Home
Handy Home Products 18250-1 Use and Care Manual
Contents
1. Fig A p 28 cm Approximately 43 DOOR HARDWARE PARTS REQUIRED 3 4 1 9 cm x4 3 4 1 9 cm x7 3 8 9 mm Drill Bit i N Mount barrel bolt flush at top of OO on left door using 3 4 screws as shown Fig A HINT Extend bolt to leave a mark in wood Tap bolt with hammer Drill 3 8 hole deep enough for bolt to slide into Install hasp on right door and latch on left door Bottom edge of hasp is 35 1 2 90 cm up from bottom edge of door trim Measure and mark locations and 4 install with 3 4 screws as shown Fig B DG in line with bolt Vee With door closed mark hole location for bolt to extend into FINISH You have finished mounting your door hardware HINT With door closed extend bolt and tap with hammer to leave a mark in wood for drilling 3 4 1 9 cm Screw x7 44 PAINT amp CAULK NOT INCLUDED Use acrylic latex caulk that is paintable Caulk at all horizontal and vertical seams between the trim and walls and all around the door trim Use a high quality exterior acrylic latex paint When painting your building there are a few key areas that can be easily overlooked that must be painted Bottom edge of all siding and trim Inside of doors and all 4 ed
2. 37 ROOF PANELS PARTS REQUIRED 2 5 152 TA 3 n 7 16 x 48 x 96 7 16 x 19 x 96 GAUGE 244 1 1 x 48 x 244 cm BLOCK 7 16 x 23 7 8 x 19 7 16 x 23 7 8 x 48 1 1 x 61 x 48 cm 1 1 x 61 x 122 cm Roof panels may cause serious injury until securely fastened TT You must square the roof by attaching one panel fist You will use the panels long edge as a lever to bring your roof into square Commonly known as racking BEGIN Attach the 48 x 96 panel with the rough side up painted grid lines side with a 3 4 measurement on the rafter Fig A and the panel flush at the peak Fig B Flush at peak Two Nails Secure panel with two 2 nails in the corners Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until the top corner is flush to the peak Fig C and there is 1 4 measurement to the gable trim Fig D You may need to move your backwall to get the 1 4 measurement Secure panel with two 2 nails in the corners 38 ROOF PANELS PARTS REQUIRED ory 3 4 GAUGE BLOCK Keep spacing between the center of the rafters at the lower edge of the panel and secure with one 2 nail into each rafter Fig E 7 16 x 23 7 8 x 48 1 1 x 61 x 122 cm Move to the top of the panel and keep spacing between the center of the rafters Se
3. PARTS REQUIRED 2 5 cm x166 x2 3 8 x 23 7 8 x 72 X2 1 x 61 x 183 cm 3 8 x 48 x 72 1 122 183 3 4 GAUGE BLOCK For squareness maintain 3 4 o and flush under soffit panel To draw panels tight at seams angle nail Place 48 panel on frame as shown with primed side facing up NOTE THE SQUARE AND LIP EDGES Nail using 2 nails 6 apart on edges and 12 apart inside panel 3 4 Gauge Block Do not nail in groove For squareness maintain 3 4 and flush under soffit panel Place 23 7 8 panel on frame as shown with primed side facing up NOTE THE SQUARE AND LIP EDGES Nail using 2 nails 6 apart on edges There Carefully flip your sidewall over e Repeat STEPS 1 8 to assemble at top your second side wall TR 6 4 Eg FINISH You have finished building both of your side walls BACK WALL INSTALLATION PARTS REQUIRED TEMPORARY P x1 ARA 3 7 6 cm x8 2 x 3 x 69 5 x 7 6 175 3 cm 2 5 cm x24 lt Y V GEGIN Center back wall assembly on the 120 305 cm floor dimension Use OO as a temporary brace Secure with two 3 screws 3 7 6 cm Screws First nail lower edge of panel to floor frame using 2 nails 6 apart A Angle nail to hit floor frame Fig A NONE Screw back wall uprights to fl
4. 3 8 x 48 x 96 1 x 122 x 244 cm BEGIN e Place LEFT panel on front frame as shown with primed side up Use a 3 4 gauge block on edges of panel Be sure to maintain 1 measurement between bottom edge of frame and bottom edge of panel Fig A E gt Nail panel to frame with 2 nails 6 apart A Do not nail in groove N Maintain 1 measurement as shown T For squareness maintain 3 4 measurements along panel edges ie p _ Primed Side d w UP 15 2 cm lt lt 7 Gauge Tw Block 97 1 2 247 7 cm bow 5 FRONT WALL PANELS PARTS REQUIRED 2 5 22 3 8 48 96 1x 122 x 244 3 4 GAUGE BLOCK x1 Place RIGHT panel on front frame primed side up Use a 3 4 gauge block on edges of panel Nail panel to frame with 2 nails 6 apart Do not nail in groove To draw panels tight at LA N seams angle nail X UP 17 lt N For squareness maintain 3 4 gt and 97 1 2 measurements 97 1 2 247 7 cm 25 FRONT WALL PANELS PARTS REQUIRED 2 5 cm x24 RIGHT E amp P Place wing wall panels onto frame with bottom of panels flush Nail left and right wing wall assemblies A using 2 nails 6 apart Beinatazil in groove FINISH You have finished attaching your wing walls Primed Side Flush To draw
