Home
Nuclear Gauge Testing Manual Section 4 Operating Instructions
Contents
1. Place Gauge on Poly ON Std Block in SAFE gt Press YES and the following is displayed Position Press Start START ee a Standard Count gt Press ENTER and the following is displayed DS At the end of the counting period the following will be MS displayed Use new STD CNT Press YES or NO Record the following values 7 DS as the density standard count MS as the moisture standard count Issue Date December 2013 Page 1 of 2 The State of Queensland Department of Transport and Main Roads 2014 Nuclear Gauge Testing Manual Operating Instruction N127 ON P Press YES and the display will return to lt READY gt OFF P Press NO if the nuclear gauge is not required for further use Issue Date December 2013 Page 2 of 2 The State of Queensland Department of Transport and Main Roads 2014 m VEN Nuclear Gauge Testing Manual es h Queensland SEL Government OPERATING INSTRUCTION N128 STATISTICAL COUNT CPN MC1 AND MC3 ELITE 1 SET UP Position the nuclear gauge on the reference block between its raised edges such that the side of the nuclear gauge furthest from the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly located in the shielded position gt Press and allow the nuclear gauge to complete the self test routine 2 MEASUREMENT When READY is displayed Press When the display rea
2. OFF if the nuclear gauge is not required for further use Issue Date October 2003 Pagel of 1 The State of Queensland Department of Main Roads 2003 THIS PAGE IS INTENTIONALLY BLANK Queensland Government Nuclear Gauge Testing Manual Departmentof Main Roads OPERATING INSTRUCTION N106 STATISTICAL COUNT TROXLER 3411B 1 Set up Position the nuclear gauge on the reference block between its raised edges such that the side of the nuclear gauge furthest from the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly located in the shielded position Turn the PWR TIME switch to NORM and allow the nuclear gauge to stabilise for at least 20 minutes before commencing the test 2 Measurement gt Press SHIFT simultaneously MEA At the end of the counting period record the displayed value as the density count gt Press and record the displayed value as the moisture count Repeat the above until at least 20 density and moisture counts have been recorded gt Turn the PWR TIME switch to OFF if the nuclear gauge is not required for further use Issue Date October 2003 Page 1 of 1 The State of Queensland Department of Main Roads 2003 THIS PAGE IS INTENTIONALLY BLANK Queensland Government Nuclear Gauge Testing Manual OS Deparment Main Roads OPERATING INSTRUCTION N107 STANDARD COUNT TRO XLER 4640B 1 Set up Position t
3. SET TARGETS _ Press and the following FAST NORM SLOW 4MIN 16MIN will be displayed ASPH SOIL THIN AUTO MANUAL Issue Date October 2003 Page 2 of 3 The State of Queensland Department of Main Roads 2003 Nuclear Gauge Testing Manual Operating Instruction N114 gt Press repeatedly until 4MIN flashes gt Press and the display will return to the main menu gt Press PWR if the nuclear gauge is not required for further use Issue Date October 2003 Page 3 of 3 The State of Queensland Department of Main Roads 2003 THIS PAGE IS INTENTIONALLY BLANK Queensland Government Nuclear Gauge Testing Manual Departmentof Main Roads OPERATING INSTRUCTION N115 STANDARD COUNT HUMBOLDT 5001C 1 Set up Position the nuclear gauge on the reference block between its raised edges such that the side of the nuclear gauge furthest from the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly located in the shielded position gt Press and allow the nuclear gauge to complete the initialising routine The following will be displayed SAF 2 Measurement gt Press SIA and the following will be displayed X XX At the end of the counting period the following will be displayed SAF Record the displayed value as the density standard count gt Press and the following will be displayed Record the displayed value as the moisture s
