Home
Installation Instructions and User Guide
Contents
1. 1000 ERMOSTATIC POWER SHOWER EVENT ANY QUERY PLEASE CONTACT CUSTOMER HELPLINE el 01536 264 012 EASE KEEP THIS BOOKLET FOR FUTURE REFERENCE DEAR INSTALLER WHEN YOU READ THESE INSTRUCTIONS PLEASE ENSURE YOUSLEAVE THEM WITH THE USER mg i rma 1 ina gt lt 8 lt 3 5 gt i 5 8 988 5 955585 95 2 2 Oe ETE Se 2 amp 4942532 5 05 or 25 52 5 8 5 gA 7 Installation and Operating Instructions for NewTeam Power Shower e 1000 Please read this booklet carefully and ensure competent person undertakes the installation Note Following the headings in sequence will guide you through the installation and operation of your NewTeam 1000 XT Power Shower Pages PLANNING YOUR INSTALLATION Plumbing Electrics FITTING YOUR SHOWER General Plumbing Connections The Unit Water Electrical Connections Riser Rail COMMISSIONING TEMPERATURE ADJUSTMENT USER INSTRUCTIONS TROUBLE SHOOTING SPARE PARTS LISTING INSTALLER NOTES GUARANTEE Refer to back cover for Guarantee Customer Service and Replacemen
2. if the stored hot water is at the recommended 60 C 1000 1 operate the shower ensure the temperature control knob is approximately to the 12 o clock position and press the stop start button 2 For a hotter shower turn the control knob anti clockwise for a cooler shower turn it clockwise 3 The handset holder has a friction grip on the rail and simply slides up and down to adjust the height The angle of the handset can also be adjusted 4 The handshower has three shower modes which are selected by rotating the bezel around the spray head Trouble shooting Symptom Pump not operating but water is flowing Pump not operating and no water is flowing Pump operates but no water is flowing Poor performance Purge shower switch switched to purge No electricity supply to unit No water supply to unit Restrictions in water supply Pump may have overheated Unit may be incorrectly installed Likely Cause Action Remedy Isolate electrical supply remove cover and switch to shower Check all fuses and electrical supply Check isolating valves are turned on Check cold water storage tank has not run dry Check both hot and cold isolating valves are fully open Allow unit to cool and retry Check
3. that the top of the shower unit is at least 75 mm below the base of the cold water tank If in doubt please call the NewTeam helpline 01536 264012 Spare Parts Listing Newleam 1000 No No Description Finish 1 SP 087 0603 Base assembly White matt chrome 2 SP 087 0604 Front cover White or matt chrome 3 SP 087 0110 Pump unit Not applicable 4 SP 087 0035 Motor cover Not applicable 5 SP 087 0127 Pipe connection Not applicable 6 SP 087 0230 Solenoid Not applicable 7 SP 087 0014 Front cover screws Not applicable 8 SP 087 0129 Latching switch Not applicable 9 SP 086 0061 Long inlet elbow x 2 Not applicable 10 SP 087 0154 Mixer valve assembly Not applicable 11 SP 087 0505 Temperature control knob White or matt chrome 12 SP 087 0514 Stop start button White or matt chrome 13 SP 087 0068 Pipe cover White or matt chrome 14 SP 087 0211 Purge shower Not applicable rocker switch 15 SP 280 0100 Spirit rail and White or slider assembly matt chrome chrome 16 SP 280 0033 Soap dish White or chrome 17 SP 280 0024 Rail end cap White or matt chrome 18 SP 285 0820 Hose White or chrome 19 SP 168 0204 Zag Handshower White or matt chrome Not shown Please define colour Fig 8 Spare parts Installer Notes Installer Notes sti 441 1111 TEE tilidi Installer Notes
4. to the terminal that is marked with the letter L The wire which is coloured Yellow Green must be connected to the terminal which is marked with the earth symbol The installation and wiring must comply with 1 regulations Fig 2 Cylinder Flange Fitting your Shower General In addition to the recommendation on Planning your Installation please take note of the following All plumbing should be completed before any electrical connections are undertaken The unit can be connected to a combination cylinder system providing it has a cold water storage capacity of 115 litres 25 gallons actual When connecting pipework avoid using elbows sweep or formed bends will ensure optimum performance Do not solder within 300mm of the unit Do not run pump dry this will damage the internal seal and invalidate the warranty All pipework to and from the unit should be a minimum of 15mm Non restrictive isolating valves must be fitted on hot and cold supply pipes Do not position unit in areas subjected to freezing conditions The temperature of your stored water must not exceed 65 C A stored water temperature of 60 C is considered sufficient to meet all normal requirements in line with the British Standard 6700 WARNING ALL CONNECTING PIPEWORK SHOULD BE EARTHED Procedure Plumbing Connections Fig 1 Isolate mains water and electrical supplies To empty the pipework open the hot and
