Home
none RK1-720A Installation Guide
Contents
1. If allowed by local codes EA Mas rs eet DRAN oT ay me e DIRECTION OF FLOW Q J 3 Ol i l 3 If the discharge does not stop refer to MAINTENANCE INSTRUCTIONS Repressurize device as in Step 1 Device should function properly 4 Slowly open the No 2 shut off valve The Model 720A is now in service 5 After the Model 720A has been prop erly installed test the device If the device fails the test refer to MAINTENANCE INSTRUCTIONS Drain Procedure for Freeze Protection 1 Turn off main shut off 1 that supplies water to the system 2 Open both inlet and outlet drain valves in the system 2 amp 6 Open inlet and outlet shut off valves on the pressure vacuum breaker 3 amp 5 and all of the test cocks Leave all valves and test cocks in the half open half closed 45 position to allow full drainage of the ball valves and test cocks 3 If you blow out the system down stream of the pressure vacuum breaker make sure the outlet drain valve 6 is open and the pressure vacuum breaker shut off valve 5 is closed 4 Connect an air hose to the outlet drain valve 6 and inject an adequate volume of air to remove all water from the downstream portion of the system 5 CAUTION Open outlet shut off valve to the pressure vacuum breaker 5 and
2. Air inlet valve does not open as gauge drops to 0 0 psid 1 Air inlet disc stuck to seat 2 Old Style pressure vacuum breaker non loaded air inlet valve Air inlet valve does not open and differential on gauge will not drop Air inlet opens below 1 0 psid Check valve opens below 1 0 psid 2 Leaking No 1 shut off valve 2 Parallel installation with leaky No 2 shut off valve Dirty or damaged air inlet disc 2 Scale buildup on seat Dirty or damaged air inlet disc 2 Damaged seat ZURN WILKINS ZURN WILKINS 1747 Commerce Way Paso Robles CA 93446 Phone 855 663 9876 Fax 805 238 5766 IS720A REV 4 13 www zurn com
3. in a building provide a suit able drain arrangement to drain off spillage from the air vent 5 Install valve at least 12 inches above the highest piping or water outlet down stream of the Model 720A Pressure Vacuum Breaker 6 Always consult local codes for installation methods approvals and guidance 7 The Model 720A Pressure Vacuum Breaker may be installed outdoors only if the device is protected against any freezing conditions Warning do not block air vent opening with insulation Exposure to freezing conditions will result in improper function or damage to the device The installation location must be kept above 32 F PLACING THE DEVICE IN SERVICE After the installation of a Model 720A Pressure Vacuum Breaker has been completed place the unit in service as follows 1 Start with both shut off valves and test cocks closed Open the inlet shut off valve until the Pressure Vacuum Breaker is completely pressurized 2 A brief discharge from the air vent may occur while the device is pressurizing The discharge should cease by the time the shut off valve is in the full open position TESTCOCKS 4 1 720A PVB 25MM Fig 1 OUTLET SHUT OFF VALVE 5 OUTLET DRAIN VALVE 6 TO IRRIGATION SYSTEM INLET SHUT OFF VALVE 3 MAIN SHUT OFF VALVE 1 Nei G T INLET DRAIN ____ VALVE 2
4. Model 720A Pressure Vacuum Breaker 1 2 3 4 1 1 1 4 1 1 2 amp 2 ZURN WILKINS Installation U Testing Q Maintenance Instructions INSTALLATION INSTRUCTIONS CAUTION Installation of Pressure Vacuum breakers must be performed by qualified licensed personnel Faulty installation could result in an improperly functioning device The installer should be sure the proper device has been selected for the particular installation ZURN WILKINS Model 720A Pressure Vacuum Breakers are for use on irrigation industrial and other non potable services where a health hazard could exist if a backsiphonage situ ation were to occur They must not be installed where backpressure may occur Proper performance depends upon following these installation instructions and prevailing governmental and industry standards and codes Failure to do so releases ZURN WILKINS of any liability that it might otherwise have with respect to that device Such failure could also result in an improperly functioning device 1 Before installing the ZURN WILKINS Model 720A Pressure Vacuum Breaker flush the lines thoroughly to remove all debris chips and other foreign matter 2 The Model 720A must be installed in a vertical position see Fig 1 to provide proper operation of the air inlet valve 3 Provide adequate space around the installed unit so that the test cocks will be accessible for testing and servicing 4 CAUTION If installation of a Model 720A unit is
