Home
APC 1000 VA Power Supply User Manual
Contents
1. UPS 0 h 3 i all Le o V 1 DR i INA SE 3 ll B ell le o Vad IE le IL D L Fun AI NIIP Sad PNE NJ TIN S S nuh fo PE is JI 9 o o nin un Ja o Pl s lo 2 LTTITTITTTTTETTITTITTITITTEIT e E TUI T PIRE E 880 0926 FE 5 z i B ej L n di 880 L m 1880 0940 i I s P o E z 880 0941 I 880 1605 f TAL Install the following baying kit busbars between the UPS and XR 880 1607 between vertical busbar N on the UPS and busbar 4 on XR1 880 1606 between vertical busbar on the UPS and busbar 1 on XR1 880 1605 between busbar on the UPS and busbar 6 on XR1 Install the following baying kit busbars between the two XR Battery Enclosures 880 0926 between vertical busbar 3 on XR1 and busbar 4 on XR2 880 0940 between vertical busbar 2 on XR1 and busbar 1 on XR2 880 0941 between vertical busbar 5 on XR1 and busbar 6 on XR2 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001
2. 352mm 160 mm 6 29 in 13 85 in 90 mm 3 54 in ji li CT T CT eS CT 0 323 mm 675 mm 1027 mm 1379 mm 12 71 in 26 56 in 40 41 in 54 26 in 10 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 Model Width 523 mm 20 59 in 90 mm 3 54 in 160 mm 6 29 in 60 mm 2 36 in 60 mm 2 36 in 60 mm 2 36 in 60 mm 2 36 in B 523 mm 160 mm 6 29 in 20 59 in 90 mm 3 54 in I 1 li P ipux wa rsma T _ DOD I p 0 494 5 mm 1017 5 mm 1540 5 mm 2063 5 mm 19 46 in 40 05 in 60 46 in 81 23 in Connect Floor Anchoring Brackets to the UPS and XR Battery Enclosure for Stability minimum size M8 Follow the specifications given by the manufacturer of the floor Note Floor anchoring bolts are not provided with the UPS Purchase the bolts locally Q anchoring system when bolting the UPS system to the floor 1 Install the L shaped floor anchoring brackets reuse the two transport brackets and secure with the M6 screws and nuts provided 2 Drill two to six holes in the floor for each bracket and attach these with bolts 990 1957C 001 MGE M Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 11 Remove the Batter
3. 3 Remove the conduit plate at the back of the UPS cover and drill holes centered in the small pre drilled holes 2 cm 3 4 in is recommended for conduits 4 Run the ABus and the PBus cables through the conduit holes into the inside of the top cover on UPS 1 Leave the cables on top of the UPS 5 Attach conduits with 2 cm 3 4 in fittings not supplied Run conduits with PBus cables to UPS 2 Pull the cables through the top cover conduit plate and leave the cables on top of the UPS as shown Attach conduits to UPS 2 with 2 cm 3 4 in fittings not supplied 8 Run the ABus cables in conduits if applicable to the maintenance bypass panel 40 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 9 Reinstall the top cover n Note Proceed the routing of cables into UPS 3 and UPS 4 if applicable 990 1957C 001 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 41 Install Seismic Option Install the Seismic Battery Lock Note In seismic areas dispose of the battery securing brackets that were used to secure the Q batteries during transport and use the seismic battery locks to secure the batteries Required parts Four battery locks and 12 M5 screws for narrow battery enclosures Six battery locks and 30 M5 screws for wide battery enclosures 1 Place the battery lock below the battery row 2 Secure the battery lock by the
4. P F a and run the cable upwards inside the panel BEAR IO O 4 Pull the cable out of the side panel through i d S the hole closest to the Network Management EN Card area 5 Plug the cable into the probe socket PowerChute inlet 6 Reattach the cable inlet plate 990 1957C 001 MGE M Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 35 Connect Communication Cables in Parallel System O Note The cables must be run by the electrician but not attached The field service engineer from Schneider Electric will attach all cables to the UPS unit s and install the parallel communication box The below is for overview only Note The PBus cables run from UPS 1 to UPS 2 to UPS 3 and UPS 4 if your configuration consists of 4 UPS units Note The PBus cables are labelled PBus 1 and PBus 2 Overview of the PBus Cables OO0O00 Note The cables must be run by the electrician but not attached The field service engineer from Schneider Electric will attach all cables to the UPS unit s and install the parallel communication box The below is for overview only Note The PBus cables run from UPS 1 to UPS 2 to UPS 3 and UPS 4 if your configuration consists of 4 UPS units Note The PBus cables are labelled PBus 1 and PBus 2 Note PBus 1 cables must be kept together and PBus 2 cab
5. reuse the screws from step 3 Attach conduits to the conduit box Run the cables through the conduits the bottom of the conduit box and up into the cable landing area A Bypass B Output C Battery D Input Attach conduit box top to the conduit box bottom and to the enclosure reusing the screws from step 2 Fasten the cables with cable ties MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 27 Connect the AC Input and AC Output Cables factory preinstalled cables on busbars Use the upper front part of busbar for WARNING Use ONLY compression type lugs Do not loosen or add cables to any A connection only n Note The terminals are only suitable for connection of copper cables Single Mains 1 Connect the AC input cables and the neutral to the input cable landings 2 Connect the AC output cables and the neutral to the output cable landings 3 Connect the ground cables to the studs earth symbol beneath using a screw Si ll Er J kc Dual Mains 1 Remove the three busbars A B and C by removing two M6 screws from each busbar P WTi C tie ECEE ECETIA EIL ETUI s 2 s E 9 LIESS bd PITT en IFI T ep TTE ETJ TS 2 28 MGE Galaxy 35