5. Guarantee Service Policy Guarantee Thank you for purchasing a NewTeam product which has been designed manufactured and tested in the U K to the highest standards Guarantee 2 Years 1 Year Parts and Labour Second Year Parts Only This is provided that 1 The guarantee registration card is completed and returned within ten days complete with a of proof of purchase 2 The product is installed and operated in accordance with our instructions and has not been misused or damaged This in no way affects your statutory rights as a consumer The information on the Guarantee card helps NewTeam to process any claims and contact you about your product and its maintenance if required The registration of your personal details is purely for Newteam use and the other information helps us to make products for the future NewTeam Shower products are designed manufactured and tested to the highest standards Should a complaint arise products are guaranteed against faulty workmanship and materials for a period of 12 months from the date of purchase when in domestic use second year guarantee is parts only For your guarantee to be valid your shower pump must be installed by a competent person in accordance with the instruction manual NewTeam will repair or replace at our option free of charge any faulty components during the guarantee period provided it has been maintained and operated in accordance with our instructio
6. Spirit level Rail with slider attached Soap Dish Screw cap Soap dish fixing screw Rail fixing screws amp wall plugs Fit the soap dish onto the bottom end of the rail and secure using the small screw from the kit Position the rail on the wall bearing in mind the heights of people likely to use the shower and the length of the hose when connected to the shower and passed through the retaining hole in the soap dish Mark the wall to indicate the upper fixing screw position Screw centres are 605 mm approx 23 inches apart Drill the wall at the marked fixing position using a 6 mm drill and loosely fix the rail end checking that the rail is hanging vertically using the spirit level incorporated into the top end of the rail The bubble should be exactly between the two lines on the spirit level body Mark the position for the lower fixing screw move the rail to one side drill the wall and fix the lower end of the rail Check that the rail is vertical and tighten both fixing screws Slide the end cap into position on the top end of the rail and fit the screw cover into the recess in the soap dish When fitting the hose it should pass through the larger hole of the soap dish Note The hose nut and not the handset handle fits into the slider and the slider moves more freely on the rail if gripped next to the rail rather than at the handset Commissioning Commissioning 1 With the front cover removed e
7. cold water taps Make your connection into the hot water supply pipe from the cylinder ensuring that it is the first draw off below the expansion pipe tee to minimise the effects of water draw offs elsewhere in the house and a minimum of 1 metre from the base of the cold storage tank and the expansion tee If this is not possible a direct connection must be made from the hot water cylinder with a cylinder flange Fig 2 The cold water supply should be taken directly from the cold storage tank and must be positioned 60mm below the cold feed connection to the hot water cylinder This should not be directly beneath the ball valve as aeration of the water going to the shower could cause pump damage Run hot and cold pipework to the unit position The Unit We recommend that the unit is fitted at chest height and set to one side of the intended riser rail position ensuring that the top of the unit is at least 75mm below the base of the cold water tank IMPORTANT The unit must be fitted on the finished tiled surface Do not seal the edge of the unit to the tiled surface with any sealant as the gap below the back of the unit and the tiles is needed for ventilation The outlet connection must be positioned at the bottom of the unit Fitting your Shower Water Electrical Connections WARNING Do not fit fuse or switch on mains electrical supply until all plumbing work is completed Connecting pipework ca
8. e rear or via channels in the base of the unit and the bottom or the right hand side 10 Feed the supply cable in to the unit but do not connect 11 Refit unit to pipes and secure to wall using 32mm x No 8 screws provided 12 Connect the supply cables into the appropriate terminals marked N L and symbol on the terminal block and secure into position with the cable clamp 13 Do not fit the front cover at this stage Refer to the commissioning procedure on page 7 Note If the electrical supply cable is concealed in the wall ensure that it avoids the unit s fixing points so that fixing screws do not pierce the cable Fig 3 Fixing points Fig 5 Fixing screws Inlet Short elbows Inlet Elbow Top Bottom 63mm Feed Long Inlet Elbow Top Bottom 86mm Feed Both Measurements Inlet Elbow given in the table Back Feed 63mm are to be taken from these points Fixing the Riser Rail Fig 6 Riser Rail Spirit Rail Kit Before proceeding with fitting the rail identify each of the items supplied using the illustration The slider need not be removed from the rail during fitting The top of the slider has smooth profile whereas the underside has recess revealing the grooves on the handset holder Part Description Rail end cap
