Home
PWS S-2024-PW Use and Care Manual
Contents
1. Failure to properly install the base rails will cause the rest of the installation to be difficult or impossible Ensure that the base rails are the proper width apart lying flat and parallel to each other Check this by having the diagonal measurements equaling the same from inside corner to inside corner approximately 30 11 If the diagonal measurements are not the same then the base rails are not square and must be corrected fig 1 fig 1 PWS Premium Canopy 1 888 547 8797 Page 7 Option 2 Anchor to New Concrete Pier The second simplest method to anchor the canopy frame is to pour concrete piers Layout the base rails per the previous instruction see Positioning Base Rails page 7 and mark the locations where the Anchor Stake are to be located Remove the base rails and dig each hole a minimum of 24 or down to the frost line whichever is greater fig 2 Once the holes are dug fill with concrete replace the base rails over the holes and make the necessary measurements to ensure proper placement Insert the supplied rebar stakes into the wet concrete Double check the measure ments to ensure that the base rails are in the proper position Concrete should cure for 24 hours before canopy assembly fig 2 24 MIN DEPTH EXTEND BLW FROST LINE AS OCCURS Option 3 Anchor to Existing Concrete Slab 12 so MIN If you already have a level concrete slab you have the option of using
2. 8797 Page 3 Parts List OT Double Sided Self Adhesive PWS Premium Canopy Sinker Screw Stitcher Screw Left Truss Half Truss Crown Insert Right Truss Half Truss Rafter i ye Eve End msn ois HH BR Bm Truss Face mig Column Insert Truss Cord Columns nl Roof Truss Assembly and Terminology 1 888 547 8797 Page 4 2 tH 9 N z z UO T oS ad iD DN o mM tH ze N rd DO DN o mM iD Ss S _ Base Rail Inserts Long base Rail Base rail assembly and Terminology Page 5 1 888 547 8797 PWS Premium Canopy Canopy Installation Its important to have the site ready for the installation of the canopy The frame is designed to be placed either onto a concrete foundation anchored with concrete piers or staked into the ground There is likely more than one way to properly anchor the canopy however we provide three different options Important If a concrete slab is to be poured preparing the ground by leveling and compacting may be necessary Make sure the area is level both side to side and front to back Failure to erect the structure on level ground may cause poor results in the installation process Make sure you have adequate room around the perimeter of the canopy to be able to move the ladders and handle the materials Base Rail Assembly Column stubs Long base Rail i Bi 1 DA Short base Rail
3. Base Rail Insert Step 1 Base rails are shipped in two pieces per side and are assembled using Base rail inserts Mark a line half way on each of the two base rail insert to reference where to stop the insert into the base rail photo 4 Step 2 Install insert into the longer base rail and stop at mark LS tel Attach with four framing screws as show in photo 5 photo 4 Now slide the shorter base rail over insert and repeat the attach ment on the other side with four more screws Repeat for the other base rail assembly is la We Wa h ER EN 7 3 photo 5 PWS Premium Canopy 1 888 547 8797 Page 6 Foundation amp Anchoring Option 1 Direct Staking Ihe canopy is delivered with rebar stakes that can be used to either directly stake the canopy down into firm ground or in option 2 page 8 as an anchor for concrete piers The Simplest method to anchor the canopy is to pound the supplied stakes into the ground with a hammer after the base rails are properly spaced See Positioning Base Rails below Note hammering the Anchor Stakes into the ground serves as a minimul anchoring solution In areas where there are high wind loads we highly recommend using permanent anchors to hold down the canopy as in Option 2 or 3 See page 8 N sy K a Pia Wee 2 UHER ER ye D 4 Aes 7 lt lt p AS 20 0 Positioning Base Rails Its critical that the base rails are properly oriented when anchored
4. base rail column insert photo 9 Now raise Roof Truss Assembly and place onto base rail column insert Repeat Steps 2 4 for all inner and end trusses Sight down the bottoms of all the eves next to the columns to confirm that they are even If adjustments to a low eve are required lift the column as needed Raise the truss eve so it is even with the others then secure the columns to the base rail with 4 frame screws fig 7 gt Attach to Base Rail Detail photo 10 fig 7 PWS Premium Canopy 1 888 547 8797 photo 8 photo 9 Page 10 Purlin Assembly nn D p i Step 1 Each 24 foot purlin assembly is shipped as two ten foot end pieces one 4 foot center piece and 2 inserts On each side of the canopy lay out the purlins next to the base rails 4 assemblies on each side With the large holes facing up slide the inserts in so the hole in the insert lines up with the half hole on the purlin photo 11 On the side install a frame screw 4 back then slide the other half of the purlin onto the insert and attach Continue until all 8 purlins assemblies are complete Step 2 The purlins assemblies should be with the large holes facing up and laying tight next to base rails Line up the ends of the assembled purlins with the ends of the base rails Mark next to the holes at the edges of each column photol2 Note Installing purlins It is recommended that you start from the top w
