Home

INSTALLATION MANUAL FOR CEILING TILE HOLDER

image

Contents

1. INSTALLATION MANUAL FOR CEILING TILE HOLDER FOR PROJECTOR LIFT SI 100 OR SI 200 Inside the packaging you will find pz 02 iron brackets for fixing the threaded rods pz 02 aluminium pi ithout holes f K R a adenine aa teas Note The threaded rods are NOT included upwards and bottom parts of the frame Q p B 3 Aa 9 pz 02 aluminium pieces with holes for left and right parts of the frame pz 04 aluminium pz 16 nuts M4 pz 16 flush head angle bars bolts 4X10 mm STEP 1 STEP 2 Mount the frame fixing the four aluminium profiles The final result should be like the picture above for every by the four angle bars with bolts and nuts supplied edge of the frame the nuts should be facing the internal part of the frame STEP 3 STEP 4 The final result should be like the picture on the left After trimmed the tile of the false ceiling put it inside the holder Measures of the tile 564x564 mm After that mount the two tron brackets for the threaded rods using the proper holes that you find on the aluminium profile you will find the threaded rods inside the packaging of projector lift SI 100 or SI 200 505 60 MEASURES of the tile MEASURES holder in mm BRACKETS for the threaded rods in mm 565

Download Pdf Manuals

image

Related Search

Related Contents

notice fumoir Tom Press  Manual de instrucciones  Samsung GT-C5130S Kasutusjuhend  Garmin affordable car navigation GPS Receiver User Manual    立教大学における 「安全保障輸出管理」 ハンドブック  Istruzioni per l'uso Instructions for use Betriebsanleitung Mode  

Copyright © All rights reserved.
Failed to retrieve file