Home

BRIGGS IRRIGATION Operators Manual & Parts Manual For

image

Contents

1. 1 24 1 34 1 46 1 56 1 7 1 82 1 94 2 06 2 22 2 36 2 51 Base 35 36 37 38 40 42 44 46 48 50 PSi Colour dark purple purple black dark mustard maroon cream dark blue copper green turquoise 30 9 7 10 2 10 9 11 5 12 8 14 2 15 5 17 0 18 6 20 1 2 65 2 78 2 97 3 14 3 49 3 86 4 23 4 63 5 06 5 47 S3000 Spinner Gentle rain like droplets ideal for sensitive soils and crops e Very low pressure operation e Excellent uniformity e Good wind fighting capability 3 4 adapter 3TN Nozzle Spinner Body Spinner Plates Spinner Cap Assembly FASTER EASIER NOZZLE CLEANING AND CHANGING A quick change adapter allows removal of the sprinkler for easy cleaning of a plugged nozzle without tools and without shutting down the system NEW USER FRIENDLY PACKAGING SYSTEM Nelson 3000 Series sprinklers and 3TN nozzles are packaged for faster easier and more accurate installation in the field NOZZLE SIZE 128 inch increments eg 27 128 inch orifice size COLOUR STRIPE odd numbered nozzles have a colour stripe of the next size NELSON SIME Jumbo 6 Sector Sprinkler This is a sprinkler of low discharge operating over either full or part circles and comes equipped with various interchangeable nozzles and adjustable jet breakers NOZZLE RANGE 5 7mm Pressure Jet Length Capacity mm Bar m m hr Gal min 4 10 1 9 4 11 2 7 MA 4 1
2. 34 40 45 si 57 oE 911 97 102 E 22 5 mm 25 30 35 40 45 51 56 81 86 91 lt 25 mm 23 27 32 36 41 45 50 73 7 82 S 27 5 mm 21 25 29 33 37 4 45 sol s54 ss 62 66 70 74 E 30 ma 1927 0 se as ao 5 57 6 8 Ps 325 mm 17 21 24 28 31 as 3s a as aof 52 s6 so 63 35 mm 16 19 23 26 29 32 36 39 42 as 4o s2 55 s8l 37 5 mm 15 18 21 24 27 301 33 36 39 42 45 48 52 55 amm a 17 20 23 26 2a ETE 37a 43 45 ES IE Chart Showing Wind In Speeds For Required Application Rate metres per hour R24 Boom Water Flow imperial gpm m hr Lane Spacing 30m so 6o 70 sol 90 100 110 0 160 170 180 mhr 14 16 19 22 25 27 30 33 36 38 41 44 47 49 5 mm 91 109 127 145 164 182 200 218 236 255 273 291 75 mol 61 73 s 97109 121 133 145 158 170 182 194 206 218 10 mm 45 55 64 73 82 91 100 ue E za E 145 155 164 12 5 mm 36 44 51 58 65 73 iia 116 124 131 s is mmf j EE ES IE a s oi a o 109 17 5 mm 26 31 36 42 47 52 57 62 63 73 78 83 88 93 Z 20 mm 2327 32 se ai as sof 55 59 ea e m7 2 225 mm 20 24 28 32 36 40 af al sa 57 el 6 69 73 lt 25 mm 18 22 25 29 33 36 40 aj 47 si ss se 62 65 27 5 mm 17 20 23 26 30 33 36 40 43 46 so 53 56 59 E 30 mm 1518 2124 27 30 33 30 39 02 45 as 52 55 Bs 325 mm 14 20 22 2s 28 31 34 36 39 42 as 48 50 35 mm 15 16 t8 21 23 26 29 31 34 36 39 a2 aa 7 375 mul 12 15
3. 17 19 22 24 27 29 3 3d 36 9 all a 40 mm 11 14 16 18 20 23 25 27 30 32 34 36 39 41 14 Hose Reel Wind in Speed Charts for Application rate range cont Chart Showing Wind In Speeds For Required Application Rate metres per hour R30 Boom Water Flow imperial gpm m hr Lane Spacing 36m imperial gpm 50 60 7o so 90 100 110 120 130 140 150 160 170 180 m hr 14 16 19 22 25 27 aa ett at 44 47 49 S mm 76 91 106 121 136 152 167 182 197 212 227 242 258 273 7 5 mm 51 61 71 s l 91 101 111 121 131 141 152 162 172 182 10 mm 38 45 53 61 68 76 83 91 98 106 114 121 129 136 a 125 mmf 30 36 42 48 ss 6 LES of 97 103 100 g 15 mm 25 30 35 40 as sij soj 61 66 71 76 sil 86 ol S 175 mm 22 26 30 3s 39 a a s2 se 6H 65 69 74 78 Z 20 mm 19 23 27 30 34 38 OROEN 61 64 68 225 mm 17 20 24 27 30 34 37 44 54 57 61l z 25 mm 15 18 21 24 27 30 E MEE E 48 52 55 5 27 5 mm 14 17 19 22 25 28 30 44 47 50 30 mm 13 15 18 20 23 25 28 40 43 45 2 32 5 mm 12 14 16 19 21 23 ANS 37 40 42 5 mm ti 13 s 17 19 2 24 26 8 3032 35713 375 mm 10 12 14 t 18 20 22 24 26 28 30 32 34 36 40 mm o ui som aa aa as 27 al sol ad Chart Showing Wind In Speeds For Required Application Rate metres per hour R30 Boom Water
