Home

ELEGANZA™ BATHTUB & WALL SET

image

Contents

1. r c ez pg Y J Y POS aA NE a 2 V N Tabs Figure 3 alcove the tabs on the bottom go into the notches of the tub Note When in position against the back wall studs the front nailing flanges on the back panel must be straight and square with the bathtub Figure 5 Position each end panel so that the hooks of the end panel go into the slots on the back wall and then push down until panel tops are even Figure 3 Horizontal nailing flanges will be located at the top of all three panels Decide which side panel will need cutouts for plumbing fixtures Carefully locate mark and cut holes using the proper size hole saw When all panels are properly set in the alcove mark a pencil line along the top edge of all panels and front edge of end panels for reference when actually gluing in Remove 3 Dry fit the panels in the alcove Position the back panel into the Pencil line all panels Adhesive ies 14 Support Board f 4 gl m Locate and nail the rear panel support board to studs as shown in Figure 4 Lay a bead of adhesive to the support board Lay a bead of caulk along the tub ledge and also fill each notch with caulk Position the back panel in place on the alcove wall Firmly press on center of panel to assure contact with adhesive on support board Center Caulk bead Figure 4
2. tre fl chir manuellement les brides de clouage pour les galiser Martelez des clous ouverture galvanis s travers chaque trou et l int rieur des montants ce qui tiendra fermement le panneau Ajoutez un cordon de produit de calfeutrage jusqu au devant de la surface verticale du panneau arri re qui poss de des fentes pour le bout des crochets muraux Figure 5 Ces rebords doivent tre droits et align s sur la baignoire des deux c t s Figure 3 Languettes Figure 5 Appliquez un cordon d adh sif sur chaque montant qui entrera en contact avec les panneaux lat raux E tendez un cordon de produit de calfeutrage le long du rebord de la baignoire et vous devez aussi remplir l encoche avec du produit de calfeutrage Installez chaque panneau lat ral Appuyez sur chaque panneau fermement pour assurer une adh sion parfaite aux montants Rep rez et percez un trou de 3 16 po au centre de la bride de clouage sur le haut du panneau et centr sur chaque montant Percez aussi des trous de 3 16 po dans la bride de clouage frontal sur chaque panneau lat ral approximativement 12 po d intervalle centr sur la bride Figure 6 Martelez des clous ouverture galvanis s travers chaque trou et l int rieur des montants ce qui tiendra fermement le panneau Ligne de crayon E Pot
3. Bath 540 Glen Ave Moorestown NJ 08057 P N27717 Rev D 4 08 Printed in USA Impreso en los EE UU Imprim aux E U 1 800 355 ASB1 F 856 235 9262 www asbcorp com 2006 American Shower amp Bath GUIDE D INSTALLATION ENSEMBLE MURAL DE SALLE DE BAIN ELEGANZA N de mod le Avis au client Veuillez noter votre num ro de mod le Le num ro du mod le se trouve sur une tiquette situ e sur le panneau avant de la C t des appareils de plomberie bo te Il est tr s important de noter votre num ro de mod le Cette droite ou gauche information sera n cessaire lorsque vous nous contacterez 14 1 2 Si vous avez des questions sur l installation de cet appareil ne le retournez pas chez le d taillant o vous l avez achet Pour de l aide t l phonez au 1 800 355 ASB1 entre 8 00 et 18 00 HE du lundi au Coupe de vidange jeudi et entre 8 30 et 15 30 HE le vendredi Vous pouvez aussi nous Max 8 x 10 faire parvenir un courriel customerservice abscorp com Centr sur la vidange Important Ces instructions incluent des suggestions que nous croyons fiables pour l installation sur une construction sans rev tement 60 Tablier de la paroi seche et sur la plomberie Les codes du b timent varient d un ere baignoire endroit l autre et ont pr s ance sur ces suggestions Si vous croyez A ne pouvoir ex cuter ces t ches recourez aux se
4. Coloque una capa de sellador a lo largo del borde de la ba era y 30 1 2 tambi n rellene todas las ranuras con sellador Coloque el panel posterior en su lugar dentro del hueco Presione firmemente en el centro Coloque los paneles en el hueco Coloque el panel posterior en el hueco las pesta as inferiores encajan en las ranuras de la ba era Central Alas de fijaci n Pesta as Figura 3 del panel para asegurar el contacto con el adhesivo de la placa de soporte Calafateado Figura 4 fijaci n en la parte superior del panel en el centro de cada viga Figura 5 Verifique que el ala de sujeci n vertical de cada lado est derecha y a escuadra con la ba era puede necesitar torcer el ala de sujeci n con la mano para enderezarla Martille clavos galvanizados de 3 4 para techo en las vigas de la pared a trav s de cada agujero para fijar los paneles de la pared Coloque una capa de sellador a lo largo de la superficie vertical delantera del panel posterior que tiene las ranuras para los ganchos de los paneles laterales Figura 5 15 Marque y perfore un agujero de 3 16 en el centro del ala de Los bordes deben estar derechos y a escuadra con la ba era Figura 5 entrar en contacto con los paneles laterales Coloque una capa de sellador a
5. at the top of the panel and centered on each stud Figure 5 Check that the vertical nailing flanges on both sides are straight and square with the tub you may need to manually bend the nailing flanges to straighten Hammer 3 4 galvanized roofing nails through each hole and into the studs securing the wall panel Add a bead of caulk down the front vertical surface of the back panel that has the slots for the end wall hooks Figure 5 5 Locate and drill a 3 16 hole in the center of the nailing flange These edges must be straight and square to bathtub on both sides Figure 5 Apply a bead of adhesive down each stud that will come in contact with the side panels Lay a bead of caulk along the tub ledge and you must also fill each notch with caulk Install each side panel Press each panel firmly to ensure proper adhesion to studs Locate and drill a 3 16 hole in the center of the nailing flange at the top of the panel and centered on each stud Also drill 3 16 holes in the front nailing flange on each side panel at approx 12 intervals centered on the flange Figure 6 Hammer 3 4 galvanized roofing nails through each hole and into the studs securing the wall panel Pencil Line Adhesive Figure 6 Install a temporary brace to hold the center of the back panel tight to the
