Home
Chief FCA103 mounting kit
Contents
1. Installation Instructions FCA103 LEGEND Tighten Fastener Apretar elemento de fijaci n Befestigungsteil festziehen Apertar fixador Serrare il fissaggio Bevestiging vastdraaien Serrez les fixations Pencil Mark Marcar con l piz Stiftmarkierung Marcar com l pis Segno a matita Potloodmerkteken Marquage au crayon Loosen Fastener Aflojar elemento de fijaci n Befestigungsteil l sen Desapertar fixador Allentare il fissaggio Bevestiging losdraaien Desserrez les fixations Drill Hole Perforar Bohrloch Fazer furo Praticare un foro Gat boren Percez un trou Phillips Screwdriver Destornillador Phillips Kreuzschlitzschraubendreher Chave de fendas Phillips Cacciavite a stella Kruiskopschroevendraaier Tournevis a pointe cruciforme Adjust Ajustar Einstellen Ajustar Regolare Afstellen Ajuster Open Ended Wrench Llave de boca Gabelschl ssel Chave de bocas Chiave a punte aperte Steeksleutel Cl a fourche Remove Quitar Entfernen Remover Rimuovere Verwijderen Retirez By Hand A mano Von Hand Com a mao A mano M
2. go ae Gei Figure 5 Adjust depth of brackets depending on depth of CPU to install Remove four screws and nuts holding adjustment screws in place and replace after desired depth is acheived See Figure 6 0 S Figure 6 Make all CPU connections and place CPU securely on shelf Use hook and loop strap J to secure CPU to shelf C See Figure 7 bottom view J Figure 7 Installing Fusion Mount to FCA103 1 Use four 5 16 18 x 5 8 hex head bolts D and four 5 16 washers G to secure Fusion rail mount to brackets A and B See Figure 8 Fusion rail mount example A e We ER P Figure 8 2 Install display to Fusion mount following the Fusion mount s installation instructions FCA103 Installation Instructions CHIEF Our Mounts Your Vision Chief Manufacturing a products division of Milestone AV Technologies 8800 002103 Rev00 2011 Milestone AV Technologies a Duchossois Group Company www chiefmfg com 08 11 USA International Europe Asia Pacific 8401 Eagle Creek Parkway Savage MN 55378 800 582 6480 952 894 6280 877 894 6918 952 894 6918 Fellenoord 130 5611 ZB EINDHOVEN
3. Concrete Wall 1 Determine the center of the TV screen and where it should be located on the wall O anchors x 4 D er 2 Line up the notches on bracket A and B with center of screen marking to determine vertical center See Figure 1 3 Measure up 8 3 4 222 2mm from the center point to mark location of the upper mounting slots See Figure 1 4 Using a level mark the wall through both upper mounting slots See Figure 3 A SG CAUTION MINIMUM HORIZONTAL DISTANCE Ki S BETWEEN WALL BRACKETS IS 16 406 4mm Do not e place mounting brackets closer together than 16 406 4mm per WARNING INSTALLING THE FCA103 INTO S UNDERRATED OR DAMAGED CONCRETE CAN LEAD TO Si SERIOUS INJURY OR DAMAGE TO PRODUCT When a installing into concrete only install the FCA103 into concrete at least 8 in depth or into 8 x8 x16 concrete blocks Never QD mN x4 install the FCA103 into cracked chipped or flaking concrete y reverse brackets to install CPU shelf to the outside WARNING ELECTRICAL SHOCK HAZARD CUTTING OR DRILLING INTO ELECTRICAL CORDS OR CABLES CAN CAUSE DEATH OR SERIOUS PERSONAL INJURY Installing Shelf to Brackets ALWAYS make certain area behind mounting surface is free of electrical wires and cables before drilling or installing 1 Hang shelf bracket C onto right wall bracket B See fasteners Figure 4 Figure 3 so WARNING EXPLOSION AND FIRE HAZARD CUTTING PA OR DRILLI