5. wedge anchors not provided to anchor directly to the concrete slab Layout the base rails per the previous instruction and mark the locations where the anchors are to be located Using the hammer drill and 1 2 x 8 concrete bit drill a minimum of 3 1 2 into the concrete slab for each anchor location photo 1 Be aware that the vibration from the drill could move the base rail be sure to double check that it is in the proper location prior to drilling the next hole Once the holes are drilled verify that they are deep enough before installing the wedge anchors fig 3 Follow the anchors installation instructions Be mindful not to overtighten the bolt and crush the base rail tube 1 2 x 5 1 2 Wedge Anchor 3 Minimum Embedment Base rail photo 1 EEE fig 3 le SS ve Se ns PER PWS Premium Canopy 1 888 547 8797 Page 8 Frame Assembly photo 4 Truss Face Truss Cord Cord Insert Truss Assembly Step 1 Verify the placement of the Base rail assemblys for squareness and correct rail separation Tip Laying the truss components at least 8 feet in front of the Base rails will help simplify the ease of assembly Step 2 In preparation for assembly stack all the truss halfs separating them half on left and half on right Using dimensions in fig 4 page 10 measuring from the eve end moving to ridge mark the purlin locations using a square and marker photo 6 Step 3 To a
6. Installation Manual 20W x24Lx8H apne Weather Strucy J PWS Premium Canopy Protective Weather Structures Inc 5290 Orcutt Road San Luis Obispo CA 93401 Customer Service 2011 All Rights Reserved PWSsteelbuildings com 1 885 547 8797 PWS has dedicated years of steel building knowledge and con struction to creating the highest quality canopy made today With a little effort following the detailed instructions during as sembly this canopy will provide you with years of enjoyment and unparalleled protection Contents Safety amp Hazards Consideration cece 4 TO OES Regie nee 4 PAS VU coed fess teers cmett sted EE E A 4 Canopy MeN O aea ee en 6 SIE ESA A OWN ee ee ee 6 Foundation amp Anchoring ee er 7 EI CINE EINE reset ee see 8 Tas EL AET oa ee ne ee 10 EV TE VI genen ren N nee 11 ROGE Se aa eect eects eects eet eet ane eee 12 Gabe E eer E ree ee 13 Rake Tr ve ee ee 14 alates IE I ee ere 15 PWS Premium Canopy 1 888 547 8797 Page 2 Safety amp Hazards Considerations e Check that all tools and canopy components are available prior to erecting structure e Two people are necessary to safely erect the canopy e Do not allow children to play around the assembly area e Protect yourself by wearing protective work gloves hard hat safety glasses and shoes during assembly Some parts have sharp edges which may cause cuts or lacerations e Do not attempt to assemble canopy on a windy day as wind may cre
7. ate both difficulty assembling canopy possible injury as well as damage to the structure e Do not attempt to assemble the canopy during wet weather which may cause slipping off the roof e Keep in mind that the metal components may get hot on a sunny day Protect your skin from touching the hot components e Keep canopy away from electrical sources such as overhead power lines and underground cables during assembly Serious injury or death may occur if contact is made with a live power source e Do not attempt to assemble the canopy if tired have taken medication drugs or alcohol e Adhere to manufactures safety advice for all tools and equipment used to erect the canopy e Consult with local planning and building authorities prior to constructing canopy e Do not install canopy in areas with snow and wind loads greater than the canopy s rating e Protect the canopy finish by assembling the components on a soft platform to prevent scratching and damage Tools Required e Safety Goggle or Glasses e Work Gloves e Tape Measure 30 foot preferable e Level e Framing Square e 8lb hammer e Utility Knife e Pencil Marker e Hammer Drill for existing concrete slab anchors only e Masonry Drill Bit 2 x 8 Drill Depth for existing concrete slab anchors only e Electric Screw Gun with Adjustable Torque Setting e 5 16 Socket Drive supplied e Socket Drive Extension e Two 8 Step Ladders PWS Premium Canopy 1 888 547
8. e J trim Check that J trim is even with bottom of rafter cord as well as rela tively flush with the top edges of the rafter before attaching Note Each sheet to the left of the center will slip under the previous sheet Sheets to the right of center will over lap the previous sheet Due to variations in cutting the sheets may be somewhat irregular however this irregularity will be covered by the rake trim Just as in the roof sheet metal use stitcher screws on the high ribs where it is a sheet metal to sheet metal Use sinker screws where you screw into the rafter The diagram on page 17 shows where to fasten the gable pieces fig 10 In order to hide the bottom screws try to screw down as low as possible in the J trim without marring its paint finish photo 29 Make sure the screws are down far enough so that they are going into the cord of the rafter a bit driver extension will make this easier to do Step 3 Repeat steps 1 amp 2 for the other end of canopy 1 888 547 8797 Page 16 De ns IN A wa A AT NA AA A Var waft aia Step 1 Locate the left side uncut Rake trim and position it as shown in photo 30 If the roof sheet was fastened in the correct location the top edge should line up directly in the middle of the peak and the bottom edge should line up with the roof sheet If it does not align properly the only solution would be to move the
