Home

USER MANUAL: JCI 155v4 Charge Decay Test Unit

image

Contents

1. This a starts timing and b provides a value for the initial peak voltage The initial voltage is deliberately taken slightly after the signal maximum occurs to ensure it is on the decaying part of the curve 7 3 Suggested Test Procedure The following procedure is suggested as likely to be suitable for general testing the ability of materials and surfaces to dissipate electrostatic static charge Alternative procedures may prove to be more appropriate for particular materials Measurements based on decay times displayed directly on the JCI 155 are normally quite satisfactory The time from initial peak voltage to 1 e of this will be found to agree well with values derived from software recording and analysis Software recording and analysis is to be preferred whenever this is practical because decay time values are based on a better analysis of observations Also the actual decay curve data is available for inspection and reanalysis if need Page 8 be and the form of the decay curve can provide better insight into the character of the material performance than can arise from a simple time from peak voltage to 1 e of this Software system operation is described in an accompanying User Manual 7 3 1 Equipment JCI 155 Charge Decay Test Unit JCI 166 Sample Support or JCI 176 Charge Measuring Sample Support or JCI 170 for powder samples IBM PC or compatible microcomputer with CGA or better graphics running MSDOS Software DECAY18E and R
2. with a 10 or 20 ms cm timebase to examine the waveform of the fieldmeter signal and the response of the digital to analogue converter generating the start voltage signal IC03 7 The time base is best triggered near the start of the rise of the fieldmeter signal The two traces should be arranged to have the same zero deflection setting so they overlap and have the same sensitivity for example 50 mV When the instrument is operated a fieldmeter signal is expected as indicated in Figure 5 The signal at IC03 7 is the DAC ramp signal and this should rise to intercept the fieldmeter signal a short time after the fieldmeter signal peak as indicated in Figure 5 The DAC level signal should correspond to the fieldmeter signal at the intercept point This should apply with both corona polarities and with both fast and very slow charge decay rate surfaces The performance of the end of timing comparator IC32 is most easily checked by comparing the decay times measured at positive and negative charging polarities with low charging voltages and carefully adjusting RV8 8 7 Instrument Calibration Instrument calibration is carried out to the procedure described in the new British Standard BS 7506 Part 2 1996 Annex A5 3 Page 18 9 REFERENCES 1 J N Chubb Measurement of tribo and corona charging features of materials for assessment of risks from static electricity IEEE IAS Meeting Phoenix Arizona Oct 1999 To be publi
3. Durable Dot and 4mm bayonet socket earth bonding signal outputs via 8w miniature DIN connector surface voltage 1V 1000V surface volts corona voltage 1V 4 0kV corona volts corona current 1V 50uA serial data communications Software DECAY 18E or later versions to transfer charge decay curve data into an IBM PC or compatible micro operating MS DOS for analysis display and storage and for optional control of operation JCI Graph is also available as an extra Dimensions 173 x 216 x 67mm Packaging in carrying case with mains and signal output cables 4 POWER SUPPLY AND BATTERY CHARGING ARRANGEMENTS The switch to control operation of the Charge Decay Test Unit is at the lower right hand side of the back plate of the instrument If the instrument is connected to mains power supplies then operation will be from the mains but if mains supplies are not available then operation is from the internal rechargeable batteries The upper of the two LEDs indicate the mains supply is connected The lower indicates fast recharging of the batteries The switched mode power supply covers supply voltages between 110V 60Hz and 230V 50Hz mains supplies The replaceable fuse in the backplate by the IEC socket should be a 250mA slow blow fuse The integral batteries are recharged by a Smart charging circuit that provides fast recharging when needed and trickle charging for fully charged batteries Fast charging is only provided when the instr
4. are retained for long times Experience is that the form of charge decay curves does not usually depend on the level of the initial peak voltage so such a decay time is a useful simple number by which to rate materials It is often observed that charge decay curves show a tendency to plateau out after an initial perhaps fairly rapid fall of surface voltage In this situation it may be argued that a better acceptance test criterion would be the time to 10 of the initial peak voltage as this would better ensure that residual surface voltages were low JCI 155 Operation The JCI 155 will operate from its internal rechargeable batteries or directly from the mains supply 100V 220V when t5his is connected The internal batteries provide only about an hour of continuous operation Signal outputs and computer linkage Analogue signal output connections enable observations to be displayed and recorded on an oscilloscope or a paper chart recorder An integral serial communications interface enables decay curves to be transferred in real time to an IBM PC or compatible microcomputer JCI software DECAY 18E provides automatic storage display and analysis of charge decay curve information Opportunity is also provided to operate the JCI 155 under software control to preset test conditions of corona charging voltage and duration and to make repetitive measurements Calibration Instrument performance can be calibrated BS 7506 Part 2 1996 A
5. fieldmeter should be independent of the presence of charge on the rotating chopper The procedure to check and set the compensation is as follows switch off the JCI 155 and allow the rotating chopper to come to a stop earth the chopper to the front aperture of the fieldmeter using a clean dry small metal rod switch on the JCI 155 and note the zero reading after a few moments operation switch off the JCI 155 and allow the rotating chopper to come to a stop apply a voltage to the chopper blades A 9V PP3 battery is a convenient source with one terminal earthed and a lead with just a little contact length beyond the insulation used to make contact with the rotor blades switch on the JCI 155 and note the reading if this differs from the previous earthed rotor value then adjust the rightmost leftmost through the test aperture potentiometer RV400 to make the reading the same switch off the JCI 155 and allow the rotating chopper to come to a stop and repeat the above earthed and charged rotor sequence until the zero reading remains the same 8 4 3 Checking sensitivity The fieldmeter is carefully set up and calibrated during manufacture No adjustments should be attempted unless suitable instruments and facilities are available The following notes describe appropriate set up and calibration procedures The fieldmeter is most simply checked and calibrated in position in the Charge Decay Test Unit in terms of a unif
