Home

Operation and installation manual for SOLIVIA 5.0 AP G3

image

Contents

1. aii TAB 2000 TAB 2000 TAB 2000 DSO SOLIVIA 5 0 AP G3 141 12 Certificates Pending Supplier s declaration of conformity fis lt For compliance levels 1 2 and 3
2. 540V MC4 18 A S gt Solar ISO GND 7 3 7 1 ISO ON Error ISO ON Warning Deltas ISO ON Warning PV PV
3. 4 2 o 150V 450V 540V 3 IP65
4. MPP Tracking o 150V 450V 540V IP65 25 C 60 C
5. A A 5 Delta Energy Systems Germany GmbH elta Energy Systems 112 B SOLIVIA 5 0 AP G3
6. SOLIVIA 5 0 AP G3 81 SS 6 7 Multi Contact Multi Contact MC4 SERIES WISER THE AM IL SOME eA Rin I 540V Multi Contact MC4 18A S gt Solar ISO GND BS 7 3 7 1 BB
7. SOLIVIA 5 0 AP G3 6 5 e 25 C 60 C 6000 W 5000 W 4000 W 3000 W 2000 W 1000 W 6 6 Wie and RST25i3S j L N PE
8. Photos Volta Alessandro Volta h 140 SOLIVIA 5 0 AP G3 N RJ45 RJ RS485 ELA485
9. EMC Deh 4 6 kVA 4 3 1 2 3 RS485 EIA485 4 5 LED 114 SOLIVIA 5 0 AP G3 5 DI CTAB 2000
10. li gt 18 A G AHERE FT RRS SEM 5 OM 76 SOLIVIA 5 0 AP G3 3 12 o IP65
11. SOLIVIA 5 0 AP G3 77 SS RS485 CRAM EMC lt 4 6 kVA SM UTRARABARRB RE NI o 1 2 3 RS485 EIA485 4 5 LED 78 SOLIVIA 5 0 AP G3 5 BASKET
12. 1 SOLIVIA 5 0 AP G3 2 SOLIVIA 5 0 AP G3 9 gt 18
13. 4 MI o s Ese B SRY B FE 3 T 4 1 4 2
14. Wieland 4 0 L 32A B C tripping 0 SOLIVIA 5 0 AP G3 117 6 7 Multi Contact MC4
15. PV grounding fault PV grounding fault K x A EO0E99000275 ISO GND OFF CHAA MULTI CONTACT yO ae Ge 32 0010P0001 U 32 0012P0001 U 32 0011P0001 U 32 0013P0001 U 32 0014P0001 U 32 0016P0001 U 32 0015P0001 U 32 0017P0001 U 118 SOLIVIA 5 0 AP G3 6 7 1 PV 150 VDC 200 VDC 6 7 2 250V 250 VDC 300 VDC 350 VDC 400 VDC 450 VDC 100
16. 25 C 60 d T SOLIVIA 5 0 AP G3 113 j ZE Fa a
17. ERB 2 SOLIVIA 5 0 AP G3 91 SS 732 Fi ED BA AK ES 8 E EB GEIER Main menu D Day statistic ENTER A Submenu D Day i 2 Upto 1 A Y ESC Ate lt D gt Energy Value Wh Lyx A Down Y Up pet D gt AC Revenue Value lt AUD Won A Down Y Up ESC D gt AC Power Max g lt Value W lt Down Y Up ESC D gt AC Volt M s lt value V 7 lt BBCD ES SEU ES BE A Down Y Up ESC D gt AC Volt Min wn lt Value V lt WEED Down 4 Y Up ESC D gt AC Curr Max fete lt Down Y Up B D gt AC Freq Max m Value Hz Down w Up ESC D gt AC Freq Min S lt A Down Y Up ESC aes dE lt D gt Runtime Value Min gn 7 SA AAMT Down to 2 Y 1 92 SOLIVIA 5 0 AP G3 733 Fi W i8 HEER AMRA APE ENTER Main menu W Week statistic gt Su
18. 1 ESC 2 TI 3 PIN ESC V 4 PIN 5 TER 6 11 LED hop support solar inverter com PIN Gi LED O Operation A Earth Fault B LED A LED B Earth Fault GND LED O 4 Operation WS Failure Ge Failure C I UPV JET 100
19. NU Z JE FORA A AC frequency N failure N AC voltage JE failure B e AC 1 i I W I r a Gee Se Calibration DC injection failure Error 301 ES SCH Error 302 ER RIN o 32 SOLIVIA 5 0 AP G3 5 508 _ Error 506 506 Error 508 Gd H m car solation start
20. 1 amp ES NNS ERRATE EMO 30 kWp PE SS PE protective carth PV
21. www solar inverter com Delta Energy Systems Germany GmbH Delta Energy Systems Ei e che SOLIVIA 5 0 AP G3 73 SS 74 SOLIVIA 5 0 AP G3 1 2 3 4 4 1 4 2 4 3 RREN 5 6 6 1 62 REZAR 63 6 4 6 5 6 6 6 7 6 7 1 672 6 8 RS485 EIA485 6 9 610 EZE 6 11 LED 7 7 1
22. e 100V 150V 100V 150V m 8 et a S ISS RIESS s N RAABHES HSB RRRA N _ SEAN BRS EA SBS Co 8 SOLIVIA 5 0 AP G3 9 6000 W 5500 W 125 540 V 125 540 V 125 540 V 125 540 V 150 450 V 150 450 V x 17 2 A f aol 32 0A lt 0 2W 5240 W 5000 W 230 V 220 V 230 V 220 V 210 0 264 0 V 187 0 242 0 V 184 0 264 5 V 200 0 240 0 V 22 0A 23 0A 22 0A 23 0A 27 2A 28 5A 27 2A 28 5A 50 Hz 48 0 52 0 Hz 49 5 50 5 Hz 47 3 52 7 Hz 49 5 50 5 Hz gt 0 99 lt 4 510 x 410 x 180 mm 32 0 kg Wieland RST25i3S 4 Multi Contact MC4 2 Harting RJ45 RS485
23. 12 IP65 4 ES 4 1
24. TT Ser et ii e 29 fi ee ees e N PES ERS ZS Ze ET Sok fw TE JE Ez TE TE TE JE E Lo lt zA o Jare ENTER d ESC 124 B SOLIVIA 5 0 AP G3 User menu 2 Upto 1 ESC Menu N Now act data ENTER Down Up ESC Menu D Day statistic ENTER Down Up ESC Menu W Week statistic lt ENTER Down Up ESC Menu M Month statistic ENTER Down Up ESC Menu Y Year statistic Down Up Menu T Total statistic mera d ENTER ESC gt ENTER Down Up ESC Menu S Setup inverter ENTER Submenu N Now Submenu D Day Submenu W Week Submenu M Month Submenu Y Year Submenu T Total Submenu S Setup Down to 2 d ESC B SOLIVIA 5 0 AP G3 125 L N Main me
25. 1 1 J Solivia 5 0 big ae get ARH GEE WEMA AM 2 He EARS Lee a Solivia 5 0 1 1 1 1 sl Solivia 5 0 GTA ype w wn SRR 138 SOLIVIA 5 0 AP G3 Solivia 5 0 SOLIVIA 5 0 AP G3 139 11 AC Alternating Current CE C Direct Current CE EC MPP
26. s Bj Emenu S Setup J J Re BBS AU Lj o Down Up 1 S gt Firmware AU L gt SZT Australia Limitation AREA ID KE ENTER ID ID ESC 5 SOLIVIA 5 0 AP G3 87 SS WE BRAEMAR R REISE AR FR 2 BR hRS ESC San BHRRAH 2 support solar invertercom 3 PIN ESC Y 4 PIN 5 BRE AULA BAR 228 BB AY So HES HERR FE po e 6 11 PIN Sg SE SC US A Co LED LED O Operation A Earth Fault B O Failure C a BA SURFS LED A RE Operations DEF LED B Earth Fault Bu
27. 80 SOLIVIA 5 0 AP G3 6 5 25 C 60 C 6000 W 5000 W 4000 W 3000 W 2000 W 1000 W 6 6 DER Wieland RST25i3S ZME Ree L N PE URREA BIS Wieland 4 0 mm L 32A B C tripping
28. Nominal power Nominal current PE PE protective earth Photovoltaics PV Photos XWA Volta Alessandro Volta Potential isolation Power dissipation PV cell SOLIVIA 5 0 AP G3 105 SS PV generator
29. PV module RJ45 2 BREEN MS RI RS485 ELA485 Separate grid system Solar inverter String String solar inverter solar inverter concept E AAMPALT RRA TEATE TAB 2000 TAB 2000 TAB 2000 DSO
30. ISO ON Error ISO ON Warning ISO ON Warning PV PV PV PV A EOE99000275 ISO GND IB it BS Ae Pa 85 IR Ba E EZ Pj Pp BJ SE SE A Ba 28 28 RE MRSS my Multi Contact 25MM2 4 0 MM2 6 0 MM za ce espa enen AWG 14 AWG 12 10 GES P 32 0010P0001 UR 32 0012P0001 UR 32 0011P0001 UR s 32 0013P0001
31. G P O 2451 32381 Minden Germany Blue IP67 Push Pull Data Plug e IP67 Push Pull Data Plug OR TXA Pin7 RX B 100 150 Ohm 025W Ping OR 120 SOLIVIA 5 0 AP G3 lt SERA L a ESSIE YA Q lt Hi C H a D 6 9 SOLIVIA 5 0 AP G3 121 1 2 3 BER i 1 Wieland ia US E
32. D 38 9 F NG 6 6 1 E R LED RAR IP65 lt ayaa z oO ee ER D y m C SE lt 2 yi 4
33. VIA 5 0 AP G3 4990 W 4600 W ENT A ELTA For Australia PL This product has been power limited at maximal output power of 4 99 kW 1 ENTER gt S Australia PL EN R gt AU L up SE S gt Firmware Australia PL menu S Setup N 133 r A BE ER gt E F AU L j gt AUstralia Limitation 122 SOLIVIA 5 0 AP G3 ID ID ID 5
34. Tyco IP65 e CH 10cm 50cm SOLIVIA 5 0 AP G3 115 6 3 6 4 ie 8 AFL b 2 3 4 5 116 E 4 I 6 4 SFL GE
35. Up to 1 A Y lt SI M gt Energy Value kWh lt lt Down Y Up ESC M gt AC Revenue lt c Value AUD Won Down Y Up LESS M gt Runtime Value h Bard AMAR A Be Un Down to 2 Y 1 e E Main menu Y Year statistic ENTER gt Submenu Y Year 2 Up to 1 A Y E Byes Energy Value kWh Down 4 Y Up ESC Y gt AC Revenue lt Value AUD Won Down Y Up ESC y ya HIR Y gt Runtime Value h Downto2 Fan 128 SOLIVIA 5 0 AP G3 T CD lop NN d Main menu T Total statistic ENTER gt Submenu T Total lt 2 Up to 1 A Y ESC gt Se lt T gt Energy Value kWh Down Y Ra ESC T gt Revenue Value lt lt AUD Won TRK Down 4 Y Up ESC T gt PV1 Vol Max mM Value V Down Y Up ESC T gt PV1 Cur Max A
36. mrrumr r j g nami AC fi GAUSS bei failure TT okee N AC voltage WREE N failure HRAS AC relay failure HSE IGE misi ge ST REAR DC injection failure Erea Je Neale Error 302 BETES REHN Si SOLIVIA 5 0 AP G3 97 SS LED Error 506 Error 508 Isolation start up warning Isolation run ning warning PV groun ding fault PV grounding ault Revision error Self test ongoing PV power too low PV voltage too low Synchronize to AC Varistor warning h A GND DIS KG EG GND EME
37. ENTER Main menu T Total statistic gt Submenu T Total E gt 2 Up to 1 A Y ESC lt T gt Energy Value kWh Down U y p ESC T gt Revenue Value AUD Won Down U Y p ESC T gt PV1 Vol Max Value V A Down Y Up ESC T gt PV1 Cur Max lt Value A A Down Y Up ESC T gt PV1 Pow Max Value W A Down Y Up ESC T gt PV2 Vol Max Value V Down w U A p ESC T gt PV2 Cur Max Value A A Down U Y p ESC T gt PV2 Pow Max Value W Beat Up 1 ESC Down to 2 lt T gt Runtime Value Min d ATEREA lt oS lt lt lt BRAA lt lt lt E SA 1 SA ERE 1 1 EEN SA 2 A EHD 2 SA EI 2 RAT A Een Serge S H amp GE Det lal 94 SOLIVIA 5 0 AP G3 737 Fi BS RB AEEA BOA Re 1 A Main menu S Setup J ENTER 5 Submenu S Setup 1 L 2 Up to 1 A Y E ER E 9 2 EE D A own Up Auto On Down Now Setup Down Y AUD Won Down Y ESC S gt ID Number 001 254 Down Y LSC s gt Solar ISO
38. 7 2 7 3 HEF 7 3 1 FEN 732 Fi HBD A 733 FEW i 734 Fi BM A 735 Fi BY 7 3 6 FEYT Mf 7 3 7 CSG 7 3 7 1 Fi H S Solar ISO GND 7 3 7 2 TEH sS ge 8 8 1 8 2 9 10 W 10 1 10 2 11 12 SS 76 76 77 77 77 77 78 79 79 79 79 80 80 81 81 82 83 83 84 86 87 88 89 89 89 89 91 92 93 93 93 94 95 96 96 97 97 97 99 101 101 103 105 142 SOLIVIA 5 0 AP G3 75 SS 1 SOLIVIA 5 0 AP G3 2 RSR SOLIVIA 5 0 AP G3 9
39. GND LED C Failure Ms IS UPV EE HAEE UPV 100V2 150V UPV 150V 450V Co 8 SOLIVIA 5 0 AP G3 7 7 1 5 A ESC B C TER MRS RA LBD BY TE a ee ise BS LETA Di i D ENTER ENTER LC O A 2S er SPS EE EE ERMA ee ES 7 2 ENTER 30 FAS A SPS sx s e EE rh RJ 32 e E EE BB Je ENTER BH 7 3 HEF FRSA 7 MEZRA SRSA X 484225 f BE EE EE N j BIB ARE An EF EE FEE ENTER WREE iik ESC 2 BAR FEE SOLIVIA 5 0 AP G3 89 SS Down to 2 User menu 2 Upto 1 ESC Menu N
40. 113 4 2 113 4 3 114 5 115 6 115 61 115 6 2 115 63 116 6 4 116 6 5 117 66 117 6 7 118 6 7 1 PV 119 6 7 2 119 6 8 RS485 EIA485 120 6 9 121 610 122 6 11 LED 123 7 124 7 1 124 7 2 124 73 ER 124 7 3 1 N 126 7 3 2 D H 127 7 3 3 W JJ 128 7 3 4 M CAD 128 7 3 5 Y 128 7 3 6 T CME 129 7 3 7 S CRED 130 123501 S Solar ISO GND 131 TITZ S 131 8 132 Hl 132 82 132 9 134 10 136 10 1 136 10 2 138 11 140 12 142 SOLIVIA 5 0 AP G3 111
41. Down Y ESC S gt Baudrate 2400 38400 Down ESC Down Y ESC S gt Date Down Y ESC S Le S gt Firmware Down to 2 Y ESC S gt LCD Backlight ESC S gt Menu Mode LS gt Time HH MM SS WD DD MM YYYY A Up Up ESC S gt Cash per kWh Value A Up A Up GND A Up A Up Up Up lt lt n 86 LCD 20 RRA x ERARE ERRE 8A 9 BH lt lt I ID lt __ _ SO GND SES lt E 2400 38400 lt lt Brie lt ae SOLIVIA 5 0 AP G3 95 SS 7 3 7 1 328 S Solar ISO GND Solar ISO GND REAREA Hu E IRS S ee Submenu Setup ENTER x Solar ISO GND A 5 Up to 6 Use old setting A Y A ESC S gt Solar ISO GND ENTER a ISO ON Warning A Down y Up ESC S gt Solar ISO GND ENTER be sees ISO ON Failure Down Y Up ESC S gt Solar ISO GND ENTER gt ISO GND OFF Down Y Up ESC S gt Solar ISO GND ENTER WE gt PV grounded Down Y Up ESC S gt Solar ISO GND ENTER lt PV grounded Down to 5 6 Y Le Use new value lt y 7 3 7 2 FES JE RATES S PORE SSH Submenu Setu
42. _ 400 220V 400 230V 4 6kVA 400 220V 400 230V 1 D 136 SOLIVIA 5 0 AP G3 400 220V 400 230V T 400 220V 400 230V 4 6kVA 1 2 3 B SOLIVIA 5 0 AP G3 137 Xch 10 2
43. 106 SOLIVIA 5 0 AP G3 SOLIVIA 5 0 AP G3 107 SS 108 SOLIVIA 5 0 AP G3 www solar inverter com Delta Energy Systems Germany GmbH Delta Energy Systems SOLIVIA 5 0 AP G3 109 110 B SOLIVIA 5 0 AP G3 1 112 2 112 3 113 4 113 4 1
44. 95 90 85 80 75 70 65 60 50W Kee SOLIVIA 5 0 150 V 500 W 1000 W 1500 W 2000 W 2500 W 3000 W SOLIVIA 5 0 250 V SOLIVIA 5 0 350 V 3500 W 4000 W 4500 W 5000 W SOLIVIA 5 0 450 V B SOLIVIA 5 0 AP G3 119 Keh 85 BC 6 8 RS485 EIA4 HARTING Deu www harting com 09 45 145 09 45 145 Sch and GmbH amp Co 510 Cable Manager 500 Cable Manager Whi TP TD h GH RS485 EIA485 RS485 EIA485 oo O gt Cn C to RS485 RERNA BE EE BE SE EE RX _B RS485 TX_A RS485 2 RS485 EIA485 220VA230V RS485 EIA485 O 5V
45. E Display Ctrl mal min bug Down to 4 3f Y x ESC S gt Firmware IT GMon Ctrl maj min bug Down to 4 J Dy SOLIVIA 5 0 AP G3 131 8 8 1 D T 1 ARR 2 WEIR ELE MEE BS 3 1 4 5 o ES VY CEMA K n SOK EH REBER g Hi B i B A Td DU n B nx a R ES N gt gt gt gt ME gt gt 8 2 n u
