNING Disposal must be carried v out by a Qualified Te e chnician NOTE As different methods of disposal are required in different countries you must comply with the requi rements provided for bv the laws and regulations provided for bv the Institutions in charge in each countiv The winch must be transported to a suitable place for the dismant
32. FUNZIONAMENTO L argano progettato per eseguire nelle varie configurazioni operazioni di sollevamento o traino 3 2 CONFIGURAZIONE E TIPOLOGIA COSTRUTTIVA La configurazione dell argano definita a livello contrattuale L argano essenzialmente composto da Tamburo Struttura di sostegno Riduttore epicicloidale Freno negativo di stazionamento Valvola di blocco e controllo discesa o traino Motore idraulico Accessori 3 3 NORME TECNICHE DI RIFERIMENTO Il fascicolo tecnico depositato presso il Servizio Tecnico contiene la documentazione di progetto le normative utilizzate i calcoli le verifiche delle ingranaggerie le referenze dei materiali i certificati di collaudo le dimensio ni i disegni di montaggio e le liste ricambi 3 4 CONDIZIONI AMBIENTALI D ESERCIZIO Per garantire un corretto funzionamento dell argano necessario che sia impiegato in luoghi con temperatura ambiente compresa tra i 10 C ed i 40 C per temperature di esercizio differenti consultare preventivamen te il Servizio Tecnico Brevini Winches 3 5 UTILIZZO IN AMBIENTI CONTAMINATI Qualora si utilizzi l argano in ambienti cor rosivi con inquinanti grossolani con polveri estremamente fini procedere al lavaggio 23 Pbrevini winches priate liquid to prevent deposits which could damage important parts such as bolts and screws rings and washer seals It is important that
33. IONI AL PERSONALE pag 11 MODALIT DI CONSULTAZIONE DEL MANUALE ne pag 12 LIMITI DI RIPRODUZIONE E COPYRIGHT 12 REVISIONI DEL MANUALE pag 12 2 MBALLO SPEDIZIONE MOVIMENTAZIONE RICEVIMENTO 2 1 IMBALLO E SPEDIZIONE pag 15 2 2 RICEVIMENTO iii pag 15 2 3 MOVIMENTAZIONE DELL ARGANO SENZA pag 16 2 4 MOVIMENTAZIONE pag 17 IMMAGAZZINAMENTO pag 17 3 DESCRIZIONE DELLA MACCHINA 3 3 3 4 3 5 3 6 3 7 3 8 E DATI TECNICI PRINCIPIO DI FUNZIONAMENTO pag 21 CONFIGURAZIONE E TIPOLOGIA COSTRUTTIVA iscissi pag 21 NORME TECNICHE DI RIFERIMENTO 21 CONDIZIONI AMBIENTALI D ESERCIZIO A A pag 21 UTILIZZO IN AMBIENTI CONTAMINATI pag 21 VIBRAZIONL icta pag 22 RUMONRE retten pag 22 ATMOSFERA CON RISCHIO DI ESPLOSIONE E O INCENDIO pag 22 5 Pbrevini winches 4 INSTALLAZIONE 4 1 NORME PER LA CORRETTA INSTALLAZIONE pag 25 42 LUBRIFICAZIONE pag 26 WAR NIN G 4 INSTALLATION 4 3 OLIO IMPIANTO IDRAULICO pag 26 4 1 RULES FOR CORRECT 4 4 COLLEGAMENTO IMPIANTO IDRAULICO Please read the technical INSTALLATION page 25 ALL ARGANO pag 27 informa
34. OCUMENTI INERENTI LA FORNITURA 4 1 Tutti i disegni fotografie illustrazioni descrizioni dati tecnici e prestazioni od ogni altro dato ed informazione riguardante i prodotti siano essi contenuti in documenti disegni acclusi all offerta del FORNITO RE o risultanti da cataloghi prospetti listini prezzi pubblicit del FORNITORE hanno carattere esclusivamente indicativo Devia zioni o scostamenti da questi non potranno costituire ragioni e motivi per la non accet tazione della merce o viziare il contratto o essere motivo per reclami nei confronti del FORNITORE 4 2 Tutti i disegni eventualmente inviati al CLIENTE per approvazione saranno ritenuti automaticamente approvati dal CLIENTE a meno che non vengano restituiti al FORNI TORE con note e commenti diversi entro 10 giorni lavorativi o entro i termini con cordati all atto della loro sottomissione al CLIENTE 4 3 Tutti i prospetti disegni dati tecnici ed ogni altro materiale e informazioni tecniche acclusi all offerta o forniti in connessione con la fornitura rimarranno di propriet del FORNITORE e non potranno essere ripro the written agreement of the SUPPLIER 5 ESTIMATES OFFERS The estimates and offers shall remain valid for a period of 30 days from the date of is sue unless otherwise stated in writing by the SUPPLIER The SUPPLIER reserves the right to cancel or revise the estimates and offers at any time prior giving written confirmation of the acce
35. a all applicatore finale come pure la stesura dell elenco dei rischi residui e all applicazio ne di tutti i sistemi di sicurezza richiesti dalle norme vigenti ATTENZIONE importante tenere pre sente che la messa in v funzione di una qua e lunque apparecchia tura implica dei rischi pertanto bene affrontare ogni tipo di operazione con la massima atten zione e concentrazione 6 MANUTENZIONE MAINTENANCE Maintenance may be classed as routine or special mainte nance WARNING All maintenance work whether routine or special must be carried out in the safest conditions in places equipped for the purpose offering perfect ventilation and lightening 6 1 ROUTINE MAINTENANCE The Operator is in charge of routine mainte nance including the following tasks Changing the reduction gear oil as structed in section 4 2 after no more than 50 hours of operation running in Regardless of the type of work the winch is used for check the status and the level of lubricant on a regular basis and top up when necessary Top up the amount of grease in the drum support transmission bearing when necessary normally given in the specifications sheet NOTE We recommend keeping a file for each winch this should be duly filled in and updated every time maintenance work is carried out Pbrevini winches NOTA La manutenzione pu essere del
36. a di emissione salvo diversa conferma scritta del FORNITORE Il FORNITORE comunque si riserva il diritto di annullare o rivedere le quotazioni ed offerte in qualunque momento prima della emissione della conferma scritta di accettazione dell ordine per cause di Forza Maggiore 6 VARIAZIONI 6 1 prezzi indicati nell offerta o nella con ferma scritta di accettazione dell ordine sono basati sui costi del FORNITORE alla data dell offerta o della conferma Qualora intervengano variazioni di tali costi mano dopera macchine materiale etc tra la da ta dell offerta o di accettazione dell ordine il FORNITORE a sua sola discrezione si riserva il diritto di variare i prezzi conse guentemente a patto che l avviso di tale variazione sia data al CLIENTE entro 14 giorni prima della consegna della merce o completamente della fornitura 6 2 Qualora il CLIENTE richieda di mo dificare la merce il CLIENTE sopporter tutti i costi aggiuntivi ed eventuali ritardi di consegna che dovessero derivare da tali modifiche 6 3 Il FORNITORE si riserva la facolt di apportare modifiche al prodotto in qua lunque momento purch tali modifiche non alterino in modo sostanziale le prestazioni e o specifiche dei prodotti 7 MODIFICHE E CANCELLAZIONI Nessun ordine pu essere modificato o annul lato da parte dal CLIENTE dopo la conferma scritta di accettazione dell ordine da parte del 89 Pbrevini winches expenses incurred
37. ble for keeping the products in safe and good condition 14 FORCE MAJEURE The SUPPLIER shall not assume the risk and shall not be liable for delays or the failure to comply with any of the obligations for the reasons outside its control listed below as grounds of Force Majeure The grounds of Force Majeure will include without exceptions accidents acts of God strikes or labour contracts government laws fires floods delays resulting from the failed 94 11 MARCHI Ogni targhetta di identificazione e o ogni altra forma di identificazione posta sui prodotti venduti dal FORNITORE non pu essere rimossa senza il consenso scritto del FOR NITORE Ogni obbligo derivante da queste Condizioni Generali di Vendita dovr ritenersi privo di effetto qualora la targhetta di iden tificazione e o ogni altra forma di identifica zione posta sul prodotto sia stata rimossa o manomessa 12 CoLLauDpo Tutti i prodotti di produzione del FORNITORE sono sottoposti a collaudo finale standard prima della consegna Tale collaudo da ritenersi finale e conclusivo Ogni collaudo addizionale e o speciale deve venire richie sto e specificato dal CLIENTE nell ordine di acquisto ed soggetto ad accettazione da parte del FORNITORE e verr eseguito a spese del CLIENTE 13 RISERVA DI PROPRIET La propriet dei prodotti rimarr del FORNI TORE sino al momento in cui il CLIENTE avr saldato interamente l ammontare concordato u
38. consiglia to sostituire le rosette di tenuta sotto i tappi tutte le volte che si svitano per gli interventi E consigliato il cambio del lubrificante ad olio caldo per evitare la formazione di morchie Al momento del cambio dell olio consigliato anche di provvedere ad un lavaggio interno del riduttore con liquido adatto allo scopo e consigliato dai produttori dei lubrificanti E consigliato a prescindere dalle ore di fun zionamento un controllo del livello lubrifican te ogni 20 giorni solari NOTA Per l utilizzo dell arga no con temperature ambientali inferiori i 10 consigliato un lubrifican te con classe di viscosit VG 100 sintetico ISO 3449 4 3 OLio IMPIANTO IDRAULICO Per l alimentazione del motore idraulico del l argano utilizzare olio a base minerale con additivi antiusura e indice di viscosit VG 46 Per assicurare un buon funzionamento ed una buona durata del motore idraulico del freno Figura 1 Feature 1 Pbrevini winches Classificazioni viscosimetriche Viscosity Classification cSt 10 m s 1 mm s o o S x a o o 3 per n o cSt a 100 C cSt at 100 C ISO AGMA Gradi SAE Gradi SAE SUS No Trasmisssioni Motori Olii base Number Transmissions Number Motors Basic Oils duration of the hydraulic motor the fail safe negative brake the selector valve for release of the brake and of the valve for control of the load descent SEE FIGURE 1 4