4. The State of Queensland Department of Transport and Main Roads 2013 n 4 gt JJ 3 Nuclear Gauge Testing Manual Operating Instruction N104 gt Press V and the following is displayed Record Dens R as the density ratio repeatedly until the following is Moist R X XXX P Biss y displayed 1 to view data Record Moist R as the moisture ratio ON e P Press ves and the display will return to lt READY gt gt Press a if the nuclear gauge is not required for further use Issue Date March 2013 Page 2 of 2 The State of Queensland Department of Transport and Main Roads 2013 Queensland Government Nuclear Gauge Testing Manual Departmentof Main Roads OPERATING INSTRUCTION N105 STANDARD COUNT TROXLER 3411B 1 Set up Position the nuclear gauge on the reference block between its raised edges such that the side of the nuclear gauge furthest from the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly located in the shielded position Turn the PWR TIME switch to SLOW and allow the nuclear gauge to stabilise for at least 20 minutes before commencing the test 2 Measurement p Press SHIFT res simultaneously MEA At the end of the counting period record the displayed value as the density standard count gt Press and record the displayed value as the moisture standard count gt Turn the PWR TIME switch to
5. following will be Avg cnts XXXX displayed R XX XXXX ENTER for Moist Record R as the density ratio MOIST STAT TEST ENTER OT Avg cnts XX gt Press START the following is displayed R XX XXXX View Stat data Record R as the moisture ratio gt Press and display will return to the SETUP menu gt Press ESC to exit Turn the power switch off if the nuclear gauge is not required for further use Issue Date March 2013 Page 2 of 2 The State of Queensland Department of Transport and Main Roads 2013 Queensland Government Nuclear Gauge Testing Manual OPERATING INSTRUCTION N125 STANDARD COUNT TROXLER 3450 1 SET UP Position the nuclear gauge on the reference block between its raised edges such that the side of the nuclear gauge furthest from the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly located in the shielded position and allow the nuclear gauge to complete the self test gt Press routine 2 MEASUREMENT When READY is displayed DS XXXX XXXX MS XXXX gt Press srANDARD the following is displayed 1 Take new count 2 View counts Put Rod In STD Pos MEM Place Gauge On P Press 1 the following is displayed Standard Block Press ENTER Taking AE Standard Count gt Press ENTER the following is displayed S remaining DS1 XXXX X X PASS DS2 XXXX X X PASS At
6. off if the nuclear gauge is not required for further use Issue Date March 2013 Page 2 of 2 The State of Queensland Department of Transport and Main Roads 2013 m E Bae R Nuclear Gauge Testing Manual ay Queensland AA Government OPERATING INSTRUCTION N123 STANDARD COUNT TROXLER 3430P 1 SET UP Position the nuclear gauge on the reference block between its raised edges such that the side of the nuclear gauge furthest from the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly located in the shielded position Turn the power switch on and allow the nuclear gauge to complete the self test routine 2 MEASUREMENT When READY is displayed Standard Count repeatedly until the following is DS XX Press 1 E SID displayed MS XX Take new count sols Is gauge on Std P Press ES repeatedly until the following is oa SOLES displayed rod in SAFE pos Lc Taking P ENTER repeatedly until the following is Standard Count Tess START displayed XX seconds remaining DS XX XX P MS XX XX P Do you want to use the new STD At the end of the counting period the following is displayed Record the following values MS as the moisture standard count 7 DS as the density standard count Issue Date March 2013 Page 1 of 2 The State of Queensland Department of Transport and Main Roads 2013 Nuclear Gauge Testing Manual Op
7. the end of the counting period the following is displayed MS XXXX X X PASS Use New Standard Issue Date March 2013 Page 1 of 2 The State of Queensland Department of Transport and Main Roads 2013 Nuclear Gauge Testing Manual Operating Instruction N126 Record the following values MS as the moisture standard count 7 DS1 DS2 as the density standard count gt Press ves and the display will return to lt READY gt gt Press if the nuclear gauge is not required for further use Issue Date March 2013 Page 2 of 2 The State of Queensland Department of Transport and Main Roads 2013 Queensland Government Nuclear Gauge Testing Manual ay CHEIT OPERATING INSTRUCTION N126 STATISTICAL COUNT TRO XLER 3450 1 SET UP Position the nuclear gauge on the reference block between its raised edges such that the side of the nuclear gauge furthest from the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly located in the shielded position gt Press ON and allow the nuclear gauge to complete the self test routine 2 MEASUREMENT When READY is displayed gt Press SPECIAL To access the Gauge Status Test menu pm r and the following is displayed 1 Take STAT Test 2 Review STAT Test 3 Print STAT Data Press ESC To Exit gt Press Put Rod In STD Pos eae Place Gauge On and the following is displayed S
