Home

user manual

image

Contents

1. should be given to safety regulations which may apply to specific circumstances for example HSE company or government regulations In the use of signal gathering equipment each device should be used in such a manner that it will not present a personnel hazard should it inadvertently become a part of the high voltage circuit or fail to function properly SAFETY TERMS AND SYMBOLS The following safety symbols appear on the equipment N CAUTION WARNING Refer to manual AN DANGER High voltage O Mains off Mains on The following safety symbols appear in this manual connected equipment This action or procedure may be cause injury or death to WARNING the operator or other personnel if not carried out correctly This action or procedure may be dangerous if not carried N CAUTION out correctly and may cause damage to the equipment or A using applicable safety procedures CONTENTS DESCRIPTION OF EQUIPMENT Electrical Specification Supply Requirements Output Specifications Zero Voltage Interlock Output Voltage Control Overload Protection Variable overload Metering Construction OPERATION Safety Installation Operation Connections See Figure 1 Front Panel Control Functions Method of Operation MAINTENANCE STANDARD ACCESSORIES OVERALL PERFORMANCE SPECIFICATION CALIBRATION RESULTS 10 11 13 14 15 16 17 1 2 DESCRIPTION OF EQUIPMENT Electrical Specification Sup
2. will be lit The output voltage can now be increased to the desired level as indicated on the kV meter In the event of a test object failure the HV output will be automatically switched off by the protection system When the test is completed turn the regulator control knob fully anti clockwise and switch off the HV output and then the main supply Before disconnecting the test object ensure the HV connection is grounded using the earthing stick provided 13 3 1 MAINTENANCE The voltage regulator should be regularly examined particularly in respect of the brushes in order that the latter may be replaced before excessive wear has taken place The intervals between inspection and renewal of the brushes will depend upon the mount of usage However it should be remembered that extensive damage to the voltage regulator can result if the brushes are allowed to wear away to such an extent that a loss of brush pressure occurs The equipment s output cable should be kept clean and inspected regularly for damage This applies especially to the unscreened portion of the output cable Removal of Unit from Case a Remove all four M5 fixing screws from the underside of the set centre of rubber feet Place the set in the normal operating position i e with the control panel horizontal and facing upwards Remove all six panel fixing screws M6 posidrive screws nylon washers Remove the two M6 dome nuts from the l
3. 30 60 60 mA 40 80 80 50 100 100 120 17
4. BM TRADA CERTIFICATION EGISTERED FIT d w U ps H MA AGEMENT ULT LOCATION ISO 9002 OPERATING MANUAL FOR THE 30KV A C TEST SET Product High Voltage AC Test Set Type P123 g a 2 ee 30KV AC QUA l 1 4 6 wee L lt e Gi CS Valid ce Bicotest High Voltage Products Ltd Hellesdon Park Road Drayton High Road Norwich NR6 5DR United Kingdom Phone 44 1603 416 900 Fax 44 1603 416 902 enquiries nisltd co uk www nisltd co uk HIGH VOLTAGE EQUIPMENT PLEASE READ CAREFULLY BEFORE OPERATING SAFETY IS THE RESPOSIBILITY OF THE USER 1 GENERAL SAFETY STATEMENT The following safety precautions should be reviewed to avoid injury to the user and damage to the product and other products connected to it To avoid potential hazards only use this product as specified Only suitably qualified personnel should use this equipment Servicing of this product should only be carried out by suitably qualified service personnel The high voltage generated by this unit is extremely dangerous and may be fatal To Avoid Fire Hazards and Personal Injury Use the correct power supply lead Only use a suitably rated and approved power supply lead for the country of use Ensure that systems that the unit is to be connected to are dead Do not connect and disconnect leads whilst outputs are switched on Ensure that the product is grounded T
5. apacitors each capacitor should be grounded separately before connections are made or broken In the case of capacitors connected in series the intermediate terminals should also be grounded It is good practice for all capacitive devices to remain short circuited when not in use High voltage connection The HV connection to the test object must be made securely and suitable stress relief components should be used where required to keep electrical stresses within acceptable limits High voltage output clearances The high voltage output from the unit is from a screened cable with an un screened termination and adequate clearances must maintained between the following parts and any other conducting object whether earthed or not e HV output connection e Non screened part of output cable e Non grounded parts of test object Any part of the test object not connected to earth should be considered live at the test voltage Particular attention should be paid to clearances between any parts of the test object at test voltage potential and the test enclosure or barriers Refer to local safety standards for details of the clearances required 2 2 Connections See Figure 1 Before making any connections please ensure that you are aware of all hazards relating to the system and environment in which it is operating The input lead on the control unit should be connected to a suitable three pin supply connector Connect the earth lead fro
