Home

SunEasy User Manual

image

Contents

1. Purchaser placing an order with Conergy except as varied by written agreement by Conergy and the Purchaser Order 1 2 Inthe event of any inconsistencies between any Order or other documentation of the Purchaser and these Terms and Conditions these Terms and Conditions will prevail 2 Offer and Conclusion of a Contract 2 4 A quotation is not an offer by Conergy to sell or supply may be withdrawn or varied at any time prior to Conergy s acceptance of an Order and is void after thirty 80 days unless extended in writing by Conergy In addition prices are subject to variation in accordance with clause 3 Conergy reserves the right to correct typographical and clerical errors Any and all declarations of acceptance and Orders need to be confirmed by Conergy in writing or by fax to become legally effective Conergy s issue of an Order acknowledgement is not and does not imply acceptance of any terms or conditions in any Order form or other documentation of the Purchaser 2 2 Conergy s employees are not authorised to make any oral collateral agreements or oral confirmations which go beyond the content of the written contract and the Purchaser will not rely on any such oral collateral agreements or oral confirmations 2 3 Inthe event that Conergy cannot perform an accepted Order for whatever reason Conergy will immediately inform the Purchaser that the performance is not available and the Purchaser s counter perfor
2. The solar power system must shut down before commencing any electrical work on the building 6 Rev 0 0704 Operational safety Please observe all safety signs installed and all warnings laid out in the accompanying operating instructions Shut down procedure The following procedure must be followed to shut down the system Please refer to the system drawings on page 13 1 Disconnect the utility grid system to the inverter via AC Grid Disconnection Circuit Breaker labelled Q1 2 Disconnect the DC power to the inverter at the DC side of the inverter via Grid Disconnection Circuit Breaker labelled Q2 3 Disconnect the DC power to the Building DC cable on the roof via the Roof Isolating Circuit Breaker if applicable labelled Q3 4 Disconnect all MC plugs between all solar modules to create lower voltage for a safe work environment DC voltage when system is shut down Even if the system has been disconnected from the grid via a circuit breaker voltage is still present in the solar panels during daylight hours In case of fire try and and shut down the system as far as possible All circuit breakers must remain off until the fire is extinguished Daylight voltage in the solar modules In daylight hours as well as at dusk and dawn DC voltage will be present in the connected wires and cables Safe work on roofs After shutting down your system in the order above if persons are working on your roof you must make them a
3. Once a year The installer of your Conergy SunEasy solar power system or a qualified electrician should carry out an annual maintenance check as outlined on page 16 4 2 Trouble Shooting The inverter is considered to be the heart of the solar system as it controls every aspect of the power generation within the system and provides system status indication To trouble shoot your system please refer to the inverter manual included with the System Installation Manual This manual contains all information to enable the user to identify problems caused Please note again that problem rectification once identified can only be carried out by your system installer or a licensed electrical contractor 12 Rev 0 0704 amr al ie CONERGY nn 5 System Drawings 8 Revision note checked 6 CONERGY LARGE AREA MODULES H H H 2P 400 VDC RATED ROOFTOP ARRAY ISOLATION NOT INCLUDED 2P 400 VDC RATED PV ARRAY MAIN SWITCH SOLAR ARRAY Voc 270 V Isc 5 4 A SOLAR MODULE Voc 44 4 V Isc 5 4 A Pmod 175 W 6KAC GRID DISCONNECTION D THE DC CABLE TO BE 4 MM2 DSI MC CABLE 2 THE AC CABLE TO BE AT LEAST 2SMM2 CROSS SECTION Itenret Quantity Ttlekane designation material dimension ete Article No Reference Designed by Checked by Approved by date Fle name Date Seale HA UN 25707706 SEW
4. Period of Delivery and Performance Delivery will be deemed to occur when Conergy informs the Purchaser that the Products are ready for collection at Conergy s works Dates and periods of delivery of which Conergy will advise the Purchaser in writing only will be regarded as best estimates but will not be guaranteed and may be subject to extension to cover delays caused by Government priorities strikes lockouts breakdowns delays in transport fines late delivery of raw materials or components or other causes beyond Conergy s control and Conergy will accept no responsibility or liability for the consequence of any delays In this event Conergy will be entitled to postpone the delivery and the performance by the period of the complication plus an appropriate restarting time or to cancel the acceptance of an Order in full or in part with respect to the part not yet fulfilled If a complication referred to in clause 4 2 lasts more than three months following the setting of an appropriate additional period of time the Purchaser may cancel that part of the Order which has not already beenperformed by Conergy In the event that the period of delivery or performance is extended or in the event that Conergy is released from its obligations the Purchaser will not be entitled to any claim for damages If Conergy accepts in writing responsibility for non compliance with bindingly agreed dates and periods of delivery or performance the
5. Intellectual Property Rights Conergy is the owner of certain patents and registered designs as well as other intellectual property rights including copyright and other technical business or similar information including all designs documents and other materials relating to the Products created by Conergy together the Intellectual Property Rights The Purchaser must not directly or indirectly manufacture or purchase from any third party the subject matter of the Intellectual Property Rights or in any way infringe the Intellectual Property Rights The Intellectual Property Rights remain at all times the exclusive property of Conergy 9 Confidentiality The Purchaser must keep these Terms and Conditions confidential and must not disclose details of them to any third party without Conergy s prior written consent The Purchaser agrees not to copy or disclose to any third party any drawings price details any other technical papers or any documents marked or identified as confidential supplied by Conergy under these Terms and Conditions 10 Drawings and Specifications All drawings and specifications descriptions and other documents attached to any quotation are for tendering purposes only and will not form the basis nor be part of any contract between Conergy and the Purchaser Conergy retains ownership of the copyright and all other intellectual and industrial property rights in all drawings specifications manuals and