6. 38 OL SIOVINOO Xnv 8Z VZ WNOLIIQOV NOILVINSNNDO LONGOYd NI 031130 Sv S NILLIS W3ISAS GIYINOIY HIIM GALYNIGYOOD ONY TOYLNOD 2dv MO4 SLOVINOD Xnv 8Z VZ HUM G3lvM ALNG SnonNINOO 08 JUV SUayWaNa OV TW v LAOAW WOISAHd 304 SONIMVHO TVOINVHO3N OL 4343Y 3SV31d LMOAV TWOISAHd JO 3AUVIN3S3Nd3N LON SI ONY SNOILOANNOD WALSAS N3MOd SLOIdIG ONIMVHO STWI3O TWNOILIGGY 804 NOLLVINSNNDOG LONGOYd OL 383338 3SV3ld S3000 TWNOLLWN ONY 1V901 318VOllddv TW HIM AIdWOO TIVHS NOLVTWISNI L SALON RUNS oue 1 pl uuos xNW Arz 98EL00SZ0SZ9ETHH qq nee A009 3104 8O vosz o iL INDHS L S989MX8ISEO S9HZHXHLGEO HO ONLLVH 391 30 sna oq SNg Qy m SW3H10 A8 Q3Gl ONd 318V9 OV EK aua931 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 Single System 10 30 kVA 480 V WN NoILO3 08d 319NV Ol udv 10 Nv RGHS 8 O3ONddY Z 40 L33HS SONIA TWLLINENS 103108 OL HdV 10 ASSIN W ANION wvyovld INN INO W3ISAS Ol NdV 10 VNHSIBM 2 NW 48S INOHUM OON viuo 0 Hd ABOZ 1ndlno 0 A38 OS 19190 3011629 sowa SNIVA 319NIS HdE AO LNdNI 00st AXYWWO 39h qui JPS 3HOLOV4DNVW JHL YO SISVA JHL SV Dvd NI MO TOHM NI 3 3OUON ANOHLIM 39NYH2 OL 1IFENS SI ONY NOIVWHOJNI 3IBVIVAV 1S31V1 NOdN Q3SYH SI ONINVEG SIHL OlIO3T3 M3OIGNHOS WOH4 NOISSIWH3d NALUWM LNOHUM SAL 40 FWS YO YO 0390008433 03400 38 LON
7. Install Busbars in 523 mm 20 59 in UPS System with the UPS Placed to the Right seen from the front UPS XR Battery Enclosure R Battery Enclosure illia ime i Z mp zn E s Ld IT Sm sss ER Y i Ee 1 PIPE e e 3 d 4 5 Waa k n n nunnnnn T T TA REIN B 6 LLLI LETT Ju m 5 i LI Jc g E Un aol el Mn e IE i E 880 1607 ks E 880 0926 B Ja ls Ae 2 2m i T lle T 880 1605 Ell 51880 0077 E 1 e x A p l I E iW E Elh i E i J M fs i o9 ehe ij 880 1606 E 880 0940 1 Install the following baying kit busbars between the UPS and XRI 880 1607 between vertical busbar N on the UPS and busbar 3 on XR1 880 1605 between vertical busbar on the UPS and busbar 1 on XR1 880 1606 between vertical busbar on the UPS and busbar 6 on XR1 2 Install the following baying kit b
8. Q3lVNIQNO09 ONY 7COMINOO OdV X04 SIOVINOO Xnv 8Z V HLM SIV ALNG SNONNILNOO 08 38v SH3NV3NG OV TW v 100AV1 WOISAHd 303 SONIMYHO TWOINVHOSN OL 33433 3SV31d LAOAW TWOISAHd 30 3AUVIN3S3Nd3M LON SI ONY SNOLLO3NNOO W3ISAS N3MOd SIOld3Q0 ONIMYNO E STvi30 TWNOLIOQv 303 NOLVIN3An2O0Q LONGOYd OL 383333 3SV3ld 83002 TVNOLVN ONY 1201 318VOllddv TW HUM AldNOD TIVHS NOLVTWISNI L S3I0N gt PENS oujoeg Jepleuyos xnv L oaAvz 98ELIASZOSZIETHJ Aq Qe no AD00S 3704 80 VOSZ pie dil INDHS 1 ki NOS S989uxalsto S9gzHX8l SEO HOJ ONLLVH 3OIA3g sna 30 SH3H10 A8 Q3Ql OHd 318v9 OV SNG ov ww GN3931 1957C 001 990 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 26 Prepare for Cables Bottom Cable Entry 1 990 1957C 001 From the rear of the UPS loosen the six M4 screws from the upper cover the cable landing area and remove Save the screws for later use Loosen the two M4 screws one on each side from the top part of the conduit box Loosen the M4 screws attaching it to the bottom part two screws in 352 mm 13 8 in enclosure three screws in a 523 mm 20 in enclosure and remove Save the screws for later use Loosen the four M4 screws two on each side from the conduit box and remove Save the screws for later use Punch as many holes as needed in the marked areas of the bottom conduit box Attach the conduit box bottom to the enclosure
9. T To XR 2 an tiisna E 22 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 1 In the UPS feed the cable up through the conduit box or through the transparent cable route bracket not shown Connect the BAT BAT N and ground cables to the busbars in the UPS Secure the cables to the perforated bracket with cable ties Equip the cable with conduits if applicable D ame D qu In the XR Battery Enclosure feed the cable up through the conduit box if applicable to the cable landing area 6 Connect the cable to busbar no 1 connect the N cable to busbar no 4 N the cable to busbar no 6 and the ground cable to the terminal in the top of the cabinet Bundle the cables using the supplied cable ties 7 Secure the cable to the perforated bracket with cable ties Attach the top part of the conduit box if applicable Connect Power Cables between Two XR Battery Enclosures WARNING Before carrying out the steps below the system must be in total power off and the batteries must be removed WARNING Each freestanding cabinet must be separately connected to the equipotential bonding system protective earthing n Note The terminals are only suitable for connection of copper cables 990 1957C 001 MGE M Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 24 nm e t XR Battery Enclosure XR Battery Enclosure F IE BAT
10. can be supplied through other vendors Dry Contacts Normally Open EPO is activated when pin 1 is connected to pins 3 and 5 Connections 2 4 6 3 5 and 1 Normally Open 24 V Normally Open EPO is activated when an isolated SELV 24 VDC voltage is supplied on pin 1 with reference to pin 2 Connections 3 5 and 4 6 Dry Contacts Normally Closed EPO is activated when a connection from pin 3 to 5 is opened Connections 4 6 24 V Normally Closed EPO is activated when a SELV 24 VDC voltage is removed from pin 3 with reference to pin 4 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 EPO in Parallel Systems In parallel systems each UPS unit must have its own dry contact voltage free connected to J108 The drawing below shows a Normally Closed installation of three UPS units in parallel WARNING For parallel and separate systems with common EPO each UPS unit must be connected to a separate dry contact WARNING Parallel EPO wiring between more UPS units can result in critical UPS malfunctioning 1 Ej UPS 1 J108 4 5 6 7 UPS 2 x J108 4 5 6 1 UPS 3 J108 4 5 6
11. lil BAT 4 49 a TON e dBAT WI a NL gt NEL Jr cm 4 H 7 ws Ay To XR 2 TTT TT T From UPS L Feed the cable up through the conduit box on XR1 or through the transparent cable route bracket not shown to the cable connection area Connect the cable to busbar no 5 the N cable to busbar no 3 N the cable to busbar no 2 in XR1 and the ground cable to the terminal in the top of the cabinet Secure the cable to the perforated bracket with cable ties Equip the cable with conduits if applicable Feed the cable up into the conduit box optional for 400 V versions on XR2 Connect the cable to busbar no 6 the N cable to busbar no 4 N and the cable to busbar no 1 in XR2 and the ground cable to the terminal in the top of the cabinet Bundle the cables using the supplied cable ties Secure the cable to the perforated bracket with cable ties Attach the top part of the conduit box if applicable MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 Connect the Power Cables to the UPS Single System 10 30 kVA 208 V 25 S SN Ol dv 10 NVaIN3HS E O3OMddY Z 40 133HS SONIMVHO IWLINGNS 1931034 MOUDJQNd Ol NdY 10 ASSIVA W Y3INIINI MYOVIO INN 3NO M3ISAS 21432943 2 319NV ol Ndv 10 VN
