Home
Grindmaster P200E User's Manual
Contents
1. 400 105 28 WIRING HARNESS SHOWN A550 185 29 ASSY BYPASS VALVE COLUMBIA 718 111 UNITS CONFIGURED WITH 1800W TANK HEATING ELEMENT AND 100W WARMER ELEMENT FOR A TOTAL OF 1900W SEE RATING LABEL UTILIZE ELEMENT P N A535 058 AND CORDSET P N A515074 amp amp QQ eG P200 RAPS200 Brewers P 200E DWG A094 055 2 REV B ECN 1258 U REV ECN 1565 11 2000 REV D Page 11 Exploded View for the P200 G version only ITEM DESCRIPTION COVER WELDMENT TANK COVER HOLDER 1650W 120V HEATER ELECTRODE ASSEMBLY PILOT THERMOSTAT KIT BULKHEAD SS W HEX NUT 1 2 3 4 5 ELECTRODE KEEPER 6 8 55 TANK FILL TUBE 9 FITTING ASSY HOSE X 1 8 MPT 10 VALVE WATER FILL 11 GROMMET PART A413 027 A314 538 535 069 712 018 A314 052 A712 046 A538 120 A718 174 A518 012 A537 154 A544 008 12 BREW VALVE A537 129 13 SILICONE ELBOW MOLDED 14 RELAY HEATER A548 129 A531 074 15 TIMER W RELAY 16 POTENTIOMETER ASSY 17 LIQUID LEVEL CONTROL 18 RED HOT WATER FAUCET 19 AMBER PILOT LAMP 20 STOP SWITCH A530 016 A531 066 A549 006 A537 043 A515016 531 063 21 START SWITCH A531 062 22 SHUTTLE WILOCKING LID 23 WARMER SWITCH LIGHTED 24 LEGS ADJUSTABLE 25 WARMER ELEMENT 26 CORD POWER 120V NEMA 5 15P 27 DEFLECTOR SPRAY 28 WIRING HARNESS NOT SHO
2. clockwise to decrease temperature 4 If the maximum temperature adjustment needs to be increased insert a small flat screwdriver into the shaft Turn the calibration screw counter clockwise to increase the maximum temperature 5 Reinstall top cover with screw then plug unit in return to use Figure B Cleaning WARNING BURN HAZARD HOT LIQUIDS AND SURFACES ARE PRESENT IN THIS EQUIPMENT TO AVOID BURNS USE CAUTION WHEN CLEANING RINSE HOT PARTS WITH COLD WATER BEFORE CLEANING USE GLOVES OR A HEAVY CLOTH WHEN REMOVING HOT PARTS FROM BREWER After Each Brew 1 Dispose of grounds and rinse brew basket 2 Rinse Shuttles and Airpots before reuse Every Day 1 Wash brew basket with warm soapy water 2 Remove spray head located above brew basket using gloves or a heavy towel Wash off coffee oils and clean any plugged holes 3 Clean Shuttles and Airpots with warm soapy water and a brush or towel 4 Wipe exterior of brewer with a damp cloth Do not use abrasives which will scratch surface 5 If the Shuttle is to be left on the warmer all night fill it with water to avoid coffee oil burn in P200 RAPS200 Brewers Page 5 Weekly or Bi Weekly Depending on Use P200 Only 1 2 Fill Shuttle with one gallon of hot water Pour the recommended concentration of urn cleaner into the Shuttle liners Excessive amounts of cleaner will attack the stainless steel Urn cleaners that have been used succe
3. The brew volume of the P200 RAPS200 brewer is controlled by its timer The batch size is directly proportional to the timer setting The timer adjustment is located under the top cover There will always be a small variation 596 in level from batch to batch Before making the timer adjustment do the following 1 Brew a batch of water to determine where the level falls Using a stop watch determine the current brew time Measure the volume of water 2 To determine the desired time setting use the following formula desired brew volume x current brew time current brew volume desired brew time Timer Adjustment Two Batch Timer with Knob Adjustment See Figure A 1 This timer is adjustable from 15 seconds to 5 minutes Locate the adjustment knobs under the top cover 2 Set this timer by adjusting the knob The batch selector switch picks the adjustment potentiometer which the timer will see Figure A Two Batch Timer P200 RAPS200 Brewers Page 4 Thermostat Adjustment The thermostat controls the water temperature in the tank Factory setting is 195 degrees F This is the ideal temperature for brewing coffee Water should never boil in the tank If water is boiling in the tank adjust the temperature appropriately Standard Mechanical Thermostat 1 Shut off power and unplug brewer 2 Open cover locate thermostat mounted on tank Refer to Figure B 3 Turn the shaft counter clockwise to increase temperature
