Home

Chief SSC4 security or access control system

image

Contents

1. INSTALLATION INSTRUCTIONS BRACKET SSC 4 The SSC bracket 1s designed for adding additional security to installations By installing the SSC a locking device can be placed to obscure access to fastening hardware Unpack and check contents see Figure 1 N P Figure 1 2 SSC 3 5 16 clearance hole 1 M4 Flat Washer 3 SSC 1 10 clearance hole 1 M5 Flat Washer 1 10 24 x 25 Phillips Head Cap Screw 1 M6 Flat Washer 1 5 16 18 x 625 Button Head Cap Screw 1 3 16 Hex Key 1 Remove one of the 10 24 screws from the projector s SLB interface bracket see Figure 2 Figure 2 2 Replace the 5 16 set screw of the RPA projector mount with the supplied 5 16 Button Head Cap Screw and an SSC 3 see Figure 3 RPA SET SCREW HOLE 5 16 18 X 625 BUTTON HEAD CAP SCREW Figure 3 3 Install an SSC 1 bracket in one pitch and one roll adjustment screw on the RPA projector mount see Figure 4 amp Figure 5 CHIEF MANUFACTURING INC 8802 000130 1 800 582 6480 952 894 6280 FAX 952 894 6918 2004 Chief Manufacturing 12800 HIGHWAY 13 SOUTH SUITE 500 www chiefmfg com SAVAGE MINNESOTA 55378 USA 01 04 ROLL ADJUSTMENT SCREWS SPITCH ADJUSTMENT SC 1 SCREWS 10 24 SCREW FROM 4 PROJECTOR me ROLL ADJUSTMENT SCREWS Figure 4 Figure 5 4 Place an SSC 3 bracket on one of the mounting points of the SLB interface bracket see Figure 6 Depending on the screw size a flat wa
2. sher provided may be necessary Figure 6 5 Install the projector on the RPA ceiling mount 6 Install the final SSC 1 bracket and 10 24 x 25 screw provided into the hole from Step 1 see Figure 7 Figure 7 7 Install locking device in each of the SSC brackets or connect all five by a cable making sure the head of each screw is covered see Figure 8 Lock not included Figure 8

Download Pdf Manuals

image

Related Search

Related Contents

temporizador eletrônico digital microprocessado  ergo-memo-Bedienungsanleitung  IHR AUSRÜSTER FÜR DIE BAUVERMESSUNG 2011  77BCA38A3  

Copyright © All rights reserved.
Failed to retrieve file