6. is achieved Also to set analysis period end to 10 so this decay time is measured as well as the default time to 1 e It is useful to note that sample may become pre charged by handling when placed ready for testing It is recommended that when samples are placed in position the moving plate is back so the fieldmeter can respond to any charge on the sample surface and show these observations via the surface voltage at present time Two main options are available if there is appreciable pre charge a to wait until the pre charge has dissipated This means waiting for the initial surface voltage to fall to say 10 50V depending on the quality of observations aimed at b to make a study on the decay of this pre charge without adding any corona charge This means making a measurement with the corona voltage turned off or set for zero volts It is to be noted that the decay of such pre charge may be rather slower than the decay of the local patch of corona charge It is none the less a useful observation It is not recommended that quality measurements are attempted by putting corona charge on to an already well charged surface or material It is also not recommended that pre charge the material is neutralised by any other means than waiting Deposition of neutralising charge may only give the appearance of neutrality There are two other possible artefacts are worth noting a that if the air dam on the leading edge of the moving pl
7. plate carrying the corona discharge points advanced ready for charge deposition and with the plate moved away to show the sensing aperture of the fieldmeter The operating principle of the JCI 155 is illustrated in Figure 4 and a typical fieldmeter response signal as the moving plate moves away is shown in Figure 5 7 2 Beginners Guide Place instrument on a simple flat test surface paper is a convenient initial test surface resting on a rigid flat surface e Connect the JCI 155 to a mains supply with the IEC mains lead supplied Switch on the Page 7 JCI 155 Move the switch on the back plate of the instrument into the fully down position e Place the instrument baseplate onto a conductive surface for example a sheet of paper Check the fieldmeter zero with the switch on the right of the Surface Voltage LCD top right hand of instrument into the middle position giving the present surface voltage reading This should be close to 0000 If the reading is more than 1 or 2 digits positive or negative use a small screwdriver to adjust the zero setting multiturn potentiometer through the 2 3 mm adjustment hole in the front end plate of the instrument to give a reading close to 0000 e Select Operation control as Instrument Select negative corona voltage rotate the HV switch body with a small coin in the slot so the spot is to the right hand side of the switch e Move the corona control switch fully down to the On C
8. CI 176 as a combination of the conduction and induction charge values By using a simple dissipative sample material such as paper or cling film it is observed that the initial charge signal is just an induction signal Qi and that as this moves out it becomes just a conduction signal Q By finding the factor f that matches the fall of induction signal to the rise of the conduction signal the total charge Qio can be calculated as Qtot Qc f Qi The geometry of the JCI 176 was designed to give f 2 Experience shows values close to 1 8 When the JCI 176 is used with samples and surfaces that have very fast charge decay times it needs to be recognised that the ultimate performance may be limited by effects due to residual air ionisation The air dam on the moving plate very effectively removes residual air ionisation when JCI 155 instruments are used with the baseplate resting directly on the sample surface When used with the JCI 176 there is opportunity for ionised air to leak back to the region in front of the fieldmeter Typically this will give apparent initial peak surface voltages of 10 20V for maximum charge transfers around 2000nC and show decay times around 100ms If charge decay performances of such levels are observed it will be wise to check instrument operation with a fully conducting surface mounted in the sample position of the JCI 176 7 5 Problems What if 7 5 1 If the LCDs do not show any numbers when the power is s
9. DUMP for creating a simple summery of results Software JCI Graph for presentation of graphs and results within a Windows operating environment Temperature and humidity measuring instrumentation e g Casella whirling hygrometer Humidity controlled test chamber e g JCI 191 7 3 2 Test Samples The charge decay characteristics of materials can easily be affected by moisture It is therefore important to test materials a in well defined environmental conditions and after sufficient time for the material to accommodate to these conditions and b in the as received condition without any handling cleaning or removal of dust or dirt The areas to be tested should not be contacted by hand or by other surfaces and care should be taken not to blow or breath on the test surface The charge decay characteristics of powders and liquids may be tested by placing these in an earthed cup under the instrument test aperture e g a JCI 170 Care must be taken when testing powders or materials with loose surface fibres to avoid these being swept into the test aperture as this may adversely affect instrument operation In particular insulating powder particles or fibres on surfaces in and near the fieldmeter sensing aperture are likely to cause appreciable zero offsets and zero drift If it is desired to make measurements on light powders easily dispersed into the air it will be wise to increase the separation between the powder surface and the instrum
10. USER MANUAL JCI 155v4 Charge Decay Test Unit UM155 Issue 20 3 October 2000 A compact instrument for quick and direct measurement of the ability of materials to dissipate static electricity Note This User Manual applies to JCI 155v4 Charge Decay Test Unit instruments made and supplied with serial numbers over 0006 Contents 1 INTRODUCTION 2 PRACTICAL DESIGN FEATURES 3 SPECIFICATION FEATURES 4 POWER SUPPLY AND BATTERY CHARGING ARRANGEMENTS 5 OUTPUT CONNECTIONS 6 SAFETY AND OPERATING PRECAUTIONS 7 INSTRUMENT SET UP FOR MEASUREMENTS 7 1 Introduction 7 2 Beginners Guide 7 3 Suggested Test Procedure 7 3 1 Equipment 7 3 2 Test samples 7 3 3 Test Environmental Conditions 7 3 4 Method 7 3 5 Test Report 7 4 Capacitance loading 7 5 Problems What if 8 INSTRUMENT SET UP AND CALIBRATION 8 1 Introduction 8 2 Basic access to circuits and mechanics 8 3 Access to mechanical features 8 4 Basic electrical checks on power supply circuit board 8 4 Checking set up and calibration of fieldmeter 8 4 1 Introduction 8 4 2 Checking charge compensation 8 4 3 Checking sensitivity 8 4 4 Cleaning and resetting fieldmeter operation 8 4 5 Checking fieldmeter dynamic response 8 5 Check operation of high voltage power supply 8 6 Operational testing 8 7 Instrument calibration 9 REFERENCES CE CONFORMANCE John Chubb proprietor of John Chubb Instrumentation of Unit 30 Lansdown Industrial Estate Gloucester Road Cheltenha
