Home

Sunjoy L-GZ605PST-A1 Installation Guide

image

Contents

1. lt lt 55 lt gt gt 55 en pS Z 2 Fig 21 Hang the curtain W with the plastic rings hung decorative slot and side beam Fig 22 Hang the mosquito screen V with the plastic rings hung on decorative slot and side beam Fig 23 Raise the post base cover 1 P1 and assemble ground spike KK to the ground through the post base 1 O1 Fig 24 Raise the post base cover 2 P2 and assemble ground spike KK to the ground through the post base 2 O2 Fig 25 Secure the gazebo to the curtain by using bolt LL through curtain mounting bracket and screw the bolts in the curtain mounting bracket Q Warranty Thank you for purchasing this product These products have been made to demanding high guality standards and are guaranteed for domestic use against manufacturing faults for a period of 12 months from the date of purchase This warranty does not affect your statutory rights In case of any malfunction of your product failure missing part etc please call Sunjoy Industries at 1 866 578 6569 from 8 30 AM to 5 30 PM EST Monday to Friday or fax the replacement part form which put into the package to 740 283 3549 or Email customer care sunjoydirect com for assistance Sunjoy reserves the right to repair or replace the defective product at its discretion The product is guaranteed for 12 months if used for normal trade purposes Any warranty is inval
2. nut 11 and flat washer BB Bolt M6X15 Flat washer M6 Bolt M6X15 Nut M6 Bolt M6X10 to edge beam and middle beam and secure one side of and flat washer BB Fig 16 Settle back card slot 1 J1 and back card slot 2 J2 HH and flat washer BB to secure the back card slot 1 J1 and back card slot 2 back card slot to edge beam by using bolt to the middle J2 1 Use bolt CC L3 Fig 16 beam Fig 17 Set the side card slot 1 1 and side card slot 2 2 to side PC panel and secure them with bolt HH and flat washer BB and edge beam 2 L2 Fig 18 Insert the PC panel 1 M1 into the slot of middle beam L3 install the edge beam 1 L1 install the edge beam1 L1 and edge beam2 L2 the 5 L3 into the slot of middle beam N Insert the PC panel Fig 18 1 same way Fig 18 2 Insert PC panel 1 M1 into the bottom card slot of middle beam L3 install edge beam 1 L1 and edge beam 2 L2 the same way Fig 19 Insert the bolt JJ into the bottom card slot of middle beam L3 edge beam 1 L1 and edge beam 2 L2 then set the front card slot 1 K1 to complete bolt JJ and insert the front card slot into the PC panel Install front card slot 2 K2 the same way see step 3 Fig 20 Install the blank 2 T2 to edge beam 2 L2 and front card slot 2 K2 and secure them with bolt DD and flat wa
3. 767676767 KAK KK KK KK AA 2 00000004 SSNS KS 8 gt 4 2555 RISS 55252 255596 552529 55269 525259 5252509 55526 SS 555255 5559 SKA 255526 050059000 555225 55525262 25552525 5525 5525250 INKA SKK 2555550 255252529 25555 552526 SS 505 LARI OC OC KKK KKK KKK KD PERKAKAS SSSR BRS SR 4 XX lt X X X X X XX x Parts List Front post 1 1 1 Front post 2 A2 1 Back post 1 A3 1 Back post 2 A4 1 Side beam 1 B1 1 TE Side beam 2 B2 1 lt Decorative slot 1 C1 1 Fe oes Decorative slot 2 C2 1 xP Ts NI Junction bar D 1 Back beam 1 E1 1 Back beam 2 E2 1 Beam junction F 2 Middle beam 1 G1 1 Middle beam 2 G2 1 Small beam 1 H1 2 Small beam 2 H2 2 Small beam junction Back card slot 1 J1 1 Back card slot 2 J2 1 Front card slot 1 K1 2 13 Front card slot 2 K2 1 Edge beam 1 L1 1 Edge beam 2 L2 1 L Middle beam L3 4 PC panel 1 M1 10 PC panel 2 M2 1 PC panel 3 M3 1