6. improper installation or application or negligence in use transportation handling or storage or repaired by anyone other than an authorised representative of Conergy this warranty will be considered void b The warranty does not include any transportation cost for returns of modules or for costs associated with removal installation or reinstallation of repaired or replaced modules c The warranty does neither include material flaws processing and production errors or functional disturbances or other damage to connection cables d The warranty does not include indirect damage in particular no secondary or resulting damages including damage to persons or property lost profit damage to reputation loss of data advertising or manufacturing costs overhead costs and loss of customers as well as costs resulting from business interruption removal and or re installation or purchasing of new items e The prerequisite for the specified services being granted is that the module concerned has been used correctly This is only the case where it has been used in a stationary application on the mainland The guarantee does not cover maritime or mobile uses in particular f No warrantee services will be performed if the module is modified from its delivery condition as a result of neglect improper operation installation use storage transport handling or by failure to observe the warnings in the data sheet or similar documents the base on which
7. CROSS SECTION Quanity Title Mane designation material dimension ete Article No Reference Designed by Checked by Approvedby date Filename Date Sale CUN 25707706 sezonooias 0 07 06 Ns SUN EASY 2000 DIAGRAM Edition Sheet lw CONERGY PTY LTD 6 13 Conergy SunEasy Grid Connect Kit User Manual 6 Safe Operating Induction Certificate The system operator has been thoroughly informed of relevant safety regulations and operating instructions for a solar power system especially potential risks handling and maintenance works on the system or its components Before carrying out any work on the solar power system or in its vicinity the installer named below must be contacted for professional advice System installer Telephone Note Failure to contact the installer may void the warranties for the system and or its components Exclusion from liability Conergy Pty Ltd and its employees agents licensees contractors and sub contractors shall not be liable in any way except to the extent such liability is incapable of being excluded or limited under any federal or state laws of Australia for any damages costs claims demands actions or other liability in respect of or arising from any injury death or from any loss of or damage to any property whether or not involving negligence or any other caus
8. Once a fortnight Check inverter and meter as in Chapter 3 System Operation Once every three months Check the array for shading during the middle of the day ideally between 10am and 4pm Surrounding trees may have grown since the solar power system was installed and may need to be trimmed Check your electricity bill to ensure you are being credited for energy generated by your solar power system The easiest way to do this is to compare your current bill with the bill for the same period last year It should show fewer kilowatt hours being consumed If not check the following before calling your electricity retailer Have you bought any new appliances or made changes to your lifestyle that may mean you are using more energy than in the same period last year Your solar power system generates less energy in winter and more in summer If it is currently winter the solar power system may not make a significant difference to your bill If you have not had your solar power system for the full quarter it may not have generated enough energy to make a significant difference to your bill If none of the above explains the difference and you are still concerned call your Conergy SunEasy system installer and ask for assistance to test the inverter and find out how much energy you have generated Then if required contact your electricity retailer and check that their billing system includes energy generated by your solar power system
9. Orange sunrise Warning displayed on the screen or Manual shutoff of the system operation Flashing Orange Inverter will automatically start up operation after sunrise General Alarm see Status Diagnosis and Repair on page 55 ofthe WR Inverter Instruction Manual for the Error Message Steady Red No Solar Array power output This is normal during night time Off Conergy SunEasy Grid Connect Kit User Manual 3 2 To Check Systems with the SMA Sunny Boy Inverter 3 2 1 Operating Mode Indication The SMA inverter displays the actual operating status with three LEDs on the inverter lid Betrieb 0 Operation Earth Fault The owner user of the solar power system should regularly inspect and take note of the inverter LED indications to make sure that the solar power system is in good condition and it is working fault free It is even more important to carry out this LED status check during the early months after the installation at different times of the day under different sunlight conditions You will find a complete description of all LED signal codes in the SMA Sunny Boy Inverter Manual 3 2 2 Normal Operating Mode As long as no LED or only the green LED is blinking the Sunny Boy is in its normal operating status If all three LEDs are on the inverter is in its initialization phase which is a normal operating state as
10. Purchaser shall be entitled to compensation for delay amounting to a half percent for every full week of delay totalling a maximum of five percent of the invoice value of the Products and Services Order affected by the delay Any and all further claims will be excluded unless the delay is caused by Conergy s gross negligence Conergy may carry out partial deliveries and partial performances at any time within the period advised by it for delivery or performance Any delivery and performance obligations arising in relation to these Terms and Conditions will not apply to Conergy until timely satisfaction of all the Purchaser s corresponding duties Time for payment will be of the essence of the contract If the Purchaser requests Conergy to delay delivery or performance or fails to give Conergy adequate instructions for delivery or performance or is in delay of acceptance of delivery or performance for any other reason Conergy may claim the damage or cost caused by such delay including the cost of storage of Products Upon the beginning of the delay in acceptance the risk of accidental deterioration or accidental loss of Products passes to thePurchaser Passing of Risk All Products will be at the Purchaser s risk from the point of delivery as defined in clause 4 Insurance cover is the responsibility of the Purchaser and Conergy will not be responsible for any loss or damage occurring after the point of delivery and will only arra