11. ate touches the sample surface then tribocharging may occur This may arise when testing light fabrics The fabric surface should be stretched flat but it may still rise by the induced air movement This effect may be checked by making measurements with no corona charging It may be avoided by raising the baseplate of the JCI 155 slightly off the sample b That with some materials a very short 1 2ms transient peak voltage is observed before the real charge decay curve This is usually positive Occurrence of this transient will upset operation of software timing It is thought to be due to charge separation between the front Page 10 and back of the sample when this is flexed by the air movement of the air dam The simple way to avoid upsetting timing when operating with negative corona is to set the positive threshold high say 500V At the third software menu the sample description is entered with notes on test conditions such as open earthed backing The corona voltage and associated test conditions are also set at the third menu The default test conditions are checked to be corona voltage 9000V and corona duration 0 02s These will suffice for most materials From the third user menu press lt return gt on proceed The plate carrying the corona points will be heard to be moved forwards and when fully forwards the computer screen will change to show the axes for graphical display of charge decay observation The moving plate
12. ecessary controls displays and data communication facilities for quick and easy testing of materials under a wide variety of conditions Test Area The JCI 155 rests directly on the test surface with a 45x54mm test aperture in the instrument baseplate Contact with the surface around the test area provides a return route for outwardly migrating charge and high local capacitance to trap such charge Charging The surface is charged by a high voltage corona discharge from points mounted as a small conical cluster on the underside of a light plate which is moved between the fieldmeter sensing aperture and the material surface under the instrument baseplate A brief pulse e g 20ms of high voltage up to about 10kV causes corona discharges and deposits charge as a patch in the middle of the exposed area of the material Charge deposition time is short compared to the minimum decay times which can usefully be measured Pulse charge deposition ensures that observations are little influenced by the position of the outer boundary The moving plate Page 3 shields the fieldmeter from high voltage connections and corona ionisation so that reliable measurements can be made down to low even surface voltages for example 50 100V Fieldmeter A proprietary design of fast response field mill electrostatic fieldmeter is used to provide sensitive and stable measurement of surface potential 14 15 The response time to surface voltage changes is below 10 ms a
13. ent baseplate e g using a JCI 172 Support Plate with a JCI 170 Powder Sample Support This will minimise the influence on the powder surface of air movement induced by rapid movement of the air dam when the moving plate is retracted 7 3 3 Test Environmental Conditions Because charge decay can be affected by the ambient temperature and humidity particularly humidity it is important a for on site measurements that the temperature and humidity be measured at the time of testing and comment made of any likely changes in the 24 hours preceding testing b for laboratory testing that sample materials are exposed to constant standard conditions of temperature and humidity for at least 24 hours before testing with measurements carried out in these same environmental conditions Standard conditions are 23C 50 RH and 23C 12 RH or an alternative low level humidity considered appropriate to the minimum level likely to arise in practical use A JCI 191 Controlled Humidity Test Chamber is a convenient test situation 7 3 4 Method The JCI 155 is placed on the JCI 166 Sample Support or the JCI 176 Charge Measuring Sample Support or JCI 170 Powder Sample Support and linked with a double bayonet plug connection lead The mains cable to the JCI 155 is plugged in and the data cable linked from the 8 pin miniature DIN connector to the serial data port of the microcomputer The JCI 155 is switched Page 9 on and the zero setting checked and if nec
14. ents on the Power Supply circuit board is shown in Figure 7 With the instrument case opened as 8 3 above or with the power supply circuit card supported on an insulating surface and the mains supply connected to the Molex connector on the back of the board near the transformer The same voltages as below should be observed with 230V or 115V mains supplies or when operating from fully charged batteries connect to the mains supply and switch ON Check that the middle led lights with mains switch on check at PLI 2 relative to PLI 3 5 7 or 9 as OV that the rail voltage of the supply with mains operation is about 15V and is free from noise and ripple Take care not to short rail to rail check at PLI 4 relative to PLI 3 5 7 or 9 as OV that the rail voltage of the supply with mains or battery operation is 12V and is free from noise and ripple Take care not to short rail to rail check at PLI 6 relative to PLI 3 5 7 or 9 as OV that the rail voltage of the supply with mains or battery operation is 8 2V and is free from noise and ripple Take care not to short rail to rail check at PLI 8 and at 10 relative to PLI 1 3 5 7 or 9 as OV that the rail voltage of the supply with mains or battery operation are 5V and free from noise and ripple Take care not to short rail to rail check at PLI 12 relative to PLI 3 5 7 or 9 as OV that the rail voltage of the supply with mains or battery operation is 5V and is free from noise a
