Home

!警告 警告 - AutomationDirect

image

Contents

1. Do not use one found damaged or deformed when unpacked Installation electric work maintenance and inspection of the device should be performed by qualified endineers havind Special knowledge Do not install the device in a place of environment with high temperature humidity dust corrosive gases excessive vibration shock etc to prevent fire accidents and malfunction of the device Mounting should be done according to the instruction manual lf the installation is incorrectly done there is a danger of personal injury caused by falling etc Screws are tightend
2. Hi UN S WARNING Turn off the power before starting mounting dismounting wiring maintenance or inspection Failure to turn off power mayresult in electrical shock or burning A CAUTION
3. SAFETY PRECAUTIONS Before installation wiring operation maintenance and inspection of the device be sure to read the operating instructions carefully to ensure proper operation Care should be taken that the operating instructions will be furnished to the maintenance supervisors of final users Safety precautions items are classified into Warning and Caution Incorrect handling of the device may result in NWARNNG death or serious injury Incorrect handling of the device may result in NCAUTON minor injury or physical damadge Even some CAUTION accident items may also result in a serious EN
4. Fuji Electric FA Components amp Systems Co Ltd 103 0011 Mitsui Sumitomo Bank Ningyo cho Bldg 5 7 Nihonbashi 0demma cho 5 7 Bldg 5 7 Ciuo ui Too 103 0011 Japan 81 3 5847 8060 One 81 3 5847 8060 81 3 5847 8182 03 5847 8060 4 103 0011 FAX 03 5847 8182 URL http Www fujielectric co jp fcs eng Contact information in each countries The company name and address URL hitp www fujielectric co jp fcs URL http www fujielectric co jp fcs http Www fujielectric co jp fcs eng sales index_s html
5. O 250A BW EW125 ET 5 5 BWEW125 Se 5 5 7 5 N m 8 13 N m a Groove for R terminal block fixatl 3 To dismount I Lead wire out groove SN Connection to terminal block PA rp S 1 these projections ta the EEE 6 a 1 wa 2 1 a For right side groove of the main cover 0 fuck 1 0 8Nrm 2 Label Wire cu only 22 14AWG 0 3 Torque Value 0 8N m 22 14AWG 0 8N m BW9SLOCA BW125 EW125 BW9SLOGA BW9SL1GA BW250 EW250 Ma A kA x 50 kA x 100 16 1 6N m W NG solid E 125A 175A 42 4mmz gt 85mms 6 1AWG 3 0AWG 200A 250A 67 4mm 2 152mm2 21 2 0AWG 300MCM 10N m 8 BW9SL0GA 125A 175A 2NmO BW9SL1GA 200A 250A solid I en BW EW 250 BW EW 250 kA x100 kA x 100
6. in specific torque shown in the instruction manual Care should be taken to prevent entry of foreign objects such as dust concrete chips iron powder etc or it may result inpoor contacts defective release unless it is permitted Do not modify the device unless it is permitted Treat this product as industrial waste when disposing of it BW9W BW9K BW9WK BW9F BW9R BW9L1SGA BZ S35B BW9SS0CA BZ S50B BW9SS0GA BW125 BW250 EW125 EW250 2 3 4 Poles NU 125A
7. INB F50880863a JEC INSTRUCTION MANUAL BW125BW250 EW125EW250 Accessory devices of FUJIAUTO BREAKER FUJIEARTH LEAKAGE CIRCUIT BREAKER for BW125 BW250 EW125 and EW250 BW125 BW250 EW125 EW250 N

Download Pdf Manuals

image

Related Search

Related Contents

FAQ PDF Manual  User Guide for MC5 PROFIBUS PA option  ホワイト PS 35 6? ー2  acv_ps3_bl8_h1_h4_a_ol  Haulotte HA16 18PX Manual  Antoine Moreau Exposition mode d`emploi n°6.9  warning  カーディアック試薬 トロポニン T コバス® h 232 用    Guide d`utilisation – Système de Toits Rigides  

Copyright © All rights reserved.
Failed to retrieve file