4. Assembly Instructions L GZ605PST A1 DO NOT REMOVE THE PROTECTIVE FILM ON THE PC TOP PANELS UNTIL INSTALLATION MAKE SURE TO PUT THE UV PROTECTED SIDE FACING UP IT IS A VERY IMPORTANT PROCEDURE IF NOT FOLLOWED AS DESCRIBED YOUR ROOF WILL NOT BE COVERED BY THE GUARANTY GAZEBO ASSEMBLY INSTRUCTIONS Our clear easy to follow step by step instructions will guide you through the project from start to finish The final product will be a quality piece that will give you years of enjoyment All you will need is a screwdriver a hammer and two ladders of at least 8 feet 2 5 m high not included THIS UNIT IS HEAVY Note DO NOT assemble this item alone for your safety Six people are necessary for smooth amp safe installation Item identification For ease of identification all parts are labeled to correspond to the Step number in which the part is used SSIS 256092990020 ROR KER ERK BANK SZ 3 28 2 Xx 280 225 KS 225 52 0990 meee 225 0 5 55 SxS 5 5 59 229 oe 5 Sx 50 229 99 5 225 gt XX 55 5 5 5 5 aces 20 aces 22 552 55 22 KS x ae 5 aces LX x 5 gt 5 XX 5525 2 52 2 4 SS SOK OOS RRR KKK RR 555525555559 WSR TERK KER KER KR 2 I gt 52 V SSSA RON XX SS PELAKSANA KKKS 99 SSAWK KK gt gt gt gt lt gt 6
5. PC panel 4 M4 1 PC panel 5 M5 1 PC penal card slot N 5 Side card slot 1 1 1 Side card slot 2 N2 1 Post base 1 O1 2 Post base 2 2 2 Post base cover 1 P1 2 Post base cover 2 P2 2 Curtain mounting tab 4 Middle beam bracket R 2 Connecting piece 1 S1 12 Connecting piece 2 52 4 Connecting piece 3 S3 1 Connecting piece 4 S4 1 Bracket 1 1 1 Bracket 2 T2 1 Bracket 3 T3 4 Corner support U 2 Mosquito screen V 1 Curtain W 1 Hardware Pack 1 Bolt M6X20 Flat washer M6 Bolt M6X15 Nut M6 Bolt M6X15 Bolt M6X35 Bolt M6X15 Wrench M6 Wrench M6 Fig 1 Install the curtain mounting tab Q to back post 1 and back post 2 A4 with bolt AA and flat washer BB Ensure the narrow surface of the curtain mounting tab Q faces the post with three holes Fig 2 Set the post base cover 1 P1 into the back post 1 and back post 2 A4 then secure post base 1 1 to post 4 4 and post 3 A3 with bolt HH and flat washer BB Ensure the flat surface of the base 1 O1 and post base cover 1 P1 face the post with three holes Fig 3 Set the post base cover 2 P2 to the front post 1 1 and front post 2 A2 then secure the post 2 O2 to front post1 1 and front post 2 A2 by using bolt HH and flat washer BB Fig 4 Install the plastic rin
6. and use Some special procedures may be valid in your area 9 While this gazebo is manufactured to withstand strong force winds through only the supplied ground stakes in areas subject to freguent severe weather securing the gazebo to a deck concrete patio or footings should be considered NOTE The gazebo s roof and structure are not guaranteed against extreme weather conditions storms high winds etc If the gazebo is not dismantled for the winter snow must be cleaned off regularly Any damage caused by snow accumulation is not covered by the warranty Care amp Maintenance Our steel components for garden accessories and furniture are treated with rust inhibiting paint that protects it from rusting However due to the nature of steel surface oxidation rusting will occur once these protective coatings are scratched This is not a defect