Technical specification for Development of Energy

image

Contents

1. TECHNICAL SPECIFICATION FOR Development of Energy Accounting amp Scheduling Software With Automatic Meter Reading AMR solution at SLDC Gotri TENDER NO GETCO ABT Software SLDC 50 PART II GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDAR PATEL VIDYUT BHAVAN RACE COURSE VADODARA 390 007 Seal amp Signature of Bidder INDEX CLAUSE TITLE PAGE NO NO Technical Specification TSP I Detail Scope of Work 1 Scheduling 3 2 Energy accounting 5 3 Automatic meter reading 9 4 System Design Outline 11 II Special Technical Terms and Condition 5 General 17 6 Demonstration 18 7 Right of Owner 18 8 Confidentially 18 9 Method of Project Implementation 18 10 Acceptance Certificate 18 11 Support during warranty and AMC 19 12 Future Migration 19 13 Functionality Compliance 19 14 Performance Bench Mark for SAT Guaranteed Technical 19 particulars 15 Documentation 20 Annexure A Scheduling flow chart Annexure B Energy accounting flow chart Annexure C Detail of Server installed at SLDC Annexure D Proposed Architecture of ABT system Seal amp Signature of Bidder Section Detail Scope of Work The proposed solution is broadly divided in to two parts gt Scheduling and Energy Accounting gt AMR Automatic Meter Reading 1 Scheduling It comprise of following Modules Module 1 Declared Capacity Resou
2. Intra state ABT regulations Balancing and settlement of REC shall be done based on Balancing and settlement mechanism notified by regulatory commission REC bill for the same shall be prepared and posted on website The State REC Pool A C will be incorporated Inter state Reactive energy exchange charges issued by WRPC WRLDC Resources e Processed meter data grouping into logical entities for HV and LV condition Outputs e REC Bill on weekly base Module 5 REC charges Invoice as per WRPC REC Bill WRPC WRLDC prepare Reactive energy exchange bill between interstate entities connected with state grid and available on WRPC website Reactive energy charges invoices will be prepared Resources e REC Bill available on WRPC website Seal amp Signature of Bidder 6 Outputs e Invoices for REC charges Module 6 Open access Approvals charges calculation and preparing Invoices OA approval preparation as per notified by regulatory commission as per standard format and data base for OA users Creation of various OA details report OA charges includes transmission charges system operation charges and distribution charges etc will be calculated based on the Open access regulations notified by the regulatory commission The injection drawal of OA customer shall be obtained from Energy Accounting and implemented schedules Invoice of the same shall be prepared and send to open access customers Resources e STOA schedule e STOA application details Ou
3. Times d Verify stop date time is greater than start date time e Invalid unit of Measure Seal amp Signature of Bidder 12 e Solution should have additional validations like a Replacement Flag b Replacement Overlap c Revenue Protection Check d Meter Multiplier e Zero Consumption f Serial Number g Spike Check h Interval High Low Check i Check Energy Sum j Test Mode e Solution should capture Meter Assets including Meter Serial Number Manufacture start and stop dates etc e Should Stores meter data in one 1 central repository and acts as a service to other applications users and customers Supports open technologies to allow easy integration with other systems e Should Maintains an audit trail of all changes made e Automatically edit meter data like Replace or change intervals Copy and replace intervals Add or delete intervals Factor intervals e Automatically estimate meter data like Estimate by linear interpolation Estimate by calculating average daily data Estimate using interval data for the previous day e Configure customizable VEE rules o Have pre defined validation rules that can be adjusted using parameters o Have the ability to define a new formula for validation rules using GUI o Have the ability to define a new routine for editing or estimation using GUI o Have the ability to turn on and off the VEE rules o Configure estimation routines for a specific group of meters account
4. open access schedule etc should generate the report on mouse click 5 For AMR all 250 locations the response time of two hour with total data of all meters complete in all respect Seal amp Signature of Bidder 19 15 DOCUMENTATION Four set of complete document of each module along with process chart to be submitted during SAT Documents mainly are Functional design specification User Manual Training Manual and Instruction Manual Test Report SAT performed at SLDC and signed positively by officials of SLDC PON gt Seal amp Signature of Bidder 20 Annexure D PROPOSED ARCHITECTURE OF THE ABT SYSTEM Meter 1 Meter 2 oor Data collecting Unit In Station where only one meter Data collecting Unit In Station where only one meter Data collecting Unit In Station where more than one meter Field Level A a y G Router amp Firewall Control Center level SCH USERS 1 N ABT USERS 1 N OA USERS 1 N a ae To be provided by Redundant Bidder connectivity Will be provided by SLDC Seal amp Signature of Bidder 21 Seal amp Signature of Bidder 22