46. SOLIVI4 5 0 ka A z Of TUTTI Operation and installation manual for A NELTA The manual is subject to change Please check our website at www solar inverter com for the most up to date manual version Copyright Delta Energy Systems Germany GmbH All rights reserved This manual accompanies our equipment for use by the end users The technical instructions and illustrations contained in this manual are to be treated as confidential and no part may be reprodu ced without the prior written permission of Delta Energy Systems Service engineers and end users may not divulge the information contained herein or use this manual for purposes other than those strictly connected with correct use of the equipment All information and specifications are subject to change without notice Operation and installation manual SOLIVIA 5 0 AP G3 1 HSII9N3 Operation and installation manual SOLIVIA 5 0 AP G3 Table of Contents Scope of delivery General warnings Notes on safety Introduction A O N System 4 1 Data evaluation and communication 4 2 Technical structure of the solar inverter 4 3 Equipment overview Installation Installation of equipment 6 1 Installation location 6 2 Minimum requirements 6 3 Maintenance 6 4 Installation 6 5 Ambient temperature 6 6 Grid connection 6 7 Connection of PV modules 6 7 1 Output power over PV voltage 6 7 2 Efficiency 6 8 Interface connection RS485 EIA485
47. 6 9 Electrical connection and operational start up 6 10 Setup settings 6 11 LED operation and fault display 7 Operating concept TA The display 7 2 Navigation in the display 7 3 Main menu 7 3 1 Submenu N Now 7 3 2 Submenu D Day 7 3 3 Submenu W Week 7 3 4 Submenu M Month 7 3 5 Submenu Y Year 7 3 6 Submenu T Total 7 3 7 Submenu S Setup 7 3 7 1 Submenu S Solar ISO GND 7 3 7 2 Submenu S Firmware 8 Diagnostics and data evaluation 8 1 Malfunction rectification 8 2 Display messages 9 Technical data 10 Appendix 10 1 Connection examples 10 2 Overview of connection diagrams 11 Glossary 12 Certificates OMA WDA DA NO aa oO ek eist SO Sek AS Sk ee O Q GQ QO N O O Oo N N N N N N N N N N ch ch ant OQ N N O o WO COC N N O oO N N o O ww w w U O O E 142 Operation and installation manual SOLIVIA 5 0 AP G3 HSIONA 1 Scope of delivery SOLAR INVERTER SOLIVIA 5 0 AP G3 e Mounting plate Operation and installation manual e AC connector 2 General warnings Notes on safety Congratulations on the purchase of the SOLAR INVERTER SOLIVIA 5 0 AP G3 These directions will help you become familiar with this product Please observe the safety regulations see 9 and technical connection conditions for local utility company Careful handling of your product will contribute to its service life durability and reliability These are essential prerequisites for maxi
48. 32 0 kg Wieland RST25i3S 4 MC4 2 Harting RJ45 RS485 3 LED SOLIVIA 5 0 AP G3 95 6 94 6 25 60 C D wen THO C 0 98 2000 m 34 SOLIVIA 5 0 AP G3 AS 4777 2 AS 4777 3 TEC 60255 5 AS 4777 1 AS 4777 2 AS 4777 3 EN 61000 6 2 IEC EN 61000 6 3 AS NZS 60950 1 AS NZS 3100 AS 4777 2 AS 4777 3 1 CGC GF001 2009 2 IP65 I IEC 62103 2003 IEC 62103 2003 EN 50178 1997 EN 50175 1997 IEC 62109 1 2007 TEC 62109 1 2007 IEC 62109 2 2005 TEC 62109 2 2005 IEC 61727 VDE 0126 1 1 TEC 62116 IEC EN 61000 6 2 IEC EN 61000 6 2 IEC EN 61000 6 3 IEC EN 61000 6 3 SOLIVIA 5 0 AP G3 4990 W 4600 W SOLIVIA 5 0 AP G3 135 10 10 1
49. BGs NAHE AC AMES PE AAS Sal AAAF sic oO SA AA PE AAS AA z tA AAP Ur oda AA alae Z ALA opal A SH Hose BS US TAs Ao aa pasini AIA FE LE ASI dai HAS AA Len ANS oa ANS BAA Ao lt e aor gy g AC AAE Wh Ego E VE SH AAI Sal JEA Se Zeto gr no s uch 46 A S o Sal 213 2 SOLIVIA 5 0 AP G3 6 7 gg vz AA Bag ALAS AAS Aol Multi Contact AEA Beas AY F40 LEX Sol al k FU Beg Ses AAS A Multi Contact MC4 dng ALS aH OF att ol DC Se AY E REA AIDC So AME oo AS USF AMS AYA PHYACH SRA WA Fe AS 47 Ha SSS ASHAR E at qee HANAL e YES Ia AA Aso A aE A 9 So AA sich aA Ha a 9 VS 7 Gaede APAE data ug Mahal got 91H E SE APES 2 ohet alc zial BQ ot 4 wm JEE AA ASS WHEY ol AAS Siet KoA ook Fr 2 Uy 44248 DC qaae Bc Bes aes Ad YS AYL 540V9Y UC AMA Multi Contact MC4 AJAA AA AF F SHE 18A ok ol Eo DC ol AAF RA BURR FARF ASHAR Setup 2123 wr S gt Solar ISO GND QA SAS PAS UVSUH7 3 7 14 44 LO e lt SE ei 5 _ oQ ke ony ey 7 TAE SM ES Sk Srel al 4 apas aE Ze Del aa BE 81 a ISO ON Warning REZ X44 rgy AA RUE Pose qey So 74 BE WAU PV uk2z 429 BZ BUSA PV grounding glat 7 S e Az HUE oqa m roll a EEN 214 E 7 aa Se JAE PAAIE Gea 7 AY aal ze o ASE och gagao az AZ PV ae fault HE py grounding fault 7 UEP Ty MS AA SAV Past a z A z 2
50. SOLIVIA 5 0 AP G3 6 10 ARTE ee ID CR DORIS Wz BA PL ID 5 Sam 1 SOLIVIA 5 0 AP G3 4990 W 4600 W EE REN Seen E B 32 EE I 85 Australia PL ID 1 lt ENTER gt BRAR Australia PL lt ENTER gt lt ENTER gt 7252 SURI A AELTA For Australia PL This product has been power limited at maximal output power of 4 99 kW
51. i B AE Isolation un METZ a op KAERRA ning warning PV grounding m GND Si H GMD PV grounding Within o ault Hike 2 se Self test ATES fe rast Flag Jy LOVE VE WAR a E See N TN PV voltage t DIN low 100V8 150V fa re ae N Z RMERRGMAR w ET Learn Sir u SO NIL OT aL SOLIVIA 5 0 AP G3 133 9 6000 W 5500 W 540 V 125 540 V 125 540 V 125 540 V 150 450 V 150 450 V I A 32 0 A lt 0 2 W 5240 W 5000 W 230 V 220 V 230 V 220 V O 2100 cog 264 0 V 187 0 242 0 V 184 0 264 5 V 200 0 240 0 V 22 0 A 23 0 A 22 0 A 23 0 A 2r BIN 28 5 A Dil A iN 28 5 A 50 Hz 52 0 Hz 49 5 50 5 Hz 47 3 52 7 Hz 49 5 50 5 Hz gt 0 99 lt 4 510 x 410 x 180 mm
52. lt Value A Down Y Up ESC T gt PV1 Pow Max lt RE Value W A Down Y Up ESC T gt PV2 Vol Max lt q Value V 2 Down U p ESC lt T gt PV2 Cur Max a Value A 2 Down pi Y up ESC T gt PV2 Pow Max lt Value W 2 Down U p ESC EFE lt T gt Runtime Value Min T ERAM AENA H Vie T wT Down to 2 1 SOLIVIA 5 0 AP G3 129 S Main menu S Setup ENTER Submenu S Setup l 2 Up to 1 A k ESC S gt LCD Contrast lt 0 9 Wm O G Down vy U ESC sS gt LCD Backlight lt LCD Auto On Down Up ESC S gt Menu Mode lt Now Setup Down Up Y ESC S gt Cash per kWh Value se gigs esau E AUD Won xx xx Down Up ESC S gt ID Number Sch va 001 254 ID A Down A Up UL S gt SolriSO GND Is0 GND Down Y Up Esc S
53. 2 400 220 400 230 R Pe PRIS RN RAS Re Re PARA 4 6 FRE SS SOLIVIA 5 0 AP G3 101 TORR EBA ES 8 pq es Een HS RAS Rae Ree HY SAKIC ERG 400 220 ERM 400 230 nn 1 2 3 400 220 r 400 230 f assis HH ees esse SHO IL RR RE 4 6 FRE 102 SOLIVIA 5 0 AP G3 10 2 Solivia 5 0 A N
54. 33 HSII9N3 11 Glossary AC Abbreviation for Alternating Current Anti islanding protection This is a unit for grid monitoring with assigned switching elements anti islanding protection and is an automatic isolation point for small power generation systems to 30 kWp CE With the CE identification code the manufacturer confirms the conformity of the product with the valid EC Guideline and compliance with the significant requirements stipulated therein DC Abbreviation for Direct Current EMC The Electro Magnetic Compatibility EMC concerns the technical and legal basics of the mutual influencing of electrical devices through electromagnetic fields caused by them in electrical engi neering Initialization Under initialization cf English to initialize is understood the part of the loading process of a pro gram in which the storage space required for the execution e g variable code buffers for the program is reserved and is filled with initial values Local utility company By local utility company is meant a company which generates electrical energy and distributes it over the public grid MPP The Maximum Power Point is the point of the current voltage diagram of a PV cell at which the largest power can be tapped off i e the point at which the product of current and voltage has its maximum value Nominal power Nominal power is the maximum permissible continuous power output indicated by the
55. Agde AS ass Eee AE Uso 4S Qu IA to zz 912 ASB BASS Ms 7SA AA AAS 214 S TA ABS HAs d FS sO A et AENA AA E NEA ole et AAS SSAA BUCH T A7 FARAS SA SA PE ABSA AG NS US 2A asta ARA Aaa AAAH See seal suc AA TAS ETAL AAJ AE ANS WEA AAS Be 7 eA 2 aoe BU FAA dat Fe ABS WEA AZ Bale dal AA AAAF Bch ANS BAA ABA BE USS EPS le il Ade Jet ddl elei ASS Kei BAS unas 33 EWS SE WS Boh HAS US SUS deich BY HE 87 ao EA gt 18kg HAM Bo Sale FUT FAA SS S ARA USS NAAL FNS AAS dd WEA BSE aor HU cp NY Soa REIS LAA A dE Wo JS UA 40 AF8 Y Sal 2313 2 SOLIVIA 5 0 AP G3 4 AS V Ue ro Ai 3 aye dur al daa elle CL S IP65 ALES lt SUT ci A ot wo Us uch As AAAA x 5 Al AN All ol Al Te is Ae A ye JAJE SS az E F Di oa J aq ese Ie qe A SA AE Li del go T od lt a q aa Hel HSS ALAM Hs eH ELS d pe AE Um Du e lt a O Ve G K ow 41 d ek CL qoa SIE sO zz APS ALO 7 Es Ja ALSO lee eh FA A Or al 2 GI e e da CLE Bo As Oz x ol ae Saat 2 e 9 AVS 22 44 ABYASOLIVIA 5 0 AP G3 4 1 a dad
56. Down to 2 Y 1 Display of the weekly lt energy gain ee Display of the weekly revenue Display of the weekly operating time of the solar inverter Remarks ESC in main menu W jumps to first entry of sub menu W 7 3 4 Submenu M Month This menu item displays the average values of the current month lain menu M Month statistic ENTER gt Submenu M Month L 2 Upto 1 A Y lt M gt Energy Value kWh Sin Sch monthly Down Y UP ESC M gt AC Revenue Display of the monthly revenue Value AUD Won Down Y Up ESC Bie Runtime Value h lt Display of the monthly operating time of the solar inverter Down to 2 Remarks Y 1 ESC in main menu M jumps to first entry of sub menu M 7 3 5 Submenu Y Year This menu item displays the average values of the current year Main menu Y Year statistic ENTER gt Submenu Y Year 1 2 Up to1 A v ESC i lt Y gt Energy Value kWh D Display of the annual energy gain Down Y Up ESC Y gt AC Revenue i lt eo Display of the annual revenue Value AUD Won pay Down Y Up ESC s Display of the annual operating lt 5 lt me Value ty time of the solar inverter Down to 2 Remarks Y 1 ESC in main menu Y jumps to first entry of sub menu Y 22 Operation and installation manual SOLIVIA 5 0 AP G3 7 3 6 Submenu T Total This menu item shows cu
57. LCDS 583 LED TRE SOLIVIA 5 0 AP G3 95 6 94 6 25 60 C 25 80 C 0 98 2000 m gt i 99 ES Ki E Kr E HH EZ Io e EZ gt oa Lei gt Q CD IP65 1 AS NZS 60950 1 A AS NZS 3100 CGC GF001 2009 EEN AS 4777 2 A 4777 3 LEE ZS IEC 62109 2 2005 AS 4777 2 AS 4777 3 VDE 0126 1 1 IEC 60255 5 AS 4777 1 AS 4777 2 AS GB T 17626 IEC EN 61000 6 2 4777 3 EN 61000 6 GB 17799 IEC EN 61000 6 3 2 IEC EN 61000 6 3 1 2 SOLIVIA 5 0 AP G3 4990 W 4600 W IEC 62103 2003 EN 50178 1997 IEC 62109 1 2007 IEC 62109 2 2005 IEC 61727 IEC 62116 IEC EN 61000 6 2 IEC EN 61000 6 3 00 SOLIVIA 5 0 AP G3 10 Wa 10 1 JESS 400 220 ERAS 400 230 1K AER 1
58. TAAA AAS uteho Si CG e EJS DC zait Fup Aag aAa AAFAA sel YEE AC ZY dell AA E AC AAEE daa El SUE gA A A JASANE Z dau OV A7 AS BE SUC ALS SA BS AJAA SlE BoA BS aed Bs cS Bsayok lc OF AAAA Delta EJAAN SUS AA 7B GAS Me Yoda HE DC A oe AAS AA AALS 214 t d Me BE ol gt r gt to 3 ID dach AANA HSH AS zkezzzk air BE SZ PL Bat PEA ag SS d st EA Hao Buc det JASH PA EA IDS ay AAO Ega dadd AJI AAF AAA AE EH Bay duc Ar E ol aAA D Z7 dadd gow AMAL FAF Baw gu ee dato SO gt rd 2 fo wy Z EI E o bei L A Ke Z oc Gel Ki Vd aa a LIVIA 5 0 AP G32 24 AC 2 71 ri aq 2 4990 W Be 4600 W AAAI dal 37 MANE 8 22 919 Australia PL amp oF Fur 24 Jz WS Fo WUC Select unit ID 1 amp press lt ENTER gt 7 44 Select country Australia PL amp press lt ENTER gt 7 94 lt ENTER gt 7 4 Confirm country selection Sal d ei ae Hes Al d a7 Hae QE AGHA FB Jo and EA PA go ge er gud A RELTA For Australia PL This product has been power limited at maximal output power of 4 99 kW SAA DIS IPS Bela ANAE menu S Setup 4 9 or tal ELS YS VS al AS FAAA Down Up t S gt Firmware AU L gt Australia Limitation AS o ga ABASOLIVIA 5 0 AP G3 ap
