Home

Installation Manual - HTK-750 links mit UFS.p65

image

Contents

1. 33 INDEX Service qualifications Installation guidelines Unpacking the tailgate loader Preparing for installation Installing the mounting device Position the tailgate unit Energize the power pack Correct wiring of power pack Installing the platform Remove tilting lock How to adjust the platform level Installing a platform lock Basic dimensions HTK 500ST M Tailgate Schematics HTK 500ST M Tailgate Specification HTK 500ST M Centre of Mass HTK 500ST M Basic dimensions HTK 500ST AL Tailgate Schematics HTK 500ST AL Tailgate Specification HTK 500ST AL Centre of Mass HTK 500ST AL Basic dimensions HTK 750ST M Tailgate Schematics HTK 750ST M Tailgate Specification HTK 750ST M Centre of Mass HK 750ST M Basic dimensions HTK 750ST AL Tailgate Schematics HTK 750ST AL Tailgate Specification HTK 750ST AL Centre of Mass HTK 750ST AL Electric and hydraulic diagram 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
2. OPTION with electrical hose burst valve HZ 500AL 35E TOTAL WEIGHT WITHOUT UNDERRUN 1835kg 000m 20 K NA 59 A VA 4 9 SY 2 2 p p p 22 xX x RKR 2 SSS 2 551855554 2 V gi V EV ga a aga ss SAI o 522 CR lt lt POOP KA 2 q X X LX Copyright 2006 17 MODEL HTK 500ST TAILGATE KINEMATICS ABT MIMINUM MEASUREMENTS 876 MAXIMAL 390 MINIMAL 100 260 MINIMAL MAXIMUM MEASUREMENTS 719 MINIMUM 600 MAXIMUM 500 MAXIMUM Copyright by 2006 18 MODEL HTK 500ST M TAILGATE SPECIFICATIONS for Liftarm L 750mm and Platform L 950mm STANDARD SPECIFICATIONS 500 at 500mm Center NOMINAL PLATFORM SIZE mm 1750 Width x 950 Length x 120 Depth INSTALLED WEIGHT kg 200 FITTING REQUIREMENTS mm 1200 Mox Height Unloaded 750 Min Height Loaded 720 Min Underbody Clearance Required OTHER SPECIFICATIONS Unit amp Cylinder kg Installation Kit kg Platform with Mesh Trolley Stops Platform Angle Construction Arm Depth mm Arm Length mm Re Bushable Overall width mm Construction Bracket Thickness mm Material Grease Nipples Welded Steel Construction Galvanized 62x25 Cross Section 6x3 16 0 or 9 2x8mm Steel Plate 40mm Steel Plate on the Platf
3. MOUNTING DEVICE Install pins Lift arm platform between mounting device and hoisting unit The main frame must be parallel with the body LIFT ARM IMPORTANT SEE TAILGATE KINEMATICS THE MAXIMUM AND MINIMUM MEASUREMENTS MUST BE KEPT Displace the power pack PIN LIFT ARM PLATFORM Before you can fix the mounting brackets you have to displace the power pack l Loosen the 4 screws M10x25 on the power pack UU UN Now displace the power pack It is not necessarry to remove any hydraulic hoses fittings Jii and electric wirings INSTALLATION INSTRUCTIONS Position the tailgate unit Install mounting brackets Placethe mounting brackets to its exact final position Clampthe mounting brackets on the truck frame Mounting Bracket Truck Main Frame Check the right angled Fixthe mounting brackets on the main frame Drill 16mm 5 8 holes into the chassis and mounting bracket Screw M16 5 8 is 8 8 Strength Grade 8 Max Torque 195Nm 145ft Ibs Drill two holes in each bracket put a bolt in each one and secure Then drill the other holes Truck Main Frame 4 HOLES Screw Clamp 16mm 5 8 Mounting Bracket NUMBER OF SCREWS PER MOUNTING BRACKET 4 pieces M16x50 MOUNT THE POWER PACK AGAIN FASTEN THE 4 SCREWS M10x25 INSTALLATION INSTRUCTIONS Energize the power pack CAUTION REMOVE TRANSPORT FILLER CAP AND INSERT DIPSTICK The
