Home

ORE International K-5109H Installation Guide

image

Contents

1. OK 5109H ASSEMBLY INSTRU JCTION INDOOR USE MONLY ues is E BULB AFTER THE BUL B GETS COOL E ye StCDS Step Li H r ig bead string D put the ring into the hole ad Step 2 Pass the main wire O through the tube B G Step 3 Turn tubeck X into the assemble Al Take out the nut B1 pu tne ass embly GC ois the Seg oe secure with the nut B1 Mee sie 5 ined 1 into the ring ae put the fue into the rhe 39 Hangi bead string E put t thet ring El into the ring C2 pul the ring E2 into the ring A2 Folow the same mothod as step 4 to hang all the bead strings total lt Ons the tube K ra ireo through th je links Or tube 8 and Loop H vs ch first Link and last ae in Keort o the power supply c Oo L to ceiling and secure its sa Z Then y you may ture n 1 the power on Ifthe es cable or cord iS damaged it shall be vepla ced exclusively by the manufacturer or

Download Pdf Manuals

image

Related Search

Related Contents

CC-QS023 - Rockwell Automation  condair 505 - Qviller AS  Cooper Lighting Combolight GR420 User's Manual  Mode d`emploi détecteur de mouvement caméra - My  Emerson NetSure 801 DC Power System Brochures and Data Sheets  RAC Section 1 09-07-09.indd  ASUS J8875 User's Manual  FMI F48H(I)(R)A User's Manual  取扱説明書    

Copyright © All rights reserved.
Failed to retrieve file