59. gt Baudrate 2400 38400 2400 38400 Down v Up LESC Ss Time HH MM SS lt Down Y Up ESC S gt Date WD DD MM YYYY Down Y Up LESC s gt Firmware Down to 2 Y 1 130 SOLIVIA 5 0 AP G3 Tr 7 3 7 1 S Solar ISO GND T Solar ISO GND Submenu Setup ENTER A gt Solar ISO GND A S 5 Up to 6 Use old setting A Y ESC gt SolarISO GND ENTER as ENTER ISO ON Warning A Down Y Up ESC S gt Solar ISO GND ENTER k Esc gt ISO ON Failure Down Ad A Up ESC S gt Solar ISO GND ENTER ISO GND OFF m Down A Y Up ESC S gt Solar ISO GND ENTER PV grounded Down Y Up ESC S gt Solar ISO GND ENTER lt PV grounded A Down to 5 J 6 L Use new value lt Y 7 3 7 2 S S Submenu Setup ENTER cb Firmware A 4 Upto 3 A Y k ESC S gt Firmware AC Ctrl maj min bug A Down Y Up k ESC S gt Firmware DC Ctrl maj min bug Down Y Up k ESC S gt Firmware SC Ctrl maj min bug Down Y Up ESC S gt Firmware lt
60. 0 264 5 V 200 0 240 0 V 22 0 A 23 0 A 22 0 A 23 0 A 27 2 A 28 5A 27 2 A 28 5A 50 Hz 48 0 52 0 Hz 49 5 50 5 Hz 47 3 52 7 Hz 49 5 50 5 Hz gt 0 99 nominal power lt 4 USTRALIA CHINA INDIA THAILAND PEA 510 x 410 x 180 mm 32 0 kg Free convection Wieland RST25i3S 4 Multi Contact MC4 2 Harting RJ45 RS485 LCD 3 LEDs N 8 Operation and installation manual SOLIVIA 5 0 AP G3 SOLIVIA 5 0 AP G3 95 6 94 6 25 60 C 25 80 C 0 98 2000 m USTRALIA CHINA ma THAILAND PEA IP65 l GENERAL E GENERAD ToN RALIA CHINA mmm THAILAND PEA STANDARDS DIRECTIVES Current limitation power limitation IEC 62103 2003 IEC 62103 2003 EN 50178 1997 EN 50178 1997 IEC 62109 1 2007 IEC 62109 1 2007 IEC 62109 2 2005 IEC 62109 2 2005 AS NZS 60950 1 AS NZS 3100 AS CGC GF001 2009 4777 2 AS 4777 3 AS 4777 2 AS 4777 3 Yes VDE 0126 1 1 IEC 61727 IEC 62116 IEC 60255 5 AS 4777 1 AS 4777 2 AS GB T 17626 IEC EN 61000 6 2 IEC EN 61000 6 2 4777 3 EN 61000 6 GB 17799 IEC EN 61000 6 3 IEC EN 61000 6 3 2 IEC EN 61000 6 3 1 The maximum AC power value indicates the power an inverter might be able to deliver However such a maximum AC power may not necessarily be achieved 2 In certain states in Australia power limitation is required With power limitation the output AC power of SOLIVIA 5 0 AP G3 will be as followed Max power 4990 W N
61. 50 Tyco IP65 SOLIVIA 5 0 AP G3 79 SS 6 3 MERE SENSIBEL Ee AEA Aa ERRIO EERE AIN 6 4 1 6 4 8 HR BAK 2 32 0 3 4 5
62. FG lt 3o 4 6kV AS o 232 ABAISOLIVIA 5 0 AP G3 42 4 3 Zhu AL 3 NAAA AA RS485 EIA485 4 zl MATA SEA 2 az z s 5 4s bel A LED AF8 amp dal ABYASOLIVIA 5 0 AP G3 43 5 212 Saa ALAS BEA AAS Z AN NER ALA HOF FU Ch AAA m79 aa ot tz QE Rolo Ast Je AA TAB 2000 S ler a Uc JAX Sao AANE TIE AS STAs AED SIE AO dos BEA BA ahok UH aS AAA 72 HE ca tas Ep UAI vi 24 22 FAE AF291 Hs Jak B72 BE sha ae AAs AANA Veet HQ Apa Bt UBL OAS ABSA o zA AE AS AF AA SS 242 SH AAA Ha AS AAPG AMA As oll Ha SA arte sold 6 ArH 412 6 1 412 AX EAJ JAA AA FAE AA a2 IE We SACHS FA 4 HA AAA HAS Aue BS Aal zl Aso vir AAH VEU FA SE SOA AED AAS S20 ol YR ASo BIS VSUHAF ASME AAA FA LED YASS Ie FMEA JARAG FEM 212 9 Fel FAFA t PE OS dal YZ SANE APPA KSA HAN S 2lol el IP65 30 5 aa BF Io WSs MSS Wor 22 7 u Ek JA aa A SES ok Bch AAF Be SAAS BA 7 o Aas USFUC 6 2 Az 2a HS SHE FA AH AR NEA oo at 3717 Sue esa As 4 Wrrs4Ay SACS k 10cm Hoku t 50cm AAWE S z720 BQ srr SF kaal gi ZAS oF FU AS Ao AS GAA UFAA AAE A sus ALS St Ze DC Ss a VERMA BH As S77 EA SA BSAA A gt IAA AHAA IP65 BS SHS FA ok BUC waj 44 84 SOLIVIA 5 0 AP G3
63. H J 2 m es Solivia 5 0 Solivia 5 0 I B 32 A 32A L pat Lu gemaa SOLIVIA 5 0 AP G3 103 SS Q wi 2 ep SOLIVIA 5 0 AP G3 104 11 AC TAlternating Current Anti islanding protection 30 kWp CE CE EC DC BRE Direct Currents EMC Initialization Ss IS Gr Local utility company MPP H EAR
64. Now act data ENTER Down Up ESC Menu D Day statistic ENTER Down Up ESC Menu W Week statistic lt ENTER Down Up ESC Menu M Month statistic ENTER Down Up ESC Menu Y Year statistic ENTER Down Up ESC Menu T Total statistic ENTER Down Up ESC Menu S Setup inverter ENTER 1 ISS ESC Submenu N Now Submenu D Day Submenu W Week Submenu M Month Submenu Y Year Submenu T Total Submenu S Setup 90 SOLIVIA 5 0 AP G3 7 3 1 PREN N gt AC Voltage Value V lt lt N gt AC Current Value A lt Main menu N Now ENTER Baal data a lt _ S gt Submenu N Now tf A 2 Up to 1 A Y LE N gt AC Power Value W lt lt Down Y Up ESC LW A Down y Up ESC LW A Down Y Up ESC N gt AC Frequency lt Value Hz A Down Y Up ESC N gt PV1 Voltage Value V own U p LESS N gt PV1 Current Value A A Down Up ESC R N gt PV2 Voltage Value V A Down Y Up ESC N gt PV2 Current Value A A Down Up Y ESC lt N gt Time HH MM SS A Down Y Up ESC N gt Date WD DD MM YYYY Down to 2 Y 1 lt
65. UR 32 0014P0001 UR 32 0016P0001 UR O 32 0015P0001 UR 32 0017P0001 UR 82 SOLIVIA 5 0 AP G3 6 7 1 150 VDC 200 VDC 250 VDC 300 VDC 6 7 2 250V 350 VDC 400 VDC 450 VDC 100 95 90 2 85 80 75 70 65 60 ae SOLIVIA 5 0 150 V SOLIVIA 5 0 250 V 50 W 500 W 1000 W 1500 W 2000 W 2500 W 3000 W SOLIVIA 5 0 350 V 3500 W 4000 W 4500 W 5000 W SOLIVIA 5 0 450 V SOLIVIA 5 0 AP G3 SS 6 8 RS485 EIA485 HARTING Deutschland GmbH amp Co KG P O 2451 32381 Minden Germany www harting com 09 45 145 1510 Cable Manager Blue IP67 Push Pull Data Plug 09 45 145 1500 Cable Manager White IP67 Push Pull Data Plug RS485 EIA485 220V230V RS485 EIA485 RS485 EIA485 GND RS485 RX_B RS485
66. hc EE CSC 5 E Ss EEN rz R Ss A Ant ALE oy Ae 63 AVS 212 81139 2 SOLIVIA 5 0 AP G3 LO Ss ale eI H P do a 540 V 125 540 V 150 45 150 45 50 Hz AA AAA lt 4 510 x 410 x Wieland RST 4 al Multi Co LCD 3 742 SOLIVIA 5 0 0 98 32 0 kg 2912121 6000 W 5500 W 125 540 V 125 540 V DV OV Ee 32 0 A lt 0 2 W 5240 W 5000 W 230 V 220 V 230 V 220 V 210 0 264 0 V 187 0 242 0 V 184 0 264 5 V 200 0 240 0 V 22 0 A 23 0 A 22 0 A 23 0 A 27 2 A 28 5 A 27 2 A 28 5 A woe Hz 49 5 50 5 Hz 47 3 52 7 Hz 49 5 50 5 Hz gt 0 99 ruwar 80 mm 29185 ntact MC4 2 79 Harting RJ45 RS485 LED AP G3 95 6 94 6 25 60 G Ye 2000 m ez 4 A S o 212 4139 2 SOLIVIA 5 0 AP G3 w rFD IP65 1 AR det da da BE 3100 AS CGC GF001 2009 EN 50178 1997 EN 50178 1997 PAA IEC 62109 1 2007 IEC 62109 1 2007 E IEC 62109 2 2005 IEC 62109 2 2005 AS 4777 2 AS 4777 3 VDE 0126 1 1 Ee EE IEC 60255 5 AS 4777 1 AS 4777 2 SNE IBC EN 61000 IBC EN 61000 AS 4777 3 T 6 2 6 2 EN 61000 6 2 IEC EN 61000 6 3 IEC EN 61000 6 3 IEC EN 61000 6 3 1 Adag He WY Ads HSS HAF Te e sh Se AASASS He WEA Sa gga at 2 ZF BH ASW SSA Sre BQH Br ee S42 H SOLIVIA 5 0 AP G32 SA AC amp sl eeu AF8 S 342 ABAISOLIVIA 5 0 AP G3 65 AAS NEJI 400 220
67. housing design and state of the art high frequency technology which enable the highest levels of efficiency The solar inverter includes monitoring units such as anti islanding protection The function of the anti islanding protection automatic isolation point for in plant generation systems stipulates com pliance with all specifications required see 12 The inverter is usable indoors and outdoors IP65 In the following technical description the precise functions are explained to the installer as well as the user which are required for the installation operational start up and handling of the solar inverter 4 System The solar inverter converts direct current from the solar cells into alternating current This enables you to feed your self produced solar energy into the public grid Thanks to efficient MPP tracking maximum capacity utilization of the solar energy plant is ensured even in the case of cloudy sky conditions The string concept means that PV modules are always connected in series in a string and or that strings with the same voltage are connected in parallel to the solar inverter with the aim of signifi cantly reducing the photovoltaic system s cabling requirements The fact that the modules are connected in strings also means that the photovoltaic system can be perfectly matched to the solar inverter s input voltage range 4 1 Data evaluation and communication The integrated data display processing an
68. in Australia ee Gia acma E As required by notices under L e section 182 of the Australian Radiocommunications Act 1992 Instructions for completion e This completed form remains with the supplier as part of the documentation required for the compliance records Do not return this form to the ACMA Supplier s details Qualsure Consultants ACMA supplier code number N136 AGENT of 18 Hood Street Rosedale Vic Product description brand name type model lot batch or serial number if available Brand Name Delta Model Number SOLIVIA5 OAPG3 Description Solar Inverter Compliance with Radiocommunications Electromagnetic Compatibility Standard 2008 The above mentioned product complies with the requirements of the Radiocommunications Electromagnetic Compatibility Standard 2008 Evidence of compliance is demonstrated by test reports to the following applicable standards Applicable standards Standard title number and if applicable number of the test report Standard Test Report Number AS NZS CISPR 11 2004 07TH0223 VDE0126 1 Declaration hereby declare that the product mentioned above complies with the requirements of the Radiocommunications Electromagnetic Compatibility Standard 2008 All products supplied under this declaration will be identical to the product identified above Gordon Slimmon Director 2 Feb 11 QUALSURE CONSULTANTS A division of B
69. the casing In no case must the device be opened Operation and installation manual SOLIVIA 5 0 AP G3 15 In order to connect the device electrically the following procedures must be followed 1 DC connection First connect the PV module strings to the DC disconnector not included in the scope of delivery 2 Connect the DC disconnector to the solar inverter ensure correct polarity 3 AC connection Please install the Wieland AC mating connector to the AC output cable and then put the AC connector to the solar inverter Please make sure that the sleeve nut is properly fixed and tighten Before switching on the power check all feeders and connections one last time Close the DC disconnector Close the circuit breaker on the AC output side In case of sufficient PV voltage UPV gt 150 V the device now goes into the start up mode In case of a new installation the time and date have to be set in sub menu S Setup see 7 3 7 oo O Q All unoccupied connectors and interfaces must be sealed using the provided sealing plugs 6 10 Setup settings The default display language for solar inverters leaving the Delta factory is set to English After connecting to correct DC voltage and running through self test you will be asked to specify the network ID and to select the desired country countries available China India Australia Aus tralia PL and Thailand PEA The selection has to be confirmed ano
70. to 1 A ESC S gt LCD Contrast VW Up ght Up ESC S gt Menu Mode Now Setup Down Y ESC S gt Cash per kWh Value AUD Won xx Down Y ESC S gt ID Number 001 254 Down Y Down Y ESC S gt Baudrate 2400 38400 Down Y ESC Down ESC S gt Date WD DD MM YYYY Down Y S gt Firmware Downto 2 Y Up XX Up Up S gt Solar ISO GND Up A Up lt s gt Time HH MM SS Up Up Submenu S Setup A A A A A A A A lt Adjustment of the brightness of the LCD display between 0 9 Adjustment of the LCD lt lt Et background lighting Selection of the start menu on restart of the device N Entry of feed in remuneration in AUD Won per kWh ssO a Input of the ID number of the solar inverter lt IsSO GND Setup Menu lt Adjustment ofthe baud rate between 2400 38400 Baud lt amp Adjustment of the internal clock Adjustment of current day of the week and date _ Adjustment of the firmware 24 Operation and installation manual SOLIVIA 5 0 AP G3 7 3 7 1 Submenu S Solar ISO GND More detailed information on the Solar ISO GND menu within the submenu S Setup Submenu Setup Solar ISO GND A Ch Use old setting A lg Use new value je o ge _ ISO GND OFF lt PV grounded ENT