4. 26 27 28 29 30 31 32 33 34 PSi Colour red red white white blue blue dark dark orange orange dark brown brown green 10 2 64 2 86 3 1 3 34 3 58 3 84 4 11 4 38 4 66 4 96 5 25 0 72 0 78 0 85 0 91 0 98 1 05 1 12 1 2 1 27 1 35 1 43 Base 35 36 37 38 40 42 44 46 48 50 PSi Colour dark purple purple black dark mustard maroon cream dark blue copper green turquoise 10 5 56 5 88 6 2 6 53 7 23 7 93 8 7 9 4 10 3 11 12 1 52 1 61 1 7 1 78 1 97 2 17 2 4 251 2 81 3 04 20 PSi Spray Head Performance Chart IMP GPM M hr 3TN Nozzle Sizes Revised 29 04 99 Base 24 25 26 27 28 29 30 31 32 33 34 PSi Colour red red white white blue blue dark dark orange orange dark brown brown green 20 3 7 4 0 4 4 4 7 5 1 5 4 5 8 6 2 6 6 7 1 7 5 1 01 il 1 19 1 28 1 39 1 48 1 59 1 83 1 81 1 93 2 05 Base 35 36 37 38 40 42 44 46 48 50 PSi Colour dark purple purple black dark mustard maroon cream dark blue copper green turquoise 20 7 9 8 3 8 9 9 4 10 4 11 6 12 7 13 9 15 2 16 4 2 16 2 27 2 42 2 56 2 84 3 15 3 45 3 78 4 13 4 74 30 PSi Spray Head Performance Chart IMP GPM MYhr 3TN Nozzle Sizes Revised 29 04 99 Base 24 25 26 27 28 29 30 31 32 33 34 PSi Colour red red white white blue blue dark dark orange orange dark brown brown green 30 4 6 4 9 5 3 5 7 6 2 6 7 7 1 7 6 8 1 8 7 9 2
5. 2 3 6 11 SIME K1 Teso 8 Sector Sprinkler This is a sprinkler of medium discharge that operates over a full or a part circle It is equipped with various interchangeable nozzles and an adjustable jet breaker NOZZLE RANGE 7 14 mm Nozzle Dia Pressure Jet Length Capacity mm Bar m m hr Gal min 4 15 37 4 16 4 8 9 3 15 5 5 2 4 18 6 0 10 3 16 5 6 4 4 19 7 4 I NELSON BLUE TOP PRESSURE REGULATORS Precision Accuracy in tough field environments FEATURES PATENTED DAMPING SYSTEM The patented O Ring Dampening System of all Nelson Pressure Regulators handles severe pressure surges without creating flow restrictions under working pressures EXTENDED FLOW RANGE The Nelson Lo Flo Pressure Regulator extends to 10 gpm providing economical precision EXTENDED ACCURACY Precision components coupled with an internally lubricated o ring minimize frictional drag and hysteresis PLUG RESISTANT DESIGN An open seat design prevents hair pinning debris hangup and plugging of the pressure regulator PRECISION MANUFACTURED Made of the toughest chemically resistant Materials 100 water tested for accuracy Application Notes Performance Tables Contact the Nelson factory for detailed Performance information Statement of Expected Performance Nelson Pressure Regulators are accurate to 6 due to variance of coefficient in manufacturing BLUE TOP Colour Coded Identification Patented In
6. Flow imperial gpm m m hr Lane Spacing 48m so 6o 70 sol 90 100 110 120 130 140 150 160 170 180 mhr 14 16 19 22 25 27 DER ES ARE EE 44 47 49 5 mm 57 68 80 91 102 114 125 182 193 205 7 5 mm 38 45 53 61 68 76 ala 121 129 136 10 mm 28 34 40 45 51 57 EERE 91 97 102 a Cs mm IS E se a IES E ss 59 oa os a 77 sa E 15 mm 19 25 27 30 34 38 42 45 49 53 57 61 64 68 gt 17 5 mm 16 19 23 26 29 32 36 39 42 as 49 52 55 58 5 20 mm 14 17 o a 26 as 31 34 37 40 as as a s 22 5 mm 13 15 18 20f 23 25 28 30 33 35 38 40 43 45 S C s mm a 14 16 18 20 23 25 27 a0 32 34 36 IE a T 27 5 mm 10 12 14 17 19 21 23 25 27 29 31 33 35 37 E 30 mm 9 11 131 15 17 19 21 23 25 27 28 301 32 34 lt 1325 mm 9 10 12 14 16 17 19 21 23 24 26 28 30 31 IMEI IR AL IE E 16 O 21 23 4 6 2829 375 mm 8 o tu 1 14 ss 17 isf 20 21 23 24 26 27 40 mm 7 9 10 11 13 14 16 17 18 20 21 23 24 26 15