6. e should be obtained from your local heath and safety regulatory body IEEE standard 510 1983 IEEE Recommended Practices for Safety in High Voltage and High Power Testing provides a working framework for establishing safe procedures but must be read in conjunction with local regulations and accepted codes of practice The following excerpts are taken from IEEE 510 All ungrounded terminals of the test equipment or apparatus under test should be considered as energised Common ground connections should be solidly connected to both the test set and the test specimen As a minimum the current capacity of the ground leads should exceed that necessary to carry the maximum possible ground current The effect of ground potential rise due to the resistance and reactance of the earth connection should be considered Precautions should be taken to prevent accidental contact of live terminals by personnel either by shielding the live terminals or by providing barriers around the area The circuit should include instrumentation for indicating the test voltages Appropriate switching and where appropriate an observer should be provided for the immediate de energisation of test circuits for safety purposes In the case of dc tests provisions for discharging and grounding charged terminals and supporting insulation should also be included High voltage and high power tests should be performed and supervised by qualified personnel Consideration
7. ifting positions Screw on to the exposed threads of the lifting positions the tommy bars provided The set can now be lifted from the case taking care not to foul the supporting brackets 14 STANDARD ACCESSORIES Spare fuses supplied a 1 off T5A 1 inch b 1 off F10A 1 inch The following items are provided with the equipment Mains input lead 2 keys for mains ON OFF switch 5 metre earth lead fitted with clip and tag Earthing stick 2 tommy bars gt e o gt Operating Manual 15 OVERALL PERFORMANCE SPECIFICATION Insulation resistance at 1000V DC Not less than 10 megohms between mains input and frame Applied voltage test 2kV RMS for 1 minute between mains input and frame Accuracy of instruments KV meter 1 5 at full scale mA meter 1 5 at full scale H V Transformer 2 5kV RMS for 1 minute between primary and earth 2 5kV RMS for 1 minute between earthy end of secondary and earth Complete Equipment Over voltage test Equipment run for 5 minutes at 115 of normal output voltage Flash over test 6 flash overs direct to ground at 100 of normal output voltage 16 6 CALIBRATION RESULTS Equipment Serial Number Range P123 Unit meter Standard Unit meter Standard Unit meter Standard 5 5 2 10 10 4 15 15 6 kV x1 20 8 25 10 30 2 5 2 5 1 5 5 2 7 5 7 5 3 kV x0 5 10 4 12 5 5 15 10 20 20 20 40 40
8. inlet connector Earth terminal for connection to low impedance local earth HV output kV meter kV meter range switch mA meter divide by 10 switch Output control knob Key operated supply ON OFF switch HV output off switch illuminated green when output is off HV output on switch illuminated red when output is on Overcurrent trip reset switch Overcurrent trip level control mA meter Mains supply fuse 12 2 4 Method of Operation Connect the equipment as described in Section 2 2 Remove the power switch operating key before connecting the equipment to the main supply This will ensure the equipment is in the OFF position as the key is only removable in that position The key is trapped in the ON position Once the equipment is connected to the main supply the key operated switch can be moved to the ON position The following will now occur a Power ON lamp will be lit b HV OFF lamp will be lit c The variable overload reset lamp will be lit Press the variable overload reset push button thus arming the circuit The indicator lamp in the reset push button will go out thus indicating that the circuit is armed Select the desired voltage range on the kV meter and set the desired overload mA trip level Before commencing testing ensure that the regulator is in the fully anticlockwise position Depress the HV ON push button and this will close the internal circuit breaker The HV OFF lamp will extinguish and the HV ON lamp
9. m a reliable efficient earth to the earth terminal on the equipment Connect the earth hook lead to the earth terminal on the test set and place the hook on the test object s high voltage terminal IMPORTANT The output cable is only partially screened it is therefore essential that the minimum clearance of 20cm be maintained around the unscreened portion of the output cable To local earth screened part of HV cable screen limit and stress relief Supply cable unscreened part of HV cable Earth return Earth stick Test object Figure 1 Connection showing earthed test object before start of test Note The test object is shown earthed via the earth stick as it should be between tests and before any adjustment to the test object The earth stick should be removed from the test object before the test and replaced after the test is complete 10 2 3 Front Panel Control Functions A B RATING SUPPLY 115 230V CONTINUOUS 20mA 1300VA INTERMITTENT 40mA _ 5 MINS ON CIRCUIT ad 15 MINS OFF CIRCUIT Gr I g A ss 30KV A C x wy C N Z J MAINS FUSE g IN VOLTAGE SELECTOR New 230V TSA 115V T10A DANGER HIGH VOLTAGE 8 FS Bw 4 m MILLIAMPS 24 a P TRIP OA A TENA 36 OUTPUT CONTROL P123 E c H G Figure 2 Unit front panel 11 U2 zr A CTO T m FOO WD gt Mains
