Home
INSTALLATION/SERVICE MANUAL e-Gate CSD series
Contents
1. CONTENTS PRE INSTALLATION CHECK LIST MAXIMUM SIZE OF GATE FOR THE CSD SERIES GATE OPERATOR FREQUENCY OF USE ENVIRONMENT SUITABLE FOR THE OPERATOR IMPORTANT SAFETY INSTRUCTIONS TOOLS AND HARDWARE REQUIRED PREPARING THE GATE GUIDE POST CLEARANCE AUTOMATIC OPERATOR FITTING REQUIREMENTS ACCESSORIES THAT CAN BE ADDED SAFETY PHOTOCELL DIGITAL KEYPAD AND OR INTERCOM A GROUND LOOP VEHICLE DETECTOR CABLING REQUIREMENTS BASIC CABLING GUIDE FULL CABLING GUIDE TYPE AND SIZE OF CABLE HOW IT WORKS oh 8 STEPS TO INSTALLING THE CSD SERIES 12 STEP 1 INSTALL CABLING bia Sto bgt 712 TIPS FOR RUNNING LOW VOLTAGE CABLE YOURSELF 13 STEP 2 FIT THE OPERATOR 13 POSITION OF THE OPERATOR 13 FIX THE OPERATOR IN PLACE 14 MANUALLY RELEASE THE OPERATOR 14 STEP 3 FIT THE RACK TO THE GATE 15 STEP 4 TERMINATE CABLING eee 19 SLD 24V S GENERAL WIRING DIAGRAM 19 CHECKING THE GATE DIRECTION 20 TERMINATING A PHOTOCELL 21 TERMINATING A LIGHT 21 TERMINATING DIGITAL KEYPAD CARD ACCESS KEY SWITCH OR PRESS BUTTON 22 TERMINATING GROUND LOOP VEHICLE DETECTOR 22 TERMINATING A 7 DAY TIMER DIGITAL KEYPAD OR KEYSWITCH 23 TERMINATING AN INTERCOM 23 TERMINATING SEPERATE OPEN STOP AND CLOSE P B S 24 TERMINATING EMERGENCE STOP DEVICES 24 STEP 5 TUNE THE REMOTE CONTROLSIN ao gto rete ad
2. Chassis E Ground 4 amp Antenna These Jumper Shunts overide the normally closed inputs REMOVE ONLY ONCE GATE LIMITS ARE SET Learn P Bs Learn P Bs for for Limits and Remote Controls Preferences E OSC m do o c STOP 95 E e n SEE dts ES PED ZIZIIZIIZIII ar TT O 7 enb 05 0 all ee 00 CTRL GP 24V S JI gu These Shunts must be in place as no z Ges limit switches are used 3 zi 0 F elt FE 5 lt lt lt lt SER ols 8 8 a Electric di Motor 2 for Brake s Bi Parting 2 Gates Motor 1 has Ped entry mode 24V Battery Charge 35A Diode Regulator Unit 191 24V Battery 35A Rectifier Unit 24VAC or 24VDC output Solar Input 240V 22V 160VA Transformer may be external 19 CHECKING THE GATE DIRECTION The Gate Operator is prewired for a Left Hand Gate p OPEN DIRECTION LEFT HAND GATE If you have a Right Hand Gate then you ll need to change the Motor Power wires around C _ 1 OPEN DIRECTION RIGHT HAND GATE vu 85 e Gate Control Board ee For Right Hand Gates change the Red and Black Motor Power wires around so the gate will travel in the opposite
3. Gate Operator i i i 10 i dard i 4 1 51 Ground Loop Sol ty gi X 3 5 2 Digital Keypad Card Acce s Keyswitch Pe 2 o or Press Button alternate to ground Loop 5 a gate sliding from the left side the Operator and Power cable will be on the opposite side Cable for the electric lock may run in the gate frame The 240VAC Mains should be kept at least 100mm away from any low voltage cabling 9 TYPE AND SIZE OF CABLE 240V Mains at Gate Mains power is best hard wired to the operator If an outdoor power point is used the can be turned off so is NOT recommended You will need a registered electrician to do this for you Low Voltage Systems Don t need a register electrican because all power at the gate is 24V A plug in transformer is supplied that can plug in anywhere there is power or can be hard wired by an electrician Low Voltage Garden Lighting Cable only is required between the transformer and the gate operator 2mm cable is good for up to 25m and 4mm for up to 50m For Accessories 0 4mm Diameter 0 12mm2 or 0 65mm Diameter 0 33mm_2 Outdoor telephone cable is ideal for Connecting Photocells Digital Keypads and Intercoms as this cable has a tough outer sheath and is gel filled to protect it from moisture Cat 5e and indoor phone cable is fine to use so long as it isn t exposed to moisture for prolonged periods If using security cable t
4. STEP 8 FINE TUNE GATE OPERATOR PREFERENCES The DIP Switch and Learn Button have a secondary purpose which is to make changes to the Control Boards preferences Once the preferences have been set the DIP switches should be returned back to the way the were for normal operation CHANGING THE AUTO CLOSE DELAY Top RH corner of control board With DIP Switch 1 only ON press the LEARN button and the Beeper will start beeping it is not necessary to hold the LEARN button Now wait for the desired Auto close time and press the LEARN button again The Beeper will beep more rapidly for a second to confirm the new delay has been learned The Beeper beeps once a second so if you count the beeps you are counting seconds handy if you want an exact time If you leave it beeping it will time out after 4 minutes and set this as the auto close delay CHANGING THE PHOTOCELL CLOSE DELAY Top RH corner of control board With DIP Switch 3 only ON press the LEARN button and a Beeper will start beeping it is not necessary to hold the LEARN button Now wait for the desired Photocell close delay and press the Learn button again The Beeper will beep more rapidly for a second to confirm the new delay has been learned The Beeper beeps once a second so if you count the beeps you are counting seconds handy if you want an exact time If you leave it beeping it will time out after 4 minutes and set that as the delay 29 CHANGING
