Home
BGA IRDA-WELDER User Manual Model:T-870A
Contents
1. once the tin ball melts the chip will be soldered in the right place automatically Pick out the PCB to check if the chip works after it cools down If not solder it again 3 Maintenance and overhaul OR Complete machine maintenance After the machine has been used for a period of time clean the focusing frame the guide rod the PCB board support and the sliders and treat them with a lubricant to protect them from rust 2 Preheating chassis and infra red lamp body maintenance Clean the pre heating chassis and in particular the infrared lamp body with dehydrated alcohol Otherwise residue from evaporated soldering paste could otherwise decrease the effectiveness of the infrared lamp ON Infra red lamp replacement Use a special inside caliper gauge or a pair of long mouth pliers to first take out the inside spring Then push the lamp gently out of the body through the air vent Cautions 1 Do not cut the power off right after the work finished You need to wait until the fan cools down the lamp body 2 Keep the lamp body clean and the ventilation opening free of any obstructions 3 The guide rod and the focusing support should be spread with lubrication regularly 4 Pull out the power plug if you don t use it for a long term 5 Be careful of operating under high temperature conditions Warranty The complete machine has a warranty period of 1 year from the time of purchase and lifelong service support as well as a lon
2. BGA IRDA WELDER User Manual Model 1 870A Puhui technology taian CO LTD www lech168 cn 7 8 The maintenance pledged that IRDA WELDER T870 User Manual CATALOGUE PO UE us AE ake oes re Ss Moe aoe aes ee eee Bae oes Lee Paramete i on wench ud ues ces are perenne en AE eee mes seem Instrument InventoOry aa The main part function explaining ccc ee cee cee ees Main body 2 cee cee an Front Pamela onta he userre terere kan aan Kek une ees Back panel cece cee cee cee aa 4 Focusing support and lamp body 5 Line board PCB support sekeras aaa Installation Step mena AE onset donate ate AA 1 Lamp body and main body assembly 2 Connection infra red lamp body ties 3 Connection infra red lamp sensor plug Operation Method soo en ake dS AET NRE Abu Kemen AA beta 1 Starting and starting front inspecis 2 Sealing off repair operation Maintenance and overhaul Matters needing attention a Http www tech168 cn IRDA WELDER T870 User Manual Features 1 Adopt infrared weld technology which independent exploration 2 Use infrared heat easy to cut through which overcomes disadvantage bum out elements of traditional welding machines 3 Easily oper
3. _ AC 220V 50H i Rated power 1000w Te 4 a T 870A ke A TEMP SENSOR PCB temp sensor Date of produ Http www tech168 cn Caution DO NOT DISASSEMBLE Power input socket for lamp temp sensor sensor Http www tech168 cn 6 IRDA WELDER T870 User Manual Operation method Infrared lamp body Circuit board Chassis workingbench Circuit board support NN Http www tech168 cn 7 IRDA WELDER T870 User Manual North bridge repair scene Position of infra red lamp temperature sensor r A W Or OFF TRY p AATE AT NE m ve gt 8 D AN Ne aa GUNA Sa Ir PA NA TAU PRIA 8 6 on LAI 6 s et o s 9 6 ow Pera aa 7 2g ate oe MAR gt g gt 7 ew E a A IN p a Go PFA RNO au 0 476 we AK 0 o 6 6 s L ea SAT Aa oe a A 0 oo stun LAL 2 33 de ena E TT ITL Removal of CPU block Http www tech168 cn IRDA WELDER T870 User Manual Removal of GAP slot 0Tm p T or An c amp e T Lj IR PRE WEA LATE R HEAT LAMP Removal of expansion slot Http www tech168 cn 9 IRDA WELDER T870 User Manual 1 Examination and starting 1 Inspect the infrared lamp body the temperature sensor and the power line and see if they are in good connection 2 Turn on the power switch Self checking uses the previous setting value semon
4. ally the ideal temperature should be between 120 to 140 The preheat interval is approximately 3 5 minutes 3D Sealing off repair process According to product technological requirement or PCB board size adjust the temperature of the preheating chassis to about 60 200 switching it on about 3 5 minutes in advance will stabilize the temperature Select the suitable heating temperature of infrared lamp between 200 450 C according to the chip size that need to be unsoldered For general guidance According to the chip size adjusts the infra red lamp temperature to about 22mm and the preheating chassis temperature to about60 200 When you unsolder chips which are smaller than 20 x 20 mm you adjust the infrared lamp s temperature to 220 240 When working on bigger chips like 30x30mm according to your experience you may adjust the infra red lamp to 240 260 preheat the dish to about 140 200 first for 3 5 minutes Once the temperature has stabilized you may complete the sealing off repair process very conveniently Please pay attention to the timing to prevent the chip from burning out Http www tech168 cn 10 IRDA WELDER T870 User Manual Soldering process Clean up the welding plate with the brush Put the tin ball and spread soldering flux not too thick only a thin layer of 1t on the soldering plate Put the chip in the accurate place after the solvent volatilizes out of soldering flux heat the tin ball until 1t melts