4. Timer faulty Check 120V between If no 120V BREW output from timer and N on timer If OK replace timer check for 120V between BREW and N on timer after pressing start Boiling tank If drip is from right side Turn down thermostat If that doesn t check for water from cure check for faulty thermostat or overflow outlet at top of heater relay tank Limed up Fill valve Visual check of valve Clean valve Valve seal or entire valve may need replacement P200 RAPS200 Brewers Page 10 Exploded View for the P200 E ITEM DESCRIPTION PART 1 COVER WELDMENT A413 027 2 TANK COVER HOLDER 314 538 3 1650W 120V HEATER 535 069 4 ELECTRODE ASSEMBLY 712 018 5 ELECTRODE KEEPER A314 052 6 PILOT THERMOSTAT KIT A712 046 7 BULKHEAD SS WHEX NUT A538 120 8 ASSY TANK FILL TUBE A718 174 9 FITTING ASSY HOSE X 1 8 MPT A518 012 10 VALVE WATER FILL A537 154 11 GROMMET A544 008 12 BREW VALVE A537 129 13 ASSY SPRAY TEE MANUAL BYPASS _A725 081 14 RELAY HEATER A531 074 15 TIMER W RELAY A530 016 16 POTENTIOMETER ASSY A531 066 17 LIQUID LEVEL CONTROL A549 006 18 RED HOT WATER FAUCET A537 043 19 AMBER PILOT LAMP A515016 20 STOP SWITCH 531 063 21 START SWITCH A531 062 22 SHUTTLE W LOCKING LID ACS LL 23 WARMER SWITCH LIGHTED A531 061 24 LEGS ADJUSTABLE A545 004 25 WARMER ELEMENT A535 018 26 CORD POWER 120V NEMA 5 15P 61530 27 SPRAYHEAD SHOWN
5. plug ELECTROCUTION HAZARD NEVER USE THE GROUND CONDUCTOR AS A NEUTRAL DO NOT USE GROUND ELIMINATING ADAPTORS UNIT MUST BE PROPERLY GROUNDED WARNING Start up Connect water line and turn water valve on Check for leaks Plug in power cord supplied to 120 15 Amp 20 Amp for some models see rating plate on unit wall outlet Once the brewer is full of water it will take 15 to 35 minutes to heat The READY LAMP will light when water has reached the set temperature After READY LAMP is lit portion volume may now be checked Insert the brew basket and place Shuttle Airpot under the brew basket Brew at least one batch at half and full volume to check for proper volumes Remember that when brewing coffee the level will be lower The water must be hot to check for proper levels If adjustments are needed see the Adjustments section of this manual WARNING HOT LIQUID HAZARD DO NOT TRANSPORT BREWER WITHOUT DRAINING WATER TANK FIRST P200 RAPS200 Brewers Page 2 Operation CAUTION HOT LIQUID HAZARD WATER USED FOR BREWING COFFEE IS VERY HOT USE CAUTION WHEN BREWING POURING OR TRANSPORTING COFFEE ACCIDENTAL SPILLS MAY RESULT IN SEVERE BURNS Place an empty warm Shuttle under the brew head Turn on the warmer once a Shuttle is in place or place an empty 1 91 to 3 0L airpot under the brewing head Choose one size airpot to minimize risk of brewing too large of volume in smaller container Remove
