Home
Technique Information
Contents
1. ebek ACCESS CONTROL FOR INTELLIGENT RING DA 04 TECHNICAL CHARACTERISTICS MONA G Cis assassine bop unatincacndatnaciue 12 V S C LOW energy ccceeeeeceeeeeeeeeeees 15 mA Maximum consumption 70 mA TIMING relay cccscceeeseeeeeeeees From 1 to 4 sec Max applicable to the relay SA Duration min pulse 40 msec Length max pulse cce 5 seconds Space min between pulses 300 msec Space max between pulses 2 seconds Space max between pulses 2 seconds Max melody ccccceeeeeeeeeeees 10 beats 9 spaces Time in self lock status 5 minutes Measures cccccceceecceeeeee ceeeeeeeees 94 x 72 x 30 mm The DA 04 connected to a doorbell to control access to any place or premises by reproducing exactly on the same ring of a previously recorded song The melody is kept in memory even after turn off the module Has self locking repetition of failed attempts Allows both recording and playback of the melody Includes leds acoustic and terminals VOLTAGE MODULE The DA 04 must be supplied with a voltage of 12 V S C adequately stabilized so we recommend not using simple feeders or rectifiers which adversely affect the operation of the module but a power supply We suggest the EF 2 or the model FE 103 which is well suited to the needs of the circuit Install a fuse and a switch as illustrated B
2. circuit will be ignored Also must respect the minimum space maximum between keystrokes etc 2 In the recording use the insert button on the motherboard suited for that role While this is produce can not provide any momentum through ring entries 3 Perform several tests with simple melodies few clicks before recording the final 4 Avoid the use of tunes codes widely used in calls to doors this will ensure further exclusive access Power supply module the LED Pwr lights Below and start recording first place Switch 1 switches battery referenced as CONTROL in the On position Immediately after the LED is On light indicating the correct circuit availability for the operation Then use the panel push button to enter the desired track If it exceeds the maximum capacity of this or any errors occur before the end of the recording the LED will also light Off To end the recording can wait for the module detects a blank space over 2 sec When which the recording will automatically be captured in memory and illuminating the LED On and Off Also can stop recording placing the switch 1 in OFF position generating the same result and work out common mode LED On and Off off From that moment on the notes will be recorded the melody introduced After recording if it is stopped automatically you must set switch 1 in OFF position and wait for the leds On and Off to turn off If you have a new recording repeat the proc
3. AC www cebek com sat cebek com DA 04 Must choose to install and tension ring as one of two entries Never connect the two inputs at the same time though the input voltages are different Nor attach a ringtone to each entry The market to ignore this warning not only void the warranty of the module but also irreversibly damage the circuit To enable this feature make sure that switches 1 and 2 are in the Off position The circuit will remain at rest On and Off LEDs off push forward to any input on the ring or on the push plate in test mode lf you enter the correct melody ring the module will automatically generate a signal of acceptance by the buzzer connected to the output and illuminating the LED On while it remains connected If composing a different tune than that stored in memory or any error occurs the module will generate a sign of denial and momentarily illuminate the LED Off The circuit supports up to five consecutive access attempts failed After these come in an auto lock preventing any operation on the module in 5 minutes or by default until you restart the power After a tune correct previous failed attempts are eliminated preventing its accumulation Likewise after 5 minutes of self locking or after restarting the module the circuit will remove the previous failed attempts return to its normal operating state Between attempts to access must wait for the Off ledsOn or are turned off If the relay is connected for e
4. ess The new tune will erase the previous one being this method Replacement the only way to remove a melody lf there is no pulse after placing the switch 1 in ON position the module will not record anything and consequently either delete the contents of memory lf you make a sustained push above 5 seconds the module will record a recording mistake Sample selection Control Recording function CONTROL OF OPERATIONS Playing the melody In memory storage module is the last track recorded for playback position the battery switch 2 switches CONTROL ON LED Off automatically after giving proper lights circuit availability for the operation After that tap the button on the board The circuit will play exactly the contents of memory illuminating the LED On and Off when the end of this Press the play button to repeat as many times as you want Sample selection Playback function Control OPERATION JOINT WORK MODE As indicated previously the DA 04 as the melody stored provide or deny access in response to keystrokes made on the ring which was installed The DA 04 has 2 inputs for connecting in parallel to the ring The entry of three terminals referenced in Example 230 V Input Connection as only acknowledge its connection fed exclusively with rings parallel to 230 VAC The two terminals referenced input as Input 3 to 24 V Just admit your connection in parallel with rings fed exclusively with voltages between 3 and 24 V DC or
