Home

Maintenance and Operating Instructions

image

Contents

1. 12 Perrot REGNERBAU CALW GmbH Industriestra e 19 27 D 75382 Althengstett Germany Telefon 0049 705 1 162 0 Fax 0049 705 1 162 133 E mail perrot perrot de E mail Konstruktion technik perrot de 8 H2 3 2 Hn 5 mi 201 Best Nr ZB11 98077 18 pu 10 Best Nr 2811 98079 9 NL 1 NE 122 A 4 4 f f A 16 4 4 p zi ATN pes EN Z 23 A NEENA 7 NI View X picture 2 TDPO18 Page 8 12 Perrot REGNERBAU CALW GmbH Industriestra e 19 27 D 75382 Althengstett Germany Telefon 0049 7051 162 0 Fax 0049 7051 162 133 E mail perrot perrot de E mail Konstruktion technik perrot de 7 Break down and elimination of the defects 7 1 TDP018 Dismantling of the sprinkler valve and pressure control unit 7 1 1 Disassembly of sprinkler insert picture 2 c Remove blind cap 1 with a sharp pointed object c Unscrew bolt 2 in the cover with a socket wrench 20 c Pull up cover with sprinkler insert turn retainer for cover 3 In that way the cover can be removed c Unscrew bolt 4 SW10 43 with socket wrench 21 and pull out sprinkler insert 5 7 1 2 Disassembly valve piston picture 2 3 Before the following mentioned work is carried out it must be sure that the sprinkler is depressurised c Unscrew valve upper part 6 with ram valve 22 c
2. XXX TDP018 Page 10 12 Perrot REGNERBAU CALW GmbH Industriestra e 19 27 D 75382 Althengstett Germany Telefon 0049 7051 162 0 Fax 0049 7051 162 133 E mail perrot perrot de E mail Konstruktion technik perrot de 7 2 3 Assembly pressure control unit Assembly pressure regulator 14 in the protection housing 15 according picture 5 Screw in tight both screw connections 16 in protection housing picture 2 Screw in protection housing 15 on sprinkler housing 16 see view X Plug in control pipe 9 in screw connections 16 Attention Take care of the right position Plug in longest control pipe in the screw connection at the coil side Left side view X Examine right clamping by drawing control pipe mox x 14 15 A N j f N N N N N SS 16 picture 5 7 2 4 Sprinkler assembly Plug in sprinkler insert 5 in guide housing Tighten fixing nuts 4 crosswise with socket wrench 21 Pull up sprinkler insert 5 and fix it by plugging a long screw driver diagonally through impact lever Plug in cover 17 on impact lever axle and turn retainer for cover 3 in slot Fasten cover 17 with bolt 2 and press blind cap 3 in screw hole Pull up sprinkler insert 5 on the cover 17 and take screwdriver away Let go off the cover Attention Bounces because of elastic force back to the housing XE The sprinkler is now completely assembled Now the functi
3. 62 133 E mail perrot perrot de E mail Konstruktion technik perrot de 5 Commissioning Winterise 5 1 Commissioning a Check of electrical function Before the water supply to the valve is opened the coil has to be triggered through a control unit Through an acoustic click on the coil the correct electrical function can be determined The click arise through attracting the relay armature b Make sure that the manual operation stands on AUTO or OFF Turn screw totally in or out In both positions it is warrant that the valve closes after the water supply c Open water supply to the sprinkler slowly Probably the valve opens for a short time but after 30 sec it should close on its own Pressure regulation Manual operation picture 1 d After opening the water supply and after the max working operation pressure is reached every seal has to be checked examined e Check valves and sprinkler for perfect function when opening the valve manual That can be executed by turning the manual operation to the right until the sprinkler head pops up So that the water jet do not hit the operator the manual operation should be opened carefully You can see the spray direction of the sprinkler on the out gushing water and so the operator can see where he has to stay for not getting wet f The desired pressure on the sprinkler nozzle can be adjusted on the pressure regulation screw while the sprinkler is working
4. Maintenance and Operating Instructions PERROT th integrated valve i sprinkler w Pop up Q oz SEB 22 Y RS SSS PS SEN gt ba ws N Page 1 12 TDP018 Industriestra e 19 27 D 75382 Althengstett Germany Telefon 0049 7051 162 0 Fax 0049 7051 162 133 Perrot REGNERBAU CALW GmbH perrot perrot de E mail Konstruktion technik perrot de E mail Contents 1 General 2 Safety 3 Description 4 Assembly 5 Commissioning 6 Maintenance 7 Break down and elimination of the defects 8 Spare parts list 1 General We presume that you are experienced in the field of irrigation Therefore we have kept this instruction as brief as possible and have included such information only which you must have for the use of this product A guarantee can be accepted only if the sprinkler has been operated in accordance with these instructions and if the defect occurs within the guarantee period 1 1 Application The sprinkler is used for the uniform distribution of the water The water should be pre cleaned and free of coarse and fibrous impurities Max water temperature will be 50 degree C Max ambient temperature will be 75 degree C TDP018 Page 2 12 Perrot REGNERBAU CALW GmbH Industriestra e 19 27 D 75382 Althengstett Germany Telefon 0049 7051 162 0 Fax 0049 7051 162 133 E mail perrot perrot de E mail Konstruktion te