5. Gate Length for Automatic Operator 400mm DRIVEWAY Guide Post if used LAWN OR GARDEN Concrete Pad 500mm LAWN OR GARDEN Operator Conduit for Power Cable to come out of concrete pad here if Power is Hardwired DRIVEWAY Concrete Pad PLAN VIEW 600mm The Gate Operator requires a level concrete pad to mount on Even if the driveway is sloping the concrete pad for the Operator MUST BE LEVEL The concrete pad should no less than 100mm thick and after concrete is poured it must be given a week or so to harden before the operator is installed If the Gate Operator power is to be hard wired it s a good idea to place a piece of conduit into the concrete pad during installation for the power cabling later on Extra Gate FRONT VIEW Length for Automatic Operator need only be the bottom rail Gate track and footing must be straight but can be on a gentle slope Concrete Pad must be well Concrete Pad must be level drained and not ever be sitting even if gate track isn t in water even after heavy rain ACCESSORIES THAT CAN BE ADDED SAFETY PHOTOCELL Photocells are a safety device that prevent the gate from closing on a vehicle They are COMPULSARY WITH INDUSTRIAL GATES 1 Photocell consists of an Invisible Low Power Infrared point to point Beam Transmitted from one side of a gate to the other REFLECTOR TYPES are ea A Photocell prevents a Gate from Closing
6. Sev 125 REMOTE CONTROL OPEN STOP AND MANUAL CLOSE 25 REMOTE CONTROL OPEN WITH AUTO CLOSE 25 REMOVING REMOTE CONTROLS 26 REMOTE CONTROLLED PEDESTRIAN ENTRY 26 USER ADDING REMOTE CONTROL AT A LATER DATE 26 STEP 6 LEARN GATE OPEN LIMIT gd tone ise al oues S Soe Cans STEP 7 ACTIVATE AND TEST ACCESSORIES Ae ata do Bea ae 67 026 OTHER OPTIONS FOR CONTROL INPUTS 28 8 FINE TUNE GATE OPERATOR PREFERENCES 29 CHANGING THE AUTO CLOSE DELAY 29 CHANGING THE PHOTOCELL CLOSE DELAY 29 CHANGING THE PEDESTRIAN CLOSE DELAY 30 CHANGING UP THE LOCK LIGHT OUTPUT 30 CHANGING THE LEVEL OF SOFT START AND SOFT STOP 31 CHANGING THE GATE OBSTRUCTION SENSITIVITY 31 RETURN TO FACTORY SETTINGS Gor asc ES ha A vo At dre RECOMMENDED MAINTENANCE SCHEDULE E E pl Jr Be eg Gey Gee 33 MAINTENANCE 34 MAINTENANCE HISTORY 34 ACCESSORIES AVAILABLE 35 TROUBLE SHOOTING 35 WARRANTY cite Ge Stee une x wx o aoe os 36 PRE INSTALLATION CHECK LIST MAXIMUM SIZE OF GATE FOR THE CSD SERIES If this Gate Operator is installed on a gate that is too Heavy it may not work properly Aluminium Gates with Open Bar Cladding or Pipe and Chain Link mmm m Aluminium Gates with Aluminium or Timber Slat
7. control board can Learn up to 60 seperate remote control buttons 25 REMOVING REMOTE CONTROLS To remove one remote control button press the OSC LEARN button a beeper will start beeping then press the already learned remote control botton you wish to remove the beeper will beep more rapidly for a second to confirm removal If you don t have the remote control then you must remove all remote controls and re Learn the ones you have If you have a lot of remote controls then consider using the RX Mega stand alone receiver as it can learn up to 1000 remote controls and individual remote controls can be removed even if it has been lost To remove all remote controls press and hold OSC LEARN button for more than 10 seconds beeps and the beeper will beep more rapidly indicating that all remote controls have all been removed REMOTE CONTROLLED PEDESTRIAN ENTRY If your automatic gate is the only way in or out of your property you can allow user access on foot only by having the remote control open the gate part way and closing automatically after a pre set delay This delay can be set independantly from the vehicular entry auto close delay see Changing the Pedestrian close Delay section in step 9 Use the PED Learn Button on the control board and any unused button on the remote control as you did above To set the amount the gate will open see Step 7 USER ADDING REMOTE CONTROLS AT LATER DATE If you have at least one remote
8. control that operates your gate you can use this to tune in new remote controls without having to open the control box up This is done by pressing combinations of buttons together on the working remote control within range of the gate Pressing Buttons A and D together is the same as pressing the Learn Button on the control board A and C together is the same as pressing the OPEN Learn button and B and D for PED Learn Button Once you press any of these combinations you ll hear the beeper in the control box beeping You can now press a button on a new remote control to get it to operate the gate Remote control buttons can also be deleted from memory this way As a safe guard not all remote control buttons can be deleted using this method there will always be one left working so the end user can t accidently delete them all and not know how to get it working again 26 STEP 6 LEARN GATE OPEN AND CLOSE LIMITS The gate must have a suitable hard stop in the open and close position as this not only prevents the gate from coming off the guide it also sets the open and close limits But the operator must know how long the gate takes to open so it knows when to start ramping down for slow stop and reverse if obstructed while operating Top RH corner of control board The Learn Open Time function must be run on the control board before the opera tor will work properly IF YOU WISH TO USE THE PEDESTRIAN See EN
