Home
Ekorodent NetBlaster Operating Instructions
Contents
1. THE NETBLASTER IS NOW FILLED AND READY TO FIRE Before proceeding to Section 4 once again check the surrounding area for any potential hazards Ekorodent s Section 4 Firing the Net Blaster Step 1 Position the safety pushing on the slide gate ide gate into the fire position by removing the pin amp The fire position is noted Insert pin to lock into fire position Step 2 Open the flip top of the trigger box amp turn the power switch to the on position gt Note The red power on light will illumi nate when the unit is armed Ekorodent s Ekorodent Operating amp Safety Instruct Step 3 To fire Depress the fire button Note The weights will be propelled at a high rate of speed amp carry the net over the catch area After Firing the NetBlaster 1 Depress the fire button 1 2 times to release any stored air in the Net laster tank 2 Remove the safety pin amp return the Safety Slide gate to the safe position and pin it into place Position noted with Sa Sticker Before attempting to capture wild life the WCS NetBlaster should be test fired a minimum of 5 five times with the appropriate nets to help the user become familiar with the device The NetBlaster barrel angle is preset for level surface Adjustments to the barrel angle can be made by elevating or lowering the front of the NetBlaster For Customer Service amp Technical
2. Support Contact Ekorodent 520 Redland Bay Road Alexandra Hills QLD 4161 07 3206 4600 www ekorodent net au Ekorodent 1
3. Ekorodent Netblaster Ji Spa ekorodent NetBlaster Operating amp Safety Instructions Ask us for an inquiry 07 3206 4600 www ekorodent net au Ekorodent WCS NETBLASTER OPERATING INSTRUCTIONS be follov g sections amp steps should al in the order and Anchoring Step 1 Position the NetBlaster in desired location near the baited area This loca tion should be a flat surface free of any rocks and debris Note The launch area should be clear of buildings vehicles or structures of any kind Step 2 Anchor the NetBlaster to the ground using the supplied anchors An alterna tive anchoring system may need to be used depending on different ground amp soil conditions Note Never discharge the NetBlaster at a proper anchoring system 4 Ekorodent Operating amp Safety Instruct Step 3 Positioning the Net Not supplied To check for coverage the net should be unrolled amp spread across the target area The net should also be checked for damage amp cleared of any debris The back corners of the net should be securely anchored Gather amp fold the net accor dion style so that the leading edge of the net containing the lead ropes is on top Position the NetBlaster in the center of the net Ekorodent s Step 4 Securing amp Inserting the Projectiles Secure the net lead ropes to the supplied weig
4. he trigger box at the blind site The supplied cord is 50 in length Cord extensions are available in 50 amp 100 lengths Ekorodent 7 Ekorodent t ty Instruct SAFETY NOTE BEFORE proceeding to Section 3 check that all of the steps in Sections 1 amp 2 have been followed In Section 3 the NetBlaster will be filled with compressed air It is at that point that the NetBlaster can become dangerous to personnel if the previous instructions have not been fol lowed correctly So please double check the following Check to insure that all lead ropes are hanging freely in front of the NetBlaster Check to insure that the Safety Slide Gate is in the Safe position Check that the NetBlaster is equipped with an Air Gauge amp Pressure Relief Valve Check to make sure that all personnel are in a safe location Sheck to insure that the compressor ball valve is in the off position that the NetBlaster is properly anchored to the ground Section 3 Filling the NetBlaster Step 1 Start the air compressor Open the ball valve on the fill hose amp fill the NetBlaster Tank to 120psi as indicated by the air gauge on the tank Note The maximum operating pressure is 140psi the NetBlaster Tank to fill with compressed air Step 2 After filling the NetBlaster Tank close the ball valve amp remove the air hose from the NetBlaster hose connection Remove the air compressor amp hose from the site
5. hts Check that the o rings are secure amp free of damage replace if necessary Note The o rings need to be lubricated before they are inserted into the barrels Insert the weights into the NetBlaster barrels The weights should be inserted to the bottom of the barrel by using a small plunger such as a wooden dowel rod Note Make sure that the lead ropes hang freely in front of the NetBlaster so not to get tangled upon discharge Lead ropes hanging freely Section 2 Pre Fill Set Up Step 1 Make sure that the Safety Slide Gate is pinned in the safe position as shown Position noted with Safe ticker Ekorodent s Step 2 Position the air compressor next to the NetBlaster Using the supplied air hose connect the ball valve male connection into the female connection on the air compressor Note The ball valve should be in the 1 position as shown Step 3 Connect the other male hose Step 4 Open the trigger box to make sure that connection into the female hose con power switch is in the off position The nection on the NetBlaster solenoid power on light should not be illuminated Y Compressor connection H The red light will be off when the system is _ NetBlaster jeactivated Step 5 Connect one end of the supplied cord to the trigger box and the other end to the solenoid electrical connection a Step 6 Position t
Download Pdf Manuals
Related Search
Related Contents
Surveyor 4B_rev C.2_SP MobileMapper 300 Benutzerhandbuch, Rev EULA - Ridom GmbH operation manual SERVICE MANUAL PRM-30 PSA 81/82/85, PUA 81/82 4cast Advanced User Guide Copyright © All rights reserved.
Failed to retrieve file