71. 63 24 ae AAS AS Sol VIS ALA Be PS Salle uc d tt ail Aoo LAA GES F714 e Brae MY AANE APA PAE HME HO SUCH Of AHN EEGEN gy Ki H 6 2121 A ASS JAE SE AAAA dza AAE AF 8 ek AA Hol AA ae doe YAE LANA FUT AFF AAE BA 82 Sr VES AAE AAAA 2 L JAE SES vie 2240 uk 1 AAD Aha o 6mm 8AA TA SF ALS 4719 TAN dai Aalst Lads dal AAU Ch BAS TY HAS HAs NEFT MSU TH 2 AGP MHS TAZ 32 0kge AAS F Yo So Sotack uc 3 ZA Bo AGS MHS Gol Maa 4 ASE 4 UES YAS SEO 4 22 242 5 As AAAF Ate SEE MEA Hels ct ae AF8 3 44 ABASOLIVIA 5 0 AP G3 45 6 9 2E KSC ES i 60 Ge FY Soll asaz UU qg THe ASS IAA addi EEN FA Sall we old AAS S z SUES A U2 AFAR JAE stitt JE Asal aza Kol AAA sich 6000 W 5000 W 4000 W 3000 W 2000 W 1000 W ow 0 C 10 C 20 C 30 C 40 C 50 C 60 C 70 C 80 C 6 6 aa AC 4 S Wieland RST25i3S AC AWE 2 AA AMES Al al AA SHS AA Yo Us YSU ASS SIE 341 kal N PENS EA AA aoe a yd AC AMS Haaay AEs dal AAS AC Fels FAS AHH 24 she ek Sch Wieland AC AYE AA We 4 FE aka AAAS 4 0 mme ANS AF2 ek SUCH L EIMA Paes AE at 32A BE APE ra l B RE C Ate EJA Sach SASS AA ANTAA EE ape AALT APS B AS Ha NA HA nt TE Grrfl reds EWE OMA 28
72. BA 28o AAU 30 Vol el als FEA Y Sw deade ago Agon ARUN 84 dys da eg Se adda 0 Ut ENTER 7 TEA YAS ao 280 cA adi 7 3 dal F A rE Che 2S 7719 A Ar Bes rA alr NAA ln DA vlnr WE vlnr MCD ln YC ala TCE SLA 2197 71S data del HTE o ang ENTER 7 S sai oars ABC die o a ERA ESC ale ag seh ri 54 AF8 o Sal 2313 24 SOLIVIA 5 0 AP G3 User menu Down Up ESC Menu W Week statistic lt ENTER Down Up ESC Menu M Month statistic ENTER Down Up ESC Menu Y Year statistic ENTER Down Up ESC Menu T Total statistic ENTER Down Up ESC Menu S Setup inverter gt ENTER Down SEI at 2 Up to 1 ESC Menu N Now act data ENTER Down Up ESC Menu D Day statistic ENTER Submenu N Now Submenu D Day Submenu W Week Submenu M Month Submenu Y Year Submenu T Total Submenu S Setup u n A AAN ESCS FEY sl a9 ATAA NA JA 2 Auda A BALA ABAISOLIVIA 5 0 AP G3 55 ber Main menu N Now ENTER Serial data Submenu N Now w 2 Up to 1 A Y ESC e lt N gt AC Power Value W 4H fe 4 ASS BN SU Down Y Up ESC lt N gt AC Voltage Value V lt 4 SB AHS BABY Down Y Up ESC zi dal ss Asti lt N gt AC Current Value A lt AA ARS
73. BENTH A Down y Up ESC N gt AC Frequency Si Aal 7 4 lee wale KSE TAL US HA BYU Value Hz lt 9 4A zz 1 uo A Down Y up ESC E A 4 vane Ai w VAA AFI AA AA BANG AA 4 A Down Y Up ESC wa eet lt AAA des AA ARS FARY 91 4 A Down Up v ESC ae V ae AAFAA AS 2 Als 9 2 Down M Up ESC oo lt AAA Aes AA ARE BABU YS 2 Down y Up ESC 3 e lt N gt Time HH MM SS BAY ANS BABU A Down Y Up ESC N gt Date sS lt WD DD MM YYYY lt VAY LAF eas wed Down to 2 A Y 1 56 AF8 Y Sal 2313 2 SOLIVIA 5 0 AP G3 7 3 2 kal d r D 9 z qa sr A ol viir Gee Aas ces ale alt SARS BASU Main menu D Day statistic ENTER gt Submenu D Day L e 2 Upto 1 Y ESC e lt D gt Energy Value Wh At 44 JSF BAe Down 4 Y Up ESC D gt AC Revenue Value p kH lt SE AIS ie wor data RAPU A Down Y Up ESC D gt AC Power Max a aZ ad sa age gygy Value W A Down Y Up ESC D gt AC Volt Max gg ad 2a aoe gaku lt value V lt Itaqae Ayd A Down y Up ESC D gt AC Volt Min a Wm Vl V lt lt Ss tt l att ee A Down Y Ub ESC D gt AC Curr Max a 8 Value A lt It a ia a ee Down Y Up ESC D gt AC Freq Max dad sy 2322 yz A Sl lt a It 3 BASU eee Sa 4948 BNI Down Y Up ESC D gt AC
74. CD 14 298 SU Auto On Down Up ESC S Ae 5 Me cee RAE rh AAE A oS eo Down Y Up ESC Se Cash perkWh Vale lt A47 SHS kw SF Baya d is dygt AUD Won xx xx A Down Y Up ego Number c n WHS Des Vag 001 254 A Down M Up LESS s gt SolarISO GND ISOIGND 24 Ut Down A Y Up ESC S gt Baudrate lt dall AS SES 2400 38400 BE YAAA ZIUA 2400 38400 Down 4 Y Up ESC amp S gt Time HH MM SS 4748 Alls BU Down Y Up ESC S gt Date WDDOMMYYYY 451 LAF ede zat Down Y Up ESC e S gt Firmware lt lt BS 24984 Down to 2 Y 1 60 AS o 242 21539 4 SOLIVIA 5 0 AP G3 7 3 7 1 89 lar S Solar ISO GND kal viir S 21 4 Solar ISO GND ire det go AAN Ch Use old setting Use new value lt Submenu Setup ENTER Solar ISO GND A Y ESC gt Solar ISO GND ISO ON Warning Down A Up Y k _ ESC S Solar ISO GND ISO ON Failure Down y Up ESC S gt Solar ISO GND k ISO GND OFF Down Y Up ESC S gt Solar ISO GND joo SE PV grounded Down Y Up Esc S gt Solar ISO GND lt E PV grounded Down to 5 6 Y 5 Up to 6 A ENTER ENTER ENTER ENTER ENTER 7 3 7 2 SA vir S Firmware ae Alar SRA Bao ATA gc apa l N S Su
75. ER 5 Upto 6 Y ESC S gt Solar ISO GND ISO ON Warning Down Y Up ESC S gt Solar ISO GND ISO ON Failure Down M Up ESC S gt Solar ISO GND Down A Y Up ESC S gt Solar ISO GND grounded A Up ESC S gt Solar ISO GND A D to5 jown to 5 6 ENTER ENTER ENTER ENTER ENTER 7 3 7 2 Submenu S Firmware More detailed information on the firmware menu within the submenu S Setup Submenu Setup ENTER Upto 3 A A Up Up Up Display Ctrl maj min bug Down to 4 J A 3 3 Firmware A A Y k ESC S gt Firmware AC Ctrl maj min bug Down Y k ESC S gt Firmware DC Ctrl maj min bug Down Y k ESC S gt Firmware SC Ctrl maj min bug Down Y P ESC S gt Firmware Down to 4 Y x ESC S gt Firmware IT GMon Ctrl maj min bug d Operation and installation manual SOLIVIA 5 0 AP G3 25 HSII9N3 8 Diagnostics and data evaluation 8 1 Malfunction rectification The solar inverter is provided with an automatic diagnostics system which independently identifies certain faults and which can make them visible on the display Troubleshooting in the field In principle it is always worth attempting a reset by reinitializing the solar inverter whenever an error message appears on the display To reset the device proceed as follows 1 Isolate the solar inverte
76. Freq Min S a lt Value Hz a lt 10 3 a SSS ENT A Down Y Up ESC lt D gt Runtime Value Min IH ES AW ASE AAs BABU Down to 2 Y 1 AF8 o a AWASOLIVIA 5 0 AP G3 57 7 3 3 39 dir W tS Ware gid Main menu W Week statistic ENTER gt Submenu W Week t 2 Upto 1 Y lt W gt Energy Value kWh 2 su SFe BAYT Down Y Up ESC W gt AC Revenue 27 0 2 wala a FS eS value AUD Won rea es Down M Up LES w gt Runtime Value h amp AF4 girl FIAS AJ21 BAT Down to 2 Y 7 3 4 ots viir M 9 tal Ware Ba So BAS BNSC Main menu M Month statistic ENTER gt Submenu M Month 2 Up to 1 A Y Pad Me Energy Value kWh y Zill FSS BA Bch Down Y Up VE Revenue lt b de eG Value AUD Won Down Y Up ESC lt M gt Runtime Value h nr FH FF AE s AZ e AAS BABY Ch Down to 2 Y 1 7 3 5 tal dir Y 91 dai Ware AA AS BERS EAFA Main menu Y Year statistic ENTER gt Submenu Y Year D lt M 2 Up to 1 A k d lt y gt Energy Value kWh s u ASS Su Down Y Up ESC Y gt AC Revenue aah Z st A SRL tl lt a AIPE erie Value AUD Won g Down Y Up Y gt Runtime Value h J 239 ANH ES AZ zF AIS BABY CH ESC Dow
77. MA As AA tao elt fae AA ek BG OSs HO F YAU AES WAS RMA 842 ASYS 2 Delta AA z Grounding Set A Solar EOE99000275 Aeae E EGuUt 84 as BUST Setup 4 WTA TAL 2 IFARA AA US tt N gt He gry f Ad Z a4 uE q S F ARAA ISO GND OFF AS o dal 4113 4 SOLIVIA 5 0 AP G3 47 E DC ASS HE AAS7 Sa do MULTI CONTACT s e z 32 0010P0001 UR 32 0012P0001 UR 32 0011P0001 UR 32 0013P0001 UR SE S 2 6 0 ae AWG 12 10 32 0014P0001 UR 32 0016P0001 UR 32 0015P0001 UR 32 0017P0001 UR a 6 7 1 Ss Ay qe do 150 VDC 200 VDC 250 VDC 300 VDC 350 VDC 400 VDC 450 VDC 48 AF8 Y Sal 2313 2 SOLIVIA 5 0 AP G3 IF oE Au ASS gt 250V YA AJAA gel du 50 w 500 W 1000 W 1500 W 2000 W 2500 W 3000 W 3500 W 4000 W 4500 W 5000 W Geteste SOLIVIA 5 0 150 V SOLIVIA 5 0 250 V SOLIVIA 5 0 350 V SOLIVIA 5 0 450 V 6 8 Sle ao 2 AA RS485 EIA485 Aea SE QE Mol 2 Hor BUT SIE s e 2 Age BY EMA AAE VHS gE LES ALB shor By ch aA AAE SF YA HARTING Deutschland GmbH amp Co KG P O 2451 32381 Minden Germany www harting com FE AA 09 45 145 1510 Ca 09 45 145 1500 Ca Di al le Manager Blue IP67 Push Pull Data Plug e Manager White IP67 Push Pull Data Pl
78. RENE TAB 2000 9 6 6 1 Mei MAES LED SERA IP65 KES R MSRM NTRSERERRE SIE SHRUG WAR SARE PEBE 6 2 10
79. SA d et TH Kai 4 as o d ag SAS AAs Ws SE daizizt E7 E Ve cap WK air a OJ ol ge Hl Fo ao Ho yo D0 o NJ H RI SS o A Ky o mr H wr oF lt HoR TFH TRga Re NKE lt KF KTK D x m AK ER bl ER T HO lt o An ES TO Eo DS mM E RES Sim K TS A D wong BS K aa wa KIP R RK Ee BH H ET m s a Z Wim ef J o WEE SR ee oJ u Gesi I HT S DEK J An Qan Om Lo dn gk We Ju TH yt eo MNS FOB pn a WU ao SAU GU poe PE Gn WD go o A REES lt 0 a oo LTR K E ai lt Pt a D D K oz RU 4j WE VO BM a ie jn FP Jo oly ees PAK Eid an pj Mr S D PWK HT PREZE wh wr toe TC y de Re d T dy gc To Ai H KU OX a RU oo RO Cy Te K U ao X T TY u SC p TEX KE si Re oK Ee D wo pr Rem Ty lt pju KO xe NP pd H ol Ne np e dy ol W I Ze oo T Je TA TA oj Sc D 7 m E ae uf de D OO el Kg bo os N St wo oe cl wowed CH B Op Del 5 EEN ZA WE m T ug Tea SI Ro Th Bd 1 alo ny X H W RE op pes mT ol TIK gp a op Rw on Te Raa e ZE Elw P ee e e ofze ri KK Ska ai Nal Sean Ge Sr pk ez noa SYDE ee Eee Vy moe Se Ml S lt m h as NPB He SS w H oO Ww Si JANA zs SH E L y 234 41 EH S a ee Hea d 2 Bs S H bai ER AE Sdt THe
80. TX_A RS485 1 2 3 4 5 6 7 8 84 SOLIVIA 5 0 AP G3 SS EBE sak EE TEE DLE BGR DERE RS485 EIA485 5V EH TS A L OR Pin 7 in 6 100 150 Ohm 0 25W SOLIVIA 5 0 AP G3 85 4a f z 6 9 SAER RD BREE 1 2 3 DJ O O Wieland SAMAR MHS RA LBL WER TRE Sec AIA RERE UPV gt 150V S Setup 7 3 7 A 86
81. V ER ROPERS bai EIE UPV 100V 150V CAMA De SOLIVIA 5 0 AP G3 123 LED 7 7 1 A B C 7 2 ENTER Wire i ten KAI feia qes 5 A ESC B HM O He D ENTER A ENTER lt 30 E ENTER Wize
82. V AAS UE Sa 400 230 V 400 220 V 400 230 V AZ s Hy isi Zu aah Fab BYE olaloiz ice 66 AS o 212 ABASOLIVIA 5 0 AP G3 AAY AEA 400 220V AAY ANEA 400 230 V 400 220 V 400 230 V A7 s u KEE AAA zc BUE o Ru 4 Ve ggas de we gA dra 2521 A S 2 212 ABASOLIVIA 5 0 AP G3 67 ber DC Hd dt Solivia 5 0 AS da daa oa A N Solivia 5 0 Solivia 5 0 as as As ale Aaa tae BEE j 32A 32A 2A A L 68 AF8 BALA 2113 4 SOLIVIA 5 0 AP G3 azo a wi 2 op 69 ALSO 22 ABAISOLIVIA 5 0 AP G3 11 84 AC Alternating Current al47 2 9 Us Sai Ja AAR AW AJE AYES rya 2 2 Jet AE BA A 22 SI 30kWp bel ae Lego FSS Bc CE CE 3E7 JSM as alee HA EC AAS ka To GS ef AAS SHANAE a WK DC Direct Current 4 2 Cfo YU ch EMC 2122 AAA Electro Magnetic Compatibility 2 a A TFAA ARYE Sa e Ges WA lt We A7 4AA SA WA 2 Bao et AM A Z Agerre Eu S Hee Sm oj voa AV gq Wr SE oa IS AA AA JA SFO RSET 27 gk S AAA Adc az ae SA 217 QAAE ANa SF AYES Sa SAsh FAS s u rul ri MPP aq o 4 Maximum Power Point 2 Wes dal AFA Y 14AN Ad age GS fol UL 31 dal TAA ARA Atte AAR di AS d sa ag w Asa talk AZo Se AZ AAZ 2 Ashe Ad lg q do sae alc auto SA doo sek ss
83. anufacturer Same as above Product Grid connected inverter Trademark Delta Type designation SOLIVIA 5 0 APG3 Serial Number 220301001104000007 Technical data 5 kW Input 150 450 Vdc Output 230 Vrms 27 2 Arms 50 60Hz The submitted sample of the above product has been tested for the following standard s and showing compliance with the criteria specified within Standard s Test report s Issued by PEA Requirements CSSC BOS 007 CES Solar Cells Testing Center and IEC 61727 2004 July 11 2011 King Mongkut s University of and IEC 62116 2008 Technology Thonburi Note This certificate should be read in conjunction with the issued test report s and it in anyway does not imply assessment of the series production of the product gt July 28 2011 Dr Dhirayut Chenvidhya Director CES Solar Cells Testing Center King Mongkut s University of Technology Thonburi 144 www solar inverter com Delta Energy Systems Germany GmbH Tscheulinstrasse 21 79331 Teningen Germany Support Email support solar inverter com Delta Electronics Korea Inc 1511 Byucksan Digital Valley 6 cha Gasan dong Geumcheon gu Seoul 153 704 Korea Phone 82 2 515 5303 5 Fax 82 2 515 5302 Support Email support korea solar inverter com Delta Energy Systems India Pvt Ltd Ozone Manay Tech Park A Block 3rd Floor Survey No 56 18 amp 55 9 Hosur Road Hongasandra Village Bangalore 560068 Karnataka India Ph
