Home

Ecoquest Fresh Air Air Purifier

image

Contents

1. 099999 9995680000 S MANUAL OWNER Specifications RCI TECHNOLOGV ECOQUEST INTERNATIONAL e Installation e Operation CERTIFIED Features SeHnoro gt e Maintenance CAUTION Read manual carefully for proper procedures and operation CONGRATULATIONS on your purchase of a Fresh Air DuctwoRx air purification enhancement system This unit is designed to be installed into an existing HVAC system and used as a virtually maintenance free enhancement to EcoQuest s air purification technology Please read and follow all service procedures outlined in this manual Use only genuine EcoQuest replacement parts available from your EcoQuest Dealer If you have any questions concerning this or any EcoQuest product contact your EcoQuest Dealer Please record the name and phone of your EcoQuest Dealer Name Phone Please record the serial number of your Fresh Air DuctwoRx Serial CONTENTS Product Contents io AA iR 3 Installation Hardware 2209 ie secure sunk tok ea Den Pee 3 Replacement Parts A A A FREES hw 3 Specifications A DER A RES 4 About DuctwORX ann anne e EY t ed ne d 4 Recommended Installation Tools 5 Installation 5 Metal Ductwork Installation I 6 Fiberglass Ductwork Installation 8 Maintenance UV Lamp Indicator 0 cece cece cence tence ence eee 10 Dispo
2. glow when the UV lamp is in use If the indicator does not glow and the unit has power the RCI cell should be replaced DISPOSAL OF THE RCI CELL Please do not throw a used RCI cell into the garbage The special germicidal UVX bulb used in the DuctwoRx contains a very small amount of mercury You may return your used RCI cell to EcoQuest for proper disposal Send the used cell post paid to EcoQuest International RCI Disposal 55 Marley Drive Greeneville TN 37743 Did you forget to register your Fresh Air DuctwoRx By registering you ll activate your warranty and your privacy is guaranteed Just fill out your warranty card and drop it in the mail WARRANTY INFORMATION This product is of solid state construction and is under warranty by EcoQuest International 310 T Elmer Cox Drive Greeneville TN 37743 to the original purchaser depending on model to be free from defect in materials and workmanship for a limited time Length of warranty will vary depending on model See warranty card for specific details If you have any questions concerning your Fresh Air DuctwoRx please see your local EcoQuest Dealer For help visit www EcoQuest com 10 CHANGING THE RCI CELL WARNING UV Light in operation Disconnect unit from power supply before servicing Failure to follow warnings may result in severe eye damage 1 Unplug unit If the unit is hard wired be 2 Remove the 4 mounting nuts sure the power
3. included template ALTERNATIVE CUTTING METHOD b Drill 4 holes where marked a Using template mark 4 holes on duct CB4 Mar For FIBERGLA MARKIF USING ALTERN MARK CENTER Fl MARKIF USING ALTERN QM MARK FOR FIBERGLA SS DUCT INSTALLATION 0 ATIVE CUTTING METHOD OR 3 5 HOLE SAW ATIVE CUTTING METHOD 55 DUCT INSTALLATION 0 METAL DUCTWORK INSTALLATION cconrinuen S 5 Remove backing from mounting plate 6 Center openings and press mounting plate onto adhesive gasket duct The adhesive gasket will hold the mounting plate in place 7 Secure the mounting plate using 8 8 self 8 Insert unit into opening Be sure the air will pass tapping screws though the RCI cell honeycomb matrix Q 9 Secure the unit to the mounting plate with 10 Plug unit into working power receptacle 4 46 32 nuts Hard wiring unit into HVAC system A should be done by a licensed HVAC installer or electrical contractor only FIBERGLASS DUCTWORK INSTALLATION 1 Locate suitable area a 6 feat max 2 Mark location for 3 5 opening using either of duct for installation the mounting plate or included template Also pd mark the locations of 4 screw holes in corners see template 3 Cut hole in duct using 3 5 hole saw 4 Drill 4 holes at corner screw locations using a 3 6 drill bit ALTERNATIVE CUTTING METHOD
4. Eg SS b Draw a line between each corner mark a Using template mark 4 holes on duct C Cut between holes using a utility knife Continue with 4 above FIBERGLASS DUCTWORK INSTALLATION Stud 5 Insert 4 2 Threaded bolts into screw holes 6 Remove backing from mounting plate at corners of mounting plate Attach 4 toggle adhesive gasket bolt anchors to ends of threaded bolts 7 Insert 4 toggle bolts into 3 8 holes in duct 8 Center large opening in mounting plate over Be sure toggle anchors open after inserting 3 5 opening in duct and press plate to duct The adhesive gasket will hold the mounting plate into place Tighten toggle bolts DO NOT OVERTIGHTEN 9 Insert unit into opening Be sure the air will 10 Secure the unit to the mounting plate with pass though the RCI cell honeycomb matrix 4 48 32 nuts 11 Plug unit into working power receptacle Hard wiring unit into HVAC system should be done by a licensed HVAC installer or electrical contractor only MAINTENANCE UV LAMP INDICATOR Your DuctwoRx unit requires no periodic maintenance beyond normal replacement of the RCI cell every 3 years Note For optimal performance EcoQuest recommends UV lamp operation indicator the replacement of the RCI cell every 3 years even if the UV lamp appears to be operating normally The UV lamp operation indicator on the face of the unit will
5. N OF CONFORMITY Name EcoQuest Model Fresh Air DuctwoRx Manufacturer EcoQuest Manufacturing This device complies with Part 18 of the FCC Rules RESPONSIBLE PARTY EcoQuest International 310 T Elmer Cox Dr Greeneville TN 37743 Ph 800 989 2299 Signature C a dell Printed Name R Paul Beam Title Engineering Manager Date 7 9 04 EcoQuest International 310 T Elmer Cox Drive Greeneville TN 37743 423 638 7246 INTERNATIONAL Healthy Living Technologies EcoQuest Fresh Air DuctwoRx Fresh Air by EcoQuest RCI Radiant Catalytic lonizer are Trademarked by EcoQuest International EcoQuest International Healthy Living Technologies Fresh Air by EcoQuest Logo are Registered by EcoQuest International 65 00117 004 DW 9IN OM 0406