5. Automatic Meter Reading AMR solution which shall fetch the data from the existing meters using special server to be provided at control center SLDC Presently there is a 1200 meter at 250 locations in Gujarat Control center hardware and software should be capable to handle 5000 meters amp 1000 locations in future The present arrangement to fetch data from meters is either by local PC at substation or using hand held MRI device Further these meter data is send to SLDC using email The location wise existing meter details are available on SLDC web site http www sldcguj com commercial abtmeterdetail 2011 DEC DEC2011 pdf 3 2 3 3 The Tri party agreement will be carried out between GETCO SLDC Successful bidder and Meter manufacturers for extending Meter protocol from Meter manufacturer to successful bidder under Non Disclosure Agreement NDA for smooth completion and working of AMR 3 4 Features Periodicity of data collection Availability of sufficient storage capacity Ability of software to integrate extract and analyze data of different make of Meters Manual automatic mode of data transmission Viewing exporting of collected data Mode of transfer of Meter data Configurable data collection engine for meters of different make Provision of On demand reading Seal amp Signature of Bidder System shall be capable of collecting data from all the Special Energy Meters SEM in sub stations at every 15 m
6. Beneficiary wise Availability and Schedule Energy Reports for the month e STOA contract report Module 2 Meter data processing The software shall process the meter data for grouping into logical entities like Generating station and Distribution Company The grouping shall be configurable by the user i e exclusively customize by user Seal amp Signature of Bidder 5 Resources e The accounting shall be based on the readings taken in SEM meters installed at interface points through AMR Outputs e Processed data grouping into logical entities wise use for UI REC bill preparation Module 3 UI Bill Accounting Unscheduled interchange energy for all the beneficiaries shall be calculated based on Intra state ABT regulations Balancing and settlement of UI shall be done based on Balancing and settlement mechanism notified by regulatory commission UI bill for the same shall be prepared and posted on website The UI will be calculated for the generating station distribution licenses and other open access users The State UI Pool A C will be balanced back to back with the Regional UI Pool A C issued by WRPC WRLDC Resources e Implemented Schedule in 15 minute blocks e Processed meter data grouping into logical entities wise in 15 minute blocks Outputs e UI Bill on weekly base Module 4 Reactive energy charges balancing and settlement of Interstate REC charges Reactive energy exchange between beneficiaries shall be calculated based on
7. M and load profile survey developer or its equivalent used by bidder for continuous technological support from original MDM and load profile survey developer without any condition and bidder has to submit this original authorization letter to SLDC 4 2 2 The bidder must have capacity to customize the MDM platform and load profile survey up to the extent of requirement of SLDC in this regard bidder has to assure SLDC during prototype presentation and development stage 4 2 3 The proposed MDM should have following functionality mainly but not limited to that 1 Data receipt 2 Data Validation and Estimating VEE 3 Aggregation and Affiliation 4 Storage 5 Interface to the other Entities 6 Reporting as per required format e Solution should be able to interface meter reads and meter events data of MDAS via multiple interfaces a CSV b XML c Web Services d Database e Solution should have built in out of the box Validating Editing and Estimation VEE e Solution should have pre defined validation algorithms based on scalar interval and time of use day meters e Solution should have ability to define profile meter for example meters at both end of the lines and validate meter reads within given range e Solution should have ability to time synchronize the drift in meters e Solution should have following mandatory validations inbuilt like a Usage of inactive meters b Meter identification c Invalid Dates
8. be read using notepad Seal amp Signature of Bidder 15 4 12 Quality Assurance All design processing testing commissioning amp inspection operation affecting the ABT Scheduling process shall be governed by quality assurance producers in accordance with the relevant standards Seal amp Signature of Bidder 16 Section ll Special Technical Terms and Condition 5 GENERAL 5 1 5 2 5 3 5 4 5 5 5 6 Bidder has to furnish demonstrate functional capability of various process cycle right from every meter data up to final revise bill as per the requirement of EIC of the project during technical evaluation of the tender within given time frame CE SLDC will be EIC of the project The bidder shall visit site with the prior intimation for assessing the detailed scope of work prior to quoting bid No claims for inadequate description of the scope shall be entertained at a later date Bidder has to comply each amp every points sub points of the all sections of functional specifications Security is the main key features for this application users need total authentication and authorization for secured application Application will be able to handle as many users as decided by EIC without compromising quality quantity amp functionality Addition Alteration modification of users will be accommodated in the application as per their right and log must be generated for each users 5 7 The bidder shall implement