7. H 2 Section LH 1 Section 3 Left Hand Side MAINTENANCE 1 Grease the turntable weekly 2 Grease the rear wheel bearings weekly and repack adjust annually 3 Grease the front wheel acetyl bushes weekly on both sides rotate wheel while greasing 4 Grease front wheel steering king pin weekly 5 Ensure Boom support brackets are holding the Boom centrally Adjust if necessary 6 Boom locking joint tension must be checked regularly and is adjusted by slackening the locking bolt and turning the offset catch cam Keep regularly greased for ease of operation RISKS AND PRECAUTIONS e Ensure all locking pins are fully closed on the boom support brackets when transporting or pulling out the boom e Always transport the boom with great caution both on the road and in the field e Always secure Booms together with ropes or straps together with the turntable pin when moving on public roads e Watch out for turning clearance of the Boom section when manoeuvring around vehicles or any other objects e When operating with obstacles in the field poles etc ensure the operator is present to rotate the Boom around the obstacle e If starting a run with the Boom angled to suit a headland ensure it is set to the finishing headland angle in good time so an end section does not protrude over a road or track 10psi Spray Head Performance Chart IMP GPM M hr 3TN Nozzle Sizes Revised 29 04 99 Base 24 25
8. PORT The transport dimensions are as follows DIMENSIONS R18 R24 amp R30 TOTAL FOLDED LENGTH 5 0 metres 5 0 metres FOLDED WIDTH 2 9 metres 3 3 metres TRACK WIDTH 1 52 4 0 metres 1 52 4 0 metres If necessary the outer boom sections should be removed from the boom to meet local transport width regulations Wide load safety triangles must be fitted and the Boom sections must be roped together for added safety Important Do not exceed 10 km hr when towing Excessive speed causes instability due to the Hose Reel rigid chassis design and high centre of gravity ASSEMBLY amp COMMISSIONING The Hose Reel mounted boom has been fully flushed and pressure tested at the Briggs Irrigation Factory Some parts are removed to make transportation of the boom from factory to site both safe and legal All parts which have been removed have been number matched and should be carefully assembled ensuring the numbers are in the correct order For commissioning position the Hose Reel and Boom for initial setting up as explained below POSITIONING THE BOOM FOR OPERATION 1 Tow Hose Reel into the position required to start the irrigation run 2 Turn the drum of the hosereel on the turntable to line up with the centre of the irrigation run see photograph below 10 11 Set the wheel track of the boom This is done manually by loosening the locking bolts and sliding the wheel mounting legs out to the desired position The locking bolts must