4. Office Factory ra Pp Hauptplatz 23 BahnstraBe 34 A 2474 Gattendorf ALUHEBETECHNIK Tel 43 2142 64260 43 2142 64360 E Mail Gesellschaft mbH Fax 43 2142 6434 43 2142 64366 office Qaht mhw com INSTALLER S MANUAL FOR THE AHT TAILLIFT HTK 500ST AL HTK 500ST M HTK 750ST AL HTK 750ST M with underrun beam Gattendorf May 2007 SERVICE QUALIFICATIONS TO INSTALL THE TAILGATE LOADER The installer should be well trained in the proper procedure for installing the AHT before beginning the installation Carefully read the manual before starting to install the AHT tailgate loader Only mature adults age 18 and above should install the AHT tailgate loader Installer should be well qualified for installing hydraulic equipment Installer should be well qualified for installing the electrical equipment INSTALLATION GUIDELINES 1 Remove bumpers lights tool box etc from rear of vehicle if necessary 2 Cut and shape the body and chassis to fit the tailgate 3 Fixing the mounting device on the truck body 4 Remove the pin from platform bearing 5 Position the mainframe under the truck Then displace the power pack 6 Fix the mounting brackets onto the truck main frame 7 Mount the power pack again 8 Energize the power pack 9 Remove the mounting devices and lower the hoisting unit for approximately 40cm 10 Position the platform and install the joint plate the sprin
5. 600 MAXIMUM 500 MAXIMUM Copyright by AHT 2006 22 MODEL HTK 500ST AL TAILGATE SPECIFICATIONS for Liftarm L 750mm and Platform L 950mm STANDARD SPECIFICATIONS 500kg at 500mm Gravy Center NOMINAL PLATFORM SIZE mm 1750 Width x 950 Length x 114 Depth INSTALLED WEIGHT kg 179 5 FITTING REQUIREMENTS mm 1200 Height Unloaded 750 Min Height Loaded 720 Min Underbody Clearance Required OTHER SPECIFICATIONS Unit amp Cylinder kg Installation Kit kg Aluminum Extrusion Profile Trolley Stops Platform Angle Construction Arm Depth mm Arm Length mm Re Bushable Overall width mm Construction Bracket Thickness mm Material Grease Nipples 30mm thick Option 16 0 or 9 2x8mm Steel Plate 40mm Steel Plate on the Platformside 750 es 100mm x 100mm x 5 25 30mm Hard Chrome Plated Yes Pinlock and Srews Power Pack Weather Proof Alum Enclosure ond Sound Proof Motor Size Lift Cylinders Quantity Quality Hose Burst Valve Closing Cylinders Quantity Quality Leak Proof Check Valve Flow Control Lift Operation Stainless steel Steel Teflon Coated M H W Included 0 8kW Two 2 Lift 35mm max Stroke 222mm Cylinder are all Aluminium Piston are all Ceramic plated and Teflon Sealed for Long Life one mechanical hose burst valve on each Cylinder One 1 Closing 20mm mox Stroke 140mm Cylinder Tube is made from Aluminum Piston is made f
6. Installing the platform Remove mounting device Press the UP Button to energize the hydraulic system until the pins for the mounting devices moves slightly Remove pins between mounting device and lift arm Remove screw clamps and mounting devices Installing the platform Press the DOWN Button and push the hoisting unit manually downward in one time to lower the hoisting unit approximately 40cm DOWN Button Position the platform KA 6 j IROL APR RSE AM MN SS SS o 452 25 VEX 5 eb lt a ONS 22 2255 2 RI i 1 Remove pin between lever arm and joint plate joint plate 2 Remove the joint plate lever arm 10 INSTALLATION INSTRUCTIONS Installing the platform Placethe joint plate to the platform bearing 1 on left side Install the pin lift arm platform from inside at the platform bearing 2 on left side Move the pin only up to the joint plate 3 lt 2 N N IN N 1 gt 5 WA E LET IN BAN ES 77 Place the joint plate to the platform bearing 1 on right side nstall the pin lift arm platform from inside at the platform bearing 2 on right side Move the pin only up to the joint plate 3 11 INSTALLATION INSTRUCTIONS Installing t