9. on a car If the Photocell s beam is interrupted by a vehicle the gate won t close The Photocell can also be used to control the closing of the gate DIGITAL KEYPAD CARD ACCESS AND OR INTERCOM To allow access to visitors or tradesman any brand of digital keypad Card Access system and or intercom can be installed provided the intercom has a door release feature A Digital Keypad or Proximity Card An Intercom allows visitors to call the System allows access to anyone with house and speak with the occupier If the correct pin number or card the occupier wishes to let the visitor in they can press a button on the intercom inside to open the gate A GROUND LOOP VEHICLE DETECTOR Loop of wire in driveway used to detect vehicles n A ground loop in the driveway detects any vehicles approaching the gate and opens it automatically to let them out Pedestrians cannot use the ground loop to open the gate which is a safe guard from anyone jumping the fence 8 CABLING REQUIREMENTS BASIC CABLING GUIDE Open Direction Gate Operator JOMOd OL FULL CABLING GUIDE RIGHT HAND GATE Oe a ey Intercom r Digital Keypad or Card Access i i 4 i ASS T 1 jt 1 I Lh ode Reece eee Se eee e 1 1 Sz Sees cem i a no 1 1
10. the gate If this isn t possible then all the rack 27 pM may need to be moved back a bit and the first nal length may also need to be cut 4 Mark on the gate where the last length will finish after cutting OPEN FULLY 5 Open Gate by hand and use the new mark to check the rack contacts the Gear Wheel when fully open if not it will need to be adjusted This gate operator has no limit switch strike plates or magnet on the rack so the rack need only overlap the dear wheel by a small amount 15 Tek Screw in centre of slot To fit the Rack start with the gate nearly closed and place the first length of rack on the Operators Gear Wheel in line with the mark you made earlier and the bottom rail Drill two 10mm or 3 8 Tek screws into mounting lugs for the rack making sure they are both in the centre of each slot Use only two and do not fully tighten at this stage as the height of the rack needs to be adjusted 1mm Move the gate by hand until each of the Tek screws are aligned with the gear wheel and adjust the height of the rack until it has about 1mm clearance above the gear wheel Tighten the tek screws fully once the height is correct 16 LU SS ion tte Drill Tek screw in on an angle to close gap between lengths of rack L Yy 2 Length Slotted into the first Now fit the 2nd length of rack by sliding the gate open a
11. 0VDC you can do your self without a license If your gate track is hollow you can run low voltage cabling through this If it isn t and you need to run Low Voltage Cable across a concrete or bitumen driveway or path you can do this by chasing a groove with a 9 angle grinder with a masonry grinding disc not a cutting disc Make it deep enough so there is 5mm or so space above the cable when installed Use an expansion gap where possible as this requires less work Make sure the cable will not be pinched if between two slabs of concrete that can shift with ground movement Fix the cable into the groove using clear plumbers silicon non acidic or other flexible sealer in the clean groove before the cable and again after making sure it sticks to both sides of the groove If the path or driveway has lawn or garden edges make sure the cable isn t exposed or accessable to edge trimmers or spades by running the groove down the edge and into conduit just under the edge of the driveway You ll need to dig a hole next to the driveway to do this Conduit runs under Path to Cable run in groove cut in concrete with keep it safe silicon top and bottom lawn or garden edge run groove N down edge of concrete Dig hole at edge of concrete If the driveway meets a post and you need to go around it then chase a groove where you can with the angle grinder then use a rotary hammer drill as a mini jack hammer for the corne
12. ARN button and the control board will beep out the current level ie if the level is 12 there will be 12 beeps then there will be a pause for 2 seconds and it will start beeping again This is when you can change the level by pressing the Learn button at the desired beep ie if you want to change it to level 15 then press the Learn button during the 15th Beep The control board will beep more rapidly to confirm the new setting If you change your mind half way through just don t press the Learn button again and it will time out after 16 beeps and no change will be made 31 RETURNING TO THE FACTORY SETTINGS Top RH corner of control board Switches ON If you get into trouble and want to return everything back to the way it was before you started you can restore the factory settings by turning ALL DIP Switches ON and pressing the LEARN Button The beeper will beep rapidly for a second to confirm the factory settings have been restored This function resets everything including removing all remote controls and resetting the Gate Open Limit You must turn the DIP Switches OFF again before proceeding further 32 RECOMMENDED MAINTENANCE SCHEDULE Maintenance Schedule depends on frequency of use as follows Cycles per day Maintenance Period 150 Month 100 150 every 2 months 50t0100 every 4 months 20t050 every 6 months
13. THE PEDESTRIAN CLOSE DELAY Top RH corner of control board With DIP Switch 4 only ON press the LEARN button and a Beeper will start beeping it is not necessary to hold the LEARN button Now wait for the desired Pedstrian close delay and press the Learn button again The Beeper will beep more rapidly for a second to confirm the new delay has been learned The Beeper beeps once a second so if you count the beeps you are counting seconds handy if you want an exact time If you leave it beeping it will time out after 4 minutes and set that as the delay CHANGING THE LOCK LIGHT OUTPUT Top RH corner of control board There are 6 modes of operation for the Lock Light output including Strike Lock comes ON for 2 seconds on open Light timer 1 comes ON for 1 minute on open Light timer 4 comes ON for 4 minutes on open Open indicator comes ON when gate is open Brake mode comes ON when gate is moving Clamp mode comes ON when gate is closed OaRWN The factory setting for the Lock Light Output is mode 2 fora light timer of 1 minute With DIP Switch 5 only ON press the LEARN button and the control board will beep out the current mode ie if the mode is 3 there will be 3 beeps then there will be a pause for 2 seconds and it will start beeping again This is when you can change the mode by pressing the Learn button at the desired beep ie if you want to change it to mode 5 then press the Learn button during th