6. located on the front control panel Brew Timer located in the top control section under the top cover Brew volume too large or too small Brew volume erratic there is always some small variation from batch to batch Brew will not start Spray head will not stop dripping water spray heads normally drip slightly after brew Timer out of ad Compare timer setting Adjust timer justment to factory setting chart Pressure not ad Check water flow before Clean or rinse strainer at fill valve equate at brewer removing strainer Spray head clogged Clean all holes Timer faulty Check if brew time Replace timer matches timer setting and if timer can be adjusted Timer faulty Measure brew time for If time is different from batch to inconsistencies batch replace timer Pressure fluctuations Check pressure at Plumb water line so its pressure is at brewer brewer inlet not influenced by other appliances Tripped circuit Check to see if circuit Reset or replace breaker breaker breaker tripped or popped out Brew valve faulty Check 120V across If 120V is across brew valve but brew brew valve valve doesnt open replace coil or valve Stop switch faulty Check for continuity If no continuity replace switch across stop switch when not pressed Start switch faulty Check 120V between If start switch does not provide 120V S S and N on timer start signal replace switch when start is pressed
7. 032 61530 550 185 548 128 548 127 VALVE WELDMENT THE TWO PARTS SHOWN HERE ARE ON THE OTHER SIDE OF THE BAASE PANEL DENOTES CONFIGURATION FOR SALE IN THE U S A AND UNITS CONFIGURED FOR EXPORT TO CANADA WILL BE SUPPLIED WITH CORDSET P N A515074 P200 RAPS200 Brewers A414 049 C RAPS200 E DWG 094 067 Page 14 Rough In Drawing for the P200 E UTILITY DATA ELECTRIC 120 1650W 1 REQUIRES 15 SERVICE 120V 1800W 1 REQUIRES 20 SERVICE WATTAGES LISTED ARE FOR MAIN HEATER THIS UNIT ALSO EMPLOYS A 100W SHUTILE HEATER WATER 1 4 FLARE FITTING REAR CONNECTION 120V NEMA 5 20 OR TOP VIEW 120V 5 15 SHOWN WITH TOP PANEL REMOVED Supply Inlet 1 4 Flare Fitting 26 3 16 9 FRONT VIEW SIDE VIEW REAR VIEW ALL MODELS REQUIRE 20 SERVICE IN CANADA REV 1 A094 054 P200 RAPS200 Brewers Page 15 Rough In Drawing for the RAPS200 E UTILITY DATA ELECTRIC 120V 1650W 1 REQUIRES 15 SERVICE 120 1800W 1ph REQUIRES 15A SERVICE WATTAGES LISTED FOR MAIN 17 WATER 1 4 FLARE FITTING REAR CONNECTION 120V NEMA 5 20P OR TOP VIEW 120V NEMA 5 15P SHOWN WITH TOP PANEL REMOVED Supply Inlet 1 4 Flare Fitting 29 S YU 19 9 FRO
8. Cleaning of any category Cleaning is a user s responsibility All warranties are null and void if muriatic or any other form of hydrochloric acid is used for cleaning or deliming our equipment NOTE THIS WARRANTY SUPERSEDES ANY OTHER WARRANTY ALL OTHER WARRANTIES EXPRESSED OR IMPLIED INCLUDING THE WARRANTIES OR MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE OR USE ARE HEREBY EXCLUDED AND DISCLAIMED HOW TO OBTAIN WARRANTY SERVICES Call Grindmaster Service Department toll free at 1 800 695 4500 for technical services or write to Grindmaster Factory Service Center P O Box 35020 Louisville KY 40232 In order to receive warranty service you must provide the serial number of the machine requiring service along with a description of the problem Service will be arranged through one of our authorized local service centers or our factory service center Transportation is the user s responsibility Should it become necessary to transport your machine to a service center make sure it is properly packaged to avoid in transit damage which is not covered by this warranty No field outside or service station work is covered by this warranty without prior authorization by Grindmaster s Service Dept Printed the U S A Grindmaster Corporation 1996 Grindmaster Corporation 4003 Collins Lane Louisville KY 40245 USA 800 695 4500 502 425 4776 502 425 4664 www grindmaster com