9. Revised August 2013 Serial Number BRIGGS IRRIGATION Operators Manual amp Parts Manual For Hosereel Mounted Boom Irrigators R18 R24 amp R30 an Briggs Irrigation S Boyle Road an CORBY x Northamptonshire NN17 5XU Tel 00 44 0 1536 260338 Fax 00 44 0 1536 263972 enquiries briggsirrigation co uk www briggsirrigation co uk EC DECLARATION OF CONFORMITY MANUFACTURER Briggs UK Limited Boyle Road Corby Northamptonshire NN17 5XU England Tel 44 0 1536 260338 Fax 44 0 1536 263972 Email enquiries briggsirrigation co uk Web www briggsirrigation co uk HOSE REEL BOOM MODEL once PYPE tan This machine complies to BS EN292 Part 2 1991 89 392 EEC Signed on behalf of Briggs UK Ltd A M Colwill Director List of Contents Page EC Declaration of Conformity 1 Introduction Specification 3 Transport Assembly amp Commissioning 4 Positioning the R18 24 30 for Operation 4 Folding the Boom 5 Unfolding amp Folding Procedure Schematic Drawing 6 Maintenance 6 Risks amp Precautions 6 Nelson 10 psi regulated S3000 flow chart T Nelson 20 psi regulated S3000 flow chart 8 Nelson 30 psi regulated S3000 flow chart 9 S3000 Spinner 10 SIME JUMBO Teso 6 Sector Sprinkler 11 SIME K1 Teso 8 Sector Sprinkler 12 Nelson Pressure Regulators 13 Hose Reel wind in speed application rate chart for R18 24m 14 Hose Reel wind in speed application rate chart for R24 30m 14 Hose Reel wind
10. be done up tightly to ensure there is no movement during the course of the run The wheels can be set to span up to a width of 4m Lower the boom by operating the Hose Reel hydraulic leg lift frame system Unlock the Boom support bracket on the hosereel and unfold the group of sections on one side only and lock securely in position repeat for opposite side page 6 action 3 this shows the sections being opened on the left hand side of the boom Prepare hosereel for pulling out Refer to Hose Reel manual Connect the tractor to the towing out bar on the boom and pull out the hose at a constant speed not exceeding 3km h Once pulled out remove the tractor and move it at least 6m to provide sufficient clearance for opening the boom sections On the highest side of the boom open the 1 section boom support bracket and unfold the second section end section on an R18 and lock it in place page 6 action 2 left hand side shown Open the end section and lock in place R24 and R30 only page 6 action 1 Repeat for the opposite side of the boom The quadrant locking system allows the boom to be set at any angle in relation to the direction of the run to suit angled headlands If starting a run with the boom angled to suit a headland ensure that it is set to the finishing headland in good time so that an end section does not protrude over a road or a track Note the position of the 180 spray jet on the centre section must face away from t
11. he Hose Reel to avoid watering in front of the boom The boom is now ready for operation Slowly open the hydrant Hose Reel valves and start the pump Engage the Hose Reel drive and set the wind in speed see pages 14 and 15 for the Hose Reel Wind in Speed charts FOLDING THE BOOM 1 Fold outer section end section on the lower side of the mini boom into the second section and lock in the boom support bracket see action 1 on page 6 Repeat for the second section action 2 Note on the R18 the end section locks into the boom support bracket on the first section 2 Repeat this on the other side of the irrigator 3 Turn the hose drum on the Hose Reel turntable to line up with the centre of the boom 4 Make sure the backstop is in on R range Hose Reels and the gear lever is in the neutral position on the VR3 amp 4 this will prevent the hose from becoming loose on the Hose Reel and will also ensure that the mini boom is positioned correctly on the lift frame If this is not correct wind in the hose on the Hose Reel using the p t o handle provided 5 Fold the first section around the Hose Reel and clamp into the Hose Reel Boom support bracket action 3 Repeat for the opposite side 6 Raise the hydraulic legs lift frame system 7 Rotate the drum to the central position and reposition the Hose Reel for the next irrigation run Unfolding and Folding Procedures for the R18 R24 and R30 Centre Section LH End Section uz TA L