11. cables report the damage to your Conergy SunEasy installer immediately AC circuit breaker Recurrent tripping of the AC circuit breaker indicates a fault Please report this fault to your Conergy SunEasy power system installer immediately Inverter display Regularly check the inverter display and report any malfunctions or warning signals Operating instructions Please refer to the enclosed operating instructions for further safety information on your inverter and instructions for displaying your system performance data Warning notices Safety Signs and Instructions All safety instructions and warning signs installed with the system Must kept a legible condition e Must not be damaged e Must not be removed e Must not be covered pasted or painted over DC disconnecting device DC plugs must never be disconnected from the sockets of the solar modules as long as the Conergy WR unit is feeding power into the mains Before disconnecting the DC plug you must always disconnect AC power to the inverter To carry out maintenance work your installer needs to switch the system off via the AC circuit breaker Q1 and then disconnect the DC side as per the shutdown procedure DO disconnect the inverter s DC side when the inverter is switched when solar panels producing energy Rev 0 0704 Switchboard Always keep the switchboard door closed Any work on the meter box or its supply cables mu
12. damages whether direct or indirect and whether or not resulting from or contributed to by the default or negligence of Conergy its agents employees and sub contractors which might be claimed as the result of the use or failure of the Product sold or the Services supplied 6 13 In the event that Conergy provides the Purchaser defective assembly instructions preventing the orderly assembly of a Product Conergy will provide the Purchaser with effective assembly instruction and Conergy expressly excludes all other liability in relation to such an occurrence 7 Indemnity 7 1 Subject to clause 14 the Purchaser indemnifies and holds Conergy harmless from and against all liabilities losses damages costs or expenses incurred or suffered by Conergy and from and against all actions proceedings claims or demands made against Conergy arising in either case as a result of 7 4 4 the Purchaser s failure to comply with any laws rules standards or regulations applicable in relation to the Products or the use of the Products any use of the Products contrary to any instructions or warnings given by Conergy any other negligence or any breach of duty by the Purchaser any compliance or adherence by Conergy with any instructions by the Purchaser in relation to the Products or their manner of preparation or any failures resulting from the incorporation of or failure of non Conergy manufactured or supplied parts in the Products 8
13. other documentation provided to the Purchaser and all such documents must be returned to Conergy on demand 6 12 2 2 7 1 3 7 1 4 7 1 5 Rev 0 0702 11 11 4 11 2 11 3 11 4 11 5 11 6 11 7 Reservation of Title The Products remain the sole and absolute property of Conergy as legal and equitable owner and the property in and title to the Products will not pass from Conergy to the Purchaser until the Purchaser has paid Conergy in full for the Products and for all other Products and Services supplied by Conergy Until title in the Products has passed pursuant to clause 11 1 the Purchaser holds the Products as bailee in the capacity of a fiduciary for Conergy The Purchaser must keep the Products supplied to it by Conergy in its possession and take good care of them and store them and mark them in a manner that identifies the Products supplied and clearly shows that they belong to Conergy In particular the Purchaser must sufficiently insure the Products at their new value and at the Purchaser s own expense against fire and water damage and theft If maintenance and inspection work is necessary the Purchaser must carry out that work at the Purchaser s own expense If the Products in any way become attached to or a part of another object before the Purchaser has paid Conergy in full for the Products and for all other Products supplied by Conergy property in so much of the object as is comprised by the Pro
14. resell the Products or any other goods recovered If the proceeds of sale are more than the amount due to Conergy from the Purchaser Conergy may use the balance to pay the costs of taking possession and selling the Products or any other goods If on resale the proceeds of sale are less than the amount due to Conergy Conergy may recover the shortfall from the Purchaser If a third party seizes Products the Purchaser must immediately inform Conergy in writing AmA 12 Construction Modifications Conergy reserves the right to modify the construction of Products at any time however Conergy is not obliged to carry out such modifications to Products already delivered 13 Confidentiality If not otherwise explicitly agreed any and all information provided to Conergy in connection with Orders shall not be considered confidential 14 General 14 4 If any of these Terms and Conditions or a provision of any other agreement is held by any competent authority to be unlawful invalid or unenforceable in whole or in part then the validity of the other provisions of these Terms and Conditions and the remainder of the provisions in question will not be affected and will continue to be valid and enforceable to the fullest extent permitted by law 14 2 The law of New South Wales governs these Terms and Conditions and the Vienna Convention of Sales of Goods does not apply The Purchaser agrees to submit to the juri
15. such as fractures L Array frame securely fixed to roof browning moisture penetration or frame corrosion are present Array clamps and fastenings tight and secure of connections water penetration seal integrity cable gland integrity conduit sealing and clamps _ Junction boxes inspected for tightness L No corrosion on mounting frame or roof Roof penetrations weatherproof Inverter and electrical _ Cabling secure Electrical connections secure _ Conduit or other mechanical protection OK _ Voc and Isc readings consistent with time of day and weather Surge arresters tested for degradation C All Voc readings within 5 of each other Earthing connections tight and free of corrosion _ Verify integrity of fuses circuit breakers residual Data logger if installed tested no faults present current devices L Inverter start up checked Meter reading Previous meter reading Annual production kWh Is the annual production consistent with the predicted output Yes No If no what advice and explanation have been given to the system operator 17 Conergy SunEasy Grid Connect Kit User Manual Shut down the solar power system before starting work Date Maintenance by Solar panels and array Panels are clean and free of dust and fungus _ Bypass diodes verified _ No visual defects such as fractures L Array frame securely fixed to roof browning moisture penetrati