6. door air contaminants Fresh Air DuctwoRx is easily mounted into air conditioning and heating system air ducts where many problems can start When the HVAC system is in operation DuctwoRx creates an Advanced Oxidation Process consisting of hydroperoxides superoxide ions and safe low level ozone all friendly oxidizers that revert back to oxygen and hydrogen after the oxidation of a pollutant Used in conjunction with other EcoQuest air purification systems Fresh Air DuctwoRx can boost effectiveness and help distribute their benefits throughout your home WARNING UV Light in operation Disconnect unit from power supply before servicing Failure to follow warnings may result in severe eye damage To reduce the risk of electric shock this equipment may have a grounding type plug that has a third grounding pin This plug will only fit into a grounding type power outlet If the plug does not fit into the outlet contact qualified personnel to install the proper outlet Do not alter the plug in any way RECOMMENDED INSTALLATION TOOLS 3 1 2 Hole Saw Drill Power Driver Phillips Screwdriver 3 8 Drill Bit for wood or metal if installing into fiberglass recommended ducting with toggle bolts You may also need 1 4 lt ji 11 32 Open End Wrench 1 4 Nut Driver Bit Utility Knife Tin Snips for metal ductwork INSTALLATION REQUIREMENTS Installation Requirements n
7. n 1 Unit should be installed after the air handler in the HVAC system Min 8 x 8 2 The duct work around the installation area should be clean and dry to insure proper adhesion of the asket materials and any tape used Air 8 6 y tap Handler 3 An approximate 3 5 8 89 cm opening will need to be cut into the existing duct work to install the 120 volt grounded outlet unit properly Electrical Requirements 110 volt units only To use the 120 volt plug be sure to locate the unit within 6 ft of a standard 120 volt grounded outlet Long term use of an extension cord is not recommended due to safety considerations Hardwiring Requirements All units A Permanent wiring of the unit into your HVAC system or installations using a 220 volt plug not included should be done by a licensed HVAC installer or electrical contractor only WARNING UNIT IS EITHER 120 VOLT OR 220 240 VOLT ONLY CHECK SPECIFICATIONS ON LABELING BEFORE INSTALLING For 110 volt units Black L1 White Neutral Green Ground For 220 volt units Black L1 White L2 Green Ground For International Units Brown L1 Blue L2 Green w yellow stripe Ground 5 METAL DUCTWORK INSTALLATION 1 Locate suitable area O 6 feet max 2 Cut away insulation to expose metal duct of duct for installation e if needed 3 Mark location for 3 5 opening using either the 4 Cut hole in duct using 3 5 hole saw mounting plate or
8. sal of the RCI Cell ccc cece cece eee Ie 10 Warranty a ee kiss 10 Changing cece cece cence eens rene een tete 11 This owner s manual is also available online at http www ecoquest com ownersmanuals 2 PRODUCT CONTENTS Mounting Replaceable RCI Cell includes UV Lamp UV bulb indicator Safety Switch INSTALLATION HARDWARE 8 8 75 4 6 32X 2 inch 1 4 Self tapping screws Threaded bolts 4 46 32 Item 0570679 Item US70680 4 48 32 Toggle bolt wall anchors Hex nuts Item US70682 Item US70681 REPLACEMENT PARTS Mounting Plate Item US70683 RCI Cell includes UV Lamp Item US70678 Base Unit A D Location for Protective Earth Line 4 Features Low level O production 0 04 ppm maximum Replaceable RCI Cell Electrical 220 or 240 VAC 50 60 Hz AC line operation depending on model 15 watts power consumption Mechanical Distribution via air handler Size Dimensions 6 x6 x 11 25 15 cm x 15 cm x 28 5 cm Weight 3 pounds 1 2 kg Coverage Covers up to 2000 ft 186 m Warranty Length of warranty will vary depending on model See warranty card for specific details ABOUT DUCTWORX Fresh Air DuctwoRx is a new generation HVAC Air System designed to work with Fresh Air by EcoQuest and Breeze to reduce odors smoke and a broad spectrum of in
9. to the unit is off 3 Remove the unit from the mounting plate 4 Remove the 2 screws holding the RCI Cell 5 Separate the used RCI cell from the base unit and dispose of properly 7 Secure with 2 screws 8 Insert the unit into the mounting plate Gp B 9 Secure unit with 4 nuts 10 Reconnect ower supply p ppy This equipment has been tested and found to comply with the limits for Industrial Scientific and Medical Equipment ISM pursuant to Part 18 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference in a residential installation This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instructions may cause harmful interference to radio communications However there is no guarantee that interference will not occur in a particular installation If this equipment does cause harmful interference to radio or television which can be determined by turning the equipment off and on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or relocate the receiving antenna Increase the separation between the equipment and receiver Connect the equipment into an outlet on a circuit different from that to which the receiver is connected Consult the Dealer or an experienced radio TV technician for help FCC DECLARATIO

Download Pdf Manuals

image

Related Search

Related Contents

02 Introduccion - Repositorio Digital-UPS  un francais\anglais  Transient Test System  O Le boom de créations d`entreprises est  Acupuncture Model of Sciatic Nerve  Philips HD3745  Candy CSC 1745 WE  EBDSPIR-AT-DD User Guide  

Copyright © All rights reserved.
Failed to retrieve file