9. FILL Disassemble valve and clean or and N on level replace plunger if frozen If plunger control but no fill is OK coil may need replacement P200 RAPS200 Brewers Page 8 Troubleshooting Filling Heating and Brewing con t Heating Problems The heating system consists of the following components Thermostat located on the tank or on the front of top control panel under top cover Heating Element located on top of tank under top cover Problem Possible Cause Service Check Tank does not Thermostat faulty or Make sure thermostat Recalibrate thermostat If no reme heat out of calibration is turned on dy or thermostat does not cycle replace thermostat Heater faulty Check resistance If resistance is much different than 7 across elements with to 10 ohms replace heater wires disconnected Recovery time is very Heater faulty See above See above long If you still need help call our Service Department at 800 568 5715 press 2 Monday through Friday 8 a m 6 p m EST or an authorized service center in your area Please have the model and serial numbers ready so that accurate information can be given Prior authorization must be obtained from Grindmaster Technical Services Department for all warranty claims P200 RAPS200 Brewers Page 9 Troubleshooting Filling Heating and Brewing con t Brewing Problems The brewing system consists of the following components Start and Stop switches
10. the brew basket and line it with a paper filter Paper size is 13 x 5 Filter BB1 5WP Place ground coffee in the filter basket Your coffee supplier can help you select the right amount of coffee and grind Coffee brewing experts recommend between 6 5 and 8 ounces of coffee per gallon of water for most applications A full Shuttle is 1 5 gallons Slide the basket into the brewer making sure the spout lines up with the top of the Shuttle or Airpot Check that the correct batch size is selected Check the READY light If lit press START Brew time is about 5 minutes for Shuttles and 4 minutes for 3 0L Airpots After the brew allow the coffee to drip for 1 to 2 minutes CAUTION HOT LIQUID HAZARD COFFEE BASKET CONTAINS VERY HOT WATER UNTIL THE DRIP IS COMPLETED EARLY REMOVAL OF A DRIPPING BASKET COULD RESULT IN BURNS Dump the grounds from the basket and rinse for the next brew Coffee is ready to serve The Shuttle may be placed on remote warming stations Use caution when moving a full Shuttle or Airpot P200 RAPS200 Brewers Page 3 Adjustments WARNING ELECTRIC SHOCK HAZARD DANGEROUS ELECTRIC VOLTAGES ARE PRESENT NEAR ADJUSTABLE COMPONENTS ALL ADJUSTMENTS SHOULD BE PERFORMED BY QUALIFIED SERVICE PERSONNEL ONLY All adjustable components are located under the top cover To access these parts 1 Unplug the brewer 2 Remove the screw fastening the top cover Remove the top cover Brew Volume Adjustment
11. EMA 5 15P A61530 28 WIRING HARNESS NOT SHOWN A550 185 29 SPRAYHEAD NOT SHOWN APT400 105 30 ASSY BYPASS VALVE COLUMBIA 718 111 DENOTES CONFIGURATION FOR SALE IN THE U S A AND UNITS CONFIGURED FOR EXPORT TO CANADA WILL BE SUPPLIED WITH CORDSET P N A515074 P200 RAPS200 Brewers 5200 DWG A094 058 2 REV Page 13 Exploded View for the RAPS200 G version only ITEM DESCRIPTION PART COVER WELDMENT A413 027 TANK COVER HOLDER A314 538 1800W 120V HEATER A535 058 ELECTRODE ASSEMBLY 712 018 ELECTRODE KEEPER A314 052 PILOT THERMOSTAT KIT 712 046 BULKHEAD SS W A538 120 ASSY TANK FILL TUBE A718 174 FITTING ASSY HOSE X 1 8 A518 012 VALVE WATER