16. well All other signals indicate a disturbed operating state Refer to the inverter manual for more information on the different LED signal codes 3 2 3 Description of Operating Mode Standby at Night If all LEDs are off then the Sunny Boy is in standby operation mode This state indicates that the input voltage at the inverter is too low to be fed into the utility grid If all three LEDs are on then the on board computer of the Sunny Boy is in the initialization phase At least one of the string voltages on the inverter is in the acceptable range Power is already supplied to the internal board but is not yet sufficient to be fed into the utility grid Data transmission is not possible at this stage All LEDs are on 10 Rev 0 0704 CONERGY i EE En Feeding Operation Green LED is on Stop Mode Betrieb Erdschluss arth Foul Groon LED blinks 3 times per second Green LED blinks once per second Green LED blinks once per second Red LED is permanently on Yellow LED is permanently on Grid Problem Berieb Operatior Yellow LED is on for 5 sec off for 3 sec then blinks twice The Sunny Boy has successfully completed the self test of its electronics components synchronised to the utility grid and starts feeding generated power to the utility grid When the green LED blinks 3 times per second the Sunny B
17. 15 8 Maintenance Checklists uun u ee ee 16 Conergy Pty Ltd General Terms and Conditions for 19 Limited Product and Power Output Warranty for Solar 22 2 Rev 0 0704 1 Introduction Thank you for placing confidence in Conergy and congratulations on the installation of your new Conergy SunEasy grid connect solar power system specifically designed for Australian conditions Conergy SunEasy Grid Connect solar power system kits have been designed to provide flexibility of use and ease of installation These kits have been designed to meet the requirements of the current Australian electrical and building codes including wind loading requirements Now that your system has been commissioned it should operate automatically Should you wish to know more about your system please read this manual and make yourself familiar with all safety requirements Observing all safety requirements in this manual in addition to the local safety rules will prevent injuries Your Conergy Team Conergy SunEasy Grid Connect User Manual 2 How your Conergy Solar Power System Works Solar energy is renewable and is different from conventional power generation in that You are using environment friendly energy which doesn t need big pollution emitting power stations It can also
18. SunEasy User Manual Conergy SunEasy Grid Connect Kit User Manual Table of Contents 1 110 VORFREBEREHEEERNENNEREREEEFENETEERSNNEFERIENEEESRCERENNERTIERENRERNELTENSOERENEHERKELHEEFEHERSEETEREHETEHEETENFEFENE 3 2 How your Conergy Solar Power System 4 2 1 System 5 2 2 System 5 2 3 Safety a Sa SS shed nea Dea a De eae eee 6 3 System au aan 9 3 1 To Check Systems with the Conergy WR 9 3 2 To Check Systems with the SMA Sunny Boy 10 3 2 1 Operating Mode 10 3 2 2 Normal Operating 10 3 2 3 Description of Operating 10 4 System Maintenance usage 12 4 1 Maintenance 12 4 2 Trouble 5 an ana ia 12 5 System 13 6 Safe Operating Induction 14 7 Where to get He ana
19. ain will be limited at the option of Conergy to either replacing or repairing the Products or in the case of Services to supplying the Services again Except as expressly set out in these Terms and Conditions and subject to clause 6 11 6 12 1 all conditions warranties terms undertakings representations and obligations whether expressed or implied and whether arising under statute common law equity custom trade usage or otherwise including any implied condition warranty term or representation as to the use of the Products their weight dimensions capacities colours or the correspondence of the Products with any contract description or as to merchantable quality fitness for any purpose or safety of the 20 Products or operating performance where such performance is conditional on empirical factors or on the whole installation or on the individual or overall operation or on the skills of an operator whether made known or not and any liability of Conergy to compensate or indemnify any person or persons in respect of the foregoing are expressly negatived and excluded and 6 12 2 in no event will Conergy be liable for any 6 12 2 1 expenses incurred by the Purchaser in an attempt to repair or rework any allegedly defective Product or Service losses costs expenses liabilities and damages including loss of profits liabilities of the Purchaser to its customers or third persons and any other consequential
20. ax goods and services tax value added tax or any similar tax impost or duty levied on any supplies made by Conergy to the Purchaser under or in connection with these Terms and Conditions and are ex works and all costs of freight and delivery from Conergy s works will be to the Purchaser s account 3 3 Conergy reserves the right to modify its prices accordingly if there is any change in the costs of labour materials transport essential services tariffs duties exchange and other costs and statutory obligations between the date of quotation and the date of invoice Conergy will provide proof of such cost changes at the Purchaser s request 3 4 Conergy must agree to any reduction of cash discounts separately in writing 3 5 The Purchaser must pay interest on any amounts in arrears Interest will be calculated from the due date for payment until Conergy receives payment 3 2 2 3 6 3 7 4 2 4 4 4 5 4 7 6 2 Conergy may use payments to satisfy older debts even if otherwise stated in the Purchaser s terms and conditions Conergy will inform the Purchaser about any such set off In the event that the Purchaser has already incurred costs and interest Conergy will be entitled to set off the payment first with costs then with any applicable interest and finally with the principal performance The Purchaser will not cancel or amend any Order accepted by Conergy without Conergy s written approval
21. be generated on a small scale like on your rooftop Once the solar power system is installed it costs you nothing to generate electricity Solar electricity generation works by converting energy from the sun in the form of light into electricity Please note that only light and not heat is transformed into electrical energy Heat from the sun will have an adverse effect on power generation as it slightly reduces the efficiency of solar cells Solar cells are made of semiconductors and work via what is known as the photovoltaic PV effect In this process when light hits a conductor and semiconductor it transfers its energy to that conductor Light is actually a stream of energy particles called photons When the photons hit the silicon surface in the solar cells they generate electricity by transferring energy and freeing electrons In this way electricity is generated Put simply photovoltaic cells are energy converters converting the energy from sunlight into electricity Solar modules usually contain multiple number of solar cells encased in a durable casing Toughened glass is used to cover and protect the solar cells and a antireflective coating is used to minimise light reflection from the surface Solar modules produce DC power usually at 12V or 24V The inverter included in your Conergy SunEasy solar power system converts DC power to power and feeds it into the electricity if not used in your household directly With this