5. Pull out valve insert 7 with ram valve 22 picture 3 7 1 3 Disassembly pressure regulator unit picture 2 5 Before the following mentioned work is carried out it must be sure that the sprinkler is depressurised c Remove cover for protection housing 8 by pressing snap fit 11 with help of screw driver in direction outside View X c Pull off downwards control pipe 9 by pressing locking ring 10 upwards Unscrew screw 12 and remove pressure regulator Page 9 12 Perrot REGNERBAU CALW GmbH Industriestra e 19 27 D 75382 Althengstett Germany Telefon 0049 7051 162 0 Fax 0049 7051 162 133 E mail perrot perrot de E mail Konstruktion technik perrot de 7 2 Assembling of the sprinkler 7 2 1 Flush sprinkler In case that the valve contains soil particles the sprinkler has to be flushed before assembling Assemble flushing equipment 23 in the sprinkler housing see picture 4 and open water supply Connect hose on flushing equipment so that water can be derived STEN TH ES I picture 4 7 2 2 Assembly valve Take care that all pieces are clean Screw on valve insert on valve ram do not forget spring 14 see picture 3 Grease seal slightly Feed introduce valve piston in the housing Examine facility by slight up and down movements Unscrew valve ram 22 Screw valve cover 6 on valve ram 22 and screw in tight into housing AO
6. c If on the sprinkler nozzle the min pressure is adjusted there is appr 3 bar pressure on the nozzle TDP018 Page 6 12 Perrot REGNERBAU CALW GmbH Industriestra e 19 27 D 75382 Althengstett Germany Telefon 0049 7051 162 0 Fax 0049 7051 162 133 E mail perrot perrot de E mail Konstruktion technik perrot de c When turning the screw 360 once in direction the pressure always raises up bar c The perfect ideal working pressure is appr 6 bar g While operation of the sprinkler there is the possibility to adjust the desired irrigation sector on the spring stop 18 h After the complete ventilation of the sprinkler the manual operating must be set on position AUTO than the sprinkler have to close i Check electrical function by turning on and off the sprinkler with help of a control unit 5 2 Winterise Before beginning of the frost period the sprinkler has to be totally drained off Therefore there must be connected a powerful compressor on the network main circuit Open the valve on the sprinkler until only air is coming out of the nozzle After the blowing out the magnetising coil has to be triggered electrically several times 6 Maintenance Clean interior space of the sprinkler with a industrial type vacuum cleaner or a similar device Clean Relieve sprinkler housing from overgrown grass This work should be done conveniently before commissioning in spring TDP018 Page 7
7. chnik perrot de 2 Safety These operation and safety instructions include basic remarks and hints for the assembly installation operation maintenance inspection and repair For this reason these instructions must be read by the fitter as well as by the customers authorised staff prior to the installation and commissioning Apart from the general safety instructions of this paragraph the special safety instructions included in other paragraphs of these operating instructions have to be observed also 2 1 Symbols of hints given in these operating instructions The non observance of the safety instructions mentioned in these operating instructions can endanger persons are marked with the general danger symbol especially Safety instructions which can endanger the sprinkler and its function if not observed are specially marked and the word ATTENTION has been inserted 2 2 Dangers if the safety instructions are not observed Non observance of the safety instructions can endanger persons as well as the environment and the sprinkler Non observance of the safety instructions can result in a loss of all claims for indemnity TDP018 Page 3 12 Perrot REGNERBAU CALW GmbH Industriestra e 19 27 D 75382 Althengstett Germany Telefon 0049 7051 162 0 Fax 0049 7051 162 133 E mail perrot perrot de E mail Konstruktion technik perrot de 3 Description Recommended operating pressure 5 to 6 bar Permissible operat