FILL A537 154 GROMMET A554 008 BREW VALVE 537 129 SILICONE ELBOW MOLDED A548 129 RELAY HEATER A531 074 TIMER W RELAY A530 016 POTENTIOMETER ASSY LIQUID LEVEL CONTROL RED HOT WATER FAUCET AMBER PILOT LAMP STOP SWITCH 531 066 549 006 537 043 515016 531 063 START SWITCH A531 062 AIRPOT SOLD WITH SYSTEM SHUTTLE SOLD WITH SYSTEM WARMER SHORT SOLD W SYSTEM WARMER SOLD WITH SYSTEM AIRPOT STOP S AAP 3 ACS LL AABW R6 ACW 1 A320 143 1 ADJUSTABLE LEGS CORD POWER 120V NEMA 5 15P WIRING HARNESS NOT SHOWN DEFLECTOR SPRAY NOZZLE BROWN 545
12. NT VIEW SIDE VIEW REAR VIEW NOTE ALL MODELS REQUIRE 20A SERVICE CANADA DURS NO dde nos REV B P200 RAPS200 Brewers Page 16 Wiring Diagram for P200 E RAPS200 E L1 CHD HEATER HEATER RELAY 1 8 ar TERM 4 SHUTTLE WARMER COMPONENTS MODELEGAF 00300 3541AM P200 RAPS200 Brewers Page 17 WARRANTY for P200 RAPS200 Series EFFECTIVE MARCH 1 1996 GENERAL WARRANTY INFORMATION Grindmaster maintains the highest standard of quality control in the manufacturing of American Metal Ware products We use the finest components and materials and employ quality engineering standards and tests The P200E Brewer is warranted for a period of one year from date of shipment This warranty will include parts and labor but will not cover transportation and shipping charges and will be limited to equip ment sold to commercial purchasers and installed in the continental U S A Hawaii Alaska and Canada EXCEPTIONS Coverage is not included for labor needed or caused by e Adjustments of temperature or flow rates or timers These adjustments are covered in the technical manual provided and subject to user preferences This warranty does not cover maintenance consumable parts such as o rings seat cups washers These are subject to NORMAL wear or everyday usage and are a responsibility of the user Accident Improper installation Neglect or abuse Excessive lime mineral content of water used
13. P200E Shuttle amp RAPS200E Airpot Shuttle Brewer Series Operation and Instruction Manual Table of Contents Installation and Start up Operation Installation 4 WARNING ELECTRIC SHOCK HAZARD INSTALLATION OF THIS APPLIANCE SHOULD BE PERFORMED BY QUALIFIED SERVICE PERSONNEL ONLY IMPROPER Troubleshooting INSTALLATION COULD RESULT IN ELECTROCUTION Filling Problems Service See rough in drawings in this manual for dimensions and locations of Heating Problems electric and water input Brewing Problems Set Up Position Exploded View for P200 E Exploded View for P200 G version Exploded View for RAPS200 E 2 Position the brewer on a strong stable table or counter Check the level front to back and side to side Adjust the legs to the correct level 1 Remove the brewer from the packing material and attach its legs Exploded View for RAPS200 G version Rough In Drawing for P200 E f IMPORTANT Rough In Drawing for RAPS200 E THE PERSON INSTALLING THIS APPLIANCE IS RESPONSIBLE Wiring Diagram for P200E RAPS200 E FOR ENSURING THAT ELECTRIC AND WATER CONNECTIONS MEET THE REQUIREMENTS OF THE NATIONAL ELECTRIC CODE NATIONAL PLUMBING CODE AND ANY LOCAL Prior authorization must be obtained from ORDINANCES Grindmaster for all warranty claims Water Hook up 1 Water inlet supply fitting is located at rear of unit 2 Use 1 4 copper or flexible water line to prevent strain Do not use low te