22. duct will remain with Conergy and will not pass from Conergy to the Purchaser until the Products and all other goods supplied or Services performed by Conergy have been paid for in full Until Conergy is paid in full for the Products and all other goods supplied or Services performed by Conergy the Purchaser holds any objects to which the Products are attached or of which the Products form a constituent part as bailee in the capacity of a fiduciary for Conergy and must store such objects separately so as to be readily identifiable If the Products or any objects to which the Products are attached or of which the Products form a constituent part are onsold by the Purchaser to a third party prior to payment by the Purchaser in full for the Products and all other goods supplied or Services performed by Conergy the Purchaser does so as agent for Conergy and the Purchaser unconditionally agrees to keep the proceeds of such onsale in a separate bank account on trust for Conergy and at Conergy s request to assign to Conergy any debt owed to the Purchaser in relation to the onsale until Conergy has been paid in full for the Products and for all other goods supplied by Conergy Notwithstanding this clause the Purchaser must not represent to any third parties that it is in any way acting for Conergy and Conergy will not be bound by any contracts with third parties to which the Purchaser is a party If any payment by the Purchaser to Conergy i
23. e of action whatsoever caused or arising out of or incidental to or connected in any way with any matter or thing done or omitted to be done by Conergy Pty Ltd or any of its employees agents licensees contractors or subcontractors The Safety and Operational Induction was carried out in person Place and date of safety briefing in writing Explanation System Owner signature System Installer signature Date and printed name Date and printed name Rev 0 0704 7 Where to get help Make sure to keep the distributor and installer s contact details for future reference if required In addition please keep your original invoice as proof of purchase should you wish to claim against the manufacturer warranty Installer Name License No Contact Phone No Fax No Email Address Street Address Supplier Name Contact Phone No Fax No Email Address Street Address Conergy Contact Phone No 1300 551 303 Fax No 02 8507 2220 Email Address support conergy com au Street Address Unit 6 44 48 O Dea Avenue Waterloo NSW 2017 15 Conergy SunEasy Grid Connect User Manual 8 Maintenance Checklist We have provided 3 checklists Please photocopy blanks for following years Shut down the solar power system before starting work Date Maintenance by Solar pan
24. els and array Panels are clean and free of dust and fungus _ Bypass diodes verified No visual defects such as fractures L Array frame securely fixed to roof browning moisture penetration or frame corrosion are present Array clamps and fastenings tight and secure _ Junction boxes inspected for tightness L No corrosion on mounting frame or roof of connections water penetration seal integrity cable gland integrity conduit sealing and clamps Roof penetrations weatherproof Inverter and electrical _ Cabling secure Electrical connections secure Conduit or other mechanical protection OK _ Voc and Isc readings consistent with time of day and weather Surge arresters tested for degradation All Voc readings within 5 of each other Earthing connections tight and free of corrosion _ Verify integrity of fuses circuit breakers residual Data logger if installed tested no faults present current devices L Inverter start up checked Meter reading Previous meter reading Annual production kWh Is the annual production consistent with the predicted output Yes No If no what advice and explanation have been given to the system operator 16 Rev 0 0702 Shut down the solar power system before starting work Date Maintenance by Solar panels and array Panels are clean and free of dust and fungus _ Bypass diodes verified _ No visual defects
25. ged defect immediately and in any case not later than three 3 days from the date of discovery of the defect the Purchaser has provided Conergy a reasonable opportunity to perform all appropriate tests on the Product and the defective part or Product is promptly returned to a designated Conergy service centre Any defective part or Product replaced will become Conergy property and the repaired or new part or Product will be delivered free to the Purchaser s site No separate warranty will apply to repaired Products as a whole or to parts not repaired or replaced by Conergy The warranties given by Conergy in clauses 6 2 6 4 and 6 5 above do not cover air wear and tear and failures or damage not reported to Conergy within the warranty period 6 failures or damage due to misapplication abuse improper installation or abnormal conditions of operation failures or damage due to operation either intentional or otherwise above or below rated capacities or in an otherwise improper manner d ailures or damage resulting from Products which have been in any way tampered with or altered by anyone other than an authorised representative of Conergy 6 4 2 6 4 3 Products damaged in shipment without the fault of Conergy and f failures or damage resulting from the incorporation of or failure of non Conergy manufactured or supplied parts in the Products Conergy does not warrant any equipme
26. mance relating to the specific accepted Order will be immediately reimbursed 2 4 Only properties which are set out in the technical product description of an Order are considered to be agreed as quality of the Products Public statements recommendations or advertising of the manufacturer are not considered contractual qualities of the Products 2 5 Any and all drawings illustrations measures weights or other performance data related to a quotation or an offer to a Purchaser will only be binding if they are explicitly agreed in writing by Conergy 2 6 Quotations may only be accepted as a whole component parts of a quotation are not open to be accepted separately Subsequent Orders are subject to further quotation 3 Prices and Terms of Payment 3 1 The terms of payment are net cash before dispatch unless the Purchaser has a current credit account with Conergy The terms of payment for a Purchaser with a current credit account are net cash free of exchange thirty 80 days from the end of the month in which the Products are delivered or are ready for delivery or the Services are supplied Conergy reserves the right to invoice for partial deliveries or supplies or deliveries or supplies delayed at the Purchaser s request 3 2 Prices quoted or accepted 3 2 1 do not include taxes imposts or duties Conergy may recover from the Purchaser and the Purchaser must pay the amount of any sales tax customs tax use tax consumption t
