Home
OWT Ornamental Wood Ties 56622 Installation Guide
Contents
1. Hammered Dome Cap Nut Ornamental Hardware Item 56622 Kit Includes 10 Hammered Dome Cap Nuts a e Decorative hardware conceals lag screws e Lag Screws Sold Separately www OZCOBuildingProducts com patent pending Hammered Dome Cap Nut n s2 Ornamental Hardware Installation Guide Steps 1 Remove threaded covers from all Dome Cap Nuts 2 Insert Lag Bolts into Cap Nut 3 OWT Lag Bolts require a 3 8 Hex Bit 4 Replace Threaded Covers do not over tighten 5 HINT Use tread lock on Threaded Covers in accessible areas Use and Care This hardware may not be suitable for every situation or installation application A design professional should be consulted to ensure the specific installation application meets local building code requirements If hardware becomes dirty clean with soap and water Avoid abrasions to surface and touch up any scrapes with paint Rinse with fresh water if hardware comes in contact with ice salt or salt water Sau 07 60 BUILDING PRODUCTS EE EH m www OZCOBuildingProducts com 2012 OZCO Building Products All Rights Reserved Design and Marketing by LiquidFly Designs
Download Pdf Manuals
Related Search
Related Contents
Samsung Посудомоечная машина HP 3500yl Series User's Manual Adjustable Frequency AC Drive HP Spectre 13-4005dx Coleman 2000004559 User's Manual iView X SDK Manual Samsung SV-DVD440 manual de utilizador Hôtel à insectes "Marie" 取扱説明書 Kit Colonna Solare Multifunzione Copyright © All rights reserved.
Failed to retrieve file