6. putty to seal between the drain and the bathtub The use of plumbers putty will degrade plastic over time and could cause damage Position bathtub or shower base in alcove 2 Less than 1 8 Figure 2 e Hammer e Pencil e 3 4 galvanized roofing nails Description Quantity Back Panel Side Panels 1 Left Hand 2 Right Hand D Apron Support 1 Figure 2 Check that bathtub or shower base is sitting on all bottom support and that it is level horizontally and vertically and square to the wall studs Also check from center above apron to each back corner There should be no more than 1 8 gap between the top bathtub or shower base flange and the wall studs Apply adhesive to the bottom support where it will touch the floor The bathtub or shower base should now be set in the alcove plumb and square While standing in the bathtub or shower base the top flange should be secured with galvanized roofing nails at each stud location and in two places on each side of the apron Locate and drill 3 16 clearance holes in the center of the nailing flange and centered on each stud Hammer nails through each hole and into the studs securing the bathtub Caution Drill chuck or hammer can damage the tub or base Drill holes from the outside or protect tub or base 4 If you are installing one of our matching wall sets pro
7. Coloque una capa de adhesivo en el interior de cada pared lateral y fije las placas Figura 2 haciendo que lleguen hasta la parte de arriba del hueco Placa de soporte llegando hasta arriba del hueco Placa de soporte Eleganza 1 1 4 x 3 1 2 x 58 1 2 fijaci n Figura 2 Nota Cuando est n en posici n contra las vigas de la pared las alas de sujeci n del panel posterior deben estar alineadas y a escuadra con la ba era Figura 5 Coloque cada uno de los paneles laterales de modo que los ganchos de los paneles encajen en las ranuras de la pared posterior y empuje hacia abajo hasta que el borde superior de todos los paneles quede a la misma altura Figura 3 Las alas de fijaci n horizontales estar n ubicadas en la parte superior de los tres paneles Decida cual de los paneles laterales necesitar cortar para las ca er as Ubique marque y corte cuidadosamente los agujeros usando una sierra para agujeros del tama o adecuado Cuando tenga todos los paneles correctamente colocados en el hueco trace una l nea en l piz a lo largo del borde superior y el borde frontal de los paneles para usar como referencia al fijarlos con pegamento Saque todos los paneles L nea marcada 4 Capa de Soporte del panel posterior dhesa Ubique y clave la placa de soporte del panel posterior a las vigas como se indica en la Figura 4 Coloque una capa de adhesivo en la placa de soporte
8. ma onnerie Construisez un colombage de 2 x 6 pour l extr mit de la plomberie Appliquez des tasseaux de 2 x 2 au mur en ma onnerie au m me endroit que les poteaux de la figure 1 e Installation sur une cloison pare feu ou de c ramique Si vous installez les panneaux muraux sur une cloison coupe feu ou de c ramique et non pas directement sur les poteaux vous devez tenir compte L Chaque de l paisseur de ces mat riaux dans vos mesures qui doivent tre prises poteau de LATE mae l alc ve doit de l int rieur des murs de finition tre d aplomb et droit Coupe de la vidange Max 8 x 10 Centr sur la vidange Figure 3 OUTILS ET MAT RIAUX REQUIS Baignoire l installation exige des outils domestiques communs et e Niveau et querre Ruban mesurer Marteau Crayon e Perceuse M che de perceuse de 3 16 e Une cartouche de calfeutrant et une d adh sif voir les sp cifications dans les instructions d assemblage de l ensemble mural ci dessous e Clous toiture galvanis s de 3 4 Sciages de 2 x 4 pour les colombages au besoin e Flipots panneaux de sous plancher ou composite de nivelage afin de s assurer que le plancher est au niveau et droit sur les murs AN e Mat riaux et raccords d eau et de ligne de vidange au besoin Avis mportant Cette baignoire est plus profonde qu une baignoire conventionnelle Elle n cessite un assemblage de vidange et
9. may also have other rights which vary from state to state This warranty is void for any damage to this product due to misuse abuse neglect accident improper installation modification unauthorized repair or any use violative of instructions furnished by us American Shower amp Bath 540 Glen Ave Moorestown NJ 08057 P N27717 Rev D 4 08 Printed in USA Impreso en los EE UU Imprim aux E U 1 800 355 ASB1 F 856 235 9262 www asbcorp com 2006 American Shower amp Bath MANUAL DE INSTALACI N JUEGO DE BA ERA Y PAREDES ELEGANZA N de Modelo Cliente Anote su n mero de modelo Lo puede encontrar en la etiqueta ubicada en el panel frontal de la caja Es muy importante anotar su n mero de modelo Necesitar esta informaci n cuando nos llame Si tiene alguna pregunta referente a la instalaci n de esta unidad no se dirija a la tienda donde la haya comprado Si necesita ayuda adicional llame al 1 800 355 ASB1 de 8 00 a 18 00 ET de Lunes a Jueves y de 8 30 a 15 30 ET los Viernes o por correo electr nico a customerservice asbcorp com Importante Estas instrucciones incluyen sugerencias para la construcci n inicial instalaci n de los paneles de pared y la ca er a que creemos que es confiable Las normas de construcci n locales var an en cada lugar y pueden tener precedencia sobre estas sugerencias Si no cree tener la habilidad necesaria para realizar estas tareas deber a usar un instala