14. TRY FEATURE then start by opening the gate OFF by the desired amount using the OSC P B on the control board other wise any position will do TO START THE LEARN FUNCTION make sure all DIP Switches are OFF then press the LEARN button and the Beeper will start beeping Now press the OSC on the control board or remote control to start the function running ONCE STARTED the gate with motor 1 will start closing slowly as it searches for the close stop then if it s a Bi Parting Gate it will do the same for gate with motor 2 WHEN IT FINDS A CLOSE STOP it will beep rapidly for a second to confirm then start opening to find the open STOP ONCE THE OPEN STOP IS FOUND the controller will beep rapidly for a second to confirm then if its a Bi Parting gate repeat the same for the other motor then once this is complete go back to normal operation leaving the gate open THE CONTROLLER WILL REMEMBER THE OPEN AND CLOSE LIMITS from this time on even if the power is removed from the operator During normal operation each the gate will always slow down just before the Hard Stop and drive gently against it 27 STEP 7 ACTIVATE AND TEST ACCESSORIES Any intercoms key switches press buttons or digital keypads connected to the OSC PED or CLOSE inputs can now be tested The OSC input opens stops and closes the gate The PED input opens the gate part way then will close automatically after the Ped close delay The CLOSE input closes the ga
15. ay not contact the rack well enough 13 FIX THE OPERATOR IN PLACE Fix the Operator to it s Concrete Pad using M10 x 50mm Dyna bolts or longer if necessary Use galvanised Dyna bolts if you can so they won t rust Large raw plugs and galvanised screws may also be used if prefered The important thing is once the Operator is fitted it doesn t move MANUALLY RELEASE THE OPERATOR Torque Control Knob To manually release the Operator loosen the knurled torque control knob on the gearbox until the Operators Gear Wheel will turn freely To re engage re tighen the knurled torque control knob If the cover is ON this knob can be accessed through a small locked door using the key is provided 14 STEP FIT THE RACK TO THE GATE Before fitting any rack lay it out in front of the closed gate to see how it lines up Start at the operator end with the first length sitting on the operators gear wheel adjusting the position of the rack as you go to make sure the mounting lugs miss the wheels If the last length needs to be cut shorter it must have at least two mounting lugs attached to the gate 1 Start with the Gate Closed and the first length of rack just overlapping the Gear wheel mark this position then add more lengths until the end is reached 2 Make sure mounting lugs miss the wheels 3 Last length of rack may need to be cut shorter if so it must have at least two mounting lugs on pe
16. bit further and placing it so one end is slotted into the first length and the other end is sitting on the operators gear wheel allowing enough room to drill another tek screw in Drill the tek screw in on an angle to close up any gap between the two lengths Should Run Smoothly over the joint between lengths of rack It the gate is now moved by hand and run over the join between the lengths ot rack there should be no jump it should run smoothly over the join Also set the 1mm clearance at the new tek screw position and tighen it up fully Repeat the same with the remaining lengths of rack just tacking them all in place for now with two tek screws 17 Once all lengths are tacked in place and the gate is opened and closed to check the rack contacts the gear wheel at all times then cut off any access rack using an angle grinder or hack saw The Rack may be plastic on the outside but it has a steel rod in the middle Now go through and tek screw ALL MOUNTING LUGS for the rack that haven t been done yet adjusting the 1mm clearance from the gear wheel as you go It is quicker to do these all in one run 18 STEP 4 TERMINATE CABLING CSD SERIES GENERAL WIRING DIAGRAM N O RELAY OUT FROM INTERCOM or PRESS BUTTON 12V LOCK OUT FROM INTERCOM 0 Digital Keypad GDN e V eH COM N O N C Photocell Receiver 2 COM N O N C Photocell 240VAC Mains Supply zu
17. d with or modified by any party not authorised in writing by Grant s Automation to do so The operator has not been damaged by any malicious act accident animals or adverse weather conditions beyond the control of Grant s Automation A reasonable amount of care with handling or using the operator has been be taken Grant s Developers and Manufacturers of Automation Technology Auto mation www grantsautomation com au 36