5. 2 Gallons 1 Quart Use 100 acrylic latex exterior paint 2 coats recommended Use 100 acrylic latex exterior paint ee Se 3 Tubes Use acrylic latex exterior caulk that is paintable 7 WOOD GLUE Exterior Rated OPTIONAL MATERIALS DRIP EDGE enne 50 Feet 15 ROOFING FELT To cover 112 Sq Ft of roof area 1 GALVANIZED ROOFING 5 1 4 Lb For roofing felt REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER S INSTRUCTIONS FOR INSTALLATION OF SHINGLES DRIP EDGE AND FELT 3 PARTS IDENTIFICATION AND SIZES Part identification Treated lumber is stamped WOOD SIZE CONVERSION CHART is stamped on some parts Nominal Board Size Actual Size 2 4 1 1 2 x 3 1 2 3 8 x 8 9 cm TREATED 1 4 3 4 x 3 1 2 1 9 x 8 9 cm Check these locations for part stamp 2 3 1 1 2 x 2 1 2 3 8 x 6 3 cm 1 x 3 3 4 x 2 1 2 3 8 x 6 3 cm PARTS LIST INVENTORY YOUR PARTS before you begin We suggest sorting parts by the category they are listed in FLOOR WALL TRUSS TRIM DOOR x6 4 4 1 4 8 x2 x4 4 2 2 8 8 x2 x4 x2 5 4 4 2 1 mE 2 4 21 5 10 53 Treated lumber is stam
6. 3 7 6 cm S 3 7 6 cm Screw Fig E 33 GABLE TRIM PARTS REQUIRED DSI 1 1 4 3 cm x24 CD 30 27 2 x 3 x 54 5 16 b x 7 6 x 138 cm BEGIN Position one CD flush to front panel edge and center on right edge of groove Fig A Attach trim with eight 1 1 4 screws from inside Install two screws at seam Fig Position second CD flush to panel edge and flush to CD already attached Fig A Attach trim with eight 1 1 4 screws from inside Install two screws at seam Fig B Repeat steps 1 2 to attach the back trim n di i 7 FINISH You have attached your upper trim Continue to attaching your endcaps pen gt in I Center on right edge of groove Flush to top 34 TRIM ENDCAPS PARTS REQUIRED 1 1 4 3 2 32 4 3 4 x 3 1 2 x 5 1 9 x 9 x 12 7 x4 3 4 x 3 1 2 x 8 1 2 1 9 x 9 x 21 6 cm a th x4 RIGHT PAINTED RED 3 4 x 6 1 4 x 11 7 8 1 9 x 15 8 x 30 cm LEFT PAINTED GREEN SUE VEGIN ER Glue 5 and 8 1 2 boards onto endcaps and fasten with 1 1 4 screws as shown Repeat steps to build two more endcaps Locate endcaps flush with upper trim and corner
7. When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square Fig A FINISH Once the floor frame is level and square fasten the frame at each point the frame contacts the 4x4 runners a NN Second secure at ends with one fastener E lt lt 167 3 8 SS 425 cm NEE 425 cm First secure at ends with Fia A one fastener 19 11 FLOOR PANELS PARTS REQUIRED FLOOR PANELS NOT INCLUDED H 5 om x55 cm x SEE PAGE 6 FOR PANEL SIZES AND QUANTITIES 5 8 x 48 x 92 5 8 feaa 1 6 x 122 x 235 cm fs fa your floor frame is square by installing one panel and squaring frame 44 SI ttach the 48 x 92 5 8 panel with the rough side up painted grid lines side with the 48 edge and corner flush to the floor frame Fig A Secure panel with two 2 nails in the corners Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until the top corner is flush to the floor frame Fig B Secure panel with two 2 nails in the corners Check the floor frame is square by measuring diagonally across the frame corners If the measurements are the same your floor frame is square The measurement will be approximately 167 3 8 425
8. Call Us First DO NOT RETURN TO STORE For immediate help with assembly or product information call our toll free number 1 800 221 1849 or email customerservice backyardproductsllc com Our staff is ready to provide assistance April through October M F 8 00 AM to 7 00 PM EST Saturday 8 30 AM to 4 30 PM EST November through March M F 8 00 AM to 5 00 PM EST This page intentionally left blank 16757 06 20 2011 ASSEMBLY MANUAL PRODUCTS A Backyard Products Company MARCO SERIES PRINCETON 10 x 10 305 x 305 cm ACTUAL FLOOR SIZE IS 120 x 116 5 8 305 x 296 cm KEEP THIS MANUAL FOR FUTURE REFERENCE A IMPORTANT A READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY BEFORE YOU BEGIN BUILDING RESTRICTIONS AND APPROVALS Be sure to check with local building department and homeowners association for specific restrictions and or requirements before building ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level your shed are listed on page 7 e CHECK ALL PARTS Inventory all parts listed on pages 4 5 Contact our Customer Service Team if any parts are missing or damaged ADDITIONAL MATERIALS You will need additional materials to complete your shed See page 3
9. 3 8 x 48 x 72 GAUGE BLOCK 1 x 122 x 183 cm AN Ensure your wall frame is square by installing one panel and squaring frame Place the 48 x 72 panel onto wall frame with primed side up as shown Note the lip and square edges Use the gauge block to mark the 3 4 measurement on the wall stud Locate the panel flush under the soffit panel Secure panel with two 2 nails in the corners Fig A Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with two 2 nails Cu Nail the panel using 2 nails 6 apart on edges 1 and 12 apart inside panel Do not nail in groove For squareness maintain 3 4 and flush under soffit panel Flush 2 Nail There will be an a verhang at top Flush 3 4 1 9 pon sc m 1 9 Primed Side mj 1 1 3 4 Gauge Block Fig A 4 iw 6 15 3 4 2 ie 1 9 cm 12 30 f Fig B 2 Nails LIP CE E SQUARE 12212241 25 EDGE 3 4 48 19cm 122 29 SIDE WALL PANELS
