Home
Riverstone R1016-P Use and Care Manual
Contents
1. gj E mi nm mo Starting at the top on one end begin securing the poly in place using extra wire stager the wire humps After you have secured both ends secure the poly in place along the groundrail When you are finished securing the poly in place trim the excess leaving approx 3 over hang on the ends and approx 6 overhang along the side walls Page 23 BOW ASSEMBLY APPROX 8 10 gt aC gt INSTALLATION OF OPTIONAL BENCH SYSTEM PAGE 24 TEK SCREWS WITH ONE HOLE CLAMPS STEP 1 LAYOUT BRACES STEP 2 PLACE 2 CLAMP AROUND BOW ASSEMBLY STEP ATTACH BENCH FRAME APPROXIMATELY 26 TO 30 FROM GROUND STEP 4 ATTACH RUNS OF TOP RAIL USING ONE HOLE CLAMPS WITH SCREWS AS SHOWN BOLT amp NUT ENCH FRAME APPROX 26 TO 30 ABOVE GROUND ANCHOR POST GROUND HOBBY BENCH INSTALLATION DRAWING NUMBER HOB13 Attach the top rail on to the top of the endwall horizontal as shown in picture 1 amp 2 using the 3 4 clamps and tek screws Tie the benchwire to the top rails using the aluminum wire ties provided in your hardware box OPTIONAL HEATER HANGER OY SP 2 X 4 HEATER STUD HANGER ROD LLL HEATER HANGER BRACE 1 ATTACH THE HEATER HANGER BRACES TO THE END WALL STUDS USING THE SUPPLIED WOOD SCREWS 2 ATTACH THE SUPPLIED
2. The wire lock base will bend over the curvatures as shown Place screws approximately 12 to 16 apart PA 1 Once the framing is complete attach wire lock base over the top of each end bow from the bottom of the ground rail over to the bottom of the gground rail on the opposite side as shown Wire lock base also attaches all the way around the base of the greenhouse screwing directly to the ground rails and around all door and fan openings Page 16 IMPORTANT NEVER APPLY POLY TOO LOOSELY IF POLY IS LOOSE IT WILL SAG BETWEEN FRAMING MEMBERS AND POCKET WATER AND OR SNOW THIS MAY RESULT IN SEVERE STRUCTURAL DAMAGE Page 17 IMPORTANT BE SURE TO USE THE SINGLE WIDE CAP WITH THE SINGLE WIDE LOCK BASE NOT THE WIRE LOCK BASE SEE THE DRAWINGS BELOW TO BE SURE YOU ARE USING THE SINGLE WIDE CAP WITH THE RIGHT BASE Wire lock base is in 8 lengths Single wide lock base is in 10 lengths POLY FILM POLY FILM SINGLE WIRE WIDE LOCK LOCK BASE SINGLE BASE WIRE WIDE on 2 Notice that Notice the both sides extended leg are the same on the bottom IF YOU USE THE SINGLE WIDE CAP WITH THE WRONG BASE IT WILL NOT HOLD SINGLE WIDE LOCK AND WIRE LOCK PAGE 18 Cover the ends first Secure the poly in place by wiggling the wire into the channel as shown Helpful Hint It is easier to start at the top and work your way down Cover the other end in the same
3. lift up one side of greenhouse and insert legs into connectors Repeat on the other side Page 5 ANCHORING TO GROUND Atlas recommends setting the anchor posts in concrete The concrete should be approximately 12 across X 30 deep The 10 X 11 amp 10 X 16 will get 4 anchor posts The 10 X 27 wil get 6 anchor posts ANCHOR POST GROUND RAIL INSIDE OF GREENHOUSE 4 VIEW EASY GROW 02 HOBBY GREENHOUSE DRAWING NUMBER DATE DRAWN 08 06 03 ALAN Page ANCHORING TO GROUND Set the anchor posts in the ground leaving enough above ground to attach the round bands to Attch the 1 band to the greenhouse and the 2 band to the anchor post as shown below Bolt the two bands together with the supplied bolts and nuts 1924 Ce j EE a DAK Anchor Post 2 Band VIEW B EASY GROW 01 HOBBY GREENHOUSE DRAWING NUMBER DATE DRAWN 08 06 03 ALAN Page 8 8 Note Slide the legs on top of the welded stanchions of the ground rails Attach the endwall ground rails using the 3x 3 L brackets Use Tek screws to secure the ground rail to the frame as shown in above picture Page 9 OPENING MEASUREMENTS FOR FANS SHUTTERS AND DOORS SUPPLIED BY ATLAS Fan opening for 18 Box wall Quietaire 24 1 2 High X 24 1 2 Wide 30 Slant wall Quietaire 35 5 8 High X 34 3 4 Wide 36 Box wall Quie