9. cessful performance of complete integrated solution 11 5 The above is broad scope of support during warranty and AMC however the decision of the SLDC shall be binding to the bidder for all sort of assistance development supply replacement and services to meet the satisfactory and smooth operational and technical requirement of the project as a whole and individual module 12 Future Migration Any changes in the proposed integrated ABT solution for which need may arise in future to deploy on future platforms frontends web services has to be carried out by the successful bidder at no extra cost during contract period The necessary user license shall be provided by SLDC if applicable 13 Functionality Compliance All the Items including Hardware Equipment or supplementary software program required directly or indirectly to fulfill the functionality required for the integrated solution of this package whether mentioned here or not shall be provided by bidder at no extra cost 14 PERFORMANCE BENCH MARKS FOR SAT GUARRANTED TECHNICAL PARAMETERS 1 With 1200 meters data UI bill will be generated within 15 min 2 In future approximately 5 years 5000 meters data UI bill will be generate within 25 min bidder has to provide dummy data for testing 3 SEA All reports should be generated within 15 min 4 All other modules including scheduling amp energy accounting all generator scheduling drawl schedule of Discom
10. ch and report capabilities ABT Scheduling System Software should provide fast easy and quality search capability to locate and report any historical data It provides multiple options to search as per the user requirement 4 3 5 Plotting Of Trend The Reporting Tool should support Real Time Trend and Historical Trend using Add In that comes with the Reporting tools 4 3 6 Report as per user requirement should be generated and placed at reporting server and out side world should be allowed to take these reports from report server 4 3 7 Report must be as per user requirement based on this project and must store at report server any change modification alteration must be user friendly and version base 4 4 User interface flexibility The total solution must be web based Web user interface has the flexibility to meet the changing business needs All the users including SLDC users presently 15nos which may increase up to 25nos however system performance should not affect with the increase in the numbers of users All such users will have a prevailage to operate and execute any or all of the modules through web interface amp client login provided by vendor with proper authorization and rights Seal amp Signature of Bidder 14 4 5 Flexible data format The system should able to access retain and process the ABT meter data and schedule parameters right from 5 April 2010 for all future process and analysis It also has an ODBC Oracl
11. d meter for real time meter data acquisition Features of scheduled mode of data collection Fictitious Meters Support for both inbound and outbound communication Type of Inbound communication Support for import of meter data 3 5 Communication In the scheduled mode of data collection the software will allow reading cycles to be configured for either individual meters or groups of meters Appropriate time windows for data collection from different meters based on location type can be set The data collection could be at any one of the pre defined weekly monthly daily hourly or quarter hourly 15 minutes every minute frequency In case of daily weekly monthly frequencies system should be capable of capturing the meter data of all 96 blocks It shall be possible to logically group physical meter locations and name it as per the existing system Such meters can be regarded as Fictitious meters both outbound The software will support inbound and communication with meters At minimum inbound communication will include event notification calls for power outage and restoration events The event driven polling of meters shall enable pinpointing of faults during outages defective or stopped meter The software will support import of meter data from external sources in industry standard formats like ASCII CSV or XML It will also allow manual entry of meter data in exceptional cases only with appropriate user identifica
12. e Data Base Connectivity compliant database interface to the historian It should also offer a mechanism for importing old data from Excel csv etc 4 6 Efficient data storage and flexible data compression ABT Scheduling System Software shall include disk saving oriented mechanisms called as data compression in order to optimize the size of the data base archive without losing valuable information The system should also allow for defining the compression parameters for each tag according to the tag nature type and data criticality The setting of the data compression parameters impacts the historical database size and consequently on the hard disk storage required Data archiving to external storage and restoring from external storage shall be done without interrupting the current running of the ABT Scheduling System 4 7 Statistics Summary Data ABT Scheduling System Software should have the ability to store summary data for past years in a database for historical analysis and a Totalize function that support summary calculations like Total Average Min Max Range etc 4 8 Advanced Calculation Functions The ABT Scheduling System Software should provide facility to build modify required ABT Scheduling Calculation based on Visual Basic or Net or other latest technology 4 9 Data Archiving amp Backup Users should be able to copy ABT Scheduling data to removable media such as magnetic tape or other suitable media suppo