39. d on pallets make sure that the lifting accessories do not damage the winch If necessary place suitable wooden blocks under the item to facilitate the use of lifting accessories WARNING When lifting the item v and putting it into po e sition avoid impacts and violent knocks 2 5 STORAGE If the winch is to be stored for a temporarv period or for a period exceeding six months follow the instructions below after completing functions testing Completely fill the reduction gear section and the hydraulic motor with oil for the use of oils see the section on lubrication and hydraulic oil Store in a safe dry place without significant variations intemperature and humidity levels Pbrevini winches 2 4 MOVIMENTAZIONE ATTENZIONE Per lo spostamento dei v pallets utilizzare mezzi e idonei al tipo di imbal lo e di portata adeguata al lavoro da svolgere Non inclinare o capovolgere durante il sol levamento e trasporto Se i colli vengono movimentati con un car rello elevatore assicurarsi che il peso sia bilanciato sulle forche di sollevamento Se i colli vengono movimentati con un pa ranco assicurarsi che il carico sia bilanciato e nell imbracatura utilizzare accessori per il sollevamento omologati a norma di legge Peri colli spediti su pallets fare attenzione che gli accessori di sollevamento non dan neggino l argano Se necessario mettere adeguati cunei
40. di legno sotto il collo per facilitare l utilizzo degli accessori di sollevamento ATTENZIONE Durante il sollevamento v ed il posizionamento e del collo evitare impat ti ed urti violenti 2 5 IMMAGAZZINAMENTO Dopo il collaudo funzionale nel caso occorra immagazzinare l argano per un periodo tem poraneo o superiore a sei mesi attenersi a quanto segue Riempire d olio totalmente la parte ridutto re e il motore idraulico vedere per l utilizzo degli oli il paragrafo lubrificazione e olio idraulico Immagazzinare in luogo asciutto e protetto onde evitare forti sbalzi termici e di umidit 19 Pbrevini winches WARNING If the storage period is v to be longer than six e months the efficiencv of the rotating seals will dete riorate we recommend regular control and replacement of seals when starting up if Donotstack items one on top of another Do not place on top of items material that could damage them Do not store the item in close proximity to areas of transit Do not rest the winch directly on the floor 20 ATTENZIONE Per l immagazzinamento v prolungato oltre i sei e mesi decade l effi cienza per le tenute rotanti si consiglia un controllo periodico e eventuale sostituzione delle tenu te all atto dell avviamento Non mettere pezzi uno sopra l altro Non appoggiare sui colli materiali che pos sano danneggiarli
41. e so that it does not become twisted or knotted taking steps to prevent it from getting dirty due to dust sand damp material or other harmful substances the appropriate revolving supports can be used for large coils SEE FIGURE 4 2 Rope wound onto a reel insert a suitably strong shaft inside the reel and then place it on a stand which allows it to turn and be stopped at the same in order to prevent it gaining too much speed due to momentum during installation so that the coils can be wound onto the drum or winch correctly especially with multi layer coils It is particularly important that the coils in the lower layers of the rope are wound tightly onto the drum surface apply a pre load to keep the taut during winding It is im portant to place the reel of rope so that the angle of deviation is reduced as much as brevini winches INCORRECT ERRATO 1 Fune fornita in un rotolo il rotolo di fune dovrebbe essere posizionato al suolo e svolto in linea retta in modo da non creare cos torsioni o nodi assicurandosi che non venga contaminato da polvere sabbia ma teriale umido od altri prodotti dannosi per rotoli di dimensioni elevate si pu ricorrere all utilizzo di appropriati supporti girevoli VEDI FIGURA 4 2 Fune avvolta su bobina inserire un albero di adeguata resistenza all interno della bobina e posizionare la stessa su un ca valletto che consenta la rotazione della s
42. e non siano bloc cate e che siano a posto una gomma sgonfia richiederebbe maggior sforzo quindi prima di iniziare il recupero controllarne lo stato e se necessario cambiare gli organi deteriorati e monitorare l ambiente circostante Nel peso del veicolo deve essere incluso di tutto l equipaggiamento compreso baga gliaio benzina passeggeri a bordo ecc La natura della superficie su cui deve essere trainato il veicolo la variabile pi grande dell equazione del recupero Un veicolo in buone condizioni su una strada asfaltata avr bisogno di una forza di traino corrispondente a circa il 4 del suo peso complessivo per indurlo in movimento mentre invece un veicolo che deve essere 73 Pbrevini winches The table below shows different surfaces with their relative proportions of power needed to start moving the vehicle type of surface and power required to move the vehicle in proportion to its weight best TARMAC road or surface 0 04 of total vehicle weight p GRASS 0 143 of total vehicle weight DAMP HARD SAND 0 166 of total vehicle weight po GRAVEL 0 2 of total vehicle weight DAMP SOFT SAND 0 2 of total vehicle weight DRY SOFT SAND 0 25 of total vehicle weight SHALLOW MUD 0 33 of total vehicle weight DEEP MUD 0 5 of total vehicle weight STICKY CLAY 0 5 of total vehicle weight Follow the indications provided in the techni cal documentation for any other coefficients of friction A
43. excess of those allowed is PROHIBITED no per permettere il richiudersi del freno negativo occorre che quando la leva del distributore viene posizionata al centro non rimanga una pressione superiore ai tre 3 bar nei due rami di ali mentazione ATTENZIONE PERICOLO Il sollevamento di un ca v rico applicato alla fune e dell argano non deve mai avvenire mediante il braccio idraulico della gru sul quale l ar gano o il vericello installato in questo caso la valvola di so vrapressione non potrebbe pro teggere l argano da sovracarichi molto pericolosi comunque assolutamente VIE TATO manomettere la valvola di sovrapressione per carichi supe riori a quelli consentiti 9 MESSA IN FUNZIONE START UP WARNING Before starting up the v winch for the first time check the following the level of the lubricant is correct all bolts and screws are securely tightened the hydraulic system complies with the specifications listed in the relative section the direction of drum rotation is correct 5 1 SECURING THE ROPE NOTE The winch is normally supplied without rope wound on the drum The assembly of the rope must be carried out by an Operator or Qualified Technician accor ding to the instructions provided by the rope manufacturer IMPORTANT Read carefully the re commendations in Appendix A 5 2 TESTING OF OPERATION NOTE All data relating to pressu
44. for use depending on the tem perature PROCEDURES PRIOR TO USE It is always good practice to inspect the rope and the documents relating to it before use because its description and or designation will enable you to identify the parts it is made of This is also important for storage purpo ses which must be in a well ventilated dry and enclosed area which is off the ground Pbrevini winches PER L USO E LA MANUTENZIONE DELLE FUNI CARATTERISTICHE PRINCIPALI La fune una macchina complessa e la scelta della formazione da utilizzare il risultato di un compromesso tra i vari fattori che possono influenzarne la durata La fune in acciaio un materiale composito ed in funzione del tipo pu contenere un nu mero diverso di materiali a l anima che pu essere in acciaio al carbo nio della stessa qualit utilizzata per i trefoli esterni oppure in fibra naturale o sintetica b Il lubrificante c Ove applicabili rivestimenti o riempimen ti per migliorare la protezione da agenti esterni Le funi in acciaio a trefoli con anima tessile tipiche per il traino possono essere usate con temperature comprese fra i 40 e i 100 C mentre per le funi in acciaio a trefoli con anima metallica usate per il sollevamento in generale il campo di utilizzo va da 40 200 C riservandosi di considerare una pos sibile perdita di capacit dell ordine del 10 della portata stessa tra i 100 e i
