Home
Electrolux T4900 Installation manual
Contents
1. Installation manual Technical data motor specifications T4900 T41200 Blower motor 3 phase Effect 1 1 kW Revolutions per minute 50 Hz 2800 rpm 60 Hz 3400 rpm Drum motor 3 phase Effect 1 5 kW Revolutions per minute 50 Hz 1440 rom 60 Hz 1730 rom 12 Installation manual Setup Unpacking Place the dryer in its place before unpacking it When unpacking the dryer handle it with care Positioning Place the dryer in such a way that work can be done as easily as possible by the user and the service technician alike The distance to the wall or other equipment behind the dryer should be min 500 mm However there should be free access to the back of the dryer for the purpose of servicing it Fig 1 Dryer with standard loading door Apart from the minimum distances shown on fig 1 there are no further requirements to the distance around the dryer Fig 2 Dryer with Sliding Door and tilt Apart from the minimum distances shown on fig 2 there are no further requirements to the distance around the dryer Installation manual Removal from transportation pallet 1 Demount back plates and filter door 2 Knock the two wood boards loose one in front and one in the back with a hammer fig 1 3 Demount the 4 screws holding the bars 4 Lift the dryer with pallet truck or fork lift truck and remove the bars 5 Mount the four feet in the bottom bearers fig 2 6 T41200 only Wh
2. 1314 1460 Installation manual Dimension sketch Dryer with Sliding Door and tilt Gas connection Electric connection Exhaust duct Steam inlet Steam return Heating unit 2 Delivery height excl 100 mm packaging 3 Operating panel 4 Door opening Y 940 mm CO o9 0 A B Cla Cb Co D E F G H 4900 1314 1270 2545 2045 500 930 230 330 1670 41200 1314 1460 2545 2045 500 930 230 330 1670 J K L M N P Q R S 4900 165 180 2130 410 530 1540 2660 2425 2130 41200 165 180 2130 410 530 1740 2680 2425 2130 DOTGOOO0O DOOGOOO0O ONOOOODOD OONOOOODOD ONOOOOOOD ONOOOODOD ONOOOOOOD OONOOODDOD OONOOOODDOD dA Installation manual Technical data type T4900 Heating Gas Steam Electric Cylinder volume Basic machine with Sliding Door with Sliding Door and tilt Weight net Heating unit Tilting unit Diameter Depth Cylinder Revolutions per minute Capacity Heat effect Gas heating Steam heating Electric heating Air consumption Piping Exhaust duct Gas connection Steam in Steam out Pressure drop Gas pressure See page regarding pressure Sound pressure level 900 litres 440 kg 494 kg 546 kg 39 kg 66 kg 1240 mm 770 mm 38 rpm 45
3. 8 0 50 30 20 8 0 3 The rest of 30 30 3 3 the world 18 8 0 5 65 except 18 8 0 6 30 Australia USA New Zealand a Gas type Austria A b Connection pressure c Nozzle pressure d Nozzle Installation manual Gas installation Gas valve 1 Measuring tap nozzle pressure 2 3 4 5 6 7 8 9 10 Cover plates Nozzle Cover screw Adjusting screw Controlbox gasvalve Measuring tap supply pressure Ignition electrode Flame sensor 23 24 Installation manual Electric installation AN To be carried out by qualified personnel The tumble dryer must be connected to its own fuse group circuit breaker group and main switch according to IEC 60947 Cable dimension For calculation of the connection cable dimension please refer to local guidelines Connecting the cable 1 Demount back plate C with supply disconnector grip fig 1 2 Lead cable through the cable gland to the supply disconnector fig 2 3 Connect cable as illustrated If there is a neutral conductor it must be connected to terminal N fig 3 Wiring diagrams Wiring diagrams for all heating types are enclosed the drum Wiring diagrams for the specific dryer are in plastic bag D Circuit breaker effect The sizes of the circuit beaker and the effect are shown on the following page Function check The function check is described in the back of this manual NB Correct direction of rotation
