Home

the Conservation Rooflight® Pleated Blind Installation Manual

image

Contents

1. Step 9 2 To keep the tension in the system pull the black guide wire s running from the back of the cill unit Part J tightly whilst turning the screw s clockwise until tight Step 9 3 Tuck the black guide wire underneath the cill unit Part J to conceal from view the wire can be cut down but this may limit accessibility in the future if re tensioning is required Issue 01 March 2011 15 Pleated Blind Installation Manual Step 10 0 Using the screws provided Part B fix the blind channel Part G onto the integral lining through the holes drilled in step 7 0 and 7 4 Repeat on the opposite side of the integral lining using Part H Step 11 0 Reattach your ironmongery motors to the Rooflight using the appropriate installation instructions 16 Issue 01 March 2011 Pleated Blind Installation Manual If installing a manual blind system move to step 13 0 If installing an electric blind system proceed with step 12 0 Step 12 0 Open the Rooflight fully using your ironmongery motor Route the power cable from the head unit Part I to the switch control unit supplied with the blind and follow the applicable wiring diagram included The cable can be concealed behind the plasterboard lining to reduce the visual impact shown or alternatively choose a suitable path to connect the power cable to the switch control unit Note Ensure enough slack is left in the power cable to allow the Roofli
2. to the bottom edge of the integral lining and abut the right side to the bottom Drill through Hole A Note Do not drill deeper than 10mm through the integral lining gt ET es u j 7 i A a T fe wer en er z i a A rs E it i i u e i Ei 1 CE r a F i p oe M aip 7 ME oe E ie kn i a 7 A w s z ii s a hy bes i ee a i S ey Bii a a Et Eat Ze Fu a j k t F i i E F n Issue 01 March 2011 9 Step 7 1 On the right jamb at the cill of the Rooflight align the bottom edge of Drilling Template 1 Part A to the bottom edge of the integral lining and abut the left side to the bottom Drill through Hole A Note Do not drill deeper than 10mm through the integral lining Step 7 2 Using one of the Screws Part B loosely screw in the left blind channel Part G through the hole created in step 7 0 10 Issue 01 March 2011 Step 7 3 With the screw holding the channel at the cill end align the channel Part G parallel to the bottom edge of the integral lining the steel rule should be used to measure between the channel and the bottom of the integral lining to ensure accuracy Mark through all the pre drilled holes in the blind channel Part G Step 7 4 Drill through all the holes marked out in step 7 3 Note Do not drill deeper than 10mm through the integral lining Repeat steps 7 2 7 4 on the opposite side of the integral lining using Part H Issue 0
3. 1 March 2011 11 Pleated Blind Installation Manual Step 7 5 Unscrew the blind channels Parts G amp H from the integral lining these will be re attached later on Step 8 0 Lift the head unit of the blind system Part I up to the clips at the head of the Rooflight Note For motorised blinds the red sticker must face the glass and the power cable should run off the left side of the unit as shown Note For manual blinds the operating handles should face into the room not shown in images 12 Issue 01 March 2011 Pleated Blind Installation Manual Step 8 1 Angle the lip of the head unit Part I into the clips Part E and push firmly until the head unit clicks into position Step 8 2 Angle the lip of the cill unit Part J into the clips Part C and push firmly until the cill unit clicks into position Issue 01 March 2011 13 Pleated Blind Installation Manual Step 9 0 The black guide wires running between the head and cill unit should be in tension in order for the blind System to run smoothly If extra tension is required turn the screw s on the cill unit Part J counter clockwise by approximately 3 turns to release the wire s Step 9 1 Increase the tension in the system by pulling down on the black guide wire s nearest to the screw s on the cill unit Part J Pull all wire slack through the system 14 Issue 01 March 2011 Pleated Blind Installation Manual
4. 3 833108 Tools list Supplied by installer a Power drill with Z 2 8mm drill bit Pozi drive Screwdriver Steel Rule Tape Measure Pencil Pleated Blind Installation Manual Step 1 0 If access for drilling at the cill of the Rooflight is prohibited by ironmongery motors they can be disengaged to aid the installation Step 2 0 At the cill of the Rooflight align the bottom edge of Drilling Template 1 Part A to the bottom edge of the integral Rooflight lining and abut the left side of the template to the left jamb lining Drill through Hole A Note Do not drill deeper than 10mm through the integral lining Issue 01 March 2011 Pleated Blind Installation Manual Step 2 1 Align the bottom edge of Drilling Template 2 Part A to the bottom edge of the integral lining and abut the right side of the template to the right jamb lining Drill through Hole A Note Do not drill deeper than 10mm through the integral lining Step 3 0 Using the screws provided Part B screw two of the clips Part C and washers Part D into the two holes drilled in step 2 Orientate the clip as shown Note The washer must go UNDERNEATH the clip 4 Issue 01 March 2011 Step 4 0 Atthe head of the Rooflight align the bottom edge of Drilling Template 1 Part A to the bottom edge of the integral Rooflight lining and abut the right side of the template to the left jamb lining Drill through Hole A N