13. e like supplied by the supplier to the owner will be treated as confidential and shall not be used by the supplier or not released to a third party without the prior written consent of the purchaser 9 METHODOLOGY OF PROJECT IMPLEMENTATION The successful bidder shall furnish action plan with Bar chart within a period of 15 days of the date of receipt of communication about the acceptance of their offer and this period shall commence from the date of letter of intent in case the detail order is issued later The action plan shall be submitted to SLDC GETCO for approval for execution of contract The action plan shall cover preparation of URS User requirement specification and its approval preparation of DFS Detail functional specifications and its approval software development and its validation trial runs training user feed back commercial roll out hand out instruction manual etc Project implementation should be carried out without affecting work of the existing system Any network related issues within ABT Scheduling system and interfacing with existing system for complete working of the project should have to be tackled and resolved by the bidder Any special tools tackles Hardware software Man power etc required for the implementation of the project shall be arranged by the bidder 10 ACCEPTANCE CERTIFICATE Upon successful completion of all the functionalities tests to be performed at the site and on comple
14. e or other means 5 It is also proposed to get scheduled data through power exchanges directly from its web site or other means 6 State Energy Accounts shall be able to prepare without manual intervention in a prescribed formats 7 Software shall be able to schedule in case of future installation of HVDC lines 8 Data to be displayed on website in line with WRLDC as well as customized modules to be developed in consultation with SLDC 9 Software should be capable to use variety of methodology each category of Generation Beneficiaries without manual intervention Software should be capable to integrate and communicate with all stake holders through web integration 10 The necessary flowchart Annexure A for various scheduling activities are attached herewith however detail business logic for scheduling entity wise will be explained to successful bidders Seal amp Signature of Bidder 4 11 General scope of scheduling model is from Declaring Generation availability to Discom s requisition and schedule for all stake holders and revision thereof in real time as well as Day ahead with all reports and web integrated module 12 All required data entry of scheduling activities is to be done through web based application only 13 As per requisition of DISCOM s it should be automatically scheduled as per set business logic including Allocation of On bar amp Off bar available generation 14 There should be diffe
15. er those are specifically brought out in this specification or not The bidder should confirm the portability of their package on all possible major hardware amp should ensure compatibility with up gradation change in operating system server amp client Backend amp network for the life cycle of package The licensed database oracle 11g and control centre data base server Active Passive configuration will be provided by SLDC GETCO the detail of server is attached in Annexure C The proposed ABT Software should be compatible with the given database server Website module development to display above data is also a part of this project Existing Webserver amp website will be utilized for the same For interactive access to the website presently 70 users but the solution should not be restricted to this The proposed architecture as envisaged is placed at Annexure D However Bidder may submit their proposed architecture covering best technical solution for the project The control center servers provided by the bidder must be suitable rack mounted Seal amp Signature of Bidder 11 4 1 9 The vendor should provide necessary up dates compatible to upcoming new user interface backend and reporting software tools during AMC period of the product cycle The licensed tools for up gradation will be provided by SLDC 4 2 Features of Meter data Management and load profile survey 4 2 1 The bidder must have Authorization right from the MD