45. hes S p A guarantees its pro ducts are free from any material or manu facturing defects for the period stated in the supply agreement or order confirmation This guarantee will be considered null and void should the cause of the fault or anomaly be deemed the result of incorrect or unsuita ble application of the product and in case of failure to comply with start up which must be done within six 6 months of the date of shipment 1 4 INFORMATION FOR PERSONNEL All employers must ensure that personnel are informed about the following issues relating to safe operation of the winch Accident risks Devices designed for operator safety General rules for the prevention of accidents or rules provided for by international directives and by the legislation of the country where the winch is to be used However Operators and Qualified Technicians must safeguard full compliance with standar ds for safety and prevention of accidents in the country where the winch is to be used Both Operators and Qualified Technicians must be acquainted with the features of the winch before starting on a job and must have read this manual in full Modifying or replacing winch parts without Pbrevini winches 1 3 GARANZIA E COLLAUDO La Brevini Winches S p A garantisce che i suoi prodotti sono esenti da difetti di mate riale o di costruzione per il periodo indicato nel contratto di fornitura o sulla conferma d ordine
46. hes are packed and shipped in crates or on pallets on a case by case basis 2 1 IMBALLO SPEDIZIONE Gli argani vengono imballati e spediti secon do i casi in casse su pallets 2 2 INCOMING GOODS PROCEDURES When the winches arrive check that the items supplied match the items stated in the order and that the packing and contents have not been damaged during transport 2 2 RICEVIMENTO Al ricevimento degli argani verificare che la fornitura corrisponda alle specifiche del WARNING l ordine che l imballo ed il suo contenuto The packing strap is v non abbia subito danneggiamenti durante il sharp It mav hit the ji trasporto Operator when cut ATTENZIONE La reggia tagliente Quando si taglia pu colpire l Operatore The packing materials should be removed as follows cut the packing straps with snips take careas the ends could hit the Operator cut away or pull off the surrounding packing material take the winches off the pallets Le demolizioni dell imballo deve essere effet tuata come segue tagliando con le cesoie le reggette fare attenzione alle estremit che potreb bero colpire l Operatore tagliando o sfilando l imballo di contorno rimuovere gli argani dai pallets If you notice any damage faults or missing items please notify Brevini Winches Technical Department without delay 39 0522 277711 39 0522 514977 39 0522 277111 A TYPE OF WINCH 39 052
47. i pizzicano vicendevolmente Ci si riferisce solitamente a tale fenomeno definendolo interferenza ma l ampiezza di quest ultimo pu essere ridotta selezionando una fune parallela se il sistema di avvolgi mento lo consente o una fune compattata 63 Pbrevini winches CRITERIA FOR TARGETED ROPE CONTROL The illustration below gives you a broad outli ne of the possible defects to take into consi deration while checking the ropes for lifting such as damaged wires wear reduction in diameter corrosion and excessive lengthe ning in relation to the various positions of the rope on the equipment SEE FIGURE 12 There are tables and standards stating the extreme conditions urging the rope to be replaced based on the rope s category and the use required It is not possible in fact to define a life cycle for this accessory In addition to the types of deformation already mentioned the following may also be en countered helical distortion basket distor tion strand protrusion wire protrusion local increase or reduction in diameter flattened sections twisting and kinks CRITERI PER IL CONTROLLO MIRATO DELLE FUNI Di seguito un illustrazione schematica degli eventuali difetti da prendere in considera zione durante il controllo delle funi per il sollevamento quali la rottura dei fili l usura la riduzione del diametro la corrosione e l allun gamento eccessivo in relazione alle diverse pos
48. ini winches del FORNITORE 10 3 La garanzia di cui sopra cessera di operare qualora il prodotto sia stato mano messo e o riparato non dal FORNITORE e comunque da persone non autorizzate per iscritto dal FORNITORE stesso 10 4 Le sostituzioni e o riparazioni in ga ranzia vengono effettuate f co stabilimento del FORNITORE ed i costi di trasporto e ogni altra eventuale spesa sono a carico del CLIENTE 10 5 Qualora il CLIENTE in accordo con il FORNITORE richieda di effettuare la sostituzione e o riparazione presso di lui quest ultimo sosterr le spese di viaggio e soggiorno del personale tecnico messo a disposizione dal FORNITORE e fornir tutti i mezzi ed il personale ausiliario necessari per eseguire l intervento nel modo pi rapi do e sicuro 10 6 La garanzia di cui sopra copre esclusi vamente i prodotti di produzione del FOR NITORE Prodotti forniti dal FORNITORE ma da esso non prodotti saranno coperti dalla stessa garanzia che il fornitore di que st ultimo riconoscer al FORNITORE 10 7 La garanzia di cui sopra costituisce la sola ed esclusiva garanzia fornita dal FORNITORE in relazione ai prodotti finiti rimanendo pertanto esclusa ogni altra garanzia di qualsiasi tipo sia espressa che implicita inclusa ma non in via limitativa quelle di buon funzionamento di idoneit all uso e del carattere mercantile dei pro dotti Nessuna affermazione o rappresen tazione fatta dal FORNITORE alle presenti condizioni
49. ion the weight of the vehicle and its mechanical conditions Assuming the vehicle is in good working order that is to say its tyres are not blocked and are satisfactory a flat tyre would demand more pulling power check its status before starting recovery and change any worn parts if necessary and then inspect the surrounding area The vehicle weight must include all its fittin gs and equipment including luggage fuel passengers on board etc The type of surface where the vehicle is to be pulled across is the biggest variable in the recovery equation The pulling power needed to start moving a vehicle in good condition on a tarmac road will be about 4 of its overall weight whilst a vehicle that has to be pulled out of deep mud will need the equivalent of 50 of its overall weight in pulling power Pbrevini winches risultati migliori negli argani da recupero vengono se si fanno alcune considerazioni in tuitive e di natura meccanica sulla differenza tra il sollevamento e il traino di un veicolo La resistenza nel sollevamento ben diversa da quella del traino e si pu desumere da questi 4 fattori che influenzano il recupero di un veicolo La resistenza dovuta all inerzia di un vei colo dipende dallo stato dei pneumatici dall attrito sulla superficie dal peso del veicolo e se questo in buono stato mec canico Per ipotesi assumiamo il veicolo in buone condizioni cio che le gomm
50. ith direct pulling considered maximum at the first layer of rope on the drum you can solve the problem using a pulley block Pbrevini winches Un semplice calcolo per dare approssima tivamente il valore della resistenza di un veicolo da trainare su una qualsiasi superficie non inclinata di quelle elencate riportata nell esempio W peso complessivo S coefficiente di resistenza da tabella W x S Forza resistente Pero se la superficie non piana il calcolo deve tenere conto della resistenza del pia no inclinato in base ai gradi d inclinazione Il coefficiente per determinare la resistenza in funzione dei gradi d inclinazione su cui si trova il veicolo quando le distanze sono brevi o se la distanza elevata ma senza avvallamenti o ostacoli di qualsiasi natura di intuizione pratica Di solito viene proposto che ogni grado d in clinazione assume un peso corrispondente a un coefficiente corrispondente a un coef ficiente di 0 017 del peso del veicolo fino a quando questo non supera i 45 inclinazione del 100 dopo di che si considera come sollevamento puro Questa formula puramente pratica va ag giunta alla precedente quando si in presen za di superfici inclinate ne risulta indicando con Gi gradi che W x S G x W x 0 017 Forza resistente 75 Pbrevini winches SEE FIGURE A The same pulley can be used for self reco very SEE FIGURE Otherwise it can als
51. izioni della fune sull apparecchio VEDI FIGURA 12 Esistono tabelle e normative che in base alla classe di appartenenza e all utilizzo preposto indicano la condizione limite cui deve av venire la sostituzione della fune infatti non possibile definire un ciclo vita di questo accessorio Un elenco dei fenomeni di deformazione che si possono incontrare il seguente oltre a quelli gi menzionati distorsione a elica distorsione a canestro espulsione di trefoli espulsione di fili aumento o riduzione localiz zata del diametro parti appiattite attorciglia menti e pieghe Figura 12 Feature 12 Tamburo Drum 1 Controllare il punto di attacco della fune al tamburo 1 Control the point where the rope is con nected onto the drum 2 Cercare avvolgimenti difettosi che causino deformazioni parti appiattite e usura che pu essere notevole nelle zone di tiro deviato 2 Check for defects in winding which cause deformation flattened sections and wear and may be significant in areas with deviated pulling 3 Ricercare le rotture di fili 3 Check for broken wires 4 Controllare la corrozione 4 Check for corrosion 5 Cercare le deformazioni causate da carico intermittente 5 Check for deformation caused by inter 6 Controllare il tratto che si avvolge sulla puleggia per scoprire even tuali rotture di fili e usura 6 Check the section winding onto the pulley for any worn or dama ged wires