10. on the carton to outline your model s limited warranty period The manufacturer warrants to the original consumer purchaser that its products will be free of defects in materials and workmanship subject to the limitations exclusions and conditions that follow from date of original purchase as shown on purchaser s receipt The manufacturer will at its discretion replace or repair FREE OF CHARGE except as noted below during the warranty period any part that the manufacturer determines to be defective in material and or workmanship under normal installation use and service The original consumer purchaser must notify the manufacturer in writing of any defect covered by the warranty at the address listed below THIS WARRANTY IS THE ONLY EXPRESS WARRANTY MADE BY THE MANUFACTURER ANY CLAIMS MADE UNDER THIS WARRANTY MUST BE MADE DURING THE PERIOD REFERRED TO ABOVE ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE IS LIMITED IN DURATION TO THE DURATION OF THIS WARRANTY LABOR CHARGES AND OR DAMAGE INCURRED IN INSTALLATION REPAIR OR REPLACEMENT AS WELL AS INCIDENTAL AND CONSEQUENTIAL DAMAGES CONNECTED THEREWITH ARE EXCLUDED AND WILL NOT BE PAID BY THE MANUFACTURER Some states do not allow limitations on how long an implied warranty lasts or the exclusion or limitation of incidental or consequential damages so the above limitations or exclusions may not apply to you This warranty gives you specific legal rights and you
11. studs for approximately 24 hours while adhesive sets Figure 7 Figure 7 Install greenboard When installing greenboard position drywall screws above the top nailing flange to avoid having to drill clearance holes If you choose to screw through the nailing flange you MUST drill 3 16 clearance holes in the flange to avoid cracking damaging the flange After greenboard is installed apply finished caulk bead to all edges and joints Figure 8 Follow caulk manufacturers recommended cure time E Figure 8 Make connections to supply and drain lines CARE AND CLEANING For regular cleaning use only mild detergents or warm soapy water applied with a soft cloth Always rinse surfaces after cleaning and dry by blotting with a damp cloth or chamois Because cleaning products often change over time we cannot recommend a specific cleaner to use on this product However whichever you choose e Always check the manufacturers instructions e DO NOT use a cleaner on this product if the label indicates it should not be used on plastics To make this product last its longest e Always rinse off cleaners within 5 minutes of application e Rinse off cleaners even if they say they are spray on amp walk away LIMITED WARRANTY Please refer to the product label located
12. INSTALLATION MANUAL ELEGANZA BATHTUB amp WALL SET Model No Customer Please record your model number The model number is found on the label located on the front panel of the box It is very important to record your model number This information is necessary when contacting us If you have any questions on the installation of this unit please do not return to the store where you purchased it For additional help call 1 800 355 ASB1 8 00 am 6 00 pm ET Monday Thursday and 8 30 am 3 30 pm ET on Friday or email us at customerservice asbcorp com Important These instructions include suggestions for rough construction drywall installation and plumbing installation that we believe to be reliable Local building codes vary by location and could supersede those suggestions If you are not confident in your ability to perform these tasks you should use a professional installer or contract out those tasks you need help with REQUIREMENTS FOR A SUCCESSFUL INSTALLATION 1 Read these instructions and confirm that tub will fit in the intended alcove and that the drain end is located where required before beginning installation 2 The alcove wall studs should be located as shown in Illustration 1 and be plumb If the studs are not plumb shimming may be required It is important that a stud is located as shown for attachment of the vertical flange on each side of the tub apron If you are installing our matching
13. ITE DE QUALIT MARCHANDE OU DE CONVENANCE POUR UN USAGE PARTICULIER SE LIMITE LA DUREE DE LA PRESENTE GARANTIE LES FRAIS DE MAIN D EUVRE ENGAGES POUR L INSTALLATION LA R PARATION OU LE REMPLACEMENT AINSI QUE LES DOMMAGES INDIRECTS SONT EXCLUS DE CETTE GARANTIE ET NE SERONT PAS REMBOURSES PAR LE FABRICANT Certains tats provinces ou territoires ne permettent pas de restreindre la dur e d une garantie expresse d exclure ou de limiter les dommages accessoires ou indirects de sorte que les limitations ou les exclusions d crites pr c demment peuvent ne pas s appliquer votre cas La pr sente garantie vous accorde des droits juridiques pr cis et vous pouvez galement exercer d autres droits qui varient d un tat d une province ou d un territoire un autre Le m susage l abus la n gligence les accidents une mauvaise installation des modifications une r paration non autoris e ou tout emploi contraire aux instructions du fabricant annuleront la garantie American Shower amp Bath 540 Glen Ave Moorestown NJ 08057 P N27717 Rev D 4 08 R Printed in USA Impreso en los EE UU Imprim aux E U 1 800 355 ASB1 F 856 235 9262 www asbcorp com 2006 American Shower amp Bath