18. direction ti wy Ps the 9 gt 1 I f hd P The terminal blocks the control mem board unplug to allow easier and better RN gc connections Make sure all strands of the wire are tightly held by the terminal block Stray strands can cause a short circuit 20 TERMINATING A PHOTOCELL Safety Photocells use a normally closed connection to the control board the photocells light beam is broken by a vehicle while the gate is closing it will be reversed back open again The gate will not close until the photocell light beam is remade and vehicle is clear If a photocell closing delay option is activated DIP 3 ON the gate will begin to close once the photocell close delay has timed out rather than the auto close delay Photocell Receiver Photocell Transmitter al 2 TERMINATING A LIGHT By connecting a 24VDC relay to the gate operator it can also activate lights for 1 or 4 minutes when ever the gate is opened See Changing the LOCK LIGHT output section in Step 8 for information on how to change this aihe f LIGHT either continuous or self flashing 21 TERMINATING DIGITAL KEYPAD CARD ACCESS KEY SWITCH OR PRESS BUTTON A Digital Keypad Card Access System Key switch Press Button or any other clean contact normally Open NO device can be used to activate the gate I
19. e 5th Beep The control board will beep more rapidly to confirm the new setting If you change your mind half way through just don t press the Learn button again and it will time out after 6 beeps and no change will be made 30 CHANGING THE LEVEL OF SOFT START AND SOFT STOP Top RH corner of control board There are 16 levels of Soft Start Stop numbered from 1 to 16 The factory setting is 8 1 being least and 16 being the most With DIP Switch 6 only ON press the LEARN button and the control board will beep out the current level ie if the level is 3 there will be 3 beeps then there will be a pause for 2 seconds and it will start beeping again This is when you can change the level by pressing the Learn button at the desired beep ie if you want to change it to level 5 then press the Learn button during the 5th Beep The control board will beep more rapidly to confirm the new setting If you change your mind half way through just don t press the Learn button again and it will time out after 16 beeps and no change will be made CHANGING THE GATE OBSTRUCTION SENSITIVITY Top RH corner of control board If the gate is obstructed while operating it will stop and reverse away There are 6 different levels of Ob struction Sensitivity for the gate numbered from 10 to 16 The factory setting is 12 with 10 being the most sensitive and 16 being the least With DIP Switch 7 only ON for motor 1 and for Motor 2 press the LE
20. f a Digital keypad has two or more relay outputs then these can be used for different operational functions such as open with manual close open with auto close or Pedestrian only access with auto close 24V Digital Keypad or Card Access Press Button TERMINATING GROUND LOOP VEHICLE DETECTOR Aground loop must be used with a photocell to control the opening and closing of a gate If a vehicle wishing to exit drives over the ground loop the gate will open If the vehicle remains over the ground loop or the photocell light beam is broken the gate will remain open Once both are clear the gate will auto close normally or if the photocell closing control is active DIP 3 ON will close immediately or can be delayed For incoming vehicles sharing the same gate the photocells closing control is inherited by the ground loop Twisted Pair from Wire Wire Loop Loop in Driveway set in driveway 24V Loop Detector TERMINATING A 7 DAY TIMER DIGITAL KEYPAD OR KEYSWITCH TO HOLD THE GATE OPEN A 7 Day Timer Digital Keypad Key switch or any other clean contact normally closed NC device can be used to hold the gate open Because this is a normally closed connection all devices must be OFF contact closed before the gate will close To hold the gate open any one device must remain ON contact open Gate closure will occur once all contacts are closed and the auto close delay has timed ou
21. his must be a conduit that is fully sealed to prvent any exposure to moisture 10 HOW IT WORKS The SLD 24V IND S Gate Operator consists of an electro mechanical drive unit with built in electronic controls that connects with racking on the gate driving it open or closed Gear Wheel from Operator drives Rack on Gate Umi mAARaMMAAAAARAA 8 FO 20 tw When the Operator is activated by remote control or other control device it drives the gate open or closed A toothed rack is fitted to the gate that engages with an output Gear Wheel on the operator Hard stops are used to determine the open and close limits of the gate The electronic controls also continually monitor the loading on the gate when ever it is operating so if the gate is obstructed it will reverse direction for safety Limit switches with are NOT used with Industrial sliding gate operators as the strike plate on the Rack is a target for Vandals and Limit Switches that work within the operator can get out if the gate jumps a cog This operator ramps the speed down for a soft stop and applies a light pressure to the hard stop The operator has an electric brake to prevent the gate being forced open 11 8 STEPS TO INSTALLING THE CSD SERIES STEP 1 INSTALL CABLING Check with local regulations before installing mains voltage yourself you may need a registered electrician to do this for you Normally any cable for voltage lower than 32VAC or 5