12. provided M5 screws Install the Seismic Stabilizing Brackets Required parts 9o 9 o UPS Battery Enclosure and Transformer 8o 89 9 9 3110 mm 2 mm Eight 10 mm fittings 18 M6 nut washers One horizontal bracket Four stabilizing brackets Maintenance Bypass Panel MBP Eight 2 mm fittings 18 M6 nut washers One horizontal bracket Four stabilizing brackets 42 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 Note When MBPs and transformer cabinets are installed up against other frames it is sufficient to install only one cross with a horizontal bracket in top or lower position 1 Insert pins of the fitting into the indicated Front view mounting holes 2 Mount the brackets in the fittings and secure 990 1957C 001 352 mm 13 85 in 523 mm 20 59 in MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 43 Final Mechanical Installation Connect Battery Securing Brackets for Stability Caution Wait until the system is ready to be powered up before installing batteries Failure to do so can result in a deep discharge of the batteries and cause permanent damage the time from t
13. 00 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 2 Connect the AC input cables and the neutral to the input cable landings 3 Connect the bypass cables and the neutral to the bypass cable landings 4 Connect the output cables and the neutral to the output cable landings 5 Connect the ground cables to the studs earth symbol beneath using a screw 1 Connect battery cables BAT BAT and N to the battery cable landings Bundle the cables using the supplied cable ties 990 1957C 001 MGE M Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation L1 L2 L3 HO Le le 29 Connect the Communication Cables Prepare for Communication Cables WARNING Make sure that the UPS is completely OFF as the connectors are very close to the power busbars ferrites over the communication cables Run the cable three times through the ferrite WARNING Before connecting the communication cables place the two supplied to reduce noise K r z m 30 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 Overview of Pin Connections ooo o J106 J108 o 0 oO o O o o oO o I 9 o 9 o 9 o g o O IE o J NU Q O 100 amp ON Q D 108 pin connections Normally open EPO Norm
14. 12CL2TC38 MD7 34R W12CVT 6 mm 0 2 in 8 YA8CL2TC38 MD7 34R W8CVT 6 mm 0 2 in 6 Ss YA6CL2TC38 MD7 34R W6CVT 6 mm 0 2 in YA4CL2TC38 MD7 34R WACVT 6 mm 0 2 in YAICL2TC38 MD7 34R WICVT 6 mm 0 2 in Torque Specifications The power wiring should be torqued to 7 Nm 45 Ibf in 4 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 Fuses and Breakers Single Utility Mains System Dual Utility Mains System 990 1957C 001 Q1 Utility mains input Q2 UPS output Q3 Manual bypass MBS Mechanical bypass switch Q1 Utility mains input Q2 UPS output Q3 Manual bypass Q5 Static bypass input MBS Mechanical bypass switch QNS Q3 F UPS MBS MIB m gt oO 9 SA bee SO o o w Qt Q2 I b d No N Battery Enclosure Q3 E UPS SN MBS ME SS gt Q js PEU l TNI ee Ad Q1 ss 2 Battery Enclosure MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation Parallel System QI Utility mains input x Q3 Q2 UPS output MIB a Q3 Manual bypass Hee A bos Q5B Q4 System output A A PH n Q1B Q2B Q5 Sta
15. 150 for 1 minute battery operation 125 for 10 minutes battery operation 110 continuous bypass operation 800 for 500 ms bypass operation Voltage tolerance 160 240 V for 208 V systems 160 253 V for 220 V systems Nom output 27 8 26 2 41 6 39 4 55 5 52 5 83 3 78 7 current A Output frequency 50 Hz 40 1 Hz 3 Hz 10 Hz sync to mains 60 Hz 0 1 Hz 3 Hz 10 Hz Slew rate Hz Sec 0 25 1 Total Harmonic lt 1 5 linear Distortion THD lt 3 5 non linear Load power factor 0 5 leading to 0 5 lagging Dynamic load 5 response Output voltage 1 regulation Battery Specifications Max current at end of discharge 83 2 A at 154 V Max charging power 10 kVA 1600 W 15 kVA 2400 W 20 kVA 3200 W 30 kVA 3200 W Typical re charge time 5 hours End voltage 1 6 1 75 V cell automatic depending on load 990 1957C 001 MGETM Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 3 Recommended Cable Sizes 1 WARNING At 100 switch mode load the neutral must be rated for 200 phase current 1 Caution All wiring must comply with all applicable national and or electrical code Note The recommended cable sizes are based on an environment with an ambient Q temperature of 30 C 86 F Use stranded copper cables Utility mains input Static bypass input Connection Terminals Cable size AWG Cable lug type Crimping tool Terminal bolt diameter YA
16. 23 mm 20 in De Level the Cabinet A 1 Take the 13 14 mm wrench attached to the pallet 2 Adjust the four leveling feet and ensure that the system is level 8 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation Note Clearance dimensions are published for airflow and service access only Consult with the local safety codes and standards for additional requirements in your local area Narrow enclosure 352 mm 14 in Wide enclosure 523 mm 20 in lt pth Y 838 mm 33 in WARNING The system must be installed on a level floor The leveling feet will stabilize the cabinet but will not account for a badly sloped floor 990 1957C 001 Remove the Front Panel 1 Useacoin or similar to turn the two black lock devices on either side of the display in the direction of each other to a vertical position 2 Push the front panel upwards and pull it outwards to disengage the locking device at the top of the enclosure 3 Lift the front panel free of the two slots at the bottom of the enclosure Floor Anchoring There are two floor anchoring options that can be used depending on the requirements in the installation area For stability Reuse the L shaped brackets that secured the enclosure to the pallet during shipment for a stand alone UPS For seismic anchoring Use a baying kit that includes U shaped seismic anchoring brackets out e g if you want t