14. ban adh sif en attendant que la colle s che 1 Figure 1 Attachez la vidange et le d versoir la baignoire collet du drain sur le base de douche selon les instructions du fabricant Si aucun joint d tanch it n a t fourni par le fabricant du drain utilisez un produit de calfeutrage n utilisez PAS du mastic de plombier pour cr er le joint tanche entre le drain et la baignoire L utilisation de mastic de plombier peut d grader le plastique Moins de 1 8 Figure 2 apr s un certain temps ce qui peut causer des dommages Placez la baignoire ou le base de douche dans l alc ve Figure 2 V rifiez que la baignoire ou le base de douche repose sur tous ses supports inf rieurs et qu elle est au niveau vertical et horizontal et droite sur les poteaux du mur V rifiez aussi partir du centre au dessus du tablier chaque coin arri re Le jeu entre la bride sup rieure de la baignoire ou le base de douche et les poteaux du mur ne doit pas exc der 1 8 13 touchera le plancher La baignoire ou le base de douche devrait maintenant reposer droit dans l alc ve de plomberie En vous tenant debout dans le bain fixez la bride sup rieure l aide des clous toiture galvanis s vis vis de chaque poteau et deux endroits derri re le tablier Rep rez des trous de passage de 3 16 au centre de la bride clouer au centre de chaque poteau Clouez les clous travers chaque trou et dans
15. bordes y juntas Figura 8 Siga los tiempos de secado recomendados por el fabricante del calafateado 9 Figura 8 Haga las conexiones del agua y del desag e CUIDADO Y MANTENIMIENTO Para la limpieza normal use nicamente detergentes suaves o agua enjabonada tibia aplicada con un trapo suave Siempre enjuague las superficies luego de limpiarlas y s quelas con un trapo h medo o gamuza No le podemos recomendar un producto limpiador espec fico ya que var an con el tiempo Sin embargo cualquiera sea su opci n e Siga siempre las instrucciones del fabricante e No use un limpiador que no sirva para pl sticos en este producto Para hacer que este producto le dure al m ximo e Siempre enjuague los limpiadores dentro de los 5 minutos de haberlos colocado e Enjuague los limpiadores incluso cuando sean del tipo col quelos y d jelos GARANT A LIMITADA Refi rase a la etiqueta del producto ubicada en la caja para determinar el per odo de garant a de su producto El fabricante le garantiza al comprador original que este producto no tendr defectos de materiales y de mano de obra sujeto a las limitaciones exclusiones y condiciones a continuaci n desde la fecha original de compra indicada en el recibo El fabricante a su criterio reemplazar o reparar SIN CARGO con excepci n de lo indicado m s abajo durante el t rmino de
16. ceed with Figure 3 the Wall Set Installation instructions that follow If not you must use caulk to fill in the five notches along the back of the tub and the two on either end before installing greenboard When installing the greenboard and wall covering leave a gap of 1 8 between the tub ledge and the wall material to help of water getting into the greenboard When wall is finished seal this gap with caulk Figure 4 Fill notches with caulk Figure 4 The bottom of the back panel has 5 tabs that will go into the Wall Set Installation 5 notches on the back ledge of the matching Eleganza tub Figure 1 Each end wall has two tabs If you are not using our matching tub the tabs must be cut off with a saw or utility Knife DO NOT try to break them off Stud A BM Matching Wall Set Panel Wall Panel Caulk Bead Finish Fill Notch with Caulk before installing panel Figure 1 If you will be installing a tub door a backer board note size in Figure 2 must be installed on the back of both side walls Apply a bead of adhesive in the recess of each side wall and attach board Figure 2 butting board up to the top of the recess backer board A E butt to top of panel recess backer board ed Eleganza 1 1 4 x anges 3 1 2 x 58 1 2 Adhesive Figure 2 Nailing flanges A r back of back panel
17. de d versement qui convient une baignoire de 16 1 2 L assemblage de l ensemble mural n cessite aussi e Perceuse M che de perceuse de 3 16 e Emporte pi ce rond r gl e pour les appareils de plomberie Fusil calfeutrer e Pour les meilleurs r sultats utilisez une cartouche de calfeutrant de silicone 100 avec ou sans agent antimicrobien Lisez les directives de calfeutrage sur le tube avant lachat pour vous assurer d un usage S curitaire sur les plastiques e Deux 2 cartouches de 10 5 oz 310 ml d une colle approuv e parmi les suivantes A e Franklin MultiBond O e Colle liquide clous Macco pour le contour de la baignoire LN 915 e Colle de construction Dap 2000 _ e Colle Macklanburg Duncan convient au polystyr ne Suivez les instructions du fabricant mais laissez prendre le calfeutrage et la colle pendant au moins 24 heures avant d employer votre baignoire Si vous installez aussi une porte de baignoire vous aurez besoin de e Deux planches d appui voir l tape 1 de l installation de l ensemble mural Installation de la baignoire N de pi ce Description Quantit Panneau arri re Panneaux lat raux 1 Gauche 2 Droite Support du panneau arri re Support du tablier Baignoire seulement Attachez les supports du tablier au bas de la baignoire Figure 1 Attachez avec du ru
18. der un nettoyant sp cifique pour ce produit Cependant peu importe le produit de votre choix e V rifiez toujours les instructions du fabricant e WEMPLOYEZ PAS un nettoyant dont l tiquette indique qu il ne convient pas au plastique Afin d augmenter la dur e de vie utile de ce produit e Rincez toujours les nettoyants 5 minutes apr s leur application e Rincez les nettoyants m me s ils indiquent vaporisez et partez GARANTIE LIMIT E Veuillez vous reporter l tiquette du produit sur l emballage pour la dur e de la garantie limit e de votre produit Le fabricant garantit le premier acheteur de ce produit contre tout d faut mat riel ou de main d uvre partir de la date d achat indiqu e sur le coupon de caisse de l acheteur Cette garantie est assujettie aux limites exclusions et conditions suivantes Pendant la p riode de garantie le fabricant sa discr tion remplacera ou r parera SANS FRAIS sauf dans les cas mentionn s ci dessous toute pi ce consid r e par lui d fectueuse au niveau mat riel ou de main d uvre suite une installation un emploi et un entretien normaux Le premier acheteur doit informer le fabricant par crit de toute d fectuosit couverte par la garantie l adresse ci dessous CETTE GARANTIE EST LA SEULE GARANTIE EXPRESSE OFFERTE PAR LE FABRICANT TOUTE RECLAMATION EN VERTU DE CETTE GARANTIE DOIT TRE EFFECTU E PENDANT LA P RIODE INDIQU E CI HAUT TOUTE GARANTIE IMPLIC
