1. Installation instruction ARAT Special mount for Navigation Systems Part No NS 1304 for Chrysler PT Cruiser 2000 Remove the switch panel from the front panel and remove the electrical plug Remove the F front panel securing screw pull off the rotating switches and prise the front panel off from its clip springs Rotating switches Installation of ARAT mount Place the ARAT mount to the contours of the dashboard and secure the mount through the metal plate with the supplied screws 4 2 X 13 into the material of the dashboard edge Cable channeling Place the cable to the display behind the front panel and through the small cut out in the front panel place the cable in the pre formed channel in the ARAT mount to the display screen ARAT GmbH Hauptstrasse 33758 Stukenbrock Germany Tel 49 5207 8952 52 Fax 49 5207 8952 68 E mail info arat de Website wwwarat de