27. nge insurance upon written instructions from the Purchaser and at the Purchaser s cost Liability for Defects or Shortfall If there is any shortfall in the number of Products or if the Products are damaged during delivery the Purchaser will inform Conergy within three 3 days from the date of delivery If the Purchaser does not then Conergy will not be responsible for any loss or damage suffered by the Purchaser as a result of the shortfall or damage If there is a shortfall in the number of Products or if the Products are damaged during delivery Conergy s liability will in any case be limited to the price of the Products not delivered or damaged No returns may be made or will be accepted by Conergy unless the returned Products are defective or damaged in transit In either case the Purchaser must first give notice under clause 6 1 before it can return the Products 19 Conergy SunEasy Grid Connect Kit User Manual 6 4 6 5 6 6 6 7 6 8 6 9 6 10 6 11 6 12 If within the warranty period applicable to a Product as set out in Conergy s product catalogue any new Product sold by Conergy is found to be defective in materials or workmanship or does not conform to any applicable drawings and specifications approved by Conergy then Conergy will at its option either repair or provide a replacement part or Product provided that 6 4 1 the Purchaser has given written notice to Conergy of any alle
28. nt of other manufacturers which is designated by the Purchaser or purchased by Conergy for resale to the Purchaser either separately or as a part of equipment manufactured by Conergy For such equipment the warranty established by the manufacturer of the equipment will apply When Conergy supplies Services to the Purchaser Conergy will exercise its best skill competence and experience to undertake the Services Conergy s liability under clauses 6 2 6 4 or 6 5 will in no event exceed the cost of replacing or repairing the Products sold or supplying the Services again The benefits conferred by the warranties in clauses 6 2 6 4 or 6 5 are in addition to all other rights and remedies in relation to the Products and the Services supplied or performed by Conergy which the Purchaser has under the Trade Practices Act and similar state and territory laws and the exceptions and limitations in clauses 6 2 6 4 or 6 5 do not apply to such statutory rights and remedies Where the Trade Practices Act or similar state or territory legislation implies into these Terms and Conditions any term condition or warranty and that legislation avoids or prohibits provisions in a contract excluding or modifying them then the term condition or warranty shall be deemed to be included in these conditions of sale provided that Conergy s liability for a breach of any such term condition or warranty including any consequential loss which the Purchaser may sust
29. oDDIAG 02 07 06 NTS SUN EASY 1000 DIAGRAM CONERGY PTY LTD a 1 0001 8 Revision note ignaturd checked 9 CONERGY LARGE AREA MODULES re H L H 2P 400 VDC RATED ROOFTOP ARRAY ISOLATION NOT INCLUDED 2P 400 VDC RATED PV ARRAY MAIN SWITCH SOLAR ARRAY Voc 400 V Isc 5 4 A 1P 6KAC SOLAR MODULE Voc 44 4 V GRID DISCONNECTION Isc 5 4 A Pmod 175 W NOTE THE DC CABLE BE 4 MM2 DSI MC CABLE 2 THE AC CABLE TO BE AT LEAST 2 5MM2 CROSS SECTION Iranrer Quantity Title Nane designation material dimension etc Article No Reference Designed by Checked by Approved by date Filename Date Seale 25 07 06 02 07 06 NTS SUN EASY 1500 DIAGRAM Ean 8 Conergy Pty Ltd 8 Revision note Signature checked 12 CONERGY LARGE AREA MODULES H H 2P 400 VDC RATED ROOFTOP ARRAY ISOLATION NOT INCLUDED 2P 400 VDC RATED PV ARRAY MAIN SWITCH SOLAR ARRAY Voc 270 INVERTER Isc 10 8 A WR 1700 SOLAR MODULE Voc 44 4 V Isc 5 4A Pmod 175 W 1P 6KAC GRID DISCONNECTION 1 THE DC CABLE BE 4 MM2 DSI MC CABLE 2 THE CABLE TO BE AT LEAST 2SWM2
30. of sale to the original user purchaser If the module malfunctions or becomes inoperable due to a defect in workmanship or material during the two year period of this warranty Conergy will at its option either repair or replace the module This warranty transfers from the original user purchaser to subsequent user purchaser but is void if the module is moved from its originally installed location 2 Limited Warranty on Power Output a Conergy warrants that any module provides not less than 90 of the minimum performance referred to as the lower tolerance value for a duration of ten 10 years as of shipment from the plant and not less than 80 of the lower tolerance value for a duration of twenty five 25 years as of delivery from the plant The performance warranty shall only apply if the modules concerned show no further defects other than the loss of performance and if the loss of performance lies within the sphere of responsibility of Conergy b The power output must have been assessed at Standard Test Conditions irradiance 1 000 W m2 air mass 1 5 AM and cell temperature of 25 C in an authorised testing process conducted by a testing body authorised by Conergy c The aforementioned solar modules are supplied with a performance tolerance of 5 3 Exclusion and limitation of liability a If in Conergy s sole judgment the module has been subject to misuse neglect or accident or has been damaged through abuse alteration
31. on or frame corrosion are present Array clamps and fastenings tight and secure _ Junction boxes inspected for tightness L No corrosion on mounting frame or roof of connections water penetration seal integrity cable gland integrity conduit sealing and clamps Roof penetrations weatherproof Inverter and electrical _ Cabling secure Electrical connections secure _ Conduit or other mechanical protection OK L Voc and Isc readings consistent with time of day and weather Surge arresters tested for degradation _ All Voc readings within 5 of each other _ Earthing connections tight and free of corrosion L Verify integrity of fuses circuit breakers residual Data logger if installed tested no faults present current devices L Inverter start up checked Meter reading Previous meter reading Annual production kWh Is the annual production consistent with the predicted output Yes No If no what advice and explanation have been given to the system operator 18 Rev 0 0702 CONERGY LTD GENERAL TERMS AND CONDITIONS FOR TRADE 1 Validity of General Terms and Conditions 1 1 Until Conergy Pty Ltd ABN 57 112 387 569 Conergy notifies a customer of replacement Terms and Conditions these Terms and Conditions will apply to all sales of products Products and supplies of services Services by Conergy and will form part of any contract resulting from any customer
