Home

Swanstone WK10000.010 Installation Guide

image

Contents

1. THAN FULL DIMENSION 2 Measure depth of sill area mark and cut panel to exact size 5 With vertical jamb panels cut to size apply pres sure sensitive tape and adhesive per pattern shown above Remove backing from pressure sensitive tape and apply a bead of white caulk to end of panel that overlaps sill Place into position and press down so tape and adhesive make good con tact to wall NOTE Depending on the condition of the existing wall sur face additional adhesive may be required to ensure contact between the substrate and the wall panel CARE AND CLEANING The surface is stain and abrasion resistant however it requires reasonable care Wash regularly with warm water use soft cloth with mild liquid detergent such as Handy Andy Mr Clean or Lestoil Scouring pads made of nylon saran or polyethylene may be used but NEVER USE ABRASIVE SCOURING POWDERS CLEANERS OR PADS THEY DULL THE FINISH Protect finish with any fiberglass wax or automotive paste wax The Swan Corporation One City Centre Suite 2300 St Louis MO 63101 p 800 325 7008 LEFT AND RIGHT JAMB 3 Cut left and right vertical panels to desired height and depth Lining up with height of tub surround material if applicable NOTE AT THIS POINT IT IS ADVISABLE TO TRIAL FIT ALL 3 PANELS 3 PIECE WINDOW s TRIM KIT INSTALLED 6 Caulk cut edges where necessary to seal out moisture Itis not necessary to caulk overlapping finis
2. Pa Installation Instructions for SWANSTONE High Gloss Window Trim Kit WTK 1 Strength Balance Beauty gt k 30 n CAUTION Read ALL instructions carefully BEFORE starting your installation ee ae DIMENSIONS ARE FULL FACTORY LENGTHS INCLUDED IN CARTON A Sill panel B Right jamb panel C Left jamp panel D One tube of adhesive E One tube of white caulk F One roll of pressure sensitive tape TOOLS REQUIRED TO INSTALL The only tools needed are a saber saw drill ruler pencil caulking gun DO NOT NAIL PANELS TO SILL THE HOLES IN THE PANELS ARE FOR MANUFACTURING PRUPOSES ONLY amro Lifetime WARRANTY Save this manual for future reference INSTALLATION PRODCEDURE Allow panels to adjust to room temperature for at least 6 hours 65 90 Remove unnecessary window moldings if any and clean area of dirt chipped paint loose plaster etc emomecenessereansd MEASURE SILL CUT 1 LESS 1 MEASURE BEFORE YOUR START Measure width of sill opening mark and cut 1 1 2 LESS than the measurement Cut off the end with the holes used for manufacturing purposes A Mi 4 Apply pressure sensitive tape and adhesive to underside of sill as illustrated Be sure to center sill panel 3 4 away from each side wall Vertical jamb panel will cover the gap Remove backing from pressure sensitive tape and final fit by press ing panel firmly into place wn FIRST P CUT END WITH HOLES 1 4 LESS
3. hed edges unless desired IMPORTANT Please allow unit to be installed 24 hours before using This will allow proper curing of adhesive and caulking material CAUTION Dry cleaning agents and solvents will damage the surface Burning cigarettes will damage and discolor surface f 314 231 8165 FORM 526 11 07 2M

Download Pdf Manuals

image

Related Search

Related Contents

  QNAP TS-212P 4TB  オールテレーンクレーン編  U-Com Umschlag - V-Zug  Notice Capteur tubulaire HP-DF BA1333-I-FR-0  Visiplex, Inc.  JVC RX-7520VBK User's Manual  PayPal Website Payments Standard - 2009 - Button Manager API (NVP) User Guide  Grundig 22 VLE 2100 DVD User's Manual  Handbuch - Extron Electronics  

Copyright © All rights reserved.
Failed to retrieve file