8. 001P 1 Set up Position the nuclear gauge on the reference block between its raised edges such that the side of the nuclear gauge closest to the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly located in the shielded position 2 Measurement Press and allow the nuclear gauge to stabilise for at least 10 minutes before commencing the test The following will be displayed e I XXXX Note The previously set depth will be displayed It is not necessary to adjust the displayed depth C X gt Press SHIFT STD simultaneously and the following will be displayed S Q J E At the end of the counting period the following will be displayed Record the displayed value as the density standard count Issue Date October 2003 Page 1 of 2 The State of Queensland Department of Main Roads 2003 Nuclear Gauge Testing Manual Operating Instruction N117 gt Press and record the displayed value as the moisture standard Ms count gt Press OFF if the nuclear gauge is not required for further use Issue Date October 2003 Page 2 of 2 The State of Queensland Department of Main Roads 2003 Queensland Government Nuclear Gauge Testing Manual OS Deparimentot Main Roads OPERATING INSTRUCTION N118 STATISTICAL COUNT HUMBOLDT 5001P 1 Set up Position the nuclear gauge on the reference block between its raised edges such that the side
9. 003 Queensland Government Nuclear Gauge Testing Manual Deparment OPERATING INSTRUCTION N109 STANDARD COUNT CPN MC3 1 Set up For a 50 mm thick reference block place the transport case on its end with the CPN logo uppermost Locate the reference block with the three studs upright on the case across the protective strips Position the nuclear gauge on the block so that the studs on the block fit into the depressions in the gauge base For a 75 mm thick reference block position the nuclear gauge on the reference block so that the studs fit into the depressions in the nuclear gauge base Check that the source rod handle is correctly located in the shielded position 2 Measurement M 2 At the end of the counting period Press repeatedly until the following is displayed 2 wet h20 XXXX XXXX XXXX XXXX XXXX XXXX 256 256 START new standard CLEAR exit Record the following values e Std wet as density standard count e Std h20o as moisture standard count Issue Date October 2003 Page 1 of 1 The State of Queensland Department of Main Roads 2003 THIS PAGE IS INTENTIONALLY BLANK Queensland Government Nuclear Gauge Testing Manual Departmentof Main Roads OPERATING INSTRUCTION N110 STATISTICAL COUNT CPN MC3 1 Measurement A Statistical analysis is performed using data obtained during a standard count The analysis is displayed together with the density and moisture standard c
10. Nuclear Gauge Testing Manual Section 4 Operating Instructions Operational Checks THIS PAGE IS INTENTIONALLY BLANK m E Bae R Nuclear Gauge Testing Manual ay Queensland SEP Government OPERATING INSTRUCTION N101 STANDARD COUNT TROXLER 3440 1 SET UP Position the nuclear gauge on the reference block between its raised edges such that the side of the nuclear gauge furthest from the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly located in the shielded position and allow the nuclear gauge to complete the self test routine gt Press 2 MEASUREMENT When READY is displayed Standard Count DS XX MS XX Take new count P Press STANDARD and the following is displayed YES oa A Is gauge on Std gt Press and the following is displayed Block amp Source EXIT rod in SAFE pos Taking YES Fae is di Standard Count gt Press and the following is displayed acond EXIT remaining MS XX XX P DS XX XX P Do you want to use the new STD At the end of the counting period the following is displayed Record the following values n MS as the moisture standard count 7 DS as the density standard count Issue Date March 2013 Page 1 of 2 The State of Queensland Department of Transport and Main Roads 2013 Nuclear Gauge Testing Manual Operating Instruction N101 YES and the display will return to lt READ