17. 57C 001 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation Insert the two taps at the bottom of the front panel into the two slots at the bottom of the enclosure 45 Worldwide Customer Support Customer support is available at no charge via e mail or telephone Contact information is available at www apc com support contact APC by Schneider Electric APC and the APC logo are owned by Schneider Electric Industries S A S American Power Conversion Corporation or their affiliated companies All other trademarks are property of their respective owners 990 1957C 001 06 2012
18. 8 Remove the front panel not shown Loosen the two screws from the cable inlet plates at the bottom plate of UPS 1 and UPS 2 and then remove the plates From UPS 1 Run the two PBus cables to the slots on the left side of the enclosure and down inside the panel From the lowest slot fish out the cables from the side panel and run these down through the cable inlet and through the round hole at the bottom Run the PBus cables to UPS 2 and to the slots on the left side of the enclosure and up inside the panel Take out the PBus cables and leave these unattached to the parallel box Run the ABus cable from the maintenance bypass panel to the slots on the left side of the enclosure and up inside the panel the same way as for the PBus cables Reattach the cable inlet covers Fasten the cables with cables ties MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 Q Note Proceed the routing of cables into UPS 3 and UPS 4 if applicable UPS Units Bayed Together without Conduits E Te d e Zan EX SF EBS poole Sa A gt Ce J L Z TTE s Gd SF Bx W Remove the front panel and the top cover not shown 2 Loosen the two screws from the ca
19. 990 1957C 001 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 33 Connect Communication Cables between UPS and XR Battery Enclosure Booo J205 g i E 2 J204 J200 e Eeg bead L L l Ll Gamal NN NEES YZ l Mz N N E Eb z e jJ A ie ZZ EBRRERREERREEERREEREERRRRT 1 Feed the cable from pin connection J106 in the UPS down through the conduit if applicable 2 Run the cable up into the XR conduit and connect it to pin connection J200 in the XR Battery Enclosure 3 Ifyou use a second XR run the cable from pin connection J204 in XRI to pin connection J200 in XR2 34 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 Connect APC Communication Options Q Note The cable routing of the power chute software and the temperature sensor is identical Note The temperature sensor is provided in a plastic bag attached to the front of the UPS Q behind the front panel Remove the two screws from the cable inlet at the front and remove the cable inlet plate 2 Guide the cable through the hole in the bottom plate and up through the cable inlet I 3 Guide the cable through the side panel hole iL TORIM
20. HSRI 9 NVC daS LNOHLIN GOK VANOC 0L HdE ABOZ 1ndlno SNNW 319NIS Hd ABOZ INANI 00st AXVIVO 39N u O OSH LOLIOSAOLISED ion a A PIIUYI uva JOON ANOHIIM 39NYH2 OL 1IFPANS SI ONY NOIVNYOJNI 3IBVINAV 1S31V1 NOdN G3S E SI ONIMVEG SIHL LINI NHOS MOYA NOISSINYSd NILUYM 1nOHIIM SW3L JO IWS YO M04 SISYB 3HL SV liyd NI MO 310HM NI Q3sn YO 0390003843 031409 38 LON TIVHS ONY 3013313 M303NHOS 40 AliidOMd 3HL JYV NI3M3H SNOLVOLIO3dS ONY ONIMNHO SIHL QNnOJ9 JAIM v HdE ABOC IAdLAO WALSAS Sdf d sgn Qv QN9 My AOZL A A80C SH3HLO Ag d3OlAONd 8 1 dNI SNIVA sogauxalceo sogcuxalce9 OlldO S340S010N3 AN3LIV8 UX Y KINO NOLWYNOLINOD dNINNT YO4 31000W TIONIS l NOLLVTIVISNI 1311V3Vd YO4 Q3A0W38 38 OL V Q31V93893S 38 CINOHS 9NIBW TOMINOO ONY 9NIBW H3MOd ZL 031V93893S 38 CINOHS S318VO LNdLNO ANY LAdNI Sd LL SNIVA WMG 303 Q3AOW3H 38 OL MNT SNA 318VAOW3N OL V7 SYSHLO A8 G3IGIAONd 3NV SOM IAYO 6 SWIL dny9V8 QN3LX3 OL SdN 3HL OL Q3193NNOO SAYNSOTONA AN3LIVB YX 3004 OL dN 8 V ONO ME dvl H3IN3O HUM OQAF8 38 OL IOYNOS Dd L QNO9 M 3svHd O3lvM A009 38 OL 9NI8VO OV 9 V u3H10 4 OdV 1OVINOO O3193NNOO 3AM MY OvASOZ 38 OL INOS OV SG V 73OVEIOA SNIVN IVNIWON NO Q3SV8 SI ONIZIS 43 V388 ISN MANOLSNO 304 dhiIS TWNINYAL OL Q3HIM
21. Note Ensure that the all UPS units are in their final location prior to the installation Note Battery and utility mains power must not be connected until all other wiring has been completed oooooPbbP BPP b 990 1957C 001 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation Specifications WARNING The UPS must be supplied from a 208 120 V or 220 127 V 4W GND A 60 HZ source AC Input Specifications wea ea mas ww tmr s Ps nn m Connection Connection type 4 wire 3PH N f4 wie PH N G s Input frequency 40 70 lt I Itd lt 5 at lt 5 at fall load load Nom input current 24 3 23 0 6 4 6 2 A Max input current 26 7 25 2 40 2 38 0 53 0 50 1 80 1 75 8 A Input current 32 8 32 8 49 5 49 5 65 2 65 2 98 8 98 8 limitation A Input power factor gt 0 98 at load gt 50 correction Maximum Short Circuit Withstand kA AC Bypass Input Specifications m em maa mia mamam asa am ass Connection Connection type 4 wire f4 wie PH N G N G Input frequency 50 10 or 60 10 Hz Nom input current 27 8 A 2 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 AC Output Specifications Po 10 kVA 15 kVA 20 kVA 30 kVA za8v 2ov 28v 220v 28v 220v 20V 220V Overload capacity 150 for 1 minute normal operation 125 for 10 minutes normal operation
22. PORATION HAS BEEN EXPRESSLY ADVISED OF THE POSSIBILITY OF SUCH DAMAGES AMERICAN POWER CONVERSION CORPORATION RESERVES THE RIGHT TO MAKE CHANGES OR UPDATES WITH RESPECT TO OR IN THE CONTENT OF THE PUBLICATION OR THE FORMAT THEREOF AT ANY TIME WITHOUT NOTICE Copyright intellectual and all other proprietary rights in the content including but not limited to software audio video text and photographs rests with American Power Conversion Corporation or its licensors All rights in the content not expressly granted herein are reserved No rights of any kind are licensed or assigned or shall otherwise pass to persons accessing this information This Publication shall not be for resale in whole or in part Table of Contents IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS oret e platine dieto udin o Specifications u uuu itera estate ie tite T AC Input Specifications re diets vto si ueri ae AC Bypass Input Specifications a nr AC Output Specifications EUR D US RA AURA NS Battery Specifications oic ani it dct del aate a iiie idea ties Recommended Cable Sizes essere Connection Terminals eee od e aer ines Torque Specifications eee Eee eee im paui eee a kas si Fuses and Breakers teet aestas te aede ae