15. essary adjusted after a few minutes operation The JCI 155 is set for computer operation and for negative corona operation Lift the JCI 155 off the sample support or raise the top plate of the JCI 176 and place the test area of the sample as a single layer on the JCI 166 Sample Support Ensure the material is lying flat If rucks in the material enter the test aperture this could interfere with testing and possibly jam instrument operation Place the JCI 155 on to the material Align the back edge of the JCI 155 with the back of the JCI 166 for open backing For earthed backing tests align the test aperture of the JCI 155 so the test aperture of the JCI 155 will be above the full metal area of the JCI 166 The JCI 155 must remain steady and undisturbed on the test surface throughout the whole of the measurement period On uneven samples it may be appropriate to steady the JCI 155 with a hand The microcomputer is switched on and DECAY 18 started via the icon provided at installation This ensures operation in true MSDOS mode which is not achieved via the MSDOS window The first menu may be used to set up and select an operating directory but this need not be of concern just to get started The second user menu is entered and the applicable values of temperature and humidity entered It is recommended that the options are taken a to set analysis period start voltage large say 10000V so analysis will start at whatever peak
16. h suitable receptacles to store screws and parts removed Only proceed as far as needed for the access required remove the two M3x8 screws in the back plate carefully ease out the plate from the side extrusions and fold down with its internal wiring connections remove the two M3x8 screws in the front plate and then slide the two side extrusions off the compression pins on the front plate carefully remove e g using a finger nail the cap from the high voltage potentiometer setting knob then holding the knob loosen the internal screw and lift off the knob carefully undo and remove the nut securing the body of the high voltage potentiometer to the top cover The top cover may now be removed by lifting off from the back end to allow the cover to disengage from the slot across the front plate The main signal processing circuit board is now exposed The power supply circuit card is on the right hand side of the instrument and the high voltage supply board is on the left The physical arrangement of components test points and adjustment potentiometers for the main signal processing and fieldmeter circuit beard for the power supply and for the high voltage supply circuit board are shown in Figures 6 7 and 8 The identities of the various leads of the inter board flexible connections are also listed in these figures While there are a number of components on the reverse inner side of the power supply PCB most diagnostic work can be carried o
17. he inside of the cylindrical housing can now be inspected in good side illumination for the presence of any dust contamination or fibres and this removed It may also be useful to sluice out the sensing region and the rotor assembly with a brief spray of aerosol solvent The sensor assembly should be reassembled and care taken to ensure the original angular alignment is maintained of the PCB to the housing When the sensor assembly is remounted through the JCI 155 test aperture care is needed to ensure that both sets of 3 contacts align correctly and mate with the corresponding sockets mounted on the main circuit board within the body of the JCI 155 Secure the fieldmeter sensor unit with the 3 M2x16 screws Switch on the instrument and check a the fieldmeter motor rotates and b the fieldmeter is sensitive to nearby charge Before using the JCI 155 the charge compensation should be checked as in 8 4 2 It may also be useful to check the sensitivity of the fieldmeter if suitable facilities are available as in 8 4 3 If the problem persists it may well be best to return the instrument to JCI If checking charge compensation showed a significant error it will be wise to check if the rotor is loose on the motor shaft by lightly pulling it If it is loose then it is necessary to pull it as clear of the shaft as is easy to put a small drop of anaerobic glue on to the shaft and then carefully slide the rotor back until the front chopper is 0 7mm from the fro
18. high voltage safety resistor in the supply line However contact with the corona discharge points when these are energised should be avoided as a feeling of a shock may cause reactions which could lead to indirect damage The JCI 155 should not be used in flammable atmospheres as it is not BASEEFA Certified Care must be taken during testing to avoid any material surface or article projecting into the test aperture Such projections could be trapped by the brass strip air dam on the moving plate and trap the item and or damage the instrument Care must be taken when testing powders liquids or materials with loose surface fibres to avoid these being swept into the test aperture as this may adversely affect instrument operation In particular insulating powder particles or fibres on surfaces in and near the fieldmeter sensing aperture are likely to cause appreciable zero offsets and zero drift If it is desired to make measurements on light powders easily dispersed into the air it will be wise to increase the separation between the powder surface and the instrument baseplate This will minimise the influence on the powder surface of air movement induced by rapid movement of the air dam when the moving plate is retracted Alternatively measurements may be made using a JCI 149 7 INSTRUMENT SET UP FOR MEASUREMENTS 7 1 Introduction Figurel shows a top view of the JCI 155 instrument Figures 2 and 3 show the underside of the instrument with the
19. itch SW5 on main board down to on position and turn potentiometer slowly towards maximum clockwise observing signal waveform on scope The waveform should be a train of full wave oscillations at about 200kHz each preceded by about a 15us period of slightly negative voltage The repetition rate of the pulses should be close to 1kHz check potentiometer can be turned fully clockwise without any breakdown showing on the signal waveform adjust RV2 varying the time of the initial current flow for maximum peak to peak signal Page 17 amplitude about 120V pk to pk move HV control switch to middle pulse position move plate movement control switch to middle position set the oscilloscope timebase to 5ms div and triggering from the presence of the HV energisation pulses check that as the plate movement control switch is moved to the discharge position that the train of HV pulses lasts close to 20ms adjust RV1 to achieve 20ms with moving plate in fully forward position link input connection of JCI 148 Electrostatic Voltmeter to corona discharge points and check the voltage corresponds to that shown on LCD3 8 6 Operational testing Operational testing is best carried out with the JCI 155 mounted on a calibration unit with defined value resistors and capacitors to earth from the test plate across the test aperture It may also be carried out using a simple dissipative test surface such as paper Use a double beam oscilloscope