9. er photo 34 Step 4 Just as the left piece make sure it is square and straight before attaching The right side rake trim piece is cut such that it makes a vertical seam in the front for aesthetics photo 35 The top flap is meant to fold over the left piece making it such that water can t get in as easily It may be necessary to manipulate the flap so that it fits well Attach the right trim piece according to the same instruc tions in previous steps 1 through 3 Step 5 The last stitcher screw goes through both rake trim pieces and into the middle high rib of the end gable sheet photo 36 Each rake piece should have a total of 8 screws holding it down Step 6 Repeat steps 1 through 5 for the other end of the canopy 1 888 547 8797 Page 18 Note The ridge cap attaches in three pieces Be careful while handling they can buckle which will leave an undesirable crease Step 1 Begin by laying the first ridge cap starting from the back Align the ridge cap end even with the outside face of the rake trim photo 37 Using color matched stitcher screws attach through the edges of the ridge cap into the rake trim on both sides Align the other end of the ridge cap with the center of roof ridge Do not attach at this time Note Fora clean look sight down from one end gable to the other making sure that the ridge is in line before attaching photo 37 Step 2 For the center trim overlapp the previous ridge cap
10. irst sheet of insulation this will be used to assist in securing the insulation to the purlins towards the end of the canopy At this time remove the tape cover on both the purlins as well as the insulation With two people holding the insulation pull it tight and square with the frame pressing down firmly onto the self adhesive tape to ensure that the insulation is securely placed photo 17 Step 3 Using a utility knife trim the excess insulation flush with the outmost purlins as shown photo 18 Step 4 Follow same procedure as in step 2 with each sheet of insulation noting that the self adhesive on the insulation will be used to adhere to the previous sheet of insulation where they overlap Trim excess insulation as in step 3 Note Overlap the previous sheet so the last sheet s edge lays even at the end face of the rafter photo 19 1 888 547 8797 Page 12 photo 18 photo 19 Step 1 Begin installing the first Eve trim at the back of canopy frame working forward Place trim on top of Insulation and end of rafter with drip edge down Extend it past outside of rafter face 1 photo 20 and fig 8 on page 14 Note It s very important to press down firmly to compress the insulation before fastening it down Otherwise when the roof sheet is installed it will tend to cause it to deform Step 2 Measuring 114 from the bottom of the eve trim fasten the eve trim to the rafter ends with matching color si
11. nking screw photo 21 Leave the last rafter screw out so that the center eve trim can overlap Continue to the front trim holding 1 from the face of the front rafter Attach the trim at each rafter end and repeat step 1 and 2 on opposite photo 20 photo 21 PWS Premium Canopy 1 888 547 8797 Page 13 Roof Sheet Ragat Roof sheeting Warning Do not attempt to stand on roof panels that have not been attached Step 1 The placement of the first sheet is the most critical The sheet is not symmetrical and must be started as shown photo 22 with the short overlap facing out Make sure the sheet is square to the frame It must be positioned a set dis tance from the outside truss face as well as from the eve trim fig 8 fig 9 Use your square to verify these measurements photo 23 e Overhang from the Truss face 1 4 fig 8 e Overhang from face of eve trim 2 fig 9 Note These overhangs are critical If the overhang measurements are not followed the rake trim will not fit properly The overhang from the truss face is necessary for the roof sheets to space out properly and the overhang from the photo 23 eve trim is required because the rake trim is pre cut for this overhang photo 24 A Left Side View Right Front View fig 9 fig 8 photo 24 PWS Premium Canopy 1 888 547 8797 Page 14 Note Double check the 2 overhang and make sure the sheet is perpendicular t
12. o the purlins The stitcher screws are only used to fasten sheet metal to sheet metal Make sure the screws are the correct type and color Step 2 Follow the pattern below to fasten the sheet to the purlins fig 9 Mark the location by measuring out where the screws go before lifting sheet onto the roof photo 25 It is recommended that one individual is on the roof who will fasten the sheet with screws while another individual makes sure the sheet is positioned correctly photo 26 It will take 8 sheets per side with the last sheet overlapping the previous by one third Stitcher Screws Sinker Screws photo 25 Screw Pattern Roof fig 9 photo 26 PWS Premium Canopy 1 888 547 8797 Page 15 Gable and J trim METAL BUNDI t NGA photo 29 PWS Premium Canopy Step 1 Align the bottom of the J trim with the bottom of the truss cord and extend end of J trim to eve trim photo 27 Using frame screws fasten the J trim to the face of the truss in from each end 2 These screws will be removed later Repeat this step on the other side This piece will sit inside the first J trim piece in the center of the frame Step 2 The Gable kit comes in five pre cut pieces per end Start with the center left section photo 28 Use a level to verify that the ribs on the sheet metal are indeed vertical before fastening with the same color screws The sheet metal should sit down into the bottom of th