9. he installation of this unit check that your site requirements allow the top of the unit to be a minimum of 75mm below the bottom of the cold water storage tank Electrics WARNING THIS APPLIANCE MUST BE EARTHED All electrical wiring for the shower must comply with the current 1 Regulations which includes earth cross bonding to all metal pipework IMPORTANT All plumbing should be completed before final electrical connections are made The shower must be connected to a 230 240 volt A C electrical supply from a 13 amp ring main via a fused double pole switch with at least 3mm contact separation The switch is to be clearly identifiable a minimum distance of 2 5m from a fixed tap or shower i e mounted in an adjacent room or via a ceiling type pull cord switch The unit should be fused at no more than 3 amps This appliance must be earthed and all associated metal pipework earth crossbonded in line with current 1 regulations As the colours of the wires in the cable not supplied used to connect to this appliance may not correspond with the coloured markings identifying the terminals in your switch please follow the procedure below Please use the cable entry point provided Failure to will eliminate any BEAB approval Procedure The wire which is coloured Blue or Black must be connected to the terminal that is marked with the letter N The wire which is coloured Brown or Red must be connected
10. lled appointments unless advised to NewTeam at least 24 hours in advance of the agreed date and time We reserve the right not to undertake work where payment cannot be made to our engineer at the time of the visit NewTeam hold stocks of components for all their range of products and these will be maintained for the duration of their life Should a product be discontinued spare parts stocks will be maintained but in the event of a part becoming unavailable NewTeam reserve the right to supply a substitute of equal quality The following payment methods can be used to obtain spare parts By post pre payment of proforma invoice by cheque or postal order By telephone quoting credit card Mastercard Visa or Visa Delta details REPLACEMENT PARTS Tel 01536 409 222 Fax 01536 409 201 E Mail spares newteam co uk CUSTOMER SERVICE HOTLINE Tel 01536 264 012 Fax 01536 409 201 E Mail service newteam co uk Part No 404 0125 Issue 02 03 Guarantee Please post immediately enclosing a copy of proof of purchase FOR NEWTEAM USE 1000 XT This label identifies your product and provides all the information needed Proof of purchase enclosed YES NO I NAME ADDRESS POSTCODE DATE OF PURCHASE PRODUCT PURCHASED FROM ra TOWN bb NewTeam s philosophy is to offer outstanding products with quality and integrity please help us by taking the time to answer the foll
11. n feed from above or below the unit or straight through the wall at nominal centres of 40mm Top Feed Hot on right cold on the left Bottom Feed Hot on the left cold on the right Back Feed Hot the bottom cold on top Procedure e The integral fittings on the valve are of the self seal push fit type All burrs and rough edges must be removed from the end of the tube Where chrome plated tube is used roughen or remove the first 25mm of plating e The inlet elbows supplied are of a standard length in some cases these will need to be shortened for correct installation please refer to the tables for correct measurements 1000 XT 1 Flush out pipework before installing the unit 2 Cut the inlet elbows to the required length please refer to table below 3 Locate the inlet elbows into the mixer valve inlets by pushing firmly through rubber grommets until pipe stop is felt 4 Hold the unit on the wall and mark the pipe work to the appropriate length 5 Cut the pipes and remove all burrs Push the unit and elbows firmly onto the pipes until the stop is felt 6 Mark the fixing points for the unit Fig 3 7 Release unit from pipes by pressing the collets on the elbow fittings and pulling the unit off the pipework Fig 4 8 Drill the wall and insert the appropriate wall fixings 9 Bring a supply cable to conform to I E E regulations from the switch to the unit position The cable can enter the unit from th
12. ns and has not been misused or damaged Modification or repair of this product by person s not authorised by NewTeam will invalidate this guarantee This guarantee applies to products purchased within the United Kingdom or Republic of Ireland but does not apply to products used commercially This guarantee does not affect your statutory rights Se rvi ce Pol Replacement Parts Policy IMPORTANT In the event of product or component malfunction DO NOT tamper with or remove the product from site Telephone NewTeam Customer Service Department on 01536 264 012 and be prepared with the date of purchase model number and a description of the complaint Our service staff are fully qualified to advise on correct installation procedures and will be able to diagnose whether the fault will require a replacement part or a visit from a NewTeam engineer If required a service call will be booked and either yourself or an appointed representative who should be a person of 18 years or over must be present during the visit All site visits to product within the guarantee period will be carried out free of any parts or labour charges provided the conditions of the guarantee have been adhered to Second year guarantee is parts only All site visits to product out of guarantee will be subject to charges for parts and labour which is payable by you or your appointed representative at the time of the visit Charges will also be levied on cance