16. ins interval on real time basis Though currently meter data is captured on weekly basis manually and this frequency may remain same in future The system shall have sufficient capacity for storing data of all connected remote modems or Data loggers in the substations Software shall be capable of collecting data on a common data structure format from meters of various manufacturers The data logging software package should be able to integrate extract and analyze data of different make of Meters There should be provision for communicating with meter on scheduled basis or on demand basis The collected data can be viewed in the form of customized reports User can take print outs of these reports export the data into spreadsheets or convert the data in the form of flat file Intelligent modems should send the data directly to server Interval of the data transmitting should be configurable It will be pull mechanism to get data from meter The Data collection engine of the Data logging software shall be configurable for Meter of different make and shall have the ability to acquire data from Special Energy Meters Meter reading of 96 blocks will be possible in both scheduled batch mode automated as well as in the on demand mode In real time mode provision should be there to capture instantaneous and counter parameters every 15 minutes and provision to capture data on hourly daily basis User should able to configure the designate
17. ise Module 6 Bilateral schedule e Resources o Requirement from beneficiaries entities o Bilateral schedule approved by RLDC s Power exchange s e Output to be incorporated in drawl schedule as per set rules e Reports To be displayed on website generator wise trader wise link wise as per user requirement 1 1 Additional features 1 Software shall be able to handle multiple losses treatment in the state a STU network transmission loss b Pooled transmission loss Common ABT network loss 2 Merchant power plants UMPPs are having special scheduling treatment Software shall be able to do it a Scheduling of UMPP i Any UMPP has multiple LTOA MTOA beneficiaries having specific share allocation in the state as well as outside of the state ii Among the beneficiaries some uses its own dedicated network no utilization of STU network some uses dedicated network as well as STU network at a time Loss treatment is as per the use of network Some uses only STU network iii Any UMPP has some spare capacity for sale outside the state under bilateral or through power exchange iv URS of beneficiaries utilize among themselves on need basis 3 Software shall be able to schedule sale of Surplus power of generator after fulfilling the requirement of beneficiaries through bilateral as well as power exchange 4 In a web based scheduling module it is preferable to get the data of central sector directly from through its websit
18. ization and ensure but not restricted to the features explained in technical specification with achieving Guaranteed Technical parameters 4 1 General 4 1 1 4 1 2 4 1 3 4 1 4 4 1 5 4 1 6 4 1 7 4 1 8 Suitable solution shall be proposed to enable SLDC to interact through web with entities like RLDC Generation companies Distribution companies Open Access Customers IEX and PEX for information exchange The solution shall remove reduce manual intervention as far as possible Manual intervention shall be required only for verification and authentication purpose The system shall be designed in such a fashion that when there is a change in regulation methodology as per requirement of SLDC it requires only change in configuration However when there is a considerable shift in the regulations after freezing of Functional design specification and that cannot be handled by configuration changes the issue shall be discussed on case by case basis between SLDC and implementing agency The changes must be incorporated by implementing agency in such a manner that the routine activities should not be affected The offered system shall be complete with all components and software necessary for their intended purpose The design engineering development testing at works supply installation testing and commissioning at site of total system shall be deemed to be within the scope of bidder s supply irrespective of wheth
19. nterchange UI charges would be as per the RRF Regulations of the Central Commission Resources e Implemented Schedule in 15 minute blocks e Processed meter data grouping into logical entities wise in 15 minute blocks Outputs e RRF Bill on weekly base Module 10 Presentation Graphical user interface GUI amp Reporting The software shall be presented in web based GUI The flow shall be user friendly and have a customary look amp feel Raw and processed information shall be presented in both tabular and graphical formats The reporting shall be widespread including Executive Operator information Management Information Customer information Regulatory compliance information like ERC and RTI etc The design of reports shall be optimal to reduce carbon foot print of SLDC Layout and no of pages to be consumed to report specific information shall be optimized The format of reports shall be customized as per requirement of SLDC and shall be capable to incorporate changes in user friendly manner Reporting tool shall be provided for the users to generate reports by them in future Presently required reports are explained in the technical specifications However solution must be capable to generate various reports using the parameters of the proposed integrated ABT solution Flow charts for Energy Accounting is Annexed in Annexure B Seal amp Signature of Bidder 8 3 Automatic meter reading 3 1 It is proposed to establish