10. OF SHED e 2 TA 2 2 7 4 AN TABS UP 1 2 5 cm overhang or flush with drip edge 1 2 5 overhang Shingle overlaps roof decking past roof deck 46 SHINGLES continued Beginning at front of shed install first row of shingles with notch at 1 past roof edge or flush with drip edge Roof Deck FRONT OF SHED BACK OF SHED Flush with starter row goccia c iss em ee spem Drip Edge Al L Flush with starter row We Notch Install second row of shingles flush at top of first row s rain slots Ensure 1 overhang or flush to drip edge at front stagger each row FRONT OF BACK OF SHED SHED 2 5 cm ET Notch Flush with rain slots Flush with rain slots Continue installing rows of shingles by staggering at front FRONT OF SHED Notch 47 SHINGLES continued Continue installing rows of shingles to the peak At the peak make sure there is a maximum of 5 or less to the rain slot as shown below If shingles overlap at ridge cut to peak with a utility knife 12 7 Cw Cut Off Top of rain slot A If more than 5 to rain slot you must install another row of shingles Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge e Once both side
11. Tighten securely GREEN OFFSET 3 8 Make sure spacer A yA oo 1 cm is attached luu 9 8 Y I 1 cm Lu 2 5 SN XE ELA zi m es 11 122 4 3 7 6 crews K Screws in middle 1 1 4 3 cm Screw at ends 2 5 cm Bottom edges flush 3 8 1 cm 40 DOORS CSS PARTS REQUIRED 3 7 6 cm x7 xil oo 2 3 69 5 x 7 6 175 3 cm ED Attach temporary support OO as a ledger board flush under wall panels for doors to rest on using three 3 screws Fig A Flush against wall panels OO Cu Center doors on right edge of groove as shown Fig B m AN Check ledger board is still flush under panels Screw hinge boards into wall supports and floor using four 3 screws as shown Make sure screws go into framing and floor Fig C D Remove temporary supports and check doors open properly FINISH You have finished installing your doors Center 3 8 A measurement on p right edge of groove Fig C 3 7 6 cm Screws into the wall support and floor frame Angle 3 7 6 cm 41 DOOR PARTS REQUIRED 5 cm x8 x1 ZJ 5 8 x 3 x 72 1 6 x 7 6 x 183 cm 3 4 1 9 cm x52 ve GIN Secure hinge boards fro
12. for required and optional materials and quantities 2 CUSTOMER SERVICE Call 1 800 221 1849 email customerserviceGbackyardproductsllc com TOOLS Required Optional Phillips de ity Knife Tool Screwdriver HUY inn Nail Pouch a us Shingle Blades Q Drill Driver 3 8 Drill Bit Snips un 2 Philips Drive Bit Eesti Gun for drip edge gt Chalk Line Hammer d Q Level Nail Gun Pencil 7 Safety Glasses Se gun nails Tape Measure s Ladder P oves 22 Square Safety Always use approved safety glasses during assembly HELPFUL REMINDER SYMBOLS Look for these symbols for helpful reminders throughout this manual e e 7 Assistance Required two or more people 27 Mark part with pencil Ensure squareness Beginning of steps for assembly or installation Important required step or operation You have finished the assembly or installation 2 5 Helpful assembly hint Level ORIENT LUMBER AND TRIM FOR BEST APPEARANCE Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our pr
13. panels tight at Flush seams angle us Mss 26 SIDE WALL FRAMES PARTS REQUIRED x2 2 x 3 x 46 1 4 5 x 7 6 x 117 5 cm xS L OV 2 x 3 x 69 5 x 7 6 x 175 cm x2 2 x 3 x 70 1 4 5 x 7 6 x 178 4 cm x2 7 16 2 1 2 x 73 1 2 1 1 x 6 3 x 187 cm BEGIN Orient parts on edge on floor Measure and mark from end of boards IMPORTANT You will build two walls the same Use two 3 nails at each mark 94 1 4 244 5 a 1 4 70 1 4 5 cm 178 5 cm 2 46 1 4 1 1 2 117 5 cm 3 8 22 1 4 57 as Center on marks Toenailing OV x4 E 1 1 2 3 8 HINT lt 24 3 4 22 24 2 24 3 4 63 cm 61 cm 63 cm 73 1 2 186 7 cm 27 SIDE WALL FRAME SOFFIT PARTS REQUIRED 5 1 1 4 3 2 28 X 3 8 x 5 x 21 1 4 0 9 x 12 7 x 54 cm x2 3 8 x 5 x 96 0 9 x 12 7 x 244 cm Place panels onto 2x3 with primed side against 2x3 Fig A AN Keep panels flush along entire edge of 2x3 top plate Fig A Attach soffit panels flush to 2x3 Fig A and with 3 8 offset at ends Fig B C using fourteen 1 1 4 screws Flush at seam 3 8 21 14 3 8 1 9 cm Fig A SIDE WALL PANELS PARTS REQUIRED 2 5 cm x34 x2 3