4. kg 64 kW Max 2300 m3 h 315 mm ISO 7 1 R1 max 100 Pa lt 70 dB A 900 litres 440 kg 494 kg 546 kg 50 kg 66 kg 1240 mm 770 mm 38 rpm 45 kg Depending upon steam pressure Max 2300 m3 h QO 315 mm ISO 228 1 G1 ISO 228 1 G1 max 100 Pa lt 70 dB A 900 litres 440 kg 494 kg 546 kg 42 kg 66 kg 1240 mm 770 mm 38 rom 45 kg 48 60 kW Max 2300 m3 h 315 mm max 100 Pa lt 70 dB A 10 Installation manual Technical data type T41200 Heating Gas Steam Electric Cylinder volume 1200 litres 1200 litres 1200 litres Weight net Basic machine 470 kg 470 kg 470 kg with Sliding Door 524 kg 524 kg 524 kg with Sliding Door and tilt 576 kg 576 kg 576 kg Heating unit 46 kg 50 kg 42 kg Tilting unit 66 kg 66 kg 66 kg Cylinder Diameter 1240 mm 1240 mm 1240 mm Depth 1000 mm 1000 mm 1000 mm Revolutions per minute 38 rom 38 rom 38 rpm Capacity 60 kg 60 kg 60 kg Heat effect Gas heating 82 kW Steam heating Depending upon steam pressure Electric heating 60 72 kW Air consumption Max 3000 m8 h Max 3000 m3 h Max 3000 m3 h Piping Pressure drop Exhaust duct Gas connection Steam in Steam out Gas pressure See page regarding pressure Sound pressure level QO 315 mm ISO 7 1 R1 max 100 Pa lt 70 dB A QO 315mm ISO 228 1 G1 ISO 228 1 G1 max 100 Pa lt 70 dB A QO 315mm max 100 Pa lt 70 dB A
5. 28 30 28 30 2 90 Norway NO GNH 20 8 0 5 00 Sweden SE GNL Finland FI GT Italy IT LPG 28 30 37 28 30 37 2 90 England GB GNH 20 8 0 5 00 Spain ES GNL Portugal PT GT Ireland IR Greece GR LPG France FR 28 30 37 28 30 37 2 90 Belgium BE GNH 20 25 20 25 4 00 GNL 20 25 20 25 4 00 GT Germany DE LPG 30 2 90 GNH 20 8 0 5 00 GNL 20 8 0 5 50 GT Holland NL LPG 28 30 30 2 90 GNH 20 8 0 5 00 GNL 23 SO 550 GT Austria A LPG 50 30 2 90 GNH 20 8 0 5 00 GNL GT 30 30 2 The rest of LPG the world 18 8 0 5 0 except 18 8 0 5 5 Australia USA New Zealand a Gas type b Connection pressure c Nozzle pressure d Nozzle 22 Installation manual Note Gas installation Because of the differences in gas installation regulations in European Union it is important to use the Italian language manual in Italy and Heat effect 82 kW the French language manual in France ect T41200 b C d mbar mbar mm Denmark DK LPG 28 30 28 30 3 30 Norway NO GNH 20 8 0 5 65 Sweden SE GNL Findland FI GT Italy IT LPG 28 30 37 28 30 37 3 30 England GB 20 8 0 5 65 Spain ES Portugal PT Ireland IR Greece GR France FR 28 30 37 28 30 37 3 30 Belgium BE 20 25 20 25 4 70 20 25 20 25 4 70 Table of pressures and adjustments Germany DE 30 50 30 3 30 20 8 0 5 65 20 8 0 6 30 Holland NL 28 30 30 3 3 20 8 0 5 65 25 6 30 3 3 5 65
6. Depending upon steam pressure Heat effect kW 82 82 82 60 60 72 72 Motor effect kW 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 1 1 5 1 1 1 5 1 1 1 5 1 1 1 5 1 1 1 5 1 1 1 5 1 1 1 5 1 1 1 5 1 1 1 5 1 1 1 5 Max effect kW 3 3 3 3 3 3 3 3 3 3 3 3 63 63 75 75 Fuse size A 20 16 16 20 16 16 100 100 125 125 27 Installation manual To be carried out by AN qualified personnel Function check Check that the drum is empty and the door has been closed Checking the magnet switches Start the dryer Check if the magnet switches are working properly The dryer must stop if the loading door is opened The dryer must stop when the filter door is opened Correct direction of rotation Correct direction of rotation on blower wheel The blower wheel must rotate clockwise fig 1 If the direction of rotation is not correct swop two phases on the connection terminal Final test Heat Let the dryer work for 5 minutes on a program that requires heat Then check whether the heating is working by opening the door and feeling the heat Only dryers with tilting function It is important to test the tilt function at the end Only dryers with Sliding Door Sliding Door must be capable of being opened with a force of max 10 kg 98N fig 2 If the abov