20. of on demand ABT meter data from field stations at SLDC on bidders demo setup using suitable mobile communication technology ABT Entire process right from ABT meter reading to issue of State Energy Accounting and UI bill covering all modules as referred in the tender The prospective bidders should consult SLDC to get logical knowhow of proposed ABT software package preferably from submission of offer So that bidder can start developing prototype demonstration with in 30 days when called for by the SLDC during technical evaluation of the bid No additional time shall be allowed to develop amp demonstrate the prototype so bidders are requested to equip themselves as early as possible Therefore prospective bidder has to understand the preliminary logic and complying with entire process right from ABT meter reading to issue of State Energy Accounting and UI bill Bidder shall make full fledged demonstration as requested for technically qualifying in the bid process failing of which the offer will be rejected 7 RIGHT OF OWNER Not withstanding anything stated above the owner reserves the right to assess bidder s capacity to perform the contract should circumstances warrant such an assessment in the overall interest of the contract and the Owner 8 CONFIDENTIALLY All information data and drawing furnished disclosed by the purchaser to the bidder supplier and all drawings calculations models technical information and th
21. rces O Submission by generator s in 15 minutes time block s in Day ahead and every revision thereof e Output o Base for every module and to be processed as per set rules e Report To be display on website generator wise Module 2 Entitlement e Resources o DC of the generator s in 15 minutes time block s in Day ahead and for every revision thereof o Share allocation from each generator s to beneficiary beneficiaries e Output o Base for requisition to be submitted by beneficiary beneficiaries and as per set rules e Report To be displayed on website constituent generator wise Module 3 Drawl Schedule e Resources o Requisition submitted by beneficiary beneficiaries o Inclusion of bilateral schedules e Output to be processed as per set rule e Report To be displayed on website constituent generator wise Module 4 Generator Schedule e Resources o Requisition submitted by beneficiary beneficiaries o Inclusion of bilateral schedules e Output to be processed as per set rule e Report To be displayed on website generator wise Seal amp Signature of Bidder Module 5 Surplus Schedule e Resources o DC of the generator s in 15 minutes time block s in Day ahead and for every revision thereof o Schedule of the generator s in 15 minutes time block s in Day ahead and for every revision thereof e Output to be processed as per set rules e Reports To be displayed on website generator w
22. rentiation between On bar amp Off bar available generation and real time scheduling is to be carried out w r t available On bar generation 15 Software shall be compatible with provisions of POC regulation RRF regulation and other regulation issued time to time 16 The software should generate log on Economic Dispatch of power for State Grid in real time as well as day ahead once schedule prepared and it should be on Index base that schedule is how much deviated from Economic Dispatch Necessary logic will be given by SLDC 2 Energy accounting It is comprise of following modules Module 1 State Energy Accounting The State energy accounting shall be done for e Availability e Schedule Energy e Plant load factor e Open access bilateral schedule and collective schedule e Incentive calculation of generating station and apportion it to respective beneficiaries etc The State energy account shall comprise calculation of Availability and Schedule Energy for each generating station and beneficiaries individually PLF and incentive calculation will be based on implemented schedule The Provisional SEA will be primed on monthly basis and posted on website It is reconciled if any observation received from stack holders Resources e Day wise DC of all Generators in 15 minute blocks e Schedule of all beneficiaries in 15 minute blocks e Incentive calculation as per PPA e STOA Schedule in 15 minute blocks day wise Reports e
23. rted by the ABT Scheduling System for Long term archiving and to retrieve archived data back into the ABT Scheduling System User oriented procedures which do not require programming or database querying skills are provided to take back up The ABT Scheduling System Software should have ability to limit access to data by user ID 4 10 Checking Simulator System should provide checking stimulator Necessary logic will be provided by SLDC This checking must be questionnaire basis and system should generate log of checking report with different logic and results SLDC will check reliability of reports and process Vendor should be responsible to do appropriate change in the process in consultation with SLDC During the various stage of process necessary check and recheck of data and output shall be carried out to ensure correct functionality For which necessary logic shall be provided to stimulate the data to avoid wrong or unreliable results at final stage 4 11 Security The ABT Scheduling System Software shall have following security features Limit the number of users for certain applications Tag Parameter level security should be possible There shall be a separate audit function which records any manual changes to either the tag configuration system configuration or any tag value These changes captured in the audit function shall reside in the server machine The audit file data should be in a log file structure which can
