Home

BD LSR II Flow Cytometer Quick User Guide v.1.1.0

image

Contents

1. System blockage Solution Blockage needs to be shifted by priming or using syringe Turn the instrument to STANDBY 2 First try to unblock the machine by pressing the PRIME button on the control panel 3 Check for resumption of the normal acquisition rate 4 If this does not work then take the 60 ml syringe with the rubberised tubing Sample Injection Port SIP 5 Place the tubing over the SIP ensuring a tight seal around it TAKE CARE NOT TO PUT UNDUE STRESS ON THE SIP WHICH WILL BEND THE PROBE OR CRACK THE PLASTIC SIP HOUSING 6 Pull the plunger out of the syringe making sure a partial vacuum is maintained There should be a loud popping noise 7 Check for resumption of normal acquisition If there is no acquisition repeat stages 5 8 Prime the fluidics system and continue as normally 9 If the acquisition problem still is occurring check for air lock in the fluidics line BD LSR II Quick User Guide Page 8 Blizard Institute Flow Cytometry Core Facility Problem Very low or no acquisition rate Cause 3 Air lock in fluidics system Solution Purge fluidics system Check the fluidics line coming on the right hand side from the TOP WHITE CONNECTOR at the right hand side of the LSR II for any air bubbles This is the tube that leads to the filter housing behind the left hand computer monitor Move this if necessary to make room for yourself to carry out the line purge Check for Air Bubbles in This Li
2. BD LSR II Flow Cytometer Quick User Guide v 1I 1 0 Blizard Institute Flow Cytometry Core Facility PLEASE REFER TO THIS GUIDE FOR ANY OUT OF HOURS PROBLEMS Table of Contents 1 LSR II Start Up Procedure 1 2 LSR Il Shut Down Procedure 3 Infrequently Encountered Problems Blizard Institute Flow Cytometry Core Facility I 1 LSR Il Start Up Procedure Turn on LSR Il at the Power Switch ringed on right of the instrument LSR II Computer Cytometer Fluidics Cart 2 Turn on the fluidics cart below the LSR II ringed top right NB Press the button up to the on I position ringed above 3 Turn on computer below the work bench and LCD screens 4 On prompt type BDIS into password section NB Case sensitive and press Return 5 After allowing the computer to boot up double click the BD FACSDiva Software icon BO FACSDiva Software 6 You will then see a log in option Find your centre in the User Name box and again type BDIS in upper case and press OK to log in r Lop in A OBD y User hame amp fusin Lin Password R joon BD LSR Il Quick User Guide Page 2 Blizard Institute Flow Cytometry Core Facility 7 Wait for about l 2 minutes to make sure that the cytometer is connected You should see this confirmatory message in the bottom right hand corner of the right hand screen 8 Allow the cytometer lasers to get up to power It is recommended that you al
3. e FACSDiva software and then shut down the computer 4 Turn off the LSR Il and the Fluidics Cart at the green buttons BD LSR II Quick User Guide Page 5 Blizard Institute Flow Cytometry Core Facility 1 3 Infrequently Encountered Problems Problem Machine does not connect Solution Reboot system Exit FACSDiva software by selecting File gt Exit and shut down the computer 2 Turn off instrument 3 Restart the LSR Il and then reboot computer 4 Repeat Start Up procedure Problem Alarm sounds on Fluidics Cart Cause Full waste container or empty sheath container Solution Change FACSFlow or Waste Cubitainer on Fluidics Cart First determine if the Waste is full or the FACS Flow is empty by checking the indicator lights on the left of the Fluidics Cart Waste FACS Flow Cubitainer Cubitainer NB Make sure that the cytometer is set to Standby before changing the tanks 2 To change the FACSFlow Sheath Cubitainer Left hand of the Fluidics Cart a Turn off Fluidics Cart b Unscrew the lid and sensor carefully remove sample line c Press the Alarm button to turn off the Alarm You may have to turn the Fluidics Cart off and then back on d Get a new full BD FACS Sheath Cubitainer below the FlowJo computer e Put the lid with the sample line and sensor back on the new box and put the box back on the Fluidics Cart f Restart Fluidics Cart 3 To change the Waste Cubitainer Right hand