13. orking your way down It is very important that the purlins are installed in the proper locations or else other components such as eve trim may not fit Please verify that everything is correct before the purlins are installed If a mistake is made the only solution will be to move the purlins into the correct location photo 13 Step 3 Screw through the purlin hole and into the rafter using frame screws photo 13 The purlins should be aligned using the marks made in the Truss Assembly step 2 and step 6 on page 9 as guides The holes should be centered to the rafter as well as the purlin being flush with the outside face of the end rafter photo 14 It may take some effort to position the rafters appropriately so that all the purlin locations line up photo 14 PWS Premium Canopy 1 888 547 8797 Page 11 photo 16 photo 17 PWS Premium Canopy Note It is not recommended to install the Insulation on a windy or breezy day as the adhesive will not likely hold in these conditions Step 1 Apply the double sided adhesive tape on top of both the outermost purlins from end to end as shown leaving the tape cover on for now photo 16 Step 2 Place the first of 5 sheets of insulation over the canopy white side facing down Ihe insulation will be sev eral inches longer than need be on both sides This is normal and will be trimmed in a later step The insulation also has a strip of self adhesive tape on the f
14. roof if the rake trim is too short or cut the top of the rake trim if it s too long Step 2 Before fastening the rake trim to the roof sheet and end gable check to make sure the trims shape is square itself and square to the sheet This can be done several ways one method is to use a framing square Another way is to use a level photo 31 However the accuracy of this method is directly related to how level the ground is that the canopy is built upon photo 31 PWS Premium Canopy 1 888 547 8797 Screw Pattern End Gables Page 17 photo 33 photo 36 PWS Premium Canopy photo 32 Step 3 Using the same color stitcher screws as the trim the first screw should be into the face of the J trim drilling through the edge of the rake trim as shown in photo 32 and photo 33 After verifying that every thing is square and in place fasten a sinker screw down through top edge of the rake trim and down through the roof sheet into the center of the purlin below Continue on every purlin You will want to make sure you have the location of the purlin correct before drilling each screw Up the outside of the rake trim use stitcher screws to at tach to the high ribs of the end gable sheet metal Match near the screws location in the purlins At this time do not attach a screw at the peak However you can drill the remaining sinker screw through the top purlin where the rake trim pieces come togeth
15. ssemble right and left truss halves mark Cord Insert at center as shown in photo 4 Begin by sliding cord insert into left truss cord photo 5 and attach with frame screws Assemble right and left truss sections by sliding Ridge Crown Insert into both right and left truss ridge crown openings leaving them one foot apart Line up the end of right cord with opening on opposite truss cord section and slide the two truss halves together photo 7 Complete the assemble by attaching the truss cord as RNT ELERAN S Ridge Crown screw location fig 5 Ehe 7 PWS Premium Canopy 1 888 547 8797 Page 9 Step 4 Install the columns to the rafter by slipping them over the column inserts Check that the columns are at right angles to the rafter by using a framing square as shown photo 8 You can verify that the columns are square by measuring the distance at the bottom of the columns This distance should be the same as the width of the frame 20 feet apart Attach all columns as shown fig 6 Each leg requires 4 frame screws Note It is best to complete and raise one frame at a time When rais ing Roof Truss Assemblies two people are necessary to lift the rafter and column assembly to place it Face the screw heads towards the inside of canopy on both end rafters Face screws to the back on the center frames Step 5 Begin installing Roof Truss Assembly at the farthest point on the base rails Rest the end of the column against
16. to a piont over a high rib at this overlap attach through both ride cap edge to the top rib of the roof sheet metal Step 3 Set the front ridge cap even with the outside face of the rake trim attach through the edges of the ridge cap into the rake trim on both sides To complete continue to attach at the high ribs of the roof about every 3 feet PWS Premium Canopy 1 888 547 8797 Page 19 PWS Premium Canopy 1 888 547 8797 Page 20
Download Pdf Manuals