4. INSTALLATION INSTRUCTIONS Fusion CPU Extender Accessory a CHIEF FCA103 Our Mounts Your Vision FCA103 Installation Instructions DISCLAIMER Milestone AV Technologies and its affiliated corporations and subsidiaries collectively Milestone intend to make this manual accurate and complete However Milestone makes no claim that the information contained herein covers all details conditions or variations nor does it provide for every possible contingency in connection with the installation or use of this product The information contained in this document is subject to change without notice or obligation of any kind Milestone makes no representation of warranty expressed or implied regarding the information contained herein Milestone assumes no responsibility for accuracy completeness or sufficiency of the information contained in this document Chief is a registered trademark of Milestone AV Technologies All rights reserved A IMPORTANT WARNINGS AND CAUTIONS WARNING A WARNING alerts you to the possibility of serious injury or death if you do not follow the instructions CAUTION A CAUTION alerts you to the possibility of damage or destruction of equipment if you do not follow the corresponding instructions WARNING Failure to read thoroughly understand and follow all instructions can result in serious personal injury damage to equipment or voiding of fac
5. NG INTO GAS PLUMBING CAN CAUSE DEATH Deg zy OR SERIOUS PERSONAL INJURY ALWAYS make certain C eo area behind mounting surface is free of gas water waste or any other plumbing before cutting drilling or installing fasteners m 5 Drill one 5 16 7 9mm pilot hole at each marking 6 Install an anchor into each pilot hole using a hammer making sure that the anchor is flush with the wall NOTE If desired CPU location is off to the side of the display reverse brackets A and B from how they are shown in Figure 3 ol 5 of A g NOTE Either Fischer UX10 anchors or the concrete anchors o P 48 shipped with the Fusion mount may be used 7 Use two 5 16 x 2 1 2 lag bolts and two 5 16 flat washers Figure 4 to attach top of brackets A and B to anchors in wall i 2 Use 10 24 x 5 8 carriage bolt E 10 24 wing nut L 8 Mark the attachment points for the lower mounting slots 1 4 washer F and 10 washer H to secure locking tab See Figure 3 K to right wall bracket B See Figure 5 9 Drill one pilot hole at each marking for lower mounting holes See Figure 3 10 Install an anchor into each pilot hole using a hammer 11 Use two 5 16 x 2 1 2 lag bolts and two 5 16 flat washers to attach the brackets to the wall through the lower mounting holes See Figure 3 Installation Instructions FCA103 N A oF
6. The Netherlands 31 0 40 2668620 31 0 40 2668615 Room 24F Block D Lily YinDu International Building LuoGang BuJi Town Shenzhen CHINA RY TH SS AN BGR ab E BR A E DPR 24F P 86 755 8996 9226 F 86 755 8996 9217 4 K2 RS 7 Pn 0 Pn 0 P K 7 Consue
7. et de hand A la main Optional Opcional Optional Opcional Opzionale Optie En option e d y E d 2 Hex Head Wrench Llave de cabeza hexagonal Sechskantschl ssel Chave de cabeca sextavada Chiave esagonale Zeskantsleutel Cl a t te hexagonale s GI Security Wrench Llave de seguridad Sicherheitsschl ssel Chave de seguranca Chiave di sicurezza Veiligheidssleutel Cl de s curit FCA103 Installation Instructions TOOLS REQUIRED FOR INSTALLATION e p 7 32 5 5mm Wood Stud 5 16 7 9mm Concrete N s a Dy Q SY u Je Al left wall bracket J 1 hook and loop strap B 1 right wall bracket KS D 4 E 1 5 16 18x 5 8 410 24 x 5 8 gei 0 s A 2 N Hl e oO ge C 1 shelf bracket G 4 H 1 5 16 10 K 1 L 1 locking tab 10 24 Installation Instructions FCA103 INSTALLATION Locate Mounting Site WARNING Exceeding the weight capacity can result in serious personal injury or damage to equipment Itisthe installer s responsibility to make sure the combined weight of all components atttached to the FCA103 does not exceed 250 Ibs 113 4 kg or the maximum weight limit of the specific F