23. Single and Parallel Installation MGE Galaxy 3500 10 30 kVA 208 220 V by Schneider Electric American Power Conversion Legal Disclaimer The information presented in this manual is not warranted by the American Power Conversion Corporation to be authoritative error free or complete This publication is not meant to be a substitute for detailed operational and site specific development plan Therefore American Power Conversion Corporation assumes no liability for damages violations of codes improper installation system failures or any other problems that could arise based on the use of this Publication The information contained in this Publication is provided as is and has been prepared solely for the purpose of evaluating data center design and construction This Publication has been compiled in good faith by American Power Conversion Corporation However no presentation is made or warranty either express or implied as to the completeness or accuracy of the information this Publication contains NO EVENT SHALL AMERICAN POWER CONVERSION CORPORATION BE LIABLE FOR ANY DIRECT INDIRECT CONSEQUENTIAL PUNITIVE SPECIAL OR INCIDENTAL DAMAGES INCLUDING WITHOUT LIMITATION DAMAGES FOR LOSS OF BUSINESS CONTRACT REVENUE DATA INFORMATION OR BUSINESS INTERRUPTION RESULTING FROM ARISING OUT OR IN CONNECTION WITH THE USE OF OR INABILITY TO USE THIS PUBLICATION OR THE CONTENT EVEN IF AMERICAN POWER CONVERSION COR
24. TWHS ONY 2012313 YIGIINHIS 40 AIN3dOMd JHL JVV NIJY3H SNOlIVOLIO3dS ONY 9NIWWO SIHL QqNnON9 3MIM v Hd INdLNO W3lSAS Sdf A80 de SEN sdn sog89sx8lcco sogzuxalse TYNOILdO S340SOT0N3 AH3LIVB UX S8 SNIQN0035 WALSAS 9dV_A8 Q3d0Nd YadWNP ONIGNOG W3LSAS OVAB0Z ADSY VAIOS a 90S MOLW4XLS 9 Ss3H10 A8 Q3Q0lA0Nd ANNI SNNN x T ONIME ud A08F an SUBHLO AB 030A0 d 38 TNHS 939 YOLINONOI 300812313 ONIGNNOYD JHL S3002 TVNOLIVN ONY WOOT HUM 39NVONO2OV NI WALSAS O3AYJOQ A13LVYYd3S V SV G3TWISNI 38 TIVHS W3LSAS SIHL SL V AINO NOLVHAOIJNOO d 3NIl 303 31000W 319NIS L NOLVTIVISNI T3TIVHVd M03 Q3AON338 38 OL L V 31v93893S 38 Q1n0HS 9NIMIM IOYLNOI ANY ONIMIM YIMOd ZL 031v53893S 38 QInOHS S318v2 LNdLNO ANY 1ndNI SdQ LL SNIVW 100 304 Q3AOW3N 38 OL NI Sn8 318VAOW3N OL V SM3HI0 A8 Q3Q0lAOMd Juv SOM 318VO 6 INIL dNXOVA ON3IX3 OL Sdn JHL OL Q3193NNOO S3YNSOTONZ AM3LIVE MX UNOS OL d 8 V7 ONO ME dvl W31N3 HLM OQAP8 38 OL IOYNOS OQ 74 QNO M 3SVHd alva A009 38 OL 9NNEYI OV 9 V H3HlO 4 OdV LOVINOD Ude ME OWA OB 38 Ol 39M00S OV G V 39VL10A SNIVW TWNINON NO Q3SV8 SI NIZIS 43 V388 ISN YSWOLSND NO3 diMIS VNIWH3I OL Q3SIM 38 OL SLOVINOD Xv SZ VZ YVNOILIQOV NOLIVIN3An29OQ LONGOYd NI Q31IvI30 Sv SONILIGS W3ISAS Q38In038 HLM
25. ally open EPO return Normally closed EPO Normaly closed EPO return 24 V SELV supply SELV ground 106 pin connections Ext charging control return External control of charging Q3 active return Q3 active Battery measurement supply Battery unit quantity Max battery temperature Battery measurement return Should be used with APC XR Battery Enclosures Pins 1 to 4 are for battery measurement only applicable to MGE Galaxy 3500 XR Battery Enclosures Pins 5 and 6 are for external maintenance bypass Q3 auxiliary switch N C type When Q3 is closed signals are fed back to the UPS controller Pins 7 and 8 are for external charge control When 7 and 8 are closed the UPS charges batteries with a pre defined percentage 0 25 50 75 10094 of the maximum charging power To be used in generator applications or if special codes require control of charging When Q3 is closed signals are fed back to the UPS controller 990 1957C 001 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 31 EPO in Single Systems Connect the EPO cable using one of the following four wiring configurations 32 Note Use only 1 177 mm copper wire for the connection of the Emergency Power Off Q EPO and other optional equipment Note The UPS must be connected to either a dry contact or a 24 VDC EPO Emergency Q Power Off switch n Note The external EPO 24 VDC 1500 mA circuit
26. and busbar 3 on XR1 880 1604 between vertical busbar on the UPS and busbar 1 on XR1 880 0939 between vertical busbar on the UPS and busbar 6 on XR1 2 Install the following baying kit busbars between two XR Battery Enclosures 880 0926 between vertical busbar 4 on XR1 and vertical busbar 3 on XR2 880 0941 between vertical busbar 2 on XR1 and vertical busbar 1 on XR2 880 0940 between vertical busbar 5 on XR1 and vertical busbar 6 on XR2 990 1957C 001 MGE M Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 21 Connect Battery Power in Installations with Cables Connect Power Cables Between the UPS and the XR Battery Enclosure WARNING Before carrying out the steps below the system must be in total power off and the batteries must be removed equipotential bonding system protective earthing Note The terminals are only suitable for connection of copper cables 1 WARNING Each freestanding cabinet must be separately connected to the XR Battery Enclosure P gt T en a t en f dD ji fl ad n BAT n Me N L I a l f ii l 5 uU N i li E M1 G I REA 5 uia M H 4 BAT N a sp s 7 6 L 2 Q m le s O y Tanna