20. ly when the back plate is removed The small cam sensor PCB is a small circuit board in the middle close behind the back plate and down near the instrument baseplate This is secured by two M2 screws on either side of the PCB If these are carefully loosened then the PCB can be slid slightly to the right e g 1 2mm to stop the cam a little earlier The two M2 screws are then retightened and after checking operation the back plate is replaced When replacing the backplate make sure that the leads will not be trapped and will not lie down in the track of the cam or main gear Make sure the two LEDs at the back of the PCB on the right hand side just above the switch go into their holes in the backplate 8 INSTRUMENT SET UP AND CALIBRATION 8 1 Introduction The JCI 155 Charge Decay Test Unit is carefully set up and calibrated during manufacture No internal adjustments should be attempted unless suitable instruments and facilities are available to also check calibration In general it will be best to return an instrument to JCI for servicing if operation becomes unsatisfactory The notes in Section 7 4 provided a basic appreciation of possible problems and their likely cause and remedy The following notes apply to JCI 155 instruments made from January 1998 8 2 Basic access to circuits and mechanics The following steps are needed to gain access to the inside of the Charge Decay Test Unit Dismantling should take place on a clean flat surface wit
21. m GL51 8PL declares as designer and manufacturer that the JCI 155 Charge Decay Test Unit conforms to the requirements of the EC Directive on Electromagnetic Compatibility EMC 89 33 EEC to Standards EN 50081 1 1992 and EN 50082 1 1992 This instrument also conforms to the requirements of the Electrical Equipment Safety Regulations 1994 SDI 1994 3260 Signed for and on behalf of JCI John Chubb October 1998 Page 2 USER MANUAL for JCI 155v4 Charge Decay Test Unit The JCI 155 Charge Decay Test Unit is compact and easy to use instrument for measuring the ability of materials to dissipate static electricity If materials dissipate static quickly and have linkage to earth then problems and risks with static will not arise 1 INTRODUCTION Many materials in particular plastics easily become electrostatically charged when rubbed against other materials Such triboelectric charging causes problems in many areas of industry It can cause ignition of flammable gases and give shocks to personnel It can make thin films and light fabrics cling attract airborne dust and debris damage semiconductor devices and upset the operation of microelectronic equipment The risks and problems arising from static electricity are best avoided by ensuring that static charge can dissipate over and through the surfaces of materials and away to earth more quickly than charge is likely to be generated For normal manual handling and body actions this mean
22. n microcomputers JCI Graph operating within a Windows syytem environment and allows up to 4 charge decay graphs and associated variations of local decay time constants to be displayed and transferred into other Windows applications such as wordprocessing At least two measurements should be made at different positions on each test sample If the decay time is short then it will be useful in addition to retest the same position to show consistency of results and lack of influence of the test on the sample surface For this the surface voltage should be allowed to fall to a low level well below the expected end of timing level before retesting 7 3 5 Test Report The following information shall be recorded a date of measurements b description and identification of test material and location of test area c history of test sample e g number of washes of fabrics d temperature and relative humidity e test conditions of corona charging voltage duration polarity and whether open or earthed backing Page 11 f individual values of initial peak sample surface voltage and the time from peak voltage to 1 e of this voltage For computer stored data the file reference of the test Where measurements are made of the charge received by the sample these values should be recorded and any calculation made of capacitance loading g graph of the variation of surface voltage and charge decay time constant during charge decay h serial numbe
23. nd charge decay times can be measured to below 50 ms The infinite input time constant means that reliable measurements can be made on materials with even very long decay time constants for example to well over 100 000 seconds Sample support Measurements are normally made both with the material freely supported and also resting against an earthed backing surface These two arrangements represent the extremes of practical constraints The longer of the two decay times is used for assessment of the suitability of the material The JCI 166 Sample Support unit provides a simple arrangement for such measurements The JCI 176 provides facilities for measurement of the charge transferred to the sample when testing with open backing 1 Test conditions Charge decay characteristics are susceptible to absorption of surface moisture and so very likely to depend on humidity It is desirable to carry out testing under defined or at least known conditions of temperature and humidity This can be achieved by carrying out measurements in a controlled environment as is provided for example in the JCI 191 Controlled Humidity Test Chamber with at least 24 hours allowed for acclimatisation Test criteria A simple acceptance test criterion is that the decay time initial peak voltage to 1 e 37 of this should be less than half a second It is also useful to record how the rate of charge decay varies during decay to see whether significant levels of charge
24. nd ripple Take care not to short rail to rail check that the upper led comes on to indicate fast charging if the mains is connected and the ON OFF switch is moved to the OFF position The current for fast and trickle charging can be measured from the voltage across the 2R7 charging resistor R22 270mV for fast charge and about 13mV for trickle charging 8 4 Checking set up and calibration of fieldmeter 8 4 1 Introduction There are 3 activities which may be needed with the fieldmeter checking and possibly adjusting sensitivity checking and possibly adjusting charge compensation disassembly cleaning and resetting fieldmeter operation The fieldmeter used in the JCI 155 is basically two field mill fieldmeter units mounted back to back so there is no need to have the chopping rotor earthed This proprietary approach has been Page 15 described in published papers 14 15 These should be consulted to gain understanding of instrument principles and operation Access to the potentiometers to set charge compensation and sensitivity of the fieldmeter can be gained through the test aperture Alternatively access can be gained with the front plate of the JCI 155 removed If the instrument has been taken apart as 8 2 above it is recommended that charge compensation and sensitivity of the fieldmeter are checked and adjusted with the fieldmeter shield in place 8 4 2 Checking charge compensation The zero setting of the