13. nsure the black purge shower switch inside the base is switched to purge see A fig 7 This enables water to flow without the pump running which is necessary in the following commissioning process 2 Fit the front cover and fix with fixing screws see fig 5 3 Push the temperature control knob onto the spindle with the marker pointing to the 12 o clock position 4 Connect the shower hose to the unit but do not fit the handshower 5 Turn on the hot and cold water isolating valves and the electricity isolating switch Place the open end of the hose in the bath or shower tray 6 Set the temperature control knob to fully cold marker at 6 o clock position and press the stop start button The pump will not operate but water should run 7 Cold water will flow from the hose and you should allow this to continue for two minutes after which the control knob should be returned to the 12 o clock position Allow the water to run for a few minutes to stabilise the hot water flow 8 Turn off the electricity at the isolating switch and remove the knob and cover Switch the black purge shower switch to shower and refit the cover and knob ensuring the marker on the knob points to the 12 o clock position 9 Turn on the electricity at the isolating switch 10 Pass the hose through the hole in the front of the soap dish and fit the handshower 11 Your shower is now ready to run Press the stop
14. owing questions Thank you MARKETING INFORMATION 1 Please state your profession Plumber Builder Electrician Customer Other please specify pa 2 Please state the reason for purchasing a shower New Build O Replacement Renovation Other please specify 3 If the product is a replacement shower please state the type and make of the shower it is replacing 1 4 What influenced you to purchase the 1000 Power Shower Advertisement Trade Press Recommendation from Stockist Recommendation from Installer TJ Other please specify 5 Please state your main reason for purchasing the 1000 XT Power Shower NewTeam Product Knowledge Product Features Product Styling Price I Other please specify Please tick here if you do not require any further information or product updates from NewTeam O POST BACK FOLD AND TAPE AS INSTRUCTED OVERLEAF see Please tape down Fold 2nd Fold Earlstrees Industrial Estate Customer Service Dept Corby NewTeam Ltd Brunel Road Northants NN17 AUW adel 4 151 Fold ske aC ne el 2 plumbworld Big brands small prices Pdf Supplied By http www pl
15. start button on the front cover to operate the shower which will work as a power shower 12 It is intended that with the temperature knob aligned to the 12 o clock position you should get a comfortable shower temperature If however the shower is too hot or too cold remove the control knob and adjust the brass spindle anti clockwise to increase temperature clockwise to decrease When the desired shower temperature is achieved replace the knob with the marker pointing to the 12 o clock position Temperature Adjustment The valve allows the maximum showering temperature to be set at a safe level preventing accidental scalding This setting should be made during commissioning and will require that the hot water cylinder is at its normal operating temperature IMPORTANT The handset must be in the spray mode e We recommend the reading of User Instructions before proceeding further This will familiarise you with the operation of the shower Procedure Turn the brass mixer valve spindle fully clockwise and then anti clockwise until the black line on the spindle is aligned with the groove on the mixer body and fit the control knob in the fully cold position Check that it is correctly fitted by turning fully clockwise to the stop pull the knob off and check that the black line and groove are aligned Adjust if necessary This sets the shower temperature to 38 40 C with the control knob pointing to 12 o clock
16. t Parts Policy In the event of any query regarding installation please contact the NewTeam Customer Service Department Tel 01536 264 012 Fax 01536 409 201 E mail service newteam co uk E mail spares newteam co uk In line with our policy of continual product development the specifications may be varied and product design altered We reserve the right to depart from the details given in this manual without prior notice Planning your Installation Plumbing Under no circumstances should the unit be connected directly to the mains cold water supply or to a combination boiler or pressurised hot water system For correct operation of the NewTeam 1000 XT power shower both hot j and cold water supplies must be gravity fed at nominally equal pressures from a cold water storage tank and a hot water storage cylinder We recommend a minimum of 115 litres 25 gallon actual of cold water supplied by a storage tank Please ensure compliance with all Water Regulations Under no circumstances must the Power Shower be connected to the mains cold water supply Please ensure maximum supply head of 10 metres minimum 75mm It is recommended that the hot water supply is at a temperature of 60 C in line with British Standard 6700 British Water Regulations and Plumbing Code of Practice Do not use jointing compounds when connecting and do not solder within 300mm of the unit Before proceeding with t
17. umbworld co uk
Download Pdf Manuals
Related Search
Related Contents
シュナイダーブランド サーマルリレーTeSys Dシリーズ 原産地変更について Phase Technology PC-SUB WL-10 User's Manual View or - Chevrolet Owner Center Samsung NP-R430I Manual de Usuario (Vista/Windows7) Audio and visual system and method for providing audio and visual Manual FR - Birth alarm Copyright © All rights reserved.
Failed to retrieve file