7. TK 750 98kg CLOSING CYLINDER 5 20 140 CROSS BEAM WITHOUT UNDERRUN BEAM 7505 1 500 24 7kg OPTION with electrical hose burst valve H2 750AL 42E TOTAL WEIGHT 200 59 TOTAL WEIGHT WITHOUT UNDERRUN BEAM 183 769 000m 20 TA RYSKA SP lt 7 p p p lt KY RP xX x gt d RKR 2 2 2 4 m gt 2 551855554 527 lt lt POOP KA 2 q X X LX Copyright 2006 25 MODEL HTK 750ST M TAILGATE KINEMATICS for Liftarm L 750mm and Platform L 950mm MIMINUM MEASUREMENTS 876 MAXIMAL 390 MINIMAL 100 260 MINIMAL MAXIMUM MEASUREMENTS 719 MINIMUM 600 MAXIMUM 500 MAXIMUM Copyright by 2006 26 MODEL HTK 750ST M TAILGATE SPECIFICATIONS for Liftarm L 750mm and Platform L 950mm STANDARD SPECIFICATIONS 750kg at 500mm Gravy Center NOMINAL PLATFORM SIZE mm 1750 Width x 950 Length x 120 Depth INSTALLED WEIGHT kg 200 5 FITTING REQUIREMENTS mm 1200 Mox Height Unloaded 750 Min Height Loaded 720 Min Underbody Clearance Required OTHER SPECIFICATIONS Unit amp Cylinder kg Installation Kit kg Platform with Mesh Trolley Stops Platform Angle Construction Arm Depth mm Arm Length mm Re Bushable Overall width mm Construction Bracket Thickne
8. CRIPTION DRAWINGNo WEKGHT CROSS BEAM WITHUNDERRUNBEAM ATK 750ST IUFS MT S00 415kg 2 ATK 7508T 21 500_ 310kg 3 PLATFORM ALUMINUM 1750x950 HTK 7S0AL 3SG 460kg 2 MOUNTING BRACKET ATK 7S0ST L 16kg 5 1SET__ HYDRAULIC HOSE OL and CABEL ADDITIONAL PARTS HTK 750ST 5 80kg 6 fiset Bout assembly HTK 750AL 6 660 GQ Jarowosr t cog 7 ATK SOAL G 8UR 100 2 TILTINGBRACKET 5 3 ATK 7S0AL G SLR 110 f1 TORSION SPRING ATK 7S0 WR t2kg f1 SLIDING BRACKET FOR POWER PACK UTK 750ST 14 5 0 12 2 LIFT CYLINDER 35 with mech hose burst valve HZ S00AL 35M 540 Powerpack 4 0Clwiw mc s 98 f1 CLOSING CYLINDER 30kg 71 Jess SU WITHOUT UNDERRON OPTION with electrical hose burst valve HZ 500AL 35E TOTAL WEIGHT 179 569 TOTAL WEIGHT WITHOUT UNDERRUN BEAM 1627kg 1108 TRUCK FRAME MAXIMUM Copyright by AHT 2006 21 MODEL HTK 500ST AL TAI LGATE KINEMATICS for Liftarm L 750mm and Platform L 950mm 390 MINIMAL 100 260 MINIMAL MIMINUM MEASUREMENTS 876 MAXIMAL 950 1X BELADUNG 500kg LOAD MAXIMUM MEASUREMENTS 719 MINIMUM
9. NCL POWERPACK H uL Copyright by AHT 2006 28 MODEL HTK 750ST AL BASIC DIMENSIONS for Liftarm L 750mm and Platform L 950mm PART Ne PCS otscRPTION omAwNGNo _ 1 1 CROSS BEAM WITH UNDERRUN BEAM _ ATK T5 S1 NES MI S00 2 i juram 5 ATK 7508T 21 500_ 3 PLATFORM ALUMINUM TI50X950 HTK SOAL 3SG 1608 f2 MOUNTING BRACKET ATK I50ST 4 6 iser Bott assemety BM HTK 750AL 6 7 1 juwmam JAK sasa 9 2 ONTPLATE 0 0 ATK IS0AL G 8LIRI 106 9 f2 ATK ISDAL G 9LIR tTkg Torsion sPRING ATK IS 9R 1 SUDNGBRACKETFORPOWERPACK 07 75057 10 57 12 2 LUFT CYLINDER 942 with mech hose burst valve HZ 750AL 42M 59 memi eem w w 0 Ps a u0 1 X 18055 BEAM WITHOUT UNDERRUN BEAM AKCSIST LNT S 26 m OPTION with electrical hose burst valve H2 750AL 42E TOTAL 180 0kg TOTAL WEIGHT WITHOUT UNDERRUN BEAM 163 2kg 770 TRUCK FRAME MINIMUM Copyright by AHT 2006 29 MODEL HTK 750ST AL TAI LGATE KINEMATICS for Liftarm L 750mm and Platform L 950mm 390 MINIMAL 100 260 MINIMAL MIMINUM MEASUREMENTS 876 MAXIMAL 950 1X 7 BELADUNG 750kg LOAD MAXIMUM MEA