32. oy is in stop mode During this mode calibration of the measurement electronics will be carried out while the inverter itself will be put in the Waiting mode When the green LED blinks once per second the Sunny Boy is in test mode to verify the required conditions for feeding operation are fulfilled If all requirements are fulfilled then grid monitoring will be started When the red LED on the Sunny Boy is on this indicates an earth fault or one of the two thermally monitored varistors on the DC input side is defective In this condition feeding to the utility grid is suspended until the failure is rectified If the yellow LED is steady on then this is an indication that there is a failure of the grid monitoring or the independent disconnection device MSD within the unit During the internal testing process the inverter has detected a malfunction of the MSD and has stopped feeding to the grid This is a failure which cannot be rectified on site Please contact your installer or supplier With this signal the Sunny Boy indicates a grid failure which can be caused by Grid under voltage Grid over voltage Grid under frequency Grid over frequency First find out whether there is a general power shutdown If you do not find any failure the grid connection of the inverter must to be checked by a qualified electrician 11 Conergy SunEasy Grid Connect Kit User Manual 4 System Maintenance 4 1 Maintenance Timetable
33. s overdue in whole or in part or the Purchaser is otherwise in default under any contract with Conergy or the Purchaser becomes bankrupt or commits any act of bankruptcy or compounds with its creditors or have judgment entered against it in any court or being a company has a provisional liquidator receiver or manager appointed or otherwise suffers some form of insolvency administration all sums then owing by the Purchaser to Conergy in relation to the Products or in relation to other goods supplied or Services performed by Conergy will become immediately due and payable and Conergy may without prejudice to any of its other rights recover and resell the Products and any other goods supplied by Conergy and may for that purpose enter upon the Purchaser s premises by its servants or agents and Conergy is irrevocably authorised to effect such entry including the use of such reasonable force as is necessary to effect such entry and to use the name of the Purchaser and to act on behalf of the Purchaser if necessary to recover possession of the Products and any other goods supplied by Conergy and to detach the Products and any such other goods from any other object to which they have been attached or of which they form a constituent part The Purchaser must provide Conergy all information and documents necessary and otherwise assist Conergy to recover possession of the Products If Conergy recovers the Products or any other goods it may
34. sdiction of the appropriate Court of New South Wales nominated by Conergy 14 3 The Purchaser must not transfer assign or sub contract its obligations under these Terms and Conditions without Conergy s prior written consent 14 4 Failure or neglect by Conergy to enforce at any time any of these Terms and Conditions will not be a waiver of Conergy s rights and will not affect the validity of the whole or any part of these Terms and Conditions or prejudice Conergy s right to take subsequent action 14 5 Any notice required under these Terms and Conditions must be in writing addressed to the other party at its registered office or principal place of business or any other address notified by the receiving party to the party giving the notice 21 LIMITED PRODUCT AND POWER OUTPUT WARRANTY FOR SOLAR MODULES Conergy Pty Ltd ACN 57 112 387 569 Conergy has the highest quality standards for its products They are manufactured according to stringent quality regulations This allows us to offer the warranties below to customers purchasing the following solar modules Conergy 123 P Conergy 175 Conergy 125 Conergy 167 5 170 5 175 1 Limited Product Warranty Conergy warrants the module to be free from defects in workmanship and materials under normal application use and installation and service conditions for two 2 years from the date
35. setup if you are using less power than you are producing your meter runs backwards If you are using more power than you are generating your meter runs forwards Some utilities require that you install two independent energy meters One to measure your consumed energy and the other for metering the amount of electricity your system has returned to the grid Your energy retailer will credit charge you the difference between your consumed energy and your generated energy Rev 0 0704 2 1 System Components The following table shows the main components of your Conergy SunEasy Grid Connect kit 1 PV modules 7 Array DC cables 2 Mounting frame for solar modules 8 Installation material required 3 DC to AC inverter 9 SunEasy Installation Manual 4 Circuit breaker enclosures 10 Suneasy User Manual 5 DC and isolating circuit breakers 11 Inverter Manual 6 A set of safety labels 12 Solar Module Data Sheet 2 2 System Performance System performance will highly depend on the geographical and atmospheric conditions of the installation site The following energy yield data show the approximate values for capital cities in Australia and New Zealand The figures shown are based on the Conergy C175M module outputs When using Conergy C167P modules the output values will be reduced by approximately 5 Kit Sydney Melbo
36. st only be carried out by a licensed electrician or personnel authorised by your electricity supplier Cables and plugs One of the most common causes of system breakdown is damage to the solar cables If you come across a damaged cable or any other system defect please report it to your SunEasy Power system installer so that it can be repaired 3 System Operation Your Conergy SunEasy solar power system meets all Australian standards and regulations current at the time of installation All necessary quality control and safety measures have been observed to guarantee safe and trouble free operation The day to day operation of your solar power system is automatic meaning you don t have to switch it on or off or monitor it during the day We recommend that you check the meter and inverter once a fortnight as follows Meter Check it during the day when there are no or minimal electrical appliances operating in your house The meter should be showing energy exported 3 1 To Check Systems with the Conergy WR Inverter Inverter Check the LED light on the front of the inverter Solar System Operational Normal Condition Steady Green Solar System Operational Error Message displayed on the LCD Screen see Status Diagnosis and Repair on page 55 of the WR Inverter Instruction Manual for the Error Message Flashing Green The inverter is in automatic start up phase Normal everyday condition after Steady
