Home

Installation Manual - Pool And Spa Centre

image

Contents

1. Installation Manual for UK and Ireland Model 75876 Arch Chemicals Ltd Wheldon Road Castleford WF10 2JT 01977 714100 RCHN 9 16 03 REV 1 Product Stewardship MAKING THE WORLD A BETTER PLACE Arch is committed to maintaining and improving our leadership in Product Stewardship One of the six initiatives outlined under the Chemical Manufacturers Association CMA Responsible Care Program is to make health safety and environmental protection an integral part of a product s life cycle from manufacture marketing and distribution to use recycling and disposal Successful implementation is therefore a shared responsibility Everyone involved with the product has responsibilities to address society s interest in a healthy environment and in products that can be used safely We are each responsible for providing a safe workplace All who use and handle products must follow safe and environmentally sound practices For more information about our Product Stewardship Program contact your Arch Representative ht h easif lo Installation Manual General Principles of Installation The Easiflo 1 chlorinator is an atmospheric system designed for pools and ranging from 15 to 600 m depending on bather load and operating conditions It is possible to install the feeder on a pool and dose a spa or small pool also with a conventional dosing pump drawing solution from the discharge tank but this possibility agai
2. Involvement of the Emergency Services Police Fire Medical e Involvement of the Environmental agencies e Major damage to property FIRST TELEPHONE 44 0 1865 407333 This will connect you with the NCEC National Chemical Emergency Centre who support the Arch Emergency Response t operates 24 hours a day 365 days a year THEN Phone your local Arch Water Products Office during office hours 9 NCEC will provide initial assistance and advice in English NCEC will also contact Arch Water Products Head Office When calling the Emergency No have the following information available use your Emergency Response Procedure Checklist e Your name e Your job title e Your company name and location e he Telephone and fax number that you can be contacted on e he Product Name e he Product Code e he nature of the emergency e he action you have taken e Are the emergency services involved e Are the environmental agencies involved PLEASE ALWAYS CONTACT NCEC IN THE EVENT OF A HEALTH SAFETY OR ENVIRONMENTAL EMERGENCY INVOLVING ARCH WATER PRODUCTS BUT PLEASE ONLY USE THIS NUMBER FOR HEALTH SAFETY AND ENVIRONMENTAL EMERGENCIES as defined above
3. Tq piouesjog dung 1 T Duont ploy dO AL T uotum S U Sg edid OAd JL Buiqn qo Em bas Venturi System Installation Refer to schematic 2AG for either above grade pool system auto control installation or Schematic 2BG for a below grade pool system installation and follow the steps below Background The next steps involve creating a bypass loop on the pool return line for installation of a Venturi This loop can be created by drilling and tapping or splicing into the return line with Tee s We refer to using the drill and tap method You may find it preferable to splice in Tee s to make these connections It will also be necessary to install a ball or gate valve in the return line at location PD1 in the schematic drawing This valve when partially closed will force water to flow through the venturi creating the suction needed to evacuate the chlorinator Step 1 Drill a 1 4 hole Fig 1V at location VS1 found on the schematic drawing Tap the GT hole with a 1 BSP tap Fig 2V Options for this step include the use of saddle clamps instead of drilling and tapping or splice in a tee with 1 pipe size Fig 3V leading to Venturi System loop Beggen Fig IV Fig 2V Fig 3V Step 2 Install a Ball or Gate valve at location PDI in Schematic Fig 4V Step 3 Drill a 1 4 hole Fig 10 at VS2 on Schematic Tap the 1 4 hole with a 1 2 BSP tap Fig 2V Options for
4. the glue is drying Connecting the Easiflo 1 to the Pool Recirculation System Step 71 Place the Easiflo 1 chlorinator in the pump room following the recommendations in the section Selecting a location for the Easiflo 1 Step 2 Drill amp Tap 2 BSP hole in effluent pipe P1 in Plumbing Schematic Step 3 Install nipple and W8MC8 on 2 ball valve and install ball valve in threaded hole Step 4 Loosen the nut on the Parker tubing connector on the inlet to the Easiflo 1 and push the 2 OD polyethylene tubing into the connector and hand tighten Step 5 Run the tubing to the inlet ball valve installed in step 3 and cut to desired length Loosen the nut on the Parker tubing connector on the inlet ball valve and push the OD polyethylene tubing into the connector and hand tighten Step 6 Loosen the nut on the Parker tubing connector on the discharge valve of the Easiflo 1 and push the 2 OD polyethylene tubing into the connector and hand tighten Step 7 Run the tubing to the outlet ball valve on venturi and cut to desired length Loosen the nut on the Parker tubing connector on the outlet ball valve and push the 2 OD polyethylene tubing into the connector and hand tighten Flow Indicator Installation A flow indicator is provided with the Easiflo l and has a scale from 0 to 4 It min Follow the instructions below to install a flow indicator Step 1 Close the inlet and the outlet shuto