8. erpackung aus Grobkies Gravel package ANS NV ISESE SISISI RARER VN NNR RRR RA ANN poro oo h ESAE do SEHE Steuerkabel Versenkregner in Ruheposition Pop up sprinkler standard position Schema B Am Leitungsende Sprinkler at the pipe end Sickerpackung aus Grobkies Gravel package ERK WES lt AAA Wir behalten uns nderungen nach dem Stand der Technik auch ohne besondere Ank ndigung vor Subject to change without prior notice ee T Piece PE 63 x 17 16 x 63 T St ck PE 75 x 2 IG x 75 __ T Piece P 75 x25 lGx 75 D D d ll j Ref Soke o t Redcution Socket No 241 1 1 Red Nippel Nr 241 2 x1 erro Redcution Socket No 2 2 1 REGNERBAU REGNERBAU CALW schema Nr en ems T Piece PE 50 x 1 IG x 50 Regnergelenk T i Swing Joint 1 Joint 1 eu ES Anschlussverschraubung 40 x 1 IG 40 x 1 IG Clamp Connection 40 x 1 Anschlussverschraubung 50 x 15 IG Clamp Connection 50 x 1 IG Anschlussverschraubung 63 x 14 IG Clamp Connection 63 x 1 Anschlussverschraubung 75 x 24 IG Clamp Connection 75 x 2 EUER ER TDP018 Page 5 12 Perrot REGNERBAU CALW GmbH Industriestra e 19 27 D 75382 Althengstett Germany Telefon 0049 7051 162 0 Fax 0049 7051 1
9. ing pressure 3to 8 bar ATTENTION The pressure at the sprinkler must not exceed 10 bar For further data please refer to the separate data leaflet 4 Assembly ve R Flush pipe work thoroughly before assembling ATTENTION Threaded connection on the sprinkler is 1 female thread For sealing the thread hemp and a jointing compound has to be used e g Fermit special Installation of the sprinkler should occur according to the Installation layout for PERROT pop up sprinkler LVZE 22 VAC see next side To avoid burden pressure on the conduit pipe use in any rate a sprinkler swing joint It is recommended to assemble a gravel package as shown in the installation layout The connection of the control cables is only allowed with approved watertight connections To screw the sprinkler on the swing joint hold on to the housing border or use a strap wrench ATTENTION Do not pinch control pipe of the sprinkler with pipe wrench TDP018 Page 4 12 Perrot REGNERBAU CALW GmbH Industriestra e 19 27 D 75382 Althengstett Germany Telefon 0049 705 1 162 0 Fax 0049 705 1 162 133 E mail perrot perrot de E mail Konstruktion technik perrot de Einbauschema f r Versenkregner Installation layout for pop up sprinkler PERROT LVZE 22 W VAC Versenkregner in Ruheposition Pop up sprinkler standard position Schema A Seitlich am Rohr Installation with T piece Sick
10. on can be checked as described under point 5 1 TDP018 Page 11 12 Perrot REGNERBAU CALW GmbH Industriestra e 19 27 D 75382 Althengstett Germany Telefon 0049 7051 162 0 Fax 0049 7051 162 133 E mail perrot perrot de E mail Konstruktion technik perrot de 7 3 Break down and elimination of the defects Subject to change without prior notice TDP018 Perrot REGNERBAU CALW GmbH Break down Cause reason Elimination Valve opens closes only manual not by electrical Control signal Coil or coil seat is dirty Remove coil and clean it see point 7 1 3 Supply voltage is to low 24VAC DC Check supply voltage and cable connections Coil is broken Check coil resistance must be appr ca 30Q Plunger in coil is seated Change coil Valve does not open even not manual Seal of valve insert is defect Change valve insert see point 7 1 2 Control water exit on cylinder of the valve is blocked Disassembly control pipe out off connection and blow through backwards Valve does not close even not manual Filter for control water is dirty Disassembly valve insert and clean filter or change it see point 7 1 3 Leakage in the control water path Check all connections control pipe and pressure regulators units for leakage s and eliminate them The pressure on the sprinkler nozzle is to low Pressure regulator is set on min position Tu
11. rn adjustment screw in direction Pressure regulator is dirty Change pressure regulator Valve is blocked Disassembly valve and flush pipes see point 7 2 1 Industriestra e 19 27 D 75382 Althengstett Germany Telefon 0049 7051 162 0 Fax 0049 7051 162 133 E mail Page 12 12 perrot perrot de E mail Konstruktion technik perrot de

Download Pdf Manuals

image

Related Search

Related Contents

Installation and Operating Instructions Classic Heater Pool Controller  TALEXXdriver LCA PRE / LC EXC – Produkthandbuch  Samsung 32" Full HD Smart TV  PRODUCT MANUAL INSTALLATION, OPERATION  Samsung SR-51NMA Manuel de l'utilisateur  Chapter 1  Altavoz Inalámbrico Recargable BTX270  Pelco C2445M-C User's Manual  DAACO-CE-1Y-KD24 - SCS La Boutique  Le jeûne renvoie chacun de nous au fameux  

Copyright © All rights reserved.
Failed to retrieve file