14. 22 cm 122 x 244 cm Roof panels are 7 16 1 1 cm thick SOFFIT PANELS 2 8 8 x 5 x 21 1 4 0 9 x 12 7 x 54 cm NAIL BOXES Shown Actual Size 2 3 7 6 cm x4 Boxes H 2 5 0 cm FASTENER HARDWARE BAG Shown Actual Size x36 E M 5 0 cm 1 49 3 7 6 om 1 24 2 5 0 om 126 1 1 4 3 2 x55 3 4 1 9 os 4 3 4 1 9 cm x7 3 4 1 9 cm 5 FLOOR PANELS Not Included You will need floor panels and nails to complete your floor Floor panel sizes and quantities are shown below NOTE Use a minimum of 5 8 1 6 cm oriented strand board OSB L x1 23 7 8 x 23 7 8 61 x 61 cm 2 48 92 5 8 122 235 3 x1 11 2 5 0 Hot Dipped Galvanized Box Type Nails 2 5 0 NOTES FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame Our recommended leveling method is shown below Leveling materials are not included in this kit PREFERRED METHOD 4x4 TREATED RUNNERS Support seam 4x4 Runners not included Measurements to 42 4 d centers of 4 4 107 t 3 Screw angled into 4x4 2 at each point frame and 4x4 touch MATERIAL REQUIRED 4 4 x 4 x 10 10 x 10 x 305 cm Treated Lum
15. ber Fasteners for Frame to 4 x 4 8 Screws shown as one option Minimum 48 3 screws exterior grade A Use only wood treated for ground contact and fasteners approved for use with treated wood A Always support frame seams Maximum between leveling Shingle 4x4 Runner material locations Level rnm y Gravel 2 Block Gravel 4 Block LEVELING METHODS 2x4 Treated Lumber 8 Block Level under 4x4 runners only e Locate leveling material 12 from ends of runners and no more than 48 apart Asphalt shingles should be used between 4x4 runners and blocks or treated lumber Never use shingles in direct contact with ground For best results and aiding in water drainage use gravel under each concrete block LEVELING MATERIALS Gravel Solid Masonry Blocks in 1 2 4 8 thickness 2x4 Treated Lumber Asphalt Shingles A Leveling higher than 16 not recommended CONCRETE If you are building your shed on a concrete foundation see the following page 7 CONCRETE FOUNDATION Your kit contains all materials to construct a wooden floor If you choose to install your kit on a concrete slab refer to the diagram below Treated Sill Plate Caulk between sill plate 3 and concrete RZ Op 4 Building Size Actual Floor Size A C 10 x 10 305 x 305 cm 10 x 9 8 5 8 305 x 296 cm 120 305 cm 109 5 8 278 116 5 8 296 cm Re
16. cm Fig C Continue attaching the panel using 2 nails 6 apart on edges and 12 apart inside panel Use a chalk line or use pre painted grid lines to nail into joists under panel 6 15 cm edges of panel 4 1 2 Flush 3 8 gt lt Fig 3 4 1 9 Approximately 2 Nails 2 Nails Flush at top corner edge 92 5 8 CAE p 235 cm Fig B li P 1 Grid lines U 12 80 5 cm inside panel Y Flush 48 122 120 305 12 FLOOR PANELS PARTS REQUIRED 5 8 x 23 7 8 x 23 7 8 x1 1 6 x 61 x 61 cm 2 5 cm x154 5 8 x 23 7 8 x 92 5 8 1 6 x 61 x 235 cm 5 8 x 23 7 8 x 96 5 8 x 48 x 92 5 8 1 6 x 61 x 244 cm 1 6 x 122 x 235 cm Continue installing panels with rough side up painted grid lines Use a chalk line or grid lines on panels for 2 nails 6 apart on edges and 12 apart inside panel FINISH You have finished Installing your floor panels 36 lt _ 23 7 8 _ Flush 244 cm 60 6 cm 92 5 8 235 cm 23 7 8 61 Flush 28 DI Flush Grid lines UP 116 5 8 296 cm N IMPORTANT Check the floor frame is level after installing floor panel
17. cure with one 2 nail into each rafter Fig E Nail the roof panel using 2 nails 6 apart on edges and 12 apart inside panel Gable Attach the second 23 7 8 x 48 upper roof panel flush to first panel flush at peak and with the 1 4 measurement Fig F G Fig G NOTE Measurements from inside of panels 22 1 4 24 24 24 22 1 4 56 5 cm 61 cm 61cm 61cm 56 5 Attach the lower roof panels flush to the upper panels Fig J and 3 4 on rafter Fig I and with a 1 4 measurement at the gable trim Fig J Nail the roof panel using 2 nails 6 apart on edges and 12 apart inside panel Repeat process to attach roof panels on the opposite side DOORS PARTS REQUIRED 1 1 1 4 3 2 D ANM CO S CY 2 5 cm x2 2 x 8 x 69 5 x 7 6 x 175 3 cm HINT Look for 3 8 SPACER attached to doors cA x1 x1 x1 71 Left Door Right Door 5 8 x 3 x 72 1 6 7 6 183 cm 6 _ BEGIN Orient parts as shown on flat surface 3 8 offset is to top Look for red right and green left on hinge board 3 7 6 cm x4 Attach temporary support OO with 3 screws in middle and at ends Tighten securely Attach temporary support ZJ at bottom with 1 1 4 screws in middle and 2 screws at ends
18. d x6 TREATED 2 x 4 x 89 1 2 5 x 10 x 227 cm Treated Wood x2 NOTE TREATED Siam 2x4x48 5x 10x 122 cm Treated Wood for Orient parts as shown on surface Measure and mark from end of boards Section 1 Cu Use two 3 nails at each mark 120 305 cm 96 244 cm 72 _ _ 183 48 48 122 122 24 Offset Seam os cm E Y 22555555 5 Center on marks Toenailing 92 5 8 Flush 235 cm at ends Center on marks Y LN LS Offset Seam 72 48 183 122 10 FLOOR FRAME 7 6 40 both floor sections together and attach as shown using 3 nails FINISH You have finished your floor frame Proceed to level and square frame 4 Nails per side stagger pattern Before attaching floor decking it is important to level and square the floor frame A level and square floor frame is required to correctly construct your shed e N LEVEL AND SQUARE FLOOR FRAME e See page 7 for the preferred floor leveling method Use level and check the frame is level before applying floor panels Check for frame squareness by measuring diagonally across corners If the measurements are the same the frame is square The diagonal measurement will be approximately 167 3 8 425 cm