52. li dove possibile Motorizzazioni differenti da quelle idrauliche dove possibile Valvole idropilotate per il controllo del carico e apertura freno negati vo lamellare NOTE Gli argani da traino sal vo ordine contrario vengono forniti con desinnesto tamburo manuale APPENDICE A FUNI PULEGGE TAMBURI APPENDIX ROPES PULLEYS AND DRUMS GENERAL INFORMATION FOR USE AND MAINTENANCE OF ROPES MAIN FEATURES Rope is a complex piece of equipment and deciding which format to use is the result of a compromise between various factors that could affect its life Steel rope is a composite material and can include a number of different materials de pending on its type a its core can be made in the same quality of carbon steel used for the outer strands or in natural or synthetic fibre b the lubricant C coatings or fillings for improving protection against external agents when applicable Normal steel stranded ropes with textile core generally used for recovery can be used at temperatures between 40 and 100 For the steel stranded ropes with metal core generally used for lifting the range goes from 40 to 200 C taking into consideration a possible drop in capacity of around 1096 between 100 and 200 C Special lubricants must be used if the tem perature exceeds 200 C we also recommend contacting the rope manufacturer Moreover the end sections of a rope also have limits
53. ling of its various parts Before starting work make sure the reduction gear and hvdraulic motor areas have been emptied of the relative liquids thev contain Store these in suitable containers separated bv tvpe Dismantle all the various parts of the unit taking extreme care with the negative brake Separate and store the different tvpes of ma terials so thev can be sent for waste recvcling or disposal Pbrevini winches ATTENZIONE La demolizione dell ar v gano deve essere e fettuata da un Tecnico Qualificato NOTA Essendo in vigore una differente modalit di demolizione nei vari Stati si devono osservare le prescrizioni imposte dalle leggi e regolamenti dagli Enti preposti dai paesi stessi L argano va trasportato in luogo idoneo effettuare lo smontaggio delle sue parti Prima dell intervento assicurarsi di svuotare la zona riduttore e quella del motore idraulico dai fluidi in essa contenuti stoccarli in reci pienti idonei e suddivisi per tipo Eseguire lo smontaggio del gruppo in tutte le sue parti facendo molta attenzione ad ese guire le operazioni sul freno negativo Dividere e stoccare le differenti tipologie di materiali per avviarli alla raccolta differenziata per lo smaltimento dei rifiuti 43 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES Pbrevini winches 8 1 LIFTING The following accessories are available for correct wi
54. ll utilizzo della mano cosi spiegata Il dito pollice indica il punto ed il lato di acoraggio della fune sul tamburo The right hand indicates the use of right torque rope The left hand indicates the use of left torque rope The direction of rope winding onto the drum is indicated by a curve starting from the tip of the index finger and has the tip of the thumb as the arrow The direction of rope winding on to the drum is always considered as starting at the rope s anchor point This is also the observation point for drum rotation during winding This system applies both to smooth drums and grooved drums BLOCKS STABILITY DURING ROTATION In order to limit the risks associated with load rotation during lifting and to safeguard the safety of personnel in the relative area you should always use anti swivel rope which will however give a minimum amount of tur ning when subjected to a load If rotation resistant ropes are used whose ring of outer strands is twisted in the op posite direction to that of the strands layer underneath the amount of twist produced when loaded either with both heads blocked twisting moment or when one head is free to rotate is considerably less than with rope with a single layer of threads ANGLE OF DEVIATION The angle of deviation is the angle formed by the axis of the rope and the surface passing through the race of the pulley The pulley must be directed s
55. lugs should be changed every time they are unscrewed for such work Lubricant should be changed when the oil is hot in order to prevent sludge formation When changing the oil you should also clean inside the reduction gear using liquid suitable for this purpose and recommended by lubricant manufacturers You should control the lubricant level every 20 days regardless of the number of hours of operation NOTE When operating the winch at room tempe ratures below 10 C we recommend using a lubricant with viscositv class VG 100 svn thetic ISO 3448 4 3 HYDRAULIC SYSTEM OIL For the supply of the winch s hydraulic motor use mineral oil with wearproof additives and VG 46 index of viscosity It is essential that you use 10 micron hydrau lic oil filters on the motor inlet in order to safeguard correct operation and satisfactory 28 NOTA Per un corretto montag gio vanno utilizzati i fori predisposti sul l interfaccia argano applicazione 4 2 LUBRIFICAZIONE L argano viene consegnato con l olio lubri ficante al suo interno VG 150 minerale ISO 3448 nel quantitativo indicato sulla scheda tecnica dell argano Il primo cambio del lubrifi cante deve avvenire entro e non oltre le 50 ore di funzionamento primo rodaggio Successi vamente ogni 500 ore di funzionamento del l argano Utilizzare per il controllo rabbocco e sostituzione olio i tappi predisposti allo sco po indicati sulla scheda tecnica E
56. maintenance is carried out in line with an appropriate schedule and using appropriate methods in order to prevent excessive wear of the winch 3 6 VIBRATION When operating conditions comply with the instructions for correct use provided in this manual vibration will not result in any hazar dous situations Should vibration occur the Operator should stop the machine immediately and notify Bre vini Winches Technical Department 3 7 Noise This winch is designed and manufactured so as to reduce the noise level at source Brevini Winches informs its Customers with regard to the issue of winch noise so that thev mav take appropriate measures according to the operating environmental conditions for example in the presence of reverberating parts or other noise sources in the vicinitv 3 8 ATMOSPHERES WITH EXPLOSION AND OR FIRE HAZARD This winch is not designed to be used in an explosive atmosphere Should such operating conditions be envisa ged it is essential vou contact Brevini Win ches Technical Department 24 dell argano con acqua o liquidi adeguati per evitare depositi pericolosi per la integrit di parti importanti come viterie anelli e rosette di tenuta E importante intervenire con modalit e tempi di manutenzione adeguati in modo da evitare l usura eccessiva dell argano 3 6 VIBRAZIONI In condizioni di impiego conformi alle indica zioni di corretto utilizzo fornite nel presente manuale
57. nch operation Ropes and Hooks Special Paints on request Pressure roller systems Pressure roller systems with con trol of minimum and maximum capacity of the rope wound onto the drum with electric or oil pres sure signal reading Direct or indirect reading systems for the number of drum revs Only with installer support the option of systems for the reading of winch overload ta del numero di giri tamburo Installation of motor driven sy Esclusivamente in collaborazione stems other than hydraulic liquid con l installatore la possibilit systems where possible di realizzazione di sistemi atti a determinare la lettura del sovra carico a cui pu essere soggetto L applicazione di motorizzazioni dove possibile differenti da quelle a fluido idraulico 8 1 SOLLEVAMENTO Per un corretto funzionamento dell argano e del vericello sono disponibili i seguenti accessori Funi e Ganci Verniciature Speciali a richiesta Sistemi di Rulli Pressa Cavo Sistemi di Rulli Pressa Cavo con controllo della capacit minima e massima della fune avvolta sul tamburo con lettura del segnale di tipo elettrico o oleodinamico Sistemi di lettura diretta o indiret CAUTION The adjustment and ca libration of systems for controlling the minimum and maximum capacity of the rope wound onto the drum must be carried out by the instal ler before the winch start up The above also applies to a