7. Installation manual Tumble dryer T4900 T41200 487 05 46 61 00 Tumble dryer N Safety instructions MN This machine is only intended for drying water washed garments Clothes that have been cleaned with chemicals flammable liquids must NOT be dried in the machine Remove clothes from the dryer as soon as they are dry This prevents them from becoming creased and reduces the risk of spontaneous ignition The machine must not be used for drying foam rubber or foam like materials The machine must not be used for drying floor mops The machine must not be used by minors The machine must not be hosed down with water The machine must not be installed or stored in an area where it will be exposed to water and or weather Mechanical electrical and gas installations and service must only be carried out by qualified personnel Report machine malfunctions to qualified service personnel as soon as possible This is important for your own safety and for the safety of others Gas dryers only The machine is not to be installed in rooms containing cleaning machines with perchloroethylene TRICHLOROETHYLENE or CHLOROFLUOROCONTAINING HYDROCARBONS as cleaning agents What to do if you smell gas Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Evacuate the room building or area Contact the laundry manager Applies only to floor mops containing poly
8. e tests points are in order the dryer is ready for use Please instruct user in correct operating procedure before leaving Please hand all instructions to user Service organisation dealer If deficiencies or errors are detected please contact your local service organisation dealer 28 y Installation manual options Dimension sketch Adaptor for direct fresh air intake 1 Adaptor kit no 988 800 0003 Steam heated dryers 2 Adaptor kit no 988 800 0004 Gas and electric heated dryers 3 Connecting branch in top bottom for fresh air intake diameter 315 mm T4900 2740 T41200 2930 i j T4900 1355 T4900 1280 T41200 1545 g T41200 1620 Dryer with Sliding Door 2450 2065 E Electrolux www electrolux com professional Share more of our thinking at www electrolux com about case studies contact 0845 077 65 65 0000
9. en pallet truck or fork lift truck is removed the 2 steel sections are disengaged Remove steel sections and the remainder from transportation pallet 14 Installation manual Dryer with tilting function Before installing the dryer follow the tilt installation manual Flexible piping connection gas heated dryers Fig 1 Due to the tilting function gas pipe A must end 30 cm before the dryer and the last piece of it must be flexible eg an approved 60 cm gas hose Flexible piping connection steam heated dryers Due to the tilting function the steam hoses must have an excessive length of 30 cm Outlet duct all heating types Fig 1 Due to the tilting function the outlet duct B must have a flexible hose 20 cm before the dryer Installation manual Mechanical installation Adjust the dryer to ensure that it is horizontal and stands firmly on all four feet the height adjustment must be as low as possible fig 1 The maximum height adjustment of the feet is 70 mm and is only to be used cautiously while removing lifting truck or fork truck Heating unit The heating unit is to be mounted on top of the dryer During transport the top plate for the heating unit is placed on top of the dryer Equally during transport the two side panels and the bracing bar A are placed in the back of the dryer fig 2 See the installation manual for the heating unit Transportation fitting
10. ion check N To be carried out by MN z qualified personnel Install a manual gas shutoff valve upstream from the dryer The gas connection to the dryer should be dimensioned to an output depending upon the kW rating of the dryer The factory nozzle pressure setting must correspond to the fuel value given on the data label Check that the nozzle pressure and fuel value agree with the values given in the table If not contact your gas supplier Bleed the pipe system before connecting the dryer After connection test all joints for leaks Note To ensure the correct amount of air to the combustion plate A must be mounted before starting the dryer Loosen the measuring branch screw 2 1 4 of a turn Connect a manometer to the measuring branch 2 See page regarding gas valve Fill garments into the drum Select a programme that uses heat Start the dryer Check the nozzle pressure see table If necessary adjust the setting screw 4 of the Note regulator under the cover screw 3 Before installing dryer with tilt Check that the gas is burning evenly and with a see section Dryer with tilting bluish flame function The function check is described in the back of this manual 20 Installation manual Gas installation Converting to bottled gas natural gas If the dryer is to be converted to another gas type the gas nozzles must be replaced Remove nozzles pos 1 Moun