19. d ONE RIGHT aside Continue building your back wall Locate OY flush to these edges 10 25 4 cm Approximately Primed Side Down 2 1 2 6 35 cm Use 2x3 s for support Flush 21 BACK WALL PANELS PARTS REQUIRED 2 5 cm x24 Pre assembled x1 LEFT x1 Pre assembled RIGHT Place wing wall assemblies onto frame with bottom of panels flush Nail left and right wing wall assemblies onto back wall frame A using 2 nails 6 apart Do not nail 1 yp in groove WAIT RH 2 FINISH WU You have finished attaching your wing walls Primed Side UP 6 15 cm 22 Flush Use a 2x3 To draw anels tight at for support seams angle nail 22 FRONT WALL FRAME PARTS REQUIRED 3 7 6 x1 2 x 3 x 22 1 8 5 x 7 6 x 56 cm x2 2 3 77 5 x 7 6 x 196 cm x1 2x3 x 94 1 2 5 x 7 6 x 240 cm e Lay out two PB one PR and one LT on edge on floor nail two PB to PR with two 3 nails at each end Ensure LT is centered with PR and in place with two 3 nails FINISH p You have finished building your Front Wall Frame LT 2 1 2 6 4 cm 2 1 2 47 1 4 6 4 cm gt 120 gt Y ET cm ice 6 4 120 cm D ae 23 FRONT WALL PANELS PARTS REQUIRED gt ory 3 4 GAUGE BLOCK x1
20. d to building your back wall 1 4 6 mm Gap Contact at peak 125 317 5 cm Use Jig to assemble Rafters 16 BACK WALL FRAME PARTS REQUIRED 3 7 6 x1 2x3 x 46 1 4 5 x 7 6 x 117 5 cm x2 PB 32 k 2x 3x77 5 x 7 6 x 196 cm xi 2 x 3 x 94 1 2 b x 7 6 x 240 cm BEGIN Orient parts on edge on floor as shown Nail using two 3 nails at each connection 3 7 6 cm Nails 1 1 2 1 1 2 8 8 cm 3 8 cm 94 1 2 240 cm 48 3 4 BT 48 3 4 46 1 4 46 1 4 117 5 cm 117 5 cm 1 1 2 3 8 cm PB Use NH as a guide to locate PB Do not nail 17 BACK WALL FRAME PARTS REQUIRED Sea a 6 2 x1 2 x 3 x 46 1 4 5 x 7 6 x 117 5 Orient parts on edge on floor as shown QQ Use two 3 screws at middle connection FINISH You have finished building your back wall frame 48 3 4 124 cm 48 3 4 124 cm 1 1 2 8 8 cm 46 1 4 117 5 2 3 7 6 Screws 18 BACK WALL PANELS PARTS REQUIRED 2 5 cm x33 3 8 x 48 x 96 1 x 122 x 244 cm GAA 3 4 GAUGE BLOCK x1 BEGIN Place LEFT panel on back frame as shown with primed side facing up Use a 3 4 gauge block at edges of panel N Be s
21. encement of any repair work REQUIREMENTS Storage Buildings amp Playhouses To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit shingle the roof and paint or solid colored stain the siding using 10096 acrylic latex exterior product with a minimum of two 2 coats within thirty 30 days of assembly caulk above all doors and all horizontal and vertical trim boards paint and seal all exposed edges sides and faces of SmartSide and waferboard siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas amp Timber Buildings To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or timber building with an exterior grade wood preservative an exterior oil based semi transparent stain an acrylic latex exterior paint or an acrylic latex solid color exterior stain within 30 days of assembly and as needed thereafter to maintain your warranty Keep vegetation trimmed away from building and make sure siding panels and trim do not come in contact with masonry or cement The minimum ground clearance for siding must be one half inch 1 2 inch from concrete slab or two and one half inches 2 1 2 from the ground when building is erected or constructed on a treated wood floor kit Water from sprinklers must be kept off unit In no event
22. ges Note Prime all un primed exterior wood before painting Follow directions provided by manufacturer ROOF FELT NOT INCLUDED Install felt flush to all roof edges overlapping 3 Use minimal amount of roofing nails to hold in place OK to overlap at ridge T aul 3 OVERLAP DRIP EDGE NOT INCLUDED Install over roof felt on gable side and under roof felt on eave side Fig A Do not use nails on side of drip edge that hangs over side of building Only nail top of drip edge as shown Roof Felt Drip Edge Edge flush to trim Snip bottom side of drip edge and BL m bend over to other side of roof Follow directions provided by manufacturer 45 SHINGLES NOT INCLUDED Follow directions provided by manufacturer and these instructions 48 fma Familiarize yourself with a 3 Tab Shingle Notch Notch SHINGLE NAIL PATTERN Full Rain Slot NAILS A NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS e Install first starter row upside down and color up with a 1 overhang at back and bottom of roof panel Use 4 nails per shingle Starter row must be straight and level all the way across with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BACK OF SHED FRONT