19. do de la ca er a a la derecha o izquierda 14 1 2 Corte para el desague M x 6 x Centrado en el desag e E 2 60 Borde de la ba era Viga adicional al final de la pared Reemplazo de vigas y ubicaci n del desagiie Greenboard Figura 1 Ubicaci n sugerida del desagiie se muestra la instalaci n a la derecha Codo de la ducha Ubicaci n del panel de A soporte acceso 81 V lvula mezcladora Codo de la canilla 32 Corte para el desag e M x 8 x 10 Centrado en el desag e Figura 2 Cada una de las vigas del hueco debe escuadra Figura 3 HERRAMIENTAS Y MATERIALES NECESARIOS Ba era la instalaci n requiere herramientas hogare as comunes y e Nivel y escuadra Cinta m trica Martillo e L piz e Taladro broca de 1 16 5mm e In cartucho de sellador y uno de adhesivo vea las especificaciones en los requisitos del juego de pared m s abajo e Clavos galvanizados para techo de 3 4 e Maderas de 2x4 para vigas adicionales si es necesario e Relleno paneles de sub suelo o compuesto para nivelar para asegurar que el piso est nivelado y a escuadra con las paredes e Materiales y acoples necesarios para las ca er as de agua y desag e Nota importante Esta ba era es m s profunda que una ba era com n y necesitar un conjunto de desag e y desborde para ba eras de 16 1 2 de profundidad El armado d
20. dor profesional o subcontratar las tareas para las que necesite ayuda REQUISITOS PARA UNA INSTALACI N EXITOSA 1 Lea estas instrucciones y verifique que la ba era entre en el lugar deseado y que el desag e est donde haga falta antes de empezar con la instalaci n 2 Las vigas de las paredes deben estar ubicadas como se muestra en la figura 1 y deben estar a escuadra Si las vigas no est n a escuadra puede tener que suplementarlas Es importante que las vigas est n ubicadas como se indica para poder fijar el ala de cada lado de los bordes de la ba era Si est instalando nuestro juego complementario de paredes debe haber una viga de cada lado de la esquina del fondo como se muestra Si est redecorando y no hay una viga en el lugar exacto agregue una nueva Las dem s vigas deber n estar ubicadas de acuerdo con las normas locales de construcci n e La ca er a deber instalarse antes que la ba era y o los paneles de pared La figura 2 muestra la ubicaci n sugerida al instalar ca er a nueva Proporcione un panel de acceso en la parte de atr s de la pared con las ca er as Si la ca er a ya existe verifique que deje suficiente lugar para la ba era y las paredes Todas las ca er as deben cumplir con las normas locales de construcci n e La ba era debe instalarse sobre un piso s lido y nivelado que est a escuadra con las vigas de las paredes Los soportes de la ba era que est n incorporados a la base de
21. eau WT y Figure 6 Installez un contrevent temporaire pour retenir le centre du panneau arri re fermement sur les poteaux pendant environ 24 heures le temps que la colle adh re fig 7 Figure 7 Installez la c ramique Lorsque vous installez la c ramique placez les vis de paroi s che au dessus de la membrure de clouage sup rieure afin d viter de percer des trous de passage Si vous d cidez de visser travers la membrure de clouage vous DEVEZ percer des trous de passage de 3 16 dans la membrure afin d viter de craquer ou d endommager la membrure Une fois la c ramique install e appliquez un cordon de calfeutrage de finition sur tous les rebords et tous les joints fig 8 Suivez les recommandations du fabricant du calfeutrage pour le temps de repos 9 Figure 8 Branchez les conduites d eau et de vidange ENTRETIEN ET NETTOYAGE Pour un nettoyage r gulier n employez qu un d tergent doux ou de l eau ti de savonneuse appliqu es l aide d un linge doux Rincez toujours les surfaces apr s le nettoyage et essuyez en tamponnant l aide d un linge humide ou d un chamois Etant donn que les produits de nettoyage changent avec le temps nous ne pouvons recomman
22. ed a continuaci n De lo contrario debe usar sellador para rellenar las cinco ranuras a lo largo de la parte posterior de la ba era y las dos de cualquiera de los extremos antes de instalar la pared resistente a la humedad Al instalar una Viga pared resistente a la Greenboard humedad con ace bbtan revestimiento deje una pared o azulejo separaci n de 1 8 entre el borde de la ba era y el material de la pared para evitar la probabilidad de que el agua llegue a la pared Cuando termine con la pared selle este espacio con calafateado Figura 4 4 Si est instalando uno de nuestros juegos de paredes prosiga Separaci n de 1 8 Calafateado ellene las ranuras on sellador Figura 4 Instalaci n de Juego de Pared en las 5 ranuras del borde posterior de la ba era Eleganza 1 La parte inferior del panel posterior tiene 5 pesta as que encajan complementaria Figura 1 Cada pared lateral tiene dos pesta as Si no est usando nuestra ba era complementaria deber cortar las pesta as con una sierra o una cuchilla NO trate de romperlas Viga uego complementario de panel de pared Capa de sellador de acabado Ba era N Panel de pared Rellene la ranura con sellador antes de instalar el panel Figura 1 Si va a instalar una puerta de ba era debe instalar una placa de soporte vea el tama o en la Figura 2 en la parte de atr s de las paredes de los costados