37. surfaces when the sun is shining and they are hot Doing so can shatter the solar module glass This type of damage will not be covered by the solar module warranty This activity could also expose you to the danger of electrocution Never walk on the surface of the solar modules Doing so will damage the solar module and will not be covered by warranty Avoid working in the vicinity of the installed solar module area when raining or when the area is still wet The installed solar power system generates electricity when exposed to the sun The generated voltage is dangerous and can be fatal The whole surface must be covered by black sheets prior to working on the system in order to ensure that no electricity is being generated Observe all safety signs installed as part of your system Please note that DC voltages will be present on the solar module side of the inverter even if the isolating circuit breakers are completely switched off Opening system components Beware of the risk of death from touching electrical components Do not open any of the components of your solar power system unless you are a qualified licensed electrical contractor Repairs or modifications Any work on the electrical components such as repairs or modifications must be carried out by a licensed electrical contractor Guarantee and warranty claims The guarantee and warranty claims will be void if unauthorised persons open or modify components Electrical work
38. the module is secured connections to modules by other manufacturers and events which could not have been prevented with the technology available at the time of purchase or in any other way even by repair No warrantee service will be performed if the module is modified damaged as a result of force majeure storm hail fire power failure lightning strike flooding infestation with insects and pests exhaust fumes etc and as a result of vandalism or comparable causes resulting from the actions of third parties Warrantee services are also excluded if a module has been damaged through misuse accident or conversion or has been repaired by a third party dealer engineer not authorised by Conergy Establishment of the existence of the above mentioned prerequisites lies within the discretion of Conergy g If the originally supplied module type is no longer produced Conergy will supply the current nearest equivalent module type as replacement h Conergy s liability will in no event exceed the purchase price of the modules i Conergy provides no explicit or implied warranties apart from those expressly made herein 4 General information a The warranty does not extend to supplying new or as new products Conergy retains the right to use new overhauled or specially manufactured parts or products Each module replaced becomes the property of Conergy b Claims granted on the warranty cause neither a new warranty period to be started nor the warran
39. ty to be extended c Should these terms of warranty differ from the information supplied in the data sheet these terms of warranty shall prevail 5 Warranty claim Procedure a Claims under this warranty will be considered if submitted in writing to Conergy Pty Ltd PO Box 909 Strawberry HIlls NSW 2012 within 14 days following the discovery of any defect covered by this warranty with specific details and provided Conergy or its agents are permitted a commercially reasonable opportunity to examine and analyze the material or workmanship claimed to be defective An authorised representative of Conergy must approve any claim in writing b For a claim to be made the original dealer invoice and this warranty certificate should be sent to Conergy or the dealer with details of the module type the module serial number the date of delivery and the defects which have arisen c The customer is entitled to return modules only with prior permission from Conergy Conergy Pty Ltd Issued March 2007 Notes For more information please contact us 1300 551 303 cost of local call Conergy Pty Ltd Unit 6 44 48 O Dea Avenue Waterloo NSW 2017 Email sales conergy com au Fax 61 0 2 8507 2220 www conergy com au superiorsolar hot water solar power pool heating Unit 2 10 Enterprise Close West Gosford 2250 tel 4323 9050 100 recycled paper
40. urne Brisbane Perth Adelaide SunEasy 1000 4 02 4 03 4 04 4 82 4 40 Sun Easy 1500 6 02 6 05 6 06 7 22 6 59 Sun Easy 2000 8 03 8 06 8 08 9 63 8 79 Kit Alice Springs Canberra Darwin Auckland Wellington SunEasy 1000 4 33 4 16 3 84 3 88 3 56 SunEasy 1500 6 50 6 24 5 75 5 81 5 33 SunEasy 2000 8 66 8 32 7 67 7 75 7 11 Kit Sydney Melbourne Brisbane Perth Adelaide SunEasy 1000 1466 1471 1475 1757 1604 SunEasy 1500 2199 2207 2213 2636 2406 SunEasy 2000 2932 2942 2950 3514 3208 Kit Alice Springs Canberra Darwin Auckland Wellington SunEasy 1000 1580 1518 1370 1415 1297 SunEasy 1500 2370 2276 2055 2123 1946 SunEasy 2000 3160 3035 2740 2830 2594 Conergy SunEasy Grid Connect Kit User Manual 2 3 Safety The following safety instructions are important for your personal safety and for the optimum performance of your solar power system Please take the time to go through the following checklist with your installation team The safety instructions must NOT be ignored The service and maintenance of your newly installed solar power system must be carried out by a licensed electrical contractor in strict compliance with the Australian building and electrical safety rules If you are not a licensed electrical contractor or a qualified person do not attempt to do any modification and or maintenance work on the solar power system Doing so may put you in danger and may also void component warranties Never pour cold water on solar module
41. ware that there is the possibility of a small non lethal electrical charge being present in the base frame and module frames Cleaning the solar array Depending on the roof slope the solar panels clean themselves during rainy weather However a layer of dust can form if there is a prolonged dry spell This could reduce the amount of energy produced by the solar power system Your system output has been calculated to take account of this dust We do NOT recommend that you climb on the roof to clean the solar panels Please do not use ANY high pressure cleaner or chemical cleaning product on the surface of the solar panels use plain water at mains pressure or less All electric components such as cables connectors generator junction boxes etc must remain dry CAUTION Never wash the solar panels while they are hot Cold water on hot solar panels may cause the glass to shatter Note that solar panels may be hot even when it is cloudy and that the temperature of the solar panel can be up to 20 C higher than the site ambient temperature Conergy SunEasy Grid Connect User Manual Heat build up Exercise caution when touching the inverter housing The inverter can become hot during use Never cover the inverter s heat sinks or vents when it is in use Please observe the distances around the inverter as laid out in the operating instructions Dust formation Do not allow excessive dust to build up around the inverter Never touch damaged

Download Pdf Manuals

image

Related Search

Related Contents

BENDIX BW1571F User's Manual  取扱説明書 [F-06D]  Descargar manual en PDF  Manual de instruções do CD-300  GE 36 in. JP626 Electric Cooktop  FR TONDEUSE AUTOPORTÉE  

Copyright © All rights reserved.
Failed to retrieve file