27. ble inlet plates at the bottom plate of UPS 1 and UPS 2 and then remove the plates 3 From UPS 1 Run the two PBus cables to the slots on the left side of the enclosure and down inside the panel 4 From the lowest slot take out the cables from the side panel run the cables across and through the cable inlets of the two side panels 990 1957C 001 MGE M Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 39 5 From the bottom of UPS 2 run the PBus cables to the slots on the left side of the enclosure and up inside the panel 6 Take out the PBus cables and leave these unattached Run the ABus cable from the maintenance bypass panel to the slots on the left side of the enclosure and up inside the panel the same way as for the PBus cables 8 Reattach the cable inlet cover plates 9 Fasten the cables with cable ties Note Proceed the routing of cables into UPS 3 and UPS 4 if applicable UPS Units Apart or Bayed Together with Conduits PBus cables can be run inside the enclosures and then only the ABus cable has to be run in Note When enclosures are assembled with interconnection plates and bolted together the Q a conduit if applicable 1 Remove the front panel not shown 2 Remove the top cover A Loosen the six screws of the top cover four at the front and two at the back B Lift up from the back and push forward to free the cover C Leave the cover unattached on top of the UPS s A
28. cal busbar on the UPS and busbar 6 on XR1 2 Install the following baying kit busbars between two XR Battery Enclosures 880 0926 between vertical busbar 3 on XR1 and busbar 4 on XR2 880 0940 between vertical busbar 2 on XR1 and busbar 1 on XR2 880 0941 between vertical busbar 5 on XR1 and busbar 6 on XR2 20 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 Install Busbars in 352 mm 13 85 in UPS System with the UPS Placed to the Left seen from the front UPS XR Battery Enclosure yp Battery Enclosure e 8 Lie ni LN LJ 1 e SPP 23 ub N 5 6 112 SH 4 H hs T N N 5 6 nuntii Titi o e TE T l lo ote TIT ST EXE n ol 2n 880 TED EAT H 880 0926 past N FI i 880 1604 BH 880 0941 Pe 1 LE y I 880 0939 880 0940 I 1 Install the following baying kit busbars between the UPS and XRI 880 1604 between vertical busbar N on the UPS
29. closures 23 Connect the Power Cables to the UPS sss 25 Single System 10 30 KVA 208 V nemen enne 25 Single System 10 30 KVA 480 V nee 26 Prepare for Cables ceo OE POUR EAE RR RR NAR RANTS 27 Bottom Cable Entiy uu ense pte htt e dA ER OI ukupa eec do hapa leave toga 27 Connect the AC Input and AC Output Cables 28 Single Mains rente otn b b edt ee am Sun TEN TR yau 28 DitaliMains xe ret EE Nem VT TE TO Ql Soca B aaa 28 Connect the DC Battery Cables if applicable 29 Connect the Communication Cables 1 esses 30 Prepare for Communication Cables sese 30 Overview of Pin Connections essen 31 OG iss Pies cee cee ct Ue teet tei ce tee ds t tru eso ces Ee gae eve oe qe TRI e EET e Dus oq us red 31 EPO in Single Systems utu tiet meist 32 EPO in Parallel Sy Steins sais cis nova pasa dy ie au e ede toe a pas a 33 Connect Communication Cables between UPS and XR Battery EnclosUfe eite buna ted qasaman qasaqa sa 34 Connect APC Communication Options eee 35 Connect Communication Cables in Parallel System 36 Overview of the PBus Cables seseseeee
30. enclosures on three levels 10 Position the third U shaped floor anchoring bracket under the adjacent enclosure see previous graphics and insert a minimum of two floor anchoring M8 screws not provided through the holes in the bottom of the enclosure and through the holes in the U shaped floor anchoring bracket and into the predrilled floor holes and then fasten the screws 990 1957C 001 MGE M Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 15 Install XR Battery Enclosures Option Remove the Cable Landing Cover and Bottom Plates WARNING Before carrying out the steps below the system must be in total power off and the batteries must be removed To access the cable landing area in the UPS and the XR Battery Enclosure s follow this procedure XR Battery Enclosure UPS HHOOHHA r sut Y z SSS BEEEEEEEENN z JE JE JE D BE JE j D a j D 1 Loosen the six M4 screws from the cable landing cover plate on the UPS and the XR Battery Enclosure s and then remove the plates 2 In installations with busbar connections remove the screws from the bottom plate on the UPS and
31. he battery installation time till the UPS is powered up should not exceed 72 hours or 3 days Note The battery securing brackets are only used in non seismic areas for stability and when seismic battery locks are not part of the installation gps 1 Install the batteries by pushing them all the way into the enclosure 2 Ifrequired install the battery securing brackets A to hold the batteries firmly in place NOTE Do not install the brackets the same way they were positioned when the enclosure arrived Rotate the brackets 180 and reinstall installed in front of the batteries Battery securing brackets for additional batteries can be purchased Refer to option SUVTOPT003 APC Smart UPS VT Battery Lock Kit for one Q Note Battery securing brackets are delivered with the UPS and XR Battery Enclosure and Battery Module two batteries 44 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 Reinstall the Top Cover and the Front Panel nl ED l irs Reinstall the top cover by fastening the four screws at the front and the two screws at the back Push the front panel forward until it engages the locking devices at the top of the enclosure ec ee abo ee Use a screwdriver to set the lock mechanism to the locked position 990 19
32. hee ue e es a e ee AR e Single Utility Mains System Dual Utility Mains System 5 nu eter tte ehh Nee ta Lene voe Ersten iae vetus Parallel System 4 eru te eie eer nde det eee dle irae Exe FPES Rao EFT aaa Pde EE RE ETE Fuse and Breaker Sizes in Single Systems Fuse and Breaker Sizes in Parallel Systems Minimum Breaker Settings Mechanical Installation sss CIS AN ATIC MEM Level The Cabinet carr rites etis m u Sum c da RESI E TURA Remove the Front Panel 1 1 sss eene ener ennt FIOOF Anchoring sso eoe esee a e ate ii Mt d d etd Hole Positions for a Stand alone UPS Enclosure with L shaped Anchoring Brackets a aspas Hole Positions for Up to Four UPS Units in Parallel with U shaped Anchoring Brackets uuu eee eae UG UI de E IS ee Sei V den Connect Floor Anchoring Brackets to the UPS and XR Battery Enclosure for ichs E Remove the Battery Modules Install the Baying Kit Optional for Interconnection of Enclosures and Seismic Arnichoring i scent t