10. SUREMENTS 719 MINIMUM 600 MAXIMUM 500 MAXIMUM Copyright by AHT 2006 30 MODEL HTK 750ST AL TAILGATE SPECIFICATIONS for Liftarm L 750mm and Platform L 950mm STANDARD SPECIFICATIONS 750kg at 500mm Center NOMINAL PLATFORM SIZE mm 1750 Width x 950 Length x 114 Depth INSTALLED WEIGHT kg 180 FITTING REQUIREMENTS mm 1200 Max Height Unloaded 750 Min Height Loaded 720 Min Underbody Clearance Required OTHER SPECIFICATIONS Unit amp Cylinder kg Installation Kit kg Aluminum Extrusion Profile Trolley Stops Platform Angle Construction Arm Depth mm Arm Length mm Re Bushable Overall width mm Construction Bracket Thickness mm Material Grease Nipples 30mm thick Option 16 0 or 9 2x8mm Steel Plate 40mm Steel Plate on the Platformside 750 es 100mm x 100mm x 5 25 30mm Hard Chrome Plated Yes Pinlock and Srews Power Pack Weather Proof Alum Enclosure ond Sound Proof Motor Size Lift Cylinders Quantity Quality Hose Burst Valve Closing Cylinders Quantity Quality Leak Proof Check Valve Flow Control Lift Operation Stainless steel Steel Teflon Coated M H W Included 0 8kW Two 2 Lift 642mm max Stroke 222mm Cylinder are all Aluminium Piston are all Ceramic plated and Teflon Sealed for Long Life one mechanical hose burst valve on each Cylinder One 1 Closing 20mm mox Stroke 140mm Cylinder Tube is made fr
11. g HTK 500ST 7505 _ 80 at min bed height max 130 at max bed height E Truck bodies with rear doors Refrigerated bodies with swing doors need an end profile made from stainless steel welded to the body as shown in the drawing on the right INSTALLATION INSTRUCTIONS Installing the Mounting Device Fixing the mounting device Center the mounting device on the truck body floor Both mounting devices must make a contact with the truck floor end Clamp both mounting devices on the truck body floor DEVICE MOUNTING DEVICE CONTACT Platform Preparation Before you can install the main frame you have to remove the 2 pins the spring and the tube from the platform 1 Remove the pin from platform bearing on both sides 2 Remove the spring on the right side Remove the tube on the left side INSTALLATION INSTRUCTIONS Position the tailgate unit Position the main frame Install the mounting brackets on the main frame but do not fix it Placethe main frame under the vehicle with lift arms attached using a floor jack and raise main frame to its approximate final position Besureto lubricate all pin surfaces before installing the pins Raise the hoisting unit to the mounting device remembering that the lift cylinders will come apart if raised too high If necessary raise the main frame closer to the vehicle chassis PARALLEL