24. s e Define complex validation rules that would execute a series of validation routines depending on the severity of exceptions e Should have formal process for historical versions and audit trails e Should have Integrated exceptions management that provides a platform and process for you to efficiently manage work e It should be possible to enable End User Access via thin client user interface by the application of row level security to allow a given user to see only their data e System required to generate following reports These out of the box reports include the following Adapter interface status report Closed Work Queues detail report Population summary by meter read system report Population summary by read cycle report Missing reads report Physical meter events report Revenue protection usage events report Usage exceptions report e Generation of MIS reports based on the results of data analysis integrate with third party reporting tools like Oracle BI Publisher e MDMS to integrate with AMR and AMI support one way and two way communication with meters Seal amp Signature of Bidder 13 e Ability to create virtual meters net meters addition substation of group of meters measurements 4 2 4 Load profile survey or its equivalent standard software should be capable to perform all the requirement of scheduling and Energy accounting specifified here after in technical specification The software must have following capacity bu
25. t not limited to this e Ability to calculate UI Unscheduled Charges based on ABT tariff for market participants based on the frequency and regulation e Ability to store ABT tariff and make changes as per regulator guide lines e Ability for solution to add validation checks like Cap rate open access energy and other specified by SLDC time to time e Generating various profile as per user requirement based on UI billing and Meter data e Self validating as per pre define criteria and generating log of this e Any addition modification alteration in user friendly way and version base e Use of Integrated data in required format from web for the different Entities 4 3 Data Reporting 4 3 1 Reporting tool should be used like BI publisher of Oracle or its equivalent versatile and proved one for the various reports creation web integration of reports 4 3 2 The bidder must have Authorization right from BI publisher or its equivalent developer used by bidder for continuous technological support from original developer without any condition and bidder has to submit this original authorization letter to SLDC 4 3 3 General data report The formats of the report will be finalized while defining User Requirement Specifications URS and Detail Functional Specifications DFS This need to be customization in due course after running the software and gaining some experience on implications of ABT Scheduling based operation 4 3 4 Sear
26. tem It shall also be possible to recover the data from external storage in case of failure of server Further it shall be possible to do data backup amp restoration to from DVD Tape External HDD based storage devices The same has to be carried out during warranty support and AMC period 5 12 It shall also be capable to receive amp process simultaneous request from multiple users for generating and managing different types of specified reports e g historical trending etc The Database shall be relational data base which shall be queried through SQL etc and shall be suitably sized for complete data storage Disaster Recovery Database shall be able to store data from software and processed data with suitable automatic backup at some suitable remote location identified by SLDC for disaster recovery as planned in future 5 13 Vendor shall study the specifications available in detail and with GETCO coordinator or SLDC will explain the system requirements to the best of his knowledge The missing links and details in the specifications or any processing or functional requirements discovered at the time of testing should NOT be treated as out of scope 5 14 There must be provision for following in the software as per the requirement Events and alarms Executive Dashboard Data analysis and charting Seal amp Signature of Bidder 17 6 DEMONSTRATION The bidder needs to make full fledge prototype demonstration of AMR Collection
27. the present methodology and likely to implement must be 5 8 5 9 incorporated in the software The software should have a provision to retain all updates as version with associated effective date so as to facilitate processing of past data as needed Any Enhancement or renewal of the software licenses will be in the scope of Bidder Dealing with any third party vendor supplier for third party software hardware supply issues will be in the scope of Bidder 5 10 Database administration amp its related activity like database backup updating amp deletion will be in the scope of bidder The optimal online retention period shall be minimum 5 years 5 11 Data Storage retention Period Backup and Restoration And Disaster Recovery Data storage server shall be used to perform Information Storage archival and Retrieval functions The methodology adopted for retrieving data both within and outside retention period is to be provided by bidder as per user requirement The design architecture of database should support the redundancy feature of oracle It shall operate in a primary standby redundancy mode i e if primary server crashes the standby automatically takes over it Data storage server shall also perform the task of taking backup on the external storage devices such as disk arrays tape libraries and optical jukeboxes etc connected in the network in such a way that the devices appear as locally attached to the operating sys