23. el juego de paredes tambi n requiere e Taladro broca de 1 16 5mm e Sierra para agujeros del tama o necesario para las ca er as Pistola para calafatear E e Para obtener los mejores resultados use un cartucho de sellador 100 de silicona con o sin anti microbios Lea las instrucciones del sellador en el tubo antes de comprarlo para verificar que sea apto para pl sticos e Dos 2 cartuchos de 10 5 onzas 310ml de uno de los siguientes adhesivos aprobados e Adhesivo Multiuso Franklin e Adhesivo Clavos L quidos de Macco para bordes de ba eras LN 915 e Adhesivo Dap 2000 para la construcci n e Adhesivo Macklanburg Duncan para poli estireno Siga las instrucciones del fabricante pero espere por lo menos 24 horas para que se seque el calafateado y el pegamento antes de usarla Si instalar una puerta tambi n necesitar e Dos placas de soporte Ver paso 1 de la instalaci n del juego de paredes Descripci n Cantidad Panel Posterior Paneles Laterales 1 Izquierdo 2 Derecho Soporte del panel posterior D Soporte del panel posterio 4 4 Instalaci n de la ba era Ba era solamente Coloque el soporte del frente en la parte inferor de la ba era Figura 1 F jelo en su lugar con cinta adhesiva hasta que el pegamento se seque 1 Figura 1 Fije la ca er a de desag e y desborde siguiendo las
24. instrucciones del fabricante Si el fabricante del drenaje no incluy una junta de goma utilice sellador de l tex o acr lico NO use masilla entre el drenaje y la ba era El uso de masilla de plomer a degradar el pl stico con el tiempo y podr a causar da os Coloque la ba era en el hueco Figura 2 Verifique que la ba era Menos de 1 8 Figura 2 est apoyada sobre todos los soportes inferiores y que est nivelada horizontal y verticalmente y a escuadra con las vigas de las paredes Tambi n verifique desde el centro por encima de la base hacia cada esquina posterior No debe quedar un espacio de m s de 1 8 entre la pesta a superior de la ba era y las vigas de la pared Coloque adhesivo en el soporte inferior donde apoyar en el piso La ba era debe estar apoyada en el hueco aplomada y a escuadra Mientras se para en la ba era fije la pesta a superior con clavos galvanizados para techo en cada viga de pared y en dos lugares de cada lado del borde Marque y perfore agujeros de 3 16 en el centro del ala de sujeci n centrados en cada una de las vigas de la pared Martille los clavos en cada una de las vigas de la pared a trav s de los agujeros para fijar la ba era Advertencia El mandril o el martillo pueden da ar la ba era o la base Haga los agujeros desde aja de Ja ba era el exterior o proteja la ba era 0 la base Figura 3 con las instrucciones de Instalaci n de Juego de Par
25. la baignoire et les panneaux La plomberie doit respecter le code du b timent local Coude de la pomme e La baignoire doit tre install e sur un sous plancher solide et au niveau de douche qui s ajuste parfaitement aux poteaux du mur Les supports de la baignoire int gr s la base de support de la baignoire doivent reposer directement sur un sous plancher au niveau Emplacement du e Prot gez la baignoire des dommages pendant l installation l aide de la panneau d acc s d coupe de la bo te de la baignoire 81 e La douche et l ensemble mural ne doivent pas tre install s dans un endroit o la temp rature peut tre inf rieure au point de cong lation 32 F ou o 0 C e Laissez la douche et l ensemble mural atteindre la temp rature de la pi ce Robinet m langeur pendant 30 minutes avant de l installer Important Les poteaux de l alc ve doivent tre d aplomb et droits sur Coude de la gargouille le plancher Les coins internes de l alc ve doivent tre carr s fig 3 3 Installations sp ciales e Au dessus des vidanges de plancher Cr ez une plateforme de 2 x 4 ou plus selon les besoins de la vidange afin d lever la zone de la baignoire en entier et couvrez la de sous plancher Cette plateforme doit tre d aplomb et droite sur les poteaux du mur Lorsque vous installez la plomberie ajoutez la hauteur de la plateforme aux dimensions illustr es la figure 2 e Murs en
26. la garant a cualquier parte que considere defectuosa en material y o mano de obra bajo condiciones normales de instalaci n uso y mantenimiento El comprador original deber notificar al fabricante por escrito acerca de cualquier defecto cubierto por la garant a a la direcci n indicada mas abajo ESTA ES LA UNICA GARANT A EXPRESA DEL FABRICANTE TODO RECLAMO HECHO BAJO ESTA GARANT A DEBE REALIZARSE DURANTE EL PER ODO INDICADO ANTERIORMENTE TODA GARANT A IMPLICITA DE CALIDAD O IDONEIDAD PARA UN PROP SITO EN PARTICULAR SE LIMITA A LA DURACI N DE ESTA GARANT A LOS CARGOS DE MANO DE OBRA Y O DA OS INCURRIDOS DURANTE LA INSTALACI N REPARACI N O REEMPLAZO AS COMO LOS DA OS FORTUITOS E IMPREVISTOS RELACIONADOS CON DICHAS ACTIVIDADES EST N EXCLUIDOS Y NO SER N CUBIERTOS POR EL FABRICANTE Algunos estados no permiten limitaciones con respecto a cuanto dura una garant a impl cita o la exclusi n o limitaci n de da os imprevistos o consiguientes por lo tanto las exclusiones o limitaciones anteriores pueden no aplicarse en su caso Esta garant a le otorga derechos legales espec ficos y usted puede tambi n tener otros derechos los que var an de estado a estado Esta garant a quedar anulada en caso de da os al producto causados por uso inadecuado abuso negligencia instalaci n inadecuada modificaciones reparaciones no autorizadas o cualquier uso contrario a las instrucciones proporcionadas por nosotros American Shower amp
27. la misma deben apoyar directamente sobre el piso nivelado e Use el modelo de la caja de la ba era para evitar que se da e durante la instalaci n e No debe instalar la ba era y paredes en lugares donde la temperatura pueda llegar a menos de 32 F 0 C e Permita que la ba era y paredes adquieran la temperatura ambiente durante 30 minutos antes de instalarlas Importante Las vigas del hueco deben estar a escuadra con el piso Las esquinas interiores del hueco deben estar a escuadra ver figura 3 3 Instalaciones especiales e Acerca del desag e del piso Haga una plataforma de 2 x 4 o m s alta dependiendo de los requisitos del desag e para elevar toda el rea de la ba era y cubrirla con el sub piso Esta plataforma debe estar nivelada y a escuadra con las vigas de las paredes Al instalar ca er as eleve la plataforma hasta las dimensiones indicadas en la figura 2 e Paredes de mamposter a Construya una pared de vigas de 2 x 6 para el extremo con las ca er as Coloque tiras de recubrimiento en las paredes de mamposter a en los mismos lugares que las vigas de la figura 1 e Instalaci n sobre paredes resistentes a la humedad greenboard o contra incendios Si est instalando paneles de pared sobre paredes resistentes a la humedad greenboard o contra incendios sus mediciones deben tener en cuenta el espesor de este material y deber hacerlas desde el interior de las paredes terminadas ES k k La
