Home

users guide - Ideal Boilers

image

Contents

1. Press reset button D for 2 seconds to repeat ignition sequence Check gas supply try another appliance cooker fire etc If no gas supply then not a boiler fault contact gas supplier Check condensate pipe is not blocked or frozen If blocked clear blockage if not possible to check contact your installer Press reset button D for 2 seconds the boiler should then re light If fault recurs this indicates an overheat condition The boiler should be turned off and your installer contacted Check if ALL radiators have thermostatic radiator valves fitted If they have contact your installer Check if ALL radiators have thermostatic radiator valves fitted If they have contact your installer r Ideal Stelrad Group pursues a policy of continuing improvement in the design and performance Ideal Consumer Helpline of its products The right is therefore reserved to vary specification without notice Tel 01482 498660 www idealboilers com j Ideal The High Efficiency Pioneers Ideal Boilers P O Box 103 National Ave Kingston Upon Hull HU5 4JN Tel 01482 492251 Fax 01482 448858 Registration No London 322 137
2. back ICOS Your Ideal users guide See reverse for icos installation amp servicing instructions When replacing any part on this appliance use only spare parts that you can be 7 4 BOILERS use reconditioned or copy parts that have not been clearly authorised by Ideal Boilers J e assured conform to the safety and performance specification that we require Do not The High Efficiency Pioneers back icos HE30 HE36 HE30 HE36 G C Appliance No 41 399 10 G C Appliance No 41 399 16 Natural Gas Only Destination Countries GB IE Introduction The icos is a wall mounted room sealed super efficient condensing boiler featuring full sequence automatic spark ignition and fan assisted combustion Due to the very high efficiency condensate is produced from the flue gases and this is drained to a suitable disposal point through the plastic waste pipe at the right lower rear of the boiler A condensate plume will also often be visible at the flue terminal Safety Current Gas Safety Installation amp Use Regulations or rules in force In your own interest and that of safety it is the law that this boiler must be installed by a CORGI registered installer In IE the installation must be carried out by a competent person and installed in accordance with the current edition of l S 813 domestic Gas Installations the current Building Regulations and reference should be made to the current ET
3. Cl rules for electrical installation It is essential that the instructions in this booklet are strictly followed for safe and economical operation of the boiler Electricity Supply The appliance must be earthed Supply 230 V 50 Hz The fusing should be 3A This appliance is intended to be connected to the supply via a double pole switch having a 3mm contact separation in both poles serving only the boiler and system controls Alternatively a 3 pin UNSWITCHED socket may be used Important Notes e This appliance must not be operated without the casing correctly fitted and forming an adequate seal e Ifthe boiler is installed in a compartment then the compartment MUST NOT be used for storage purposes e Ifthe boiler is installed with a loft air grille and roof flue the loft must not be used as a living space and care must be taken to ensure that the loft air grille is not blocked e Ifthe appliance is fitted with a twin flue system using a loft air grille and both the boiler and grille are installed within a cupboard or compartment then permanent air vents are required and care must be taken to ensure that the air vents are not blocked e Under NO circumstances should any of the sealed components on this appliance be used incorrectly or tampered with e If itis known or suspected that a fault exists on the boiler then it MUST NOT BE USED until the fault has been corrected by a CORGI registered installer or in IE a competent
4. e boiler thermostat settings are Knob Setting Flow Temperature o o c F Minimum 30 86 Maximum 82 180 To shut down the boiler 1 For short periods Set the mains on off switch A to OFF 2 For longer periods Set the mains on off switch A to OFF Switch the electricity supply to OFF For longer periods the entire system should be drained including the domestic hot water supply To relight the boiler Repeat the procedure detailed in To light the boiler Frost Protection If no frost protection is provided and frost is likely during a short absence from home leave the heating controls if fitted at a reduced temperature setting For longer periods the entire system should be drained If the system includes a frost thermostat then during cold weather the boiler should be turned OFF at the time switch if fitted ONLY The mains supply should be left switched ON with the boiler thermostat left in the normal running position Boiler Overheat Thermostat This thermostat will shut down the boiler in the event of overheating Should this occur a fault code L A will be displayed Press the reset button D and the boiler will relight If the fault recurs turn off the boiler and consult a CORGI registered installer or in IE a competent person Flame failure Should this occur a fault code F will be displayed Press the reset button and the boiler will relight If the fault recurs turn off the b