23. m inside using 3 4 screws as shown Fig A Reinforce the door trim using 3 4 screws through door panel into trim Fig A Locate screws as shown in Fig B Use two screws at seams ED Center trim ZJ over doors and secure using eight 2 finish nails into framing as shown FINISH You have finished securing your door and trim Na Door T 2 Nails x8 Panel Nail into Z 7 Aa SEC Hinge n a Board di Fig A Door Gum Trim Install 3 4 screws from inside x6 14 35 5 cm Approximately 75 _ 211 42 DOOR WEATHERSTRIP PARTS REQUIRED 5 cm x2 2 x 3 x 69 5 x 7 6 x 175 cm With left door closed center weatherstrip OO vertically on the left door the door opening Fig A OO will offset the left door 1 OUT past the door trim 1 Fig B Secure OO using seven 3 screws through outside trim into OO Fig B ED On right door center OO vertically in door opening Fig A OO will offset the right door 1 IN from the door trim Fig CH Secure OO using seven 3 screws through outside trim into OO Fig C FINISH You have finished installing your door weatherstrips 1 OFFSET 2 5 lt Center OO in door opening
24. oduct See Fig A B C ADDITIONAL MATERIALS FOUNDATION OR FLOOR MATERIALS This shed kit includes a complete wood floor frame system It does not include any floor panels See page 6 for the additional floor panel sizes and quantities required This shed kit does not include ANY leveling materials See the FLOOR LEVELING section on page 7 for recommended methods and suggested materials to properly level your floor as this will vary depending on your specific site REINFORCED WOOD FLOOR FRAME OPTIONAL IMPORTANT The included floor has been designed for general use Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists shown below as shaded Below is a list of additional materials not included Xl 2 4 10 5 10 x 305 cm Treated Lumber Cut to 5 2x 4x 21 5 x 10 x 53 3 5 2 4 8 5x10 x244 cm Treated Lumber Cut to 5 2 x 4 x 89 1 2 5 x 10 x 227 x40 ea 7 6 Hot Dipped Galvanized Nails lt Optional 12 30 5 cm spacing lt Standard 24 61 cm spacing COMPLETING YOUR SHED You will need these additional materials 3 TAB SHINGLES 5 Bundles 1 GALVANIZED ROOFING 6 2 Lbs For shingles PAINT FOR SIDING
25. oor using two 3 screws Fig B FINISH You have finished standing your back wall N Maii 2 nails first Angle to nail into floor frame 2 5 cm Nail 3 7 6 cm Screw 3 7 6 cm Screw al gt 2 3 7 6 cm 5 cm Screw SIDE WALLS INSTALLATION s 3 7 6 16 3 7 6 4 2 5 70 BEGIN Stand right sidewall on floor A It is important to secure the sidewall in the following order Soffit a a Center sidewall on floor front to back Panel Trim 3 8 0 9 cm Rest the top of the sidewall so the soffi t panel overlaps the backwall panel 3 8 Fig A OVERLAP Fig A SSS SS SSeS SS SSS SSS Se SS See Fig B DOOR Trim Nail the lower sidewall corner to the backwall trim with one x 2 nail Fig B 5 2 oem CENTER GY Be sure the measurement between the panel edge and the trim is the same along the entire length Then secure with one 2 nail in the upper corner Fig C Nail along the panel edge into the trim using 2 nails spaced 6 apart Nail along bottom of panel using 2 nails 6 apart Angle nail to hit floor frame Fig D Fig D ED Nail d
26. own the bottom plate using two 3 nails between the wall studs Screw through the backwall trim into the top and bottom plates using one 3 screw Fig E Screw through the backwall trim using one 3 screw Angle screw to hit floor frame Fig F Fig 32 FRONT WALL INSTALLATION 3 7 6 cm x8 Gu e e VBEGIN Stand frontwall on floor It is important to secure the frontwall in the following order Soffit Panel ED Center frontwall on floor side to side The sidewall soffit will overlap the frontwall 3 8 Fig A Nail the frontwall flush to the floor using 2 nails 6 apart Angle nails to hit floor frame Fig B Nail the lower sidewall corner to the frontwall trim with one 2 Fig Be sure the measurement between the panel edge and the trim is the same along the entire length Then secure with one 2 nail in the upper Tae PS corner Fig D 9 2 5 Nail along the panel edge into the trim using 2 15 Nail nails spaced 6 apart 3 7 6 cm 2x3 CS Secure the frontwall frame using two 3 screws Fig E Screw through the frontwall trim into the top Fig F and bottom plates using one 3 screw Fig F 3 7 6 cm Screw Repeat process to secure the right side of the frontwall