28. tion security and audit trail The input sources of meter data could be DCD Data Collection Device CMRIs Common Meter Reading Instruments The communication between Meters to Control centre has to be arranged by bidder and the whole responsibility from initial establishment to complete AMC period is in the scope of bidder only However as per TRAI rules the ownership of link will be on the name of CE SLDC and necessary SLA Service level Agreement for 99 guaranteed up time with Communication Company will be done by SLDC The bidder has to coordinate all things right from application to bill payment and operating SLA on behalf of SLDC ensuring satisfactory services 3 6 Wiring and cabling 3 7 Site Survey Seal amp Signature of Bidder All inter connection wiring with required capacity cable etc for AMR Will be in the scope of the bidder at all meter sites Site survey of existing meters site for the AMR will be in the scope of the bidder and bidder should provide AMR solution with existing meters and this should be clearly mentioned in their prototype and proposal 10 4 System Design Outline In order to address reliable integrity and support bidders should develop their solution on standard product like Meter data Management and load profile survey and billing settlement utilities and BI publisher of Oracle or equally versatile renowned time tested and proven platform referred at clause 4 2 and 4 3 with necessary custom
29. tion of a successful trial run the engineer in charge of SLDC shall issue an acceptance certificate to the bidder Seal amp Signature of Bidder 18 11 SUPPORT DURING WARRANTY AND AMC 11 1 The bidder shall provide 1 one year warranty amp five year AMC from the date of acceptance of the package 11 2 The developer need to maintain update and fine tune all the modules sub modules during AMC as suggested by SLDC from time to time This will also include regular backup and restore of data as the need arise for revision of the past bill etc during the AMC period Developer should demonstrate and maintain all performance parameters indicated in the tender document during warranty and AMC period failing to which penalty shall be imposed and SLDC reserve the right to impose quantum of penalty rate depends upon severity of unavailable unreliable modules All arrangements shall be made in advance by developers to avoid such phenomena because 100 availability and reliability of all modules is the mandate of the project 11 3 During warranty and AMC period in which physical presence of competent technical person is required at control centre SLDC on working days during business hours During emergency the said timing and holiday shall not be applicable 11 4 AMC include upkeep maintenance maintaining required spare repair or replacement of all hardware s at control center and field level without any financial implication on owner to suc
30. tputs e STOA e STOA details report as per customized by SLDC e Invoices for various charges to STOA users Module 7 Wind energy allocation and certification SEM Meter data are received from WF pooling station at SLDC same meter reading to be processed in software and derived energy to be sent to GEDA for wind developer wise energy bifurcation From GEDA submission Beneficiary wise allocation is to be incorporated in UI bill Wind certificate will be prepared monthly from the same data and to be posted on website Also it is to be incorporated in SEA bill for different Discom set off as per their allocation Resources e Processed meter data grouping into logical entities wise in 15 minute blocks e GEDA wind allocation Reports Outputs e Wind certificate e Wind data in SEA bill Module 8 Transmission Loss calculation for the state e State Transmission Loss Loss calculation for the state boundary using Field data of various interface points i e Generation to Transmission Transmission to Distribution Same data should be entered and corrected at GETCO Circle offices within defined time duration Seal amp Signature of Bidder 7 Resources e Meter data entry to be carried out at GETCO circle offices as per joint meter reading sheet prepared in presence of GETCO DISCOMs representatives Outputs e State Transmission Loss Module 9 RRF Accounting The scheduling metering energy accounting and accounting of Unscheduled I

Download Pdf Manuals

image

Related Search

Related Contents

Samsung 400TS-3 Lietotāja rokasgrāmata  Page 1 Verlegung der Wärme- und Trittschalldäm  ARRI ALEXA Pocket Guide  Sample Probe Module, SPM, User`s Manual  アクリル板彫刻加工  FR MODE D`EMPLOI AnaConDa ® (Anaesthetic Conserving Device  Le mieux est l`ennemi du bien, soulager la  USER`S MANUAL - Icon Heath & Fitness  Swingline LongLife  salva - Restoconcept.com  

Copyright © All rights reserved.
Failed to retrieve file