58. ndi un aumento della pressione in tutto l impianto 4 5 SCHEMA IDRAULICO STANDARD 01 02 VEDI FIGURA 2 ATTENZIONE La pressione necessaria v a fare scorrere Volio o lungo i tubi a sistema fermo non deve superare i tre 3 bar AVVERTENZA Utilizzare distributori oleodinamici di co mando argano aventi le linee V1 V2 a scarico in posizione neutra configurazione H per evitare che il freno negativo possa venire accidentalmente aperto ad arga no fermo da eventuale pressione idraulica residua nelle tubazioni AVVERTENZA Durante il normale fun zionamento dell arga no il freno negativo si apre in modo automatico per mezzo della valvola o del motore stesso all avviamento del motore e deve richiudersi quando il mo tore stesso viene fermato Per aprire il freno si preleva pres sione dal ramo di alimentazione del motore all arresto dell arga 31 Pbrevini winches order to allow the negative brake to lock again the remaining pres sure must not be above three 3 bar in the two supply lines when the distributor lever is placed in the centre DANGER WARNING The lifting of a load ap v 32 plied to the winch rope e must never make use of the hvdraulic jib of the crane where the winch is installed In this case the pressure relief valve mav not be able to protect the winch from verv dangerous overloads Tampering with the pressure relief valve for loads in
59. ne oltre al lubri ficante si pu ricorrere all utilizzo di fili zin cati protezioni esterne ed eventualmente in 57 Pbrevini winches Figura 7 Feature 7 CON FUNE A TORSIONE DESTRA USARE LA MANO DESTRA USE RIGHT HAND FOR RIGHT TORQUE ROPE Da AVVOLGIMENTO DA SOTTO BOTTOM WINDING AVVOLGIMENTO DA SOPRA TOP WINDING CON FUNE A TORSIONE SINISTRA USARE LA MANO SINISTRA USE LEFT HAND FOR LEFT TORQUE ROPE 244 7 77 AVVOLGIMENTO DA SOTTO BOTTOM WINDING ROPE ANCHORING ONTO THE DRUM AND WINDING DIRECTION Unless specified otherwise in the instructions provided by the manufacturer of the machine the position for connecting the rope onto the drum and the winding direction must comply with the illustration above SEE FIGURE 7 NOTE The hand rule can be ex plained as follows the thumb indicates the point and the side for ancho ring the rope onto the drum the index finger indicates the type of rope outlet top or bottom 58 AVVOLGIMENTO DA SOPRA TOP WINDING casi particolari materiali diversi quali l acciaio inossidabile ANCORAGGIO DELLA FUNE SUL TAMBURO E SENSO DI AVVOLGIMENTO A meno che non sia altrimenti specificato nel le istruzioni del costruttore della macchina la posizione dell attacco della fune sul tamburo e la direzione di avvolgimento dovrebbero rispettare quanto raffigurato VEDI FIGURA 7 NOTE La regola de
60. nformity with the said law 20 JURISDICTION Any disputes arising between the parties in relation to these General Conditions of Sale including but not restricted to those concer ning their existence validity effectiveness interpretation execution etc shall be brou ght before the sole jurisdiction of the Court of Reggio Emilia Italy 96 c Non osservi gli obblighi di riservatezza previsti dall art 4 17 2 1 contratto si intender risolto nel caso in cui il cliente venga posto in liquida zione o sia assoggettato ad una qualsiasi procedura concorsuale 18 RECESSO CONVENZIONALE Nel caso in cui il CLIENTE diminuisca le garanzie che aveva dato o non fornisca le garanzie che aveva promesso il FORNITORE avr facolt di recedere dal contratto senza necessit di preavviso 19 LEGGE APPLICABILE Le presenti Condizioni Generali di Vendita sono soggette in via esclusiva alla legge Italiana e vanno interpretate in conformit alla stessa 20 COMPETENTE Tutte le controversie che insorgano tra le parti in connessione con le presenti Condizioni Generali di Vendita incluse ma non in via li mitativa quelle concernenti la loro esistenza validit efficacia interpretazione esecuzione etc saranno soggette alla giurisdizione esclu siva del Foro di Reggio Emilia Italia
61. ng safety devices and swivels should be checked for damage and that they can move freely and checked for wear Every bolt hook and the stop nut should be checked for prohibited movement which could indicate wear and corrosion ROPE LUBRICATION The protection guaranteed by the lubricant used by the rope manufacturer is usually suffi cient to prevent deterioration due to corrosion during shipment and storage and for the initial period of rope use However for optimum performance the majority of ropes will benefit from the applica 56 MONTAGGIO E MANUTENZIONE DELLA FUNE fondamentale controllare che la fune venga avvolta correttamente sul tamburo e che non si presentino allentamenti nelle spire della fune o sovrapposizioni incrociate su strati del tamburo consentendo di adattarsi gradual mente alle condizioni operative con carichi crescenti Inoltre le funi devono essere esaminate accu ratamente da personale competente durante i periodi di manutenzione ordinaria e straor dinaria del macchinario Nei casi di utilizzo pesante e continuativo dei macchinari stessi corretto eseguire le verifiche funi anche in periodi molto pi brevi tra i periodi intercorsi dalle normali manutenzioni Nel caso di gru bisognerebbe operare un controllo all inizio di ogni turno o giornata lavorativa in cui la gru in funzione al fine di assicurarsi che le funi siano correttamente posizionate sulle loro pulegge e sui tamburi e
62. ng deterioration is abrasion wear caused by repeated and ongoing contact with another element such as drum pulleys etc your choice should be directed towards a rope whose outer wires are as large as possible We recommend lang lay rope with both hea ds blocked so as to be impossible to turn and ropes with compacted strands for high levels of abrasion Flattening is another problem malfunction which may occur for various reasons but most frequently when the is subject to multi layer winding on the drum Additionally greater pressure is found between the rope and a smooth or flat surface compared to a grooved drum When winding with several layers ropes and strands with textile core should not be used for lifting Ropes with steel core and compacted strands offer greater resistance against crushing and deformation To prevent corrosion in addition to the use of lubricant you can also use galvanized wires outer protection and different materials such as stainless steel in special circumstances Pbrevini winches adeguata a prevenire il deterioramento dovu to alla corrosione durante le fasi di spedizione e stoccaggio e per i primi periodi di lavoro della fune tuttavia al fine di ottenere le pre stazioni ottimali la gran parte delle funi trarra beneficio dall applicazione di un lubrificante di servizio il tipo consigliato varia in funzione dell applicazione della fune e delle condizioni ambientali
63. nit See at O ee a e Ek Lunghezze Lengths EA BEE MILLIMETER METER core a Me n sos 1 millimetro 0 03937 0 0033 0 00109 0 001 1 millimetre 1 metro 39 37 3 2808 1 0936 1 000 1 meter Momento Moment Foot KILOGRAMMETRO NEWTON POUND KILOGRAM METER METER m kg 5 K cd mol ES Tant 1 inch pound 0 0833 1 152 x 10 0 1130 TTT 1 Kilogrammetro 1 388 7 86 796 7 233 9 80665 1 Kilogram meter Area Area e T we nm 81 ho Gason Foor US Gaon umo ume 0 0173 0 0036 0 00058 0 0043 0 0164 1 US quart 57 5 G 0 2082 0 0334 0 9464 TUS galon omer 0 1337 MEN o 1 litro dm 61 024 1 0567 0 220 0 0353 0 264 Temperatura Temperature pem a oe re pu e 5 9 F 32 273 15 F 32 x 5 9 SS Densita Density 1 pound foot 0 0092 so 2 Forza Force Foro oem oom Pears sew TT wem Massa Mass Velocit Velocity Foor s METRI S KM ORA 5 KM HOUR 0 017 0 0114 0 00508 0 01829 muc 14607
64. nitamente all ammontare di eventuali altre fatture Fintantoch la propriet dei prodotti non sar passata al CLIENTE quest ultimo responsabile della loro conservazione in buono e sicuro stato 14 FORZA MAGGIORE Il FORNITORE non si assume il rischio e non sar responsabile per i ritardi o la mancata ottemperanza di uno qualunque degli obbli ghi per ragioni al di fuori del suo controllo qui di seguito indicate come Causa di Forza Maggiore Cause di Forza Maggiore sono da ritenersi senza esclusione incidenti atti di Dio scio peri o contratti di lavoro leggi governative delivery by suppliers and or carriers and any other cause outside the SUPPLIER s reaso nable control 15 LiABILITY AND OBLIGATIONS The SUPPLIER is solely responsible for the correct operation of the products supplied in terms of the characteristics and performance that it has expressly indicated The SUP PLIER s liability is limited to the replacement and or repair and or reimbursement of the invoiced value With the exception of this liability the SUPPLIER cannot in any way be held responsible for any direct and or indirect and or consequential damage to the CUSTO MER or to third parties as a result of defects to the products including loss of production damage to things or persons or others 16 WHOLE CONTRACT These General Conditions of Sale together with any other derogative or additional term or condition which has been acce