11. ON N122 STATISTICAL COUNT TROXLER 3440P 1 SET UP Position the nuclear gauge on the reference block between its raised edges such that the side of the nuclear gauge furthest from the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly located in the shielded position Turn the power switch on and allow the nuclear gauge to complete the self test routine 2 MEASUREMENT When READY is displayed P Press SETUP P Press V Until stat test appears as an option ijuod Take STAT Test gt Press 4 the following is displayed Review STAT Test Print STAT Test lt ESC gt to Exit Place Gauge on Std Block amp Source Rod in SAFE Pos Press lt START gt gt Press 1 the following is displayed m Zz 3 m ae gt Press m H gt I Issue Date March 2013 Page 1 of 2 O The State of Queensland Department of Transport and Main Roads 2013 Nuclear Gauge Testing Manual Operating Instruction N122 DENS STAT TEST At the end of the counting period the following will be Avg cnts XXXX displayed R XX XXXX ENTER for Moist Record R as the density ratio MOIST STAT TEST ENTER OT Avg cnts XX gt Press START the following is displayed R XX XXXX View Stat data Record R as the moisture ratio gt Press and display will return to the SETUP menu gt Press ESC to exit Turn the power switch
12. OUNT TROXLER 4640B 1 Set up Position the air gap spacer on the reference block Position the nuclear gauge on the spacer so that the handle end rests over the two posts on the spacer Check that the source rod handle is correctly located in the shielded position gt Press m and allow the nuclear gauge to complete the self test routine 2 Measurement When READY is displayed Special Function Press and the following Yes Next Menu X i 1 Surface Voids EA will be displayed 2 Recover Erase Place Gauge on z Spacer amp both on Press and the following will be displayed Hon Put Rod in SAFE Press ENTER STAT TEST Reading X gt Press A and the following will be displayed a Time XX secs STAT TEST At the end of the counting period the following will be Avg XXXX XXX Z displayed Avg XXXX X XX Z View stat data Issue Date October 2003 Pagel of 2 The State of Queensland Department of Main Roads 2003 Nuclear Gauge Testing Manual Operating Instruction N108 Record the second value on the first line of displayed data as the System 1 density ratio Record the second value on the second line of displayed data as the System 2 density ratio Press and the display will return to READY C CE gt Press OFF if the nuclear gauge is not required for further use Issue Date October 2003 Page 2 of 2 The State of Queensland Department of Main Roads 2
13. Y gt P Press EX P Press TM if the nuclear gauge is not required for further use Issue Date March 2013 Page 2 of 2 The State of Queensland Department of Transport and Main Roads 2013 Nuclear Gauge Testing Manual Ne h Queensland XI Government OPERATING INSTRUCTION N102 STATISTICAL COUNT TROXLER 3440 1 SET UP Position the nuclear gauge on the reference block between its raised edges such that the side of the nuclear gauge furthest from the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly located in the shielded position gt Press and allow the nuclear gauge to complete the self test routine 2 MEASUREMENT When READY is displayed P Press SHIFT x SPECIAL oe ee gt Press and the following is displayed SPECIAL FUNCTION Le YES Next menu 1 STAT TEST 2 DRIFT TEST COUNTS STAT TEST gt Press COUNTS and the following is displayed Want to view last Stat Data NO CE on Put gauge on Std gt Press 22 and the following is displayed Block rod in C CE SAFE position amp press START STAT TEST Reading X Time XX secs START gt Press ENTER and the following is displayed Issue Date March 2013 Page 1 of 2 The State of Queensland Department of Transport and Main Roads 2013 Nuclear Gauge Testing Manual Operating Instruction N102 DENS STAT TEST At the end of the counting period t
14. cated in the shielded position gt Press a and allow the nuclear gauge to complete the self test routine 2 MEASUREMENT When READY is displayed TP RECALL P Press MENU and the following is displayed UP DOWN or ENTER repeatedly until the following is STAT TEST P Press DOWN isplased E UP DOWN or ENTER no cuin nad Press START for P Press ENTER and the following is displayed 20m Stat Test nm n d d 2 2 3 3 take da STAT TEST Press Suter and the following is displayed Rdg 4X XX Sec At the end of the counting period the following is displayed LE HALE gt Press and the following is displayed an a Record Dens R as the density ratio Issue Date August 2012 Page 1 of 2 The State of Queensland Department of Transport and Main Roads 2012 Nuclear Gauge Testing Manual Operating Instruction N120 repeatedly until the following is Moist R XX gt Press DOWN displayed DOWN views data Record Moist R as the moisture ratio gt Press TEE and the display will return to lt READY gt gt Press OFF if the nuclear gauge is not required for further use Issue Date August 2012 Page 2 of 2 The State of Queensland Department of Transport and Main Roads 2012 m E Bae R Nuclear Gauge Testing Manual ay Queensland AA Government OPERATING INSTRUCTION N121 STANDARD COUNT TROXLER 3440P 1 SET UP Position the nuclear gauge on the reference block bet