22. ning arrangment also allows the power transformer to be away from the gate and Low Voltage Power Cable only run to the gate This is because any current that is too high for the low voltage cable is taken up by the battery Solar Powered Run from the Battery during normal use which is charged from a solar panel They need at least a 100Ah battery to run for up to 300 operations per day for 10 days straight with no charge The solar panel needs to be large enough to recharge the battery in full sun in three days or longer if cloudy A 24V 80Watt solar panel will do this This also requires a larger charge regulator a 24V 6A or larger is required ENVIRONMENT SUITABLE FOR OPERATOR The CSD series is suitable for outdoor use so long as it is NOT exposed for long periods to saltly air or other corrosive substance or contaminents that may cause fouling of the gate gate operator any of the gate operators components or accessores that may be connected to the operator 2 IMPORTANT SAFETY INSTRUCTIONS CONSIDERING THE GENERAL PUBLIC When Installing an Automatic Gate that will be entered from a public road way make sure the Gate is placed far enough from the road to prevent traffic congestion The Gate must be installed in a location that provides adequate clearance between it and adjacent structures when opening and closing to reduce risk of entrapment Swing gates must not open into public access areas Install the Gate Operator on the i
23. nside of the property and fence line DO NOT install an opener on the outside of the gate where the public has access to it The Gate and Gate Operator must comply with any applicable local council regulations CONSIDERING THE USERS Industrial Gate Operators must use Point to Point Safety Photocells to help prevent the gate closing on any vehicle using the gate It is also recommended that a seperate small side gate is used for pedestrians particularly if there will be children disabled or elderly people using the gate If push buttons key switches or Digital Keypads are installed they should be within sight of the gate but not placed so the user will be tempted to reach through the gate to activate the gate operator USER AWARENESS It is important to make sure everyone that will be using the gate is aware of the following dangers associated with automatic Gates do not contact any part of the gate or walk in the path of the gate while it is moving Never let children play with the gate controls Do not attempt to beat the gate while it is closing This is extremely dangerous In the event you sell the property make sure the new owners have a copy of these instructions If you lose the instructions they can be downloaded from www grantsautomation com au TOOLS AND HARDWARE REQUIRED THE TOOLS YOU LL NEED INCLUDE A basic set of hand tools will be needed including side cutters pliers wire strippers a range of philli
24. on board receiver is used not a stand alone receiver Button A is the main button on the remote control for opening the gate The other buttons can be used for other options or opening a garage door e Gate RX 1 receiver required Each remote control transmits a unique digital code Before the control board can respond it must first learn this code and know what action to take At the top right hand corner of the Control Board are three press buttons used for OSC Learning the remote controls codes for different actions For Opening the gate with Manual Stop and Close Press the OSC Learn Button a beeper will start beeping then press a button on the remote control within range of the gate and the beeper will beep more rapidly for a second to confirm it has been learned This button should now operate the gate Repeat the same with all remote controls REMOTE CONTROL OPEN WITH AUTO CLOSE If you do as above but use the OPEN Learn Button the remote control will now open the gate only and it will close automatically after auto close delay or close with an OSC or CLOSE input You can use one remote control button to open the gate with manual close OSC and a second with auto close OPEN if you like Button A is handy to have with open only and auto close for normal use and button B with Open Stop and Manual close in case you want to back a trailer in and don t want the gate closing on you The
25. or entire length of i gate The Keeper Mh Hard Stop to lt lt an be aligned 1 E Must also to the gate correctly H bios a eats pen Limi Em __ L PT ani Gate must be Straight not twisted or bowed Y M tee EE Gate Operator on a Pa level concrete w on the track d Make sure that the gate has been properly installed is straight and slides freely throughout its entire length without any grabbing from the guides or track any where along the gate The GATE TRACK MUST BE IN A STRAIGHT LINE any sudden dips or rises may prevent the gate operator from being installed properly Repair or replace all worn or damaged gate hardware prior to installation Gate posts less than 150mm wide should be made from steel not timber Replace posts where necessary A freely moving gate will require less force to operate and will enhance the performance of the operator and give a long working life The operator should be well drained and not be submersed in water or have water running past it in heavy rain GUIDE POST CLEARANCE If using a guide post behind a gate allow at least 60mm clearance for the Rack If the guide is fitted to the Rear front Fence or Wall the clearence pups has no effect so long as the Gate does not contact it at all if used AUTOMATIC OPERATOR FITTING REQUIREMENTS Extra