10. o avoid electric shock it is essential that the grounding conductor is connected to the earth ground Additional earth terminals are provided on the control unit and HV transformer that must be connected to a local earth Ensure that the unit is properly grounded before making any connections to inputs or outputs Terminal ratings must be observed to prevent fire hazards and risk of injury to the operator Consult the product manual for ratings information before making connections to any terminal It is ESSENTIAL to consult the product manual for rating information before making any connection to a terminal or terminal group marked with a warning triangle Only use fuses of a type and rating specified for this product Do not operate the unit out of its case or with any covers or panels removed Do not touch exposed connections and components when power is present Do not operate the product if any damage is suspected Refer the unit to qualified service personnel to be checked Do not operate the unit in wet or damp conditions Do not operate the unit in an explosive atmosphere If any further queries occur regarding the usage and maintenance of the equipment detailed in this manual please refer these to the supplier of the equipment in the first case or to Bicotest High Voltage Products Ltd HIGH VOLTAGE SAFETY It is essential to follow safe working procedures when working with high voltage Information on accepted codes of practic
11. or HV unit interlock to ensure that the unit cannot be switched on unless the area is secure Refer to IEEE Std 510 1983 for further details of suitable test enclosures The test area must also be identified with suitable signs Mains supply The unit must be connected to a suitable supply via an approved and suitably rated mains connector with earth connection Earthing Particular attention must be made in earthing the equipment and all earth connections must be made with substantial conductors with secure joints The earth connection on the unit must be connected to a suitable low impedance earth The earth return from the test object must also be made with a suitable conductor back to the earth point on the unit All earth connections must be able to withstand the largest fault current that may be encountered in the system Operation It is essential that safe working practices are maintained when conducting high voltage testing Safe working procedures must be implemented to accepted standards 2 1 2 1 2 1 2 2 2 1 2 3 Grounding of the high voltage output A temporary ground should be applied to the high voltage output when the circuit has been de energised using the earth stick provided When connections are made or disconnected the circuit either side of the connection should be grounded first Extra earth sticks are available from Bicotest High Voltage Products as an optional accessory If the test circuit includes c
12. ply Requirements The supply voltage will be as follows 220 240V 1 phase 50 60Hz 10 1200VA max 115V 1 phase 50 60Hz 10 6 1200VA max Output Specifications The output voltage current and duty cycle are as follows Output Voltage Output current Continuous 5 min on 15 min off P123 30kV 20mA 40mA One side of the high voltage transformer output is connected to the earth system of the equipment Zero Voltage Interlock The equipment is fitted with a zero volt interlock system on the controlling regulator This interlock prevents the output being energised unless the controlling regulator is in the minimum output position Output Voltage Control The output is controlled from zero by means of a regulating transformer The transformer is operated by means of a control knob which is located on the front panel To increase the output voltage the knob is turned in a clockwise direction 1 3 1 3 1 1 4 1 5 Overload Protection The equipment is fitted with fixed and variable overload protection circuits as standard Variable overload The variable overload protection system senses current changes in the high voltage circuit The trip level is adjusted by means of a selector switch on the front panel of the unit The switch allows the level to be adjusted from 10 110 of normal full load current in eleven steps The circuit will activate when the load current exceeds that set by the trip level selector switch The circuit
13. will respond to more slowly to changing levels of load current IMPORTANT NOTE The variable overload trip circuit does not limit the output current on short circuit Metering The equipment is provided with the following metering a A moving coil dual range kilovoltmeter monitoring the output voltage from the equipment b A moving coil single range milliammeter monitoring the secondary current of the high voltage transformer Construction The equipment is housed in a robust case with recessed carrying handles All the controls and metering are located on the front panel together with all external connections 2 1 2 1 1 1 2 1 1 2 2 1 1 3 OPERATION Safety The output from the P123 is extremely dangerous and if used incorrectly could be fatal The unit must only be installed operated and maintained by suitably qualified and trained personnel It is essential to follow accepted safety procedures and local health and safety regulations and guidelines when installing and operating high voltage equipment A risk assessment should be undertaken on both the installation and the working procedures to ensure the safety of test personnel and all other personnel Installation Test Area The unit must be installed in a suitable high voltage test area completely enclosed by walls or some type of physical barrier Appropriate controls and safety measures must be applied to this area including interlocks connected to the supply

Download Pdf Manuals

image

Related Search

Related Contents

Service Manual  GUIA DO USUÁRIO  PULSOR 300 / 350 / 400 / 500 / 400 Mt° / 600 Mt° OPERATING  SDFTA11  EXSYS EX-1163HMS-WT  Biostar U8798 Grand Owner's Manual  Mode d`emploi Chiffres clés - 55,22 kB  Samsung HG48ED890WB Manuel de l'utilisateur  10 jour en confiance - LM-Coaching-Laurent  P1-P12_PIVOT AUTO_CS3.indd  

Copyright © All rights reserved.
Failed to retrieve file