25. nity to measure the corona charge received by the sample powders and liquids may be studied by placing these in an earthed cup under the test aperture e g JCI 170 fast response field mill fieldmeter measures surface voltage with response time less than 10ms 4 2 digit liquid crystal digit with last digit equal to 1 volt of surface potential zero stability within 10 V long term Noise on liquid crystal display within 1V on analogue and serial data link outputs 5V about 2 seconds to set for charging 20 ms opening internal feedback stabilised high voltage supply providing positive and negative potentials to 8 10kV A 10 Megohm personnel safety resistor is used in the link to the corona discharge points from about 50V to about 3kV depending on charging conditions and rate of charge dissipation on test surface from under 50ms to over 100 000 seconds integral mains power supply with automatic selection between Page 5 240V 6VA 50Hz and 110V 6VA60Hz supplies 250mA slow blow fuse automatic selection of operation between mains supplies or integral 100 mAh nickel hydride rechargeable batteries Batteries provide about hour continuous operation Battery charging the nickel metal hydride batteries are Smart charged whenever the instrument is connected to the mains supplies but is not operating Fast recharging takes about an hour Connections mains input via IEC connector combined
26. nnex 5 using measurements whose accuracy is traceable to National Standards 3 Page 4 3 SPECIFICATION FEATURES Controls Displays Test area Sample Fieldmeter Operating times HV supply Surface voltage Measurement Operation 3 position On Off slide switch with operation by mains or integral rechargeable batteries in back plate 3 position slide switch to Set for charging and to Discharge 3 position high voltage on off switch with middle position providing 20 ms pulse of corona charging at instant of Discharge high voltage level control potentiometer high voltage polarity changeover rotary switch 3 position slide switch to select display of surface voltage at start of timing present end of timing screwdriver zero adjustment for fieldmeter 2mm hole in front plate 8 digit liquid crystal display showing elapsed time in 0 001s units 3 2 digit liquid crystal display of corona voltage with polarity and LO BATT indication 4 2 digit liquid crystal display of surface voltage selected as present voltage initial voltage at start of decay timing and voltage for end of timing 45x54 mm aperture in instrument Baseplate the unit may be placed directly on a surface or area of sample the JCI 166 Sample Support Unit provides a simple support for open and earthed backing tests the JCI 176 Charge Measuring Sample Support provides opportu
27. nt of the sensing surface To set up basic fieldmeter operation when the main PCB has been accessed connect an oscilloscope probe lead to TP12 apply a voltage for example 1000V to the calibration test plate and observe the waveform at TP12 check the signals at TP12 are a set of well balanced negative half sine waves for a positive potential on the test plate Now check charge compensation and sensitivity as 8 4 2 and 8 4 3 above With the shield in place over the top of the fieldmeter circuitry the noise on the fieldmeter signal should be less than 5V 5mV p p as viewed by an oscilloscope and as observed by software recording of the first 3s of charge decay curves 8 4 5 Checking fieldmeter dynamic response The dynamic response of the fieldmeter may be checked if the plate used for calibration above is energised from a square wave signal generator and the fieldmeter output observed on an oscilloscope If the voltage swing of the signal generator is rather modest say only 20V then it will be better to apply this to a disc or small metal plate introduced through the test aperture so as to lie close to the sensing aperture of the fieldmeter so there is a reasonable signal to observe The response time of the fieldmeter should be below 10ms 8 5 Check operation of high voltage power supply connect oscilloscope probe lead to junction of diode D8 linking to transformer and set probe to x10 on 5V range move high voltage control sw
28. ntamination Control The Hague 16 20 Sept 1996 13 J N Chubb Instrumentation and measurements to assess electrostatic conditions and risks in cleanroom situations Cleanroom Technology Expo Confr Frankfurt 5 6 May 1998 14 J N Chubb Two new designs of field mill type fieldmeters not requiring earthing of rotating chopper IEEE Trans Ind Appl 26 6 Nov Dec 1990 p 1178 15 J N Chubb Experience with electrostatic fieldmeters with no earthing of the rotating chopper Electrostatics 1999 Inst Phys Confr Series 163 p443 16 J N Chubb New approaches for testing materials Proceedings ESA Annual meeting Brock Univesity Niagara Falls June 18 21 2000 Page 19
29. ontinuous position and turn the HV potentiometer clockwise to give maximum corona charging voltage this will show as about 10kV on the Charging Voltage LCD top left side of instrument Now move the corona control switch to the middle pulse position Set for charging Move the switch near bottom of the top cover into the forward Set for Charging position The motor advancing the plate carrying the corona discharge points will be heard to run for about 2s and then stop Inspection of the underside of the instrument will show the plate now in the forward position and the cluster of corona discharge points visible e Discharge Move the lower switch down to the Discharge position The plate will be heard to flip back The Surface Voltage LCD reading should show an excursion away from zero and the counter in the middle of the instrument will start counting and then stop For normal paper a decay time between 0 1 and 5s can be expected A basic fieldmeter response signal is shown in Figure 5 The fieldmeter signal rises to a peak in about 20ms as the plate mounting the corona discharge points moves away and allows the fieldmeter to observe the full surface potential created by the charged surface A short time after the initiation threshold is passed counting is started into a digital to analogue convertor DAC to generate a rising ramp voltage As this ramp voltage crosses the fieldmeter signal counting into the DAC is stopped
30. orm potential across a surface covering the whole area of the test aperture and just below the plane of the test area aperture While setting the sensitivity it is necessary to have the front end plate or an equivalent metal surface in position The sensitivity is best set with a voltage of 1000V applied to this plate Adjustment of sensitivity is by the leftmost potentiometer RV401 of the 4 pots along the top edge of the main PCB rigthmost as viewed through the test aperture 8 4 4 Cleaning and resetting fieldmeter operation Noisy and variable fieldmeter zero signals indicate that the inside of the sensing region is contaminated for example by insulating particles or fibres In this situation it is necessary to dismantle the sensing system clean it reassemble and reset operation including setting charge compensation and sensitivity as above The fieldmeter sensing section can be taken out through the test aperture by unscrewing the 3 M2x16 screws around the edge of the gold plated body outside the sectored sensing aperture It is important NOT to disturb the 5 M1 6 screws in a ring nearer the sensing aperture With the 3 M2 screws removed the cylindrical brass body can be carefully pulled out with care to pull it straight down and not at an angle Removal of the 3 M1 6 screws around the edge of the PCB holding the motor will allow the motor and rotor assembly to be removed from the cylindrical Page 16 body The chopper assembly and t