12. g the tube and the pin at the platform bearing 11 Lift up the lever arm and the closing cylinder and install the pins for lever arm joint plate 12 Remove the tilting Lock 13 Agjust the platform level 14 Installing the platform lock UNPACKING THE TAILGATE LOADER A complete unit will be shipped on one pallet consisting of two main units 1 Platform 2 Main frame with lifting arms cylinders power pack mounting brackets 2 button remote control and installation manual Mounting Bracket Pallet Main Frame Power Pack Lifting A Platform CAUTION Never lift the Main Frame with the hoisting Qk y unit at the stabilizer st Lift cylinder will be damaged Always lift the complete unit evenly as shown in the picture being careful to raise the lift arms at the same 2 time Be sure the lift arms and the lever arms are N Qu secured 2 PREPARING FOR INSTALLATION Remove rear lights bumper tool box and spare wheel if necessary Disconnect the battery cable to prevent damage to the battery while welding Remove any obstruction attached to the frame of the vehicle that would interfere with the installation The mounting brackets will cover the mainframe and subframe Installing on a truck body with roll up doors or without rear doors Cut out the rear of the frame if necessary as shown in the installation drawings Reinforce the cut outs Mountin
13. he platform Install the torsion spring only on right side Putone end of the spring in the bearing of the joint plate and the other end in the bearing of the platform Move the pin lift arm platform to its final position and install the locking screw A SPRING BEARING OF THE JOINT PLATE AND PLATFORM 1 the tube only on left side Move the pin lift arm platform to its final position and install the locking screw lf both pins lift arm platform are installed and secured manually close the platform 30 INSTALLATION INSTRUCTIONS Installing the platform Now lift up the lever arm on the right side and the platform closing cylinder on the left side to the joint plate Lift up the lever arms to the joint plate Install the pin on the right side lever arm joint plate and secure it joint plate lever arm Install the pin on the left side lever arm joint plate and secure it joint plate Da D pin lever arm joint plate platform closing cylinder 13 INSTALLATION INSTRUCTIONS Remove tilting lock The platform installation is now complete Open the platform Remove Tilting Lock The tilting lock prevents the automatic leveling from working until the installation is complete It is the last thing to remove Remove the screw M6x70 on both sides Before removing the screw M6x70 the platform mus
14. om Aluminum Piston is made from Steel Hard Chrome plated and Teflon Sealed for Long Life Included 96mm 1 4 Thermo Plastic 2pcs L 750mm 2pcs L 1000mm Pressure Compensating Hydraulic Oil 22cSt Power up Gravity down Tilting Operation Closing Operotion Locking Device Battery Isolation Switch Fixed Control Removable Remote Push Button Safety Plug automatica mechanical Tilting on the ground floor automatica hydraulic Closing at Truck Floor Level Platform Lock Integra to Power Pack 2 Button on Power Pack 2 Button Hand Held c w 3m Lead Yes Bose Copyright by AHT 2006 Yes Flush Mounted Subject to Vehicle Type amp Floor Height 31 MODEL HTK 750STIAL TAILGATE KINEMATICS for Liftarm L 750mm and Platform L 950mm CENTRE OF MASS FOR HTK 750ST AL IN TRAVELING POSITION MEASUREMENTS Z Okg COMPLETE TAILGATE INCL POWERPACK Lo l Copyright by AHT 2006 32 BATTERY SWITCH N 2V 25A 24V 16A MAIN FUSE 1 1 ELECTRIC AND HYDRAULIC DIAGRAM with mechanical hose burst valve with 2 Button Remote Control with 2 Button Hand Control ELECTRICAL WIRING DIAGRAM 21 2 BUTTON REMOTE CONTROL NE 7 UP DOWN ee Pu 4 NS AN _ 2 SUIS e H se 0 2 gt a gt B E