65. ny other systems aiming to control AVVERTENZA Le regolazioni e tarature dei sistemi di controllo della capacita minima winch overload and produced in co operation with the final instal ler e massima della fune avvolta sul tamburo devono essere eseguite dall installatore prima della mes sa in funzione dell argano Le operazioni sopra descritte valgono anche per tutti i sistemi realizzati in collaborazine con l in stallatore finale atti a controllare il sovracarico dell argano 47 Pbrevini winches 8 2 RECOVERY The following accessories are available for correct operation of the recovery winch Pneumatic declutch Pressure roller systems Ropes and Hooks Pulley Blocks Different systems for drum blocking or releasing Special Paints on request Special Rope Guiding System where possible Installation of motor driven sy stems other than hydraulic stems where possible Hydraulically controlled valves for controlling the load and release of the negative lamellar brake NOTE Winches for recovery are supplied with manual drum release unless specified otherwise 8 2 TRAINO Per un corretto funzionamento dell argano da traino sono disponibili i seguenti accessori Disinnesti Pneumatici Sistemi di Rulli Pressa Cavo Funi e Ganci Pulegge di Rinvio Sistemi differenti di blocco o sblocco tamburo Verniciature Speciali a richiesta Sistemi di Guida Fune specia
66. o aliunde pu essere interpreta ta nel senso di estendere la garanzia di cui sopra 10 8 Il CLIENTE dichiara di aver libera mente scelto i beni tra la vasta gamma di prodotti del FORNITORE secondo proprio libero ed insindacabile giudizio Il FORNI TORE non conosce e non risponde dell uti lizzo pratico e dell impiego concreto che il CLIENTE imporr ai beni 93 Pbrevini winches 11 TRADEMARKS The identification plates and or any other form of identification on the products sold by the SUPPLIER must not be removed without the SUPPLIER s written consent All obligations arising from these General Conditions of Sale will be deemed invalid if the identification pla te and or other form of identification on the product has been removed or tampered with 12 INSPECTION All products produced by the SUPPLIER are subject to a standard final inspection before delivery This inspection is regarded as final and conclusive Any additional and or special inspection must be requested and specified by the CUSTOMER in the purchase order and is subject to acceptance by the SUPPLIER and will be undertaken at the CUSTOMER s expense 13 RETENTION OF OWNERSHIP The SUPPLIER will retain the ownership of the products until such time as the CUSTOMER has fully paid the price agreed as well as any outstanding invoices Until such time as the ownership of the products has been tran sferred to the CUSTOMER the latter shall be responsi
67. o as to minimize the entry angle as far as possible ranging from zero when the rope is midway on the drum to maximum when it is close to one of the two flanges Pbrevini winches dito indice indica il tipo di uscita fune da sopra o da sotto La mano destra indica l utilizzo di una fune a torsione destra La mano sinistra indica l utilizzo di una fune a torsione sinistra Il senso di avvolgimento della fu ne sul tamburo indicato da una curva che parte dalla punta del dito indice e ha come freccia la punta del dito pollice Il senso di avvolgimento della fu ne sul tamburo sempre conside rato dal punto di ancoraggio della fune stessa che anche il punto di osservazione per la rotazio ne del tamburo in avvolgimento Questo sistema si applica sia ai tamburi lisci che a quelli scanalati STABILIT DEI BOZZELLI ALLA ROTAZIONE AI fine di limitare i rischi legati alla rotazione del carico durante un sollevamento e per as sicurare la sicurezza del personale nella area di sollevamento sempre preferibile selezio nare una fune anti girevole che comunque ruoter in modo minimo quando sottoposta ad un carico Avvalendosi di funi resistenti alla rotazione che presentano la corona dei trefoli esterni avvolti in senso opposto rispet to a quelli dello strato di trefoli sottostanti la quantit di torsione generata sotto carico sia con entrambe le estremit bloccate momen to torcente che
68. o be used for direct reco very but with the load creating an angle with the winch axis SEE FIGURE C CAUTION All the information in this section is purely theoretical and is provided as a users guide for a correct and rational use of win ching equipment 76 Nel caso che si superi a traino diretto la capacit massima dell argano di recupero considerando che massima al primo strato di fune sul tamburo possibile ovviare con l utilizzo di una puleggia di rinvio VEDI FIGURA La stessa puleggia pu essere utilizzata per eseguire il lavoro di auto recupero VEDI FIGURA B Altrimenti viene utilizzata anche per recuperi diretti ma con carico angolato rispetto all as se dell argano VEDI FIGURA C AVVERTENZA Tutte le indicazioni con tenute in questo para grafo sono puramente teoriche ma vogliono indicare all utilizzatore un uso corretto e ragionato di un apparecchio da traino VEICOLO BLOCCATO WHEELS BLOCKED VEICOLO LIBERO WHEELS MOVING VEICOLO BLOCCATO WHEELS BLOCKED Pbrevini wincdiesr Figura A Figure A PULEGGIA RINVIO PULLEY BLOCK Min 20 Ton PUNTO DI ANCORAGGIO ANCHOR POINT Figura B Figure B PUNTO DI ANCORAGGIO ANCHOR POINT PULEGGIA RINVIO PULLEY BLOCK Min 20 Ton Figura C Figure C PUNTO DI ANCORAGGIO ANCHOR POINT PULEGGIA RINVIO PULLEY BLOCK Min 20 Ton 11 TABELLE DI CONVERSIONE CONVERSION TABLES Unit Base Base U
69. o dei seguenti articoli 1460 CC 1461 CC 2762 CC 10 GARANZIA 10 1 Salvo diversamente concordato per iscritto il FORNITORE garantisce i suoi prodotti contro difetti di lavorazione e materiale impiegato per un periodo di 12 mesi dalla data di spedizione fa fede il n di matricola riportato sulla targhetta di identi ficazione o di 6 mesi dalla data della sua messa in funzione qualora dei due scada prima 10 2 Entro tale periodo il FORNITORE s impegna a propria insindacabile scelta a sostituire riparare o rifondere il valore in fattura a patto che a il CLIENTE abbia prontamente comunicato per iscritto l esi stenza di tale difetto b che il FORNITORE abbia a sua scelta avuto l opportunit di ispezionare il prodotto presso la propria sede c che dall ispezione risulti che tali difetti non siano stati causati da montag gio e o utilizzazione e o manutenzione non corretta d che il prodotto non sia stato manomesso pena la decadenza della ga ranzia stessa e il CLIENTE abbia rispetta to puntualmente le modalit di pagamento del prezzo Il materiale difettoso dovr es sere messo a disposizione del FORNITORE da parte del CLIENTE c o lo stabilimento 10 3 The aforesaid warranty will cease to be valid if the product has been tampered with and or repaired by a party other than the SUPPLIER or by persons not authorised in writing by the SUPPLIER 10 4 Replacements and or repairs under warranty will be carried out ex
70. on required 1 6 REPRODUCTION AND COPYRIGHT All rights reserved by Brevini Winches S p A The structure and the contents of this manual may not be copied even partially without prior authorisation issued by Brevini Winches S p A in writing 1 7 VERSIONS OF THIS MANUAL This manual is subject to review further to application and operation changes 14 ricolo di infortunio a persone e danni a cose in tal caso si solleva il costruttore dell argano da responsabilit civili e penali 1 5 MODALIT DI CONSULTAZIONE DEL MANUALE La consultazione di questo manuale facilita ta dall inserimento in terza pagina dell indice generale che consente la localizzazione in maniera coerente dell argomento d interesse capitoli sono organizzati con una struttura gerarchica che facilita la ricerca dell informa zione desiderata 1 6 LIMITI DI RIPRODUZIONE E COPYRIGHT Tutti i diritti riservati alla Brevini Winches S p A La struttura ed il contenuto del presente manuale non pu essere riprodotta neppure parzialmente salvo espressa autorizzazione scritta della Brevini Winches S p A 1 7 REVISIONI DEL MANUALE Il presente manuale pu subire revisioni a seguito di modifiche funzionali o di applica zione 2 IMBALLO SPEDIZIONE MOVIMENTAZIONE RICEVIMENTO PACKING SHIPMENT HANDLING INCOMING GOODS PROCEDURES Pbrevini winches 2 1 PACKING AND SHIPMENT Winc
71. ondere alle richieste di appro vazione di disegni e schemi esecutivi b qualora il CLIENTE non sia in regola con i pagamenti c qualora a giudizio insinda cabile del FORNITORE la condizione pa trimoniale del cliente e o l ammontare del suo credito sia ritenuto tale da costituire evidente pericolo per il conseguimento del prezzo 8 6 Unless otherwise agreed in writing if the goods are ready for shipment before the agreed date the SUPPLIER may opt to make the shipment and the CUSTOMER cannot refuse to accept delivery of the goo ds 8 7 If the CUSTOMER fails to accept the delivery of the goods for reasons attribu table to the former or for reasons unrelated to the wishes of the SUPPLIER the CU STOMER shall assume the risks and costs for their safekeeping 8 8 For special products the SUPPLIER re serves the right to deliver 5 more or less than the quantity ordered and to consider the order as fully dispatched Payment will be made for the quantity actually delivered 9 PAYMENTS 9 1 Unless otherwise agreed and confirmed in the written confirmation of acceptance of the order the prices shall be regarded as net not inclusive of packaging costs and all additional charges and payment must be made in advance and must be received by the SUPPLIER at the latest 10 days before the date fixed for delivery 9 2 The terms of payment are obligatory and essential In the event of late payment without the need to issue a warning