5. n for a device operated at 12 V S C and one operated at 230 V C A 12V DC CONNECTION 230V CA en Normally Closed NC Normally Closed NC Normally Open No NA a Ne Common a 7 SYN ae 230V AC Normally Open No NA Common a 1 Device Load www cebek com sat cebek com 3 DA 04 ABOUT THE OUTPUT During operation of the circuit and according to its load it could happen a fluctuation or an incorrect output performance If this happens install a circuit sparking between the two relay contacts used in this connection as shown in the drawing 230 V CA CONNECTION Normally Closed NC Normally Open No NA a Common a Device Load Power load GENERAL WIGRIN MAP o E SL The feed line ring Button Control X Input 3 24V DC AC 230V AC Input Alimentation DA 04 m Power supply Il Output relay 230V AC NA NC Note Remember that you can only use one of the two ring entries common V ae ROHS amp COMPLIANT Cebek 1s a registered trademark of the Fadisel group www cebek com sat cebek com
6. oth are essential to protect the module for your own safety as reflected in the CE standard Observe the General Wiring Asked the layout of the source output a positive and negative power corresponding to the input terminal of the module shown in the drawing Make sure the installation was successful and do not activate the switch until you have read the rest of the instructions OPERATION The operation of the module can be roughly divided into two parts or concepts control of operations and their use in common job CONSIDERATIONS OF DA 04 Before turning to the description of the operations control or use in common work you must follow these instructions If the input wiring ring exceeds 50 cm use shielded cable However do not exceed 2 m installation and maximum length otherwise the circuit may operate incorrectly Please note that during operation in different parts of the module can reach 230 V circular C A so we recommend extreme care and attention during assembly and handling Ultimately the DA 04 protection from inclement weather direct excessive moisture water extreme temperatures as well as equipment or industrial parasites generating devices such as coils contactors motors fluorescent etc The switches 1 and 2 battery switches Control should never be selected at the same time in the On position Select only one of them according to your task E CONTROL OF OPERATIONS Control Operations were performed
7. through the battery of four switches incorporating the module Using the Control QS Operations can perform the functions of recording and playing the melody of access in addition to programming of the timing of the relay Control Battery Status Z Control Switches pe Operations in motherboard 7 gt O Q www cebek com sat cebek com DA 04 OPERATION The DA 04 is an intelligent circuit specially designed to control access to doors with an external ring The module after being recorded a tune in memory and then connecting it to the doorbell you ll see every keystroke made on it If the pulses correspond to the reproduction of the prerecorded melody the trigger circuit output allowing the opening of the door If the pulses do not respond to the pattern of the melody the circuit denied access The bell when connected in parallel with the DA 04 every time you press will sound masking and enhancing function of the module Only knowledge of it and the reproduction of the melody allow automatic opening of the door CONTROL OF OPERATIONS RECORD OF THE MELODY The recording of the melody is essential for module operation For reasons of subsequent recognition of the melody the DA 04 is bounded at pulse specifications described in the Specifications The effective translation of all of them can be summarized the following points 1 Make beats defined neither too short nor too long Note that if pulse is too fast the
8. xample the LED will Stay lit On remaining in that state until the output is disconnected and denying form any operation Sample selection Control Working as Normal TIMING RELAY The DA 04 lets you choose between 1 2 3 or 4 seconds the time at which the relay after a successful login you must be connected Locate the switches 3 and 4 as the combination indicated in the following picture Relay time setting Relay time setting Relay time setting Relay time setting in 1 sec in 2 sec in 3 sec in 4 sec z 34 lt 34 12 34 81234 Control m La Control m Control m Control a Buzzer If desired you can cancel the sound from the buzzer To do this disengage open the two pins of jumper JP1 JP provided by removing the factory piece If you later want to restore sound warning rejoin JP1 contacts JP1 Closed Open JP1 JP Room a Buzzer enabled Buzzer disabled OUTPUT CONNECTION The output of the DA 04 is controlled by a relay device which allows any type of load does not exceed 3 A The relay has three output terminals The normally open at rest NA the normally closed at rest NC and Common The operation of this mechanism is identical to a switch shutting down and giving way to one of the two poles of power or Opening and denying it to pass through The two terminals of this switch pseudo NA and the Common To perform the inverse function must be used and common terminals NC The following chart shows the typical connectio
Download Pdf Manuals
Related Search
Related Contents
Cape Horn Extreme 330 User Manual SMOOTHIE MAKER Philips LCD TV 42PFL7655H User`s Manual FX1000 First Step Guide JET 708457DXK Use and Care Manual Home Accents Holiday TY187-1218 Instructions / Assembly QTLMap 0.9.6 User's guide Alcatel Carrier Internetworking Solutions 4038 Telephone User Manual Copyright © All rights reserved.
Failed to retrieve file