5. this step include the use of saddle clamps instead of drilling and tapping or splice in a tee with 1 pipe size Fig 3V leading to Venturi System loop Note Below grade systems will require the addition of ball valves at locations BV1 amp BV2 in schematic 2BG This will allow the Venturi System to be isolated for servicing Step 4 Take one Union for the Venturi system apart Note that they have different halves Glue these two halves of the union onto the Venturi Fig 5V Step 5 Take the other union apart and install on the union halves on the Venturi Fig 6V Fig 4V Fig 5V Fig 6V Step 6 Apply PTFE tape to both ends of 2 ball valve and install Parker tubing connector W8FC8 on one end of the 2 ball valve Step 7 Install 2 ball valve onto venturi Fig 7V Step 8 Close the valve Fig 8V Fig7V Fig 8V Step 9 Note the Arrow on the venturi indicating the direction of flow Fig 9V Note When performing step 710 make sure the venturi is installed with correct direction of flow Step 10 Complete installation of venturi bypass loop using 1 PVC pipe and fittings There are four methods profiled in the following figures Drill amp Tap Above Grade Auto Control Fig 19A Below Grade Fig 19C 10 Above Grade Auto Control Fig 19B Below Grade Fig 19D Allow at least 30 minutes for glue to set before restarting the pool pump Note Perform the following procedure while
6. 2JT th een Feeder Detailed View Ath easif nti easifio Number Number 0 75876 1 Easiflo Feeder 74062 Ee EI Dissolving Cup with Nozzles Assembly 71615 1 Discharge Valve Body with Plug Ball amp Gasket KH 71584 wa Discharge Valve Arm with Suction Cup 8 71496 EN Emergency Shut Off Valve Assembly Part 71910 Not Included 8a 71910 1 Rubber Gasket for Emergency Shut Off Valve 74059 1 Parker Fitting W6FE4 d 716019 1 Elbow W6ME6 3 8 For Feeders 30991 amp P3 P1 71618 O4 43 8 PE Tubing 2 ft 71535 1 Emergency Shut Off Valve with Arm Only Emergency Shut Off Float Plate PVC Nut Discharge Arm Nut 18 799 1 Emergency Shwt Of Over ow oa C Emergency Shut Off Mounting PVC Screws 1 4x20x2 1 4 71539 71536 71537 71585 71583 71890 22 71614 17 z ns 3 2 oer 25 71626 1 20 1 2 O D PE Tubing P4 only need 3 inch piece 1 2 FNPT x 1 2 FNPT PVC Ball Valve 28 71974 ORP Below Grade Installation Kit for Small Feeder 20 2 ISSUE 1 SPRING 2003 ARCH WATER PRODUCTS RESPONSIBLE CARE GUIDANCE NOTE s EMERGENCY RESPONSE PROCEDURE FOR ARCH WATER PRODUCTS CUSTOMERS 1 i In the event of a Health Safety or Environmental Emergency involving Arch Water products This includes Injury to persons requiring medical treatment e e Loss of containment of product to the environment e
7. D W8MCA for ESV inlet tube x 2 FBSP W8FCS for discharge valve and flow indicator Arch Venturi 2 1 Slip x Slip Sch 40 PVC Unions 2 PVC Nipples Will the Small Feeder Venturi Work Site Ask the pool operator what the flow rate minimum of the pool is with a dirty filter Backwash or clean the filter and measure the effluent pressure of the pool system after the heater at P1 in the Installation Schematic If this pressure is 17psi or less and the minimum flow rate of the pool is greater than 170 Its min the small feeder venturi will provide adequate suction to operate the Easiflo 1 The chart overleaf lists the suction flow generated by the small feeder venturi at various pressure differentials Install the venturi loop as shown in the appropriate Installation Schematic for either an above or below grade filtration system The primary difference between the two is the use of ball valves on the below grade installation to allow the loop to be isolated from the pool system for service Once the loop has been installed using the step by step instructions in the Installation Manual adjust the pressure differential ball valve to achieve a vacuum reading of 13 Hg Easiflo 1 Venturi Flow Through Installation Theory Venturi Its min Is min Flow to the venturi is taken from the pressure side of the pool recirculation pump after the filter and heater loop if present Flow from the venturi is return
8. actual outlet flow After installation it is important to check the evacuation cycle of the Easiflo 1 Chlorinator to ensure that the drain time of the discharge tank is adequate The maximum recommended elapsed time to drain a 4 litre bottle positioned at the same height of the Easiflo 1 discharge valve of water is 1 minute This corresponds to an outlet flow rate of approximately 4 litres per minute dedO 5Vv433 uonejeisu oyise3 sionpoug jood EUSO G0 L 0 UOHe E SU SPeIE SAOQV UIUUoOh mee NOV VCH 9neueuos uonejejsu ojise3 dung uone noJooM Eier T 1J l d LOL MOL el dO Je j o 3uo2 eola Jo jo uuoo Buiqn S bi 9A EA legd uA 10j2euuo Buiqn IOOd OL 0 4 SA bad LA BL 1 UUAXO 9A EA UE uA J D 9d OoJIs eJ U O janno T jeuondo JUEL E euondey DV piouejos bugan ao iA N O d JL buiqn qo Zi ddOo 9844 uonejrjsu opseg sionpoud 00d Ieiojeuiuo G0 L 0 Uonej e jsu opEeJc MoJ9g IJnyu9gA vein HONY ggzZ neueuos uonel elsu osea dwng 15x uonejnoioey LC WOJ4 MO J E duo a 1J lo nuoo LILA jeorueuo Jopee Oise B JO OBUUOD Buiqn SAIEA eg Joyoauuoy Buiqn ood 9 eA eg 4 OL MO CSA Lad ISA se eh en eA Us l Ss C t Ag re J9 OWMO 4 j t d jenno i N Jeuondo EH E yuel jeuondo II It Io oe E J9jeo DV Ces t I LAg e H INEN UU