15. d during a standard count Following completion of the standard count as detailed in Operating Instruction N111 Press Dxi XXXX The following will be displayed Mxi XXXx Record the following values e Dxias the density ratio e Mxi as the moisture ratio After 30 seconds the display will turn off Press OR to restore the display Issue Date October 2003 Pagel of 1 The State of Queensland Department of Main Roads 2003 THIS PAGE IS INTENTIONALLY BLANK Queensland Government Nuclear Gauge Testing Manual Ro Deparment Main Roads OPERATING INSTRUCTION N113 STANDARD COUNT HUMBOLDT 5001EZ 1 Set up Position the nuclear gauge on the reference block between its raised edges such that the side of the nuclear gauge closest to the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly located in the shielded position Press PWR and allow the nuclear gauge to complete the initialising routine DATA XX XX XX The following will be displayed E DEPTH SAF 2 Measurement SET UP2 gt Press F2 and the following SET MEASUREMENT MODES SET TRNCH COR will be displayed SET TARGETS i FAST NORM SLOW gt Press F2 and the following 4MIN 16MIN will be displayed ASPH SOIL THIN AUTO MANUAL gt Press repeatedly until 4MIN flashes DS XXXX MM DD YY MS XXX MM HH gt Press and the following TAKE NEW STD
16. ds START gt Press ENTER After 20 minutes the display will show the results of the test you can scroll through to see each count Issue Date December 2013 Page 1 of 1 The State of Queensland Department of Transport and Main Roads 2014 THIS PAGE IS INTENTIONALLY BLANK
17. erating Instruction N123 P Press YES and the display will return to lt READY gt p Turn the power switch off if the nuclear gauge is not required for further use Issue Date March 2013 Page 2 of 2 The State of Queensland Department of Transport and Main Roads 2013 Queensland Government Nuclear Gauge Testing Manual CHEIT OPERATING INSTRUCTION N124 STATISTICAL COUNT TRO XLER 3430P 1 SET UP Position the nuclear gauge on the reference block between its raised edges such that the side of the nuclear gauge furthest from the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly located in the shielded position Turn the power switch on and allow the nuclear gauge to complete the self test routine 2 MEASUREMENT When READY is displayed P Press SETUP P Press V Until stat test appears as an option ijuod Take STAT Test gt Press 4 the following is displayed Review STAT Test Print STAT Test lt ESC gt to Exit Place Gauge on Std Block amp Source Rod in SAFE Pos Press lt START gt gt Press 1 the following is displayed m Zz 3 m ae gt Press m H gt I Issue Date March 2013 Page 1 of 2 O The State of Queensland Department of Transport and Main Roads 2013 Nuclear Gauge Testing Manual Operating Instruction N124 DENS STAT TEST At the end of the counting period the
18. he air gap spacer on the reference block Position the nuclear gauge on the spacer so that the handle end rests over the two posts on the spacer Check that the source rod handle is correctly located in the shielded position gt Press ES and allow the nuclear gauge to complete the self test routine 2 Measurement When lt READY gt is displayed Standard Count and the following will be displayed XXXX XXXX Take a new Standard Count Press Place Gauge on a Spacer amp both on gt Press YES and the following will be displayed Block Put Rod in EXIT SAFE Press ENTER Taking START Standard Count Press ENTER and the following will be displayed E remaining Std1 Std2 At the end of the counting period the following will be XXXX XXXX duse X XX Z X XX Z p ayeg Use new Stds Issue Date October 2003 Page 1 of 2 The State of Queensland Department of Main Roads 2003 Nuclear Gauge Testing Manual Operating Instruction N107 Record the following values e Stdl as the System 1 standard count Std2 as the System 2 standard count Press YES and the display will return to lt READY gt EXIT gt Press OFF if the nuclear gauge is not required for further use Issue Date October 2003 Page 2 of 2 The State of Queensland Department of Main Roads 2003 Queensland Government Nuclear Gauge Testing Manual M ommo Main Roads OPERATING INSTRUCTION N108 STATISTICAL C