33. les must be kept together If you by mistake run a cable between a PBUSI terminal and a PBUS2 terminal you will be notified by the display Note If the configuration consists of only two UPS units the terminators must be installed in UPS 1 and 2 With three UPS units the terminators must be installed in UPS 1 and 3 Bs Terminators Abus Abus Abus Abus Cc o PBus1 PBus1 ma 1A 1A 2A 1B 1B 2B 36 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 Prepare for Cables Remove the Batteries n Note See Remove the Battery Modules for information on how to remove the batteries Run the Communication Cables Three different ways of routing cables interconnection plates If the enclosures are kept apart the communication cables can be run Note The enclosures in a parallel system can be kept apart or they can be assembled with Q in conduits if applicable The routing of cables between the UPS units can be done in three different ways UPS units apart without conduits and without interconnection plates UPS units bayed together without conduits and with interconnection plates UPS units apart or bayed together with conduits and optional interconnection plates 990 1957C 001 MGE M Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 37 UPS Units Apart without Conduits and Interconnection 3
34. nI eene emen rene ee tenter enne 36 Prepare for Cables raesent eno oe eee ee aee ua a tateces 37 UPS Units Apart without Conduits and Interconnection 38 UPS Units Bayed Together without Conduits 39 UPS Units Apart or Bayed Together with Conduits 40 Install Seismic Option 7 C cccuseennnneees 42 Install the Seismic Battery LOCK sse 42 ii MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 999 1957C 001 Install the Seismic Stabilizing Brackets Final Mechanical Installation sse Connect Battery Securing Brackets for Stability Reinstall the Top Cover and the Front Panel 990 1957C 001 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation iii MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS WARNING ALL safety instructions in the Safety Sheet 990 2940 must be read understood and followed when installing the UPS system Failure to do so could result in equipment damage serious injury or death WARNING After the UPS has been electrically wired do not start it u
35. o install an XR Battery Enclosure at a later stage Minimum rear clearance is 100 mm 3 93 in and must comply with applicable national and local codes 600 mm 23 6 in is recommended Q Note Hole positions are guidelines only Note Allow for enough working space behind the enclosure for electrical work to be carried 990 1957C 001 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 9 Hole Positions for a Stand alone UPS Enclosure with L shaped Anchoring Brackets Note Recommended minimum number of screws per enclosure for the L shaped brackets is four one in each corner Recommended floor bolt size M8 Model Width 352 mm 13 85 in and 523 mm 20 59 in Minimum 100 mm 3 93 in 1 Recommended 600 mm 23 6 in i Conduit Box if applicable F 130 mm 5 1 in 650 mm 25 in 23 5 mm 0 9 in 576 6 mm 22 7 in 405 1 mm 16 in Hole Positions for Up to Four UPS Units in Parallel with U shaped Anchoring Brackets Note Recommended minimum number of floor screws for the two configurations below is 10 Model Width 352 mm 13 85 in 90 mm 3 54 in 160 mm 6 29 in 60 mm 2 36 in 60 mm 2 36 in 60 mm 2 36 in 60 mm 2 36 in
36. p Start up is commissioned to authorized personnel from Schneider Electric WARNING When the UPS input is connected through external isolators that when opened isolate the neutral or is connected to an IT power distribution system a label must be fitted at the UPS input terminals by the UPS supplier and on all primary power isolators installed remote from the UPS area and on external access points between such isolators and the UPS by the user displaying the following text or equivalent Risk of voltage backfeed Before working on this circuit isolate the UPS and check for hazardous voltage between all terminals including the protective earth Caution All electrical power and power control wiring must be installed by a qualified electrician and must comply with local and national regulations for maximum power rating Caution Wait until the system is ready be powered up before installing batteries Failure to do so can result in a deep discharge of the batteries and cause permanent damage the time from the battery installation time till the UPS is powered up should not exceed 72 hours or 3 days Note The system is designed for connection to an IT power distribution system Note The parallel cables must be run by the electrician but not attached The field service engineer from Schneider Electric will install the parallel communication box and attach all cables to the UPS units Note Up to four UPS units can run in parallel
37. re 990 1957C 001 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 13 3 On each side of the same enclosure insert a maximum of nine and a minimum of two M screws not provided through holes in the bottom of the enclosure and through holes in the U shaped floor anchoring brackets and into the pre drilled floor holes 4 Fasten the screws 5 Move the adjacent enclosure on its casters close to the enclosure with the U shaped floor anchoring brackets Note If the adjacent enclosure is on its leveling feet use a forklift or pallet jack to move it Q into position to avoid damaging the leveling feet 14 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 6 Insert the interconnection plates between the two enclosures One is positioned toward the front and the other toward the rear Notice how the wings on the interconnection plates rest in slots at the top of the inner panel 7 Align the two enclosures and level the three marked rows of bolt holes in UPS 1 with the holes in UPS 2 Push the two enclosures firmly together Bolt the two enclosures together using the six M6x25 mm screws and nuts supplied in the kit join one hole at the front and one hole at the rear of the