84. ay u E 9 3 DYA SE N ENTER RIESEN E WEA Dud aaa SG Ka Se ENTER He 37 REES Ay BE 7S gel Se Sieg Ue okul 9k Ge YW o suk a7 Ags ABS YSU 1 ESC AS Z Sc S44 Z ANS Byes 2 7 HES data A Se support sclar inverter coni el yal PIN ch aaja 2 Belay AAA such BE ai F AGUT 3 PIN HES glaat ESC bi H 9 i a AA WAS St Mo APAE PYG 194 Sau a7 Ag wes gage 6 11 LED ais Odd EN aka MH elo ai eS 37 2 LED7 4 3 3 Zo So ga AFAR e LED A 4 4h5 Ss SHS VED Ud LED B XUA HA a AA AY Earth Fault B A He DC ASS GND EAS Ue C Operation A dd O Failure C e LED C ebay aa q7 TEE sine JZ HA HE Je AW SS Jao 4 dad viel 100V Lt SE E B7 AAS als Sea a Ys ey a AF8 amp da ABYASOLIVIA 5 0 AP G3 53 toh als FEA SOA GR ol Az 2H ber LED 4 zF zg x eee at ae a Bif EE EE Ge HEB dal aye AAJA AAS a5 F GEES GEES E de gagao dall PAAL S Ze Wa 7 1 Ho JAA del date AWE deii ENTER ANS AGA BS Aa AMSA Zut FAE aA YS Qa dd segue 7 A ESC dir n 9 dir o el 24 39 ATS SS GAS Sc z BA C lar oaa A A dir t d APS ect V e geg iss z D PN TER ENTER J wir HAE o daa AQ dadd dai WSS Bolas A t 4 4 dad 7 2 YAR ga g 23 ZF AEA ENTER 71S FEA A
85. bmenu Setup ENTER Firmware A 4 Y k ESC S gt Firmware AC Ctrl mal min Down Y k ESC S gt Firmware DC Ctrl maj min bug Down Y ESC S gt Firmware SC Ctrl maj min Down Y k ESC S gt Firmware Display Ctrl maj Down to 4 Y 2 ESC S gt Firmware Down to 4 Upto 3 A bug Up A Up bug A Up min bug A 3 IT GMon Ctrl maj min bug af ALSO 232 ABAISOLIVIA 5 0 AP G3 61 o 8 ale 2 9 3321 8 1 LAF A AEs AQAA Aa dd Aag go dal SAt KAS Besa Asal oJ HAHHA Ago wa A sare i S AAAF Ye dir yey AAE GA data ANE Ae Hq AAS 7 e AHS s ZU cp LA EE i Bo PUGS S dl mY 2 DC r z ull E 20 3 17 SF Lie 4 DC 924998 4A Ac DIES AAU AS S kl 7 Gi kel A MA HAE AYA aluigdzt stau Eas 27S ZAA RK da adele au AGU 2 e Ss Sa oes 42 ot Ass au Aq Hale Melo qe ASS o Fo Ei gt ALS Al eta Je Fi Se Alok gt FAT A SER Z AY gt Azle AFF AA AY TEASE gt AS YAS ae aa AAS ZAE Sdt ASE A d s gaged ai ua a aa sae Age ele Ke a AC frequen St wy o ALS OAS e 4A N ATA zg cy failure ee anes teh Avg det dl ASA oa N are ar asr AC voltage ya ae ae ka Ale ch f E failure We Aste Mow alt ZF S 2Fvt7 dai a ae TZ 5 2s AC relay GaSe aaa 393 deel age leu failure Ze Ze JAE wa
86. bmenu W Week 1 2 Y ESC Down E Down b ESC Down to 2 Y Up to 1 A lt W gt Energy Value kWh ETEA A Up ESC W gt AC Revenue Value AUD Won Up lt W gt Runtime Value h A d 734 F EM A Main menu M Month statistic ENTER gt Submenu M Month Y r k ESC bam Down a Down i ESC Down to 2 Y 735 i Y WEFR El E ia E BJ AER Upto 1 A M gt Energy Value kWh A Up ESC M gt AC Revenue Value AUD Won A Up e M Runtime Value h BECH KEELT A 1 ENTER D Main menu Y Year statistic gt Submenu Y Year 2 Up to 1 A Y ESC s lt Y gt Energy Value kWh Down Y Up ESC y gt AC Revenue Value AUD Won Down Y Up ESC Rowe seeps lt Y Runtime Value h amp Far SEAM AEE ETS Down to 2 1 SOLIVIA 5 0 AP G3 93 SS 7 3 6 PEET E
87. d communication of the device enables easy operation of the solar inverter Monitoring of the operational status and signaling of operational failures are ca pable of being called up over the device display The data interface enables the downloading of data which can be evaluated with a PC system and guarantees continuous recording of operating data The best way of accessing this functionality is via the available accessories comprehensive and seamless solar inverter monitoring is ensured The data read out over the integrated interface and the display is possible only in solar operation Operation and installation manual SOLIVIA 5 0 AP G3 5 HSII9N3 4 2 Technical structure of the solar inverter A galvanical isolation of the solar inverter from the grid is achieved through a DC AC converter with an integrated high frequency transformer The photovoltaic voltage is adjusted so that the maximum power output of the PV modules is also achieved with varying solar irradiation levels and tempera tures MPP Tracking The MPP range of the solar inverter is between 150 V and 450 V This facilitates the use of PV modules by a variety of manufacturers Measures must be taken to ensure that the maximum open circuit voltage of 540 VDC is never exceeded Please note that the maximum open circuit voltage will occur at the lowest temperatures anticipated You will find more detailed information about temperature dependency in the data sheet of the PV mo
88. d national safety regulations For details please refer to 9 Caution The secondary short circuit current rating is increased at the transfer connection point to the public electricity supply system by the nominal current of the connected solar inverter 6 Installation of equipment 6 1 Installation location e Install the device on a non flammable support base e Avoid installation on resonating bodies light construction walls etc e Installation is possible both indoors and in protected outdoor areas An increased ambient temperature can reduce the efficiency of the PV system e Noise generation is possible avoid installation in residential areas e Ensure legibility of the LEDs and the display check read off angle and installation height e Although the unit is fitted with UV resistant components direct exposure to sunlight should be avoided e Despite having an IP65 enclosure and being certified in accordance with soiling category Ill the unit must not be allowed to become heavily soiled e Dusty conditions can impair the unit s performance 6 2 Minimum requirements e Free convection around the solar inverter must not be impaired e For proper air circulation to dissipate heat allow a clearance of approx 10 cm to the side and approx 50 cm above and below the unit e The grid impedance requirement at the supply terminal is to be observed cable length cable cross section The recommended installation pos
89. d upstream of the automatic circuit breaker The solar inverter must be grounded via the AC connector s PE conductor To do this connect the PE conductor to the designated terminal If you wish to integrate more than one inverter into the installation please proceed as illustrated in the drawings in the appendix Please note the cable length and the cable cross section due to the risk of undesirable temperature rise and power losses The AC connector is protected from unintentional disconnection by a clip mechanism which can be released with a screwdriver 10 Operation and installation manual SOLIVIA 5 0 AP G3 6 7 Connection of PV modules Before the photovoltaic system is connected the polarity of the PV voltage at the Multi Contact con nectors must be checked to ensure that it is correct The connection of the PV module is implemented using Multi Contact MC4 connectors where the DC negative pole is located on the connector upper row and the DC positive pole on the connector lower row The connectors are coded to prevent you from accidentally plugging them into the wrong terminal Please ensure the following at all times e That there is never any risk of anyone coming into contact with the solar inverter connection terminals due to the risk of dangerous voltages across them e That under no circumstances are the PV modules to be disconnected from the solar inverter under load If a disconnection should be necessary first switch
90. device has been reset please inform your service technician Versions of hard and soft Boisionenoy ware are not compatible The first time the solar inverter is started Self test Initialization of solar inver up ongoing ter on start up Normal function with a PV cell voltage of between 100 V and 150 V Insufficient insolation dawn twilight PN DEER Insufficient input power Check the PV cell voltage via the display in the N menu Insufficient insolation PV voltage PV generator voltage bet Check the PV cell volta ge via the too low ween 100 V and 150 V display in the N menu F Checks grid voltage and eagles grid frequency for grid Normal function before input mode input mode Although you can in theory carry on Varistor Internal varistor at the DC usingthe solar inverter he varisiors warning input is defective should be replaced at the earliest oppor tunity This will involve returning the device r m o g gt h Please follow the instructions above before contacting your service technician A Operation and installation manual SOLIVIA 5 0 AP G3 27 HSI19N3 o INPUT DC OUTPUT AC MECHANICAL DESIGN Technical data AUSTRALIA CHINA INDIA THAILAND PEA 6000 W 5500 W 125 540 V 125 540 V 125 540 V 125 540 V 150 450 V 150 450 V 17 2A 32 0A lt 0 2 W 5240 W 5000 W 230 V 220 V 230 V 220 V 210 0 264 0 V 187 0 242 0 V 184
91. dules The device s power consumption is kept to a minimum The high quality aluminum casing corresponds to protection class IP65 water jet proof and dust proof and is protected against weathering processes by surface refinement The cooling charac teristic profile is designed so that operation of the inverter is possible with ambient temperatures from 25 C to 60 C A cooling characteristic profile is used for the removal of the power dissipation caused through the voltage conversion An internal temperature control protects the device against excessive tem peratures in the interior of the solar inverter In case of high ambient temperatures the maximum transferable power is limited The solar inverter is controlled by microcontrollers which also implement interface communication and the monitoring of values and messages on the display Two independent and redundant microcontrollers control the monitoring of the grid which is consis tent with the feed in directives of your local utility company This enables an installation of the solar inverter in the in house electrical grid Operator protection requirements are met by electrically isolating the grid from the PV module The electrical isolation between the grid and the PV module is equivalent to basic insulation Maximum operator protection is ensured by reinforced isolation between the grid PV modules and accessible interfaces display RS485 interface Relevant standards concer
92. ectrical connector connection RJ stands for Registered Jack standardized socket RS485 EIA485 Differential voltage interface on which the genuine signal is transmitted on one core and the ne gated or negative signal on the other core Separate grid system Energy supply equipment which is completely independent of an interconnected grid Solar inverter is an electrical device which converts DC direct voltage into AC voltage and or direct current into alternating current String Designates a group of electrical PV modules switched in series String solar inverter solar inverter concept The PV generator is divided up into individual strings which feed into the grid over their own string solar inverters in each case In this way the installation is considerably facilitated and the gain de crease which can arise from the installation or from different shading conditions of the PV modules is considerably reduced TAB 2000 The TAB 2000 are the technical regulations governing connection to the low voltage grid operated by distribution system operators in Germany These Technischen Anschlussbestimmungen or TAB for short have been in force since the year 2000 They define the requirements imposed by DSOs on the electrical systems operated by the end customers of utility companies Operation and installation manual SOLIVIA 5 0 AP G3 35 HSII9N3 36 AFS o 212 AWASOLIVIA 5 0 AP G3 Arae Was W uri Z ute EE sl AHE