5. ate Just need one day training Can operate it shillfully 4 Don t need weld tools This machine can weld all the component betwween 35 50mm 5 This machine has 800W heating system It s preating area is 240x180mm 6 Infrared heating without heated sirocco flowing No impact on perimeter small component Can suitable for all component especially Micro BGA component 7 This machine is suitable for a variety of computers notebooks and the rework or repair of their BGA components especially suits to the computer north and south bridge Technic parameter Rated voltage and frequency AC220 230v 60 50Hz Complete machine power 1000W pemanan w Http www tech168 cn 2 IRDA WELDER T870 User Manual Instrument inventory Welding table main body 1 Power line user s manual Compact disc The main part function explaining 1 Welding table main body Focus the holder The infrared lamp body Filter and cover Lamp temp sensor Board support of the circuit Front panel Preheat dish Http www tech168 cn 3 IRDA WELDER T870 User Manual 25 Front panel PCB temp sensor Infra red lamp adjustment Preheating chassis Infra red lamp temperature temperature display monitor display monitor LA Dive Propam 4 OLIN N 4 BGA me IRDA WELDER Infra red lamp switch Temperature level regulation Preheating chassis switch bu
6. g term factory price supply The life of the infrared lamp should be around 1000 working hours guaranteed usable for 3 months We provide online Q A and troubleshooting support and technical advice service Http www tech168 cn 11 IRDA WELDER T870 User Manual Reminder These machines are very heavy between 8 to 15 kilograms and are not designed to be shipped on airplanes but in containers that do not move We are not the shipping company the airplane crew the customs agent or the carrier in your country and therefore take no responsibility for damage caused in transit Corollary When our machines leave QC they are tested 100 new and in perfect condition These machines consist of modules Should you receive a faulty or damaged module we will be happy to replace it However we will not replace the complete machine this is not covered by our warranty PUHUI is responsible to give proper guidance of the use and installation of the machine if you don t follow these it will void the warranty Statement The images and screenshots in this product manual may vary slightly from the actual purchased product Http www tech168 cn 12
7. s trated on the keyboard display monitor after you turn on the machine 3 The front panel has two switches one controls the preheating dish the other the infrared lamp separately Press the A or V buttons on the IR PRE HEAT PIATE on the front panel to choose a temperature between 60 and 200 C for the preheating dish Press the ON button and the preheating dish will start to warm up Press OFF and the heater will shut down Press the A or Y buttons on the IR HEAT LAMP on the front panel to choose a temperature between 200 and 450 C for the lamp Press the ON or OFE buttons accordingly to switch the lamp on or off 2 Sealing off repair operation O Inserting of the PCB board Put PCB on the corresponding notch in PCB support and adjust the pinch nuts of locating ring and fasten with the hand wheel Make sure the PCB board is in a secured position 2 Before starting with sealing off repair Adjusts the PCB board position so that it s centre is vertically aligned with the infra red lamp Adjust the height of infrared lamp body the ideal height between lamp and the component is 20 30mm Place the temperature sensor of the infrared lamp near the chip in a suitable position If the circuit board is adhered by solid sealing colloid you can switch on the pre heater plate to melt the colloid If not please take other proper measures The temperature to melt colloid can t be too high gener
8. ttons 3 Back panel Pubui technology Via ame i Pie he Product name VELDER R93 i x Product modet STA iD HE S IC A put voltage AC iiv soHz Sa AM zie ss 3 1 PCB temp sensor r SENSOR Rated power Product SN 87 X AA Date of production Http ro AP ka a Caution DO NOT IN UE 4 a gt lt Ad FA 1 3 ia 4 Lamp temp sensor p p Http www tech168 cn 4 IRDA WELDER T870 User Manual 4 Focusing support and lamp body Lamp body segment G Preheat dish Board support of the circuit Chassis workingbench Http www tech168 cn 5 IRDA WELDER T870 User Manual Installation step 1 Lamp body and main body assembly Loosen the pinch nut of focusing support Pick up focusing support make the guide rod aim at the corresponding nut on the base then rotate the guid rod 3 Fasten the focusing support by rotating pinch nut of it NN AL s p Rotate the direction p Lead the post and pack the direction into i jj Ss iv pA ya rrp P _ O 2 Connection of infra red lamp body cable and temperature sensor 1 Get the adapter of connecting wire plug in the socket of infrared lamp connecting wire 2 Rotate setscrew clockwise Puhui technology taian CD LTD Product name IR WELDER Product model T 870A IR HEAT LAMP Socket for the infrared Input voltage
Download Pdf Manuals
Related Search
Related Contents
Manual Semi-guidões mod. GP JVC KD-G207 User's Manual Chaos Set up Informativo Comercia.. Guide à l`usage des élus 2012 2013 Goodmans GFMTDAB10 User's Manual Folate - BIO 2000 Eminent EM7050 storage enclosure ルーツポンプ TDP-MT200 DLP Projector User`s Manual Copyright © All rights reserved.
Failed to retrieve file