14. WN 29 VALVE BRACKET WELDMENT 30 NOZZLE BROWN ACS LL A531 061 545 004 535 018 61530 548 128 550 185 414 049 548 127 THE TWO PARTS SHOWN THE OTHER SIDE OF THE BAASE PANEL UNITS CONFIGURED WITH 1800W TANK HEATING ELEMENT AND 100W WARMER ELEMENT FOR A TOTAL OF 1900W SEE RATING LABEL UTILIZE ELEMENT P N A535 058 AND CORDSET P N A515074 P200 RAPS200 Brewers 16 7 8 9 99 D 02 P 200E DWG 94 066 Page 12 Exploded View for the RAPS200 E ITEM DESCRIPTION PART 1 COVER WELDMENT A413 027 2 TANK COVER HOLDER A314 538 3 1800W 120V HEATER A535 058 4 ELECTRODE ASSEMBLY A712 018 5 ELECTRODE KEEPER A314 052 6 PILOT THERMOSTAT KIT A712 046 7 BULKHEAD SS W HEX NUT A538 120 8 ASSY TANK FILL TUBE A718 174 9 FITTING ASSY HOSE X 1 8 A518 012 10 VALVE WATER FILL A537 154 11 GROMMET A554 008 12 BREW VALVE A537 129 13 ASSY SPRAY TEE MANUAL BYPASS _A725 081 14 RELAY HEATER A531 074 15 TIMER W RELAY 530 016 16 POTENTIOMETER ASSY 531 066 17 LIQUID LEVEL CONTROL A549 006 18 RED HOT WATER FAUCET A537 043 19 AMBER PILOT LAMP A515016 20 STOP SWITCH A531 063 21 START SWITCH A531 062 22 AIRPOT SOLD WITH SYSTEM AAP 3 23 SHUTTLE SOLD WITH SYSTEM ACS LL 24 WARMER SHORT SOLD W SYSTEM AABW R6 WARMER SOLD WITH SYSTEM ACW 1 25 AIRPOT STOP S A320 143 26 1 ADJUSTABLE LEGS 545 032 27 CORD POWER 120V N
15. mperature plastic tubing The connection is 1 4 flare lt Water line pressure must be from 30 to 70 psi gt Hot to 160F or cold water may be used Hot water offers faster recovery between brews Use cold water only if in line water filters are implemented before the brewer Install a shut off valve near the brewer 2 a Installing a filtering system can improve the taste of brewed coffee and extend the life of the brewer If your water has high calcium lime chlorine or iron content this is especially important The filter should be the lime inhibiting type if cold water is used Contact our Customer Service Department to select the filter for your conditions Grindmaster Corporation 4003 Collins Lane Louisville KY 40245 USA 502 425 4776 800 695 4500 800 568 5715 Technical Service Only FAX 502 425 4664 www grindmaster com Grindmaster Corporation 1996 1004 FORM AM 308 06 Printed in the U S A Part A090 085 Installation con t Electric hook up 1 The electric ratings for your brewer are printed on its nameplate Typical electric ratings are 120V 1 65 kW 15 Amp 1 phase 2 The brewer should be connected to its own circuit with a fused disconnect switch or a circuit breaker near the brewer 3 Electrical connection is made with power cord with NEMA 5 15P grounded plug supplied to 120V 15 Amp wall socket Certain models may be equipped with a NEMA 5 20P cordset and
16. on fill valve 6 Pull tube through the brewer body so that it exits at the bottom 7 Place tube over drain and release clamp To Remove The Heater 1 Disconnect power and remove top cover of brewer 2 Disconnect wire leads to heater 3 Remove tank cover by loosening retaining nuts Remove heater from cover 4 Replace heater with sealing washers in same configuration When tightening nuts hold element so it does not twist 5 Replace tank cover 6 Replace heater wires Be sure all electrical connections are secure 7 Replace top cover of brewer and connect power cord to outlet P200 RAPS200 Brewers Page 7 Troubleshooting Filling Heating and Brewing Filling Problems The filling system consists of the following components Liquid Level Control located behind the brewer front panel Liquid Level Probes located on the tank top secured by wing nut under the top cover Fill Valve located behind the front panel Overfilling Fill valve not sealing Water entering tank Disassemble valve and clean out watertank even properly continuously usually dirt Valve may need new plunger when power is off slowly if seal is worn Fill valve installed Look for direction of If arrow on valve is pointing toward backwards arrow on valve body water inlet remove valve and install correctly Overfilling High electrode coated Jumper HI terminal on Remove electrode assembly and watertank only with lime or faulty level control