19. he following will be Avg cnts XX displayed R XX XXXX ENTER for Moist Record R as the density ratio MOIST STAT TEST SIART o Avg cnts XX gt Press ENTER and the following is displayed R XX XXXX View Stat data Record R as the moisture ratio gt NO CE Press ClGE and display will return to lt READY gt P Press OFF if the nuclear gauge is not required for further use Issue Date March 2013 Page 2 of 2 The State of Queensland Department of Transport and Main Roads 2013 Nuclear Gauge Testing Manual Ne h Queensland CRT Government OPERATING INSTRUCTION N103 STANDARD COUNT TROXLER 3430 1 SET UP Position the nuclear gauge on the reference block between its raised edges such that the side of the nuclear gauge furthest from the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly located in the shielded position gt Press ON and allow the nuclear gauge to complete the self test routine lt m n 2 MEASUREMENT When READY is displayed m DS XXXX MS XXX gt Press STANDARD and the following is displayed New Std Count Press START for 29 3 gt mo m oi 4 gt Press and the following is displayed ICO P Press and the following is displayed Ps ae At the end of the counting period the following will be Standard Count DS XXX MS XXX displayed Record the following values 7 DS as the de
20. nsity standard count MS as the moisture standard count P Press an and the display will return to lt READY gt lt mz Issue Date March 2013 Page 1 of 2 The State of Queensland Department of Transport and Main Roads 2013 Nuclear Gauge Testing Manual Operating Instruction N103 OFF i i s P Press NO if the nuclear gauge is not required for further use Issue Date March 2013 Page 2 of 2 The State of Queensland Department of Transport and Main Roads 2013 Nuclear Gauge Testing Manual Ne h Queensland XI Government OPERATING INSTRUCTION N104 STATISTICAL COUNT TRO XLER 3430 1 SET UP Position the nuclear gauge on the reference block between its raised edges such that the side of the nuclear gauge furthest from the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly located in the shielded position gt Press a and allow the nuclear gauge to complete the self test routine n 2 MEASUREMENT When READY is displayed Press SPECIAL and the following is displayed repeatedly until the following is STAT TEST P Press V displayed t4 or ENTER START JT Press START for gt Press ENTER and the following is displayed 7 STAT TEST gt Press ENTER and the following is displayed At the end of the counting period the following will be D XXXX M XXXX displayed 14 to view data Issue Date March 2013 Page 1 of 2
21. of the nuclear gauge closest to the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly located in the shielded position 2 Measurement gt Press and allow the nuclear gauge to stabilise for at least 10 minutes before commencing the test The following will be displayed JE XX Note The previously set depth will be displayed It is not necessary to adjust the displayed depth gt Press SHIFT STAT simultaneously and the following will be displayed At the end of the counting period the following will be displayed an x lt S x XXXX X Record the displayed value as the density ratio Issue Date October 2003 Pagel of 2 The State of Queensland Department of Main Roads 2003 Nuclear Gauge Testing Manual Operating Instruction N118 gt Press and record the displayed value as the moisture ratio gt Press OFF if the nuclear gauge is not required for further use Issue Date October 2003 Page 2 of 2 The State of Queensland Department of Main Roads 2003 Nuclear Gauge Testing Manual Queensland ix Government OPERATING INSTRUCTION N119 STANDARD COUNT INSTRO TEK XPLORER 3500 1 SET UP Position the nuclear gauge on the reference block between its raised edges such that the side of the nuclear gauge furthest from the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correc