27. ped ex4x48 6x 10x 122 em 5 TREATED TREATED 2x4x72 5x 10 x 183 cm 2x4x89 1 2 5 x 10 x 227 cm 2 x 3 x 22 1 8 5 x 7 6 x 56 2x3x46 14 5x 7 6 117 5 cm 2 x 8x 69 5 x 7 6 x 175 3 2x 3x 70 114 6X7 6x 17844 2x 3 x 72 5x 7 6 x 183 2x3xTT 6X T6 x 196 2x 3x 94 1 2 5 x 7 6 x 240 7 16 x 2 1 2 73 1 2 1 1 6 3 x 187 os 6 x 24 15 x 61 cm 2 x 4 x 65 7 8 5 x 10 x 167 cm 1x 8x 23 1 4 2 5 x 7 6 x 59 cm 2 x 8x 54 5 16 5 x 7 6 138 TF 1 x3 x 95 112 28x T6x 2425 om 3 4 GAA 1 x 3x5 2 5 7 6 x 12 7 ONE USED AS A GAUGE BLOCK FOR 3 4 1 9 CM MEASUREMENT 1 9 cm Sas GBZ 1 x 3 x 8 1 2 2 5 x 7 6 x 21 6 RIGHT PAINTED RED 3 4 x 6 1 4 x 11 7 8 1 9 x 15 8 x 30 cm LEFT PAINTED GREEN OO 2x 3 x 69 5 7 6 x 175 3 om ZJ 5 8 x 8 x 72 1 6 x 7 6 x 183 cm WALL PANEL amp DOORS PARTS LIST x1 x1 x2 x4 x2 x1 x1 x1 1 2 3 8 23 7 8 x 72 3 8 x 48 x 72 LEFT DOOR RIGHT DOOR 1 61 183 1 122 183 cm ROOF PANELS 61 x 48 cm 48 x 244 cm LI X2 61 x 1
28. quires 4 2 4 10 5 10 305 cm A MUST be treated lumber 1 Cauk C Allow new concrete slabs to cure for at least seven 7 days A treated 2 x 4 5 x 10 cm sill plate is required when installing your shed on concrete Hint Use treated lumber in your kit or purchase full length treated lumber Use a high quality exterior grade caulk beneath all sill plates Fasten 2 x 4 5 x 10 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES FLOOR FRAME 3 7 6 cm x28 x2 2x4x72 5 10 x 183 cm 2 mms 2 x 4x 48 5 x 10 x 122 cm 2 Stamp 8s x6 2 4 21 5 x 10x 53 cm VEGIN You will build two floor sections Orient parts as shown on flat surface Measure and mark each dimension from end of boards gt Use two 3 nails at each mark Section 1 Section 2 120 lt 305 cm 96 244 gt 48 72 122 183 48 Center on 2280 24 Offset Seam marks 61 cm TR Flush at ends Offset Seam y2 lt gt 183 HINT For easier nailing stand on frame Toenail FLOOR FRAME PARTS REQUIRED 3 7 6 x28 x2 mun 2 x 4 x 72 5 x 10 x 183 cm Treated Woo
29. ranted for two years SmartSide siding is warranted for 10 years on all Marco series buildings and 15 years on all Premier Series buildings Timber series buildings siding and trim are warranted for 10 years Solar Shed windows are warranted for 1 year Cedar lumber is warranted for 15 years Cedar doors and Cedar Garden Center are warranted for 10 years 0 Metal roof is warranted for 25 years Warranty P ONO oOnN gt Backyard Storage Solutions LLC will repair replace or pay for the affected part In no event shall Backyard Storage Solutions LLC pay the cost of labor or installation or any other costs related thereto All warranties are from date of purchase If a cash refund is paid on affected part it will be prorated from the date of purchase CONDITIONS The warranty is effective only when 1 The unit has been erected in accordance with the assembly instructions 2 The unit has been properly shingled and painted or stained and reasonably and regularly maintained thereafter 3 The failure occurs when the unit is owned by the original purchaser 4 Backyard Storage Solutions LLC has received the warranty registration card within thirty 30 days of purchase and notification of the failure in writing within the warranty period specified above 5 Backyard Storage Solutions LLC has had reasonable opportunity during the sixty 60 days following receipt of notification to inspect and verify the failure prior to comm
30. s Re level if needed lt 2 ER xw floor should used as a stable work surface for wall construction HINT Organize your assembly procedure during the build process to avoid over handling of the walls SIDEWALL BACKWALL SIDEWALL FRONTWALL RAFTER ASSEMBLY JIG PARTS REQUIRED 1 1 4 3 2 8 2 GAA 3 4 x 3 x 5 1 9 x 7 6 x 12 7 x2 8 4 x 3 x 8 1 2 1 9 x 7 6 x 21 6 cm BEGIN Build a Jig to ensure all Rafters are assembled the same Mark a straight line on the Floor from corner to corner E gt Screw blocks in place to measurement shown p AN Make sure blocks are square and at 125 317 5 cm INISH You have finished building a Rafter Jig 2 1 1 4 3 2 cm Screws per block GAA GBZ GAA Square Chalk Line Flush Flush 15 RAFTERS PARTS REQUIRED 2 5 cm x96 X8 6x24 15x61 cm 1 T x8 m 3 1 2x4 x 65 7 8 5 x 10x 167 cm BEGIN Place two rafter halves CV on floor jig You will assemble 4 rafters A Rafters should touch at peak Apply glue on gusset and place on rafters Nail gusset onto rafter using 2 nails staggered as shown Flip over rafter assembly and glue and nail gusset to back side Repeat steps 1 4 to build three more assemblies FINISH p Unscrew jig and save blocks Set aside rafters and procee