17. ssfully DIP IT manufactured by Economics Laboratories Inc 4 Corporate Park Drive White Plains NY 10604 OXYLITE manufactured by Avril Inc Syndet Division 601 N Third Street Reading PA 19601 Scrub the liner interior with a plastic bristle brush Remove the knurled nut at the top of the gauge glass and clean the glass with a small bottle brush Pour out the contents of the Shuttle Remove the handle assembly of the Shuttle faucet by unscrewing the plastic bonnet Gently wash the faucet seat cup with a soft cloth and warm soapy water Wash the faucet shank with a bottle brush Clean the warmer and bottom of Shuttle surfaces These surfaces must be clean for proper heat transfer Polish the exterior of the brewer with stainless steel cleaner Use the appropriate cleaner for brass copper or vinyl if these optional finishes are provided P200 RAPS200 Brewers Page 6 Service The rest of this manual contains information to help the service person who is working on this equipment This section has information on performing common service tasks To Drain The Water Tank CAUTION HOT LIQUIDS BURN HAZARD WATER IN TANK IS VERY HOT USE CAUTION WHEN DRAINING TANK ACCIDENTAL SPILLS MAY RESULT IN SEVERE BURNS Shut off power to brewer 2 Remove the top panel 3 Remove the warmer shelf 4 Pinch or clamp the tube from fill valve to tank near tank entry on bottom 5 Disconnect rubber tube from outlet barb
18. to metal clean both probes If this does not when power is on enclosure stops fill work replace assembly Missing or faulty Jumper from C Make secure connection of C to connection of C terminal to metal body metal body terminal on level stops fill control to metal enclosure Fill valve connected to Check connections Connect black lead for valve to heat terminal on level FILL on level control control Liquid level control is Jumper from HI to C Replace level control faulty or metal enclosure does not stop fill Tank does not refill No power at Nothing operates Check main switch or circuit equipment breaker brewer s circuit breaker or power switch if provided No water at Crack water inlet Make sure all water supply line equipment fitting valves are open Water strainer Water pressure Remove and clean or replace clogged before strainer but strainer s mesh not after No power to level Check for 120V AC If no voltage check for loose or control across H and N broken wires terminals on level control Level control faulty Disconnect probe If no 120V at FILL terminal replace wire to HI terminal on level control level control Check for 120V at FILL terminal Electrodes faulty Tank fills only when Replace electrodes If no remedy probe wire is check for improper wiring or level disconnected from probe tip touching metal terminal on level control Fill valve faulty 120V is across
Download Pdf Manuals
Related Search
Related Contents
Scan-Test™ Scan-Test™ Infinity GPS-MIC-1 GPS Receiver User Manual Hoover U8351900 vacuum cleaner Energy Sistem Aquatic 2 Oreck AIR94 User's Manual La composition des recueils de La Fontaine : esquisse d`un 【空間衛生除菌水クリンメソッドシャワーポンプ】 取扱説明書 Samsung L301 User Manual Copyright © All rights reserved.
Failed to retrieve file