22. ounts Following completion of the standard count as detailed in Operating Instruction N109 the following will be displayed wet XXXX XXXX XXXX 256 START new standard CLEAR Exit Record the following values Xi wet as the density ratio e Xi h2o as the moisture ratio Issue Date October 2003 Pagel of 1 The State of Queensland Department of Main Roads 2003 THIS PAGE IS INTENTIONALLY BLANK Queensland Government Nuclear Gauge Testing Manual OS Deparimentot Main Roads OPERATING INSTRUCTION N111 STANDARD COUNT CPN MC1DR MC 1DR P 1 Set up Position the nuclear gauge on the reference block so that the studs on the block fit into the depressions on the nuclear gauge base Check that the source rod handle is correctly located in the shielded position 2 Measurement Press 218 At the end of the counting period the following will be Dstd XXXXX displayed Mstd XXXXX Record the following values e Dstd as the density standard count e Mstd as the moisture standard count After 30 seconds the display will turn off Press OR to restore the display Issue Date October 2003 Page 1 of 1 The State of Queensland Department of Main Roads 2003 THIS PAGE IS INTENTIONALLY BLANK Queensland Government Nuclear Gauge Testing Manual OS depart OPERATING INSTRUCTION N112 STANDARD COUNT CPN MC1DR MC1DR P 1 Measurement The statistical analysis is performed using data obtaine
23. tandard Block Press ENTER Issue Date March 2013 Page 1 of 2 The State of Queensland Department of Transport and Main Roads 2013 Nuclear Gauge Testing Manual Operating Instruction N126 P Press ENTER and the gauge displays the progress of the STAT test STAT Test Avg R At the end of the counting period the following will be D 1 PASS xxxx xxxx displayed D 2 PASS xxxx xxxx M PASS xxxx xxxx Record R D 1 R D 2 as the density ratio Record R as the moisture ratio for M to return to the lt READY gt screen gt Press lt ESC gt gt Press OFF if the nuclear gauge is not required for further use Issue Date March 2013 Page 2 of 2 The State of Queensland Department of Transport and Main Roads 2013 m E MEN r Nuclear Gauge Testing Manual Y Queensland ZEN TAL AR Government OPERATING INSTRUCTION N127 STANDARD COUNT CPN MC1 AND MC3 ELITE 1 SET UP Position the nuclear gauge on the reference block between its raised edges such that the side of the nuclear gauge furthest from the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly located in the shielded position gt Press ON and allow the nuclear gauge to complete the self test routine lt m n 2 MEASUREMENT When READY is displayed DS MS P Press STD and the following is displayed Take new Starcount Press YES or NO
24. tandard count SAF x Press OFF if the nuclear gauge is not required for further use Issue Date October 2003 Page 1 of 1 The State of Queensland Department of Main Roads 2003 THIS PAGE IS INTENTIONALLY BLANK Queensland Government Nuclear Gauge Testing Manual Departmentof Main Roads OPERATING INSTRUCTION N116 STATISTICAL COUNT HUMBOLDT 5001C 1 Set up Position the nuclear gauge on the reference block between its raised edges such that the side of the nuclear gauge furthest from the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly located in the shielded position and allow the nuclear gauge to complete the initialising routine gt Press A SAF The following will be displayed 000000 2 Measurement STA S SAF gt Press and the following u will be displayed At the end of the counting period the following will be displayed ER amp x ln Bg IR gt Press and record the displayed value as the density ratio gt Press and record the displayed value as the moisture ratio gt Press QEF if the nuclear gauge is not required for further use Issue Date October 2003 Page 1 of 1 The State of Queensland Department of Main Roads 2003 THIS PAGE IS INTENTIONALLY BLANK Queensland Government Nuclear Gauge Testing Manual OS Deparimentot Main Roads OPERATING INSTRUCTION N117 SIANDARD COUNT HUMBOLDT 5
25. tly located in the shielded position gt Press a and allow the nuclear gauge to complete the self test routine 2 MEASUREMENT When READY is displayed MNT DS XXXX MS XXX gt Press STD and the following is displayed New Std Count ON S Standard Count P Press ves _ and the following is displayed Press START D Press START and the time will count down from Time XXX sec ENTER 240 seconds and display Standard Count At the end of the counting period the following will be DS XXXX MS XXX displayed Use New STD CNT Record the following values DS as the density standard count MS as the moisture standard count Issue Date August 2012 Page 1 of 2 The State of Queensland Department of Transport and Main Roads 2012 Nuclear Gauge Testing Manual Operating Instruction N119 P Press x and display will return to READY P Press No if the nuclear gauge is not required for further use Issue Date August 2012 Page 2 of 2 The State of Queensland Department of Transport and Main Roads 2012 Nuclear Gauge Testing Manual Queensland bx Government OPERATING INSTRUCTION N120 STATISTICAL COUNT INSTROTEK XPLORER 3500 1 SET UP Position the nuclear gauge on the reference block between its raised edges such that the side of the nuclear gauge furthest from the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly lo