38. tbi eda um m Rte Tees aen S uuu E ET Cd pru e Ronda Install XR Battery Enclosures Option sss Remove the Cable Landing Cover and Bottom Plates Connect Battery Power in Installations with Busbars Isolator Installation Principle 990 1957C 001 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation Install Busbars in 523 mm 20 59 in UPS System with the UPS Placed to the Left seen from the front eene eene nennen nens e sette n nnne nens 18 Install Busbars in 523 mm 20 59 in UPS System with the UPS Placed to the Right seen from the front enne eene ene eene te tnn nen enn 19 Install Busbars in 352 mm 13 85 in UPS System with the UPS Placed to the Right seen from the front I eene een eren entente nn enne 20 Install Busbars in 352 mm 13 85 in UPS System with the UPS Placed to the Left seen from the front hene nennen eene eere r ersten tenter nen enn 21 Connect Battery Power in Installations with Cables 22 Connect Power Cables Between the UPS and the XR Battery Enclosure 22 Connect Power Cables between Two XR Battery En
39. the XR Battery Enclosure s and then remove the plates Punch holes in the bottom of the conduit boxes to fit the size of the conduit pipes 4 Attach the bottom part of the conduit boxes to the back of the UPS and to the back of the XR Battery Enclosure with four screws each if applicable 16 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 Connect Battery Power in Installations with Busbars WARNING Before carrying out the steps below the system must be in total power off and the batteries must be removed Isolator Installation Principle The isolators separate the baying kit busbar from the six vertical busbars in each XR Battery Enclosure and the N and busbars in the UPS 1 Guide the busbar with isolator through the adjacent side panels Jr IL o c e 2 Position the isolators across the vertical busbars N in this example and then fasten the isolator busbar by using the provided M5 Torx screws 3 Secure the isolator to its busbar with cable ties 990 1957C 001 MGE M Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation Install Busbars in 523 mm 20 59 in UPS System with the UPS Placed to the Left seen from the front 18 1 2 XR Battery Enclosure XR Battery Enclosure
40. tic bypass input MIB UPS B i di ali 3 Battery Enclosure PX H Q5A ak SA UPS AT na B A gt eo Battery Enclosure Fuse and Breaker Sizes in Single Systems 10 kVA 15 kVA 20 kVA 30 kVA Static bypass input 35 A 60 A 80 A 110A Q5 Manual bypass Q NOA Fuse and Breaker Sizes in Parallel Systems Q3 and Q4 in Parallel Capacity Systems Q3 and Q4 in Redundant Parallel Systems n 1 Units in parallel 10 kVA 15 kVA 20 kVA 30 KVA 110 A 175 A 225 A 350 A 6 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 Minimum Breaker Settings Duration 800 overload bypass operation Static bypass 223A input UPS output 223A Static bypass 333A input UPS output 333A Static bypass 444 A input UPS output 444 A Static bypass 667 A input UPS output 667 A For single mains systems use the higher value of mains and static bypass 990 1957C 001 150 overload normal battery operation 125 overload normal battery operation Continuously 51A MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 7 Mechanical Installation Clearance Minimum rear clearance 100 mm 4 in Recommended 600 mm 24 in Bp LEURS Top cover to ceiling ventilation 523 mm 20 in Minimum front clearance 1000 mm 39 in a Narrow enclosure 352 mm 14 in Wide enclosure 5
41. usbars between the two XR Battery Enclosures 880 0926 between vertical busbar 4 on XR1 and vertical busbar 3 on XR2 880 0941 between vertical busbar 2 on XR1 and vertical busbar 2 on XR2 880 0940 between vertical busbar 5 on XR1 and vertical busbar 5 on XR2 990 1957C 001 MGE M Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 19 Install Busbars in 352 mm 13 85 in UPS System with the UPS Placed to the Right seen from the front XR Battery Enclosure XR Battery Enclosure UPS 0 0 1 e bd m o 2 3 4 2 0 e T t NEN 5 6 i 2 4 HE 9 o ible Pl s LI 29 Md TIT nn X v o F H s NW Y 880 0926 F I 880 ej Ea L 80 1604 ld N 37880 0940 x s E 880 0939 Ez eh IL X LIE 880 0941 a Tr l m r RM a am e 880 1604 CA 1 Install the following baying kit busbars between the UPS and XR1 880 1604 between vertical busbar N on the UPS and busbar 4 on XR 1 880 0939 between vertical busbar on the UPS and busbar 1 on XR1 880 1604 between verti
42. y Modules Note Two people are needed to lift the battery modules the UPS and the XR Battery Enclosure s must be removed before interconnecting these enclosures Note When you remove battery modules start from the highest row and work your way down n Note The XR Battery Enclosures ship with two battery modules All battery modules in Remove all battery securing brackets used to secure the batteries during transport by removing the M6 Torx screws 2 Remove the blind plate 3 To release the battery from its lock mechanism gently push the battery upwards and then pull it out while supporting the battery with your other hand 12 MGE Galaxy 3500 10 30 kVA 208 220 V Single and Parallel Installation 990 1957C 001 Install the Baying Kit Optional for Interconnection of Enclosures and Seismic Anchoring 1 Caution Baying kits are required in seismic areas Remove the side panels from the enclosure s to get access to the holes in the bottom frame Q Note Make sure that the enclosures are level so that they can be anchored to each other 2 Position two U shaped floor anchoring brackets under one enclosure one on each side enclosure to inactivate the casters Therefore the enclosure must be tilted when placing the Note The U shaped anchoring brackets are 1 2 mm higher than the opening below the Q U shaped anchoring brackets under the enclosu
Download Pdf Manuals
Related Search
Related Contents
Lenco Marine 15054-001 Boating Equipment User Manual Kenroy Home 32029CAN Instructions / Assembly (Intel)HP 250 G4 Notebook PCHP 256 G4 Notebook PC Téléchargez le PDF *2030483* 2030483 Samsung Galaxy Tab S 10.5 IQ SensorNet CarboVis Sensor User Manual Copyright © All rights reserved.
Failed to retrieve file