31. s are shingled you need to trim ends Strike a chalk line 1 from edge CED Using your shingle hooked blade carefully cut shingles along chalk line FINISH You have finished shingling your roof Proceed to capping the ridge 48 SHINGLES RIDGE Co You will finish off the top of the roof with a ridge cap made from shingles B f Cut shingles into THREE pieces Hint Use cut off pieces first 2 2 5 5 es aiil K 5 2 5 A Score shingle then snap off angled cut Weather Seal Top of slot 24 to 26 Note You will need about 24 26 cut pieces Pieces c Install first ridge cap flush to shingles at front as shown Le 7 LL Flush FRONT OF SHED Install second ridge cap 5 back as shown 1 Nail per side through weather seal Flush FRONT OF SHED 49 SHINGLES RIDGE continued 212 Continue installing ridge cap to back of roof a You have finished your ridge cap 50 Trim cap off flush to shingles WARRANTY Storage Solutions LLC warrants the following Limited Conditional Every product is warranted from defects in workmanship and manufacturing for one year All hardware and metal components are warranted for two years Trim is warranted for 10 years Waferboard siding and sheathing is war
32. trim and attach each endcap from inside of shed using four 1 1 4 screws as shown Fig A FINISH You have attached your endcaps GBZ GBZ Right RED 8 1 2 Board x2 4 1 1 4 3 2 cm Screws S7 ON Fig A 35 RAFTERS P A RT S R E Q U D C LLL LLL pre assembled 3 7 6 cm x16 sl RSS ASSAY x4 2 5 cm x8 a Locate rafters directly over studs and flush to overhang in wall frame Fig A Check that you have the measurements shown Screw through soffit panel into rafters using one 2 screw Fig A VEGIN Attach with two 3 screws at each end Fig B Re tighten 2 screws if neccessary Repeat steps to attach 4 rafters FINISH You have attached your rafters Fig B T 2 5 cm Screw 22 1 4 56 5 cm 61 cm A Maintain the measurements between rafters 36 TRIM PARTS REQUIRED 2 5 cm x28 x2 1 3 x 23 1 4 2 5 x 7 6 x 59 cm x2 1 x 3 x 95 1 2 2 5 x 7 6 x 242 5 cm f e VEGIN 7 Attach fascia trim flush to bottom of soffit Fig A and endcaps at ends of rafters Fig B C using 2 5 cm nails as shown Repeat steps to attach fascia trim on both sides FINISH You have attached your fascia trim Flus
33. ure to maintain 1 measurement between bottom edge of frame and bottom edge of panel Fig A B Nail using 2 nails 6 apart on edges and 12 apart inside panel Do not nail in groove For squareness maintain 3 4 measurement along panel edges 3 4 1 9 4 B Primed side UP A lt A 1 9 cm gt N Maintain 1 measurement as shown BACK WALL PANELS PARTS REQUIRED e 2 b cm x33 x1 3 8 x 48 x 96 1 x 122 x 244 cm 3 4 GAUGE BLOCK A Q gt Place RIGHT panel on back frame as shown with primed side facing up Use 3 4 gauge block at edges of panel CD Nail using 2 nails 6 apart on edges and 12 apart inside panel A p p Do not nail MALTA Proceed to building your wing wall panels in groove To draw panels tight at seams angle nail For squareness maintain 3 4 22 and 97 1 2 measurements 20 WING WALL PANELS PARTS REQUIRED 1 1 4 3 32 x4 OVO 2 x 3 x 72 bx 7 6 x 183 cm You will assemble TWO RIGHT and TWO LEFT wing walls E gt Place OY on floor N Place a wing wall panel primed side down onto OY Fig A and flush to panel edges as shown Secure flush to edges using eight 1 1 4 screws 10 apart x2 You have finished building two sets of wing wall assemblies Set ONE LEFT an
34. will Backyard Storage Solutions LLC be responsible for any indirect incidental consequential or special damages nor for failure s that are caused by events acts or omissions beyond our control including but not limited to misuse or improper assembly improper maintenance which eventually leads to rot or decay and acts of God Backyard Storage Solutions LLC will not be held responsible for any labor costs incurred to construct your unit This warranty gives you certain specific rights that vary from state to state CLAIM PROCEDURE To make a claim under this warranty you can either call 1 888 827 9056 or prepare a letter Please have ready the information below when you call or include the information when writing The model and size of the product 2 A list of the part s for which the claim is made 3 Proof of purchase of the Backyard Storage Solutions LLC item as shown on the original invoice 4 Run code as listed on the yellow warranty card enclosed in the product package Mail the above information to Backyard Storage Solutions LLC Attn Customer Service 1000 Ternes Monroe MI 48162 WARRANTY TERMS MAY VARY OUTSIDE THE U S A IMPORTANT This is your warranty certificate Please complete and mail your warranty card to properly validate your warranty 51
Download Pdf Manuals
Related Search
Related Contents
Les sept étapes pour l`entretien complet de votre échangeur d`air TG Color GPO 磁力によるコンタミ除去 FRAIS BANCAIRES : ENCORE UN EFFORT 沖縄県周辺の海域における水上オートバイの事故 有り 無し 機関故障 発 Electro-Voice CS15P User's Manual FreeStar Pro Kit User Guide La finition Pilla L`alliage Pilla Mode d`emploi DDA - グルンドフォスポンプ Progress Lighting P5649-20 Installation Guide Copyright © All rights reserved.
Failed to retrieve file