28. les murs fixant ainsi la baignoire Attention Un mandrin de per age ou un marteau peut endommager la baignoire ou le base de douche Percer des trous partir de l ext rieur ou prot ger la baignoire ou le base de douche 4 Appliquer un adh sif sur le support du bas l endroit qui Bride de la baignoir Figure 3 Si vous installez un ensemble mural correspondant suivez les instructions Installation de l ensemble mural ci dessous Sinon vous devez utiliser du produit de calfeutrage pour remplir les cinq encoches le long de l arri re de la baignoire et les deux de chaque c t avant d installer le tableau vert Lorsque vous installez le tableau vert et le rev tement mural laissez un espace de 1 8 po entre le rebord de la baignoire et le mat riau constituant du mur pour contribuer r duire la chance que l eau p n tre l int rieur du tableau vert Une fois le mur termin scellez ce jeu l aide de calfeutrage fig 4 Poteau C ramique Rev tement de mur ou carreaux de c ramique Jeu de 1 8 Cordon de calfeutrage Pencoche avec du produit de calfeutrage Figure 4 Installation de l ensemble mural 1 Le bas du panneau arri re poss de 5 languettes qui entreront 3 Essayez les panneaux dans alc ve sans les coller Placez le panneau l int rieur des 5 encoches sur le rebord arri re de la baignoire arri re l int rieur de l alc ve les lang
29. lo largo del borde de la ba era y tambi n rellene todas las ranuras con sellador Instale cada uno de los paneles laterales Presione firmemente cada panel para asegurar que se adhiera correctamente a las vigas de la pared Marque y perfore un agujero de 3 16 en el centro del ala de fijaci n en la parte superior del panel en el centro de cada viga Perfore tambi n agujeros de 3 16 en el ala de sujeci n frontal de cada panel lateral a intervalos de aproximadamente 12 centrados en el ala Figura 6 Martille clavos galvanizados de 3 4 para techo en las vigas de la pared a trav s de cada agujero para fijar los paneles de la pared 6 Coloque una capa de adhesivo en cada viga de la pared que L nea marcada Adhesivo LTT Figura 6 Coloque un soporte provisorio para sostener el centro del panel posterior presionado contra las vigas de la pared por unas 24 horas mientras se seca el adhesivo Figura 7 Figura 7 Coloque el greenboard Al instalar el greenboard coloque tornillos para paneles de pared por encima del ala de fijaci n para evitar perforar agujeros de paso Si escoge atornillar a trav s del ala de sujeci n deber perforar agujeros de paso de 3 16 en el ala para evitar que se raje da e Luego de instalar el greenboard coloque calafateado de terminaci n en todos los
30. lustration 2 e Masonry walls Construct a 2 x 6 stud wall for the plumbing end Apply 2 x 2 furring strips to the masonry wall in the same locations as the studs in Illustration 1 e Installation over greenboard or firewalls If you are installing wall panels over greenboard and or firewall material and not directly on the studs your dimensions must take into account the thickness of this material and measurements should be taken from the inside of the finished walls 8 11 32 7 15 3 8 14 5 8 14 5 8 15 3 8 p A XX Plumbing fixture side right or left hand 14 1 2 Drain cutout 7 7 8 x 10 Max Centered on drain A Additional stud if end of wall 60 Tub Apron Stud placement and drain location Illustration 1 Greenboard Suggested rough plumbing locations right hand installation shown A Shower head elbow Access panel location 81 Mixing valve Spout elbow 32 Drain cutout 8 x 10 Max Centered on drain Illustration 2 Each alcove stud must be plumb and square Illustration 3 TOOLS amp MATERIALS REQUIRED Bathtub installation requires common household tools and e Level amp square Tape measure e Drill 3 16 5mm drill bit e One cartridge each of caulk and adhesive see specifications in wall set requirements below e 2x4 lumber for additional wall studs if
31. n Support du panneau arri re 4 d installer le panneau y pe colle Figure 1 Rep rez et clouez la planche de support du panneau arri re aux montants comme illustr gt O A Sn A Parria dans la figure 4 tendez d appui voyez la taille la figure 2 doit tre install e l arri re un cordon d adh sif sur la de chaque mur lat ral Appliquez un cordon de colle dans la planche de support fraisure de chaque mur lat ral et attachez le panneau fig 2 Centre tendez un cordon de en guidant le panneau sur le dessus de la fraisure produit calfeutrage le long du rebord de la baignoire Membrures gt cloutage 12 Si vous souhaitez installer une porte de baignoire une planche et remplissez aussi l encoche avec du produit calfeutrage Placez le panneau arri re dans son Planche d appui appuy e au dessus de la emplacement sur le mur fraisure du de l alc ve Appuyez panneau fermement au centre du panneau pour assurer le Cordon de calfeutrage contact avec l adh sif sur Planche d appui la planche de support Eleganza 1 1 4 x 3 1 2 x 58 1 2 Figure 4 Rep rez et percez un trou de 3 16 po au centre de la bride de clouage sur le haut du panneau et centr sur chaque montant Figure 5 V rifier que les brides de clouage vertical sur les deux c t s sont gales et perpendiculaires avec la baignoire vous aurez peut