4. low 30 minutes for this 9 It is also advised to run a series of 3 cleans of 5 minutes each before starting after priming the machine ringed The tubes are in a rack at the side of the LSR II and run them in the order of Bleach FACS Rinse and Deionised Water Top up the tubes from the wash bottles if required Place the tube on the sample injection port Sample Injection Port SIP Press RUN ringed at the low MEDIUM ringed flow rate for 5 minutes each 2 The machine is now ready for use When not in use always leave the machine on STANDBY ringed mode with a FACS tube of deionised water in the SIP Sample Injection Port SIP BD LSR II Quick User Guide Page 3 Blizard Institute Flow Cytometry Core Facility 13 When you are finished and if you are not the last booked user for the day log out of your centre folder by selecting File gt Log Out The screen should look like this ready for the next user ROB 4g User Share 2 sustin Lin Password R hoo NB PLEASE DO NOT LOG OUT OF THE FACS DIVA SOFTWARE AS THIS MAY CAUSE CONNECTIVITY PROBLEMS FOR THE NEXT USER 14 If you are the last user for the day please perform the machine shutdown procedure BD LSR Il Quick User Guide Page 4 Blizard Institute Flow Cytometry Core Facility 1 2 LSR Il Shut Down Procedure Make sure the instrument is set to STANDBY mode 2 Place the tube of deionised water on the SIP 3 Shut down th
5. ne 2 Take the flow line coming from the FILTER HOUSING behind the left hand computer monitor and place it over the 250 ml Schott waste bottle Check for Air Bubbles in This Line BD LSR II Quick User Guide Page 9 Blizard Institute Flow Cytometry Core Facility 3 Carefully remove the white plastic plug from the top of the flow line and allow the sheath fluid to flow into the waste bottle 4 Any air bubbles should be purged from the line and a constant stream of fluid should be going into the waste bottle 5 Replace the white plastic plug onto the flow line 6 Check for resumption of normal acquisition rate 7 Prime the fluidics system and continue as normally BD LSR II Quick User Guide Page 10
6. of the Fluidics Cart a Turn off the Fluidics Cart BD LSR II Quick User Guide Page 6 Blizard Institute Flow Cytometry Core Facility a Remove the black holder that holds up the opening of the waste tank b Unscrew the lid and sensor of the waste tank c Get an empty waste tank from under the sink to the left of the LSR II d Replace the sensor in the empty container and screw up the lid e Replace the black holder f Leave the full tank for disposal by the Core Facility staff g Restart the Fluidics Cart 4 Prime the fluidics after changing the tanks a Install an empty tube on the SIP b Press the PRIME fluid control button on right hand side of the control panel see above to force the fluid out of the flow cell and into the waste container c Repeat the priming procedure d Install a FACS tube clear plastic with Iml of deionised water on the SIP and run it on high flow rate for about 2min NB Take care when lifting or moving full cubitainers They are heavy and weigh gt 20 kg Problem Very low or no acquisition rate Cause Cracked tube Solution Transfer tube contents to fresh FACS tube Check the sample tube for cracks 2 Transfer contents of to a new FACS tube and rerun the sample 3 If there is no acquisition check for blockage or air lock BD LSR II Quick User Guide Page 7 Blizard Institute Flow Cytometry Core Facility Problem Very low or no acquisition rate Cause 2

Download Pdf Manuals

image

Related Search

Related Contents

報道資料(PDF:423KB)  Biostar K8NHA Grand Owner's Manual  Hoover Stick Vacuum User's Manual  ミニベロ用室内自転車練習機 取扱説明書  View Acrobat Installation & Service Manual  PM‐3033 User`s Manual v1.00 Last Revised:Sep. 2015  Mode d`emploi  Canon ImageCLASS 2300 User's Manual  

Copyright © All rights reserved.
Failed to retrieve file