26. ps head screw drivers a small flat head screw driver for terminal block screws and a socket set You ll also need a tape measure marking pen an elecric drill with hammer action and variable speed control a 10mm hammer drill bit and socket bit for 10mm or 3 8 tek screws An angle grinder is also handy although a hacksaw will do if you don t have one If you intend on doing you own low voltage cabling a pair of conduit cutters are handy although a hacksaw can also be used If you wish to run cabling across the driveway you will need either a 230mm angle grinder with masonary grinding disc or a hand held concrete cutter You can hire these if necessary If you ll be running cabling across a lawn or garden you ll need a spade and mattock for digging a low trench If it s a long run then a small trench digger can be hired to do the job YOU MAY ALSO NEED THESE ITEMS BEFORE INSTALLATION For systems with accessories added Low Voltage Cable is required see Cabling Requirements for more information You may also need conduit which is available from Electrical trade suppliers and hardware stores For Mains Powered Systems you will need a mains power point mounted on a free standing post in front of the gate next to automatic operator Check with local regulations before installing a mains voltage power point yourself you may need a registered electrician to do this for you PREPARING THE GATE 1 Guide must 1 move easily f
27. r Sliding Gate operator 2 required for 24V VCB 12 Voltage Converter Board 16 to 24VAC DC in and 12V 500mA out RLY 12 Relay Board 12VAC DC in and clean contacts rated at 60 0 125 2A RLY 24 Relay Board 24VAC DC in and clean contacts rated at 60VDC 125AC 2A PC 1 Photocell 12 24VAC DC 15m outdoor TROUBLE SHOOTING Gate runs in the wrong direction check the motor power wires are correct if wired the wrong way around the motor will travel in the wrong direction Gate runs for a short distance then stops check the gate obstruction sensitivity or operator isn t being overloaded by a stiff gate Operator not working at all check power cord or battery cable is plugged in Check there is power atthe gate Check fuse on the control board Check input shunts are correct or control accessories are working properly Operator running slowly check the power and battery is connected properly and battery is charged A fully charged battery should be at 27 6VDC Gate won t work when first powered up check the OPEN STOP and PC input cable connections and shunts are correct and all accessories that may be connected are working properly OPEN PC or STOP inputs won t work check the shunts for these inputs have been removed These shunts overide the inputs preventing them from working Remote control range is poor check the antenna placement and connections The antenna should be as high as possible above any metal fencing gates or pos
28. rs and fiddly bits 12 TIPS FOR RUNNING LOW VOLTAGE CABLE YOURSELF 4 Always use conduit if running cable in grass open ground gardens or pebbles 4 Conduit should be buried deep enough so it is out of harms way For existing lawns pebbled areas or if run along side a driveway then buried just below the surface is fine For open ground gardens and area s where there is likey to be other digging going on then conduit should be buried at least 300mm deep 4 Never make joints in cable directly in the ground If you must join cable either bring it up well above the ground and have the joint protected from the elements by a weather proof junction box or put a pit in the ground to make sure the joint is sitting in the air within the pit and cannot be submerged in water STEP 2 FIT THE OPERATOR POSITION OF THE OPERATOR NGF hs ul 60mm from back j li face of gate SS NGS 2 Open and Close the Gate to check straightness Gap must not vary more than 5mm as lt gate open 1 and closes Remove the Cover the Operator then place it on it s concrete pad 60mm from the back face of the gate Then open and close the gate checking this distance from the operator as you go It should not vary more than 5mm each way from fully open to fully closed other wise the gate and or track is not straight enough and the gear wheel m
29. s or Steel Gates with Open Bars 1 8m High 1 8m High 12m Wide B 150mm rise 8m Wide Steel Gates with Hardwood Slats or Solid Hardwood gates ji per lt gt lt gt 12m Wide 2m High 1 2m High 1 8m High GATE OPERATOR FREQUENCY OF USE This Gate Operator is rated for INDUSTRIAL use which is any Housing Estates Commercial or Industrial Building Car Parks or Entry ways that have anything up to continuous use Battery Back Up System This operator has a 24V 7Ah back up battery as standard that take over if the mains power fails It will provide up to 200 operations for light weight gates or up to 100 operations for 800kg Gates over a 4 hour period or last up a day or more if not used depending on how manu accessories are fitted Upgrading the Battery Back Up The Battery Back Up capacity can be increase if desired by adding extra bat teries If using more than a 20Ah battery its a good idea to also upgrade the charge regulator to improve recovery time it batteries are run flat Battery Conditioning During Normal Use During normal use when the motor starts up it draws power from the battery which keeps it conditioned for reliable operation as batteries need to be used regularly for them to work properly This also means that the operator must have a battery connected before it will work properly Low Voltage Power Cable The Battery Conditio