93. ege mb Bia i RRR AA BIR 6 10 So REEM 2228231 UPV gt 150V 38 oF S Setup 7 3 7 PLD E HI o Bre pee ID gt ES H D ID CH 5 1 AB De SOL
94. erter is not feeding power to the grid Night disconnection Input voltages Initialization UPV 100 V to 150 V self test ongoing Input and grid moni toring Starting conditions are tested Operation and installation manual SOLIVIA 5 0 AP G3 17 HSI1SN3 LED STATUS OPERATIONAL STATE EXPLANATION Normal operational state UPV 150 V to 450 V Feed in operation Internal or external fault Equipment fault interrupted feed See also display messages Solar inverter is not connected to the grid No power is delivered See also display messages General error condition You can carry on using the solar inverter Warningimessage See also display messages 7 Operating concept 7 1 The display The display on the device indicates varied information The enter keys are used for the adjustment of the device and for the retrieval of information The indicated data can deviate with a tolerance of up to 5 Key A ESC To switch from the menu items to the main menu and to exit each sub menu Key B and C For scrolling in the individual menu items and or carrying out adjustments in the setup menu A B C D Key D ENTER ENTER key for changing into the menu levels and for input acknowledgement in the setup menu 7 2 Navigation in the display Lighting of the displa After pressing the ENTER key in automatic operation the display lighting is switched on If no key is pressed wi
95. frequency via the display in the N menu Check the grid voltage via the display in the N menu If no voltage present check grid auto matic circuit breaker The solar inverter is defective Return the device Normal function before input mode If the fault persists after the device has been reset please inform your service technician If the fault persists after the device has been reset please inform your service technician NO 6 Operation and installation manual SOLIVIA 5 0 AP G3 DISPLAY MESSAGE CAUSE ELIMINATION The device trips and Error 302 reverts to grid input mode Check the installation site no direct once the temperature has sunlight air circulation dropped Isolation resistance fault Error 506 on the DC side during Check the isolation resistance on the DC Error 508 start up phase 508 or side of the PV modules running phase 506 Isolation start Isolation resistance fault up warning on the DC side during Isolation run start up phase or running ning warning phase You must check the isolation resistance on the DC side of the PV modules Solar inverter is still feeding Check that the GND connection has been Ge ie Me Ne ed made correctly and or check the fuse in PV grounding wrong pole is connected the grounding path Change the fuse if ault to GND necessary The solar inverter remains in feed in operation If the fault persists after the
96. ition is to be adhered to vertical e Unused DC connectors and interfaces must be sealed airtight with sealing plugs to ensure protection class IP65 for the whole system inverter amp cables 8 Operation and installation manual SOLIVIA 5 0 AP G3 6 3 Maintenance Make sure that the device remains uncovered while in operation To avoid the casing of the solar inverter becoming soiled it should be cleaned periodically User serviceable parts are not contained in the device Under no circumstances should the solar inverter be opened 6 4 Installation You should utilize the delivered mounting plate for problem free installation of the solar inverter Installation to the wall should be implemented with the proper screws Mount the wall bracket so that the solar inverter only has to be simply attached After that the device is to be bolted on securely Assembly instructions T Mount the mounting plate with appropriate screws max 6mm into at least four of the eight holes to fix the wall bracket in place You can employ the mounting plate as a template for marking the positions of the boreholes 2 As the solar inverter weighs 32 0 kg it should be lifted out of the transport crate by at least two persons 3 Place the solar inverter onto the mounting plate with at least two persons 4 Fasten the supplied mounting nuts and washers on the threaded bolt intended for secu ring the device 5 Check that the
97. k ID ESC Select country x E Next country Country before Normal mode Timeout if no key is pressed within 5 minutes Please note that once the country has been selected and confirmed it is only possible to change the country by following the steps as listed below 1 Please click ESC for few seconds to get the key information 2 Provide the key code to the Solar Support Team at support solar inverter com to get the PIN code valid for one use only 3 Once you get the PIN code you need to press ESC y 4 Then you will be asked to insert the PIN code and to confirm it twice 5 After confirmation you will then be able to select the desired country Note These steps must be executed without interruption Otherwise you will stay in the country selection mode 6 11 LED operation and fault display Three light emitting diodes LEDs which display the operational state of the solar inverter are attached on the front LED A green Operation displays the operational state O Operation A e LED B red Earth Fault displays an insula tion resistance fault or PV grounding GND Earth Fault B fault on the DC side e LED C yellow Failure displays existing O Failure C faults internally or externally and whether the grid feed in operation has been interrupted LED STATUS OPERATIONAL STATE EXPLANATION The input voltage UPV is lower than 100 V The solar inv
98. lues Display of the active output power Display of the active output voltage Display of the active output current Display of the active mains frequency Display of the active PV cell voltage input 1 Display of the active PV cell current input 1 Display of the active PV cell voltage input 2 Display of the active PV cell current input 2 Display of the current time Display of current day of the week and date ESC in main menu N jumps to first entry of Main menu N Now ENTER DEET Ate SL Submenu N Now L 2 Up to 1 A Y ESC lt N gt AC Power Value W s Down Y Up ESC lt N gt AC Voltage Value V A Down U y p ESC lt N gt AC Current Value A s sA x A Down Y Up ESC N gt AC Frequency Value Hz A Down Y Up ESC N gt PV1 Voltage lt Value V A Down Y Up ESC N gt PV1 Current lt n Value A A Down Up Y ESC N gt PV2 Voltage lt Value V A Down Y Up ESC N gt PV2 Current lt Value A Down Y Up ESC lt N gt Time HH MM SS lt lt A Down Y ve ESC N gt Date WD DD MM YYYY Down to 2 Y 1 Remarks sub menu N 20 Operation and installation manual SOLIVIA 5 0 AP G3 7 3 2 Submenu D Day This menu item displays the daily values for the grid feed Main menu D Day statistic ENTER gt Sub
99. lulen Pty Ltd ACN 090 692 354 Registered Office 18 Hood Street Rosedale Vic 3847 CF3543 1 2 142 Ww lt O a L U lt on a uu U lt O E uu U lt Y CC LU O lt O EH CC LU O A me Certificate No 11040101 ASA CERTIFICATE OF SUITABILITY Delta Energy Systems Germany GmbH Tscheulinstra e 21 D 79331 Teningen Germany Class Noa Preseribed Product Galvanically Insulated SKW Solar Inverter Brand Name Delta Model Number EOE46010301 Solivia 0APG3 Ratings Input 150 S40Vde 324 IP65 Output 230Vac S0Hz 27 24 5000 W Standard AS 4777 2 2005 and AS 4777 3 2005 with AS NZS 3100 2009 Al Approval Mark ASA 11040101 Date of Approval 28 July 2011 Date of Expiry 27 July 2016 Mies Se For and on Behalf of Australian Safety Approval ASA Confirms in accordance with ISO IEC Guide 65 that the equipment described above complies with the minimum safety standards listed This Certificate does not confirm that the described equipment complies with Performance Standards or any other claims of Performance Speciatists Pry Lint Trading as Autersiian Safety Approval Ground Floox 35 Alleyne Sereet Chatrwood NSW 2067 No 002 54reW Certification of Conformity Applicant Delta Electronics Thailand Public Co Ltd 909 Soi 9 Moo 4 E P Z Bangpoo Industrial Estate Prakasa Muang Samutprakarn 10280 Thailand M
100. manufacturer for a device or a system Usually the device is also optimized so that the efficiency is at its maximum in case of operation with nominal power Nominal current Nominal current is the absorbed current in case of electrical devices if the device is supplied with the nominal voltage and yields its nominal power PE In electric systems and cables a protective earth conductor is frequently employed This is also called grounding wire protective grounding device soil grounding or PE English protective earth Photovoltaics abbr PV The conversion of PV energy into electrical energy The name is composed of the component parts Photos the Greek word for light and Volta after Alessandro Volta a pioneer in electrical research 34 Operation and installation manual SOLIVIA 5 0 AP G3 Potential isolation No conductive connection between two component parts Power dissipation Power dissipation is designated as the difference between absorbed power and power of a device or process yielded Power dissipation is released mainly as heat PV cell PV cells are large surface photodiodes which convert light energy generally sunlight into electrical energy This comes about by utilization of the photoelectric effect photovoltaics PV generator System comprising a number of PV modules PV module Part of a PV generator converts PV energy into electrical energy RJ45 Abbreviation for standardized eight pole el
101. menu D Day 1 2 Upto 1 Y ESC i i lt D gt Energy Value Wh q Display of the daily energy gain Down U Y p ESC D gt AC Revenue Value DAU M Display of the daily revenue AUD Won Down U A 4 p ESC D gt AC Power Max Display of the daily Value W lt maximum output power Down U Y p ESC D gt AC Volt Max Display of the daily max Value V lt output voltage Down Y Up ESC D gt AC Volt Min lt Display of the daily min Value V output voltage A Down U 4 p ESC D gt AC Curr Max Display of the daily Value A lt maximum output current A Down Y Up ESC D gt AC Freq Max Display of the daily lt Value Hz lt maximum output frequency Down Y Up ESC D gt AC Freq Min lt Display of the daily Value Hz minimum output frequency Down Y Up ESC i Display of the daily operating D gt Runtime Value Min amp time of the solar inverter A Down to 2 Y 1 Remarks ESC in main menu D jumps to first entry of sub menu D Operation and installation manual SOLIVIA 5 0 AP G3 21 HSII9N3 7 3 3 Submenu W Week This menu item displays the average values of the current week ENTER lt ESC lt W Main menu W Week statistic Submenu W Week 2 Up to1 A Energy Value kWh Down Y Up ESC W gt AC Revenue Value AUD Won Down Y Up ESC Le W gt Runtime Value h A
102. mulated and maximum minimum values since first use ENTER Main menu T Total statistic gt D lt U 2 Up to 1 A Y ESL T gt Energy Value kWh A Down Y Up ESC T gt Revenue Value lt AUD Won Down U Y p ESC T gt PV1 Vol Max Value V A Down Y Up ESC T gt PV1 Cur Max lt Value A A Down Y Up ESC T gt PV1 Pow Max Value W A Down Y Up ESC rz PV2 Vol Max Value V Down U 4 p ESC T gt PV2 Cur Max Value A Do wn U Y p ESC T gt PV2 Pow Max Value W Down Uu 4 p ESC lt T gt Runtime Value Min Down to 2 1 t Submenu T Total lt Remarks Display of the total energy gain Display of the total revenue Display of the max PV cell voltage input 1 Display of the max PV cell current input 1 Display of the max PV cell power input 1 Display of the max PV cell voltage input 2 Display of the max PV cell current input 2 Display of the max PV cell power input 2 Display of the total operating time of the solar inverter ESC in main menu T jumps to first entry of sub menu T Operation and installation manual SOLIVIA 5 0 AP G3 23 HSITONA 7 3 7 Submenu S Setup This menu item is used for changing the presettings of the solar inverter Main menu S Setup ENTER A l ESC lt ESC Le 2 Y DESS Down Y ESC S gt LCD Backli Auto On Down Up