11. is important The tumble dryer must be equipped with supplementary protection in accordance with heavy current regulations Installation manual Electric installation Type T4900 Heating Gas Steam Electric Voltage 200 230 240V 400 415V 400 415 440 480V 200 230 240V 400 415V 400 415 440 480V 230 240V 400 415V 400 415 440 480V 400 415V 400 415 440 480V 1 Blower motor 2 Drum motor effect kW 3AC 50 60Hz 64 SAC 50Hz 64 3AC 60Hz 64 3AC 50 60Hz 3 3AC 50Hz 3 3AC60Hz 3 3AC 50 60Hz 48 3AC 50Hz 48 SAC 60Hz 48 SAC 50Hz 60 SAC 60Hz 60 3 Depending upon steam pressure Motor effect 1 1 1 2 15 1 1 1 2 15 1 1 1 2 15 1 1 1 2 15 1 1 1 2 15 1 1 1 2 15 1 1 1 2 15 1 1 1 2 15 1 1 1 2 15 1 1 1 2 15 1 1 1 2 15 Max effect kW 3 3 3 3 3 3 3 3 3 3 3 3 51 51 51 63 63 25 Fuse size A 20 16 16 20 16 16 160 80 80 100 100 26 Installation manual Electric installation Type T41200 Heating Voltage Gas 200 230 240V SAC 50 60Hz 400 415V SAC 50Hz 400 415 440 480V SAC 60Hz Steam 200 230 240V SAC 50 60Hz 400 415V SAC 50Hz 400 415 440 480V SAC 60Hz Electric 400 415V SAC 50Hz 400 415 440 480V SAC 60Hz 400 415V SAC 50Hz 400 415 440 480V 3AC 60Hz 1 Blower motor 2 Drum motor 3
12. propylene The dryer must not be installed behind a lockable door or a sliding door In the rooms where the dryer is to be installed the door hinges must be on the outer side Installation manual Contents DimensionsketCh c c 22222224 6 Technical data 00d ar e ede a a RA 9 212 10 0 TTT A a 12 Dryer with tilting function 322 422 14 Mechanical installation c rennen nen 15 Exhaust systems cto sacro reee PRE 17 Steam Installation y xr da 18 Gas installation ie krepi 4 RARE eee 19 Electrical Installation wales 24 Function Check 27 Options Dimension sketch Adaptor for direct fresh air intake 28 The manufacturer reserves the right to modify design and material specifications without notice Installation manual Dimension sketch Dryer with standard loading door Heating unit Delivery height excl 100 mm packaging 3 Operating panel 4 Door opening 940 mm N 1290 1290 C b C c 500 CON OO Gas connection Electric connection Exhaust duct Steam inlet Steam return Installation manual Dimension sketch Dryer with Sliding Door 10 Sliding Door Door opening Y 940 Where nothing else is mentioned the dimension sketch applies to Dryer with standard loading door All measurements in mm U V 4900 1314 1270 41200
13. s During transport the transmission is secured Remove the transportation securing B by cutting the strips fig 2 16 Installation manual Exhaust system Air principle The blower creates low pressure in the dryer drawing air into the cylinder via the heating unit The heated air passes through the garments and the cylinder vents The air then flows out through a lint filter positioned immediately below the drum After this the air is evacuated through the blower and exhaust system fig 1 It is very important that the dryer gets enough fresh air see next section Fresh air For maximum efficiency and the shortest possible drying time it is important to ensure that fresh air is able to enter the room from the outside in the same volume as that blown out of the room To avoid a draught in the room it is advisable to place the air inlet behind the dryer The area of the air inlet opening must be 5 times the size of the exhaust pipe area fig 2 See table on the following page The resistance in the grating slats on the air inlet cover plate should not exceed 10 Pa 0 1 mbar The air consumption is maximum T4900 2300 m3 h T41200 3000 m3 h Note Gratings slatted covers often block half of the total fresh air vent area Remember to take this into account fig 3 The area of the inlet opening is the area through which the air can flow without resistance from grating