8. re 2 WARNING ELECTRICAL SHOCK HAZARD CUTTING OR DRILLING INTO ELECTRICAL CORDS OR CABLES CAN CAUSE DEATH OR SERIOUS PERSONAL INJURY ALWAYS make certain area behind mounting surface is free of electrical wires and cables before drilling or installing fasteners WARNING EXPLOSION AND FIRE HAZARD CUTTING OR DRILLING INTO GAS PLUMBING CAN CAUSE DEATH OR SERIOUS PERSONAL INJURY ALWAYS make certain area behind mounting surface is free of gas water waste or any other plumbing before cutting drilling or installing fasteners 6 Drill one 7 32 5 5mm pilot hole in each stud 7 Use two 5 16 x 2 1 2 lag bolts and two 5 16 flat washers to attach top of brackets A and B to wall See Figure 2 NOTE If desired CPU location is off to the side of the display reverse brackets A and B from how they are shown in Figure 2 reverse brackets to install CPU shelf to the outside Figure 2 8 Mark the attachment points for the lower mounting slots making sure the attachment points are located on the studs See Figure 2 9 Drill 7 32 5 5mm pilot holes at markings for lower mounting holes See Figure 2 10 Use two 5 16 x 2 1 2 lag bolts and two 5 16 flat washers to attach the mount to the wall through the lower mounting holes See Figure 2 11 Proceed to Installing Shelf to Brackets Section FCA103 Installation Instructions Installing to a
9. tory warranty It is the installer s responsibility to make sure all components are properly assembled and installed using the instructions provided WARNING Failure to provide adequate structural strength for this component can result in serious personal injury or damage to equipment It is the installer s responsibility to make sure the structure to which this component is attached can support five times the combined weight of all equipment Reinforce the structure as required before installing the component The wall to which the mount is being attached may have a maximum drywall thickness of 5 8 1 6cm WARNING Exceeding the weight capacity can result in serious personal injury or damage to equipment It is the installer s responsibility to make sure the combined weight of all components atttached to the FCA103 does not exceed 250 Ibs 113 4 kg or the maximum weight limit of the specific Fusion mount being attached The maximum weight that can be installed onto the FCA103 shelf is 30 lbs 13 6 kg 312 7 12 31 10 7 ZE SI 69 3 SYD 76 2 273 3 00 MIN DEPTH te i Ir 127 5 00 MAX DEPTH a Di 1 406 4 16 00 MINIMUM STUD SPACING Jo of I o o i IN 00100 O 1 La N 444 5 17 50 pas 15 10 i 469 9 a 304 8 18 50 gt POU lt 12 00 8 o 1 og0dQ0 o St 1 a lo S cH
10. usion mount being attached The maximum weight that can be installed onto the FCA103 shelf is 30 Ibs 13 6 kg The FCA103 can be installed to either wood studs or a concrete wall The minimum distance between fasteners must be 16 whether installing to 2 x 4 wood studs or concrete NOTE Proceed to either the Installing to a Wood Stud Wall section or the Installing to a Concrete Wall section NOTE If already installed Fusion mount must be uninstalled prior to FCA103 installation Set aside wall mounting hardware as it will be used again for FCA103 mounting Installing to a Wood Stud Wall 1 Determine the center of the TV screen and where it should be located on the wall 2 Locate the closest 2 x 4 stud to the left and right of the selected location NOTE If the screen area lies over a stud use that stud and the stud to either the left or right of it 3 Line up the notches on mount A with center of screen marking to determine vertical center See Figure 1 4 Measure up 8 3 4 222 2 mm from the center point to mark location of the upper mounting slots Center of screen Ei 5 2 o fo O fo 8 3 4 222 2mm 4 l oO OO fo oO oO Fr HH Vertical center of mount EEE Figure 1 5 Using a level mark the wall on each stud to attach the brackets through the upper mounting slots See Figu
Download Pdf Manuals
Related Search
Related Contents
Philips SWV2742T User's Manual ダウンロード Imaging FlowCytobot - McLane Research Laboratories, Inc. User Manual - Trade Connect Page 1 Page 2 はじめに このルームエアコンは、 一般家庭の人を対象と a los niños a salvo Traitement des verrues USER`S MANUAL - Sophie Systems R0560031 S gel lftside p6no ins Craftsman Heavy-Duty Stainless Steel Rolling Cabinet Service Parts Copyright © All rights reserved.
Failed to retrieve file