72. ptance of the order for reasons of force majeure 6 VARIATIONS 6 1 The prices indicated in the offer or in the written confirmation of acceptance of the order are based on the SUPPLIER s costs at the date of the offer or the accep tance If variations to the said costs labour machines materials etc occur between the date of the offer and the acceptance of the order the SUPPLIER at its sole discretion reserves the right to revise the prices providing the notice of this variation is given to the CUSTOMER within 14 days of the goods being delivered or the supply completed 6 2 If the CUSTOMER asks to modify the goods the CUSTOMER shall bear all addi tional costs as well as the possible delays to delivery resulting from the said changes 6 3 The SUPPLIER reserves the right to make changes to the product at any time provided the said changes do not substan tially alter the performance and or specifi cations of the products 7 AMENDMENTS AND CANCELLATIONS No order can be changed or cancelled by the CUSTOMER after written confirmation of acceptance of the order by the SUPPLIER If the SUPPLIER accepts the change or can cellation the SUPPLIER reserves the right to invoice the CUSTOMER for any costs and Pbrevini winches dotti o comunicati a terzi senza il consenso scritto del FORNITORE 5 QUOTAZIONI OFFERTE Le quotazioni ed offerte rimarranno in vigore per un periodo di tempo di 30 giorni dalla da t
73. pted in writing by the SUPPLIER constitute the whole con tract between the parties in relation to the sale and supply of the products Any other term and or condition shall not be valid and shall not be deemed to be part of the Contract 17 EXPRESS RESCISSION CLAUSE AND CONDITIONS FOR_WITHDRAWAL 17 1 The Supply contract will be rescinded by law in accordance with Article 1456 CC following the SUPPLIER s simple written declaration that it wishes to enforce the ex press rescission clause if the CUSTOMER a misses or delays the payments due b delays or fails to accept delivery of the products within the terms stated in Article 8 above c does not comply with the obligation of confidentiality stated in Article 4 Pbrevini winches incendi inondazioni ritardi per mancata con segna da parte di fornitori e o vettori ed ogni altra causa al di fuori del ragionevole controllo da parte del FORNITORE 15 RESPONSABILITA E OBBLIGHI Il FORNITORE esclusivamente responsabile del buon funzionamento dei prodotti forniti in rapporto alle caratteristiche e prestazioni da lui espressamente indicate La responsabilit del FORNITORE limitata alla sostituzione e o riparazione e o rimborso del valore fat turato Tolto l obbligo di cui sopra il FORNI TORE non potr in ogni caso essere ritenuto responsabile per qualsiasi danno diretto e o indiretto e o consequenziale derivante al CLIENTE o a terzi da difetti del prodot
74. rawings atta ched to the SUPPLIER s offer or reported in the SUPPLIER s catalogues tables price lists advertising shall be purely indicative Differences or divergences from the said data shall not be grounds for the non ac ceptance of goods the vitiation of the con tract or be grounds for complaints against the SUPPLIER 4 2 Any drawings sent to the CUSTOMER for approval shall be automatically deemed to have been approved by the CUSTOMER until they are returned to the SUPPLIER complete with notes and comments within 10 working days or before the deadlines agreed at the time of being submitted to the CUSTOMER 4 3 All the tables drawings technical data and any other material and technical infor mation contained in the offer or supplied in connection with the supply shall remain the SUPPLIER s property and cannot be repro duced or divulged to third parties without 88 3 PREZZI 3 1 Salvo diversa conferma scritta da parte del FORNITORE i prezzi quotati o fatturati sono netti e non comprendono i costi d im ballo e spedizione 3 2 Le imposte bolli spese doganali ed ogni altro onere aggiuntivo non sono compresi nei prezzi Salvo una qualunque esenzione tali costi ed oneri saranno paga ti dal CLIENTE e se eventualmente pagati dal FORNITORE il loro ammontare sar fatturato al CLIENTE in aggiunta ai prezzi quotati 3 3 prezzi sono soggetti a correzioni do vute ad errori di stampa 4 DATI TECNICI DISEGNI E D
75. re hydraulic oil flow and velocity are listed in the table of winches technical specifications When starting up you must run the winch without a load in both directions of rotation for about ten minutes For the first time only lift a small load to a height of about one metre and check that the brake is working correctly Pbrevini winches ATTENZIONE Prima di effettuare il v primo avviamento e dell argano occorre verificare quanto segue Controllare che il livello del lubrificante sia corretto Controllare il serraggio di tutte le viterie Verificare che l impianto idraulico rispetti le caratteristiche descritte nel paragrafo ad esso dedicato Verificare il corretto senso di rotazione del tamburo 5 1 FissAGGIO FUNE NOTA Normalmente l argano viene fornito senza fune avvolta sul tam buro Il montaggio della fune deve essere eseguito da Operatore o Tecnico Qualificato rispet tando quanto prescritto dal costruttore della fune IMPORTANTE Leggere attentamente i f consigli riportati nel l appendice A 5 2 PROVE FUNZIONALI NOTA Tutti i dati relativi a pressioni portata olio idraulico e velocit sono indicate nella tabella dati tecnici degli argani E obbligatorio all avviamento un funziona mento di circa dieci minuti senza carico per 35 Pbrevini winches Make sure you are able to control descent and that the pressure in the return line does not
76. russe 40 b DISTANZA TRA PULEGGIA E TAMBURO m b DISTANCE PULLEY SHEAVE AND WINCH m The angles of deviation may be reduced as follows a by reducing drum width b by increasing the distance between the pulley and the drum Excessive angles of deviation force the rope to be wound onto the drum prematurely crea ting vacant spaces between the various coils of rope placed close to the drum flange and therefore increasing the pressure on the rope in crossover positions Even when the drum has helical grooves large angles of deviation will inevitably result in local areas of mechanical damage as the wires break catch on one another This phenomenon is usually referred to as interference but its extent can be reduced by choosing a lang lay rope if the winding system allows it or a compacted rope Gli angoli di deviazione possono essere ridotti come segue a riducendo la larghezza del tamburo b aumentando la distanza tra la puleggia ed il tamburo Angoli di deviazione eccessivi spingono la fune ad avvolgersi sul tamburo prematura mente creando dei vuoti tra le diverse spire della fune posizionate vicino alla flangia del tamburo aumentando cos la pressione sulla fune nelle posizioni di incrocio Anche nei casi in cui il tamburo provvisto di scanalature elicoidali ampi angoli di devia zione daranno inevitabilmente luogo ad aree localizzate di danno meccanico in quanto i fili si strappano s
77. sterni nei trefoli VEDI FIGURA 6 casi possibili sono quattro Fune crociata destra Z s trefoli Z e fili 5 Fune crociata sinistra S z trefoli 5 e fili 2 Fune parallela destra Z z trefoli Z e fili z Fune parallela sinistra S s trefoli S e fili s 59 Pbrevini winches ROPE FITTING AND MAINTAINING It is essential to check that the rope is wound onto the drum correctly and that there is no looseness in the rope coils or crossing over of layers on the drum so it is able to gradually adapt to working conditions as the load in creases Ropes must also be inspected thoroughly by trained personnel during the routine and spe cial maintenance of the machinery In conditions of heavy and continuous use of the machinery ropes should be checked much more frequently than the scheduled intervals for normal maintenance With cranes a check should be carried out at the start of each shift or working day when the crane is in operation in order to ensure the ropes are placed correctly on their pulleys and on the drums and have not been tampe red with When the crane is working normally the ropes should be inspected at least once a week to check for any broken wires kinking or flatte ning and any other damage excess wear and surface corrosion All rope heads swivels safety accessories pins and pulleys should be checked for da mage and worn or seized bushings Hooks and other couplings for lifti