103. mum yield from your product Please observe the following notes on safety e During operation of electrical devices certain parts are under dangerous voltage e Inappropriate handling can lead to physical injury and material damage e Adhere to the installation regulations e Installation and operational start up work may be implemented only through qualified electrical experts Repair work on the device should be carried out by the manufacturer only e Please observe all points in the operating and installation manual Cla e Isolate the device from the grid and the PV modules before carrying out any work on it As a result of very high temperatures the device surface can become hot e Sufficient cooling is necessary e As the solar inverter is heavy weight gt 18 kg it should be lifted by at least two persons Remember that the unit has a high leakage current The PE conductor MUST be connected prior to commencing operation contains no user serviceable parts Opening the cover will invalidate the warranty ma To avoid risk of electrical shock do not open the solar inverter The inverter Dangerous voltage is present for 5 minutes after disconnecting all sources of power 4 Operation and installation manual SOLIVIA 5 0 AP G3 3 Introduction With this device you have acquired a solar inverter for connection of photovoltaic systems to the grid This solar inverter is characterized by its advanced
104. ning electromagnetic compatibility EMC and safety are fulfilled The solar inverter is functional in on grid operation exclusively An automated isolation point which is approved by a certification agency guarantees secure disconnection in case of circuit isolation or interruptions in power supply and avoids isolated operation The disconnection equipment allows for automatic isolation for in plant generation systems of nomi nal power lt 4 6 kVA with single phase parallel feed in through the solar inverter into the grid 6 Operation and installation manual SOLIVIA 5 0 AP G3 4 3 Equipment overview S 4 1 Connections for PV modules 2 Grid connection 3 Interface connection RS485 EIA485 4 Display for status messages and keypad for operation 5 Light emitting diodes for operational status display Operation and installation manual SOLIVIA 5 0 AP G3 7 5 Installation Installation and commissioning must only be carried out by qualified electrical experts The recommended local and national safety regulations and the technical interface conditions TAB 2000 should be complied with To carry out an energy measurement a meter must be attached between the grid feed in point and the solar inverter in accordance with all local and national safety regulations By means of the integrated anti islanding protection the function of the recommended section switch is fulfilled in accordance with all local an
105. nto 2 Y tz rz of x LO Ze e Ss gt on gt Q C 58 AS BR 7 3 6 ae vir T P AAAS OME TAS at 2 u 2 2 gk S vais Main menu T Total statistic ENTER gt Submenu T Total 1 2 Upto 1 A Y pd T gt Energy Value kWh ll 357 SHS BANU A Down Y Up ESC T gt Revenue Value Ae e lt lt 2S BATU AUD Won ee Down Y p ESC T gt PV1 Vol Max AAAF AS BBG input 1 Value V A Down Y Up ESC T gt PV1 Cur Max z Value A AA lq lang EAHA input 1 A Down Y Up ESC T gt PV1 Pow Max w ny AA d AAAS EAHA P Value W BS 2S HA FUT input 1 A Down Y Up ESC T gt PV2 Vol Max lt 4g AAY azads SABC input 2 Value V Down U Y p lt 2 cur Max Ay 199 AJARI ale input 2 Value A Down Y UP ESC T gt PV2 Pow Max lt AO datt AJAJE EAT input 2 Value W A Down U y p ESC lt T gt Runtime Value Min 0 FH HE S AZ SIS Alt Down to 2 1 ber ALSO 22 ABAISOLIVIA 5 0 AP G3 7 3 7 ats air S 3 4 miir SSS HUT WHE S Je AVS aalt GAS ec Main menu S Setup ENTER gt Submenu S Setup l 8 2 Up to 1 A Y ESC S gt LCD Contrast lt LCD r E o S 8 7 S oF Bom ABU Ope Sg Down b Y Up VI s gt LCD Backlight L
106. nu N Now ENTER BE data ot Submenu N Now L 2 Up to 1 A Y ESC SE lt N gt AC Power Value W O O Down Y Up ESC z lt N gt AC Voltage Value V A Down U Y p ESC i lt N gt AC Current Value A A Down M Up lt eun a e swamp A Dewa Up ESC N gt PV1 Voltage lt Value V 1 A Down Y Up ESC N gt PV1 Current lt Value A 1 A Down Up Y ESC N gt PV2 Voltage lt Value V 2 Down Y Up ESC N gt PV2 Current lt Value A 2 Down A Y Up ESC i lt N gt Time HH MM SS A Down Y Up ESC N gt Date WD DD MM YYYY Down to 2 Y 1 126 SOLIVIA 5 0 AP G3 7 3 2 ars D LA ARSE EXE o Main menu D 1 Day statistic ENTER gt lt Submenu D Day 2 Up to 1 A Y ESC lt D gt Energy Value Wh lt Down Y Up Ese D gt AC Revenue Value lt AUD Won A Down Y Up ESC D gt AC Power Max lt Value W A Do
107. o 2 r 2k s 22 z lt seru rk oA AF oa ARH A7 PAA C4 Atte SHR Sa AAS Whose AP a7 Bale 7 lt HS S ru etch PE 217 AAW ASA SS HS BZ ANS ASST o SH ANS FZ AA HS da JA A3 224 BS AAPA PRAH EH g4 eFo DV AF ej uJ 2 242 el t 2 AF Photovoltaics 4137 Ho TAHAA Photos 208 14H Volta 217 AFA AFA Alessandro Volta Z l 2 4 As Ro T TAF 61 AEA AA AE 221 SAL oA SS FTA ASF AAs 0a eE BYU Aa KEE 70 ARS R AA 1SOLIVIA 5 0 AP G a og HZ AAS ENA lead 1 o 12 91ut2 o Qs a7 AAE way FAIA F HA BPS o Beyer a 0 D Mo ber 79 AFELE BS AdE 47 AAE WSs cy Jg 8 47 AYE A8 FAJA RJE Registered Jack 4 27 2 FJA RS485 EIA485 AA AZE X 21S AST TEREA ASE OS o AAE AS AG AAA JENY 3S AAW AES tas Ye AAA Sip PH AFF IHE DC AVS AC ALE HE ATS wn Aae 217 22 SES 482 A448 47 WSS 2S S gydd SEX ASS WHE CaS eae AA Aes BAS WA SEJLE prg 4 SES za 2 E 2 aes cael a YEH AAS Zich oes AS YP SSS sp 342 SE GY BES Ad EUS Wad zad UMS Ve F544 248 a7 ede TAB 2000 TAB 20002 S29 Wa AA 28 SA7 esate AAY ele Me AA ABs 7 E TAMU e Z FAS 20000 HE AYO PHU Ch e HAYS Ay BAS AS Ho gaje 27 AZM da DSO Waert au AAS HAIG AF8 amp dal ABYASOLIVIA 5 0 AP G3 71 72 SOLIVIA 5 0 AP G3
108. ominal power 4600 W Operation and installation manual SOLIVIA 5 0 AP G3 29 10 Appendix 10 1 Connection examples Individual in plant generation system in parallel operation without isolated operation possibility single phase feed with anti islanding protection Low voltage network 400 220 V Low voltage network 400 230 V House connection line House connection box VNB en Ee Owner boundary Customer Measurement unit 1 Meter for power consumption J I 2 Meter for power feed in with back stop in each case Remark A meter can also be employed which registers both energy directions separately 400 220 V 400 230 V Electric circuit distributor Switching equipment Anti islanding protection with voltage and frequency monitoring as well as network impedance measurement Consumer equipment of the customer Photovoltaic generator with power inverter max 4 6 kVA Short circuit protection Overload protection 30 Operation and installation manual SOLIVIA 5 0 AP G3 Individual in plant generation system in parallel operation without isolated operation possibility single phase feed with anti islanding protection separate feed Low voltage network 400 220 V Low voltage network 400 230 V House connection line House connection box VNB Owner boundary Customer 400 220 V 400 230 V I Consumer equipment of the customer Photovoltaic genera
109. one 91 0 80 67164777 Extn 5284 Mobile 91 9900 001724 Support Email support india solar inverter com 5012218107 07 02 April 2012 Delta Electronics Thailand Plc 909 Moo 4 E P Z Bangpoo Industrial Estate Tambon Prakasa Amphur Muang Samutprakarn Samutprakarn 10280 Thailand Phone 662 709 2800 Extn 6352 Fax 662 709 2826 Support Email support thailand solar inverter com Delta Energy Systems Australia Pty Ltd Unit 6 25 Howleys Road Notting Hill VIC3168 Australia Phone 61 3 9543 3720 Main line Phone 61 3 9543 3053 Service line 1 Phone 61 3 9543 3056 Service line 2 Fax 61 3 9544 0606 Support Email support australia solar inverter com A NELTA
110. p ENTER Firmware A 4 Up to 3 A Y ESC S gt Firmware AC Ctrl maj min bug A Down Y Up ESC S gt Firmware DC Ctrl maj min bug A Down Y Up ESC gt Firmware SC Ctrl maj min bug A Down Y Up ESC S gt Firmware Display Ctrl maj min bug D to 4 own to4 3 96 SOLIVIA 5 0 AP G3 8 8 1 1 2 3 1 DiE 4 5 BE N RREB gt gt gt gt gt gt RE 8 2
111. pplier HARTING Deutschland GmbH amp Co KG P O 2451 32381 Minden Germany www harting com Order designation 09 45 145 1510 Cable Manager Blue IP67 Push Pull Data Plug 09 45 145 1500 Cable Manager White IP67 Push Pull Data Plug SHEH PFP H PIS EHS RS485 EIA485 terminating resistor 220 V 230 V House connection line RS485 EIA485 Connection Datalogger Operation and installation manual SOLIVIA 5 0 AP G3 13 HSI1SN3 Connector pin assignment RS485 EIA485 Pin Reserved Reserved Reserved GND RS485 Reserved RX B RS485 TX_A RS485 Reserved ECKER Top View When several devices are connected in series and the total length of the data line measures 2 m or more the following option is available for terminating the RS485 EIA485 interface O sv Reserved OR TXA Pin7 Ser 100 150 Ohm 0 25W Pin 6 OR Reserved GND Operation and installation manual SOLIVIA 5 0 AP G3 Anti islanding protection Communi cation Power controller Operating and system control Public MPP Isolation grid Tracker col AC Booster Solar inverter 6 9 Electrical connection and operational start up The electrical connection is utilized on this solar inverter using the connector contacts which are attached to
112. r from the grid open automatic circuit breaker 2 Switch off the DC disconnector 3 Wait approx 1 minute 4 Switch DC disconnector back on 5 Switch in grid close automatic circuit breaker In the field the first step is to scan for potential fault causes that could be picked up by the solar inverter and result in tripping Various key parameters can be scanned via the display thereby enabling conclusions to be drawn about potential fault causes Current values in the N menu Display of current output voltage gt AC Frequency gt Display of current grid frequency gt AC Voltage gt Voltage limiting values Frequency limiting values Solar Voltage gt Display of current PV cell voltage gt Switch in threshold 8 2 Display messages AC frequency failure AC voltage failure AC relay failure Calibration ongoing DC injection failure Error 301 Display communication faulty Grid frequency overshoo ting or undershooting specified limit range Grid voltage overshooting or undershooting specified limit range One of the anti islanding protection output relays is faulty defective Check internal settings DC component of input side alternating current is too high Internal communication error or hardware fault DISPLAY MESSAGE CAUSE ELIMINATION If the fault persists after the device has been reset please inform your service technician Check the grid