26. utine The following will be displayed Measurement and the following will be displayed Press F2 Press F2 and the following will be displayed Press F2 Press SUE and the following will be displayed o d gt 3 Issue Date October 2003 and allow the nuclear gauge to complete the initialising DATA XX XX XX SET UP XX XX XX ENGINEERING DEPTH SAF SET UP 2 SET MEASUREMENT MODES SET TRNCH COR SET TARGETS FAST NORM SLOW 4MIN 16MIN ASPH SOIL THIN AUTO MANUAL repeatedly until 16MIN flashes DS XXXX MM DD YY MS XXX MM HH TAKE NEW STD USE CURRENT STD Page 1 of 3 The State of Queensland Department of Main Roads 2003 Nuclear Gauge Testing Manual Operating Instruction N114 TAKING STATISTICS gt Press F3 and the following TIME REMAINING X XX DS zX will be displayed MS X DEPTH SAF At the end of the counting period the following will be displayed STAT TEST RESULTS DS z XXXX ERR X X MS XXX ERR X X DS XXXX X R X XXX REJECT amp TAKE NEW STD MS XXX X R X XXX RETAIN THE NEW STD Record the following displayed values e R in the DS row as the density ratio R in the MS row as the moisture ratio If an error message is displayed gt Press F4 to take new counts MAIN f p Press MENU and the display will return to the main menu SET UP 2 gt Press F2 and the following ill CD e ES will be displayed
27. ween its raised edges such that the side of the nuclear gauge furthest from the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly located in the shielded position Turn the power switch on and allow the nuclear gauge to complete the self test routine 2 MEASUREMENT When READY is displayed Standard Count repeatedly until the following is DS XX Press 1 E SID displayed MS XX Take new count sols Is gauge on Std P Press ES repeatedly until the following is oa SOLES displayed rod in SAFE pos Lc Taking P ENTER repeatedly until the following is Standard Count Tess START displayed XX seconds remaining DS XX XX P MS XX XX P Do you want to use the new STD At the end of the counting period the following is displayed Record the following values MS as the moisture standard count 7 DS as the density standard count Issue Date March 2013 Page 1 of 2 The State of Queensland Department of Transport and Main Roads 2013 Nuclear Gauge Testing Manual Operating Instruction N121 P Press YES and the display will return to lt READY gt p Turn the power switch off if the nuclear gauge is not required for further use Issue Date March 2013 Page 2 of 2 The State of Queensland Department of Transport and Main Roads 2013 Queensland Government Nuclear Gauge Testing Manual CHEIT OPERATING INSTRUCTI
28. will be displayed USE CURRENT STD Issue Date October 2003 Page of 2 The State of Queensland Department of Main Roads 2003 Nuclear Gauge Testing Manual Operating Instruction N113 TAKING STANDARD gt Press and the following DE ees X XX will be displayed MS X DEPTH SAF gt At the end of the counting period the following will be displayed STD TEST RESULTS DS XXXX ERR X X MS XXX ERR X X DS XXXX X REJECT amp TAKE NEW STD MS XXX X RETAIN THE NEW STD Record the following displayed values if no error message is displayed e DS as the density standard count e MS as the moisture standard count gt Press MAIN and the display will return to the main menu MENU play If an error message is displayed Press and the display will return to the main menu gt Press PWR if the nuclear gauge is not required for further use gaug q Issue Date October 2003 Page 2 of 2 The State of Queensland Department of Main Roads 2003 Nuclear Gauge Testing Manual 1 OPERATING INSTRUCTION N114 Set up Queensland Government Department of Main Roads STATISTICAL COUNT HUMBOLDT 5001EZ Position the nuclear gauge on the reference block between its raised edges such that the side of the nuclear gauge closest to the source rod is in contact with the metal plate on the side of the block Check that the source rod handle is correctly located in the shielded position Press PWR ro
Download Pdf Manuals
Related Search
Related Contents
Brass Band Guide for GYSO members LOW FREQUENCY ON LINE UPS Infinity powerOne CRE 2 (669449305208) Samsung QM105D دليل المستخدم Trésor de la Langue Française Informatisé (TLFI) Sistema Operacional l - Prof. Fernando Mattar Philips docking speaker DS1150 Samsung DV4006 User's Manual Copyright © All rights reserved.
Failed to retrieve file