14. slatted cover Installation manual Exhaust system Exhaust duct It applies to the exhaust duct that e The exhaust duct must be smooth on the inside low air resistance e The exhaust duct must lead into the open e The exhaust duct must lead clear of the building as condensation may cause frost damage to the building e The exhaust duct must be protected against rain and foreign objects e The exhaust duct must have gentle bends fig 2 O e The exhaust duct must not be a shared duct between dryers and appliances using gas or other fuels as their energy source It applies to the installation of several dryers Tr on a shared exhaust duct that e The exhaust duct diameter must increase after each dryer fig 1 The table below shows the exhaust duct diameter and the necessary fresh air inlet area e The exhaust duct must have a nonreturn flap after each dryer Note It is recommended that each dryer is connected to a separate exhaust duct Service organization dealer If you have questions relating to the design of the exhaust system please contact your local dealer or service organization The exhaust duct AN diameter must not be reduced No of dryers Air outlet pipe diameter in mm Required area of fresh air inlet 0 4 y 1 6 2 0 in m2 Each dryer requires a fresh air aperture of min 624 x 624 mm 18 Installation man
15. t the supplied nozzles Dismount plate with ignition electrode pos 7 4 2 3 4 Carefully dismount flame sensor pos 8 5 T41200 Dismount both cover plates pos 9 10 6 T41200 Mount the supplied cover plates 7 Remount pos 7 and pos 8 Mount the heating unit on the dryer as described in the installation manual for the heating unit The numbers in brackets refer to the page regarding the gas valve Test run Re test run see earlier in this section Affixing the sign Place the label with the right country code on the gas label as shown below See fig 1 E Electrolux GOGO OODOOO a 555551 EP258 TYPE GAS 987222288 ELLE SERIWLNO DICE 0015980 or 10200068 POLLO 400 V aN nu 35HZ inno W E IDA a 450 w 1400 BEVA Q ag HEI CATECCAY AND PRESSUNES TDE SEIL A 20 39 50 MEE 71 ID MA gt aan NATURAL GAS Gav zu MBSA MANIF PRESSUFT 10 5 MNAP Linear nam __ MAX LOAD KG 116 37 4 1exa 0048 01 LALA 00 N H we MI A IEN ATKO nen x 21 Installation manual s x Note Gas installation Because of the differences in gas installation Table of pressures and adjustments regulations in European Union it is important to use the Italian language manual in Italy and Heat effect 64 kW the French language manual in France ect b C d mbar mbar mm Denmark DK LPG
16. ual Steam installation Before start The steam supply must be cut off and must not be under pressure Steam Steam 3 10 bar absolute pressure 130 180 C Steam forward 1 The branch pipe s branch must be located at the top of the main steam pipe to prevent condensation in the steam 2 The branch pipe must have a descending gradient and must end at a height above the inlet connecting branch D 3 Mount a shut off valve a and a strainer b in the branch pipe fig 1 Condensation return 1 It is important that the branch pipe for condensed water on return to the main condensate pipe has a descending gradient and is lower than the outlet connecting branch E Mount a strainer b in the return pipe Mount a steam trap behind the dirt collector c Then mount a shut off valve a ar N Mount pressure hoses between branch pipes and dryer hoses are not supplied fig 1 6 The pressure hoses must not hang down fig 2 Leak test 1 Leak test the system 2 Clean the dirt collectors b Function check The function check is described in the back of this manual Pipe insulation All pipes must be insulated in order to reduce risk of burning Insulation also reduces loss of Note heat to the surroundings g Before installing dryer with tilt see section Dryer with tilting function Installation manual Gas installation Test run Funct
Download Pdf Manuals
Related Search
Related Contents
Open PDF 取扱説明書 Eingeschränkte Garantie Cálculo Trabalhista - Federação dos Empregados no Comércio do Manual de instalación general hogar guillotina CoaguChek® XS System Data Sheet - BioVision KitchenAid KEBS177X User's Manual Copyright © All rights reserved.
Failed to retrieve file