4. Carver Premium Commercial Greenhouse Assembly Manuals for Models 10 16 x 8 h 10 x 27 4 x 8 h Riverstone f Green Products for a Brighter Future Customer Service 877 373 3078 Email customerservice rsiww com 65 Fleetwood Drive Rockaway NJ 07866 PARTS DESCRIPTION 1 X 2 GROUND RAIL WITH WELDED STANCHIONS 1 X 2 X 10 RECTANGLE Spr TUBING FOR 7 ENDWALL J GROUND RAIL 2 X 2 SQUARE TUBING USED FOR STUDS AND ENDWALL FRAMING 3 WAY CONNECTOR 4 WAY CONNECTOR HOBBY HOUSE DRAWING DATE DRAWN PAGE STANDARD PARIS 2 X 2 SQUARE NS BAND NE AN TEK SCREW B 1 5 8 2 HOLE WIGGLE WIRE amp ROUND CLAMP WIRE LOCK 1 5 8 BAND SEI 1 3 8 2 HOLE ROUND CLAMP 5 16 X 1 1 4 BOLT Q 3 CONCRETE BOX OF POLY 3 X 3 ANCHOR BOLT BRACKET OP LEEINAL PARTS CURTAIN PARTS BENCH PARIS BENCH FRAME 2 ROUND BAND CURTAIN CRANK 372 1 HOLE BENCH PARIS MP 3 4 PIPE WIRE FUR BENCH TOP CURTAIN CHANNEL HOBBY HOUSE DRAWING NO DATE DRAWN BY panne NOTE When setting the width for the E Z Grow Hobby House theOutside to outside measurement should be 10 4 Eaxample 10 X 16 is 10 4 X 16 outside to outside Square the structure by measuring diagonally from corner to corner When the diagonal measurements are the same
5. EYE BOLT TO THE TOP OF THE HEATER 3 SLIDE THE HEATER HANGER ROD THROUGH THE EYE BOLT 4 SET THE HEATER HANGER ROD WITH ATTACHED HEATER ON THE HEATER HANGER BRACES AND SECURE THE ROD IN PLACE USING THE ONE HOLE CLAMPS PAGE 26 SECURE THE ONE HOLE CLAMPS WITH TEK SCREWS AFTER YOU HAVE THE ROD SECURED DRILL A TEK SCREW THROUGH ONE HOLE CLAMP AND INTO THE ROD TO KEEP IT FROM SLIPPING HOBBY HOUSE DRAWING NUMBER DRAWN HOB15 ALAN INSTALLATION OF OPTIONAL HANGING BASKET RAILS 1 5 8 BOW 1 3 8 TUBING amp BAND 27 STEP 1 PUT THE 1 8 BANDS AROUND THE BOW STEP 2 ATTACH A PIECE OF CHAIN TO THE 1 8 BAND STEP 3 ATTACH THE 1 2 BANDS TO THE 1 8 TUBING 8 STEP 4 ATTACH THE 1 8 BANDS TO THE BOTTOM OF THE CHAIN DRAWING NUMBER DATE HBR1 12 12 01
6. manner Page 19 Trim around the door and fan openings leaving approx 1 over hang Lay out the poly along the side of the greenhouse and pull it over the top as shown 0 1 Page 20 Page 21 Pull the polyfilm over the greenhouse attach the side without the curtain at the groundrail first Pull the polyfilm tight and secure it at the eave on the curtain side Note DO NOT cut the polyfilm at the eave the curtain and the roof poly are the same piece Lay the curtain rod in the curtain channel on top of the polyfilm with the wire lock base pointing up Fold the poly film up so you can lock the polyfilm to the crank rod using the wiggle wire Be sure the crank rod lays flat in the curtain channel while you are locking the polyfilm in place NOTE Be sure to position the crank rod so that the swedged will iinsert into the crank handle After you are certain you have the polyfilm properly locked in place cut the polyfilm and attach the piece you cut off to the bottom knee wall OPTIONAL CURTAIN SYSTEM 7 Field Drill Roll the curtain up so it rolls to the inside attach the curtain guides using a Tek screw at the top and or bolt and nut at the bottom as shown you will need to drill the holes in the curtain channel for the bolts and nuts Slide the crank in so it will lock the curtain in its up position pull the crank out to roll the curtain down Page 22