5. deral Safe Drinking Water Act Lead Free requirements as of January 4 2014 this product can only be used in water sys Maintenance Clean all parts with clean water only ONDARON esting Procedures Close inlet and outlet shut off valves before disassembling device Remove canopy screws counterclockwise and remove canopy Bleed off pressure by opening the No 2 test cock Unscrew the bonnet from the body by turning counterclockwise Remove the disc amp poppet assembly check spring and spider assembly from body After completing inspection replace necessary parts and reassemble Repair kits are available from your supplier Retest according to TEST PROCEDURES TEST NO 1 Purpose To test the opening pressure dif ferential of the air inlet valve Requirement The air inlet valve shall open when the pressure in the body is no less than 1 0 psi above atmospheric pressure The air inlet valve shall be fully open when the water drains from the body STEPS Bleed water through both test cocks to eliminate foreign material 2 Install appropriate fittings for test kit hoses 3 Remove air inlet valve canopy 4 Install the high side hose of the differ ential pressure gauge to test cock 2 Open test cock 2 and bleed air from hose and gauge 5 Close 2 shut off valve then close 1 shut off valve 6 Slowly open the high side bleed needle valve being especially careful not to drop the pressure
6. differential too fast Record the pressure differential at which the air inlet valve opens 7 Close test cock 2 and remove equip ment 8 Open 1 shut off valve TEST NO 2 Purpose To test the check valve for tightness in the direction of flow Requirement The check valve shall be drip tight in the normal direction of flow when the inlet pressure is 1 0 psi and the outlet pres sure is atmospheric STEPS 1 Attach high side hose of differential gauge to test cock 1 Open test cock 1 and bleed all air from the hose and the gauge by opening high side bleed needle valve Close high side bleed needle valve Close 1 shut off valve Open test cock 2 The air inlet valve will open and the water in the body will drain out through test cock 2 When this flow of water stops the dif ferential pressure indicated by the gauge after it has settled will be the pressure drop across the check valve This value must be 1 0 psi or greater Record this value If water continues to flow out of test cock 2 then the 1 shut off valve is leaking 4 Close test cocks 1 and 2 and remove equipment 5 Replace air inlet valve canopy 6 Open 1 shut off valve then 2 shut off valve iN CANOPY SCREW N z CANOPY BONNET N PLASTIC SY WASHER O RING O t DISC amp ES POPPET ASSY SPRING s BALL VALVE li A TEST COCK 2 J Troubleshooting PROBLEM POSSIBLE CAUSES
7. outlet drain valve 6 to the half open half closed 45 position after blow out process is completed 6 If drain valves 2 amp 6 are not part of the system and if air pressure is not used to blow out the system the internal com ponents of the pressure vacuum breaker should be removed for the duration of the winter 7 Leave all drain valves 2 amp 6 shut off valves 3 amp 5 and test cocks in the half open half closed position 45 for the duration of the winter to prevent freezing Caution Be certain that main shut off 1 remains tightly closed to prevent refilling of the system Also the main shut off valve must be resilient seated to insure no leak age of water into the system be limited to our agreement to repair or replace the valve only WARRANTY ZURN WILKINS Valves are guaranteed against defects of material or workmanship when used for the services recom mended If in any recommended service a defect develops due to material or workmanship and the device is returned freight prepaid to ZURN WILKINS within 12 months from date of purchase it will be repaired or replaced free of charge ZURN WILKINS liability shall or other reproductive harm Proposition 65 Warning This product contains chemicals known to the State of California to cause cancer or birth defects tems considered non potable Please contact your local water utility for further requirements In accordance with U S Fe
Download Pdf Manuals
Related Search
Related Contents
MANUEL MONTAGE/UTILISATION DCV 700 DC Drives Software Description ABB Industry システムコントローラ Control Pack CP-317M 木製防火 ドア (開き戸) 施工業者様へ Air King Fan 9020 User Manual MODEL MA-300 - Pentair Water Literature Beipackzettel Clavier Contrôleur Copyright © All rights reserved.
Failed to retrieve file