and thus not covered by the warranty To minimize this condition we recommend care when assembling amp handling the product to prevent scratching the paint Should any scratching or damage occur we recommend immediate touch up with rust inhibiting paint Surface rust can also be easily removed with a very light application of common cooking oil If surface oxidation rusting occurs and if no measure is taken to prevent this the oxidation may start dripping on to deck or patio and caused damaging stains which may be difficult to remove This can be prevented if the above mentioned measures a
7. edge beam 1 L1 or edge beam 2 L2 to back seam Use bolt CC and flat washer BB to install middle beam mounting bracket R and middle beam to side beam Install connecting piece 2 S2 to the bolt of edge beam 1 L1 or edge beam 2 L2 s card slot by using bolt DD and flat washer BB then use bolt CC and flat washer BB to install connecting piece 2 to middle beam Hardware Pack 2 Flat washer M6 Bolt 6 15 Nut M6 Nut M6 B1 B2 Fig 13 Fig 13 1 Insert the PC panel 3 M3 or PC panel 5 M5 to the card slot of edge beam and side beam then insert PC panel 2 M2 or PC panel 4 M4 to the card slot of edge seam and side beam Fig 14 Using connecting piece 1 S1 bolt CC and flat washer BB to install one side of middle beam L3 to back beam Fig 14 1 Install the connecting piece 1 S1 to the bolt of middle beam L3 s card slot by using bolt CC and flat washer BB Use bolt CC and flat washer BB to install the connecting piece 2 S2 to middle beam Fig 14 3 Install another side of middle beam L3 to decorative slot by using connecting piece 1 S1 bolt CC and flat washer BB Fig 15 Insert the small beam junction 1 into small beam 1 H1 and small beam 2 2 and secure them with bolt CC and flat washer BB Fig 15 1 Set the complete small beam through the 2 group bolts middle beam L3 and edge beam L1 and secure them with
8. gs EE into decorative slot 1 C1 and decorative slot 2 C2 use 7 plastic rings for each decorative slot Fig 4 1 Insert the junction bar D into the decorative slot 1 C1 and decorative slot 2 C2 and secure with bolt CC and flat washer BB Fig 5 Install the plastic rings EE into the runner of side beam 1 B1 and side beam 2 B2 12 plastic rings for each runner Fig 6 Insert the beam junction F into back beam 1 E1 and beam 2 E2 and secure with bolt CC and flat washer BB Install the middle beam 1 G1 and middle beam 2 G2 in the same way with back seam1 E1 and back seam2 E2 2 4 Fig 7 Use bolts FF to install the complete side beam 1 1 side beam 2 B2 to front post 1 1 and back post2 A4 or front post 2 A2 and back post 1 A3 Fig 8 Install the complete decorative slot to front post with bolt GG and flat washer Fig 9 Install the corner support U to the corner of front post and secure them with bolt HH and bolt Fig 10 Install the complete back beam to back post with bolt FF Fig 11 Use bolt HH flat washer BB to install the connecting piece 3 S3 or install connecting piece 4 S4 to edge beam 1 L1 or edge beam 2 L2 then install the complete side beam to post 1 A1 or post 2 A2 Fig 12 Using connecting piece 2 S2 bolt CC flat washer BB to secure the