12. in speed application rate chart for R30 36m amp 48m 15 SPARE PARTS LIST 16 Figure 1 Chassis 17 18 Figure 2 Centre Section 19 20 Figure 3 First Section 21 22 Figure 4 Second Section R24 amp R30 only 23 24 Figure 5 R30 End Section 25 26 Figure 6 R24 End Section 27 28 Figure 7 R18 End Section 29 30 Figure 8 Nelson Pressure Regulator and S3000 Spray Jet 31 32 Figure 9 SIME JUMBO Teso 6 Sector Sprinkler 33 Figure 10 SIME K1 Teso 8 Sector Sprinkler 34 Figure 11 R18 R24 or R30 Lift Frame Kit for Briggs Range of Hose Reels 35 36 This manual covers the Briggs R18 R24 R30 hosereel mounted boom range INTRODUCTION The Briggs R18 R24 R30 Booms have been well designed manufactured and tested for long life and trouble free operation It is essential to read this manual before operating the Boom and follow the Operation and maintenance schedules carefully SPECIFICATION Regulated Pressure 0 66 bar 10psi 1 00 bar 15psi 1 40 bar 20psi 2 00 bar 30psi OOOO Minimum Requirements Pressure Settings 15psi for 10psi regulated spray Boom 20psi for 15psi regulated spray Boom 25psi for 20psi regulated spray Boom 35psi for 30psi regulated spray Boom Nozzle amp End Sprinkler Specifications Nozzle No of Flow Total Size Nozzles per Flow Nozzle room 3000 series 360 Sprayjets Rotators Nelson 3000 series 180 Sprayjets Rotators centre Nelson 3000 series 180 Sprayjets Rotators end TRANS
13. ternal Dampening System Retards Vibration Withstands Water Hammer Vented for Below Ground Use Chemically Resistant Materials Internally Lubricated O Ring for Precision Accuracy Plug Resistant Seat Design Design Considerations Maintain a 3 psi threshold above the normal spray rated pressure CAUTION Pressure regulators should be installed downstream from all shut off valves OUTLET INLET 3 4 FNPT HI FLO PSI BAR GPM M8 HR 6 41 4 16 91 3 63 10 70 4 16 91 3 63 15 1 0 2 20 45 4 54 20 1 4 2 20 45 4 54 25 1 7 2 20 45 4 54 30 2 0 2 20 45 4 54 40 2 8 2 20 45 4 54 50 3 4 2 20 45 4 54 Hose Reel Wind in Speed Charts for Application rate range Chart Showing Wind In Speeds For Required Application Rate metres per hour R18 Boom Water Flow imperial gpm m hr Lane Spacing 24m so 6o 70 so 90 100 110 120 130 140 150 160 170 180 mar 14 to 19 22 2827 30 ES 36 38 ai _ 44 _ 47 _49 5 mm 114 136 159 182 205 227 250 7 5 mm 76 91 106 121 136 152 167 182 197 212 227 242 258 273 a 10 mmf 57 6s wo 91 102 114 125 136 148 159 170 182 193 205 E 12 5 mm 45 55 64 73 82 91 100 T EE a ES 145 155 164 3 15 mm 38 45 53 61 68 76 Se 108 me 121129 136 17 5 mm 32 39 4s 52 58 65 71 104 110 117 20 mm 28

Download Pdf Manuals

image

Related Search

Related Contents

HK-8102D User`s manual - HighTek Interface Converter  Información Importante 1  Diagnostic Agenda 21 Blagnac V3  HP LaserJet P3010 Service Manual  o - Tokens Only  bajar manual    Liebherr BFI1051 User's Manual  SPHSPR15 MANUAL - July 15.indd  Heart Rate Logger with PC Model: WM100 USER  

Copyright © All rights reserved.
Failed to retrieve file