9. ed downstream of the venturi inlet A partially closed valve in between the venturi inlet and outlet provides the pressure drop needed to power the venturi The three critical parameters in choosing a venturi are the inlet and outlet pressures and the suction lift The Venturi must be capable of evacuating Alt min from the discharge tank when the filter is dirty Suction flow will decrease with an increase in filter pressure as less water will flow through venturi Always minimize the backpressure when installing a venturi This includes eliminating minimizing any elbows on the outlet side of the venturi In addition if the venturi is located more than 0 9 metres above the chlorinator outlet it will be necessary to calculate the effect of the suction lift loss on outlet flow Follow instructions below to perform the Suction Lift calculation if required After the evacuation system has been laid out measure the height differential in metres between the venturi and discharge valve of the Easiflo l chlorinator Use this height differential to calculate the suction lift factor in the formula that follows Suction lift factor 10 37 height differential in metres 10 37 Example height differential 1s 2 metres therefore Suction lift factor 10 37 2 10 37 8 37 10 37 0 81 Take the suction flow F1 and multiply it by the suction lift factor to get the actual outlet flow The formula 1s F1 x suction lift factor
10. ff valves to the Easiflo l chlorinator Step 2 Mount flow indicator where it 1s easily read Step 3 Splice into inlet tubing and connect inlet flow to bottom port of flow indicator Step 74 Connect tubing from chlorinator inlet to top outlet port of flow indicator Adjusting and Testing the Outlet Flow Rate Install vacuum gauge with 1 MBSP x 1 FBSP fitting into coupling and install on the Venturi Start pool system and open all valves on the venturi loop Slowly close PDI until the vacuum gauge reads 13 Hg Put Do Not Adjust tag on PDI Remove vacuum gauge and install outlet ball valve with fitting Close the outlet ball valve Connect 2 tubing to fitting on outlet ball valve Check outlet flow with following procedure Fill a 4 litre bottle with water Place near Easiflo l Discharge valve Disconnect the tubing from the discharge valve and place end of tubing at bottom of 4 litre bottle Open outlet ball valve and record time it takes to empty the bottle It should take 1 minute or less to empty the bottle This corresponds to an outlet flow rate of 4 It min or greater Close outlet ball valve and connect tubing to the discharge valve WARRANTY POLICY The Easiflo Chlorine Feeder comes with a 12 month warranty from the date of installation In order for the warranty to be validated the Warranty Registration Document W2 must be completed and returned to Arch Water Products Wheldon Road Castleford WF10
11. n depends on volumes and bather load Arch Technical Services personnel can help to determine this Tel 01977 714100 for this or other helpful advice if needed There are two different types of installations The location of the pool pump above grade or below grade will determine the installation type necessary Both Easiflo 1 installations use the small feeder venturi to inject chlorine post filter heater Selecting a location for the Easiflo 1 Choose a location in the pump room that will allow easy access and service Always try to minimize the length of the outlet tubing when locating the Easiflo 1 The Easiflo 1 comes with 6mt of half inch OD polyethylene tubing Equipment Required for Chlorinator Installation Drill Cordless Recommended Tube Cutters or Utility Knife 2 BSP Tap and 11 16 Drill Bit l MBSP x A4 FBSP Reducing Bushing PTFE or Pipe Sealant PVC Primer Cleaner and PVC Glue Saw to cut PVC Pipe Gas Pliers Channel Locks Equipment Required for Venturi Installation 1 PVC Pipe and Fittings elbows tees etc Ball or Gate Valve for Pool Return Line 1 2 BSP Tap and 1 4 Hole Saw Optional saddle Clamps optional Parts Included with the Easiflo 1 Chlorinator GT OD Polyethylene Tubing 20 feet GT FBSP threaded Sch 40 PVC coupling 2 FBSP x FBSP PVC ball valve W8MCS8 0 4lts acrylic flow indicator Parker tubing connector 1 Tube x 1 MBSP 3 Parker tubing connector 2 O

Download Pdf Manuals

image

Related Search

Related Contents

Harmony Ultimate™ Bedienungsanleitung  Nobo 1901760  BD GenomeWalker Kits  Safety Configuration & Diagnosis (SCD) User Manual      Loader PLUS MANUALE DELL`UTENTE  DiaLog Scout User Manual  N8180−45/46 無停電電源装置 取扱説明書  WINDAQ/Lite/Pro/Pro+ WINDAQ Waveform Browser DI  

Copyright © All rights reserved.
Failed to retrieve file