9. id if the product has been overloaded or subject to neglect improper use or an attempted repair other than by an authorized agent Heavy duty or daily professional commercial usage are not guaranteed Due to continuous product improvement we reserve the right to change the product specifications without prior notice SAFETY WARNINGS 1 Keep all children and pets away from assembly area Children and pets should be supervised while gazebo is being assembled 2 The assembled gazebo should be located at least 6 feet 2 m from any obstruction such as fence garage and house overhanging branches laundry lines or electrical wires 3 This unit is heavy Do not assemble this item alone Six people are recommended for safe assembly 4 Some parts may contain sharp edges Wear protective gloves if necessary during assembly 5 When assembling and using this product basic safety precautions should always be followed to reduce the risk of personal injury and damage to eguipment Please read all instructions before assembly and use 6 For outdoor use only Install on level ground 16 stakes are provided to secure the gazebo in the ground If you wish to secure the pavilion to a wood deck or concrete surface 16 anchors provided for these surfaces 7 Check all bolts for tightness before and during usage 8 Please check your state and local regulations prior to installing this gazebo Some jurisdictions may reguire permits for installation
10. re taken to keep the product from oxidizing Made in China Supplement Installthe roof panels and according to the picture Make sure they are completely inserted in the roof bars track Insert roof panels from the end ofthe roof bars in the middle of the 12 ft side of the shelter Align with the other panels
11. sher BB Same way to install the blank 1 T1 and blank 3 T3 see step 3 Hardware Pack 4 O S 9 x aE amp 42 z lt Hardware Pack 5 Plastic ring SKK 2525 RI 000 SKM X 5 25252 LLLI 5 5 2 lt lt gt x lt gt lt gt 4 OR 5 amp 2 lt gt gt lt 2 In lt 5 lt 2 gt 2 lt gt lt 5 5 5 5 5 5 55 lt gt 5 gt 2 K 2 gt lt gt gt gt lt gt gt gt lt gt gt gt lt lt gt 25 25 55 ox lt gt gt 25 5 5 x x L 5 amp 5 8 252 5 25 lt gt lt 2 lt lt gt lt 5 55 x 2 2 lt 55 5 5 lt gt 5 4 gt 7 amp 50 lt gt lt gt gt 5 8 amp SS 25 Q 55 55 gt 25 gt lt gt lt gt gt 2 lt gt 2 gt 2 lt gt lt gt gt gt gt gt lt gt gt gt lt gt lt gt 55 lt gt gt lt gt lt gt 25252 lt gt gt 52 lt gt 2 QS lt gt lt gt lt gt QS lt gt lt gt 52 gt Xe gt gt lt gt 52 lt gt gt gt lt gt KS 5 25 KS 09 KS 05 Q K Q lt 2 l
12. t gt Q lt gt lt gt 2 55 5 5 lt b 55 55 2 5 25 lt 5 lt lt 2 lt gt gt lt gt gt gt gt gt 2 gt lt gt lt gt lt gt gt lt gt lt gt gt 25 5 55 55 5 8 55 5 5 55 gt 2 x 5 lt lt gt lt gt lt gt 55 55 55 lt gt gt 2 lt 2 lt 2 lt gt 5 lt gt 55 lt gt lt gt 0 Xe lt gt gt gt gt lt gt gt gt lS lt gt 2 ce 5 5 lt gt gt 5 N2 gt gt lt gt gt lt gt 52 lt gt 52 lt gt gt gt 52 lt gt lt gt 52 lt gt lt gt 2222 gt gt gt A lt lt 8 5 lt 22 2 5 2 lt gt 25 25 In 5 2 x In 2 lt lt gt lt gt lt gt lt 5 25 5 5 5 lt gt gt lt gt gt 28 lt gt gt gt 252 lt gt lt 2 5 00 lt gt lt gt 5 lt lt 52 lt gt lt gt 5 lt gt 25 5 lt gt 5 5 25 gt 52 lt gt 52 lt gt lt gt lt gt 2 gt 2 gt lt gt gt gt 55 2 5 5 5 5 5 2 5 In lt gt lt gt gt lt gt Q gt lt gt L 5 2 0 585

Download Pdf Manuals

image

Related Search

Related Contents

Fiches descriptives des outils validés et/ou normés en franco  Lucent DSLPipe Router  Manual do operador  3 - Karavan.cz  DOWNLOAD  TruVision IP Camera Configuration Manual  PROOF_DGUN-2578  corega FEther PCI-BLK 取扱説明書  MASTERSuite 5  

Copyright © All rights reserved.
Failed to retrieve file