Home

Minka Lavery 4176-84 Instructions / Assembly

image

Contents

1. INSTALLATION INSTRUCTION FOR 4176 WARNING SHUT POWER OFF AT FUSE OR CIRCUIT BREAKER AVERTISSEMENT COUPER LE COURANT AU NIVEAU DES FUSIBLES OU DU DISJONCTEUR READ AND SAVE THESE INSTRUCTIONS ASSEMBLING THE FIXTURE Fig 2 1 Carefully remove the fixture from the carton and check that all parts are included as shown in the illustration 2 Shut off the power at the circuit breaker and remove old Set A O012 fixture including the mounting hardware Crossbar 3 Spread the arms N so that the arms N are at equal Ground screw distance from each other ro Mounting screw 2 4 Thread the center column assembly nipple K through the tube L onto the coupling M and secure with the nipple K HANGING THE FIXTURE Fig 1 5 Thread the nipple E into the ceiling loop H until snug 6 Thread hex nut D onto nipple E Place lock washer C over end of nipple E Chain HCH2072 84 7 Thread other end of nipple E with loop attached into 4 0mm crossbar A until snug 8 Take this crossbar A assembly and mount to ceiling junction box with mounting box screws B Size 8 32 0 6 L The side of the mounting bar marked GND must face out 9 Using proper chain pliers open one link of chain I and connect it to the fixture loop J 10 By measuring determine connect number of links needed for desired hanging height 11 Lace the fixture wires through the chain links and slip screw collar ring G and
2. PEN and CLOSE the chain included with this fixture Do not open them with other tools that may twist or stress the chain links Itis important to use proper chain pliers like the ones shown in the diagram
3. the canopy F over the chain 12 Open one link of the other end of the chain 1 and connect it to the ceiling loop H 13 Feed the fixture wires through the ceiling loop H and nipple E and pull until taut CONNECTING THE WIRES Fig 3 14 At this point connect the electrical wires as shown in Fig 3 making sure that all wire connectors are secured If your outlet box has a ground wire green or bare copper connect the fixture s ground wire directly to the mounting plate using the green screw provided After the wires are connected tuck them carefully inside the outlet box COMPLETING THE INSTALLATION Fig 2 15 Raise the canopy F all the way to the ceiling Raise the screw collar ring G and thread onto ceiling loop H protruding through canopy F Fig 1 16 Install the light bulb s in accordance with the fixture s specification DO NOT EXCEED THE MAXIMUM Fig 3 WATTAGE RATING NE PAS DEPASSER LA ae eee tn Ce PUISSANCE NOMINALE MAXIMALE WIRES WIRES WIRES Smooth Ribbed I Your installation is now complete Return the power to the Ground junction box and test the fixture HOUSE I HOUSE WIRES l WIRES White Green or Neutral Bare Copper Ground US lighting association ff Notice It is important to use proper chain pliers not included To O

Download Pdf Manuals

image

Related Search

Related Contents

  Jet Tools 50 User's Manual  JVC AV-29FH1BUG User's Manual  Hyundai i10  Philips PET320 User's Manual  Guía para el sustentante Examen General para el Egreso de la  USER MANUAL FOR FEIGAO MULTIFUNCTION R/C  Home User Guide - Markey Construction  Toshiba Thrive AT105-T108  Tributaries PWRI-X User's Manual  

Copyright © All rights reserved.
Failed to retrieve file