31. r of instrument used and date of most recent calibration 7 4 Capacitance Loading The influence of electrostatic charge on materials depends both on how long it is there and to the associated surface voltage created The quantity of charge per unit of initial peak surface voltage is effectively a capacitance If this capacitance is large then only low surface voltages will arise from the quantities of charge likely to arise in practical tribocharging events Many materials notably cleanroom garment fabrics including conductive threads show high values of capacitance so although their charge decay times may be long it may be they present little risk of causing problems Measurements of the quantity of corona charge transferred to a sample using a JCI 176 Charge Measuring Sample Support The initial peak voltage as measured by the JCI 155 is related to a voltage on a conducting plane across the whole test aperture area When corona charge is deposited the area of charge is much smaller than this area so the local voltage will be much higher Rather than express capacitance in terms of a guessed area of charge it is more practical to assess materials in terms of their capacitance loading 1 16 This is the capacitance value observed for the test material divided by the capacitance value observed for a very thin dielectric layer such as cling film The corona charge deposited on the sample is measured with a J
32. s the charge decay time need to be below 1 2 second Recent studies 1 16 suggest that decay times may need to be nearer 4 second The way to test the ability of materials to dissipate static electricity is to put some charge on the material surface and see how quickly this charge disappears In the JCI 155 a high voltage corona discharge is used to deposit a patch of charge on the surface and a fast response electrostatic fieldmeter is used to measure without contact the voltage generated by this charge and how quickly this voltage falls as charge migrates away 2 The method of assessing the static charge dissipation capabilities of material used in the JCI 155 is included in a British Standard 3 and an International Standard 4 Corona charge deposition is the simplest way to simulate practical static changing events It allows control of initial surface voltage and charge polarity and is applicable for all types of surfaces whether uniform or with localised conducting features Studies have shown that the decay of corona charge matches well the practical situation of the decay of charge generated by rubbing surfaces together 1 5 16 A number of other studies have also been reported 6 13 2 PRACTICAL DESIGN FEATURES The JCI 155 Charge Decay Test Unit is a compact self contained unit which includes its own high voltage supply for corona charging a fast response field mill fieldmeter for surface voltage measurement and all the n
33. shed in Trans IEEE Ind Appl 2 J N Chubb Instrumentation and standards for testing static control materials IEEE Trans Ind Appl 26 6 Nov Dec 1990 p 1182 3 British Standard Methods for measurements in electrostatics BS 7506 Part 2 1996 4 IEC 61340 5 1 1998 Electrostatics Part 5 1 Protection of electronic devices from electrostatic phenomena General requirements Technical Report International Electrotechnical Commission 5 J N Chubb Dependence of charge decay characteristics on charging parameters Proceedings of Electrostatics 1995 Conference University of York April 3 5 1995 Inst Phys Confr Series 143 p103 6 J N Chubb P Malinverni Experimental comparison of methods of charge decay measurements for a variety of materials EOS ESD Symposium Dallas 1992 7 J N Chubb Testing how well materials dissipate static electricity British Plastics and Rubber May 1995 p8 MCM Publishing Ltd 8 J N Chubb Avoiding risks from static electricity Evaluation Engineering Sept 1995 p 57 9 J N Chubb Corona charging of practical materials for charge decay measurements J Electrostatics 37 1 amp 2 1996 p53 10 J N Chubb Reappraising static materials Cleanroom Technology Winter 95 96 p4 11 J N Chubb Static A material problem Converting Today May 1996 p21 12 J N Chubb Instrumentation to assess the static charge dissipation capabilities of materials 13th Int Symp Co
34. this charge is able to neutralise itself very quickly it may give an excursion of the fieldmeter observations which trigger and upset operation of the timing circuits 7 5 5 Decay timing will not start on the instrument unless the test surface voltage excursion is greater than about 50V so if timing does not start it may be useful to try a higher corona voltage or to change from a 20ms to charging for a few seconds Negative corona produces stronger charging It is useful to check basic instrument operation with a material which normally will give satisfactory operation for example paper With software monitoring try reducing the threshold voltage for the polarity of charging 20V is probably a sensible minimum If timing still does not start it is probable that the materials tested has such a fast charge decay that it is not feasible to create a sufficient surface voltage to allow measurements to be made This point should be recorded in the Test Report 7 5 6 If the charge decay time is very short 0 1s or less and the initial peak voltage is very low it will sometimes be observed that the timer counter shows a time around 2 4 seconds This is an artefact of unknown origin When handling materials which give short decay times and very low initial peak voltages it is always wise to make observations and measurements using software so the real form of the decay curve and the influence of signal noise can be appreciated 7 5 7 If the mo