7. mps The ridge purlin attaches under all bows Two hole clamp PAGE 13 The ridge purlin is connected under all bows 4 using 2 hole clamps Hidge Purlin 1 3 8 Prepare to attach wire lock base to the top of _ the end bows around the openings and gt En around the base of the greenhouse ENS Side Purlin With Optional FA Wirelock Base iu OPTIONAL Cutrain will require wire lock on NN the Side Purlins at the eave Page 14 If you ordered the optional curtain system attach the curtain channel approximately 28 above the ground rail See photo 1 ee Approx 28 from top of groundrail Curtain Chanel b pA PTE gt mlt NE ENN When framing is complete wire lock base will be attached on top of the end bows as shown in pictures 4 amp 5 The wire lock base will go from the bottom of the ground rail over the end bow down to the curtain channel then from the curtain channel down to the bottom of the ground rail as seen in picture 2 emn ANNONSERE ps t t mE 43 AA EN VAR OE t EI A gt t SS E 5 i gt 141 ESS SE X HE 2 m 5 gt X LT i 1 2D j Identify the curtain crank rod Attach wire lock base along the length of the crank rod Page 15 Attach Wire Lock Base over the end bows using Tek screws
8. taire 40 1 2 High X 40 1 2 Wide Shutter openings for 24 Shutter 30 Shutter 39 Shutter 45 Shutter 48 Shutter 60 Shutter Door openings for 6 X698 French Door Set openings 72 Wide X 80 High 4 Single Sliding door Set openings 46 Wide X 82 High 8 X 7 Double slide door Set openings 96 Wide X 82 High NOTE Measurements are inside to inside All of the above listed items may not be available for your particular structure BOW ASSEMBLY 2 X 2 SQUARE BAND 2 X 2 STUD WALL SUPPORT FOR OPTIONAL BENCHES 1 5 8 CONNECTOR MOUNTS OVER BOW UT HOBBY HOUSE DRAWING NUMBER DATE DRAWN 10a 8 23 07 rev 02 10 11 MITCH TODD PAGE 10 Frame out the door 30 1 2 wide x 72 1 4 high End wall framing attaches to the bow using a round clamp on the bow and a square clamp on the 2 x2 stud See photo 2 Attach the 2 x 2 studs to the end ground rail using 3 x 3 L bracket as shown PAGE11 The Shutter opening Is 24 1 2 W ide x 24 3 4 High Attach horizontal 2x2 using L brackets as shown Note the L brackets will attach on the outside of any openings Example On top of the door header on bottom of the lower horizontal for shutter and on top of the upper horizontal for shutter Page 12 You must field cut the ridge purlin to exact length of the ground rails Attach ridge purlin with Tek screws and two hole cla
9. the structure will be square see photo 2 Example 10 4 wide x 16 long 19 9 16 diagonal measurements Note These measurements are approximate your measurements may be different Once the ground rails are squared anchor the rails using the 12 spiked provided as shown in photo 3 485 i on ground 1 5612 spike CONCRETE MOUNTING OPTION front rear ground rail Secure aluminum 2 bracket onto side groundrails evenly spaced between welded stanchions using 14 tek screws Front amp Rear ground rail place the z brackets approximately 16 from each end as shown in diagram to the right aluminum z bracket for DETAIL A shows further attachment details anchoring ground rail DETAIL A tek Screws N 1 concrete drive pins ground rail sides or ends Page 4 ASSEMBLING THE FRAME 1 Identify 3 amp 4 way connectors 3 way connectors are for the ends and 4 way connectors are for intermediate rafters legs and at the peak of greenhouse 2 Assemble frame as shown in below diagram DO NOT assemble legs at this time completed frame must be lifted and placed on the legs then onto anchor posts 4 way connector purlin 5 1 mos x Rafter 5 1 7 Y purlin 5 1 Y Leg 5 1 MEE ALL PURLIN RAFTERS AND LEGS ARE THE SAME LENGTH Position 2 men approximately along one side of the greenhouse Holding legs in one hand
Download Pdf Manuals
Related Search
Related Contents
Projecteur Caractéristiques À propos du manuel d`utilisation USB-RS232 変換基板 rev2 (取扱説明書) Instructivo para el Diligenciamiento del Formulario Cisco Systems STACKT150CM White Paper Light Source Specification & User Manual voir le livret technique MB 1000 power amp - User Manual COVERMATE III OPERATING INSTRUCTIONS Copyright © All rights reserved.
Failed to retrieve file