5. ght to open and close fully without straining the cable Issue 01 March 2011 17 Pleated Blind Installation Manual t Step 13 0 Electric blind systems Check the operation of the blind using the switch controller to fully open and close the blind Manual blind systems Check the operation of the blind by holding the handles on the head unit and sliding the blind fully up and down the Rooflight 1 Installation complete Please follow our care and maintenance instructions for optimum lifetime of the blind These can be found at www therooflightcompany co uk or alternatively call us on 01993 833108 for details 18 Issue 01 March 2011 Pleated Blind Installation Manual 7 64 2 8mm Drill bit Part A Drilling Template 1 ning f Align arrows to the bottom edge of rooflight integral lining Carefully push the drilling template out of the manual cover and disconnect from Part F Use as instructed in the manual au 9 4U99 Position this edge facing the glass 7 64 2 8mm Drill bit DRILLING TEMPLATE 1 DRILLING TEMPLATE 2 Align arrows to the bottom edge of rooflight integral li Part F Drilling Template 2 Carefully push the drilling template out of the manual cover and disconnect from Part A Use as instructed in the manual Q O z ee N st lt HOLE B Issue 01 March 2011 19 Wychwood Business Centre Tel 01993 833108 Milton Road Fax 01993 831066 Shipton u
6. nder Wychwood email info therooflightcompany co uk OX7 6XU www therooflightcompany co uk foo amp Va Y M N V y NY h4 l vd SS A BS El KM 9375 193754 INVESTOR IN PEOPLE RECYCLE the Rooflight Company The Professionals Choice
7. ote Do not drill deeper than 10mm through the integral lining Step 4 1 Align the bottom edge of Drilling Template 1 Part A to the bottom edge of the integral Rooflight lining and abut the left side of the template to the right jamb lining Drill through Hole A Note Do not drill deeper than 10mm through the integral lining Issue 01 March 2011 5 Pleated Blind Installation Manual Step 5 0 Using the screws provided Part B screw two of the clips Part E into the two holes drilled in step 4 Orientate the clips as shown Note Washers are NOT required for the head clips Step 6 0 At the head of the Rooflight mark a centre line along the width of the integral lining 6 Issue 01 March 2011 Issue 01 March 2011 7 Step 6 3 At the cill of the Rooflight mark a centre line along the width of the integral lining Step 6 4 Align the centre line shown on drilling template 2 Part F with the line marked in step 6 3 Position the arrows on the template at the bottom edge of the integral lining Drill through holes B amp C Note Do not drill deeper than 10mm through the integral lining 8 Issue 01 March 2011 Using the screws provided Part B screw two of the clips Part C and washers Part D into the two holes drilled in step 6 4 Note The washer must go UNDERNEATH the clip Step 7 0 On the left jamb at the cill of the Rooflight align the bottom edge of Drilling Template 1 Part A
8. the Conservation Rooflight Pleated Blind Installation Manual Issue O01 March 2011 the Rooflight Company The Professionals Choice Thank you for purchasing the Conservation Rooflight Pleated Blind please follow this step by step guide to ensure the blind is installed correctly We recommend that the blind is installed after the Rooflight integral linings have been painted This blind system requires a reasonable level of practical skill to ensure correct installation If you would like on site assistance we have a team of trained professionals available through our blind fitting service please call 01993 774 446 for details Take precautions to remove dirt and grease from any tools used as the blind fabric will mark easily A Only a qualified electrician should carry out work uninstalling installing electrical motors detailed in steps 1 0 11 0 and 12 0 ensuring they adhere to any applicable safety precautions Parts list Supplied with blind Right hand blind channel Blind system Head unit only supplied with H Dual Pleated blinds Drilling template 1 supplied on back cover of installation guide Drilling Template 2 supplied on back cover Left hand blind channel only supplied with Dual Pleated blinds Blind system Cill unit Please check that you have all the parts before proceeding to install the Pleated Blind If you believe any items are missing please call us on 0199

Download Pdf Manuals

image

Related Search

Related Contents

Tu Samsung Instinct HD  the user manual    manuale utente p001/20  Válvula Namur.vp  Fisher-Price N8849 Instruction Sheet  Samsung SGH-X600 Manual de Usuario      取扱説明書  

Copyright © All rights reserved.
Failed to retrieve file