113. rs yl 2 Calibration ue aa ag ga me Ao dat als ongoing u H SE DC injection DC TA 9 VAS aus 44 5 7 s l F471 As EAS failure Lux ES A Mutz Ale oy 3 9 34 4 9 n Error 301 SE SE Lip HES 62 A S o Sal 213 4 SOLIVIA 5 0 AP G3 ao E 4 4 ol dn E k eg 8 e E Zeg P oe ee 8 r e R p g M p 2 of T o F ka w TT X ve s E T E De He S W ve K i e Ee Zi 2 oj FR lt SE EH E Is Wor Soe Jo Jo Ee ol E o 7 s ayes Pi lt s SE Ee BONI et lt my d dr Ss ali e g D CS em CS Sie a BES EGI j gt lt Sg d x T TOA U Sr zk Z F D x G Zi dn Wei e R oct CS ge Doa Greet De bt g Man Seen x To sont ef aa F erg Zb E cee ome H Ae ZS SE D Cogn Wie dy lie io DH se me TT guo TH Tea A RT Rens d s Ale W SE PE Be 1 FIRE go Ky WKS Q aps 5 ES Ea Wa WER Les ef cc R ES SES A oR 2 T S KE on Q 7 z z T P rire A Be s TINH u toe ai F Sr Es Si st i al 3 z Alen H lt F mm om 6S a ge MOF Fo Nr T de Tol on T KAT HON Hor GE J ma E e E af R at EE D h z F SNE oo NIG TIEK i 5 S T i wm SNP yg se En S E z T i Pot EE xna TA E WI Su Kaze dron K el Se a dq B Es P om al dem Z P U Ze B Ser eet OR o To lt oi roy AAS ae i gt S amp amp be Gelz 54 o 8 gt Says s 5 Ey E Ea Eca ye 5 e Sg 5 55 PESEE Ss ER 26 Se lt E T B Euu ES sole SR
114. solar inverter is securely sealed Mounting plate Locking screw Operation and installation manual SOLIVIA 5 0 AP G3 9 HSII9N3 6 5 Ambient temperature The solar inverter can be operated in an ambient temperature between 25 C to 60 C The following diagram illustrates how the power supplied by the solar inverter is reduced automa tically in accordance with ambient temperature The device should be installed in a well ventilated cool and dry location 6000 W 5000 W 4000 W 3000 W 2000 W 1000 W DW r 6 6 Grid connection The grid AC output is connected over a Wieland RST25i3S AC connector You can find the cor rect allocation on the screw type terminal connection of the connector The solar inverter must be connected to the grid over a three core line L N PE The connected AC line must be switched potential free before the disconnection or the insertion of the AC connector The connection to the Wieland AC connector must be made with a flexible line and a conductor cross section of 4 0 mm An automatic circuit breaker is to be provided in the line L upstream of every device with a nominal current of 32 A and tripping characteristic type B or C please refer to your local country installation requirements and regulations for correct tripping characteristic type In addition attention is to be paid to the selectivity of the fuse unit attache
115. the grid off so that the solar inverter cannot absorb any further power Next open the upstream DC disconnector The maximum input voltage of the solar inverter is 540 V The maximum current load of each indi vidual Multi Contact MC4 connector is 18 A The solar inverter has an insulation and grounding monitoring on the DC side The options can be configured in the Setup menu S gt Solar ISO GND see 7 3 7 1 The insulation monitoring has two modes e ISO ON Error the solar inverter is disconnected from the grid in the event of an insulation fault e ISO ON Warning the solar inverter indicates the fault but is not disconnected from the grid Deltas solar inverters are factory set to ISO ON Warning mode on delivery The grounding monitoring has two modes e PV grounding grounding monitoring of the positive pole of the PV generator e PV grounding grounding monitoring of the negative pole of the PV generator In these modes the solar inverter remains in feed in operation and will not be disconnected from the grid in case of a fault The error message PV grounding fault or PV grounding fault will appear on the display If you need to connect the positive or negative pole of the PV system to meet requirements set out by the module manufacturer you can do this Earth continuity must be implemented close to the inverter We suggest using Deltas grounding kit Grounding Set A Solar EOE99000275 The gro
116. ther time by the user Once confirmed the network ID and the country selection are stored to the controller memory and the solar inverter is ready for operation Please note that the enter keys on the display are locked if there is no input entry within 5 minutes To unlock the enter keys you need to switch off the DC voltage and then switch it on again 1 In certain states in Australia power limitation is required With power limitation the output AC power of SOLIVIA 5 0 AP G3 will be as followed Max power 4990 W Nominal power 4600 W To activate power limitation please select dedicated country Australia PL Installed settings are password protected Select unit ID 1 amp press lt ENTER gt key Select country Australia PL amp press lt ENTER gt key Confirm country selection by pressing lt ENTER gt key The following label that is enclosed in the box of the inverter MUST be sticked next to the model label A ELTA For Australia PL This product has been power limited at maximal output power of 4 99 kW To check if power limitation has been activated please go to the menu S Setup and press the UP or DOWN buttons to find the following display message Down Up 1 S gt Firmware AU L Australia Limitation 16 Operation and installation manual SOLIVIA 5 0 AP G3 Country selection Enter network ID lt Es E Increase network ID Decrease networ
117. thin 30 seconds the display lighting automatically goes out The setup menu enables selection between continuous or automatic lighting Through pressing the ENTER key the display lighting is switched on again 7 3 Main menu The main menu consists of 7 menu items which are subdivided into submenus e Menu N Now e Menu D Day e Menu W Week e Menu M Month e Menu Y Year e Menu T Total e Menu S Setup Handling of the menu items You can scroll the main menu by activating the selector keys f Press the ENTER key to select the submenus In order to exit the menus again activate the ESC key 18 Operation and installation manual SOLIVIA 5 0 AP G3 Down to gd User menu 2 Up to 1 ESC Menu N Now act data ENTER Down Up ESC Menu D Day statistic E ENTER Down Up ESC Menu W Week statistic lt ENTER Down Up ESC Menu M Month statistic ENTER Down Up ESC Menu Y Year statistic ENTER Down Up ESC Menu T Total statistic ENTER Down Up ESC Menu S Setup inverter ENTER 1 Remarks Submenu N Now Submenu D Day Submenu W Week Submenu M Month Submenu Y Year Submenu T Total Submenu S Setup ESC in main menu jumps to first entry of corresponding sub menu Operation and installation manual SOLIVIA 5 0 AP G3 HSI9N3 7 3 1 Submenu N Now This menu item displays the active va
118. tor with power inverter max 4 6 kVA Measurement unit 1 Meter for power consumption 2 Meter for power feed in with back stop in each case Remark A meter can also be employed which registers both energy directions separately 3 Meter for power take off of the customer system Electric circuit distributor Switching equipment Anti islanding protection with voltage and frequency monitoring as well as network impedance measurement Short circuit protection Overload protection Operation and installation manual SOLIVIA 5 0 AP G3 31 HSII9N3 10 2 Overview of connection diagrams PV generator PV generator DC terminal stri Meter for DC disconnector power sich a consumption Consumer gt equipment Solivia 5 0 House connection box Automatic Selective circuit breaker Meter for main line type B 32 power feed in circuit breaker House connection line PV generator PV generator a i DC disconnector a A 8 S 5 2 s 8 EI Solivia 5 0 Solivia 5 0 Automatic circuit Automatic reaker circuit breaker type B 32A J type B 32A Customer L Meter for Meter for Ee kWh kwh power feed in 32 Operation and installation manual SOLIVIA 5 0 AP G3 PV generator DC disconnector Solivia 5 0 Operation and installation manual SOLIVIA 5 0 AP G3
119. ug DO PFP h N RS485 EIA485 SU AD 220V 230V aera aa gel RS485 EIA485 A A ol 7157 AF8 22 dal ABASOLIVIA 5 0 AP G3 49 foe qa AJ JAE JAE AAE RS485 EIA485 Ql 0 ja A AE A 47 RS485 EIA485 D ECKER gold dai Fae Aa ENEE go do do EDELA ty 3 Aa z 12 RS485 B RS485 A RS485 del 7 2m d Zelt az ARBRE ed 5V AMS Oe OR es A S 400 150 REE Ohm 025W Pin 6 OR NEA ge 42 50 AS o 232 ABAISOLIVIA 5 0 AP G3 gata Sg GER EES AS a ASY dei y DC E t 2 d gt K ee ob MPP Sal Ias Se DC 4 K KOR F 94 ge e gt c ege al DC D datz A 6 9 AZ AA BAG Bes Aa A7 AAS ze gel FAs AYE gas rea ANU omg 2 o JAE 24 ol Buc AF8 Z 22 213 A1SOLIVIA 5 0 AP G3 51 w N oN cke S Z gt EI gt x 6 10 o gt O oO O nl o gt D rg rg Vd pu oQ rg oW N X jo ku 1 gt my gd T Tag D S Wu D amp SE x Gi ECA u a S Sm HE AAS AAF ro to E N oe ty s ba Vd a DEI D EI Di bi EI mt o bi Ka oO of N r gt L T UPV gt 15 dir SADANA AIA SS BAB Sok FU 7 3 74 BA Ei m ou
120. unding connection is monitored and should be configured in the Setup menu see above Alternatively it is possible to turn off the insulation and grounding monitoring ISO GND OFF Operation and installation manual SOLIVIA 5 0 AP G3 11 HSI9N3 Required cable coupler types for DC cable connection to inverter WIRE SIZE WIRE SIZE FEMALE COUPLER 2 5 MM2 4 0 MM 6 0 MM CABLE POLARITY AWG 14 AWG 12 10 COUPLER MALE CABLE MULTI CONTACT COUPLER ORDER NUMBER 32 0010P0001 UR 32 0012P0001 UR 32 0011P0001 UR 32 0013P0001 UR 32 0014P0001 UR 32 0016P0001 UR 32 0015P0001 UR 32 0017P0001 UR 6 7 1 Output power over PV voltage 150 VDC 200 VDC 250 VDC 300 VDC 350 VDC 400 VDC 450 VDC 12 Operation and installation manual SOLIVIA 5 0 AP G3 6 7 2 Efficiency The best efficiency of the solar inverter is obtained at input voltages gt 250 V 100 95 90 50 w 500 W 1000 W 1500 W 2000 W 2500 W 3000 W 3500 W 4000 W 4500 W 5000 W Ses sssi SOLIVIA 5 0 150 V SOLIVIA 5 0 250 V SOLIVIA 5 0 350 V SOLIVIA 5 0 450 V 6 8 Interface connection RS485 EIA485 The interfaces not used must always be closed off In case of utilization of an interface only the counterpart fitting on the interface connector is to be employed Mating connector su
121. wn Y Up ESC D gt AC Volt Max Value V lt Down Y Up ESC D gt AC Volt Min n Value V A Down D Up ESC D gt AC Curr Max Value A lt Down Y Up ESC D gt AC Freq Max Value Hz lt Down Y Up ESC D gt AC Freq Min lt lt Value Hz A Down Y Up ESC lt D gt Runtime Value Min Down to 2 Y 1 B SOLIVIA 5 0 AP G3 127 Teh 7 3 3 W ga Main menu W Week statistic ENTER gt Submenu W Week ee 2 Up to 1 A Y Paza W gt Energy Value kWh Down Y Up ESC W gt AC Revenue Le gn Value AUD Won EES Down y Up LESC W gt Runtime Value h ERA eR BS W ll Down to 2 v 1 M CAD Main menu M Month statistic ENTER gt Submenu M Month i
122. www solar inverter com ma o h ol gt dza Delta Energy Systems Germany GmbH HE A4 H 9 gur AS ABA ABS ze eer Za Sf ad 4 z444 9 Agy US 71449 gut To loi Awe Apelor H qA HH Delta Energy Systems 7ER AAA Au EES zal aL Bale WUT ES BEE ais Sue A AAA dadd SS SEE ol ABA ai 4 e SAS AF8 23 4 Ve e Wo Bx Go Waal AGA KEN foe AF8 amp 212 ABASOLIVIA 5 0 AP G3 37 38 AS o 212 AWASOLIVIA 5 0 AP G3 Be 1 AS eS 4 2 gut A A 2 4 40 3 N 4 4 2J2 l 4 4 1 Q4 84 SA 4 42 Bes ANAA zez 42 43 AH AL 43 KEN 44 ayy 232 44 6 1 212 AX 44 62 ia zz 44 63 Sal Hy 45 6 4 KE 45 65 al Sie 46 6 6 g Aa 46 67 ot xE AA 47 6 7 1 AY At dy ea aa 48 672 S 49 6 8 AHA AA RS485 EIA485 49 69 A7 AA BAS 5 6 10 TAAA 52 6 11 LED 4 5 Z FA SA 53 7 Ae Wa 54 Tol r u e 54 72 rezo 4A 54 7 3 m r r 54 73 1 kal war N 912 56 7 3 2 IA AF D 2 57 7 3 3 A dir W 58 7 3 4 A dir M 8 58 7 3 5 A AF Y 91 58 7 3 6 A dir T C D 59 7 3 7 A AT SAR 60 7 3 7 1 5 vir S Solar ISO GND 61 7 3 7 2 5A Alar S Firmware 61 8 Ad m ole 87 62 81 24S WA 62 82 gae Az 62 9 Je Ao 64 10 MS 66 10 1 AZA o 66 10 2 AA EM Ae 68 11 94 70 12 AA 142 AS o 212 2119 A SOLIVIA 5 0 AP G3 39 ber 1 ALS SS 3 ol E SOLIVIA 5 0 AP G3 Hz ER ee AA 294 AC 494 2 A A A 2 Hes 91H E SOLIVIA 5 0 AP GBS FAA TAN PARA

Download Pdf Manuals

image

Related Search

Related Contents

Easy PocketNAV.com 5 User`s guide  NV200 MANUAL SET  "user manual"  HP Pavilion 500-064er  BDA_UBISOUND2GO  York TG8S User's Manual  Newstar NM-W460WHITE flat panel wall mount  Schneider BAK innen - Anton Schneider Cuckoo Clocks    Ficha Técnica Extraplas Naranja 2h  

Copyright © All rights reserved.
Failed to retrieve file