30. t 24V Digital Keypad 22155501 Fl ggl 10 TERMINATING AN INTERCOM Intercoms also use a normally open connection to the control board Intercoms will either have a relay output with clean contacts or provide 12VAC or 12VDC to directly operate an electric strike lock The later requires a relay available as an accessory and will work with both 12VAC or 12VDC INTERCOM WITH 12VAC or 12VDC OUTPUT for Electric Strike Lock INTERCOM WITH N O RELAY N C OUTPUT 12VAC DC Relay TERMINATING SEPERATE OPEN STOP AND CLOSE P Bs With some Industrial Applications it may be necessary to have three seperate Press Buttons for Opening Stopping and Closing the Gate NO P B 46 NC P B I NL TERMINATING EMERGENCY STOP DEVICES For Industrial gates exposed to the general pedestrian traffic it is a good idea to install emergency stop photocells in area s or possible entrapement or an emergency stop press button for staff EMERGENCY STOP NC P B ZZzzzzzz2z bz 3 R 1 ail Ut Photocell Receiver POWERING UP FOR THE FIRST TIME Before you can go any further you must Power the Gate operator up for the first time Make sure the control board input shunts are ON Then plug the Batt DC IN terminal in 24 STEP 5 TUNE THE REMOTE CONTROLS IN If the
31. te only Any devices connected to the OPEN STOP or PC inputs require their shunt to be removed before they will be active The open input opens the gate will hold it open while ON and will close automatically after auto close delay once OFF The STOP input will stop the gate in any direction when ever it is moving The PC input will reverse the gate while closing only and hold it open while it remains ON and will close automatically after close delay once OFF OTHER OPTIONS FOR CONTROL INPUTS DIP 1 ON activates auto These Shunts overide the normally closed inputs close function for the OSC control input or any remote control button that has been LEARN activated for OSC operation Gate will close after preset auto close delay GND DIP DIP 3 ON allows the Switches Photocell s to control closing ose of the gate immediately or OPEN after a preset Photocell close STOP O delay default delay is 2 PC seconds CLS n Peb Ba DIP 4 ON changes the OSC GND input so it can open the gate 24V only Ideal when there is a z lot of users Must be used 5 L with auto close or the Close il ali Control input to close the 8 gate DIP 5 ON deactivates the auto close feature for the OPEN only control input This can be handy for some commercial installations DIPs 2 6 7 and 8 are spare and can be used to select special features that may be programmed into the control board
32. ts 35 WARRANTY a 12 Month Back to Base Warranty is offered by Grant s Automation for any defect in a Gate Operator System manufactured by Grant s Automation or any third party component supplier to Grant s Automation due to faulty workmanship or materials causing the Operator to fail to work as specified in this Installation and Service Manual Should any fault occur during the first 12 months after the operator was purchased it should be returned to the factory for repair or at the discretion of Grant s Automation replacement at no charge under the following conditions 1 2 3 Proof of purchase is required ie Invoice or purchase details recorded by Grant s Automation If an operator is not installed immediately after purchase at the discretion of Grant s Automation the warranty may be extended to up to a maximum of 12 months after the date installed The operator has been installed and serviced according to this Installation and Service Manual The operator has not been used for a gate larger of a different type or higher frequency of use than that specified in this Installation and Service Manual The gate specifications are required before any claims will be accepted The operator hasn t been used in a highly corrosive environment or has been exposed to contaminents that could cause the operator to fail The operator has not been used for purposes other that it was intended for The operator has not been tampere
33. upto20 every 12 months MAINTENANCE CHECKLIST Use the following Checklist for Scheduled Maintenance of the CSD Series Gate Operator e Gate Hinges in Good Condition and Lubricated e Gate Swings Freely with suitable clearance from ground posts Gate Hard Stops in good condition e Gate Operator and gate mounting bracket bolts nuts are tight All arm joints loose but firm Nooil leaks from gear boxes Gear box drive cogs tight on shafts e Gear box mounting bolts nuts tight e Manual release torque limiter works correctly e Inside operator clean from insects animal droppings spider webs etc Baygon Surface spray around operator not on electronics e Chain lightly oiled All Electrical Connections tight e Access Exit control devices work properly e External Safety devices work properly e Check all components for corrosion 33 MAINTENANCE HISTORY Serviced by Comment ACCESSORIES TX 4 Extra Remote Controls for either 433 92Mhz Blue or 315Mhz White RX 4 Stand alone Receiver to allow a garage door or another brand of gate operator to be operated with the e Gate remote control ether 433 92Mhz RX Mega Stand alone receiver for a large number of users allows use of up to 1000 remote controls A remote control can be deleted even if lost ANT 1 Antenna for remote control ether 433 92Mhz Batt TX Replacement Battery for TX 4 Remote control Batt 7 Replacement Battery fo
Download Pdf Manuals
Related Search
Related Contents
datasheet PDF Betriebsanleitung - Ersatzteile Avaya Configuring Line Services User's Manual DRYPIX 7000 SERVICE MANUAL REMOVAL AND ADJUSTMENT (MC) 取扱説明書の表示 Exam papers PC COM 8 PORT v RS-232/RS はじめに 安全にご使用いただくために Fichas de productos Descarca fisierul atasat Copyright © All rights reserved.
Failed to retrieve file