15. ormside 100mm x 100mm x 5 25 30mm Hard Chrome Plated Pinlock and Srews Yes Stainless steel Power Pack Weather Proof Alum Enclosure ond Sound Proof Motor Size Lift Cylinders Quantity Quality Hose Burst Valve Closing Cylinders Quantity Quality Leak Proof Check Valve Flow Control Lift Operation Included Two 2 Lift 35mm max Stroke 222mm Cylinder are all Aluminium Piston are all Ceramic plated and Teflon Sealed for Long Life one mechanical hose burst valve on each Cylinder One 1 Closing 20mm mox Stroke 140mm Cylinder Tube is made from Aluminum Piston is made from Steel Hard Chrome plated and Teflon Sealed for Long Life 6mm 1 4 Thermo Plastic 2pcs L 750mm 2pcs L 1000mm Pressure Compensating Hydraulic Oil 22cSt Tilting Operation Closing Operation Locking Device Battery Isolation Switch Fixed Control Removable Remote Push Button Safety Plug Power up Gravity down Base Copyright by AHT 2006 Yes Yes Flush Mounted Subject to Vehicle Type amp Floor Height 19 MODEL HTK 500ST M TAILGATE KINEMATICS for Liftarm L2 750mm and Platform L 950mm CENTRE OF MASS FOR HTK 500ST M IN TRAVELING POSITION MEASUREMENTS 200 0kg COMPLETE TAILGATE ANC 2 LZ D _INCL POWERPACK H uL Copyright by AHT 2006 20 MODEL HTK 500ST AL BASIC DIMENSIONS for Liftarm L 750mm and Platform L 950mm PART PCS DES
16. re is no air hole in filler cap and the pump or reservoir will be destroyed Be sure the vehicle and the liftgate are of the same current 12V or 24V Fuse is in the power pack 12V 25 Amp and 24V 16 Amp Connect the positive cable directly from the battery to the starter solenoid min 16mm Connect the negative cable directly from the battery to the motor ground min 16mm Complete all other electrical work Connect all control switches CAUTION REMOVE TRANSPORT FILLER CAP AND INSERT DIPSTICK There is no air hole in transport filler cap and the pump or reservoir will be destroyed Build in between Battery and Cable the Main Fuse WA 99 MAIN FUSE x amp 12V 125 Ampere 24V 80 Ampere INSTALLATION INSTRUCTIONS Correct wiring of the Power Pack NOTE All battery power leads must have a core area not less than 16mm and be double insulated Connect both battery cables and directly from the battery to the power pack ATTENTION By fixing the battery cable on the starter switch you must hold up the lock nut Battery Cable Lock Nut Starter Switch Energize the power pack and actuate the valve to be sure they are operating properly Please check the operating temperature regularly It should not increase by more than 20 C to 70 C Check a new power pack for leakage after a short period of time Tighten any fittings that may be leaking INSTALLATION INSTRUCTIONS
17. rom Steel Hard Chrome plated and Teflon Sealed for Long Life Included 96mm 1 4 Thermo Plastic 2pcs L 750mm 2pcs L 1000mm Pressure Compensating Hydraulic Oil 22cSt Power up Gravity down Tilting Operation Closing Operotion Locking Device Battery Isolation Switch Fixed Control Removable Remote Push Button Safety Plug automatica mechanical Tilting on the ground floor automatica hydraulic Closing at Truck Floor Level Platform Lock Integra to Power Pack 2 Button on Power Pack 2 Button Hand Held c w 3m Lead Yes Bose Copyright by AHT 2006 Yes Flush Mounted Subject to Vehicle Type amp Floor Height 23 for Liftarm L 750mm and Platform L 950mm CENTRE OF MASS FOR HTK 500ST AL IN TRAVELING POSITION MEASUREMENTS 5kg COMPLETE TAILGATE INCL POWERPACK Lo l Copyright by AHT 2006 24 MODEL HTK 750ST M BASIC DIMENSIONS for Liftarm L 750mm and Platform L 950mm 1 CROSS BEAM WITH UNDERRUN BEAM ATK T505T 1UFS MT S00 2 LIFT ARM ATK 150ST 2L 500 310k PLATFORM WITH MESH 1750x950 7 WTK 7S0ST 3SG 665kg 5 1SET HYDRAULIC HOSE OL and CABEL ADDITIONAL PARTS HTK 750ST S 16 6kg 80g 6 1SET BOLT ASSEMBLY HTK 750AL 6 66kg wg 3 10kg t TORSONSPRNG ATK I50 10R 12g 7 2 LIFT CYLINDER 9 2 with mech hose burst valve HZ 750AL 42M 1 POWER PACK MHW