78. tact Brevini Winches Technical Department in case of any doubt or should this manual be damaged or misplaced 39 0522 277711 39 0522 514977 Stating A TYPE OF WINCH B SERIAL NUMBER OF THE WINCH YEAR OF MANUFACTURE This information can be found on the name plate attached to the winch io da d CEDE hes Tel 39 0522 277711 www breviniwinches it TIPO DIAMETRO FUNE TYPE ROPE DIAMETER NUM MATR TIRO MAX 1 STRATO NR MAX LINE PULL Teo LAYER ANNO PRESSIONE MAX YEAR MAX PRESSURE PESO MAX PORTATA WEIGHT MAX OIL FLOW AVVERTENZA Esiste la possibilit di arrecare danno alla macchina e o ai componenti della stessa PRECAUZIONE IMPORTANTE Ulteriori notizie inerenti l operazione in corso f NOTA Fornisce informazioni utili o importanti 39 0522 277711 39 0522 514977 Queste indicazioni vanno rilevate sulla tar ghetta identificativa fissata sull argano MA U DEGOLA 1 DIY 42100 REGGIO EMILIA ITALY Indes Tel 39 0522 277711 www breviniwinches it TIPO DIAMETRO FUNE TYPE ROPE DIAMETER NUM MATR TIRO MAX 1 STRATO gom NR MAX LINE PULL Teo LAYER ANNO PRESSIONE MAX YEAR MAX PRESSURE PESO MAX PORTATA WEIGHT MAX OIL FLOW 1 3 GUARANTEE AND TESTING Brevini Winc
79. tessa ed il contempo di essere frenata al fine di evitare la corsa eccessiva per inerzia durante l installazione consenten do un corretto avvolgimento delle spire sul tamburo o sull argano soprattutto nel caso di avvolgimenti multi strato par ticolarmente importante che le spire della fune degli strati inferiori siano avvolte in modo serrato alla superficie del tamburo avere un precarico che tiene in tensione la fune in fase d avolgimento E importante posizionare la bobina di fune in modo tale 53 Pbrevini winches CORRECT CORRETTO possible during installation see instructions for fitting the rope Should a loop kink accidentally occur along the rope it must not be pulled order to prevent permanent distortion and that it does not come across unwelcome ob stacles or contact SEE FIGURE 5 DIRECTION FOR WINDING THE ROPE Looking at the direction used for twisting the rope itself we call ita 2 winding when we can see the letter Z when looking at the direction of the threads in the mid section and holding the rope vertically We call it an 8 winding 54 Figura 5 Feature 5 INCORRECT ERRATO da ridurre al minimo l angolo di deviazione vedi montaggio fune durante l installazio ne Se casualmente si formasse un asola occhiello sulla fune bene assicurarsi che non venga tirata fino a formare una de formazione permanente e che non incontri ostacoli o contatti indesiderati
80. tion in this manual with 4 2 LUBRICATION page 26 4 5 SCHEMA IDRAULICO STANDARD pag 29 43 HYDRAULIC SYSTEM OIL page 26 care and follow all the instructions 4 4 CONNECTING THE 5 MESSA IN FUNZIONE provided before starting to use the SYSTEM TO THE WINCH page 27 winch 4 5 STANDARD HYDRAULIC LAYOUT page 29 51 FISSAGGIO FUNE pag 33 i 52 PROVE FUNZIONALI pag 33 5 STARTUP a Keep this manual and any 5 1 SECURING THE ROPE page 33 appendixes in a place offering ready 5 2 TESTING OF 33 6 1 MANUTENZIONE ORDINARIA pag 37 access to operato mz 6 2 MANUTENZIONE STRAORDINARIA pag 38 mal Sa 6 MAINTENANCE 6 3 MANUTENZIONE STRAORDINARIA maintenance personnel and which DEL FRENO NEGATIVO 38 6 1 ROUTINE MAINTENANCE page 37 pag is known to all 6 2 SPECIAL MAINTENANCE page 38 6 3 SPECIAL MAINTENANCE 7_DEMOLIZIONE OF THE NEGATIVE BRAKE page38 iii pag 41 7 DISPOSAL 8 ACCESSORI AE VERO 41 81 SOLLEVAMENTO pag 45 82 TRAINO vicina pag 46 8 ACCESSORIES ATTENZIONE 8 1 LIFTING page 45 1 i i 8 2 RECOVERV FUNI PULEGGE E TAMBURI pag 49 Prima di rendere MP l argano leggere attentamente le 9 APPEN
81. to incluse perdite di produzione danni a cose o persone o altro 16 CONTRATTO INTERO Le presenti Condizioni Generali di Vendita unitamente ad ogni eventuale termine o con dizione derogativa o complementare e che sia stata accettata per iscritto dal FORNITO RE costituiscono l intero contratto tra le parti per quanto riguardi la vendita e fornitura dei prodotti Qualsiasi altro termine e o condizio ne non avr validit e non sar ritenuta parte del Contratto 17 CLAUSOLA RISOLUTIVA ESPRESSA E CONDIZIONE RISOLUTIVA 17 1 Il contratto di fornitura sar risolto di diritto ai sensi dell art 1456 CC per effetto della semplice dichiarazione scritta del FORNITORE di volersi avvalere della pre sente clausola risolutiva espressa qualora il CLIENTE a Ometta o ritardi i pagamenti dovuti b Ritardi o manchi di prendere in consegna i prodotti nei termini previsti dal precedente art 8 95 Pbrevini winches 17 2 The contract shall be rescinded if the CUSTOMER is placed in liquidation or is the subject of any form of credit proceedin gs 18 OPTING OUT CLAUSE In the event that the CUSTOMER reduces the guarantees that it has submitted or does not provide the guarantees as promised the SUPPLIER shall be entitled to withdraw from the contract without giving prior notice 19 APPLICABLE LAW These General Conditions of Sale shall be exclusively governed by Italian law and must be construed in co
82. ts and materials used for a period of 12 months from the date of shipment reference will be made to the serial number printed on the identification plate or for 6 months from the date it becomes operative whichever occurs first 10 2 Within this period the SUPPLIER undertakes at its own final judgement to replace repair or refund the invoice va lue provided that a CUSTOMER has promptly reported the fault in writing b the SUPPLIER at its own choice has had the chance to inspect the product on its own premises c the said inspection shows that the faults were not caused by incorrect assembly and or use and or maintenance d the product has not been tampered with which would invalidate the warranty e the CUSTOMER has complied punctually with the methods of payment The CUSTOMER must make the faulty material available to the SUPPLIER c o the SUPPLIER s plant 92 percepite in conto maggior avere a titolo di risarcimento del danno e pretendere la restituzione dei beni consegnati 9 4 pagamenti in nessun caso potranno essere sospesi o ritardati qualora fossero insorte contestazioni le relative azioni non potranno essere iniziate o proseguite se prima non si sar provveduto al pagamen to del prezzo secondo i termini e i modi stabiliti 9 5 Il FORNITORE libero di accettare o non accettare la proposta contrattuale del CLIENTE secondo proprio insindacabile giudizio resta in ogni caso applicabile il portat
83. uch that it is a risk to attaining the price 90 FORNITORE Qualora il FORNITORE accetti la modifica o annullamento il FORNITORE si riserva la facolt di fatturare al CLIENTE i costi e le spese eventualmente sostenute in seguito alla modifica o annullamento 8 CoNsEGNE 8 1 Salvo diversamente indicato per iscritto del FORNITORE nella conferma scritta di accettazione dell ordine le merci sono vendute franco fabbrica del FORNITORE 8 2 Con la remissione della merce al CLIENTE o al vettore il FORNITORE si li bera dall obbligo di consegna e tutti i rischi sui materiali passano al CLIENTE indipen dentemente dalle condizioni di spedizione anche nel caso in cui il FORNITORE sia incaricato della spedizione 8 3 Ogni data di consegna indicata sulla conferma scritta di accettazione dell ordine ha solo carattere indicativo Il FORNITORE far ogni ragionevole sforzo per mantenere le date di consegna stipulate FORNITO RE non sar tuttavia in ogni caso respon sabile di eventuali ritardi ed il CLIENTE sar tenuto ad accettare la consegna della merce quando essa verr pronta 8 4 Le date di consegna si computano a partire dalla data della conferma scritta di accettazione dell ordine da parte del FOR NITORE 8 5 termini di consegna s intendono automaticamente prolungati a qualora il CLIENTE non fornisca in tempo utile i dati necessari per la fornitura o richieda modifiche in corso di esecuzione o ancora ritardi nel risp
84. ys are not blocked For handling and fitting the we should distinguish between two different types of supply formats 52 Figura 3 Feature 3 CORRECT CORRETTO pongono Cid anche funzione del relativo stoccaggio che deve avvenire in un luogo coperto sollevata dal terreno ben ventilato ed asciutto consentendo un ispezione periodica un movimento della stessa per migliorare l azione del lubrificante MISURAZIONE DEL DIAMETRO DELLA FUNE Il diametro della fune il diametro del cerchio che circoscrive la sezione della fune Si con sidera come diametro della fune quello del cerchio circoscritto alla sezione medesima ponendo attenzione durante la misurazione a rilevare la misura tra esterno di un trefolo e quello diametralmente opposto VEDI FIGURA 3 COME MANEGGIARE LA FUNE Prima di installare la nuova fune bisogna controllare le condizioni e le dimensioni delle parti delle macchine collegate alla fune tam buri pulegge guida fune eccetera al fine di verificare che siano se gi utilizzati ancora nei limiti operativi specificati dal costruttore del macchinario Sarebbe opportuno sempre verificare il non bloccaggio di tutte le pulegge di rinvio ed di guida fune Per maneggiare ed installare la fune neces sario distinguere due tipi di fornitura Figura 4 Feature 4 CORRECT CORRETTO 1 Coiled rope the coil of rope should be placed on the ground and uncoiled in a straight lin
Download Pdf Manuals
Related Search
Related Contents
ASUS PU301LA User's Manual 1 - Epson America, Inc. Cybex® Free Weight Olympic Bench Press Owner`s Manual Semaine de la Mobilité dans le canton de Vaud 2008 Programme Ipsolute VMS Lite TDSHーBA 保管用 Copyright © All rights reserved.
Failed to retrieve file