5. h our current warranty policy we would ask that you check through the following guide to identify any problems external to the boiler prior to requesting a service engineers visit Should the problem be found to be other than with the appliance we reserve the right to levy a charge for the visit or for any pre arranged visit where access is not gained by the engineer TROUBLESHOOTING TYPICAL NON PRODUCT FAULTS Boiler is not working for central heating or hot water Boiler is not working for central heating or hot water but attempts to fire by going through 3 ignition attempts Display shows F flashing Boiler is not working for central heating or hot water and the display shows LA flashing Boiler is not working for central heating or hot water and the display shows HA flashing Solution Check there is power to the boiler switch A in the ON position and displayed on the controls If not displayed then not a boiler fault contact your installer service company Check external programmer is set to an ON period and the relevant function selected i e central heating or domestic hot water Test by overriding the programmer by setting to continuous Check room thermostat for central heating or the cylinder thermostat for domestic hot water are set at the required temperature To test operation of either thermostat turn fully up If no response contact your installer
6. ion the control unit display F will show the codes O Standby no demand for heat C CH or DHW being supplied P Boiler frost protection boiler will fire when temperature is less than 3 C During ignition the LED E will flash During normal running the LED will remain illuminated Note f the boiler fails to light after 3 attempts the fault code L F will be displayed Press and hold the reset button for 2 seconds then release The boiler will repeat the ignition sequence If the boiler fails to light consult a CORGI registered installer or in IE a competent person All CORGI registered installers carry a CORGI ID card and have a registration number Both should be recorded in the Benchmark Commissioning Checklist You can check your installer by calling CORGI direct on 01256 372300 Ideal Stelrad Group is a member of the Benchmark initiative and fully supports the aims of the programme Benchmark has been introduced to improve the standards of installation and commissioning of central heating systems in the UK and to encourage the regular servicing of all central heating systems to ensure safety and efficiency THE BENCHMARK SERVICE INTERVAL RECORD MUST BE COMPLETED AFTER EACH SERVICE benchmari icos Users back Control of water temperature The boiler controls the central heating radiator temperature to a maximum of 82 C adjustable via the CH thermostat knob C Approx CH flow temperatures for th
7. oiler and consult a CORGI registered installer or in IE a competent person Condensate Drain The condensate drain must not be modified or blocked Blockage of the condensate drain caused by debris or freezing can cause automatic shutdown of the boiler If freezing is suspected and the pipe run is accessible an attempt may be made to free the obstruction by pouring hot water over the exposed pipe and clearing any blockage from the end of the pipe If this fails to remedy the problem the assistance of a CORGI registered installer or in IE a competent person should be sought Escape of gas Should a gas leak or fault be suspected contact your local gas supplier without delay Do NOT search for gas leaks with a naked flame Cleaning For normal cleaning simply dust with a dry cloth To remove stubborn marks and stains use a damp cloth and mild detergent DO NOT use abrasive cleaning materials Maintenance The appliance should be serviced at least once a year by a CORGI registered installer or in IE a competent person 1 BOILER CONTROLS Legend Boiler on off switch Thermostat knob Reset button LED nm8173 Display m o O U gt Condensate drain CAUTION To avoid the possibility of injury during the installation servicing or cleaning of this appliance care should be taken when handling edges of sheet steel components icos Users back POINTS FOR THE BOILER USER Note n line wit
8. person e This appliance is not intended for use by persons including children with reduced physical sensory or mental capabilities or lack of experience and knowledge unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety e Children should be supervised to ensure that they do not play with the appliance In cases of repeated or continuous shutdown a CORGI registered installer or in IE a competent person should be called to investigate and rectify the condition causing this and carry out an operational test after each intervention on the device Only the manufacturers original parts should be used for replacement Minimum Clearances Clearances of 165mm 6 1 2 above 150mm 6 below 15mm 5 8 at the sides and 450mm 17 3 4 at the front of the boiler casing must be allowed for servicing The minimum front and bottom clearance allowed when built into a cupboard is 5mm To light the boiler Refer to Frame 1 1 CHECK THAT THE ELECTRICITY SUPPLY TO THE BOILER IS OFF 2 Set the mains on off switch A to off and the CH thermostat knob C to maximum 3 Switch on the electricity supply to the boiler and check that all external controls e g programmer room thermostat etc are on 4 Set the mains on off switch to ON The boiler will commence the ignition sequence supplying heat to the system when required Operation In normal operat

Download Pdf Manuals

image

Related Search

Related Contents

Setting up CU-Wireless with Vista / Windows 7 (Certificate Issues  ELM3311 ELM3711  Circulaire 31458 - Circulaires.gouv.fr  Detail K2 S12000-SR Use and Care Manual  installation, operating, G1, G2, G3 & G2 trifecta  取扱説明書  ISL26134AV28EV1Z Evaluation Board User Guide    Watlow DIN-A-MITE Style B Manual  STRUT User's Guide Jean-Marc Boite, Laurent Couvreur, Geoffrey  

Copyright © All rights reserved.
Failed to retrieve file