32. required e Shims sub floor panels or leveling compound to ensure floor is level and square with walls e Necessary water and drain line materials and fittings Important note this tub is deeper than a conventional tub and will require a drain and overflow assembly that will fit a 16 1 2 deep tub Assembly of the wall set also requires e Drill e 3 16 5mm drill bit e Hole saw sized to accommodate plumbing fixtures Caulk gun e For best results use one cartridge of 100 silicone caulk with or without antimicrobial additive Read caulk instructions on tube prior to purchase to ensure safe use on plastics e Two 2 10 5 FI Oz 310 ml cartridges of one of the following approved adhesives e Franklin MultiBond e Macco Adhesives Liquid Nails for Tub Surrounds LN 915 e Dap 2000 Construction Adhesive e Macklanburg Duncan Adhesive suitable for polystyrene Follow manufacturers instructions but allow at least 24 hours for caulk and adhesive to set before using If you will be installing a tub door you will also need e Two backer boards See step 1 of Wall Set Installation Bathtub Installation Tub Only Attach apron support to bottom of tub Figure 1 Tape it in place until adhesive dries 1 Figure 1 Attach drain and overflow to tub drain body on shower base following manufacturers instructions If a rubber gasket has not been supplied by the drain manufacturer use caulk NOT plumbers
33. rvices d un installateur Positionnement du Poteau professionnel pour l installation en tout ou en partie poteau et emplacement CONDITIONS POUR UNE INSTALLATION R USSIE de la vidange Figure 1 C ramique 1 Lisez ces instructions et assurez vous que la baignoire convient l alc ve choisie et que l extr mit de la vidange se situe au bon endroit avant de commencer l installation ER 2 a pae d mi a Loa covet tre ue tel Eu la Toure Emplacement sugg r pour la structure de plomberie Ils doivent tre d aplomb Si les poteaux ne sont pas d aplomb vous devrez j Hai 5 peut tre les niveler Il est important qu un poteau se trouve tel qu illustr installation de droite illustr e pour la fixation des brides verticales lat rales du tablier de la baignoire Si vous installez notre ensemble mural correspondant un poteau doit se trouver chaque c t du coin arri re tel qu illustr Si vous r novez et qu il n y a pas de poteau l endroit indiqu ajoutez en un Les autres pivots doivent tre positionn s selon votre code du b timent r gional e La structure de plomberie doit tre install e avant la baignoire ou les panneaux muraux La figure 2 illustre l emplacement sugg r des poteaux si une nouvelle plomberie est install e Installez un panneau d acc s l arri re du mur l aide des appareils de plomberie Si les appareils sont pr sents v rifiez qu ils laissent assez d espace pour
34. uettes dans le bas vont dans Eleganza correspondante Figure 1 Chaque bout de mur les encoches de la baignoire Remarque Lorsque plac es contre A RTE les poteaux muraux arri res les brides de clouage sur l arri re du poss de deux languettes Si vous n utilisez pas notre marque panneau doivent tre en ligne droite et perpendiculaires avec la de baignoire les languettes doivent tre coup es avec une ete baignoire Figure 5 Placez chaque bout de panneau de fa on ce ou un couteau tout usage N ESSAYEZ PAS de les casser que les crochets au bout du panneau aillent l int rieur des fentes sur l arri re du mur ensuite poussez vers le bas jusqu ce que les Poteau es sup rieures des panneaux soient gales ure 3 Les Panneau mural rides de clouage horizontal seront situ es dans le haut des trois Ensemble de panneaux D terminez quel panneau lat ral devra tre coup pour panneaux assortis sl les accessoires de plomberie Localisez marquez et coupez Cordon de produit soigneusement les trous en utilisant une scie cylindrique appropri e de calfeutrage de Lorsque tous les panneaux sont correctement plac s dans l alc ve finition faites une ligne de crayon aux contours sup rieurs de tous les Baignoire panneaux et sur les contours frontaux du bout des panneaux comme r f rence lorsque l encollage sera effectu Enlevez tous les panneaux emplissez l encoche Ligne de crayon ee a Baignoire Cordo
35. wall set there must be a stud on each side at the back corner as shown If you are remodeling and a stud is not at that exact location add a Laa one Other studs should be located according to local building codes e Rough plumbing must be installed before tub and or wall panels Illustration 2 shows suggested location of fixtures if new plumbing is being installed Provide an access panel on the back side of the wall with the plumbing fixtures If plumbing exists check that fixtures will clear tub and panels All plumbing must meet local building codes e The tub must be installed on a solid and level sub floor that is square su the wall studs The tub support must sit directly on a level sub oor e Use the cutout from the tub carton to protect the tub from damage during installation e The tub and wall set should not be installed in areas where the temperature may drop below freezing 32 F or 0 C aa LL and wall set to reach room temperature for 30 minutes before installing Important The alcove studs must be plumb and square to the floor Inside corners of the alcove should be square refer to Illustration 3 3 Special installations e Above the floor drains Create a platform of 2 x 4 s or taller depending on drain requirements to raise the entire tub area and cover it with sub flooring This platform must be level and square to the wall studs When installing plumbing add platform height to the dimensions shown in Il

Download Pdf Manuals

image

Related Search

Related Contents

Leatherman Juice CS4  USER MANUAL - Webklik.nl  Bandridge VTP1111D wire connector  M16C Flash Starter User`s Manual M38039FFHSP/FP/HP/KP  Telone User Manual - Chemical Containers  

Copyright © All rights reserved.
Failed to retrieve file