18. ss mm Material Grease Nipples 192 5 Welded Steel Construction Galvanized 62x25 Cross Section 6x3 16 0 or 9 2x8mm Steel Plate 40mm Steel Plate on the Platformside 100mm x 100mm x 5 25 30mm Hard Chrome Plated Pinlock and Srews Yes Stainless steel Power Pack Weather Proof Alum Enclosure ond Sound Proof Motor Size Lift Cylinders Quantity Quality Hose Burst Valve Closing Cylinders Quantity Quality Leak Proof Check Valve Flow Control Lift Operation Included Two 2 Lift 642mm max Stroke 222mm Cylinder are all Aluminium Piston are all Ceramic plated and Teflon Sealed for Long Life one mechanical hose burst valve on each Cylinder One 1 Closing 20mm mox Stroke 140mm Cylinder Tube is made from Aluminum Piston is made from Steel Hard Chrome plated and Teflon Sealed for Long Life 6mm 1 4 Thermo Plastic 2pcs L 750mm 2pcs L 1000mm Pressure Compensating Hydraulic Oil 22cSt Tilting Operation Closing Operation Locking Device Battery Isolation Switch Fixed Control Removable Remote Push Button Safety Plug Power up Gravity down Base Copyright by AHT 2006 Yes Yes Flush Mounted Subject to Vehicle Type amp Floor Height 27 MODEL HTK 750ST M TAILGATE KINEMATICS for Liftarm L 750mm and Platform L 950mm CENTRE OF MASS FOR HTK 750ST M IN TRAVELING POSITION MEASUREMENTS 200 5kg COMPLETE TAILGATE ANC 2 _I
19. t be raised from ground Main frame Tilting bracket Screw M6x70 INSTALLATION INSTRUCTIONS How to adjust the platform level Lower the platform to ground level Do not tilt the platform to ground Adjusting screw M16 Loosen the locking nut on both sides Joint plate Locking nut Turn the adjusting screw clockwise for Sr EE 1 lower the platform tip Ts NANG on both sides Turn the adjusting screw anti clockwise for raise the platform tip on both sides Check the correct adjustement of the adjusting screws On lower position the both adjusting screws must have contact with the joint plate WRONG contact 15 INSTALLATION INSTRUCTIONS Installing the platform lock Installing the platform lock Be sure the platform is in its uppermost position at vehicle bed level and closed Weld or bolt the lock hook to the vehicle body Platform 5 2 x Lock hook lt 7 Platform lock MODEL HTK 500ST M BASIC DIMENSIONS for Liftarm L 750mm and Platform L 950mm PART Na PCS DESCRIPTION DRAWING No i CROSS BEAM WITH UNDERRUN BEAM ATK 750ST 1UFS MT S00 2 1 LIFT ARM ATK 750ST 2L 500 5 ISET HYDRAULICHOSE Ol and CABEL ADDITIONAL PARTS HTK 7S0ST S 2 LIFT CYLINDER 935 with mech hose burst valve HZ 500AL 35M 1 POWER PACK 4 g CROSS BEAM WITHOUT UNDERRUN BEAM 7505 1 500 24 7kg

Download Pdf Manuals

image

Related Search

Related Contents

Synology RackStation RS3413xs+  siècle - Alliance québécoise du loisir public    1998 Lincoln Continental  グリーングルー製品説明資料はこちら。  BlueWalker VFI 2000CRM LCD  Introduction - Hardhats.Org  MIRAC WR/WH - Frost Italy  CDA KVF21L    

Copyright © All rights reserved.
Failed to retrieve file