35. ument is connected to the mains but is not operating Full recharging will be achieved in 1 1 hours The batteries will provide for up to about an hour of instrument operation If the batteries have been very fully discharged then initial charging is at a trickle charging rate until the battery voltage has built up and charging can move into a fast charge mode 5 OUTPUT CONNECTIONS The 8 way miniature DIN connector on the backplate of the JCI 155 provides output of an analogue signal of the fieldmeter observations and of the corona and current measurements and also the RS 232 communication signals The allocation of pins on the 8 way miniature DIN socket and 9 way and 25 way D type connectors for serial data communications are as follows Page 6 8w miniature DIN 9w D type 25 way D type 4 RTS 1 black 7 earth 2 white 1 7 3 TX 4 yellow 3 2 Surface volts 5 violet 1 0V 1000V surface volts Corona current 6 blue 1V 50uA RX 7 green 2 3 Corona volts 8 brown 2 5V 10 0kV 5 cable screen 1 The serial data communication rate is set at 9600 baud by hardware links in the interface circuit The software DECAY 18E accepts and handles data at this rate and achieves 400 12 bit fieldmeter readings a second 2 5ms between readings 6 SAFETY AND OPERATING PRECAUTIONS Voltages up to 10kV can be applied to the corona discharge points There is no risk of direct shock or damage to an operator touching these points because there is a 10 Megohm
36. ut without further disassembling the instrument The instrument can be operated quite satisfactorily with the covers off and the circuits undisturbed at this stage The cover over the fieldmeter section usefully reduces interference noise and so should be left in place for instrument testing 8 3 Access to mechanical features The mechanical system is accessed from the disassembled state above as follows Page 14 Remove the two M3 screws securing the folded aluminium shield over the fieldmeter region and remove the two phosphor bronze spring trapped by these screws These springs make earthing contact with the underside of the top cover Lift off the fieldmeter shield Unscrew the two hexagonal pillars securing the main PCB to the mechanical structure Disconnect the flexible connection strips from the main PCB to the power supply PCB and to the HV supply PCB Gently lift up the main PCB and disconnect the lead to the mechanism motor drive and the lead to the microswitch below the PCB Lift the PCB clear Lift out the power supply PCB Unscrew the 2 M3x20 screws securing the HV module and lift that out Remove the 3 M2 screws securing the shield over the top of the mechanism structure If necessary the mechanism can now be separated from the baseplate by unscrewing the 3 M3x8 screws securing it to the baseplate Reassembly is the reverse of the above sequence 8 4 Basic electrical checks on power supply circuit board The basic layout of compon
37. vement of the plate carrying the corona discharge points jams then check whether this was due to material getting into the test aperture If so carefully remove the obstruction and if necessary straighten the brass air dam if this was bent If the mechanism itself has jammed with the plate part way back then try pushing the plate forwards by finger pressure near the base of the brass sheet air dam and check if the drive motor runs freely with the plate held forwards If the plate does not move easily in its guide slots it may be useful to try wiping these with a piece of link free tissue or cloth with a little light solvent Do NOT lubricate the slides with oil If the plate is jammed fully forwards and the motor runs freely then carefully try to prize the air dam away from the front edge of the aperture but take care as the plate may fly back fast If the motor does not run freely it maybe that there is some obstruction in the gear train It may be that this can be spotted by removing the back plate of the instrument and very carefully incrementing the gear train by hand if not the instrument must be returned to JCI for servicing Page 13 7 5 8 If the motor driving the plate carrying the corona points runs on continuously or if the plate flips back as soon as it is fully advanced and before the swtch is moved to the Discharge position then the angular setting of the cam sensor PCB may need adjusting This can be accessed direct
38. will be heard to flip back after a few seconds and the progress of charge decay will be shown on the screen When a suitable end point has been reached either automatically or be pressing lt esc gt the computer will provide opportunity for numerical analysis and then graphical display of observations Charge decay results are stored automatically and can be reviewed via the data directory in the initial menu of DECAY 18 If the graphical display is exited by pressing lt return gt rather than lt esc gt the graph is stored as displayed With older microcomputers this can be printed out directly with the Screen Print command or later using the program GPRINT A summary of the main features of a number of observations can be prepared later using the program RDUMP This creates a CSV file that can be loaded into most Spreadsheet software and enables the summary of results to be printed out or transferred into a report It is to be noted that the form of the charge decay curve and the associated variation of decay time constant during the decay gives a much fuller picture of the behaviour of the material than the simple decay time value as the time from the initial peak surface voltage to 1 e or to 10 of this The two software programs GPRINT and RDUMP are MSDOS programs Use of GPRINT requires the operating system to be in true MSDOS and set into the GRAPHICS mode appropriate for the printer connected This may not be easy with more moder
39. witched on with battery operation it may be the batteries are flat and need to be recharged Try mains operation if mains operation has been selected check if the mains power supply is really on This is shown by the mains led If the instrument only operates at all from batteries then the mains fuse Page 12 has probably blown and should be checked and replaced 7 5 2 If the surface voltage at present time fluctuates more than 5V or if the zero setting has changed appreciably during use or is drifting the sensing region of the fieldmeter may need cleaning This needs to be carried out with some care The fieldmeter sensing section can be taken out through the test aperture as described in section 8 4 4 7 5 3 If the reading of the high voltage LCD fluctuates appreciably with the HV switched to continuous operation there may he a problem with the high voltage module This may cause premature triggering of the timing circuits or the software or may limit maximum high voltage levels Operation with brief corona 20ms charge deposition is more likely to continue to be satisfactory Contact JCI and expect to need to return the instrument for servicing 7 5 4 If the elapsed time LCD does not start to count or shows a time of only a few ms below 20 then the timing circuits did not trigger properly This may be because vertical flexing of the sample has created some surface charge by internal tribo of piezoelectric effects Although

Download Pdf Manuals

image

Related Search

Related Contents

Descargar la ficha tecnica  Hent og udskriv hele manualen ()  Basco 3600-6CLBN Installation Guide  現場の声から生まれた、 スマー トアルコール検知器 !  Mode d`emploi - Tri Bleiz Die  Add-On Computer Peripherals (ACP) AT901AA#ABA-AA rechargeable battery  Manuel d`utilisation pour puces aux pieds - DAG System  

Copyright © All rights reserved.